CN201280693Y - Totally enclosed hanging basket - Google Patents
Totally enclosed hanging basket Download PDFInfo
- Publication number
- CN201280693Y CN201280693Y CNU2008201498527U CN200820149852U CN201280693Y CN 201280693 Y CN201280693 Y CN 201280693Y CN U2008201498527 U CNU2008201498527 U CN U2008201498527U CN 200820149852 U CN200820149852 U CN 200820149852U CN 201280693 Y CN201280693 Y CN 201280693Y
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- die platform
- bottom die
- anchor
- totally enclosed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a sealed hanging cradle, comprising a running system and an anchoring system. The running system tows a bearing device connected with a bed die platform which is connected on the bearing device and a cast box girder through a suspension system; a sealed protecting system is arranged along the circumference of the bed die platform; the anchoring system anchors the bearing device on the cast box girder; the sealed protecting system comprises a hanging cradle top cover and a hanging cradle circumference protecting structure; and the sealed protecting system and the bed die platform together make up a totally sealed construction room which can seal the cast-in-place concrete in the construction, thus preserving the quality of the concrete in indoor condition and avoiding the fear of heights of the operators. The hanging cradle simply and conveniently realizes the assembling, forward moving, anchoring and retreating of the hanging cradle, and can be suitable for the occasion that as the place below the construction site has a highway or a railway line, the hanging cradle can not be disassembled above the highway or the railway line.
Description
Technical field
The utility model relates to field of bridge construction, especially a kind of totally enclosed type Hanging Basket and adopt this Hanging Basket to carry out the job practices of concrete suspension casting.
Background technology
The bridge construction Hanging Basket is to be used for the cast-in-place a kind of equipment of concrete bridge cantilever.The construction Hanging Basket that uses in the cantilever casting construction of China's beams and prestress concrete continuous (structure beam just) adopts the functional form design more, as long as satisfy intensity, rigidity, stability, the deadweight requirement for restriction of structure.It is a kind of opened type Hanging Basket, and security protection is also only for conventional guardrail, protective screening, and the dismounting of Hanging Basket requires overall pulling down on the spot.Consider the requirement of safety, environmental protection, standardization construction, semi-enclosed Hanging Basket just arises at the historic moment.Chinese patent 200720032252.8 discloses a kind of semi-enclosed Hanging Basket, and this Hanging Basket is provided with dense mesh around it, fall in Hanging Basket to prevent article; This Hanging Basket also has lightning protection device, the injury that can prevent to get an electric shock and bring to Hanging Basket and constructor; Simultaneously, this Hanging Basket also is provided with dewatering installation in the bottom, avoids taking place in the Hanging Basket seeping phenomenon.Adopt this semi-enclosed Hanging Basket to carry out cantilever construction, many-sided advantage is arranged: (1) is difficult for dropping instrument, material and causing security incident from Hanging Basket; (2) improve operating personnel's working environment, improve work efficiency; What (3) outward appearance appeared is clean and tidy scaffolding structure, environmental.But this Hanging Basket still has following defective: (1) its structure is semi-enclosed structure, and the Hanging Basket top is sealing not, and air can enter Hanging Basket by Hanging Basket top and gauze wire cloth all around, is unfavorable for concrete health.(2) dismounting of Hanging Basket still needs overall pulling down on the spot, can not retreat away to walk to more suitably position dismounting.When construction below required occasion that Hanging Basket can not remove up for the railway network etc., existing Hanging Basket can not adapt to the dismounting requirement.(3) the lightning protection device copper lead hingedly that is provided with the straight-through stake end separately, cost is higher.
The utility model content
The purpose of this utility model provides a kind of totally enclosed type Hanging Basket, and this Hanging Basket enclose inside is for concrete health provides good environment.
For achieving the above object, totally enclosed type Hanging Basket totally enclosed type Hanging Basket of the present utility model, comprise walking system, bottom die platform and anchor system, the walking system traction is connected with load carrier, bottom die platform is connected load carrier by hangar system and has watered on the case beam, be provided with the sealing guard system along the bottom die platform periphery, anchor system is anchored at load carrier and waters on the case beam, described sealing guard system comprises Hanging Basket top cover and Hanging Basket periphery safeguard structure, and sealing guard system and bottom die platform surround totally enclosed construction space together.
As a kind of improvement of the present utility model, this Hanging Basket includes anti-shock device, and anti-shock device connects reinforcing bar ground connection in the bridge beam body with lead.
As another kind of improvement the of the present utility model, this totally enclosed type Hanging Basket also includes the drainage system that is arranged on the bottom die platform.
As further improvement of the utility model, described load carrier comprises the connection structure of main truss sheet and main truss sheet; Described suspended basket system comprises ground connection Hanging Basket aisle beam, the power set that are connected with the Hanging Basket traction, slide anchor after being located at sliding beam in the middle of the bottom die platform and the traveling of cunning beam, sliding anchor comprises the sliding anchor davit of traveling, the sliding anchor spike of sliding anchor framework and back after the sliding beam traveling, also be fixed with a pull bar on the sliding anchor framework, during suspended basket, the sliding anchor in back is rigidly connected on the case beam, after suspended basket put in place, the sliding anchor in back was by the dilatory playback of pull bar; Hangar system is lifted on bottom die platform on the load carrier, comprise preceding top rail, preceding suspender belt and back strap, more than the lower end of each suspender belt all be connected on the bottom die platform and preceding suspender belt upper end be connected before on the top rail, the back strap upper end is connected in pours into a mould Liang Tishang, preceding top rail is installed on the main truss sheet, and preceding suspender belt is connected on the main truss sheet by preceding top rail; Lower transverse beam and back lower transverse beam before bottom die platform includes.
As further improvement of the utility model, described power set comprise above structural dynamic device of beam face that is connected with the traction of main truss sheet and the following structural dynamic device of beam face that is connected with the bottom die platform traction.
The utlity model has following advantage:
Sealing guard system and bottom die platform surround totally enclosed construction space together, in the cast-in-situ concrete in the construction is closed in, can avoid circulation of air during health, thereby reach the effect of the indoor health of concrete.The operating personnel can't see the outer environment of Hanging Basket simultaneously, thereby eliminates the fear that work high above the ground brings.
This Hanging Basket also includes anti-shock device, and anti-shock device is used the reinforcing bar ground connection in the bridge beam body.Utilize the interior reinforcing bar of bridge beam body to draw copper conductor and be connected in Hanging Basket as anti-shock device, realized the Hanging Basket electricity-preventing function easily and reliably, cost is lower.
The setting of drainage system makes in the construction can discharge Hanging Basket with water easily.
When the structure of this suspended basket system makes suspended basket, can be by tightening the sliding anchor screw rod in back, by pretension the sliding anchor in back is rigidly connected on the case beam, and unconventional being hinged, thereby this is more steady will make suspended basket the time, reduce to rock and reduce the adverse effect of traveling dynamic load to cradle structure; After suspended basket put in place, the sliding anchor in back was by the dilatory playback of the pull bar of artificial traction, easy-to-operate.
Description of drawings
Fig. 1 is the structural representation of totally enclosed type Hanging Basket of the present utility model;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is that Hanging Basket retreats the right view when walking;
Fig. 5 is the structural representation of sliding anchor after the suspended basket;
Fig. 6 is the right view of Fig. 5.
The specific embodiment
To shown in Figure 6, totally enclosed type Hanging Basket of the present utility model comprises load carrier, hangar system, back anchor system 4, walking system, sealing guard system, bottom die platform and drainage system, anti-shock device, internal mold and support 6 as Fig. 1.
Shown in Fig. 1 to 4, load carrier comprises the connection structure 2 of main truss sheet 1 and main truss sheet 1, and connection structure 2 connects into an integral body with the composition purlin sheet of main truss sheet 1.
Hangar system is used for the beam face is lifted on the load carrier with the lower part, top rail 301, preceding suspender belt 302, preceding suspender belt 303 and back strap 304, back strap 305 before comprising, more than each suspender belt lower end all be connected on the bottom die platform and preceding suspender belt 302,303 upper ends be connected in before on the top rail 301, preceding top rail 301 is installed on the main truss sheet 1, and preceding suspender belt 302,303 is connected on the main truss sheet 1 by preceding top rail 301.The upper end of back strap 304,305 is connected in pours into a mould Liang Tishang.
Walking system is slided anchor 709 after comprising sliding beam 706, Hanging Basket aisle beam 701, the above structural dynamic device 702 of beam face, the following structural dynamic device 707 of beam face and the sliding beam traveling that is located at the bottom die platform centre.As shown in Figure 5 and Figure 6, slide that sliding anchor 709 comprises the sliding anchor davit 7092 of traveling, the sliding anchor spike 7093 of sliding anchor framework 7091 and back after the beam traveling.Also be fixed with the sliding anchor tie 7094 in a back on the sliding anchor framework 7091, the other end of pull bar is a free end, and during suspended basket, the sliding anchor in back is rigidly connected on the case beam, and after suspended basket put in place, the sliding anchor in back was by the dilatory playback of pull bar.
The sealing guard system can be divided into three parts: the one, and Hanging Basket bottom surface enclosed construction 8012 and circumferential safeguard structure 8011, two, sliding anchor enclosed construction 802, three after the traveling, Hanging Basket top cover 803, each several part all are made up of support, panel.Bottom die platform comprises preceding lower transverse beam 501, back lower transverse beam 502 and two-layer up and down, and lower floor is a bottom surface enclosed construction 8012, and the upper strata is a Hanging Basket bed die 504.Bottom surface enclosed construction 8012 is connected on preceding lower transverse beam 501 and the back lower transverse beam 502.Sealing guard system and bottom die platform constitute totally enclosed construction space together.The template of Hanging Basket bed die 504 double as concrete constructions, bottom surface enclosed construction 8012 prevent that with the sealing guard system foreign material from dropping out Hanging Basket as the overcoat of operation.
Drainage system comprises the charge for remittance ditch 901 that is located at the bottom die platform outside and is located at collection box 902 on the bottom die platform.Charge for remittance ditch 901 is connected with collection box 902 by steel pipe, is used for water is collected into collection box 902.To being provided with a plurality of gutters 903, gutter 903 can be set as different numbers as required along bridge in collection box 902 bottoms.
Utilize the reinforcing bar 1001 in the bridge beam body to make anti-shock device, in the beam body of bridge agent structure reinforcing bar 1001 is arranged, draw copper conductor 1002 from 1001, be connected in Hanging Basket, whole device plays the effect of the anti-electricity of Hanging Basket.
During the assembly unit Hanging Basket, the first step is the Hanging Basket each several part on spliced girder face on the case beam of having constructed, the above structural dynamic device 702 of Hanging Basket aisle beam 701, Hanging Basket beam face that comprises walking system, main truss sheet 1, bracing 2, hangar system 3, back anchor system 4 and Hanging Basket top cover 803; Hanging Basket each several part below assembly unit Bridge Beam face on ground or the support comprises bottom die platform, circumferential safeguard structure 8011, the following structural dynamic device 707 of beam face and drainage system; Second step was to use whole lifting of Hanging Basket part below lifting instrument such as the jack beam face that assembly unit in the first step is good, and with this part Hanging Basket with water case beam 11 and be connected; The 3rd step was that bottom die platform is connected with hangar system, made main truss sheet 1 bear Hanging Basket weight by hangar system; The 4th step was to remove the following Hanging Basket part of beam face and water being connected of case beam 11, finished the system conversion.The 5th step was assembling reinforcement, and prestressed bundle and pipeline thereof are installed internal mold and support 6; Copper conductor 1,002 one ends are connected with case beam steel 1001, and the other end is connected with Hanging Basket, finishes ground device, and Hanging Basket assembly unit is so far finished.
After finishing, the Hanging Basket assembly unit can build, and the same with common Hanging Basket, whenever to build and finish a sections, Hanging Basket relies on the traveling forward of its walking system, so that build next sections.
Suspended basket of the present utility model can realize like this: the method that described Hanging Basket is walked forward comprises four steps, the first step is to pass case beam preformed hole 1101 the sliding anchor davit 7092 of traveling is tightened against sliding anchor framework 7091, makes the sliding anchor spike 7093 in back embed preformed hole 1101 and be pressed in the beam body.Second step was active section 8032 to be set to adapt to the needs of traveling, transport of materials etc. below Hanging Basket top cover 803 end plates 8031.Make upwards slippages of active section 8032, loosen suspender belt 302,303 before the hangar system simultaneously, back strap 304,305 makes disengagement between the sliding anchor enclosed construction 802 and Hanging Basket top cover 803 after the traveling.This moment, bottom die platform produced downward displacement, thereby the demoulding as shown in Figure 4 falls within on the sliding anchor 709 in back to sliding beam 706 rears.The 3rd step was to remove back strap 304,305, removed back anchor system 4.The 4th step was to start the suspended basket system, and main truss cradle sheet 1, bottom die platform (band sealing guard system) are drawn by power set 702,707, thereby made whole Hanging Basket vertical shift forward.
After suspended basket puts in place, enter casting process.Anchor system 4 behind the Hanging Basket is set earlier, screws out the sliding anchor davit 7092 of traveling, utilize the sliding anchor tie 7094 in back will slide anchor and retract near the lower transverse beam 502 of back, tighten the sliding anchor davit 7092 of traveling at the preformed hole place again.In the traveling process, because the existence of sliding anchor protection 802 after the traveling, the sliding anchor 709 in back is within the Hanging Basket protection system all the time.
As shown in Figure 4, after the Hanging Basket cantilever is finished, be subjected to place or other factors, in the time of can't removing on the spot, can retreat to solution space and remove then.Hanging Basket top load-carrying members remove with can dismounting on the spot on the beam face after bottom die platform is connected.The Hanging Basket substructure can retreat like this: lower transverse beam 501, lower transverse beam 502 both sides, back respectively add a hook 708 before bottom die platform, are equiped with the travelling wheel 7010 that has drive unit on the hook 708.Bottom die platform 708 is hung on the beam face by 4 hooks, after removing load bearing system and hanging of bottom die platform being connected, starts the drive unit of this travelling wheel 7010, realization Hanging Basket substructure retreat traveling continuously.Certainly, the Hanging Basket substructure also can adopt other modes, as the sliding beam of traveling, bottom die platform rely on mutually, slideway each other, gradation retreats.
Above-mentioned each operation has realized that simply and easily the assembly unit of Hanging Basket, Hanging Basket walk forward and anchoring, when construction finishes needs dismounting Hanging Basket, can by Hanging Basket retreat traveling method Hanging Basket is retreated away continuously walk to correct position again row remove, can adapt to the occasion that the construction below requires Hanging Basket not remove up for the railway network etc.
Claims (5)
1. totally enclosed type Hanging Basket, comprise walking system, bottom die platform and anchor system, the walking system traction is connected with load carrier, bottom die platform is connected load carrier by hangar system and has watered on the case beam, be provided with the sealing guard system along the bottom die platform periphery, anchor system is anchored at load carrier and waters on the case beam, it is characterized in that: described sealing guard system comprises Hanging Basket top cover and Hanging Basket periphery safeguard structure, and sealing guard system and bottom die platform surround totally enclosed construction space together.
2. totally enclosed type Hanging Basket according to claim 1 is characterized in that: this Hanging Basket includes anti-shock device, and anti-shock device connects reinforcing bar ground connection in the bridge beam body with lead.
3. totally enclosed type Hanging Basket according to claim 2 is characterized in that: this totally enclosed type Hanging Basket also includes the drainage system that is arranged on the bottom die platform.
4. totally enclosed type Hanging Basket according to claim 3 is characterized in that: described load carrier comprises the connection structure of main truss sheet and main truss sheet;
Described suspended basket system comprises ground connection Hanging Basket aisle beam, the power set that are connected with the Hanging Basket traction, slide anchor after being located at sliding beam in the middle of the bottom die platform and the traveling of cunning beam, sliding anchor comprises the sliding anchor davit of traveling, the sliding anchor spike of sliding anchor framework and back after the sliding beam traveling, also be fixed with a pull bar on the sliding anchor framework, during suspended basket, the sliding anchor in back is rigidly connected on the case beam, after suspended basket put in place, the sliding anchor in back was by the dilatory playback of pull bar;
Hangar system is lifted on bottom die platform on the load carrier, comprise preceding top rail, preceding suspender belt and back strap, more than the lower end of each suspender belt all be connected on the bottom die platform and preceding suspender belt upper end be connected before on the top rail, the back strap upper end is connected in pours into a mould Liang Tishang, preceding top rail is installed on the main truss sheet, and preceding suspender belt is connected on the main truss sheet by preceding top rail; Lower transverse beam and back lower transverse beam before bottom die platform includes.
5. totally enclosed type Hanging Basket according to claim 4 is characterized in that: described power set comprise above structural dynamic device of beam face that is connected with the traction of main truss sheet and the following structural dynamic device of beam face that is connected with the bottom die platform traction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201498527U CN201280693Y (en) | 2008-10-22 | 2008-10-22 | Totally enclosed hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201498527U CN201280693Y (en) | 2008-10-22 | 2008-10-22 | Totally enclosed hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201280693Y true CN201280693Y (en) | 2009-07-29 |
Family
ID=40927572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201498527U Expired - Lifetime CN201280693Y (en) | 2008-10-22 | 2008-10-22 | Totally enclosed hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201280693Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725111B (en) * | 2008-10-22 | 2013-04-03 | 中铁大桥局集团第一工程有限公司 | Totally enclosed cradle and construction method for suspending cast of concrete by using same |
CZ304398B6 (en) * | 2011-05-26 | 2014-04-16 | Metrostav A. S. | Method of gradual transferable formation of shuttering bearing surface when casting highway bridge structure with transfer center |
CN105088970A (en) * | 2015-09-09 | 2015-11-25 | 上海城建市政工程(集团)有限公司 | Construction method of corrugated steel web PC box girder cable-stayed bridge |
CN108914776A (en) * | 2018-07-02 | 2018-11-30 | 浙江中乐建设有限公司 | A kind of construction hanging basket built for municipal works and room |
-
2008
- 2008-10-22 CN CNU2008201498527U patent/CN201280693Y/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725111B (en) * | 2008-10-22 | 2013-04-03 | 中铁大桥局集团第一工程有限公司 | Totally enclosed cradle and construction method for suspending cast of concrete by using same |
CZ304398B6 (en) * | 2011-05-26 | 2014-04-16 | Metrostav A. S. | Method of gradual transferable formation of shuttering bearing surface when casting highway bridge structure with transfer center |
CN105088970A (en) * | 2015-09-09 | 2015-11-25 | 上海城建市政工程(集团)有限公司 | Construction method of corrugated steel web PC box girder cable-stayed bridge |
CN108914776A (en) * | 2018-07-02 | 2018-11-30 | 浙江中乐建设有限公司 | A kind of construction hanging basket built for municipal works and room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101725111B (en) | Totally enclosed cradle and construction method for suspending cast of concrete by using same | |
CN106677211B (en) | Early-dismantling assembly type pipe gallery aluminum mould trolley system for integrally casting wall and top plate and construction method thereof | |
CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
CN206538787U (en) | Early-dismantling assembly type pipe gallery aluminum mould trolley system for integrally pouring wall and top plate | |
CN111926720A (en) | Construction method suitable for continuous steel-structure cantilever beam closure in loess area | |
CN101481944A (en) | Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN109881585A (en) | A kind of assembly flow shop platform for high pier construction | |
CN201280693Y (en) | Totally enclosed hanging basket | |
CN110468713B (en) | Dual-purpose device used as pier column template and prestressed support and construction method thereof | |
CN107165062A (en) | A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame | |
CN106351180A (en) | Full hydraulic opening self-propelled template system for aqueduct | |
CN207267966U (en) | Zipline-type non-bracket support replacement operating platform | |
CN114561873B (en) | Construction method of high bridge pier | |
CN111749133A (en) | Beam-arch combined rigid frame bridge and construction method of bridge pier thereof | |
CN208844424U (en) | Multifunctional assembled construction trolley | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN212052333U (en) | Suspension bridge catwalk surface course installing the system | |
CN210797285U (en) | Dual-purpose device used as pier column template and prestress support | |
CN211949528U (en) | Double-deck operation platform of high-rise building elevartor shaft | |
CN102225580B (en) | Method for longitudinally moving box girder internal mold | |
CN211143800U (en) | Reusable rainproof steam-curing dual-purpose shed for beam yard | |
CN210049105U (en) | Self-propelled bridge formwork operation trolley | |
CN207296361U (en) | A kind of regularization assembled overhanging protection canopy | |
CN209260561U (en) | A kind of integration Bridge Erector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20090729 Effective date of abandoning: 20081022 |
|
RGAV | Abandon patent right to avoid regrant |