CN201228206Y - Self-made small-sized hoisting machine - Google Patents
Self-made small-sized hoisting machine Download PDFInfo
- Publication number
- CN201228206Y CN201228206Y CNU2008201109980U CN200820110998U CN201228206Y CN 201228206 Y CN201228206 Y CN 201228206Y CN U2008201109980 U CNU2008201109980 U CN U2008201109980U CN 200820110998 U CN200820110998 U CN 200820110998U CN 201228206 Y CN201228206 Y CN 201228206Y
- Authority
- CN
- China
- Prior art keywords
- crane
- guide rope
- cable car
- steel
- self
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 238000000034 method Methods 0.000 abstract description 10
- 239000000463 material Substances 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 4
- 239000011521 glass Substances 0.000 description 3
- 230000003068 static effect Effects 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a home-made small cable car which is characterized in that the home-made small cable car comprises a small winch, a hoist, a guide rope, a positioning block, a cable car chassis and a rotary disk, the upper part of the guide rope is fixed with a steel beam on the cable car, the lower part of the guide rope is fixed with a ground anchor steel bar ring, the positioning block is arranged on the guide rope, the small winch is arranged below the cable car, the cable car is arranged on a steel roof truss of a roof, a cable car chassis of the cable car is fully welded on the steel beam, the positioning block is arranged on the guide rope, and the rotary disk is arranged at one end of the cable car. A series of construction difficult problems are solved by using the home-made small cable car to carry out the high-altitude material lifting, thereby successfully smoothly completing all the lifting tasks and leading the whole construction process to be safe and smooth.
Description
Technical field
The utility model relates to a kind of crane, is specifically related to a kind of self-control small crane that upper air installing is used of carrying out.
Background technology
Carry out high-altitude material lifting on the engineering roof that is completed, owing to needing to consider that the material swing destroys glass curtain wall in the upper air installing process, it has proposed to compare higher requirement to hanging device, because of various device place in operation, be subjected to the influence of roofing field condition, normal hanging device can't be installed, only can make hanging device by oneself and carry out the material lifting, upper air installing must be guaranteed personal security, guarantee that hoisting process does not collide glass curtain wall, it is limited that the hanging device space is installed, and only can use the roof steelframe and install.
The utility model content
Problem to be solved in the utility model provides a kind of self-control small crane that upper air installing is used of carrying out.
The utility model comprises: comprise that the top of small winch, cucurbit, guide rope, location coaster, crane chassis, rotating disk, described guide rope and the girder steel on the described crane fix, the bottom of described guide rope and earth anchor reinforced steel bar ring are fixed, the location coaster is installed on the guide rope, described small winch is installed in below the described crane, described crane is installed on the steel roof truss on roof, the crane chassis full weld of described crane is on girder steel, described location coaster is installed on the described guide rope, and described rotating disk is installed in an end of described crane.
Described rotating disk is installed on the pallet, and described pallet is installed on the service platform.
Be former steel column below the described service platform, described former steel column is installed in roof.
The utlity model has following beneficial effect: carry out the material lifting by using this crane equipment, guarantee that personal security and hoisting process do not collide glass curtain wall, installation hanging device space does not need very big, only uses the roof steelframe and can install.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is crane and girder steel connection structure scheme drawing;
Fig. 3 is guide rope and earth anchorage structural representation.
The specific embodiment
The utility model will be further described below in conjunction with accompanying drawing.
Fig. 1 is the utility model structural representation; Fig. 2 is crane and girder steel connection structure scheme drawing; The top and the girder steel on the described crane 7 that comprise small winch 1, cucurbit 2, guide rope 3, location coaster 4, crane chassis 5, rotating disk 6, guide rope 3 are fixing, the bottom of guide rope 3 and earth anchor reinforced steel bar ring 8 are fixing, location coaster 4 is installed on the guide rope 3, small winch 1 is installed in below the described crane, crane is installed on the steel roof truss on roof, crane chassis 5 full welds of crane are on girder steel 9, and location coaster 4 is installed on the guide rope 3, and rotating disk 6 is installed in an end of crane.Rotating disk 6 is installed on the pallet 10, and pallet 10 is installed on the service platform 11, is former steel column 12 below the service platform 11, and former steel column 12 is installed in roof.Principle of work of the present utility model mainly is to adopt small winch 1 to lift, and rotating disk 6 is installed simultaneously crane can be rotated freely, and makes member be unlikely to bump the building curtain wall along guide rope 3 slippages by guide rope 3 in addition.Guide rope 3 is directly as stressed usefulness, only as a guide piece in the hoisting process, prevents object swing in the hoisting process, and object is connected with location coaster 4 on the guide rope 3 by steel rope, location coaster 4 suitable liftings and sliding; Guide rope 3 tops and girder steel is fixed, bottom and earth anchor reinforced steel bar ring 8 is fixing.
Fig. 3 is guide rope and earth anchorage structural representation, and the effect of earth anchor mainly is to be fixed guide rope 3 usefulness, and main method is to build two on concrete pier on ground, suitable configuration reinforcement, and interior pre-buried suspension ring are convenient to reeve.
To try to hang after the self-control small crane that upper air installing is used completes: should carry out necessary examination step by step before the lifting and hang, main method is as follows:
(1) lift heavy 0.5T for the first time checks the lifting facility of crane, even if there is problem to solve, make it to be in a safe condition; Lift heavy 1T tries the process of hanging with for the first time for the second time;
The examination of (2) 1.1 times of dynamic loads is hung: on the member basis of the 1T that slings, at the load that increases 0.1T, promptly the load of 1.1T carries out the dynamic load examination and hangs, and sling height is 1m, three times repeatedly, will check all that at every turn each position must be in safety case to tackling system;
The examination of (3) 1.2 times of static loads is hung: adding the load of 0.1T on the basis that 1.1 times of dynamic loads examinations are hung, promptly the load of 1.2T carries out the static load examination and hangs, and weight lifting built on stilts 100mm get final product, and stop was checked wherein system more than 10 minutes, confirmed to be in a safe condition.
Carry out high-altitude material lifting by the self-control small crane, solved a series of construction difficult problems, satisfactorily finished all lifting tasks smoothly, construction overall process safety is smooth.
Claims (3)
1, a kind of self-control small crane, it is characterized in that: comprise small winch (1), cucurbit (2), guide rope (3), location coaster (4), crane chassis (5), rotating disk (6), the top of described guide rope (3) and the girder steel (7) on the described crane are fixing, the bottom of described guide rope (3) and earth anchor reinforced steel bar ring (8) are fixing, location coaster (4) is installed on the guide rope (3), described small winch (1) is installed in below the described crane, described crane is installed on the steel roof truss on roof, crane chassis (5) full weld of described crane is on girder steel (9), described location coaster (4) is installed on the described guide rope (3), and described rotating disk (6) is installed in an end of described crane.
2, self-control small crane according to claim 1 is characterized in that: described rotating disk (6) is installed on the pallet (10), and described pallet (10) is installed on the service platform (11).
3, self-control small crane according to claim 1 and 2 is characterized in that: be former steel column (12) below the described service platform (11), described former steel column (12) is installed in roof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201109980U CN201228206Y (en) | 2008-04-30 | 2008-04-30 | Self-made small-sized hoisting machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201109980U CN201228206Y (en) | 2008-04-30 | 2008-04-30 | Self-made small-sized hoisting machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201228206Y true CN201228206Y (en) | 2009-04-29 |
Family
ID=40633164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201109980U Expired - Fee Related CN201228206Y (en) | 2008-04-30 | 2008-04-30 | Self-made small-sized hoisting machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201228206Y (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103043537A (en) * | 2012-08-22 | 2013-04-17 | 北京江河幕墙股份有限公司 | Hoisting implementation method and hoisting device used therefor |
CN103086276A (en) * | 2013-01-20 | 2013-05-08 | 北京首钢建设集团有限公司 | Construction method for hoisting bridge type crane in high-rise well tower type building |
CN104261296A (en) * | 2014-09-18 | 2015-01-07 | 苏州金螳螂幕墙有限公司 | Hoisting trolley for unitized curtain wall |
CN104261278A (en) * | 2014-10-13 | 2015-01-07 | 马记 | Herringbone mast hoisting system provided with flexible guide rails and hoisting method |
CN105002876A (en) * | 2015-05-28 | 2015-10-28 | 深圳海油工程水下技术有限公司 | Anchor pile downward placement head direction control and adjustment method |
CN105236318A (en) * | 2015-10-22 | 2016-01-13 | 浙江省电力建设有限公司 | Hanging basket guiding device used for painting inner wall of hyperbolic-type cooling tower and painting method |
CN105731271A (en) * | 2016-04-07 | 2016-07-06 | 上海市机械施工集团有限公司 | Combined tower crane for roof construction and construction method thereof |
CN109694007A (en) * | 2019-01-31 | 2019-04-30 | 广东省工业设备安装有限公司 | A kind of super high-rise building hoisting transportation method |
CN109850745A (en) * | 2019-03-04 | 2019-06-07 | 中启胶建集团有限公司 | A kind of cladding glass installation erecting by overhang |
CN110792637A (en) * | 2019-11-08 | 2020-02-14 | 浙江省二建建设集团安装有限公司 | Method for installing booster fan for building smoke exhaust system |
CN111140642A (en) * | 2018-11-05 | 2020-05-12 | 珠海达理宇航科技有限公司 | Pulley system for pulley and space cable transfer system |
CN111661767A (en) * | 2020-05-29 | 2020-09-15 | 许伟虎 | Reinforcement type hoist and mount instrument for building |
CN112938282A (en) * | 2021-02-03 | 2021-06-11 | 优顶特技术有限公司 | Intelligent warehousing safety management system and device |
CN115492357A (en) * | 2022-08-01 | 2022-12-20 | 中建三局集团有限公司 | Flexible moving operation platform for narrow tunnel in pit and manufacturing and mounting method thereof |
-
2008
- 2008-04-30 CN CNU2008201109980U patent/CN201228206Y/en not_active Expired - Fee Related
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103043537B (en) * | 2012-08-22 | 2015-01-21 | 江河创建集团股份有限公司 | Hoisting implementation method and hoisting device used therefor |
CN103043537A (en) * | 2012-08-22 | 2013-04-17 | 北京江河幕墙股份有限公司 | Hoisting implementation method and hoisting device used therefor |
CN103086276A (en) * | 2013-01-20 | 2013-05-08 | 北京首钢建设集团有限公司 | Construction method for hoisting bridge type crane in high-rise well tower type building |
CN103086276B (en) * | 2013-01-20 | 2014-07-02 | 北京首钢建设集团有限公司 | Construction method for hoisting bridge type crane in high-rise well tower type building |
CN104261296A (en) * | 2014-09-18 | 2015-01-07 | 苏州金螳螂幕墙有限公司 | Hoisting trolley for unitized curtain wall |
CN104261278A (en) * | 2014-10-13 | 2015-01-07 | 马记 | Herringbone mast hoisting system provided with flexible guide rails and hoisting method |
CN105002876B (en) * | 2015-05-28 | 2017-01-11 | 深圳海油工程水下技术有限公司 | Anchor pile downward placement head direction control and adjustment method |
CN105002876A (en) * | 2015-05-28 | 2015-10-28 | 深圳海油工程水下技术有限公司 | Anchor pile downward placement head direction control and adjustment method |
CN105236318A (en) * | 2015-10-22 | 2016-01-13 | 浙江省电力建设有限公司 | Hanging basket guiding device used for painting inner wall of hyperbolic-type cooling tower and painting method |
CN105731271A (en) * | 2016-04-07 | 2016-07-06 | 上海市机械施工集团有限公司 | Combined tower crane for roof construction and construction method thereof |
CN111140642A (en) * | 2018-11-05 | 2020-05-12 | 珠海达理宇航科技有限公司 | Pulley system for pulley and space cable transfer system |
CN109694007A (en) * | 2019-01-31 | 2019-04-30 | 广东省工业设备安装有限公司 | A kind of super high-rise building hoisting transportation method |
CN109850745A (en) * | 2019-03-04 | 2019-06-07 | 中启胶建集团有限公司 | A kind of cladding glass installation erecting by overhang |
CN109850745B (en) * | 2019-03-04 | 2020-07-10 | 中启胶建集团有限公司 | Curtain wall glass mounting and hanging device |
CN110792637A (en) * | 2019-11-08 | 2020-02-14 | 浙江省二建建设集团安装有限公司 | Method for installing booster fan for building smoke exhaust system |
CN110792637B (en) * | 2019-11-08 | 2020-12-15 | 浙江省二建建设集团安装有限公司 | Method for installing booster fan for building smoke exhaust system |
CN111661767A (en) * | 2020-05-29 | 2020-09-15 | 许伟虎 | Reinforcement type hoist and mount instrument for building |
CN112938282A (en) * | 2021-02-03 | 2021-06-11 | 优顶特技术有限公司 | Intelligent warehousing safety management system and device |
CN115492357A (en) * | 2022-08-01 | 2022-12-20 | 中建三局集团有限公司 | Flexible moving operation platform for narrow tunnel in pit and manufacturing and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201228206Y (en) | Self-made small-sized hoisting machine | |
CN102359302B (en) | UHV long-span iron tower assembly method | |
CN103086279B (en) | Vertical transportation construction method for building construction | |
CN203373014U (en) | Static load loading apparatus of overhead and gantry crane | |
CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
CN101761031B (en) | Continuous and perpendicular lifting apparatus for large segmental bridge floor beam | |
CN201990404U (en) | Portable roof hoist frame | |
CN109231023B (en) | Method for installing jib system of portal crane | |
CN103899093A (en) | Step-by-step hoisting construction method of mega-frame steel truss beam | |
CN102049335B (en) | Installation and construction method of large-sized ball mill | |
CN100417586C (en) | Integral lifting method of large bridge crane and its appts | |
CN206538126U (en) | The large-scale overweight equipment handling constructing device of Super High | |
CN201458583U (en) | Liftable and detachable lifting platform | |
CN103086276B (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
CN201325826Y (en) | Rock anchor beam hoisting device for underground power house | |
CN2900454Y (en) | Device for hoisting super large equipment using rotary balance method | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN102849626A (en) | Indoor non-standard crane installation method | |
CN213294466U (en) | Tower crane for building engineering | |
CN202744232U (en) | Tower crane long suspension arm lifting steel rope supporting device | |
CN210193239U (en) | Supplementary portal frame device of dismantling construction tower crane counterweight | |
CN103922232B (en) | A kind of tower crane fall tower process | |
CN212769534U (en) | Rotatable simple and easy hoist device | |
CN202063655U (en) | Anti-tilting safe device of tower type crane | |
CN106861882A (en) | The method that ball mill has bad luck lifting in building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090429 Termination date: 20160430 |