[go: up one dir, main page]

CN201099690Y - Steelmaking converter repair equipment - Google Patents

Steelmaking converter repair equipment Download PDF

Info

Publication number
CN201099690Y
CN201099690Y CNU200720087594XU CN200720087594U CN201099690Y CN 201099690 Y CN201099690 Y CN 201099690Y CN U200720087594X U CNU200720087594X U CN U200720087594XU CN 200720087594 U CN200720087594 U CN 200720087594U CN 201099690 Y CN201099690 Y CN 201099690Y
Authority
CN
China
Prior art keywords
furnace
derrick
stove
steel
repaiied
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720087594XU
Other languages
Chinese (zh)
Inventor
金辉
戴长清
叶卉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CNU200720087594XU priority Critical patent/CN201099690Y/en
Application granted granted Critical
Publication of CN201099690Y publication Critical patent/CN201099690Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

本实用新型提供一种炼钢转炉修炉设备,包括炉外施工平台(1)和炉内井架(2),在炉顶上口有横梁(8、9),炉内井架(2)固定在炉顶横梁(9)上、插入炉顶上口至炉体锥形腔下部,炉内吊盘(4)通过提升设备(6)的倒链吊挂在炉顶横梁(9)上;炉外施工平台(1)的水平运输滚道(1.1)由炉体维修孔(10)通至炉内井架(2)。炉内井架(2)下端安装有炉体锥形腔施工平台(7),锥形腔施工平台(7)是组装结构,包括有两根横梁(7.2)和两根纵梁(7.1)交叉连接在炉内井架下框架上的主梁和在炉内井架下框架外、连接相邻主梁之间的支梁(7.3)。吊盘通过4个电葫芦的倒链(6)吊挂在炉顶工字钢横梁上,倒链长度以使吊盘到达炉底为准。

The utility model provides a furnace repairing equipment for a steelmaking converter, which comprises a construction platform (1) outside the furnace and a derrick (2) inside the furnace. Insert the top beam (9) on the furnace roof to the lower part of the conical cavity of the furnace body, and hang the hanging pan (4) on the furnace roof beam (9) through the upside down chain of the lifting device (6); outside the furnace The horizontal transport raceway (1.1) of the construction platform (1) leads to the furnace inner derrick (2) through the maintenance hole (10) of the furnace body. Furnace conical chamber construction platform (7) is installed at the lower end of the furnace derrick (2), and the conical cavity construction platform (7) is an assembled structure, including two beams (7.2) and two longitudinal beams (7.1) cross-connected The main beam on the lower frame of the furnace derrick and the support beam (7.3) outside the lower frame of the furnace derrick connecting adjacent main beams. The hanging pan is hung on the I-beam beam on the furnace top through the upside-down chains (6) of four electric hoists.

Description

炼钢转炉修炉设备 Steelmaking converter repair equipment

技术领域technical field

本实用新型涉及一种炼钢转炉修炉设备,属于炼钢转炉修炉领域。The utility model relates to furnace repairing equipment for a steelmaking converter, which belongs to the field of repairing a steelmaking converter.

背景技术Background technique

整体转炉炉底部均为死炉底,所以只能采用上修法进行施工。一般采用修炉塔等专用修炉设备,耐火材料运输和施工人员出入方便,也易于组织施工,保证施工质量和安全。The bottom of the overall converter furnace is a dead bottom, so the construction can only be carried out by the upward repair method. Generally, special furnace repair equipment such as furnace repair towers are used, which is convenient for refractory material transportation and construction personnel to enter and exit, and is also easy to organize construction to ensure construction quality and safety.

如果没有专用修炉设备而采用简易上修法施工时,可在炉内搭设脚手架然后铺跳板进行施工。耐火材料可以从炉内进入,也可以在炉壳上部开口进入。这样会给材料运输和施工人员的进出都带来许多的不便,同时施工的难度比较大,所以施工必须认真进行组织。If there is no special furnace repair equipment and the simple upward repair method is used for construction, scaffolding can be set up in the furnace and then a springboard can be laid for construction. The refractory material can enter from inside the furnace, or through the upper opening of the furnace shell. This will bring a lot of inconvenience to the transportation of materials and the entry and exit of construction personnel. At the same time, the construction is relatively difficult, so the construction must be carefully organized.

修炉塔虽然安全有效,可是价格昂贵(约人民币:900万元),需从国外进口,同时修炉塔仅适用于转炉上部烟罩为活动型。只有这种炉型,才能将修炉塔整体吊装进炉内。对于上部烟罩不是活动型的转炉则不能使用修炉塔。综合以上原因,国内转炉施工极少采用修炉塔,普遍采用简易上修法施工,其砖块易损耗、施工安全性低、施工难度较大、效率低。Although the furnace tower repair is safe and effective, it is expensive (about RMB: 9 million yuan) and needs to be imported from abroad. At the same time, the furnace tower repair is only suitable for the movable upper smoke hood of the converter. Only this type of furnace can hoist the repair tower into the furnace as a whole. For converters whose upper hood is not movable, the repair tower cannot be used. Based on the above reasons, domestic converter construction rarely adopts furnace tower repair, and generally adopts simple upward repair method, which is prone to wear and tear, low construction safety, difficult construction and low efficiency.

发明内容Contents of the invention

本实用新型的目的是设计一种砖块损耗小、施工成本低、施工安全、机械化程度高,减轻操作者劳动强度的炼钢转炉修炉设备。The purpose of this utility model is to design a steelmaking converter repairing equipment with small brick loss, low construction cost, safe construction, high degree of mechanization, and reduced labor intensity of operators.

本实用新型的技术方案:本实用新型的炼钢转炉修炉设备包括炉外施工平台1和炉内井架2,在炉顶上口有横梁8、9,炉内井架2固定在炉顶横梁9上、插入炉顶上口至炉体锥形腔下部,炉内吊盘4通过提升设备6的倒链吊挂在炉顶横梁9上;炉外施工平台1的通道1.1由炉体维修孔10通至炉内井架2。Technical scheme of the present utility model: The steelmaking converter repairing equipment of the present utility model includes a construction platform 1 outside the furnace and a derrick 2 inside the furnace, beams 8 and 9 are arranged on the top of the furnace roof, and the derrick 2 inside the furnace is fixed on the beam 9 on the furnace roof Insert, insert the upper opening of the furnace roof to the lower part of the conical chamber of the furnace body, the hanging plate 4 in the furnace is hung on the beam 9 of the furnace roof through the inverted chain of the lifting device 6; Lead to the derrick 2 in the furnace.

所述的炼钢转炉修炉设备,炉内井架2下端安装有炉体锥形腔施工平台7,锥形腔施工平台7是组装结构,包括有两根横梁7.2和两根纵梁7.1交叉连接在炉内井架下框架上的主梁和在炉内井架下框架外、连接相邻主梁之间的支梁7.3。In the steelmaking converter repairing equipment, the lower end of the furnace derrick 2 is equipped with a construction platform 7 for the conical cavity of the furnace body. The construction platform 7 for the conical cavity is an assembled structure, including two beams 7.2 and two longitudinal beams 7.1 cross-connected The main beam on the lower frame of the derrick in the furnace and the support beam 7.3 outside the lower frame of the derrick in the furnace, connecting adjacent main beams.

所述的炼钢转炉修炉设备,吊盘通过4个电葫芦的倒链6吊挂在炉顶工字钢横梁上,倒链长度以使吊盘到达炉底为准。In the steelmaking converter repairing equipment, the hanging pan is hung on the I-beam beam on the top of the furnace through the inverted chains 6 of four electric hoists, and the length of the inverted chain is such that the hanging pan reaches the bottom of the furnace.

所述的炼钢转炉修炉设备,炉外施工平台的通道1.1是水平运输滚道。In the steelmaking converter repairing equipment, the channel 1.1 of the construction platform outside the furnace is a horizontal transport raceway.

所述的炼钢转炉修炉设备,吊盘为组装结构,包括横竖梁连接起来的吊盘骨架和多块板构成的盘面。In the steelmaking converter repairing equipment, the hanging pan is an assembled structure, including a hanging pan skeleton connected by horizontal and vertical beams and a pan surface composed of multiple plates.

所述的炼钢转炉修炉设备,在炉顶上口有横梁8、9上有通过电葫芦的倒链吊挂的吊篮3。The furnace repairing equipment for the steelmaking converter has a hanging basket 3 suspended by the reverse chain of the electric hoist on the crossbeams 8 and 9 on the top of the furnace.

本实用新型的效果:砖块损耗小,施工成本低;提高施工的安全性;增大机械化程度。与专用修炉设备相比成本低廉;与简易上修施工法相比施工简便、安全性大,减轻操作者的劳动强度。The effect of the utility model: the loss of bricks is small, the construction cost is low; the safety of construction is improved; the degree of mechanization is increased. Compared with special furnace repair equipment, the cost is low; compared with the simple upward repair construction method, the construction is simple and safe, and the labor intensity of the operator is reduced.

附图说明Description of drawings

图1是本实用新型的总体结构示意图。Fig. 1 is the overall structural representation of the utility model.

图2是图1的A向示意图。Fig. 2 is a schematic view along the direction A of Fig. 1 .

图3是锥形腔施工平台的骨架结构示意图。Fig. 3 is a schematic diagram of the skeleton structure of the tapered cavity construction platform.

图4是吊盘的骨架结构示意图。Fig. 4 is a schematic diagram of the skeleton structure of the hanging pan.

具体实施方式Detailed ways

如图1、图2:本实用新型的炼钢转炉修炉设备,包括炉外施工平台1和炉内井架2,在炉顶上口有横梁8、9,主梁8为20#工字钢,次梁9为16#槽钢。炉内井架2固定在炉顶横梁9上、插入炉顶上口至炉体锥形腔下部,炉内吊盘4通过四个提升设备6吊挂在炉顶横梁9上,提升设备6的倒链的长度以使吊盘到达炉底为准,并配置4台2吨手拉倒链11作为辅助定位绳。As shown in Figure 1 and Figure 2: The steelmaking converter repairing equipment of the present utility model includes the construction platform 1 outside the furnace and the derrick 2 inside the furnace, and there are beams 8 and 9 on the top of the furnace, and the main beam 8 is 20# I-beam , Secondary beam 9 is 16# channel steel. Furnace derrick 2 is fixed on the furnace top beam 9, inserted into the upper opening of the furnace roof to the lower part of the conical cavity of the furnace body, and the furnace inner hanging plate 4 is hung on the furnace roof beam 9 through four lifting devices 6, and the lifting device 6 is inverted The length of the chain is as the criterion that the hanging pan reaches the bottom of the furnace, and four 2-ton hand-drawn chains 11 are configured as auxiliary positioning ropes.

炉外施工平台1的通道1.1由炉体维修孔口10通至炉内井架2。通道1.1是水平运输滚道。The channel 1.1 of the construction platform 1 outside the furnace leads to the furnace inner derrick 2 by the furnace maintenance opening 10 . Channel 1.1 is a horizontal transport raceway.

炉内井架2下端安装有炉体锥形腔施工平台7。在炉顶上口横梁8上有通过电葫芦5的倒链吊挂的吊篮3。吊篮是运送耐火材料的,提升采用1台电葫芦(规格按实际需要配置)。Furnace body tapered cavity construction platform 7 is installed at the lower end of derrick 2 in the furnace. There is the hanging basket 3 that is hung by the reverse chain of the electric hoist 5 on the top beam 8 of the stove top. The hanging basket is used to transport refractory materials, and one electric hoist is used for lifting (the specifications are configured according to actual needs).

如图3:锥形腔施工平台7是组装结构,其骨架包括由两根横梁7.2和两根纵梁7.1交叉连接在炉内井架下框架上的主梁和在炉内井架下框架外、连接相邻主梁之间的支梁7.3组成的框架,再在框架上铺平台板7.4、7.5组成施工平台。平台板7.4、7.5各有两块。As shown in Figure 3: the tapered cavity construction platform 7 is an assembled structure, and its skeleton includes a main beam cross-connected on the lower frame of the furnace derrick by two crossbeams 7.2 and two longitudinal beams 7.1 and connected outside and outside the lower frame of the furnace derrick. The frame formed by the supporting beams 7.3 between adjacent main beams, and then the platform boards 7.4, 7.5 are laid on the frame to form a construction platform. Platform plate 7.4,7.5 respectively has two pieces.

如图4:吊盘为组装结构,其骨架由横梁4.1、竖梁4.2和圆框4.3连接起来的,吊盘骨架上放多块平台板构成的吊盘。炉内吊盘提升采用4台提升重量为2000kg为电动倒链,吊盘通过电动、手动倒链与炉顶横梁连接。As shown in Figure 4: the suspension pan is an assembled structure, and its skeleton is connected by a beam 4.1, a vertical beam 4.2 and a round frame 4.3, and a suspension pan composed of multiple platform boards is placed on the suspension pan skeleton. The lifting of the hanging pan in the furnace adopts 4 lifts with a lifting weight of 2000kg as the electric uplink, and the hanging pan is connected to the furnace roof beam through the electric and manual uplink.

炉内电葫芦轨道梁为20#工字钢,井架主梁为16#槽钢,井架及平台的立杆、横杆、支撑杆为∠75mm*75mm*7mm,各连接板为t=8mm钢板。各杆件与连接板用螺杆相连。The track beam of the electric hoist in the furnace is 20# I-beam, the main beam of the derrick is 16# channel steel, the vertical bar, cross bar and support bar of the derrick and platform are ∠75mm*75mm*7mm, and each connecting plate is t=8mm steel plate . Each bar is connected with the connecting plate by a screw.

使用方法:Instructions:

1、将炉外施工平台1现场组装,组装好水平运输滚道及炉内井架等;亦可将炉内井架部件吊于炉内在炉内组装;1. Assemble the construction platform 1 outside the furnace on site, and assemble the horizontal transport raceway and the derrick inside the furnace; the parts of the derrick inside the furnace can also be hung in the furnace and assembled in the furnace;

2、将水平运输滚道与炉体维修孔10连接;2. Connect the horizontal transport raceway with the maintenance hole 10 of the furnace body;

3、通过炉外施工平台及水平运输滚道,将炉内井架2及吊盘组装所用零部件运至转炉口;3. Through the construction platform outside the furnace and the horizontal transport raceway, the components used in the assembly of the derrick 2 and the suspension plate in the furnace are transported to the converter mouth;

4、在炉口先安装电葫芦的轨道梁及井架主梁;4. Install the track beam of the electric hoist and the main beam of the derrick at the furnace mouth;

5、装入炉内组装井架2及锥形腔施工平台7(施工平台7只组装井架下部靠维修孔一侧部分);5. Put it into the furnace to assemble the derrick 2 and the conical cavity construction platform 7 (the construction platform 7 only assembles the lower part of the derrick close to the side of the maintenance hole);

6、将电葫芦及电动倒链从施工孔引入井架施工平台上,用手拉倒链将电葫芦等提升至轨道梁并安装;6. Introduce the electric hoist and the electric chain down from the construction hole to the derrick construction platform, and lift the electric hoist to the track beam and install it by pulling the chain down by hand;

7、将铝合金伸缩梯放入炉内作为施工人员上下的通道,在炉底组装炉内吊盘骨架,并铺上吊盘平台板,将组装完后的吊盘4提升至炉内井架2下口,砌筑炉底砖,当炉底砖砌筑完后,再放下吊盘,在吊盘上砌炉壁墙砖。7. Put the aluminum alloy telescopic ladder into the furnace as a passage for the construction personnel to go up and down, assemble the hanging pan skeleton in the furnace at the bottom of the furnace, and lay the hanging pan platform board, and lift the assembled hanging pan 4 to the furnace derrick 2 At the mouth, the furnace bottom bricks are built by masonry. After the furnace bottom bricks are built, the hanging pan is lowered, and the furnace wall bricks are built on the hanging pan.

8、当炉壁墙砖砌至施工孔下部时,组装完炉内井架施工平台7的框架,把吊盘上的平台板拆除并安装在井架平台上,将吊盘放至炉底并分解,同时,将电葫芦及电动倒链等拆除,将备件从维修孔运出炉外。8. When the furnace wall is bricked to the lower part of the construction hole, the frame of the derrick construction platform 7 in the furnace is assembled, the platform plate on the hanging pan is removed and installed on the derrick platform, and the hanging pan is placed on the bottom of the furnace and disassembled. At the same time, remove the electric hoist and electric chain down, and transport the spare parts out of the furnace through the maintenance hole.

9、利用炉内井架平台2砌筑施工锥形腔,此时耐火材料从炉口进入。9. Use the derrick platform 2 in the furnace to build a conical cavity, and at this time, the refractory material enters from the furnace mouth.

10、炉内所有耐材砌筑完毕后,从炉口将井架拆除。10. After all the refractory materials in the furnace are built, remove the derrick from the furnace mouth.

Claims (7)

1. a steel-making converter is repaiied furnace apparatus, comprise derrick (2) in outer operation platform (1) of stove and the stove, it is characterized in that: crossbeam (8,9) arranged in that furnace roof is suitable for reading, the interior derrick (2) of stove is fixed on the furnace roof crossbeam (9), the insertion furnace roof is suitable for reading to body of heater conical cavity bottom, and hanging scaffold (4) is hung on furnace roof crossbeam (9) by the jack of lift technique (6) in the stove; The passage (1.1) of the outer operation platform (1) of stove passes to derrick (2) in the stove by body of heater service hatch (10).
2. steel-making converter according to claim 1 is repaiied furnace apparatus, it is characterized in that: derrick (2) lower end is equipped with body of heater conical cavity operation platform (7) in the stove, conical cavity operation platform (7) is a packaging assembly, include two crossbeams (7.2) and two longerons (7.1) cross connection in stove the girder on the derrick underframe and in stove outside the derrick underframe, connect the strutbeam (7.3) between the adjacent girder.
3. steel-making converter according to claim 1 and 2 is repaiied furnace apparatus, it is characterized in that: hanging scaffold is hung on furnace roof joist steel crossbeam by the jack (6) of four electric hoists, and jack length is so that hanging scaffold arrives furnace bottom is as the criterion.
4. steel-making converter according to claim 1 and 2 is repaiied furnace apparatus, it is characterized in that: the passage (1.1) of the outer operation platform of stove is a level transportation raceway.
5. steel-making converter according to claim 1 and 2 is repaiied furnace apparatus, it is characterized in that: hanging scaffold is a packaging assembly, comprises the card that hanging scaffold skeleton that beam anyhow couples together and polylith plate constitute.
6. steel-making converter according to claim 1 and 2 is repaiied furnace apparatus, it is characterized in that: furnace roof suitable for reading have the hanging basket of hanging by the jack of electric hoist (3) is arranged on the crossbeam (8).
7. steel-making converter according to claim 1 and 2 is repaiied furnace apparatus, it is characterized in that: 4 of hanging scaffold (4) configurations pull jack (11) as the assist location rope.
CNU200720087594XU 2007-10-18 2007-10-18 Steelmaking converter repair equipment Expired - Fee Related CN201099690Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720087594XU CN201099690Y (en) 2007-10-18 2007-10-18 Steelmaking converter repair equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720087594XU CN201099690Y (en) 2007-10-18 2007-10-18 Steelmaking converter repair equipment

Publications (1)

Publication Number Publication Date
CN201099690Y true CN201099690Y (en) 2008-08-13

Family

ID=39936224

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720087594XU Expired - Fee Related CN201099690Y (en) 2007-10-18 2007-10-18 Steelmaking converter repair equipment

Country Status (1)

Country Link
CN (1) CN201099690Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102719592A (en) * 2011-03-30 2012-10-10 鞍钢股份有限公司 Large-scale converter lining masonry method
CN103884184A (en) * 2014-03-27 2014-06-25 中国三冶集团有限公司机械安装工程公司 Vertical continuous annealing furnace refractory material and lining installing method and movable installing platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102719592A (en) * 2011-03-30 2012-10-10 鞍钢股份有限公司 Large-scale converter lining masonry method
CN103884184A (en) * 2014-03-27 2014-06-25 中国三冶集团有限公司机械安装工程公司 Vertical continuous annealing furnace refractory material and lining installing method and movable installing platform
CN103884184B (en) * 2014-03-27 2015-10-21 中国三冶集团有限公司 The resistance to material of a kind of vertical continuous annealing furnace, liner installation method and movable mounting platform

Similar Documents

Publication Publication Date Title
CN101324146A (en) Construction method for hanging wide span arcuated open-web beam
CN110562868B (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN101363069B (en) A simple upper furnace repair equipment and furnace repair process
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN106015729A (en) Reverse in-position method for vaporization flue in closed plant
CN110760634A (en) Blast furnace shell installation method
CN201099690Y (en) Steelmaking converter repair equipment
CN106996698A (en) A kind of dismounting of coke dry quenching furnace inner lining refractory and discharge method
CN203359745U (en) Hot blast stove refractory vertical transport device
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN104089481A (en) Method and device for constructing indoor flue wall of roasting furnace
CN102311074A (en) Converter afterheat boiler maintenance equipment and boiler maintenance method
CN106016233A (en) Boiler roof with long span and fewer welding spots and hoisting method for boiler roof
CN203582282U (en) Automatic tripping device
CN202208696U (en) Construction platform used for dry quenching furnace
CN206502573U (en) A kind of hoistable platform for blast furnace building construction
CN205635674U (en) Portable petticoat pipe residue beating platform of converter
CN114809659A (en) Unloading platform for construction engineering and construction method thereof
CN211257761U (en) Lifting type elevator shaft operating platform
CN102492438A (en) Method for replacing brackets of dry quenching furnace
CN207079894U (en) Construction of Steel Structure steel platform and device is set up at the top of light shaft
CN109402313B (en) Blast furnace downcomer bricklaying lining material transportation system and construction method
CN202279834U (en) Converter furnace repairing trolley
CN201737894U (en) Coke oven charging hole seat iron piece mounting jig

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080813