The lithium bromide absorption refrigeration and air-conditioning device that vertical two-period form absorbs
Technical field
The utility model relates to a kind of lithium bromide absorption refrigeration and air-conditioning device, relates in particular to the heat hot source temperature and be the lithium bromide absorption refrigeration and air-conditioning device that 70 degrees centigrade to 100 degrees centigrade the vertical two-period form than low-grade heat source absorbs.
Background technology
Lithium bromide absorption refrigeration and air-conditioning device drives and utilizes the absorption refrigeration principle to realize kind of refrigeration cycle with thermal source.Its process of refrigerastion is that the heating thermal source makes it produce steam by the heat exchanger heats bromize lithium dilute solution in the generator, and forms bromize lithium concentrated solution in the bottom of generator.The steam that is produced enters in the evaporimeter through throttling then through coming together in after heat exchanger is cooled in the drip tray.Water in the evaporimeter sprays in the cold water heat exchanger after pump or the lifting of siphon chamber, thereby absorbs the heat of cold water and reach refrigeration.Simultaneously, the concentrated solution in the generator sprays in absorber after the solution heat exchanger cooling, when cooling water heat exchanger further cools off, utilizes the steam in the water vapour pressure difference absorption evaporimeter.Simultaneously, form lithium-bromide solution, and behind solution heat exchanger, be recycled to generator by pump or siphon passage lifting in the generator bottom.
Above systemic circulation is the basic principle of mono-potency lithium bromide absorption refrigeration aircondition.Yet when the heating source temperature is lower, as when being lower than 100 degrees centigrade, the solution concentration that system's generator takes place is lower, thereby has a strong impact on system effectiveness.
For the situation in low-temperature heat source,, above-mentioned two-period form lithium bromide water absorption refrigerating plant reduces weak solution concentration increase system efficiency thereby leading to fully absorption.But existing apparatus adopts the side-by-side structure.Although the side-by-side structure is comparatively compact, need to increase solution and refrigerant cycle pump.Increased manufacturing cost and use cost.Simultaneously, for promoting as far as possible concentration takes place, this device at first enters condenser and reduces condensing pressure as far as possible by arranging cooling water.
The utility model content
The lithium bromide absorption refrigeration and air-conditioning device that the utility model provides a kind of vertical two-period form to absorb.This device comprise condenser, generator, solution heat exchanger, on put absorber, on put evaporimeter, underlying absorber, underlying evaporimeter, pipeline that condenser is connected with the underlying evaporimeter, the pipeline that generator, solution heat exchanger and underlying absorber are connected and with generator, solution heat exchanger and on put the pipeline that absorber connects.In addition, this device also comprise one by condenser, on put the cooling water pipeline of absorber and underlying absorber, and one by on put the cold water pipes of evaporimeter and underlying evaporimeter.Condenser and generator are arranged in the same cavity and are positioned at the top of refrigerating air conditioning device.On put absorber and on put evaporimeter and be arranged in the same cavity and underlying absorber and underlying evaporimeter are arranged in the same cavity, these two cavitys are stacked up and down and be positioned at the bottom of aircondition jointly.On put between absorber and the underlying absorber and be provided with dividing plate with holes, be provided with the spray dish that is used to compile solution below the dividing plate.
In addition, in above-mentioned lithium bromide absorption refrigeration and air-conditioning device, the water inlet of cooling water pipeline is positioned at the top, and its delivery port is positioned at the below.
In addition, in above-mentioned lithium bromide absorption refrigeration and air-conditioning device, the water inlet of cold water pipes is positioned at the below, and its delivery port is positioned at the top.
In addition, the quantity of condenser and generator is one.Described pipeline comprises pump or siphon passage.
The utility model can only adopt a cover condenser and a generator.Characteristics of the present utility model are: (a) further reduce weak solution concentration by the two-part structure; (b) utilize gravitational difference to realize that two-part absorbs more fully by stacked structure up and down.(c) thus by cooling water at first cooler condenser concentration promote to take place, avoid consuming too much cooling water simultaneously.Therefore, thus further having promoted the system concentration difference strengthens assimilation effect and system effectiveness.In addition, the solution in first section absorber is transported to necessary pumping equipment in second section absorber, obviously can saves manufacturing cost and work energy consumption owing to needn't adopt two covers or overlap condenser and generator more and saved in the prior art.
Should be appreciated that the above generality of the utility model is described and the following detailed description all is exemplary and explanat, and be intended to provide further explanation for as claimed in claim the utility model.
Description of drawings
Comprise that accompanying drawing is for providing the utility model further to be understood, they are included and are constituted the application's a part, and accompanying drawing shows embodiment of the present utility model, and play the effect of explaining the utility model principle with this specification.In the accompanying drawing:
Fig. 1 is the diagrammatic sketch according to the lithium bromide absorption refrigeration and air-conditioning device of vertical two-period form absorption of the present utility model.
Fig. 2 is according to the diagrammatic sketch of arranging the two-period form absorbing structure up and down in the lithium bromide absorption refrigeration and air-conditioning device of vertical two-period form absorption of the present utility model.
The specific embodiment
Now embodiment of the present utility model will be described with reference to the drawings in detail.Fig. 1 is the diagrammatic sketch according to the lithium bromide absorption refrigeration and air-conditioning device of vertical two-period form absorption of the present utility model.As shown in Figure 1, refrigerating plant of the present utility model comprise condenser 1, generator 2, solution heat exchanger 3, on put low temperature absorption device 4, on put cryogenic vaporizer 5, underlying high temperature absorber 6, underlying high-temperature evaporator 7, solution pump or siphon passage 8 (9), absorb evaporation channel 10 (11).Condenser 1 and generator 2 are arranged in the same cavity, and this cavity is arranged at the top of whole refrigerating plant.On put low temperature absorption device 4 and on put cryogenic vaporizer 5 and be arranged in the same cavity, and underlying high temperature absorber 6 and underlying high-temperature evaporator 7 are arranged in the same cavity, these two cavitys are stacked up and down and be positioned at the below of above-mentioned condenser 1 and generator 2 jointly, as being shown specifically among Fig. 2.
The following work of refrigerating plant of the present utility model.Weak solution in the underlying high temperature absorber 6 is carried by solution pump or siphon passage 8 and enter generator 2 after solution heat exchanger 5 is heated up.Concentrate after the heating of weak solution in the generator 2 by the heating thermal source, the condenser 1 that the steam that is produced is set in the same cavity is condensed into water as refrigerant, is stored in the drip tray.Under the effect of gravity and pressure, this water as refrigerant enters underlying high-temperature evaporator 7 after throttling, puts spraying and sprinkling evaporation in evaporimeter 5 and the underlying evaporimeter 7 through water pump or siphon passage 9 last.Because evaporation latent heat is forming lower temperature in the evaporimeter 5 and 7 up and down, and carries out heat exchange with cold water.Simultaneously, the bromize lithium concentrated solution through concentrating enters after solution heat exchanger 3 coolings and puts spray in the low temperature absorption device 4 in the generator 2.On put low temperature absorption device 4 form thus with on put the relatively low pressure of cryogenic vaporizer 5 for steam, make the solution concentration in the same cavity thinning thereby absorb steam by evaporation channel 10, form intermediate concentration solution.This intermediate concentration solution compiles in last bottom of putting low temperature absorption device 4 after the gravity effect, by on the dividing plate hole of putting between absorber 4 and the underlying absorber 5 come together in the spray dish of underlying high temperature absorber 6.This intermediate concentration solution after cooling water heat exchanger heat exchange cooling, sprays and forms the water vapour pressure lower with respect to underlying high-temperature evaporator 7 in underlying absorber 6 under the acting in conjunction of the gravitational difference of absorber up and down and pressure differential.Therefore, above-mentioned intermediate concentration solution is further dilution in underlying absorber 6, forms the weak solution that systemic circulation is used in its bottom.This weak solution is taken out liter through solution pump or siphon passage 8, flows back in the generator 2 after heating by solution heat exchanger 3, thus the circulation of formation solution.
In the above-described embodiments, the delivery port of described cooling water pipeline is arranged in the top of refrigerating plant (being condenser), and delivery port is arranged in its bottom (being absorber).The cooling-water flow direction is to go out under enterprising.Such cooling water flow path makes generating process more abundant, thereby promote concentration takes place.
Be that in a real work, the cold in-water temperature of this system is 32 ℃ under 85 ℃ the condition at the heat hot source temperature, the outlet temperature of cooling water is 37 ℃; The cooling water inlet temperature is 18 ℃ simultaneously, and cold water outlet temperature is 7 to 8 ℃, thereby can obtain the system effectiveness more than 0.85.This compares with the refrigerating plant of prior art and is significantly improved.
It is lower (for example that the utility model has taken into full account the heating source temperature, 100 ℃) time, thereby the lower problem that has a strong impact on system effectiveness of solution concentration that system's generator takes place, by the change optimization system to the structure of whole device and cooling water turnover design, the crystallization curve that makes full use of system pressure difference and gravitational difference and take into account absorbent solution when considering fully to absorb comes increase system efficiency.
Those skilled in the art can be obvious, can carry out various modifications and variations and not depart from spirit and scope of the present utility model above-mentioned exemplary embodiment of the present utility model.Therefore, be intended to make the utility model to cover to drop in appended claims and the equivalence techniques scheme scope thereof to modification of the present utility model and modification.