CN1995571A - Built-in steel truss concrete combined huge size beam column frame and its manufacture method - Google Patents
Built-in steel truss concrete combined huge size beam column frame and its manufacture method Download PDFInfo
- Publication number
- CN1995571A CN1995571A CN 200610169831 CN200610169831A CN1995571A CN 1995571 A CN1995571 A CN 1995571A CN 200610169831 CN200610169831 CN 200610169831 CN 200610169831 A CN200610169831 A CN 200610169831A CN 1995571 A CN1995571 A CN 1995571A
- Authority
- CN
- China
- Prior art keywords
- steel
- built
- giant
- truss
- diagonal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 212
- 239000010959 steel Substances 0.000 title claims abstract description 212
- 239000004567 concrete Substances 0.000 title claims abstract description 70
- 238000004519 manufacturing process Methods 0.000 title claims abstract 4
- 238000000034 method Methods 0.000 title description 2
- 239000002131 composite material Substances 0.000 claims abstract 15
- 230000002787 reinforcement Effects 0.000 claims description 57
- 238000009826 distribution Methods 0.000 claims description 12
- 238000003466 welding Methods 0.000 claims description 7
- 239000011241 protective layer Substances 0.000 claims description 6
- 239000011150 reinforced concrete Substances 0.000 claims description 6
- 238000004873 anchoring Methods 0.000 claims description 4
- 210000002435 tendon Anatomy 0.000 claims description 2
- 238000009415 formwork Methods 0.000 claims 2
- 230000003014 reinforcing effect Effects 0.000 description 39
- 210000003205 muscle Anatomy 0.000 description 14
- 238000010586 diagram Methods 0.000 description 13
- 238000002360 preparation method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 238000011068 loading method Methods 0.000 description 4
- 230000035939 shock Effects 0.000 description 4
- 239000002245 particle Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 239000010410 layer Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 241001503485 Mammuthus Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 1
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明的内藏钢桁架混凝土组合巨型梁柱框架及制作方法,属于一种用在高层建筑中的巨型框架结构体系。内藏钢桁架混凝土组合巨型柱,呈空间筒状,角柱(3)中的型钢(6)与型钢斜支撑(9)、钢筋斜支撑(10)构成钢桁架,钢筋斜支撑和型钢斜支撑在巨型柱中呈空间螺旋形。内藏钢桁架混凝土组合巨型梁的边框梁(13)中设置型钢梁(14),型钢梁、型钢斜支撑(19)与钢筋斜支撑(20)组合,在混凝土剪力墙内部形成钢桁架。本发明的内藏钢桁架混凝土组合巨型柱比普通巨型柱有更好的抗扭能力,具有很大的强度和抗侧力刚度。内藏钢桁架混凝土组合巨型梁比普通巨型梁承载能力高,承载力和刚度衰减较慢,剪切滑移破坏减轻。
The giant beam-column frame with built-in steel truss concrete composite and the manufacturing method of the present invention belong to a giant frame structure system used in high-rise buildings. The built-in steel truss concrete composite giant column is in the shape of a space cylinder. The section steel (6) in the corner column (3), the section steel diagonal support (9), and the steel bar diagonal support (10) constitute a steel truss. The steel bar diagonal support and the section steel diagonal support A spatial spiral in a giant column. A profiled steel beam (14) is set in the frame beam (13) of the built-in steel truss concrete composite giant beam, and the profiled steel beam, profiled steel diagonal support (19) and steel bar diagonal support (20) are combined to form a steel beam inside the concrete shear wall. truss. Compared with ordinary giant columns, the concrete composite giant column with built-in steel truss has better torsion resistance, and has great strength and rigidity against lateral force. Concrete composite giant beams with built-in steel trusses have higher load-carrying capacity than ordinary giant beams, and the decay of bearing capacity and stiffness is slower, and the shear slip damage is reduced.
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2006101698317A CN1995571B (en) | 2006-12-29 | 2006-12-29 | Built-in steel truss concrete composite giant beam-column frame and its manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2006101698317A CN1995571B (en) | 2006-12-29 | 2006-12-29 | Built-in steel truss concrete composite giant beam-column frame and its manufacturing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1995571A true CN1995571A (en) | 2007-07-11 |
CN1995571B CN1995571B (en) | 2010-06-02 |
Family
ID=38250767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2006101698317A Expired - Fee Related CN1995571B (en) | 2006-12-29 | 2006-12-29 | Built-in steel truss concrete composite giant beam-column frame and its manufacturing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1995571B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031829A (en) * | 2010-11-30 | 2011-04-27 | 哈尔滨工业大学 | Diagrid sleeve structure for restricting connection of high strength concrete nodes |
CN102409755A (en) * | 2011-11-28 | 2012-04-11 | 北京工业大学 | Bottom double-overlapped steel concrete frame built-in steel plate core barrel and manufacturing method thereof |
CN102409783A (en) * | 2011-11-28 | 2012-04-11 | 北京工业大学 | Bottom double-overlapped steel concrete frame built-in steel plate shear wall and manufacturing method thereof |
CN102535672A (en) * | 2012-02-15 | 2012-07-04 | 姚攀峰 | Novel hybrid huge anti-seismic structure and construction method thereof |
CN102561518A (en) * | 2011-12-16 | 2012-07-11 | 华东建筑设计研究院有限公司 | Boom truss component and core tube connection node |
CN103669651A (en) * | 2013-12-26 | 2014-03-26 | 北京工业大学 | Infilled wall with build-in cross steel bars and manufacturing method of infilled wall |
CN105469696A (en) * | 2016-01-12 | 2016-04-06 | 南京工业职业技术学院 | Framework structure top corner post and roofing beam node steel bar space assignment teaching model |
CN108331172A (en) * | 2018-04-20 | 2018-07-27 | 香港华艺设计顾问(深圳)有限公司 | A kind of conversion beam of the unidirectional diagonal brace of setting |
CN109551447A (en) * | 2019-01-04 | 2019-04-02 | 湖南省富生钢结构有限公司 | A kind of support formed steel construction of high stability |
CN111558982A (en) * | 2019-02-13 | 2020-08-21 | 河南天久装配式建筑有限公司 | Manufacturing method of light sandwich concrete reinforced steel angle steel truss column |
CN111558981A (en) * | 2019-02-13 | 2020-08-21 | 河南天久装配式建筑有限公司 | Manufacturing method of light sandwich concrete steel bar truss column |
CN111558995A (en) * | 2019-02-13 | 2020-08-21 | 河南天久装配式建筑有限公司 | Manufacturing method of light sandwich concrete angle steel truss column |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2763377Y (en) * | 2004-12-23 | 2006-03-08 | 北京工业大学 | Reinforced concrete tube structure with built in support |
CN2791137Y (en) * | 2005-05-13 | 2006-06-28 | 北京工业大学 | Concrete combine tube with built-in steel girder |
CN1333141C (en) * | 2005-07-08 | 2007-08-22 | 北京工业大学 | Combined concrete shear wall with built-in eccentric supporting steel truss and its making method |
CN100432345C (en) * | 2005-09-09 | 2008-11-12 | 北京工业大学 | Method for making built-in eccentric supporting steel truss concrete combined barrel and the barrel |
CN2818607Y (en) * | 2005-09-09 | 2006-09-20 | 北京工业大学 | Built-in assembled bearing eccentric cylinder of concrete truss |
CN201016187Y (en) * | 2006-12-29 | 2008-02-06 | 北京工业大学 | Built-in steel truss concrete composite giant beam-column frame |
-
2006
- 2006-12-29 CN CN2006101698317A patent/CN1995571B/en not_active Expired - Fee Related
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031829A (en) * | 2010-11-30 | 2011-04-27 | 哈尔滨工业大学 | Diagrid sleeve structure for restricting connection of high strength concrete nodes |
CN102409783B (en) * | 2011-11-28 | 2014-04-16 | 北京工业大学 | Manufacturing method of bottom double composite section steel shear wall with reinforced concrete frame and inside-hidden steel plate |
CN102409755A (en) * | 2011-11-28 | 2012-04-11 | 北京工业大学 | Bottom double-overlapped steel concrete frame built-in steel plate core barrel and manufacturing method thereof |
CN102409783A (en) * | 2011-11-28 | 2012-04-11 | 北京工业大学 | Bottom double-overlapped steel concrete frame built-in steel plate shear wall and manufacturing method thereof |
CN102409755B (en) * | 2011-11-28 | 2014-04-09 | 北京工业大学 | Section steel concrete frame inbuilt steel plate core cylinder with doubly superimposed bottom and producing method thereof |
CN102561518B (en) * | 2011-12-16 | 2017-04-12 | 华东建筑设计研究院有限公司 | Boom truss component and core tube connection node |
CN102561518A (en) * | 2011-12-16 | 2012-07-11 | 华东建筑设计研究院有限公司 | Boom truss component and core tube connection node |
CN102535672B (en) * | 2012-02-15 | 2014-05-28 | 姚攀峰 | Novel hybrid huge anti-seismic structure and construction method thereof |
CN102535672A (en) * | 2012-02-15 | 2012-07-04 | 姚攀峰 | Novel hybrid huge anti-seismic structure and construction method thereof |
CN103669651A (en) * | 2013-12-26 | 2014-03-26 | 北京工业大学 | Infilled wall with build-in cross steel bars and manufacturing method of infilled wall |
CN103669651B (en) * | 2013-12-26 | 2017-01-11 | 北京工业大学 | Infilled wall with build-in cross steel bars and manufacturing method of infilled wall |
CN105469696A (en) * | 2016-01-12 | 2016-04-06 | 南京工业职业技术学院 | Framework structure top corner post and roofing beam node steel bar space assignment teaching model |
CN108331172A (en) * | 2018-04-20 | 2018-07-27 | 香港华艺设计顾问(深圳)有限公司 | A kind of conversion beam of the unidirectional diagonal brace of setting |
CN109551447A (en) * | 2019-01-04 | 2019-04-02 | 湖南省富生钢结构有限公司 | A kind of support formed steel construction of high stability |
CN111558982A (en) * | 2019-02-13 | 2020-08-21 | 河南天久装配式建筑有限公司 | Manufacturing method of light sandwich concrete reinforced steel angle steel truss column |
CN111558981A (en) * | 2019-02-13 | 2020-08-21 | 河南天久装配式建筑有限公司 | Manufacturing method of light sandwich concrete steel bar truss column |
CN111558995A (en) * | 2019-02-13 | 2020-08-21 | 河南天久装配式建筑有限公司 | Manufacturing method of light sandwich concrete angle steel truss column |
Also Published As
Publication number | Publication date |
---|---|
CN1995571B (en) | 2010-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1995571B (en) | Built-in steel truss concrete composite giant beam-column frame and its manufacturing method | |
CN1995579B (en) | Steel pipe concrete frame-steel truss-concrete combined shear wall and its manufacture method | |
CN101435231B (en) | Folding frame - steel support - concrete combined shear wall and manufacturing method thereof | |
CN101260692B (en) | Bearing force-free anti-knock steel support system | |
CN102704593B (en) | Steel tube reinforced concrete composite column-steel beam-lattice steel support shear wall and manufacturing method | |
CN202627254U (en) | Shear wall consisting of vertical mild steel energy consumption belts with horizontal seams arranged among concrete-filled steel tubes | |
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN103061453B (en) | Double-perforated steel plate-concrete combined coupling beam | |
CN102995789A (en) | Built-in section steel column-lattice steel beam-mesh steel support concrete wall body and manufacturing method | |
CN207776149U (en) | A kind of Prefabricated concrete-filled steel tube frame-shear wall | |
CN209637112U (en) | A steel pipe concrete pouring body with tension bars | |
CN101435235A (en) | Steel tube concrete - steel support - steel plate external wrapping concrete shear force wall and manufacturing method thereof | |
CN110439104A (en) | Low system of multi-floor steel structure residential building and its method of construction | |
CN208604792U (en) | A kind of prefabricated prestressing Self-resetting shear wall structure | |
CN208072705U (en) | A kind of energy-dissipating and shock-absorbing connection structure of coupling beam | |
CN112832417A (en) | Honeycomb hollow grid tubular double steel plate concrete composite shear wall and preparation method thereof | |
CN102704597A (en) | Encased concrete composite shear wall embedded with dense steel plate beams between concrete-filled steel tube columns and construction method thereof | |
CN215211690U (en) | Buckling-restrained steel plate shear wall | |
CN201016187Y (en) | Built-in steel truss concrete composite giant beam-column frame | |
CN102561552A (en) | Steel tube concrete shear wall comprising vertical soft steel energy consuming straps with horizontal seams and manufacturing method | |
CN212104521U (en) | Girdle truss and super high-rise building giant frame | |
CN202672353U (en) | Panel constraint type concrete filled steel tube composite column-steel beam joint | |
CN2791137Y (en) | Concrete combine tube with built-in steel girder | |
CN102409755B (en) | Section steel concrete frame inbuilt steel plate core cylinder with doubly superimposed bottom and producing method thereof | |
CN210597882U (en) | Lattice type steel reinforced concrete combined column beam column node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: BEIJING UNIVERSITY OF TECHNOLOGY Effective date: 20130104 Owner name: CANGZHOU INSTITUTE OF ARCHITECTURAL DESIGN CO., LT Free format text: FORMER OWNER: BEIJING UNIVERSITY OF TECHNOLOGY Effective date: 20130104 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Cao Wanlin Inventor after: Zhang Hongyu Inventor after: Tian Na Inventor after: Zhang Defeng Inventor after: Liu Shuyi Inventor after: Cui Yuguo Inventor after: Wang Min Inventor after: Zhang Jianwei Inventor before: Cao Wanlin Inventor before: Wang Min Inventor before: Zhang Jianwei |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: CAO WANLIN WANG MIN ZHANG JIANWEI TO: CAO WANLIN ZHANG HONGYU TIAN NA ZHANG DEFENG LIU SHUYI CUI YUGUO WANG MIN ZHANG JIANWEI Free format text: CORRECT: ADDRESS; FROM: 100022 CHAOYANG, BEIJING TO: 061000 CANGZHOU, HEBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130104 Address after: 061000 No. 116 West Central Street, Canal District, Hebei, Cangzhou Patentee after: Cangzhou architectural design and Research Institute Co Ltd Patentee after: Beijing University of Technology Address before: 100022 No. 100 Chaoyang District Ping Tian Park, Beijing Patentee before: Beijing University of Technology |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100602 Termination date: 20131229 |