CN1843581A - Square absorption tower for wet method desulfurization of flue gas - Google Patents
Square absorption tower for wet method desulfurization of flue gas Download PDFInfo
- Publication number
- CN1843581A CN1843581A CN 200610200290 CN200610200290A CN1843581A CN 1843581 A CN1843581 A CN 1843581A CN 200610200290 CN200610200290 CN 200610200290 CN 200610200290 A CN200610200290 A CN 200610200290A CN 1843581 A CN1843581 A CN 1843581A
- Authority
- CN
- China
- Prior art keywords
- flue gas
- tower
- wet method
- absorption tower
- mentioned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
Description
(一)技术领域(1) Technical field
本发明涉及一种烟气湿法脱硫装置。The invention relates to a flue gas wet desulfurization device.
(二)背景技术(2) Background technology
在现有的湿法脱硫工艺中,为脱除烟气中的硫份,必须建造烟气反应的反应塔,烟气必须经烟道送入反应塔进行脱硫反应。通常的反应塔为钢制圆形,需要特殊的预加工和复杂的现场组装。该装置为两段变径竖直塔形,其下段为石膏浆池,上段为脱硫反应段,脱硫反应段的下部与进烟管连通。塔形设计复杂,圆柱形塔体加工焊接和安装难度较大,反应塔内烟气的流场分布和流速不合理,反应塔的塔底浆池的浆液经常有沉积和结垢现象,因此影响了烟气的脱硫效果。In the existing wet desulfurization process, in order to remove sulfur in the flue gas, a reaction tower for flue gas reaction must be built, and the flue gas must be sent to the reaction tower through the flue for desulfurization reaction. Usually the reaction tower is round in steel, requiring special prefabrication and complex on-site assembly. The device is in the shape of a two-section variable-diameter vertical tower, the lower section is a gypsum slurry pool, the upper section is a desulfurization reaction section, and the lower part of the desulfurization reaction section is connected with the smoke inlet pipe. The design of the tower is complicated, the processing, welding and installation of the cylindrical tower body are difficult, the flow field distribution and flow velocity of the flue gas in the reaction tower are unreasonable, and the slurry in the slurry pool at the bottom of the reaction tower often deposits and scales, which affects desulfurization effect of flue gas.
(三)发明内容(3) Contents of the invention
本发明的目的是提供一种烟气湿法脱硫方形吸收塔,要解决避免塔底浆池的浆液沉积和结垢的问题;并解决进一步提高烟气脱硫效率的问题;还解决烟气湿法脱硫吸收塔便于加工和安装的技术问题。The purpose of the present invention is to provide a square absorption tower for flue gas wet desulfurization, to solve the problem of avoiding slurry deposition and fouling in the slurry pool at the bottom of the tower; and to solve the problem of further improving the efficiency of flue gas desulfurization; The technical problem of easy processing and installation of the desulfurization absorption tower.
本发明的技术方案:这种烟气湿法脱硫方形吸收塔,塔体下段为循环浆池,上段为洗涤反应段,其特征在于:塔体上段与下段的横截面均为矩形,并垂直连为一体,上段的下部与进烟管连通,上段的中部布有喷淋管,塔体顶部的切线方向连接烟气出口,下段循环浆池内部插入搅拌器和通气管。The technical solution of the present invention: the flue gas wet desulfurization square absorption tower, the lower section of the tower body is a circulating slurry pool, and the upper section is a washing reaction section, which is characterized in that the cross-sections of the upper section and the lower section of the tower body are both rectangular and connected vertically. As a whole, the lower part of the upper section is connected to the smoke inlet pipe, the middle part of the upper section is equipped with a spray pipe, the tangential direction of the top of the tower body is connected to the flue gas outlet, and the agitator and ventilation pipe are inserted into the lower section of the circulating slurry tank.
上述塔体的材质为钢制或混凝土结构。The above-mentioned tower body is made of steel or concrete structure.
上述进烟管与脱硫反应段的插入角度为5-15度。The insertion angle between the above-mentioned smoke inlet pipe and the desulfurization reaction section is 5-15 degrees.
上述塔体的内壁衬有防腐层。The inner wall of the tower body is lined with an anti-corrosion layer.
上述防腐层是橡胶内衬层、树脂鳞片或玻璃鳞片内衬层。The above-mentioned anti-corrosion layer is a rubber lining layer, a resin flake or a glass flake lining layer.
上述防腐层的厚度是2-10mm。The thickness of the above-mentioned anti-corrosion layer is 2-10mm.
上述防腐层的厚度为5-8mm。The thickness of the above-mentioned anticorrosion layer is 5-8mm.
上述喷淋管为一至四层。Above-mentioned shower pipe has one to four layers.
上述喷淋管包括主管和从主管两侧分出的支管,支管两端架设在吸收塔塔壁上的支座上。The above-mentioned spray pipe includes a main pipe and branch pipes branched from both sides of the main pipe, and the two ends of the branch pipe are erected on the support on the wall of the absorption tower.
本发明与现有传统技术相比具有的有益效果:本发明的塔体为正方形或长方形的钢制或混凝土结构,突破了采用传统圆柱形塔体的固有偏见,取得了意想不到的技术效果。上下直连结构消除了易沉积和结垢的载体,解决了塔底循环浆池的浆液易沉积和结垢的问题;反应塔内烟气的流场分布和流速合理,提高了反应速度和脱硫效率,同时,方筒形塔体形状简单,非常便于加工和安装,比传统吸收塔造价大为降低。可以广泛应用在石灰石(石灰)-石膏湿法或海水脱硫工艺。方形吸收塔的烟气处理量和传统的钢制圆形塔相当,可以满足从50MW至1000MW容量机组的烟气湿法脱硫的处理需要。Compared with the existing traditional technology, the invention has beneficial effects: the tower body of the invention is a square or rectangular steel or concrete structure, which breaks through the inherent prejudice of adopting the traditional cylindrical tower body, and achieves unexpected technical effects. The upper and lower direct connection structure eliminates the carrier that is easy to deposit and scale, and solves the problem that the slurry in the bottom circulating slurry tank is easy to deposit and scale; the flow field distribution and flow rate of the flue gas in the reaction tower are reasonable, which improves the reaction speed and desulfurization Efficiency. At the same time, the square cylindrical tower has a simple shape, which is very convenient for processing and installation, and the cost is much lower than that of traditional absorption towers. It can be widely used in limestone (lime)-gypsum wet process or seawater desulfurization process. The flue gas processing capacity of the square absorption tower is equivalent to that of the traditional steel circular tower, which can meet the processing needs of flue gas wet desulfurization for units with a capacity of 50MW to 1000MW.
(四)附图说明(4) Description of drawings
图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图2是俯视吸收塔内部喷淋层的示意图;Fig. 2 is the schematic diagram that overlooks the spray layer inside the absorption tower;
图3是侧视吸收塔内部喷淋层的示意图。Fig. 3 is a schematic diagram of the spray layer inside the absorption tower viewed from the side.
1-洗涤反应塔、2-循环浆池、3-进烟管、4-喷淋管、5-烟气出口、6-防腐层、7-搅拌器、8-通气管、9-主管、10-支管、11-支座、12-法兰、13-检查孔、14-排气孔。1-washing reaction tower, 2-circulating slurry tank, 3-smoke inlet pipe, 4-spray pipe, 5-smoke gas outlet, 6-anti-corrosion layer, 7-stirrer, 8-ventilation pipe, 9-main pipe, 10 -branch pipe, 11-support, 12-flange, 13-inspection hole, 14-exhaust hole.
(五)具体实施方式(5) Specific implementation methods
参见图1-3,这种烟气湿法脱硫方形吸收塔,塔体下段为循环浆池2,塔体上段为洗涤反应塔1,塔体上段与下段的横截面均为矩形,并垂直连为一体,上段的下部与进烟管3连通,上段的中部布有四层喷淋管4,喷淋管包括主管9和从主管两侧分出的支管10,主管9上有检查孔13和排气孔14,主管9与支管10由法兰12连接,支管两端架设在吸收塔塔壁上的支座11上。Referring to Figure 1-3, this kind of flue gas wet desulfurization square absorption tower, the lower part of the tower body is the circulating slurry tank 2, the upper part of the tower body is the
塔体顶部的切线方向连接烟气出口5。上述塔体的材质为钢制或混凝土结构。上述进烟管3与洗涤反应段的插入角度a为5-15度。下段循环浆池内部插入搅拌器7和通气管8。The tangential direction at the top of the tower body is connected to the flue gas outlet 5 . The above-mentioned tower body is made of steel or concrete structure. The insertion angle a between the smoke inlet pipe 3 and the washing reaction section is 5-15 degrees. A stirrer 7 and a ventilation pipe 8 are inserted into the lower circulation slurry tank.
吸收塔的内部由于接触腐蚀性的浆液和烟气,在塔体内壁可衬有防腐层6,防腐层可选择橡胶内衬层、玻璃鳞片或树脂鳞片内衬层,防腐层的厚度是2-10mm,最佳厚度为5-8mm。The interior of the absorption tower is exposed to corrosive slurry and flue gas, and the inner wall of the tower can be lined with an anti-corrosion layer 6. The anti-corrosion layer can choose a rubber inner liner, glass flake or resin flake inner liner, and the thickness of the anti-corrosion layer is 2- 10mm, the best thickness is 5-8mm.
本发明提出了采用正方形或长方形的钢制或混凝土制结构作为脱硫反应的吸收塔。塔底部为循环浆池,需要脱硫的烟气经烟道送入塔内浆池上方。经塔内洗涤的烟气从塔的上部出口排出。塔内的烟气流速控制在3~5米/秒。塔内一般为微正压的工作环境,塔体的厚度需根据强度计算的结构确定。The present invention proposes to adopt a square or rectangular steel or concrete structure as the absorption tower for desulfurization reaction. The bottom of the tower is a circulating pulp pool, and the flue gas that needs to be desulfurized is sent to the top of the pulp pool in the tower through the flue. The flue gas washed in the tower is discharged from the upper outlet of the tower. The flue gas velocity in the tower is controlled at 3-5 m/s. The inside of the tower is generally a slightly positive pressure working environment, and the thickness of the tower body needs to be determined according to the structure of the strength calculation.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB200610200290XA CN100450588C (en) | 2006-03-30 | 2006-03-30 | Square absorption tower for wet method desulfurization of flue gas |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB200610200290XA CN100450588C (en) | 2006-03-30 | 2006-03-30 | Square absorption tower for wet method desulfurization of flue gas |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1843581A true CN1843581A (en) | 2006-10-11 |
| CN100450588C CN100450588C (en) | 2009-01-14 |
Family
ID=37062569
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB200610200290XA Active CN100450588C (en) | 2006-03-30 | 2006-03-30 | Square absorption tower for wet method desulfurization of flue gas |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN100450588C (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102274688A (en) * | 2011-04-10 | 2011-12-14 | 江苏揽山环境科技有限公司 | Multistage spray absorbing device with high efficiency |
| CN109603431A (en) * | 2018-11-29 | 2019-04-12 | 北京国电龙源环保工程有限公司 | The rectangular desulfuration absorbing tower of steel construction of high position arrangement |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2140809C1 (en) * | 1995-02-28 | 1999-11-10 | Бабкок-Хитачи Кабусики Кайса | Wet-type plant for desulfurization of flue gases and method of use of solid desulfurizing substance |
| CN2376993Y (en) * | 1999-05-06 | 2000-05-10 | 彭铁成 | Integral flue gas desulfuration dust-collecting apparatus |
| CN2374256Y (en) * | 1999-05-13 | 2000-04-19 | 祖国铭 | Effective desulfrizing appts. in smoke duct |
| CN2647415Y (en) * | 2003-10-27 | 2004-10-13 | 刘幼林 | Overflow circulating efficient desulfurization dust-removing apparatus |
| CN2923004Y (en) * | 2006-03-30 | 2007-07-18 | 国电科技环保集团有限公司 | Flue gas wet desulfurization square absorption tower |
-
2006
- 2006-03-30 CN CNB200610200290XA patent/CN100450588C/en active Active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102274688A (en) * | 2011-04-10 | 2011-12-14 | 江苏揽山环境科技有限公司 | Multistage spray absorbing device with high efficiency |
| CN102274688B (en) * | 2011-04-10 | 2013-06-26 | 江苏揽山环境科技有限公司 | Multistage spray absorbing device with high efficiency |
| CN109603431A (en) * | 2018-11-29 | 2019-04-12 | 北京国电龙源环保工程有限公司 | The rectangular desulfuration absorbing tower of steel construction of high position arrangement |
| CN109603431B (en) * | 2018-11-29 | 2023-12-19 | 国能龙源环保有限公司 | Steel structure square desulfurization absorption tower arranged at high position |
Also Published As
| Publication number | Publication date |
|---|---|
| CN100450588C (en) | 2009-01-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105268296A (en) | Acid mist purifying tower | |
| CN1597059A (en) | Twin-tower circulation washing and suction smoke and desulfurization method for waste water of power plant boiler | |
| CN106823742A (en) | A kind of desulfurization and dust-removal method of double circulation desulphurization and dust-removing device and flue gas | |
| CN2923004Y (en) | Flue gas wet desulfurization square absorption tower | |
| CN1843581A (en) | Square absorption tower for wet method desulfurization of flue gas | |
| CN204093296U (en) | A kind of wet flue gas desulfurization tower | |
| CN107758160A (en) | A kind of method of guarantee the quality type sulfuric acid storage facility and raising sulfuric acid quality | |
| CN109529596A (en) | A kind of SDA semi-dry desulphurization tower of improvement | |
| CN201454364U (en) | Combined flue gas desulfurization absorption tower with enhanced corrosion resistant performance | |
| CN103388829A (en) | Eliminator for gypsum rain or stack rain in wet desulphurization system | |
| CN101062462A (en) | Liquid holding bath side-placed smoke gas desulfurization unit | |
| CN1843580A (en) | Flue gas desulfurization circulating slurry spraying device | |
| CN113233566A (en) | A acid-base charge device of waste water treatment for steam power plant | |
| CN219540005U (en) | Calcium desulfurization tower cauldron thick liquid agitating unit | |
| CN208799958U (en) | A kind of horizontal calcium method desulfurizing tower | |
| CN206103695U (en) | Desulfurization absorption tower | |
| CN215610542U (en) | Desulfurizing tower thick liquid pond subregion oxidation unit | |
| CN201050795Y (en) | Separated type flue gas desulfurizing and absorption tower | |
| CN212369950U (en) | Hydraulic stirring system for ammonia flue gas desulfurization | |
| CN210522234U (en) | Installation structure of adsorption device of desulfurization tank | |
| CN210584445U (en) | Plastic adsorption desulfurizing pot | |
| CN100556511C (en) | Wet method flue gas-desulfurizing absorption tower with dual speed sprinkling and desulfurizing absorption method thereof | |
| CN222865646U (en) | Anti-blocking heat exchanger | |
| CN220983065U (en) | A local corrosion test device for round steel pipes in a simulated industrial-coastal environment | |
| CN120039832A (en) | Vertical concentrated sulfuric acid circulating tank, concentrated sulfuric acid dry suction production system and dry suction production process |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20081226 Address after: Beijing City, Xuanwu District Xuanwu street outside No. 28 Futuris building block A No. 1609 Patentee after: Guodian Longyuan Environment Protection Engrg. Co., Ltd., Beijing Address before: Beijing City, Beijing City, Xuanwu District No. two Baiguang Road Patentee before: Guo Dian Technology Environment Protection Group Co., Ltd. |
|
| ASS | Succession or assignment of patent right |
Owner name: BEIJING GUODIAN LONGYUAN ENVIRONMENTAL PROTECTION Free format text: FORMER OWNER: GUO DIAN TECHNOLOGY ENVIRONMENT PROTECTION GROUP CO., LTD. Effective date: 20081226 |
|
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangsu Deke Environmental Equipment Co., Ltd. Assignor: Guodian Longyuan Environment Protection Engrg. Co., Ltd., Beijing Contract fulfillment period: 2009.2.18 to 2014.2.18 Contract record no.: 2009320000586 Denomination of invention: Square absorption tower for wet method desulfurization of flue gas Granted publication date: 20090114 License type: Exclusive license Record date: 20090413 |
|
| LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.2.18 TO 2014.2.18; CHANGE OF CONTRACT Name of requester: JIANGSU DEKE ENVIRONMENTAL PROTECTION EQUIPMENT CO Effective date: 20090413 |
|
| ASS | Succession or assignment of patent right |
Owner name: NATIONAL ELECTRIC NEW ENERGY TECHNOLOGY INSTITUTE Effective date: 20130701 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20130701 Address after: 100052 Beijing City, Xuanwu District Xuanwu street outside No. 28 Futuris building block A No. 1609 Patentee after: Guodian Longyuan Environment Protection Engrg. Co., Ltd., Beijing Patentee after: Guodian New Energy Technology Institute Address before: 100052 Beijing City, Xuanwu District Xuanwu street outside No. 28 Futuris building block A No. 1609 Patentee before: Guodian Longyuan Environment Protection Engrg. Co., Ltd., Beijing |
|
| CP03 | Change of name, title or address |
Address after: 100039 room 901, 9 / F, building 1, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing Patentee after: Guoneng Longyuan environmental protection Co.,Ltd. Patentee after: GUODIAN NEW ENERGY TECHNOLOGY INSTITUTE Address before: 100052 Beijing City, Xuanwu District Xuanwu street outside No. 28 Futuris building block A No. 1609 Patentee before: BEIJING GUODIAN LONGYUAN ENVIRONMENTAL ENGINEERING Co.,Ltd. Patentee before: GUODIAN NEW ENERGY TECHNOLOGY INSTITUTE |
|
| CP03 | Change of name, title or address |