CN1793525A - Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method - Google Patents

Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method Download PDF

Info

Publication number
CN1793525A
CN1793525A CN 200610037621 CN200610037621A CN1793525A CN 1793525 A CN1793525 A CN 1793525A CN 200610037621 CN200610037621 CN 200610037621 CN 200610037621 A CN200610037621 A CN 200610037621A CN 1793525 A CN1793525 A CN 1793525A
Authority
CN
China
Prior art keywords
sand stone
core sand
concrete
concrete core
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610037621
Other languages
Chinese (zh)
Other versions
CN100371537C (en
Inventor
赵维炳
唐彤芝
蔡新
黄家青
沙迎春
黄健
乐茂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing R & D Tech Group Co., Ltd.
Original Assignee
NANSHUI SOIL CONSTRUCTION ENGINEERING Co JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANSHUI SOIL CONSTRUCTION ENGINEERING Co JIANGSU filed Critical NANSHUI SOIL CONSTRUCTION ENGINEERING Co JIANGSU
Priority to CNB2006100376212A priority Critical patent/CN100371537C/en
Publication of CN1793525A publication Critical patent/CN1793525A/en
Application granted granted Critical
Publication of CN100371537C publication Critical patent/CN100371537C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to deep-thick soft foundation reinforcing new method-concrete core sand stone pile composite foundation. It is aimed at the current problem, and combines drainage consolidation method. It is used pre-form concrete pile as pile core to bear vertical load and transmit it to below solid ground. The medium coarse sand or brash chips are filled around to use as pile shell to increase core pile side surface friction resistance and vertical drainage. The pile body is laid with mattress layer to from new composite foundation. The method has the advantages of simple construction, fast pile forming speed, fast earth strength resuming, saving curing time and high strength. It can be applied to deep-thick soft earth foundation with high water and organic matter content, especially for irrigation works and traffic engineering.

Description

The new method of reinforcing deep soft base-concrete core sand stone mar compound foundation method
Technical field
The present invention relates to a kind of method for processing foundation, especially a kind of reinforcing and processing method of high-moisture high organic content deep soft soil foundation, specifically a kind of new method of reinforcing deep soft base-concrete core sand stone mar compound foundation method.
Background technology
Soft-soil foundation treatment method mainly contains preloading, dynamic compaction, cement mixing pile, powder spray piling, compacted sand-gravel pile, CFG stake, cast-in-place thin-wall pipe pile, prefabricated tubular pile compound foundation method etc. at present.Wherein, piling prepressing discharging consolidation method easy construction, expense are low, but exist the reinforcing phase long, settlement after construction is big, in work progress for guaranteeing that base stabilization needs problems such as the loading velocity requirement are tight; Dynamic compaction exist to lack ripe design and calculation method, ruggedized equipment and rams that energy is little, reinforcement depth is shallow (generally about 10m), problem such as constructional difficulties, consolidation effect difference when groundwater table is high; Cement mixing pile and powder spray piling are cheap, construction technology is comparatively ripe, and reinforcement depth shallow (general unit in charge of construction quality can guarantee that the degree of depth is in 12~14 meters), match ratio and construction technology must in time be adjusted according to geological conditions,, problem such as construction quality wayward strict to unit in charge of construction's technical level but exist; Problems such as stake poor continuity when compacted sand-gravel pile exists natural weak soil intensity low, bearing capacity are little; Problem such as bottom poor continuity when stake was longer when immersed tube pore-forming CFG stake existed natural weak soil intensity low, there are problems such as ruggedized equipment is few, output investment ratio immersed tube pore-forming CFG stake high about 10% in long spiral pore-forming CFG stake; There is the quality examination difficulty in cast-in-place thin-wall pipe pile, invests problems such as big; The prefabricated tubular pile existence runs into hard interbedded layer and penetrates difficulty, invests problems such as big.On the whole, the reinforcing of discharging consolidation method ubiquity is long in time limit, settlement after construction big, require problems such as tight to banketing; Problem such as low-intensity pile composite foundation method ubiquity quality control difficulty, reinforcement depth are shallow; Then there are problems such as investment is bigger in the compound ground method of high strength, so these methods all have its scope of application.
Summary of the invention
The purpose of this invention is to provide a kind of in conjunction with consolidation to the consolidation effect of weak soil own significantly and precast concrete pile intensity height, quality control the concrete core sand stone mar compound foundation method of both advantages easily.
Technical scheme of the present invention is:
A kind of new method of reinforcing deep soft base-concrete core sand stone mar compound foundation method is characterized in that it may further comprise the steps:
A, employing vibration sinking tube or long spiral way form installing hole on soft foundation;
B, the prefabricated single or some prefabricated concrete stakes that connect while placing less than the aperture of the installing hole of above-mentioned gained of maximum outside diameter size are positioned in the described installing hole between two parties;
C, perfusion has excellent permeability in space around described installing hole and the concrete stake sand and/or stone fragment, limit vibration pipe-drawing limit material filling makes the sand of perfusion in the hole and/or rubble form the draining shell of stake through vibratory compaction, thereby obtains concrete core sand stone mar;
The quantity of the concrete core sand stone mar that d, repetition a, b, c bury underground on the soft foundation of reinforcing at need meets design requirement;
E, lay and the suitable mattress layer of soft foundation area that needs to reinforce at the top of concrete core sand stone mar, described concrete core sand stone mar promptly constitutes composite foundation of the present invention with described mattress layer, forms drainage channel between concrete core sand stone mar and mattress layer.
The present invention has also further taked following technical measures:
1, make the upper surface of described concrete core sand stone mar apart from 20~50 centimetres on ground, and make and form a reverse taper hole between the top of concrete core sand stone mar and the ground, in described reverse taper hole, pour into sand and/or rubble and compacting, formation prevents that prefabricated concrete pile body produces the sand stone layer of thrusting destruction upwards under the upper load effect, lay mattress layer then on sand stone layer top, the draining shell of concrete core sand stone mar, sand stone layer, mattress layer mutual group become drainage channel.
2, described sand can be pure medium coarse sand.
3, described mattress layer can be sand or rubble mattress layer, and its thickness is 40~60 centimetres.
4, be provided with two-way geogrids layer in described mattress layer, the soffit of mattress layer contacts with sand stone layer in the described reverse taper hole.
5, described prefabricated concrete stake or be cylindrical or square, the internal diameter of described installing hole should be greater than the external diameter of cylindrical concrete stake or the cross section catercorner length of square concrete stake, and the space between installing hole hole wall and the prefabricated concrete stake outer wall placed in the middle is not less than 10cm.
Beneficial effect of the present invention:
Prefabricated concrete stake of the present invention mainly plays bears vertical load and it is passed to down hardpan effect for sleeping in, owing to be prefabricated, quality is controlled easily, thereby make concrete high strength be not fully exerted, thereby can reach the bearing capacity of single pile of pile strength control and the single pile bearing equilibrium of forces of pile side friction control (mainly by the control of sidewall frictional resistance, concrete strength wastes 30~50% to the bearing capacity of single pile of common friction-type concrete stake); The sandstone shell that is tamped around the concrete stake of the present invention mainly works core pile sidewall friction force and the vertical drainage effect of strengthening, and weak soil because of descending, is recovered strength of turbulence rapidly, sharing the super quiet hole of banketing behind the load in the inter-pile soil, ground presses rapidly and dissipates, dissipation speed is generally about 18 times in the common plastics plate consolidation, inter-pile soil intensity improves rapidly, and the bearing capacity of stake increases along with the depth of fill and significantly improves; Owing to needn't resemble vertical carrying the sand compaction pile, so require needn't be too high for the compactness of arenaceous shell, common vibratory compaction or perfusion pressurize closely knit all can, thereby convenient and quick construction.Simultaneously concrete core sand stone mar of the present invention need not maintenance, can save the curing time before detecting when engineering is used.
Description of drawings
Fig. 1 is the structural representation of concrete core sand stone mar of the present invention.
Fig. 2 is the structural representation of composite foundation of the present invention.
Fig. 3 is a concrete core sand stone mar composite foundation structure generalized section of the present invention.
1 is prefabricated concrete stake among the figure, and 2 are the draining shell, and 3 is the back taper sand stone layer, and 4 is geogrids layer, and 5 is the sandstone mattress layer, and 6 is concrete core sand stone mar, and 7 is top preloading layer.
The specific embodiment
The present invention is further illustrated below in conjunction with accompanying drawing and example.
As shown in Figure 1, 2, 3.
Specific operation process of the present invention is:
(1) stake position setting-out: arrange stake position (being the position of installing hole) by the design scheme requirement.
(2) pile-forming machine perching: the stake machine moves to pre-piling position, center, immersed tube centrally aligned stake position, and it is perpendicular to the ground to adjust immersed tube, guarantees that perpendicularity deviation is not more than 1%.
(3) immersed tube: starter, immersed tube is shut down to predetermined absolute altitude.Starter vibration loading when meeting hard interbedded layer is until penetrating hard interbedded layer.Adopt vibration sinking tube (it is generally weak to be applicable to that ground does not have hard interbedded layer, weak soil soil property) or long spiral (being applicable to that ground has very weakness of hard interbedded layer or weak soil soil property) mode pore-forming.
(4) put into prefabricated concrete stake 1: immersed tube utilizes after the projected depth hoist engine prefabricated concrete stake 1 to be sling and by the hole in the middle of two vibrating hammers the steel pipe center is put in first prefabricated concrete stake 1 from tower top and fixes, and puts into the hole subsequently slowly.When treating that pile crown bassets 50~60cm, insert from the pile body preformed hole with a bar reinforcement that is about 80cm and to cross, take, place in the hole pile body is unsettled, so that pile extension in the firm position of stake pipe.
(5) pile extension: be connected pre-embedded steel slab flange, sulphur spring clay, welded connection or other effective means spreading that adopts routine between stake and the stake.
(6) feed intake, tube drawing: pile body is all put into hole back spud pile in center, position, hole, utilizing near the pipe top dog-house to pour into pure medium coarse sand or stone fragment enriches and pushes up until stake, starter stays the 5~10s that shakes, begin tube drawing then and open the sharp flap valve door of stake, tube drawing limit, limit vibration (adopting segmentation to stay in case of necessity shakes) forms the concrete core sand stone mar 6 that has draining shell 2 in ground.Pipe-pulling speed should be controlled at about 1.2~1.5m/min by at the uniform velocity control.Repeat above-mentioned steps and continue next root construction.
(7) treat to lay the sandstone of geo-grid 4 and the thick 40~60cm of being as mattress layer 5 at the top of stake after whole concrete core sand stone mar 6 constructions finish.Lay half storey sand-gravel cushion down earlier, lay two-way geo-grid 4 after the leveling compacting, lay then and go up the half storey sand-gravel cushion, all concrete core sand stone mars 6, geo-grid 4 and up and down two half storey sandstone mattress layers 5 constituted composite foundation of the present invention, the draining shell 2 of concrete core sand stone mar 6, geo-grid 4 and up and down two half storey sandstone mattress layers 5 formed the drainage channel that connects simultaneously between them.
For preventing that prefabricated concrete stake produces the destruction of thrusting that makes progress under the upper load effect, can control the stake top behind the pile and be lower than ground 20~50cm, can form than the big slightly cone-shaped groove of concrete core sand stone mar 6 diameters on pile crown top with artificial finishing a little back, pour into the sandstone compacting and form back taper sand stone layer 3, lay the sandstone mattress layer 5 of thick about 40~60cm and 1~2 layer geo-grid 4 subsequently, concrete core sand stone mar 6, sand stone layer 3, sandstone mattress layer 5 and the geo-grid 4 that is arranged in the sandstone mattress layer constitute the more perfect composite foundation of the present invention together, the draining shell 2 of concrete core sand stone mar 6, sand stone layer 3, sandstone mattress layer 5 and the geo-grid 4 that is arranged in the sandstone mattress layer form the more complete drainage channel of the present invention, as Fig. 2, shown in 3.Prefabricated concrete stake can be circle, also can be square (as Fig. 1), about the about 20cm of diameter, is of a size of 20cm * 20cm when square when its size is generally circle.

Claims (6)

1, a kind of new method of reinforcing deep soft base-concrete core sand stone mar compound foundation method is characterized in that it may further comprise the steps:
A, employing vibration sinking tube or long spiral way form installing hole on soft foundation;
B, the prefabricated single or some prefabricated concrete stakes that connect while placing less than the aperture of the installing hole of above-mentioned gained of maximum outside diameter size are positioned in the described installing hole between two parties;
C, perfusion has excellent permeability in space around described installing hole and the concrete stake sand and/or stone fragment, limit vibration pipe-drawing limit material filling makes the sand of perfusion in the hole and/or rubble form the draining shell of stake through vibratory compaction, thereby obtains concrete core sand stone mar;
The quantity of the concrete core sand stone mar that d, repetition a, b, c bury underground on the soft foundation of reinforcing at need meets design requirement;
E, lay and the suitable mattress layer of soft foundation area that needs to reinforce at the top of concrete core sand stone mar, described concrete core sand stone mar promptly constitutes composite foundation of the present invention with described mattress layer, forms drainage channel between concrete core sand stone mar and mattress layer.
2, the new method of reinforcing deep soft base according to claim 1-concrete core sand stone mar compound foundation method, it is characterized in that making the upper surface of described concrete core sand stone mar apart from 20~50 centimetres on ground, and make and form a reverse taper hole between the top of concrete core sand stone mar and the ground, in described reverse taper hole, pour into sand and/or rubble and compacting, formation prevents that prefabricated concrete pile body produces the sand stone layer of thrusting destruction upwards under the upper load effect, lay mattress layer, the draining shell of concrete core sand stone mar then on sand stone layer top, sand stone layer, the mattress layer mutual group becomes drainage channel.
3, the new method of reinforcing deep soft base according to claim 1 and 2-concrete core sand stone mar compound foundation method is characterized in that described sand is pure medium coarse sand, and described rubble is a stone fragment.
4, the new method of reinforcing deep soft base according to claim 1-concrete core sand stone mar compound foundation method is characterized in that described mattress layer is the sandstone mattress layer, and its thickness is 40~60 centimetres.
5, according to the new method-concrete core sand stone mar compound foundation method of claim 1 or 4 described reinforcing deep soft bases, it is characterized in that being provided with two-way geogrids layer in described mattress layer, the soffit of mattress layer contacts with sand stone layer in the described reverse taper hole.
6, the new method of reinforcing deep soft base according to claim 1-concrete core sand stone mar compound foundation method, it is characterized in that described prefabricated concrete stake is cylindrical or square, the internal diameter of described installing hole should be greater than the external diameter of cylindrical concrete stake or the cross section catercorner length of square concrete stake, and the space between installing hole hole wall and the prefabricated concrete stake outer wall placed in the middle is not less than 10cm.
CNB2006100376212A 2006-01-05 2006-01-05 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method Expired - Fee Related CN100371537C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100376212A CN100371537C (en) 2006-01-05 2006-01-05 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100376212A CN100371537C (en) 2006-01-05 2006-01-05 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method

Publications (2)

Publication Number Publication Date
CN1793525A true CN1793525A (en) 2006-06-28
CN100371537C CN100371537C (en) 2008-02-27

Family

ID=36805163

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100376212A Expired - Fee Related CN100371537C (en) 2006-01-05 2006-01-05 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method

Country Status (1)

Country Link
CN (1) CN100371537C (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831904A (en) * 2010-05-06 2010-09-15 南京工业大学 Permeable concrete pile
CN102011391A (en) * 2010-11-11 2011-04-13 河北建设勘察研究院有限公司 Reinforcement processing method of soft foundation
CN102071679A (en) * 2010-12-29 2011-05-25 西安建筑科技大学 Method for consolidating existing building foundation
CN103336105A (en) * 2013-06-18 2013-10-02 浙江工业大学 Soft foundation treatment experiment device and method
CN103437371A (en) * 2013-08-29 2013-12-11 湖南城市学院 Construction method of water drainage uplift pile
CN104762961A (en) * 2015-04-21 2015-07-08 福州大学 Ultra-high performance concrete and common concrete combined pile and construction method thereof
CN107916661A (en) * 2017-11-24 2018-04-17 国家电网公司 A kind of reinforcement means of transmission line of electricity collapsible loess foundation
CN108677912A (en) * 2018-06-07 2018-10-19 江苏科技大学 A kind of CFG core sands stone built pile, its composite foundation constituted and construction method
CN109440802A (en) * 2018-12-25 2019-03-08 郭兆泉 The tamper dentiform pile and its construction method haveing excellent performance
CN110359443A (en) * 2019-08-01 2019-10-22 顾青林 A kind of soft foundation in water conservancy project construction method
CN110409525A (en) * 2019-07-31 2019-11-05 大成科创基础建设股份有限公司 Weak soil and unfavorable geology composite foundation reinforcing method
CN111622273A (en) * 2020-05-08 2020-09-04 浙江大学 Test device and test method for simulating pile foundation bearing performance of precast pile filled with discrete drainage materials around
CN112359815A (en) * 2020-11-05 2021-02-12 浙江世润建创科技发展有限公司 Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0447018A (en) * 1990-06-15 1992-02-17 Taisei Corp Reinforcement method for soft ground
JPH04108910A (en) * 1990-08-28 1992-04-09 Daido Concrete Kogyo Kk Method for processing pile head of sunk concrete pile
CN1121973A (en) * 1994-05-13 1996-05-08 顾叙根 Double compounded crushed stone pile and concrete cast-in-place pile foundation and its construction method
JP3904274B2 (en) * 1997-02-25 2007-04-11 日本コンクリート工業株式会社 Construction method for building foundation
CN1158434C (en) * 2002-01-14 2004-07-21 河海大学 Construction method of large-diameter cast-in-place pipe pile composite foundation for soft foundation treatment
CN1470709A (en) * 2002-07-26 2004-01-28 峻 曹 Reinforced bored concrete pile construction method

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831904A (en) * 2010-05-06 2010-09-15 南京工业大学 Permeable concrete pile
CN102011391A (en) * 2010-11-11 2011-04-13 河北建设勘察研究院有限公司 Reinforcement processing method of soft foundation
CN102011391B (en) * 2010-11-11 2012-01-11 河北建设勘察研究院有限公司 Reinforcement processing method of soft foundation
CN102071679A (en) * 2010-12-29 2011-05-25 西安建筑科技大学 Method for consolidating existing building foundation
CN103336105A (en) * 2013-06-18 2013-10-02 浙江工业大学 Soft foundation treatment experiment device and method
CN103336105B (en) * 2013-06-18 2015-03-25 浙江工业大学 Soft foundation treatment experiment device and method
CN103437371A (en) * 2013-08-29 2013-12-11 湖南城市学院 Construction method of water drainage uplift pile
CN103437371B (en) * 2013-08-29 2015-06-10 湖南城市学院 Construction method of water drainage uplift pile
CN104762961A (en) * 2015-04-21 2015-07-08 福州大学 Ultra-high performance concrete and common concrete combined pile and construction method thereof
CN104762961B (en) * 2015-04-21 2016-03-30 福州大学 A composite pile of ultra-high performance concrete and ordinary concrete and its construction method
CN107916661A (en) * 2017-11-24 2018-04-17 国家电网公司 A kind of reinforcement means of transmission line of electricity collapsible loess foundation
CN108677912A (en) * 2018-06-07 2018-10-19 江苏科技大学 A kind of CFG core sands stone built pile, its composite foundation constituted and construction method
CN109440802A (en) * 2018-12-25 2019-03-08 郭兆泉 The tamper dentiform pile and its construction method haveing excellent performance
CN110409525A (en) * 2019-07-31 2019-11-05 大成科创基础建设股份有限公司 Weak soil and unfavorable geology composite foundation reinforcing method
CN110409525B (en) * 2019-07-31 2021-07-02 大成科创基础建设股份有限公司 Soft soil and unfavorable geology composite foundation reinforcing method
CN110359443A (en) * 2019-08-01 2019-10-22 顾青林 A kind of soft foundation in water conservancy project construction method
CN111622273A (en) * 2020-05-08 2020-09-04 浙江大学 Test device and test method for simulating pile foundation bearing performance of precast pile filled with discrete drainage materials around
CN111622273B (en) * 2020-05-08 2021-04-23 浙江大学 Test device and test method for simulating pile foundation bearing performance of precast piles filled with surrounding bulk drainage material
CN112359815A (en) * 2020-11-05 2021-02-12 浙江世润建创科技发展有限公司 Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof

Also Published As

Publication number Publication date
CN100371537C (en) 2008-02-27

Similar Documents

Publication Publication Date Title
CN102206939B (en) Method for processing soft soil foundation of high vacuum drainage filter pipe capable of being grouted
WO2021082767A1 (en) Method for constructing reinforced fiber and metakaolin-based pressurized cast-in-place pile
CN100371537C (en) Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN103184734A (en) Implanted and grouted compound pile and construction method
CN201358456Y (en) Plastic sleeve concrete pile
CN103074882A (en) Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles
CN103774674A (en) Support structure for steel tube underpinned pile and anchor rod deep pit and construction method thereof
CN111485547A (en) A kind of prefabricated horizontal bearing type high toughness concrete permeable pile and preparation method thereof
CN101532291B (en) Reinforcement of thick overburden layer and deep buried soft soil layer variable-diameter plastic casing hybrid pile and its pile-forming method
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN102322057A (en) Grouting type cement fly-ash gravel (CFG) pile construction method with continuous construction operation function
CN111058443A (en) Precast pile composite foundation construction method for eliminating loess collapsibility
CN108824412B (en) Soft foundation treatment method based on gabion wall reinforced soil and dynamic compaction
CN104480956A (en) Small-diameter mold-bagged concrete pile composite foundation
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN104695417A (en) Post-grouting gravel pile composite foundation, post-grouting gravel pile and manufacturing method of post-grouting gravel pile
CN105839620A (en) Plastic-sleeve bamboo-reinforcement cemented soil pile and construction method thereof
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof
CN2753797Y (en) Long-spiral pressure-poured concrete core-inserting combined pile
CN117211700A (en) Pile body expanding multifunctional double-power drilling tool, preparation method and pile
CN1648354A (en) Method of Drilling Prefabricated Composite Pile
CN202202325U (en) Compaction expansion micro mortar pile forming device
CN108570979A (en) A kind of construction method for building antiseepage composite foundation on dolomite stratigraph
CN1676762A (en) Boring-tamping lime-soil compacting pile construction process
CN102605775A (en) Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANJING R+D CONSTRUCTION TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: NANSHUI SOIL CONSTRUCTION ENGINEERING CO., JIANGSU

Effective date: 20120730

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120730

Address after: 1122, room 223, 210029 Guangzhou Road, Jiangsu, Nanjing

Patentee after: Nanjing R & D Tech Group Co., Ltd.

Address before: 210029 Guangzhou Road, Jiangsu, China, No. 223, No.

Patentee before: Nanshui Soil Construction Engineering Co., Jiangsu

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080227

Termination date: 20180105

CF01 Termination of patent right due to non-payment of annual fee