CN1458377A - 一种大跨越输电铁塔的安装方法 - Google Patents
一种大跨越输电铁塔的安装方法 Download PDFInfo
- Publication number
- CN1458377A CN1458377A CN 03140535 CN03140535A CN1458377A CN 1458377 A CN1458377 A CN 1458377A CN 03140535 CN03140535 CN 03140535 CN 03140535 A CN03140535 A CN 03140535A CN 1458377 A CN1458377 A CN 1458377A
- Authority
- CN
- China
- Prior art keywords
- derrick
- tower
- tower member
- hoisting machine
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000005540 biological transmission Effects 0.000 title abstract description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 22
- 238000009434 installation Methods 0.000 claims description 18
- 229910052742 iron Inorganic materials 0.000 claims description 11
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
一种大跨越输电铁塔的安装方法,它是在建塔基地的中间先安装一段直立的井架,井架的端部通过四摇臂抱杆安装有吊装机,利用该吊装机搬升一段塔架构件于建塔基地后,再以该塔架构件为依托,将直立的井架连同吊装机一起提升,并在被提升的井架下再接入一段井架并用内套法兰固定连接,再以组合固定后的井架作基础,用吊装机搬升另一部分塔架构件至前一部分塔架构件上部并组装连接,如此循环,完成整体大跨越输电铁塔的安装,从而使本发明不仅具有稳固性好,结构牢固,占地面积小;而且还具有节约安装费用,降低成本,安装施工操作安全可靠,使安装的效率大大提高等特点。
Description
技术领域
本发明涉及的是一种架空输电线路铁塔的安装方法,尤其是一种大跨越输电铁塔的安装方法,属于输电设备类。
背景技术
现有输电铁塔的安装施工,尤其是对于大跨度的铁塔的安装大多采用以下三种方法:
(1)落地冲天扒杆安装法,由于常规的扒杆断面尺寸一般较小,它只适用于跨度和塔高均较小的工程,而对于较大跨越输电工程,常用的扒杆高度和臂长都相差太多,截面的承载力也大大不够,若专门重新加工,费用很高;另外落地扒杆的抱杆是不能旋转的,起吊的铁塔构件只能从顺线路和垂直线路两个方向提升,同样它适用于跨度和塔高均较小的输电工程。
(2)悬臂扒杆安装法,虽然安装设备费用较低,但其支点是以已安装好的铁塔部分为根基的,且扒杆的底部坐落在柔性的钢绞线上,因此其稳定性很不理想。同时,当它要进行下一步工作时,自身位置的提升也显得比较困难,由于高空作业的工作量较多,安全性比较差。
(3)塔吊安装法,它是高层建筑施工中常采用的安装方法,在大跨越高塔的安装中,其附着臂搭在铁塔的塔架上,这种安装法的优点是比较稳定,安全性较好;其缺点是投资费用较高,光塔吊的基础费用就需要30---50万元,同时,塔吊本身的提身也比较费事,对安装的进度有一定的影响;另外,由于安装时附着臂产生的水平力较大,使得塔身有一些变形,这在最后的调整中比较麻烦。
发明内容
本发明的目的在于克服上述存在的不足,而提供一种占地面积小,结构牢固且安装效率高,成本低的大跨越输电铁塔的安装方法。它是在建塔基地的中间先安装一段直立的井架,井架的端部安装有四摇臂抱杆,利用抱杆上的吊装机搬升塔架构件用于安装铁塔,再以该塔架为依托,将直立的井架连同吊装机一起提升,并在被提升的井架下再接入一段井架并固定,再以组合固定后的井架作基础,用吊装机搬升另一部分塔架构件至前一段塔架上部并组装连接,如此循环,完成整体大跨越输电铁塔的安装。
所述的井架的上端部固定安装有带转盘的、四摇臂铝合金抱杆,其上的吊装机将一段段塔架构件起吊到已固定安装的塔架之上进行连接固定,并在已搭接完成的塔架构件的横隔面上设置有一个四角与塔架构件主立杆拉住的正方形铁框腰箍。
本发明在所述的每固定安装完一部分塔架构件后,在塔架上设置有连接提升井架用滑轮组的挂板,并通过拉绳及滑轮组连接于井架的底部,将井架连同吊装机一起提升一个高度。
所述的部分井架在被提升后,其下部叠加另一部分井架并用内套法兰作为连接接头将它们连接,而在井架的上端部还连接有均布的四根落地拉线。
本发明与现有技术相比,不仅具有结构简单,稳固性好,结构牢固,占地面积小;而且还具有节约安装费用,降低成本,安装施工操作安全可靠,使安装的效率大大提高等特点。
附图说明
图1是本发明的结构示意图。
图2是本发明吊装铁塔构件时的结构示意图。
图3是本发明在井架提升时的结构示意图。
具体实施方式
下面将结合附图对本发明作详细的介绍:图1所示,本发明主要由主立杆1和横杆2等构件相互连接并构成的塔架3。该塔架3固定立于地基上,其顶部安装有线架4,用于架设输电线。塔架3内的地基中间安置有直立的由铁构件构成的井架5,该井架5直接连接于塔架顶部的线架4。在井架5外从下到上装有能供维修、安装人员上下的登塔楼梯6。所述的构成井架的铁构件包括有主杆7、横杆8及支撑杆9等。所述的井架5是由一段段上下叠合连接而成,各段之间采用内套法兰作为井架的连接接头。
本发明的其它实施例也可以是用圆管构成井架,在圆管井架的外臂上装有登塔楼梯。由于大跨越铁塔的安装井架高度很高,为了保证其压杆的稳定,应尽可能地减少其细长比,因此施工方案设计中考虑在适当位置设置有一个四角与铁塔主杆拉住的正方形铁框状的腰箍,它的内边尺寸与井架四根主材的外边有不到1厘米的间隙,当井架设备处于工作状态时,井架身部只要有稍许变形挠曲,腰箍就可作为一个支点将其牢牢顶住。
本发明所述的输电铁塔的安装方法,充分利用了井架和塔架一段段先后搭接的特点,如图2和图3所示。先在建塔基地中间安装一段直立的井架5,井架5的上端部安装有带有转盘12的四摇臂铝合金抱杆13,该抱杆上装有吊装机10,该吊装机10上有一根直杆11、直杆11的端部连接有四根落地拉线14,以保证吊装机的吊装稳固。利用该吊装机10搬升一部分塔架构件3于建塔基地后,再以该塔架构件3为依托,将直立的井架连同吊装机10一起向上提升,并在被提升的井架5下部再接入一段井架并用内套法兰相互固连。再以组合固定后的井架作为基础,用吊装机10再搬升另一部分塔架构件3至前一段塔架构件之上并组装连接,如此循环,从而完成整体大跨越输电铁塔的安装。为保证顺利提升井架,在每固定安装完一段塔架5后,在塔架上设置有连接提升井架用滑轮组的挂板,用拉绳经过滑轮组至井架的底部,将井架连同吊装机一起提升一个高度。
Claims (4)
1、一种大跨越输电铁塔的安装方法,其特征在于在建塔基地的中间先安装一段直立的井架,井架的端部固定安装有四摇臂抱杆,利用抱杆上的吊装机搬升塔架构件用于安装铁塔,再以该塔架为依托,将直立的井架连同吊装机一起提升,并在被提升的井架下再接入一段井架并固定,再以组合固定后的井架作基础,用吊装机搬升另一部分塔架构件至前一段塔架构件上部并组装连接,如此循环,完成整体大跨越输电铁塔的安装。
2、根据权利要求1所述的大跨越输电铁塔的安装方法,其特征在于所述的所述的井架的上端部固定安装有带转盘的、四摇臂铝合金抱杆,其上的吊装机将一段段塔架构件起吊到已固定安装的塔架构件之上进行连接固定,并在已搭接完成的塔架构件的横隔面上设置有一个四角与塔架构件主立杆拉住的正方形铁框腰箍。
3、根据权利要求1或2所述的大跨越输电铁塔的安装方法,其特征在于所述的每固定安装完一部分塔架构件后,在塔架上设置有连接提升井架用滑轮组的挂板,并通过拉绳及滑轮组连接于井架的底部,将井架连同吊装机一起提升一个高度。
4、根据权利要求3所述的大跨越输电铁塔的安装方法,其特征在于所述的部分井架在被提升后,其下部叠加另一部分井架并用内套法兰作为连接接头将它们连接,而在井架的上端部还连接有均布的四根落地拉线。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB031405355A CN1180173C (zh) | 2003-05-28 | 2003-05-28 | 一种大跨越输电铁塔的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB031405355A CN1180173C (zh) | 2003-05-28 | 2003-05-28 | 一种大跨越输电铁塔的安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1458377A true CN1458377A (zh) | 2003-11-26 |
CN1180173C CN1180173C (zh) | 2004-12-15 |
Family
ID=29430727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB031405355A Expired - Fee Related CN1180173C (zh) | 2003-05-28 | 2003-05-28 | 一种大跨越输电铁塔的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1180173C (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100449097C (zh) * | 2006-12-20 | 2009-01-07 | 韩永波 | 塔架段的组对方法及组对平台 |
CN101187268B (zh) * | 2007-08-08 | 2010-09-29 | 安徽省电力公司淮北供电公司 | 可均匀沉降和高度可调的输电铁塔 |
CN101967902A (zh) * | 2010-09-25 | 2011-02-09 | 中国电力科学研究院 | 一种用于直升机组立输电线路铁塔塔腿段的基础导轨 |
CN101363287B (zh) * | 2007-08-07 | 2011-09-28 | 刘玉恩 | 塔架的安装方法 |
CN102296870A (zh) * | 2011-06-17 | 2011-12-28 | 中国电力科学研究院 | 一种输电线路钢管塔中钢管变角钢的连接式接头 |
CN102296867A (zh) * | 2011-05-18 | 2011-12-28 | 中国电力科学研究院 | 一种输电线路钢管塔中交叉斜材的平行连接式接头 |
CN102359303A (zh) * | 2011-10-31 | 2012-02-22 | 湖北省输变电工程公司 | 特高压普通线路铁塔组立方法 |
CN101586402B (zh) * | 2009-06-22 | 2012-08-29 | 华为技术有限公司 | 通信自立塔及其荷载升级方法 |
CN106245984A (zh) * | 2016-09-26 | 2016-12-21 | 吉林安装集团股份有限公司 | 自升式多功能爬行扒杆 |
CN106285177A (zh) * | 2016-08-12 | 2017-01-04 | 上海电力设计院有限公司 | 架空线铁塔的组装方法 |
CN110778201A (zh) * | 2019-11-07 | 2020-02-11 | 苏州圣典企业管理咨询有限公司 | 一种高压塔及其安装架设方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101832051B (zh) * | 2010-04-18 | 2012-08-15 | 山西省电力公司太原供电分公司 | 有塔颈高压送电铁塔 |
-
2003
- 2003-05-28 CN CNB031405355A patent/CN1180173C/zh not_active Expired - Fee Related
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100449097C (zh) * | 2006-12-20 | 2009-01-07 | 韩永波 | 塔架段的组对方法及组对平台 |
CN101363287B (zh) * | 2007-08-07 | 2011-09-28 | 刘玉恩 | 塔架的安装方法 |
CN101187268B (zh) * | 2007-08-08 | 2010-09-29 | 安徽省电力公司淮北供电公司 | 可均匀沉降和高度可调的输电铁塔 |
CN101586402B (zh) * | 2009-06-22 | 2012-08-29 | 华为技术有限公司 | 通信自立塔及其荷载升级方法 |
CN101967902A (zh) * | 2010-09-25 | 2011-02-09 | 中国电力科学研究院 | 一种用于直升机组立输电线路铁塔塔腿段的基础导轨 |
CN101967902B (zh) * | 2010-09-25 | 2013-11-27 | 中国电力科学研究院 | 一种用于直升机组立输电线路铁塔塔腿段的基础导轨 |
CN102296867A (zh) * | 2011-05-18 | 2011-12-28 | 中国电力科学研究院 | 一种输电线路钢管塔中交叉斜材的平行连接式接头 |
CN102296867B (zh) * | 2011-05-18 | 2014-03-12 | 中国电力科学研究院 | 一种输电线路钢管塔中交叉斜材的平行连接式接头 |
CN102296870B (zh) * | 2011-06-17 | 2014-03-12 | 中国电力科学研究院 | 一种输电线路钢管塔中钢管变角钢的连接式接头 |
CN102296870A (zh) * | 2011-06-17 | 2011-12-28 | 中国电力科学研究院 | 一种输电线路钢管塔中钢管变角钢的连接式接头 |
CN102359303B (zh) * | 2011-10-31 | 2013-10-09 | 湖北省送变电工程公司 | 特高压普通线路铁塔组立方法 |
CN102359303A (zh) * | 2011-10-31 | 2012-02-22 | 湖北省输变电工程公司 | 特高压普通线路铁塔组立方法 |
CN106285177A (zh) * | 2016-08-12 | 2017-01-04 | 上海电力设计院有限公司 | 架空线铁塔的组装方法 |
CN106245984A (zh) * | 2016-09-26 | 2016-12-21 | 吉林安装集团股份有限公司 | 自升式多功能爬行扒杆 |
CN110778201A (zh) * | 2019-11-07 | 2020-02-11 | 苏州圣典企业管理咨询有限公司 | 一种高压塔及其安装架设方法 |
CN110778201B (zh) * | 2019-11-07 | 2021-05-14 | 苏州圣典企业管理咨询有限公司 | 一种高压塔的安装架设方法 |
Also Published As
Publication number | Publication date |
---|---|
CN1180173C (zh) | 2004-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1180173C (zh) | 一种大跨越输电铁塔的安装方法 | |
CN101649683A (zh) | 组合抱杆技术吊装输电铁塔工法 | |
CN216587766U (zh) | 一种大跨度悬挑钢结构构件的吊装设施及吊装结构 | |
CN1206686A (zh) | 一种四连杆臂架自升式门座起重机 | |
CN215828096U (zh) | 自提升吊装设备和滑动锁固组件 | |
CN101660660B (zh) | 一种煤气柜的安装方法 | |
CN218714838U (zh) | 一种自升降重载施工平台 | |
CN214941062U (zh) | 一种空腹钢连廊分层逆序提升的结构 | |
CN101865593B (zh) | 空分塔结构设备的安装方法 | |
JPH10205430A (ja) | 風力発電装置の建設方法 | |
CN215048189U (zh) | 一种超高层建筑机电设备桅杆式吊装装置 | |
CN201694777U (zh) | 水轮机蜗壳自吊装装置 | |
JPH10205429A (ja) | 風力発電装置の建設方法 | |
CN113775040A (zh) | 一种高空大跨度钢连廊幕墙安装施工方法 | |
CN115627713A (zh) | 一种拱肋边段斜拉扣挂及中段大节段提升安装方法 | |
CN110293341B (zh) | 偏心弧形环廊段高空提升工装及其提升方法 | |
CN115559414A (zh) | 一种建筑顶层悬挑钢桁架施工方法 | |
CN210855029U (zh) | 一种高空运输、吊装作业的钢箱梁构件施工便车 | |
CN210549018U (zh) | 偏心弧形环廊段高空提升工装 | |
JP3939237B2 (ja) | 大梁間架構の構築方法 | |
CN113152687A (zh) | 一种空腹钢连廊分层逆序提升的结构及方法 | |
CN117585597B (zh) | 一种塔式起重机不同塔身节顶升安装转换装置及方法 | |
JP2004346651A (ja) | 鉄塔の嵩上げ工法 | |
CN2256418Y (zh) | 电梯井爬模提升架 | |
CN218667893U (zh) | 一种装配式建筑主体连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20041215 Termination date: 20150528 |
|
EXPY | Termination of patent right or utility model |