CN118774273A - A prefabricated component for wall insulation engineering and a rapid assembly method thereof - Google Patents
A prefabricated component for wall insulation engineering and a rapid assembly method thereof Download PDFInfo
- Publication number
- CN118774273A CN118774273A CN202411219947.1A CN202411219947A CN118774273A CN 118774273 A CN118774273 A CN 118774273A CN 202411219947 A CN202411219947 A CN 202411219947A CN 118774273 A CN118774273 A CN 118774273A
- Authority
- CN
- China
- Prior art keywords
- wall
- main frame
- groove
- arc
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/78—Heat insulating elements
- E04B1/80—Heat insulating elements slab-shaped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/90—Passive houses; Double facade technology
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Acoustics & Sound (AREA)
- Building Environments (AREA)
Abstract
本发明属于墙体保温预制构件技术领域,具体涉及一种墙体保温工程预制构件及其快速组装方法,所述墙体保温工程预制构件包括主框架,主框架的外壁紧密贴合有副框架,主框架的外壁开设有活动槽,活动槽的内壁固定装配有强力弹簧。通过设置的主框架、副框架、插槽、活动槽、固定螺栓、连接槽、限位槽、保温板结构,使得该保温墙体在安装过程中,作业人员可通过卡条将保温板安装在主框架上,再通过弧形板一和弧形板二将主框架和副框架连成一体,通过侧板的插入让限位条与限位槽插接,从而使得保温板受到限制而无法脱离主框架和副框架,最后通过固定螺栓将侧板、主框架以及副框架进行固定即可,进而提高了作业人员对该保温墙体预制构件的组装效率。
The present invention belongs to the technical field of prefabricated wall insulation components, and specifically relates to a prefabricated wall insulation component and a rapid assembly method thereof, wherein the prefabricated wall insulation component comprises a main frame, the outer wall of the main frame is tightly fitted with a sub-frame, the outer wall of the main frame is provided with a movable groove, and the inner wall of the movable groove is fixedly equipped with a strong spring. Through the main frame, sub-frame, slot, movable groove, fixing bolt, connecting groove, limiting groove, and insulation board structure, during the installation of the insulation wall, the operator can install the insulation board on the main frame through the card strip, and then connect the main frame and the sub-frame into one through the arc plate 1 and the arc plate 2, and insert the side plate to allow the limiting strip to be plugged into the limiting groove, so that the insulation board is restricted and cannot be separated from the main frame and the sub-frame, and finally the side plate, the main frame and the sub-frame are fixed by the fixing bolts, thereby improving the assembly efficiency of the prefabricated insulation wall component by the operator.
Description
技术领域Technical Field
本发明属于墙体保温预制构件技术领域,具体涉及一种墙体保温工程预制构件及其快速组装方法。The invention belongs to the technical field of prefabricated wall insulation components, and in particular relates to a prefabricated wall insulation engineering component and a rapid assembly method thereof.
背景技术Background Art
建筑墙体分为装饰性墙体和具有保温功能的墙体,而墙体的制作方法分为预制构件和浇筑的形式,浇筑相较于预制构件更具稳定性,预制构件的应用范围更加广泛。Building walls are divided into decorative walls and walls with thermal insulation functions, and the wall manufacturing methods are divided into prefabricated components and casting. Casting is more stable than prefabricated components, and prefabricated components have a wider range of applications.
现有的保温墙体预制构件在使用过程中,虽然其使用范围更广,但现有的预制构件中并未设有便于对构件进行固定的机构,因此,在安装过程中通常需要安装人员加装大量的固定螺栓来对构件进行固定,不仅增加了安装人员的作业量,也会导致墙体建造时间以及经济成本的增加,降低了现有保温墙体预制构件的实用性。During the use of existing thermal insulation wall prefabricated components, although their scope of use is wider, the existing prefabricated components are not provided with a mechanism for fixing the components. Therefore, during the installation process, installers are usually required to install a large number of fixing bolts to fix the components, which not only increases the workload of the installers, but also leads to an increase in the wall construction time and economic cost, reducing the practicality of the existing thermal insulation wall prefabricated components.
发明内容Summary of the invention
本发明要解决的技术问题,就是针对现有技术所存在的不足,而提供一种墙体保温工程预制构件及其快速组装方法,本发明具备组装效率高且稳定性好的优点,解决了现有技术中所存在的上述技术问题。The technical problem to be solved by the present invention is to provide a prefabricated component for wall insulation engineering and a rapid assembly method thereof in view of the deficiencies in the prior art. The present invention has the advantages of high assembly efficiency and good stability, and solves the above-mentioned technical problems existing in the prior art.
本方案是通过如下技术措施来实现的:一种墙体保温工程预制构件,包括主框架,所述主框架的外壁紧密贴合有副框架,所述主框架的外壁开设有活动槽,所述活动槽的内壁固定装配有强力弹簧,所述活动槽的内壁转动连接有转杆,所述转杆的外壁开设有收纳槽,所述收纳槽的内壁转动连接有卡杆,所述卡杆的外壁固定装配有拉伸弹簧,所述副框架的底部开设有限位槽,所述副框架的顶部开设有插槽,所述插槽的内壁插接有侧板,所述侧板的外壁开设有圆槽,所述圆槽的内壁固定装配有限位条,所述侧板的外壁开设有对接槽,所述对接槽的内壁开设有方槽,所述副框架的底部分别固定装配有弧形板一和弧形板二,所述侧板的外壁紧密贴合有保温板,所述保温板的外壁开设有凹槽,所述凹槽的内壁固定装配有定位块,所述保温板的外壁固定装配有卡条,所述主框架的外壁分别固定装配有定位柱一和定位柱二,所述定位柱一和定位柱二的外壁皆设有固定螺栓,所述主框架的顶部固定装配有定位杆,所述定位杆的外壁开设有条形槽,所述定位杆的外壁固定装配有连接板,所述副框架的底部分别开设有盲孔和连接槽。The present invention is realized by the following technical measures: a prefabricated component for wall insulation engineering, comprising a main frame, the outer wall of the main frame is tightly fitted with a sub-frame, the outer wall of the main frame is provided with a movable groove, the inner wall of the movable groove is fixedly equipped with a strong spring, the inner wall of the movable groove is rotatably connected with a rotating rod, the outer wall of the rotating rod is provided with a storage groove, the inner wall of the storage groove is rotatably connected with a clamping rod, the outer wall of the clamping rod is fixedly equipped with a tension spring, a limiting groove is provided at the bottom of the sub-frame, a slot is provided at the top of the sub-frame, the inner wall of the slot is plugged with a side panel, the outer wall of the side panel is provided with a circular groove, the inner wall of the circular groove is fixedly equipped with a limiting strip, and the side panel is provided with a circular groove. The outer wall is provided with a docking groove, the inner wall of the docking groove is provided with a square groove, the bottom of the sub-frame is fixedly equipped with arc plate 1 and arc plate 2, the outer wall of the side plate is tightly fitted with an insulation board, the outer wall of the insulation board is provided with a groove, the inner wall of the groove is fixedly equipped with a positioning block, the outer wall of the insulation board is fixedly equipped with a clamping strip, the outer wall of the main frame is fixedly equipped with positioning column 1 and positioning column 2, the outer walls of the positioning column 1 and the positioning column 2 are both provided with fixing bolts, the top of the main frame is fixedly equipped with a positioning rod, the outer wall of the positioning rod is provided with a strip groove, the outer wall of the positioning rod is fixedly equipped with a connecting plate, and the bottom of the sub-frame is provided with a blind hole and a connecting groove.
优选的,所述拉伸弹簧远离卡杆的一端与收纳槽的内壁固定装配,所述卡杆的数量为两个,且两个卡杆皆沿转杆的外壁对称分布,所述卡杆与收纳槽的内壁贴合后转杆可由对接槽进入方槽中,所述转杆与侧板呈平行状态时卡杆的外壁与方槽的内壁紧密贴合。Preferably, one end of the tension spring away from the clamping rod is fixedly assembled with the inner wall of the storage groove, the number of the clamping rods is two, and the two clamping rods are symmetrically distributed along the outer wall of the rotating rod, and after the clamping rod is in contact with the inner wall of the storage groove, the rotating rod can enter the square groove through the docking groove, and when the rotating rod is parallel to the side plate, the outer wall of the clamping rod is in close contact with the inner wall of the square groove.
优选的,所述限位条的外壁分别与弧形板一以及弧形板二的外壁滑动连接,且定位杆的内壁与限位条的外壁滑动连接,所述连接板的外壁与卡条的外壁紧密贴合,且连接板和卡条以及定位块皆通过镀锌铁金属制备而成。Preferably, the outer wall of the limit strip is respectively slidably connected to the outer walls of arc plate one and arc plate two, and the inner wall of the positioning rod is slidably connected to the outer wall of the limit strip, the outer wall of the connecting plate is tightly fitted to the outer wall of the clamping strip, and the connecting plate, the clamping strip and the positioning block are all made of galvanized iron metal.
优选的,所述条形槽的形状与限位槽的形状相同,且定位杆的直径与弧形板一和弧形板二之间的间距相等,且定位杆的外壁分别与弧形板一和弧形板二的内壁滑动连接。Preferably, the shape of the strip groove is the same as that of the limiting groove, and the diameter of the positioning rod is equal to the spacing between arc plate one and arc plate two, and the outer wall of the positioning rod is slidably connected to the inner walls of arc plate one and arc plate two respectively.
优选的,所述圆槽的内壁与弧形板一以及弧形板二的外壁滑动连接,所述弧形板一和弧形板二的数量皆为若干个,若干个弧形板一和弧形板二分为若干组,且若干组弧形板一和弧形板二皆沿副框架的外壁均匀分布。Preferably, the inner wall of the circular groove is slidably connected to the outer walls of arc plate 1 and arc plate 2, the number of arc plate 1 and arc plate 2 are both several, the several arc plate 1 and arc plate 2 are divided into several groups, and the several groups of arc plate 1 and arc plate 2 are evenly distributed along the outer wall of the sub-frame.
优选的,所述副框架通过定位柱一、定位柱二、固定螺栓与主框架固定连接,所述保温板通过连接板、定位杆、卡条、定位块与主框架固定连接,所述保温板的数量为若干个,且一个保温板的外壁与主框架的顶部固定装配。Preferably, the sub-frame is fixedly connected to the main frame by positioning column one, positioning column two, and fixing bolts, and the insulation board is fixedly connected to the main frame by a connecting plate, a positioning rod, a clamping strip, and a positioning block. There are several insulation boards, and the outer wall of one insulation board is fixedly assembled to the top of the main frame.
优选的,所述凹槽的内壁分别与弧形板一和弧形板二的外壁紧密贴合,所述保温板与主框架边缘处的间距和形状皆与侧板的直径和形状相适配。Preferably, the inner wall of the groove is tightly fitted with the outer wall of the arc plate 1 and the arc plate 2 respectively, and the spacing and shape of the insulation plate and the edge of the main frame are both adapted to the diameter and shape of the side plate.
优选的,所述侧板的底部与转杆靠近强力弹簧的一端紧密贴合,且强力弹簧的末端与转杆的外壁固定装配。Preferably, the bottom of the side plate is tightly fitted with one end of the rotating rod close to the strong spring, and the end of the strong spring is fixedly assembled with the outer wall of the rotating rod.
优选的,所述侧板的数量为两个,且两个侧板的外壁皆与保温板的外壁紧密贴合。Preferably, there are two side panels, and the outer walls of the two side panels are tightly fitted with the outer wall of the insulation board.
本发明还提供了一种上述墙体保温工程预制构件的快速组装方法,包括以下步骤:The present invention also provides a method for quickly assembling the above-mentioned prefabricated components for wall insulation engineering, comprising the following steps:
S1:首先作业人员将主框架固定装配在地面上,而主框架上所固定装配的保温板无需作业人员加设固定机构,只需拿起未与主框架连接的保温板,将保温板上的卡条对准连接板之间的间隙,然后由卡条的底部与连接板的顶部对接,再按压保温板,使得保温板逐渐向下移动直至与主框架的顶部贴合;S1: First, the operator fixes and assembles the main frame on the ground. The insulation board fixed on the main frame does not need to be fixed by the operator. The operator only needs to pick up the insulation board that is not connected to the main frame, align the clip on the insulation board with the gap between the connecting boards, and then connect the bottom of the clip with the top of the connecting board, and then press the insulation board to gradually move downward until it fits with the top of the main frame;
S2:然后作业人员可拿起副框架,将副框架调整至能与主框架形成一个整体的角度,此时固定螺栓与盲孔的位置相对应,而连接槽的位置则与定位柱二的位置相对应,同时限位槽和弧形板一与弧形板二之间的间距和形状皆相对应;S2: Then the operator can pick up the sub-frame and adjust it to form an integral angle with the main frame. At this time, the position of the fixing bolt corresponds to the position of the blind hole, and the position of the connecting groove corresponds to the position of the second positioning column. At the same time, the spacing and shape between the limit groove and the arc plate 1 and the arc plate 2 are all corresponding.
S3:最后作业人员可拿起侧板,将侧板对准插槽后向下按压侧板,使得限位条分别沿限位槽以及条形槽的内壁进行滑动,而此时弧形板一、弧形板二的外壁则因圆槽所提供的活动空间保障侧板的持续下移,当侧板下降至与转杆抵触时,转杆因侧板的压迫而压缩强力弹簧,从而使得转杆发生转动,以此让转杆的外壁与对接槽的内壁滑动连接,而卡杆则因对接槽的阻隔而拉长拉伸弹簧,直至卡杆转动至与收纳槽内壁相平行的状态,使得转杆的末端穿过对接槽进入方槽中,方槽内部的活动空间会使得卡杆重新展开,以此让转杆锁死在方槽中,而此时转杆的外壁与侧板的外壁紧密贴合,从而起到对侧板进行夹持的作用,作业人员再通过拧紧固定螺栓的方式使得主框架、副框架、侧板皆连成一体,侧板在固定螺栓、限位条、转杆的定位效果下稳固的受到固定,而保温板则在侧板所提供的防护和限位效果下稳固的与主框架和副框架连接即可。S3: Finally, the operator can pick up the side panel, align the side panel with the slot and press the side panel downward, so that the limit strip slides along the inner wall of the limit slot and the strip slot respectively. At this time, the outer wall of the arc plate 1 and the arc plate 2 ensures the continuous downward movement of the side panel due to the activity space provided by the circular groove. When the side panel drops to contact the rotating rod, the rotating rod compresses the strong spring due to the pressure of the side panel, so that the rotating rod rotates, so that the outer wall of the rotating rod is slidably connected with the inner wall of the docking slot, and the clamping rod stretches the tension spring due to the obstruction of the docking slot until the clamping rod rotates to be flush with the inner wall of the storage slot. The movable space inside the square groove will cause the clamping rod to unfold again, so that the rotating rod is locked in the square groove. At this time, the outer wall of the rotating rod fits tightly with the outer wall of the side panel, thereby clamping the side panel. The operator then tightens the fixing bolts to connect the main frame, sub-frame and side panels into one. The side panels are firmly fixed under the positioning effect of the fixing bolts, limit strips and rotating rods, and the insulation panel is firmly connected to the main frame and sub-frame under the protection and limiting effect provided by the side panels.
本发明的有益效果:Beneficial effects of the present invention:
1、本发明通过设置的主框架、副框架、插槽、活动槽、固定螺栓、连接槽、限位槽、保温板结构,使得该保温墙体在安装过程中,作业人员可通过卡条将保温板安装在主框架上,再通过弧形板一和弧形板二将主框架和副框架连成一体,通过侧板的插入让限位条与限位槽插接,从而使得保温板受到限制而无法脱离主框架和副框架,最后通过固定螺栓将侧板、主框架以及副框架进行固定即可,进而提高了作业人员对该保温墙体预制构件的组装效率;1. The present invention provides a main frame, a sub-frame, a slot, a movable slot, a fixing bolt, a connecting slot, a limiting slot, and a heat preservation board structure, so that during the installation of the heat preservation wall, the operator can install the heat preservation board on the main frame through the clamping strip, and then connect the main frame and the sub-frame into one by the arc plate 1 and the arc plate 2, and insert the side plate to allow the limiting strip to be plugged into the limiting slot, so that the heat preservation board is restricted and cannot be separated from the main frame and the sub-frame, and finally the side plate, the main frame and the sub-frame can be fixed by the fixing bolts, thereby improving the assembly efficiency of the prefabricated components of the heat preservation wall by the operator;
2、本发明通过设置的活动槽、强力弹簧、卡杆、转杆、侧板、对接槽、收纳槽、方槽结构,当作业人员在安装侧板时,利用作业人员对侧板的按压使得转杆与侧板的底部抵触,从而使得强力弹簧受到压缩而使得转杆转动,利用对接槽对卡杆的限位使得卡杆对拉伸弹簧产生拉力,以此让收纳槽收纳卡杆,而转杆的顶端转动至方槽的内部,利用拉伸弹簧的弹性使得卡杆重新复位,实现自动锁死转杆的效果,而转杆则会对侧板进行夹持,进而提高了该墙体在组装后的稳定性。2. The present invention provides a movable groove, a strong spring, a clamping rod, a rotating rod, a side panel, a docking groove, a receiving groove, and a square groove structure. When the operator is installing the side panel, the operator presses the side panel to make the rotating rod contact with the bottom of the side panel, so that the strong spring is compressed and the rotating rod rotates. The docking groove limits the clamping rod so that the clamping rod generates a pulling force on the tension spring, so that the receiving groove receives the clamping rod, and the top end of the rotating rod rotates to the inside of the square groove. The elasticity of the tension spring is used to reset the clamping rod, thereby achieving the effect of automatically locking the rotating rod. The rotating rod clamps the side panel, thereby improving the stability of the wall after assembly.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本发明中墙体保温工程预制构件的立体结构示意图;FIG1 is a schematic diagram of the three-dimensional structure of the prefabricated components of the wall insulation project in the present invention;
图2为本发明中墙体保温工程预制构件的侧视结构示意图;FIG2 is a schematic side view of the structure of the prefabricated components of the wall insulation project in the present invention;
图3为本发明中副框架的结构示意图;FIG3 is a schematic diagram of the structure of the sub-frame in the present invention;
图4为图3中A处的放大图;FIG4 is an enlarged view of point A in FIG3 ;
图5为本发明中限位槽的结构示意图;FIG5 is a schematic diagram of the structure of the limiting groove in the present invention;
图6为本发明中侧板的结构示意图;FIG6 is a schematic diagram of the structure of the side plate of the present invention;
图7为图6中B处的放大图;FIG7 is an enlarged view of point B in FIG6;
图8为本发明中弧形板一和弧形板二的结构示意图;FIG8 is a schematic structural diagram of the curved plate 1 and the curved plate 2 in the present invention;
图9为本发明中定位柱一的结构示意图;FIG9 is a schematic structural diagram of a positioning column 1 in the present invention;
图10为本发明中对接槽的结构示意图;FIG10 is a schematic diagram of the structure of the docking groove in the present invention;
图11为本发明中保温板的结构示意图;FIG11 is a schematic diagram of the structure of the insulation board of the present invention;
图12为本发明中活动槽的结构示意图。FIG. 12 is a schematic diagram of the structure of the movable groove in the present invention.
图中:1、主框架;2、副框架;3、插槽;4、侧板;5、对接槽;6、活动槽;7、转杆;8、固定螺栓;9、盲孔;10、连接槽;11、限位槽;12、方槽;13、收纳槽;14、拉伸弹簧;15、卡杆;16、弧形板一;17、弧形板二;18、定位柱一;19、保温板;20、定位杆;21、条形槽;22、限位条;23、连接板;24、定位柱二;25、圆槽;26、凹槽;27、卡条;28、定位块;29、强力弹簧。In the figure: 1. main frame; 2. sub-frame; 3. slot; 4. side plate; 5. docking slot; 6. movable slot; 7. rotating rod; 8. fixing bolt; 9. blind hole; 10. connecting slot; 11. limiting slot; 12. square slot; 13. storage slot; 14. tension spring; 15. clamping rod; 16. arc plate 1; 17. arc plate 2; 18. positioning column 1; 19. insulation plate; 20. positioning rod; 21. strip slot; 22. limiting strip; 23. connecting plate; 24. positioning column 2; 25. round slot; 26. groove; 27. clamping strip; 28. positioning block; 29. strong spring.
具体实施方式DETAILED DESCRIPTION
为能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本方案进行阐述。In order to clearly illustrate the technical features of this solution, this solution is described below through specific implementation methods and in conjunction with the accompanying drawings.
请参阅图1-12,一种墙体保温工程预制构件,包括主框架1,主框架1的外壁紧密贴合有副框架2,主框架1的外壁开设有活动槽6,活动槽6的内壁固定装配有强力弹簧29,活动槽6的内壁转动连接有转杆7,转杆7的外壁开设有收纳槽13,收纳槽13的内壁转动连接有卡杆15,卡杆15的外壁固定装配有拉伸弹簧14,副框架2的底部开设有限位槽11,副框架2的顶部开设有插槽3,插槽3的内壁插接有侧板4,侧板4的外壁开设有圆槽25,圆槽25的内壁固定装配有限位条22,侧板4的外壁开设有对接槽5,对接槽5的内壁开设有方槽12,副框架2的底部分别固定装配有弧形板一16和弧形板二17,侧板4的外壁紧密贴合有保温板19,保温板19的外壁开设有凹槽26,凹槽26的内壁固定装配有定位块28,保温板19的外壁固定装配有卡条27,主框架1的外壁分别固定装配有定位柱一18和定位柱二24,定位柱一18和定位柱二24的外壁皆设有固定螺栓8,主框架1的顶部固定装配有定位杆20,定位杆20的外壁开设有条形槽21,定位杆20的外壁固定装配有连接板23,副框架2的底部分别开设有盲孔9和连接槽10。Please refer to Figures 1-12, a prefabricated component for wall insulation engineering, including a main frame 1, the outer wall of the main frame 1 is tightly fitted with a sub-frame 2, the outer wall of the main frame 1 is provided with a movable groove 6, the inner wall of the movable groove 6 is fixedly equipped with a strong spring 29, the inner wall of the movable groove 6 is rotatably connected with a rotating rod 7, the outer wall of the rotating rod 7 is provided with a storage groove 13, the inner wall of the storage groove 13 is rotatably connected with a clamping rod 15, the outer wall of the clamping rod 15 is fixedly equipped with a tension spring 14, the bottom of the sub-frame 2 is provided with a limit groove 11, the top of the sub-frame 2 is provided with a slot 3, the inner wall of the slot 3 is plugged with a side panel 4, the outer wall of the side panel 4 is provided with a circular groove 25, the inner wall of the circular groove 25 is fixedly equipped with a limit strip 22, the outer wall of the side panel 4 is provided with a docking groove 5, the docking A square groove 12 is provided on the inner wall of the groove 5, and an arc plate 16 and an arc plate 2 17 are fixedly installed on the bottom of the sub-frame 2 respectively. The outer wall of the side plate 4 is tightly fitted with an insulation plate 19, and a groove 26 is provided on the outer wall of the insulation plate 19. A positioning block 28 is fixedly installed on the inner wall of the groove 26, and a clamping strip 27 is fixedly installed on the outer wall of the insulation plate 19. The outer wall of the main frame 1 is fixedly installed with a positioning column 18 and a positioning column 24, and the outer walls of the positioning column 18 and the positioning column 24 are both provided with fixing bolts 8. A positioning rod 20 is fixedly installed on the top of the main frame 1, and a strip groove 21 is provided on the outer wall of the positioning rod 20, and a connecting plate 23 is fixedly installed on the outer wall of the positioning rod 20. Blind holes 9 and connecting grooves 10 are respectively provided on the bottom of the sub-frame 2.
对该预制构件进行组装时,可直接将保温板19连同卡条27插在主框架1上,利用连接板23对卡条27的插接使得保温板19受到限位,再通过侧板4上限位条22与条形槽21的插接使得保温板19受到限位,配合副框架2的下压使得主框架1、副框架2、侧板4连成一体,从而达到对该保温墙体进行快速组装的效果,进而提高了该墙体的组装效率,配合侧板4在插入插槽3中时对转杆7造成的压迫,使得转杆7靠近主框架1的一端压缩强力弹簧29,从而使转杆7发生转动,让卡杆15与对接槽5的内壁接触,以此让卡杆15持续展开而使得卡杆15收纳于收纳槽13中,继而让转杆7的顶端能够持续转动至方槽12中,而方槽12则对卡杆15的展开提供活动空间,对接槽5对卡杆15的束缚力消失后配合拉伸弹簧14的弹性将卡杆15展开,从而使得转杆7与侧板4固定连接,而转杆7又会对侧板4进行夹持,以此保障侧板4的底部无法脱离主框架1,在定位柱一18和定位柱二24与固定螺栓8连接后,侧板4的顶部也会受到固定,进而提高了该保温墙体组装后的稳定性,利用作业人员组装侧板4时所产生的压力使得侧板4受到夹持和固定,保证了该保温墙体各配件的配合效果。When assembling the prefabricated component, the insulation board 19 together with the clamping strip 27 can be directly inserted into the main frame 1, and the insulation board 19 is limited by plugging the clamping strip 27 with the connecting plate 23, and then the insulation board 19 is limited by plugging the upper limit strip 22 and the strip groove 21 on the side plate 4, and the main frame 1, the sub-frame 2, and the side plate 4 are connected as a whole with the downward pressure of the sub-frame 2, so as to achieve the effect of rapid assembly of the insulation wall, thereby improving the assembly efficiency of the wall, and the side plate 4 is pressed on the rotating rod 7 when being inserted into the slot 3, so that the end of the rotating rod 7 close to the main frame 1 compresses the strong spring 29, so that the rotating rod 7 rotates, and the clamping rod 15 contacts the inner wall of the docking slot 5, so that the clamping rod 15 continues to expand and makes The clamping rod 15 is received in the receiving groove 13, and then the top end of the rotating rod 7 can continue to rotate into the square groove 12, and the square groove 12 provides space for the expansion of the clamping rod 15. After the binding force of the docking groove 5 on the clamping rod 15 disappears, the clamping rod 15 is expanded with the elasticity of the tension spring 14, so that the rotating rod 7 is fixedly connected to the side panel 4, and the rotating rod 7 clamps the side panel 4 to ensure that the bottom of the side panel 4 cannot be separated from the main frame 1. After the positioning column 18 and the positioning column 24 are connected with the fixing bolt 8, the top of the side panel 4 is also fixed, thereby improving the stability of the insulation wall after assembly. The pressure generated by the operator when assembling the side panel 4 is used to clamp and fix the side panel 4, thereby ensuring the coordination effect of the various accessories of the insulation wall.
拉伸弹簧14远离卡杆15的一端与收纳槽13的内壁固定装配,卡杆15的数量为两个,且两个卡杆15皆沿转杆7的外壁对称分布,卡杆15与收纳槽13的内壁贴合后转杆7可由对接槽5进入方槽12中,转杆7与侧板4呈平行状态时卡杆15的外壁与方槽12的内壁紧密贴合。One end of the tension spring 14 away from the clamping rod 15 is fixedly assembled with the inner wall of the storage groove 13. There are two clamping rods 15, and the two clamping rods 15 are symmetrically distributed along the outer wall of the rotating rod 7. After the clamping rod 15 is in contact with the inner wall of the storage groove 13, the rotating rod 7 can enter the square groove 12 through the docking groove 5. When the rotating rod 7 is parallel to the side plate 4, the outer wall of the clamping rod 15 is in close contact with the inner wall of the square groove 12.
作业人员在对侧板4进行安装时,利用作业人员向下对侧板4所施加的压力使得侧板4对转杆7进行压迫,从而使得转杆7转动,而对接槽5对卡杆15造成的阻挡使得卡杆15持续转动,使得拉伸弹簧14延伸让卡杆15转动至与转杆7两侧相平行的状态,从而保障转杆7的顶端能够转动至方槽12的内部,再通过拉伸弹簧14的拉力让卡杆15复位,从而实现自动锁死的效果,而转杆7在卡杆15展开复位后能够对侧板4进行夹持,进而保障侧板4在安装后的稳定性,提高了该保温墙体内部配件的精密配合,便于作业人员对该保温墙体进行快速组装作业。When installing the side panel 4, the operator uses the pressure applied downward to the side panel 4 to make the side panel 4 press the rotating rod 7, thereby making the rotating rod 7 rotate, and the obstruction caused by the docking groove 5 to the clamping rod 15 makes the clamping rod 15 continue to rotate, so that the tension spring 14 extends to allow the clamping rod 15 to rotate to a state parallel to the two sides of the rotating rod 7, thereby ensuring that the top end of the rotating rod 7 can be rotated to the inside of the square groove 12, and then the clamping rod 15 is reset by the tension of the tension spring 14, thereby achieving an automatic locking effect, and the rotating rod 7 can clamp the side panel 4 after the clamping rod 15 is unfolded and reset, thereby ensuring the stability of the side panel 4 after installation, improving the precise matching of the internal accessories of the thermal insulation wall, and facilitating the operator to quickly assemble the thermal insulation wall.
限位条22的外壁分别与弧形板一16以及弧形板二17的外壁滑动连接,且定位杆20的内壁与限位条22的外壁滑动连接,连接板23的外壁与卡条27的外壁紧密贴合,且连接板23和卡条27以及定位块28皆通过镀锌铁金属制备而成。The outer wall of the limit strip 22 is slidably connected to the outer wall of the arc plate 16 and the arc plate 2 17 respectively, and the inner wall of the positioning rod 20 is slidably connected to the outer wall of the limit strip 22, the outer wall of the connecting plate 23 is tightly fitted with the outer wall of the clamping strip 27, and the connecting plate 23, the clamping strip 27 and the positioning block 28 are all made of galvanized iron metal.
作业人员在将侧板4插入插槽3中后,利用限位条22和插槽3对侧板4的移动轨迹进行限位,从而保障侧板4能够以垂直的状态向下移动,从而提高了侧板4在移动过程中的稳定性,避免侧板4在插入时出现卡顿的情况,提高了作业人员对侧板4的安装效率,在侧板4安装后能够配合卡条27对保温板19进行定位,保障该墙体在组装完成后保温板19能够起到隔温保温的作用。After the operator inserts the side panel 4 into the slot 3, the operator uses the limit strip 22 and the slot 3 to limit the movement trajectory of the side panel 4, so as to ensure that the side panel 4 can move downward in a vertical state, thereby improving the stability of the side panel 4 during the movement, avoiding the side panel 4 from getting stuck when inserted, and improving the operator's installation efficiency of the side panel 4. After the side panel 4 is installed, the insulation board 19 can be positioned in conjunction with the card strip 27 to ensure that the insulation board 19 can play a role in heat insulation after the wall is assembled.
条形槽21的形状与限位槽11的形状相同,且定位杆20的直径与弧形板一16和弧形板二17之间的间距相等,且定位杆20的外壁分别与弧形板一16和弧形板二17的内壁滑动连接。The shape of the strip groove 21 is the same as that of the limiting groove 11, and the diameter of the positioning rod 20 is equal to the distance between the arc plate 1 16 and the arc plate 2 17, and the outer wall of the positioning rod 20 is slidably connected to the inner wall of the arc plate 1 16 and the arc plate 2 17 respectively.
侧板4在送入插槽3中后,利用限位条22对侧板4进行限位,再通过副框架2与主框架1的对接使得弧形板一16和弧形板二17对定位杆20进行包裹,从而使得副框架2与主框架1之间产生连接,配合定位柱一18和定位柱二24将副框架2固定在主框架1上,副框架2在固定后对侧板4进行阻隔,保障侧板4无法产生位置偏移的情况,进而提高了作业人员对该保温墙体的组装效率,也能够保障该保温墙体的稳定性。After the side panel 4 is sent into the slot 3, the limit strip 22 is used to limit the side panel 4, and then the arc plate 1 16 and the arc plate 2 17 are wrapped around the positioning rod 20 through the docking of the sub-frame 2 and the main frame 1, so that a connection is established between the sub-frame 2 and the main frame 1, and the sub-frame 2 is fixed on the main frame 1 with the positioning column 1 18 and the positioning column 2 24. After being fixed, the sub-frame 2 blocks the side panel 4 to ensure that the side panel 4 cannot be displaced, thereby improving the assembly efficiency of the insulation wall by the operators and ensuring the stability of the insulation wall.
圆槽25的内壁与弧形板一16以及弧形板二17的外壁滑动连接,弧形板一16和弧形板二17的数量皆为若干个,若干个弧形板一16和弧形板二17分为若干组,且若干组弧形板一16和弧形板二17皆沿副框架2的外壁均匀分布。The inner wall of the circular groove 25 is slidably connected to the outer walls of the arc plate 1 16 and the arc plate 2 17. The number of arc plates 1 16 and arc plates 2 17 is multiple, and the multiple arc plates 1 16 and arc plates 2 17 are divided into multiple groups, and the multiple groups of arc plates 1 16 and arc plates 2 17 are evenly distributed along the outer wall of the sub-frame 2.
利用若干组弧形板一16和弧形板二17使得副框架2在与主框架1对接后,副框架2因弧形板一16、弧形板二17以及定位杆20的对接而无法产生位置偏移的情况,从而保障作业人员可直接将固定螺栓8与定位柱一18以及定位柱二24螺纹连接,以此使得副框架2与主框架1之间受到固定,利用副框架2对侧板4进行固定从而保障侧板4对保温板19的定位效果,同时配合转杆7对侧板4的夹持而使得侧板4稳固的与主框架1固定连接,既提高了作业人员对该保温墙体的组装效率,又能提高该保温墙体的稳定性。By utilizing a plurality of groups of arc plates 16 and arc plates 2 17, after the sub-frame 2 is docked with the main frame 1, the sub-frame 2 cannot be displaced due to the docking of the arc plates 1 16, the arc plates 2 17 and the positioning rods 20, thereby ensuring that the operator can directly thread the fixing bolts 8 with the positioning columns 18 and the positioning columns 24, so that the sub-frame 2 and the main frame 1 are fixed, and the side panels 4 are fixed by the sub-frame 2 to ensure the positioning effect of the side panels 4 on the insulation panels 19, and at the same time, the side panels 4 are clamped by the rotating rods 7 to ensure that the side panels 4 are firmly fixed to the main frame 1, which not only improves the assembly efficiency of the operators for the insulation wall, but also improves the stability of the insulation wall.
副框架2通过定位柱一18、定位柱二24、固定螺栓8与主框架1固定连接,保温板19通过连接板23、定位杆20、卡条27、定位块28与主框架1固定连接,保温板19的数量为若干个,且一个保温板19的外壁与主框架1的顶部固定装配。The sub-frame 2 is fixedly connected to the main frame 1 through positioning column 1 18, positioning column 24, and fixing bolts 8. The insulation board 19 is fixedly connected to the main frame 1 through a connecting plate 23, a positioning rod 20, a clamping strip 27, and a positioning block 28. There are several insulation boards 19, and the outer wall of one insulation board 19 is fixedly assembled to the top of the main frame 1.
该保温墙体整体利用主框架1和副框架2的对接使得各配件彼此之间受到固定,安装步骤简单,使得该保温墙体具有结构简单且紧凑的特征,从而提高了作业人员对该保温墙体的组装效率,提高了该保温墙体的实用性。The insulation wall as a whole utilizes the docking of the main frame 1 and the sub-frame 2 to fix the various accessories to each other, and the installation steps are simple, so that the insulation wall has the characteristics of simple and compact structure, thereby improving the assembly efficiency of the insulation wall by the operators and improving the practicality of the insulation wall.
凹槽26的内壁分别与弧形板一16和弧形板二17的外壁紧密贴合,保温板19与主框架1边缘处的间距和形状皆与侧板4的直径和形状相适配。The inner wall of the groove 26 is closely fitted with the outer wall of the arc plate 1 16 and the arc plate 2 17 , respectively. The spacing and shape between the insulation plate 19 and the edge of the main frame 1 are adapted to the diameter and shape of the side plate 4 .
作业人员在对保温板19进行安装时,凹槽26能够避免保温板19在与主框架1连接时对保温板19的下移造成干扰,从而为保温板19的移动提供充足的活动空间,进而便于作业人员将保温板19安装在主框架1上,而保温板19在安装后能够为墙体提供保温的作用,避免温差过大而导致墙体产生损伤,保障了该墙体的使用寿命。When the operator is installing the insulation board 19, the groove 26 can prevent the insulation board 19 from interfering with the downward movement of the insulation board 19 when it is connected to the main frame 1, thereby providing sufficient movement space for the insulation board 19, and making it convenient for the operator to install the insulation board 19 on the main frame 1. After installation, the insulation board 19 can provide insulation for the wall, avoiding damage to the wall due to excessive temperature difference, and ensuring the service life of the wall.
侧板4的底部与转杆7靠近强力弹簧29的一端紧密贴合,且强力弹簧29的末端与转杆7的外壁固定装配。The bottom of the side plate 4 is tightly fitted with one end of the rotating rod 7 close to the strong spring 29 , and the end of the strong spring 29 is fixedly assembled with the outer wall of the rotating rod 7 .
当侧板4在下降后会与转杆7的外壁搭接,而转杆7设有卡杆15的一端重量较大,强力弹簧29无法将转杆7设有卡杆15的一端拉向主框架1,因此在侧板4插入插槽3中时转杆7设有卡杆15的一端远离侧板4,而当侧板4贴合转杆7靠近主框架1的一端后,因压力使得转杆7压缩强力弹簧29,以此让转杆7发生转动,从而使得卡杆15受对接槽5的阻隔而持续展开直至转杆7的顶端移动至方槽12中,然后通过拉伸弹簧14的弹性和方槽12所提供的活动空间让卡杆15重新展开,从而实现转杆7的顶端自动锁死在方槽12中,而转杆7此时则会与侧板4的外壁紧密贴合,起到了对侧板4进行夹持的效果,进而保障侧板4在安装后的稳定性,更无需作业人员加设固定机构对侧板4进行固定,提高了作业人员对侧板4的安装和固定效率。When the side plate 4 is lowered, it will overlap with the outer wall of the rotating rod 7, and the end of the rotating rod 7 with the clamping rod 15 has a larger weight, and the strong spring 29 cannot pull the end of the rotating rod 7 with the clamping rod 15 toward the main frame 1. Therefore, when the side plate 4 is inserted into the slot 3, the end of the rotating rod 7 with the clamping rod 15 is away from the side plate 4. When the side plate 4 fits the end of the rotating rod 7 close to the main frame 1, the rotating rod 7 compresses the strong spring 29 due to pressure, so that the rotating rod 7 rotates, so that the clamping rod 15 is blocked by the docking slot 5 and continues to expand. Until the top end of the rotating rod 7 moves into the square groove 12, and then the clamping rod 15 is re-expanded through the elasticity of the stretch spring 14 and the activity space provided by the square groove 12, so that the top end of the rotating rod 7 is automatically locked in the square groove 12, and the rotating rod 7 will fit tightly with the outer wall of the side panel 4 at this time, so as to clamp the side panel 4, thereby ensuring the stability of the side panel 4 after installation, and there is no need for the operator to add a fixing mechanism to fix the side panel 4, thereby improving the installation and fixing efficiency of the side panel 4 by the operator.
侧板4的数量为两个,且两个侧板4的外壁皆与保温板19的外壁紧密贴合,保温板19在安装后能够受到侧板4的遮挡,以此对保温板19形成防护,保障保温板19在作业过程中不会受到外界干扰,延长了保温板19的使用寿命,同时该墙体在组装后整体更为平整,从而提高了该保温墙体的美观度,进一步提高了该保温墙体的实用性。There are two side panels 4, and the outer walls of the two side panels 4 are tightly fitted with the outer wall of the insulation board 19. After installation, the insulation board 19 can be shielded by the side panels 4, thereby forming protection for the insulation board 19 and ensuring that the insulation board 19 will not be disturbed by the outside world during operation, thereby extending the service life of the insulation board 19. At the same time, the wall is smoother as a whole after assembly, thereby improving the aesthetics of the insulation wall and further improving the practicality of the insulation wall.
本发明还提供了一种上述墙体保温工程预制构件的快速组装方法,包括以下步骤:The present invention also provides a method for quickly assembling the above-mentioned prefabricated components for wall insulation engineering, comprising the following steps:
S1:首先作业人员将主框架1固定装配在地面上,而主框架1上所固定装配的保温板19无需作业人员加设固定机构,只需拿起未与主框架1连接保温板19,将保温板19上的卡条27对准连接板23之间的间隙,然后由卡条27的底部与连接板23的顶部对接,再按压保温板19,使得保温板19逐渐向下移动直至与主框架1的顶部贴合;S1: First, the operator fixes and assembles the main frame 1 on the ground. The insulation board 19 fixedly assembled on the main frame 1 does not need to be fixed by the operator. The operator only needs to pick up the insulation board 19 that is not connected to the main frame 1, align the clamping strip 27 on the insulation board 19 with the gap between the connecting plates 23, and then dock the bottom of the clamping strip 27 with the top of the connecting plate 23, and then press the insulation board 19, so that the insulation board 19 gradually moves downward until it fits with the top of the main frame 1;
S2:然后作业人员可拿起副框架2,将副框架2调整至能与主框架1形成一个整体的角度,此时固定螺栓8与盲孔9的位置相对应,而连接槽10的位置则与定位柱二24的位置相对应,同时限位槽11和弧形板一16与弧形板二17之间的间距和形状皆相对应;S2: Then the operator can pick up the sub-frame 2 and adjust the sub-frame 2 to form an integral angle with the main frame 1. At this time, the positions of the fixing bolt 8 and the blind hole 9 correspond to each other, and the position of the connecting groove 10 corresponds to the position of the second positioning column 24. At the same time, the spacing and shape between the limit groove 11 and the arc plate 1 16 and the arc plate 2 17 correspond to each other.
S3:最后作业人员可拿起侧板4,将侧板4对准插槽3后向下按压侧板4,使得限位条22分别沿限位槽11以及条形槽21的内壁进行滑动,而此时弧形板一16、弧形板二17的外壁则因圆槽25所提供的活动空间保障侧板4的持续下移,当侧板4下降至与转杆7抵触时,转杆7因侧板4的压迫而压缩强力弹簧29,从而使得转杆7发生转动,以此让转杆7的外壁与对接槽5的内壁滑动连接,而卡杆15则因对接槽5的阻隔而拉长拉伸弹簧14,直至卡杆15转动至与收纳槽13内壁相平行的状态,使得转杆7的末端穿过对接槽5进入方槽12中,方槽12内部的活动空间会使得卡杆15重新展开,以此让转杆7锁死在方槽12中,而此时转杆7的外壁与侧板4的外壁紧密贴合,从而起到对侧板4进行夹持的作用,作业人员再通过拧紧固定螺栓8的方式使得主框架1、副框架2、侧板4皆连成一体,侧板4在固定螺栓8、限位条22、转杆7的定位效果下稳固的受到固定,而保温板19则在侧板4所提供的防护和限位效果下稳固的与主框架1和副框架2连接即可。S3: Finally, the operator can pick up the side panel 4, align the side panel 4 with the slot 3, and then press the side panel 4 downward, so that the limit strip 22 slides along the inner wall of the limit slot 11 and the strip slot 21 respectively, and at this time, the outer wall of the arc plate 16 and the arc plate 2 17 ensures the continuous downward movement of the side panel 4 due to the activity space provided by the circular groove 25. When the side panel 4 drops to contact the rotating rod 7, the rotating rod 7 compresses the strong spring 29 due to the pressure of the side panel 4, so that the rotating rod 7 rotates, so that the outer wall of the rotating rod 7 is slidably connected with the inner wall of the docking slot 5, and the clamping rod 15 is stretched due to the obstruction of the docking slot 5. The tension spring 14 is stretched until the clamping rod 15 rotates to the inner wall of the storage slot 13. The walls are parallel to each other, so that the end of the rotating rod 7 passes through the docking groove 5 and enters the square groove 12. The movable space inside the square groove 12 will cause the clamping rod 15 to unfold again, so that the rotating rod 7 is locked in the square groove 12. At this time, the outer wall of the rotating rod 7 is tightly fitted with the outer wall of the side panel 4, thereby clamping the side panel 4. The operator then tightens the fixing bolts 8 to connect the main frame 1, the sub-frame 2, and the side panel 4 into one. The side panel 4 is firmly fixed under the positioning effect of the fixing bolts 8, the limit strips 22, and the rotating rod 7, and the insulation board 19 is firmly connected to the main frame 1 and the sub-frame 2 under the protection and limiting effect provided by the side panel 4.
本发明中未经描述的技术特征可以通过现有技术实现,在此不再赘述。本发明并不仅限于上述具体实施方式,本领域普通技术人员在本发明的实质范围内做出的变化、改型、添加或替换,也应属于本发明的保护范围。Technical features not described in the present invention can be implemented by existing technologies and will not be described in detail here. The present invention is not limited to the above specific embodiments, and changes, modifications, additions or substitutions made by ordinary technicians in the field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202411219947.1A CN118774273A (en) | 2024-09-02 | 2024-09-02 | A prefabricated component for wall insulation engineering and a rapid assembly method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202411219947.1A CN118774273A (en) | 2024-09-02 | 2024-09-02 | A prefabricated component for wall insulation engineering and a rapid assembly method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN118774273A true CN118774273A (en) | 2024-10-15 |
Family
ID=92989723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202411219947.1A Pending CN118774273A (en) | 2024-09-02 | 2024-09-02 | A prefabricated component for wall insulation engineering and a rapid assembly method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN118774273A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06248727A (en) * | 1993-02-27 | 1994-09-06 | Tokyo Koutetsu Kogyo Kk | Frame of cloth tape fastener connection type partition panel |
KR102180144B1 (en) * | 2020-01-08 | 2020-11-17 | 유현교 | Cover frame corresponding to positive pressure of air handling unit |
CN215406654U (en) * | 2021-07-22 | 2022-01-04 | 肖琦 | Insulation material board convenient to installation |
KR20220037753A (en) * | 2020-09-18 | 2022-03-25 | 한국전력공사 | Work scaffold assembly for working of steel tower, mounting method and separating method of the work scaffold assembly |
CN219509157U (en) * | 2023-03-08 | 2023-08-11 | 彭伟文 | Outdoor multi-functional heat preservation wall body template |
CN220247241U (en) * | 2023-05-04 | 2023-12-26 | 山东大地建筑规划设计有限公司 | Outdoor heat preservation wall form |
CN220953941U (en) * | 2023-09-01 | 2024-05-14 | 咸阳职业技术学院 | New rural building wall body heat preservation |
-
2024
- 2024-09-02 CN CN202411219947.1A patent/CN118774273A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06248727A (en) * | 1993-02-27 | 1994-09-06 | Tokyo Koutetsu Kogyo Kk | Frame of cloth tape fastener connection type partition panel |
KR102180144B1 (en) * | 2020-01-08 | 2020-11-17 | 유현교 | Cover frame corresponding to positive pressure of air handling unit |
KR20220037753A (en) * | 2020-09-18 | 2022-03-25 | 한국전력공사 | Work scaffold assembly for working of steel tower, mounting method and separating method of the work scaffold assembly |
CN215406654U (en) * | 2021-07-22 | 2022-01-04 | 肖琦 | Insulation material board convenient to installation |
CN219509157U (en) * | 2023-03-08 | 2023-08-11 | 彭伟文 | Outdoor multi-functional heat preservation wall body template |
CN220247241U (en) * | 2023-05-04 | 2023-12-26 | 山东大地建筑规划设计有限公司 | Outdoor heat preservation wall form |
CN220953941U (en) * | 2023-09-01 | 2024-05-14 | 咸阳职业技术学院 | New rural building wall body heat preservation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113818589B (en) | Heat-insulating wall structure and construction method thereof | |
CN110670825B (en) | Decorative plate with quick assembling function | |
CN118774273A (en) | A prefabricated component for wall insulation engineering and a rapid assembly method thereof | |
CN216075802U (en) | Architectural decoration curtain quick connecting device | |
CN211421501U (en) | Aluminum veneer convenient to installation | |
CN221321853U (en) | Connection structure is used in installation of assembled steel construction | |
CN218205225U (en) | Steel structure beam with installation assembled structure | |
CN212273263U (en) | Ground heating coil convenient to installation | |
CN212866700U (en) | Stone plate dry hanging structure | |
CN215054140U (en) | Wall surface installation structure of mineral wool sound-absorbing board | |
CN221524005U (en) | Roof heat-insulating anti-falling device | |
CN208996345U (en) | A kind of wall panel assemblies connection framework | |
CN115523663A (en) | Wall-hanging heat pump water heater convenient to installation | |
CN208572002U (en) | Solar panels photovoltaic bracket | |
CN222595204U (en) | A HF fireproof insulation board with strong earthquake resistance and sound insulation | |
CN117240193B (en) | Modularized fast-installed photovoltaic bracket and application method thereof | |
CN212001739U (en) | A thermal insulation partition for temperature zoning in an office area | |
CN216304463U (en) | High-efficiency sound insulation and noise reduction composite sound barrier for highway construction | |
CN115256586B (en) | Furniture assembling equipment | |
CN221567742U (en) | Building external wall heat preservation decorative board | |
CN117955416B (en) | Composite material solar component frame connection structure | |
CN222161593U (en) | Building wood rafter mounting structure | |
CN221001481U (en) | Heat preservation mounting structure of factory building plywood | |
CN221236306U (en) | External insulation board of building wall | |
CN221481035U (en) | Spherical net rack supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |