CN118502512A - Intelligent liquid cooling platform and operation monitoring method - Google Patents

Intelligent liquid cooling platform and operation monitoring method Download PDF

Info

Publication number
CN118502512A
CN118502512A CN202410961262.8A CN202410961262A CN118502512A CN 118502512 A CN118502512 A CN 118502512A CN 202410961262 A CN202410961262 A CN 202410961262A CN 118502512 A CN118502512 A CN 118502512A
Authority
CN
China
Prior art keywords
temperature
heat dissipation
temperature change
dissipation device
change value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202410961262.8A
Other languages
Chinese (zh)
Other versions
CN118502512B (en
Inventor
陈海燕
黄正岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Aircraft Design Institute Yangzhou Collaborative Innovation Research Institute Co ltd
Changzhou Junding Machinery Manufacturing Co ltd
Original Assignee
Shenyang Aircraft Design Institute Yangzhou Collaborative Innovation Research Institute Co ltd
Changzhou Junding Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aircraft Design Institute Yangzhou Collaborative Innovation Research Institute Co ltd, Changzhou Junding Machinery Manufacturing Co ltd filed Critical Shenyang Aircraft Design Institute Yangzhou Collaborative Innovation Research Institute Co ltd
Priority to CN202410961262.8A priority Critical patent/CN118502512B/en
Publication of CN118502512A publication Critical patent/CN118502512A/en
Application granted granted Critical
Publication of CN118502512B publication Critical patent/CN118502512B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/20Control of temperature characterised by the use of electric means with sensing elements having variation of electric or magnetic properties with change of temperature

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Temperature (AREA)

Abstract

本申请公开了一种智能液冷平台及运行监测方法,属于设备监测技术领域,包括:对电子设备进行初始化运行,并获取第一峰值温度和第二峰值温度以及饱和时间;获取第一单位功率温度变化值以及第二单位功率温度变化值;重新进行初始化运行,并根据饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。在本申请的技术方案实施过程中,通过对电子设备进行初始化运行,并获取饱和时间,以饱和时间为参考计算不同的散热设备输出功率调整量,减少电子设备温度的波动性,提高运行稳定性。

The present application discloses an intelligent liquid cooling platform and operation monitoring method, which belongs to the field of equipment monitoring technology, including: initializing the operation of the electronic device, and obtaining the first peak temperature, the second peak temperature and the saturation time; obtaining the first unit power temperature change value and the second unit power temperature change value; re-initializing the operation, and adjusting the output power of the heat dissipation device according to the first unit power temperature change value before the saturation time and the second unit power temperature change value after the saturation time; after adjusting the power of the heat dissipation device, obtaining the temperature data of the electronic device, and judging the volatility of the temperature data, and verifying the heat dissipation effect. In the implementation process of the technical solution of the present application, by initializing the operation of the electronic device and obtaining the saturation time, the output power adjustment amount of different heat dissipation devices is calculated with reference to the saturation time, so as to reduce the volatility of the temperature of the electronic device and improve the operation stability.

Description

一种智能液冷平台及运行监测方法Intelligent liquid cooling platform and operation monitoring method

技术领域Technical Field

本申请涉及设备监测技术领域,具体为一种智能液冷平台及运行监测方法。The present application relates to the technical field of equipment monitoring, and specifically to an intelligent liquid cooling platform and an operation monitoring method.

背景技术Background Art

随着航天工业的发展,飞机等飞行工具中的电子设备越来越多,而为了保障飞行工具的正常运行,这些电子设备通常需要满频率、满功率运行,随之带来的设备发热问题不仅会影响设备性能,还会导致内部温度升高,带来额外的降温工作。With the development of the aerospace industry, there are more and more electronic devices in aircraft and other flying vehicles. In order to ensure the normal operation of flying vehicles, these electronic devices usually need to operate at full frequency and full power. The resulting heating problem of the equipment will not only affect the performance of the equipment, but also cause the internal temperature to rise, bringing additional cooling work.

在现有的使用场景中,为了防止飞行工具中的电子设备发热影响性能,通常会设置散热设备,例如风冷散热设备、液冷散热设备,近年也出现了液风混合的散热设备,结合风冷和液冷的散热优点,从而提高散热效率,并且能够检测实施运行参数实现散热调节,具体为风扇转速调节以及对散热液流速的调节,从而在使电子设备散热的同时,根据当前运行状况对散热设备进行调控,使电子设备始终处于合适的工作温度下。In existing usage scenarios, in order to prevent the electronic equipment in the flight vehicle from generating heat and affecting its performance, heat dissipation devices are usually installed, such as air-cooled heat dissipation devices and liquid-cooled heat dissipation devices. In recent years, liquid-air hybrid heat dissipation devices have also appeared, which combine the heat dissipation advantages of air cooling and liquid cooling to improve heat dissipation efficiency, and can detect and implement operating parameters to achieve heat dissipation adjustment, specifically fan speed adjustment and heat dissipation liquid flow rate adjustment. In this way, while the electronic equipment is dissipated, the heat dissipation device can be adjusted according to the current operating conditions to keep the electronic equipment at a suitable operating temperature at all times.

然而,虽然通过监测电子设备运行状况,并对散热设备进行调控的方式能够实现使电子设备处于合适的温度,但是在飞行工具中,电子设备的发热存在滞后性,即在开始发热到被检测到发热中间存在一个过程,同时检测到发热到调控散热设备直到设备降温也存在一个过程,这些过程会导致电子设备的散热存在空窗期,对于对温度变化比较敏感的电子设备来说,这种空窗期会导致设备运行不稳定,造成严重的后果,因此需要对监测方式进行改进。However, although the electronic equipment can be kept at an appropriate temperature by monitoring its operating conditions and adjusting the heat dissipation device, there is a lag in the heating of the electronic equipment in aircraft, that is, there is a process from the beginning of heating to the detection of heating, and there is also a process from the detection of heating to the adjustment of the heat dissipation device until the equipment cools down. These processes will cause a window period for the heat dissipation of the electronic equipment. For electronic equipment that is sensitive to temperature changes, this window period will cause unstable equipment operation and cause serious consequences. Therefore, the monitoring method needs to be improved.

所以有必要提供一种智能液冷平台及运行监测方法来解决上述问题。Therefore, it is necessary to provide an intelligent liquid cooling platform and an operation monitoring method to solve the above problems.

需要说明的是,本背景技术部分中公开的以上信息仅用于理解本申请构思的背景技术,并且因此,它可以包含不构成现有技术的信息。It should be noted that the above information disclosed in this background technology section is only for understanding the background technology conceived of the present application, and therefore, it may contain information that does not constitute the prior art.

发明内容Summary of the invention

基于现有技术中存在的上述问题,本申请所要解决的问题是:提供一种智能液冷平台及运行监测方法,达到将电子设备的温度变化分为非线性区间和线性区间,并分别采用不同的计算方法计算出散热设备的输出功率调整量,降低因设备间的空窗期导致的温度波动,提高电子设备的运行稳定性。Based on the above-mentioned problems existing in the prior art, the problem to be solved by the present application is: to provide an intelligent liquid cooling platform and an operation monitoring method, so as to divide the temperature change of the electronic equipment into a nonlinear interval and a linear interval, and use different calculation methods to calculate the output power adjustment amount of the heat dissipation device, thereby reducing the temperature fluctuation caused by the window period between devices and improving the operation stability of the electronic equipment.

本申请解决其技术问题所采用的技术方案是:一种智能液冷平台的运行监测方法,该方法包括:The technical solution adopted by the present application to solve the technical problem is: an operation monitoring method of an intelligent liquid cooling platform, the method comprising:

对电子设备进行初始化运行,并接收初始化运行过程中来自采集设备所采集的温度数据,该温度数据具有时序信息,基于温度数据和时序信息获取温度变化曲线,并根据温度变化曲线获取第一峰值温度和第二峰值温度,以及第一峰值温度与第二峰值温度所对应的饱和时间;Initialize the electronic device and receive temperature data collected by the collection device during the initialization process, the temperature data having timing information, obtain a temperature change curve based on the temperature data and the timing information, and obtain a first peak temperature and a second peak temperature according to the temperature change curve, as well as saturation times corresponding to the first peak temperature and the second peak temperature;

根据温度变化曲线获取在饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值;Acquire a first unit power temperature change value before the saturation time and a second unit power temperature change value after the saturation time according to the temperature change curve;

重新进行初始化运行,并根据饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;Re-initialize the operation, and adjust the output power of the heat dissipation device according to the first unit power temperature change value before the saturation time and the second unit power temperature change value after the saturation time;

在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。After adjusting the power of the heat dissipation device, the temperature data of the electronic device is obtained, and the volatility of the temperature data is determined to verify the heat dissipation effect.

在本申请的技术方案实施过程中,通过对电子设备进行初始化运行,并获取饱和时间,以饱和时间为参考计算不同的散热设备输出功率调整量,减少电子设备温度的波动性,提高运行稳定性。During the implementation of the technical solution of the present application, the electronic device is initialized and operated, and the saturation time is obtained. The output power adjustment amount of different heat dissipation devices is calculated with the saturation time as a reference, thereby reducing the temperature fluctuation of the electronic device and improving the operation stability.

进一步的,所述初始化运行包括散热设备未开启状态以及散热设备开启后维持额定功率状态两种测试工况。Furthermore, the initialization operation includes two test conditions: a state where the heat dissipation device is not turned on and a state where the heat dissipation device is turned on and maintains a rated power.

进一步的,在两种测试工况的电子设备均到达峰值温度后,第一峰值温度与第二峰值温度首次同时出现对应的时间为饱和时间。Furthermore, after the electronic devices in the two test conditions reach the peak temperature, the time corresponding to the first simultaneous appearance of the first peak temperature and the second peak temperature is the saturation time.

进一步的,所述第一单位功率温度变化值的获取方法包括:Furthermore, the method for obtaining the first unit power temperature change value includes:

对从初始化运行开始到饱和时间的时间段进行拆分,并按照固定的拆分间隔将该时间段拆分为多个时间点,获取每个时间点上的第一温度与第二温度,其中,第一温度为散热设备未开启情况下的电子设备温度,第二温度为散热设备在额定功率下的电子设备温度;Split the time period from the start of the initialization operation to the saturation time, and split the time period into multiple time points according to a fixed splitting interval, and obtain the first temperature and the second temperature at each time point, wherein the first temperature is the temperature of the electronic device when the heat dissipation device is not turned on, and the second temperature is the temperature of the electronic device when the heat dissipation device is at rated power;

对第一温度与第二温度进行差值计算,得到温度差值,然后将温度差值与拆分间隔的比值作为该时间点处的单位温度变化值;Calculate the difference between the first temperature and the second temperature to obtain the temperature difference, and then use the ratio of the temperature difference to the split interval as the unit temperature change value at the time point;

获取散热设备的额定功率,该额定功率为风扇转速恒定与冷却液流速恒定下的散热设备总功率,并用单位温度变化值除以散热设备的额定功率,得到第一单位功率温度变化值;Obtaining the rated power of the heat dissipation device, where the rated power is the total power of the heat dissipation device when the fan speed and the coolant flow rate are constant, and dividing the unit temperature change value by the rated power of the heat dissipation device to obtain a first unit power temperature change value;

记录饱和时间之前每个时间点处的第一单位功率温度变化值,并进行保存。The first unit power temperature change value at each time point before the saturation time is recorded and saved.

进一步的,所述第二单位功率温度变化值的获取方法为:Furthermore, the method for obtaining the second unit power temperature change value is:

对第一峰值温度与第二峰值温度进行差值计算,并将计算结果与散热设备的额定功率之比作为第二单位功率温度变化值。The difference between the first peak temperature and the second peak temperature is calculated, and the ratio of the calculated result to the rated power of the heat dissipation device is used as the second unit power temperature change value.

进一步的,在饱和时间之前,采用时序对应法进行散热设备输出功率的调整量计算,在饱和时间之后,采用线性调整法进行散热设备输出功率的调整量计算。Furthermore, before the saturation time, the time series correspondence method is used to calculate the adjustment amount of the output power of the heat dissipation device, and after the saturation time, the linear adjustment method is used to calculate the adjustment amount of the output power of the heat dissipation device.

进一步的,所述时序对应法包括以下步骤:Furthermore, the timing correspondence method includes the following steps:

将重新进行初始化运行的时间点设为初始时间,并按照拆分间隔对初始化运行时间进行标记,然后对计算出的所有第一单位功率温度变化值进行均值计算,得到第一单位功率温度变化均值,并根据该变化均值和电子设备的预期温度以及散热设备的额定功率计算散热设备的输出功率调整量。The time point for re-initialization operation is set as the initial time, and the initialization operation time is marked according to the split interval, and then the average of all the calculated first unit power temperature change values is calculated to obtain the first unit power temperature change average, and the output power adjustment amount of the heat dissipation device is calculated based on the change average and the expected temperature of the electronic device and the rated power of the heat dissipation device.

进一步的,所述线性调整法包括以下步骤:在到达饱和时间后,根据第二单位功率温度变化值与电子设备的预期温度,结合第一峰值温度和第二峰值温度计算散热设备在饱和时间之后的输出功率调整量。Furthermore, the linear adjustment method includes the following steps: after reaching the saturation time, calculating the output power adjustment amount of the heat dissipation device after the saturation time according to the second unit power temperature change value and the expected temperature of the electronic device, combined with the first peak temperature and the second peak temperature.

一种智能液冷平台,该平台包括:An intelligent liquid cooling platform, comprising:

初始化运行模块,用于对电子设备进行初始化运行,并接收初始化运行过程中来自采集设备所采集的温度数据,该温度数据具有时序信息,基于温度数据和时序信息获取温度变化曲线,并根据温度变化曲线获取第一峰值温度和第二峰值温度,以及第一峰值温度与第二峰值温度所在的饱和时间;An initialization operation module is used to perform initialization operation on the electronic device, and receive temperature data collected from the acquisition device during the initialization operation, the temperature data having timing information, obtain a temperature change curve based on the temperature data and the timing information, and obtain a first peak temperature and a second peak temperature, as well as a saturation time of the first peak temperature and the second peak temperature according to the temperature change curve;

参数获取模块,用于根据温度变化曲线获取在饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值;A parameter acquisition module, used for acquiring a first unit power temperature change value before the saturation time and a second unit power temperature change value after the saturation time according to the temperature change curve;

输出功率调整模块,用于重新进行初始化运行,并根据第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;An output power adjustment module, used for re-initializing operation and adjusting the output power of the heat dissipation device according to the first unit power temperature change value and the second unit power temperature change value after the saturation time;

散热效果验证模块,用于在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。The heat dissipation effect verification module is used to obtain the temperature data of the electronic device after the power of the heat dissipation device is adjusted, and to determine the volatility of the temperature data to verify the heat dissipation effect.

本申请的有益效果是:本申请提供的一种智能液冷平台及运行监测方法,通过对电子设备进行初始化运行,并获取饱和时间,以饱和时间为参考计算不同的散热设备输出功率调整量,减少电子设备温度的波动性,提高运行稳定性。The beneficial effects of the present application are as follows: the present application provides an intelligent liquid cooling platform and operation monitoring method, which initializes the operation of the electronic equipment and obtains the saturation time, and uses the saturation time as a reference to calculate the output power adjustment amount of different heat dissipation devices, thereby reducing the temperature volatility of the electronic equipment and improving the operation stability.

除了上面所描述的目的、特征和优点之外,本申请还有其它的目的、特征和优点。下面将参照图,对本申请作进一步详细的说明。In addition to the above-described purposes, features and advantages, the present application also has other purposes, features and advantages. The present application will be further described in detail with reference to the drawings.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

构成本申请的一部分的说明书附图用来提供对本申请的进一步理解,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The drawings constituting part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

图1为本申请中一种智能液冷平台的运行监测方法的整体流程示意图;FIG1 is a schematic diagram of the overall process of an operation monitoring method of an intelligent liquid cooling platform in the present application;

图2为温度变化曲线其中一种情况的示意图;FIG2 is a schematic diagram of a temperature variation curve in one case;

图3为温度变化曲线的另一情况的示意图;FIG3 is a schematic diagram of another situation of the temperature variation curve;

图4为本申请中一种智能液冷平台的模块构成示意图。FIG4 is a schematic diagram of the module structure of an intelligent liquid cooling platform in the present application.

具体实施方式DETAILED DESCRIPTION

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本申请。It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

为了使本技术领域的人员更好地理解本申请方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分的实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。In order to enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this application.

实施例一:本申请提供了一种智能液冷平台的运行监测方法,该监测方法用于液冷平台中,该液冷平台应用于飞行工具的电子设备散热降温中,例如飞行控制系统、导航系统、雷达系统、显示设备、其他传感器等,这些设备在工作时会产生温度,容易造成运行异常,液冷平台是用于对上述电子设备进行散热降温的装置,通常为风冷加液冷组合散热,其中风冷散热需要使用风扇以及对应的风速调节设备,液冷散热需要使用冷却液体以及用于泵送冷却液体的水泵;Embodiment 1: The present application provides an operation monitoring method of an intelligent liquid cooling platform, and the monitoring method is used in a liquid cooling platform, and the liquid cooling platform is used for heat dissipation and cooling of electronic equipment of flight tools, such as flight control systems, navigation systems, radar systems, display devices, other sensors, etc. These devices will generate temperature when working, which may easily cause abnormal operation. The liquid cooling platform is a device for heat dissipation and cooling of the above electronic equipment, usually a combination of air cooling and liquid cooling, wherein air cooling requires the use of a fan and a corresponding wind speed regulating device, and liquid cooling requires the use of a cooling liquid and a water pump for pumping the cooling liquid;

在现有技术中,智能液冷平台的调控逻辑通常为:在监测区域设置温度传感器,实时采集监测区域的温度,然后设定温度阈值,当采集到的温度小于温度阈值时,散热设备不作调整,当采集到的温度大于温度阈值时,开启散热设备,这种方法忽略了电子设备在开始发热至被检测到温度升高、以及开启散热设备至实际温度降低过程中产生的空窗期,这种空窗期会导致电子设备的温度产生波动,而在飞行工具中,即使电子设备的温度能够通过调整散热设备使其保持在阈值以下,但是发热到散热的过程会使其产生不可避免的温度波动,同样会对电子设备的运行产生影响,尤其是对于温度波动较敏感的设备,导致电子设备的运行过程存在风险;In the prior art, the control logic of the intelligent liquid cooling platform is usually as follows: a temperature sensor is set in the monitoring area, the temperature of the monitoring area is collected in real time, and then a temperature threshold is set. When the collected temperature is lower than the temperature threshold, the heat dissipation device is not adjusted. When the collected temperature is higher than the temperature threshold, the heat dissipation device is turned on. This method ignores the window period generated in the process from the beginning of heating of the electronic equipment to the detection of temperature rise, and from the turning on of the heat dissipation device to the actual temperature drop. This window period will cause the temperature of the electronic equipment to fluctuate. In an aircraft, even if the temperature of the electronic equipment can be kept below the threshold by adjusting the heat dissipation device, the process from heating to heat dissipation will cause inevitable temperature fluctuations, which will also affect the operation of the electronic equipment, especially for devices that are sensitive to temperature fluctuations, resulting in risks in the operation of the electronic equipment.

如图1所示,为了解决上述问题,该运行监测方法包括以下步骤:As shown in FIG1 , in order to solve the above problem, the operation monitoring method includes the following steps:

步骤A:对电子设备进行初始化运行,并接收初始化运行过程中来自采集设备所采集的温度数据,该温度数据具有时序信息,基于温度数据和时序信息获取温度变化曲线,并根据温度变化曲线获取第一峰值温度和第二峰值温度,以及第一峰值温度与第二峰值温度所对应的饱和时间;Step A: Initializing the electronic device and receiving temperature data collected from the collection device during the initialization process, the temperature data having timing information, obtaining a temperature change curve based on the temperature data and the timing information, and obtaining a first peak temperature and a second peak temperature according to the temperature change curve, as well as saturation times corresponding to the first peak temperature and the second peak temperature;

在进行运行监测前,先对电子设备进行初始化运行,该初始化运行是指对电子设备进行模拟运行,该模拟运行可以模拟电子设备的装机使用过程,该模拟运行过程包括从打开电子设备,运行固定时间后关闭,并分别监测散热设备在额定功率下以及散热设备未开启情况下的电子设备温度变化,而并非直接对装机后的电子设备进行监测,减少操作风险,并在初始化运行的过程中获取不同条件下的电子设备温度变化情况;Before the operation monitoring is performed, the electronic equipment is initialized and operated first. The initialization operation refers to the simulated operation of the electronic equipment. The simulated operation can simulate the installation and use process of the electronic equipment. The simulated operation process includes turning on the electronic equipment, running it for a fixed time and then turning it off, and monitoring the temperature changes of the electronic equipment when the heat dissipation device is at rated power and when the heat dissipation device is not turned on, instead of directly monitoring the electronic equipment after installation, so as to reduce the operation risk and obtain the temperature changes of the electronic equipment under different conditions during the initialization operation;

其中,采集设备是指用于对电子设备进行温度采集的设备,包括温度传感器、红外测温仪等,散热设备的额定功率是指开启散热设备后未经任何调整下的工作功率,对散热设备的调整是指调节风扇转速和冷却液流速的调整,采集到的温度作为第一温度数据,并且同时记录采集过程的时序信息,即采集到温度数据对应的时间点,从而精准获取电子设备运行过程中的温度变化情况,并基于第一温度数据和时序信息绘制温度变化曲线,该温度变化曲线可以打包为表格文件,便于后续处理以及工作人员调取分析,该温度变化曲线如图2所示,其中曲线一为散热设备未开启状态下的温度变化情况,曲线二为散热设备开启至额定功率下的温度变化情况;Among them, the acquisition device refers to a device used to collect the temperature of the electronic device, including a temperature sensor, an infrared thermometer, etc. The rated power of the heat dissipation device refers to the working power without any adjustment after the heat dissipation device is turned on. The adjustment of the heat dissipation device refers to the adjustment of the fan speed and the coolant flow rate. The collected temperature is used as the first temperature data, and the timing information of the acquisition process is recorded at the same time, that is, the time point corresponding to the temperature data is collected, so as to accurately obtain the temperature change of the electronic device during operation, and draw a temperature change curve based on the first temperature data and the timing information. The temperature change curve can be packaged into a table file for subsequent processing and retrieval and analysis by the staff. The temperature change curve is shown in Figure 2, wherein Curve 1 is the temperature change when the heat dissipation device is not turned on, and Curve 2 is the temperature change when the heat dissipation device is turned on to the rated power;

如图2所示,在温度变化曲线中,由于环境温度的存在,不同情况的电子设备会具有一个初始温度,该初始温度与环境温度大小相同,在曲线一中,由于未使用散热设备,电子设备在模拟运行过程中温度会呈现升高状态,并在到达第一峰值温度后上升趋势逐渐放缓,该第一峰值温度即为电子设备正常运行时能够达到的最大温度,该第一峰值温度可以作为电子设备的监测对比温度,如果在未使用散热设备的情况下,电子设备的运行温度高于第一峰值温度,则说明电子设备的运行出现异常,需要停用检修;As shown in FIG. 2 , in the temperature change curve, due to the existence of the ambient temperature, the electronic device in different situations will have an initial temperature, which is the same as the ambient temperature. In curve 1, since no heat dissipation device is used, the temperature of the electronic device will increase during the simulation operation, and the rising trend will gradually slow down after reaching the first peak temperature. The first peak temperature is the maximum temperature that the electronic device can reach when it is operating normally. The first peak temperature can be used as a monitoring comparison temperature of the electronic device. If the operating temperature of the electronic device is higher than the first peak temperature without using a heat dissipation device, it means that the operation of the electronic device is abnormal and needs to be stopped for maintenance.

在使用散热设备,并使散热设备处于额定功率下运行时,电子设备的温度变化会呈现曲线二的变化趋势,由于添加了散热设备,在散热设备开启后会维持额定功率运行,从而使电子设备的温度升高趋势放缓,但是随着电子设备运行时产生的热量逐渐增加,大于散热设备能够散发的热量后,电子设备的温度变化总体上仍然呈现上升状态,直到电子设备的温度到达第二峰值温度后保持稳定,第二峰值温度始终小于第一峰值温度,在第一峰值温度与第二峰值温度对应的曲线位置导数为零;When the heat dissipation device is used and operated at rated power, the temperature change of the electronic device will show the change trend of curve 2. Since the heat dissipation device is added, the rated power will be maintained after the heat dissipation device is turned on, so that the temperature increase trend of the electronic device is slowed down. However, as the heat generated by the electronic device during operation gradually increases and exceeds the heat that can be dissipated by the heat dissipation device, the temperature change of the electronic device generally still shows an upward state until the temperature of the electronic device reaches the second peak temperature and remains stable. The second peak temperature is always lower than the first peak temperature, and the position derivative of the curve corresponding to the first peak temperature and the second peak temperature is zero;

在两种测试工况的电子设备均到达峰值温度后,第一峰值温度与第二峰值温度首次同时出现对应的时间为饱和时间,如图2所示,在饱和时间处,两种测试工况的电子设备均到达峰值温度,在不调整散热设备的输出功率的情况下,两种峰值温度均不会变化,After the electronic devices under the two test conditions have reached the peak temperature, the time corresponding to the first simultaneous appearance of the first peak temperature and the second peak temperature is the saturation time. As shown in FIG2 , at the saturation time, the electronic devices under the two test conditions have reached the peak temperature. Without adjusting the output power of the heat dissipation device, the two peak temperatures will not change.

步骤B:根据温度变化曲线获取在饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值;Step B: acquiring a first unit power temperature change value before the saturation time and a second unit power temperature change value after the saturation time according to the temperature change curve;

在散热设备处于额定功率持续运行一段时间直到饱和时间处后,两种测试工况的电子设备温度保持定值,分别为第一峰值温度和第二峰值温度,在这个饱和时间之前,从曲线图可以看出,在电子设备运行到达饱和时间之前,两种测试工况下的电子设备温度变化为非线性,即在不同时间点下,即使散热设备处于额定功率运行,通过散热设备产生的降温幅度均不相同,因为在这个阶段电子设备从开启到稳定运行过程中的温度变化会从环境温度开始,直到峰值温度,之间存在较大的温度跨度,同时散热设备能够散发的热量也会随着运行时间逐渐稳定,在散热设备开启初期,由于热量在介质中的传输、环境温度与电子设备温度温差较小等原因,都会导致散热设备的散热能力呈现非线性变化,即产生的降温幅度会随着时间产生变化,难以形成统计特性,因此需要在饱和时间之间获取第一单位功率温度变化值,具体的,第一单位功率温度变化值的获取方法如下:After the heat dissipation device is continuously running at rated power for a period of time until the saturation time, the temperature of the electronic equipment under the two test conditions remains constant, namely the first peak temperature and the second peak temperature. Before this saturation time, it can be seen from the curve that before the electronic equipment reaches the saturation time, the temperature change of the electronic equipment under the two test conditions is nonlinear, that is, at different time points, even if the heat dissipation device is running at rated power, the temperature reduction amplitude generated by the heat dissipation device is different, because at this stage, the temperature change of the electronic equipment from startup to stable operation will start from the ambient temperature until the peak temperature, and there is a large temperature span. At the same time, the heat that the heat dissipation device can dissipate will gradually stabilize with the running time. In the early stage of the heat dissipation device, due to the transmission of heat in the medium, the small temperature difference between the ambient temperature and the temperature of the electronic equipment, etc., the heat dissipation capacity of the heat dissipation device will show nonlinear changes, that is, the temperature reduction amplitude will change with time, and it is difficult to form statistical characteristics. Therefore, it is necessary to obtain the first unit power temperature change value between the saturation time. Specifically, the method for obtaining the first unit power temperature change value is as follows:

对从初始化运行开始到饱和时间的时间段进行拆分,并按照固定的拆分间隔将该时间段拆分为多个时间点,获取每个时间点上的第一温度与第二温度,其中,第一温度为散热设备未开启情况下的电子设备温度,第二温度为散热设备在额定功率下的电子设备温度;Split the time period from the start of the initialization operation to the saturation time, and split the time period into multiple time points according to a fixed splitting interval, and obtain the first temperature and the second temperature at each time point, wherein the first temperature is the temperature of the electronic device when the heat dissipation device is not turned on, and the second temperature is the temperature of the electronic device when the heat dissipation device is at rated power;

从初始化运行开始到饱和时间的时间段表示电子设备在不同测试工况下到达峰值温度的时间,在该时间段中,每个时间点都对应不同的电子设备温度,因此需要对其进行拆分,为了提高精准度,可以按照秒为拆分间隔进行拆分,即获取每秒电子设备不同测试工况下的温度值,并分别作为第一温度与第二温度;The time period from the start of the initialization operation to the saturation time indicates the time when the electronic device reaches the peak temperature under different test conditions. In this time period, each time point corresponds to a different temperature of the electronic device, so it needs to be split. In order to improve the accuracy, it can be split according to seconds as the splitting interval, that is, the temperature value of the electronic device under different test conditions per second is obtained, and used as the first temperature and the second temperature respectively;

对第一温度与第二温度进行差值计算,得到温度差值,然后将温度差值与拆分间隔的比值作为该时间点处的单位温度变化值;Calculate the difference between the first temperature and the second temperature to obtain the temperature difference, and then use the ratio of the temperature difference to the split interval as the unit temperature change value at the time point;

在拆分完毕后,每个时间点处都对应不同的温度值,对第一温度与第二温度进行差值计算后,得到温度差值,该温度差值即为从前一时刻到当前时刻的单位温度变化值,从而获取电子设备在未使用散热设备到使用额定功率运行的散热设备下的温度变化情况;After the splitting is completed, each time point corresponds to a different temperature value. After the difference between the first temperature and the second temperature is calculated, the temperature difference is obtained, and the temperature difference is the unit temperature change value from the previous moment to the current moment, thereby obtaining the temperature change of the electronic device from not using a heat dissipation device to using a heat dissipation device running at rated power;

获取散热设备的额定功率,该额定功率为风扇转速恒定与冷却液流速恒定下的散热设备总功率,并用单位温度变化值除以散热设备的额定功率,得到第一单位功率温度变化值;Obtaining the rated power of the heat dissipation device, where the rated power is the total power of the heat dissipation device when the fan speed and the coolant flow rate are constant, and dividing the unit temperature change value by the rated power of the heat dissipation device to obtain a first unit power temperature change value;

其中,额定功率的单位为W(瓦特),单位温度变化值的单位为摄氏度每秒(℃/s),第一单位功率温度变化值的单位为℃/sW,该第一单位功率温度变化值是指,在单位功率下,每秒产生变化的温度值大小,表示非线性情况下的散热设备的散热能力;The unit of rated power is W (watt), the unit of unit temperature change value is degree Celsius per second (℃/s), the unit of first unit power temperature change value is ℃/sW, and the first unit power temperature change value refers to the temperature value that changes per second under unit power, indicating the heat dissipation capacity of the heat dissipation device under nonlinear conditions;

记录饱和时间之前每个时间点处的第一单位功率温度变化值,并进行保存。The first unit power temperature change value at each time point before the saturation time is recorded and saved.

在饱和时间点之前的时间段中,每个时间点都可能会具有不同的第一单位功率温度变化值,在计算完毕后进行保存,并记录每个数值对应的时间点,作为调控参考。In the time period before the saturation time point, each time point may have a different first unit power temperature change value, which is saved after the calculation is completed, and the time point corresponding to each value is recorded as a control reference.

在到达饱和时间点之后,散热设备的运行趋于稳定,同时不同测试工况下的电子设备均到达峰值温度,因此第二单位功率温度变化值需要采用不同的方法获得,具体的,该方法包括:After reaching the saturation time point, the operation of the heat dissipation device tends to be stable, and the electronic devices under different test conditions all reach the peak temperature. Therefore, the second unit power temperature change value needs to be obtained by different methods. Specifically, the method includes:

对第一峰值温度与第二峰值温度进行差值计算,并将计算结果与散热设备的额定功率之比作为第二单位功率温度变化值;Calculating the difference between the first peak temperature and the second peak temperature, and taking the ratio of the calculation result to the rated power of the heat dissipation device as the second unit power temperature change value;

在电子设备与散热设备运行至饱和时间后,散热设备的散热能力不再呈非线性变化,即在增加散热设备的输出功率时,电子设备的温度会从第二峰值温度开始线性下降,无需考虑运行时间,因此在需要调控散热设备至指定温度时,只需要根据第二单位功率温度变化值进行换算即可得到散热设备的输出功率增加值,不会导致电子设备的温度变化波动较大。After the electronic device and the heat dissipation device have run to the saturation time, the heat dissipation capacity of the heat dissipation device no longer changes nonlinearly, that is, when the output power of the heat dissipation device is increased, the temperature of the electronic device will decrease linearly from the second peak temperature without considering the running time. Therefore, when the heat dissipation device needs to be adjusted to a specified temperature, it is only necessary to convert the second unit power temperature change value to obtain the output power increase value of the heat dissipation device, which will not cause large fluctuations in the temperature change of the electronic device.

步骤C:重新进行初始化运行,并根据饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;Step C: re-initialize the operation and adjust the output power of the heat dissipation device according to the first unit power temperature change value before the saturation time and the second unit power temperature change value after the saturation time;

待散热设备和电子设备回到环境温度或者更换散热设备与电子设备后,重新进行初始化运行,并在该过程中对散热设备的输出功率进行调整,调整过程以饱和时间为参考,在饱和时间之前,采用时序对应法进行散热设备输出功率的调整量计算,在饱和时间之后,采用线性调整法进行散热设备输出功率的调整量计算,其中,时序对应法包括以下步骤:After the heat dissipation device and the electronic device return to the ambient temperature or are replaced, the heat dissipation device and the electronic device are re-initialized and the output power of the heat dissipation device is adjusted in the process. The adjustment process uses the saturation time as a reference. Before the saturation time, the timing correspondence method is used to calculate the adjustment amount of the output power of the heat dissipation device. After the saturation time, the linear adjustment method is used to calculate the adjustment amount of the output power of the heat dissipation device. The timing correspondence method includes the following steps:

将重新进行初始化运行的时间点设为初始时间,并按照拆分间隔对初始化运行时间进行标记,然后对计算出的所有第一单位功率温度变化值进行均值计算,得到第一单位功率温度变化均值,并根据该变化均值计算散热设备的输出功率调整量;The time point of re-initialization operation is set as the initial time, and the initialization operation time is marked according to the split interval, and then all the calculated first unit power temperature change values are averaged to obtain the first unit power temperature change mean, and the output power adjustment amount of the heat dissipation device is calculated according to the change mean;

例如,在饱和时间之前设置了十个时间间隔,则对所有第一单位功率温度变化值进行求和计算,然后用计算结果除以十,得到第一单位功率温度变化均值,然后根据该单位功率温度变化均值推算散热设备在饱和时间之前的输出功率调整量,并对散热设备进行输出功率调整;For example, if ten time intervals are set before the saturation time, all first unit power temperature change values are summed up, and then the calculation result is divided by ten to obtain the first unit power temperature change mean value, and then the output power adjustment amount of the heat dissipation device before the saturation time is calculated according to the unit power temperature change mean value, and the output power of the heat dissipation device is adjusted;

其中,散热设备在饱和时间之前的的输出功率调整量的推算公式为:P1调整量=T2/T1×P额定功率,式中,T1为第一单位功率温度变化均值,T2为预期温度与环境温度的差值,与额定功率和拆分间隔之积的比值,当预期温度大于环境温度时,T2为正值,因此P1调整量也为正值,表示需要增加散热设备的输出功率,当预期温度小于等于环境温度时,T2为负值或者零,因此P1调整量也为负值或零,表示散热设备的输出功率无需调整,在计算完散热设备的输出功率调整量后,对散热设备进行输出功率调整,即增加或减少散热设备的输出功率,调整散热设备输出功率后电子设备的温度变化如图3中的曲线3所示,在经过调整后,电子设备的温度变化波动较小,并且在到达饱和时间后,仍然没有到达额定功率下的第二峰值温度,降低温度变化波动的同时,提高了散热效果;The calculation formula of the output power adjustment amount of the heat dissipation device before the saturation time is: P1 adjustment amount = T2/T1×P rated power, where T1 is the mean value of the temperature change of the first unit power, T2 is the ratio of the difference between the expected temperature and the ambient temperature to the product of the rated power and the split interval, when the expected temperature is greater than the ambient temperature, T2 is a positive value, so the P1 adjustment amount is also a positive value, indicating that the output power of the heat dissipation device needs to be increased, when the expected temperature is less than or equal to the ambient temperature, T2 is a negative value or zero, so the P1 adjustment amount is also a negative value or zero, indicating that the output power of the heat dissipation device does not need to be adjusted, after calculating the output power adjustment amount of the heat dissipation device, the output power of the heat dissipation device is adjusted, that is, the output power of the heat dissipation device is increased or decreased, and the temperature change of the electronic device after adjusting the output power of the heat dissipation device is shown as curve 3 in Figure 3, after adjustment, the temperature change fluctuation of the electronic device is small, and after reaching the saturation time, it still does not reach the second peak temperature under the rated power, while reducing the temperature change fluctuation, the heat dissipation effect is improved;

在饱和时间之后,采用线性调整法进行包括:After the saturation time, a linear adjustment method is used including:

在到达饱和时间后,计算散热设备在饱和时间之后的输出功率调整量,并对散热设备进行输出功率调整,其中,散热设备在饱和时间之后的输出功率调整量的推算方法为:P2调整量为电子设备的预期温度,与第一峰值温度与第二峰值温度差值的比值,采用线性调整法后电子设备的温度运行如图3中的曲线四所示,电子设备在运行过程中没有达到峰值温度,也没有产生较大波动;After reaching the saturation time, the output power adjustment amount of the heat dissipation device after the saturation time is calculated, and the output power of the heat dissipation device is adjusted, wherein the method for calculating the output power adjustment amount of the heat dissipation device after the saturation time is as follows: the P2 adjustment amount is the ratio of the expected temperature of the electronic device to the difference between the first peak temperature and the second peak temperature. After the linear adjustment method is adopted, the temperature operation of the electronic device is shown as curve 4 in FIG3 . The electronic device does not reach the peak temperature during operation, nor does it produce large fluctuations.

以饱和时间为参考,在饱和时间之前采用时序对应法推算出散热设备的调整功率,在饱和时间之后采用线性调整法推算出散热设备的调整功率,根据电子设备的温度走向进行调整方式的选择,降低电子设备的整体运行温度的同时,减少电子设备温度波动变化,提高运行稳定性。Taking the saturation time as a reference, the timing correspondence method is used to calculate the adjustment power of the heat dissipation device before the saturation time, and the linear adjustment method is used to calculate the adjustment power of the heat dissipation device after the saturation time. The adjustment method is selected according to the temperature trend of the electronic equipment, which reduces the overall operating temperature of the electronic equipment while reducing the temperature fluctuation of the electronic equipment and improving the operating stability.

需要说明的是,由于散热设备包含风冷散热和液冷散热,在进行调控时可以结合PID控制算法实现,具体可以参照现有技术,在本实施例中不做详细说明。It should be noted that, since the heat dissipation device includes air cooling and liquid cooling, the PID control algorithm can be combined for implementation during regulation. For details, reference can be made to the prior art and no detailed description is given in this embodiment.

步骤D:在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。Step D: After adjusting the power of the heat dissipation device, obtain the temperature data of the electronic device, determine the volatility of the temperature data, and verify the heat dissipation effect.

在对散热设备进行功率调整后,根据获取到的电子设备的温度数据进行波动性分析,并可以通过设置波动阈值的方式判断散热效果是否达标,波动性分析可以采用统计特性的方法实现,例如温度数据的方差、标准差等,在本实施例中不做详细说明。After the power of the heat dissipation device is adjusted, a fluctuation analysis is performed based on the temperature data of the electronic device obtained, and whether the heat dissipation effect meets the standard can be determined by setting a fluctuation threshold. The fluctuation analysis can be implemented using statistical characteristics, such as the variance and standard deviation of the temperature data, which will not be described in detail in this embodiment.

实施例二:如图4所示,本申请提供了一种智能液冷平台,该智能液冷平台应用于飞行设备中,该智能液冷平台包含散热设备,该散热设备由风冷散热和液冷散热组成,该散热设备能够根据接收到的信号进行输出功率调控,具体的,该智能液冷平台包括:Embodiment 2: As shown in FIG. 4 , the present application provides an intelligent liquid cooling platform, which is applied to flight equipment. The intelligent liquid cooling platform includes a heat dissipation device, which is composed of air cooling and liquid cooling. The heat dissipation device can adjust the output power according to the received signal. Specifically, the intelligent liquid cooling platform includes:

初始化运行模块,用于对电子设备进行初始化运行,并接收初始化运行过程中来自采集设备所采集的温度数据,该温度数据具有时序信息,基于温度数据和时序信息获取温度变化曲线,并根据温度变化曲线获取第一峰值温度和第二峰值温度,以及第一峰值温度与第二峰值温度所在的饱和时间;An initialization operation module is used to perform initialization operation on the electronic device, and receive temperature data collected from the acquisition device during the initialization operation, the temperature data having timing information, obtain a temperature change curve based on the temperature data and the timing information, and obtain a first peak temperature and a second peak temperature, as well as a saturation time of the first peak temperature and the second peak temperature according to the temperature change curve;

参数获取模块,用于根据温度变化曲线获取在饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值;A parameter acquisition module, used for acquiring a first unit power temperature change value before the saturation time and a second unit power temperature change value after the saturation time according to the temperature change curve;

输出功率调整模块,用于重新进行初始化运行,并根据第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;An output power adjustment module, used for re-initializing operation and adjusting the output power of the heat dissipation device according to the first unit power temperature change value and the second unit power temperature change value after the saturation time;

散热效果验证模块,用于在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。The heat dissipation effect verification module is used to obtain the temperature data of the electronic device after the power of the heat dissipation device is adjusted, and to determine the volatility of the temperature data to verify the heat dissipation effect.

以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (10)

1.一种智能液冷平台的运行监测方法,其特征在于:该方法包括:对电子设备进行初始化运行,并接收初始化运行过程中来自采集设备所采集的温度数据,该温度数据具有时序信息,基于温度数据和时序信息获取温度变化曲线,并根据温度变化曲线获取第一峰值温度和第二峰值温度,以及第一峰值温度与第二峰值温度所对应的饱和时间;根据温度变化曲线获取在饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值;重新进行初始化运行,并根据饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。1. An operation monitoring method for an intelligent liquid cooling platform, characterized in that: the method comprises: initializing the operation of an electronic device, and receiving temperature data collected from an acquisition device during the initialization operation, the temperature data having timing information, obtaining a temperature change curve based on the temperature data and the timing information, and obtaining a first peak temperature and a second peak temperature according to the temperature change curve, as well as a saturation time corresponding to the first peak temperature and the second peak temperature; obtaining a first unit power temperature change value before the saturation time and a second unit power temperature change value after the saturation time according to the temperature change curve; re-initializing the operation, and adjusting the output power of a heat dissipation device according to the first unit power temperature change value before the saturation time and the second unit power temperature change value after the saturation time; after adjusting the power of the heat dissipation device, obtaining the temperature data of the electronic device, judging the volatility of the temperature data, and verifying the heat dissipation effect. 2.根据权利要求1所述的一种智能液冷平台的运行监测方法,其特征在于:所述初始化运行包括散热设备未开启状态以及散热设备开启后维持额定功率状态两种测试工况。2. The operation monitoring method of an intelligent liquid cooling platform according to claim 1 is characterized in that: the initialization operation includes two test conditions: a state where the heat dissipation device is not turned on and a state where the rated power is maintained after the heat dissipation device is turned on. 3.根据权利要求2所述的一种智能液冷平台的运行监测方法,其特征在于:在两种测试工况的电子设备均到达峰值温度后,第一峰值温度与第二峰值温度首次同时出现对应的时间为饱和时间。3. The operation monitoring method of an intelligent liquid cooling platform according to claim 2 is characterized in that: after the electronic equipment under the two test conditions reaches the peak temperature, the time corresponding to the first simultaneous appearance of the first peak temperature and the second peak temperature is the saturation time. 4.根据权利要求1所述的一种智能液冷平台的运行监测方法,其特征在于:所述第一单位功率温度变化值的获取方法包括:对从初始化运行开始到饱和时间的时间段进行拆分,并按照固定的拆分间隔将该时间段拆分为多个时间点,获取每个时间点上的第一温度与第二温度,其中,第一温度为散热设备未开启情况下的电子设备温度,第二温度为散热设备在额定功率下的电子设备温度;对第一温度与第二温度进行差值计算,得到温度差值,然后将温度差值与拆分间隔的比值作为该时间点处的单位温度变化值;获取散热设备的额定功率,该额定功率为风扇转速恒定与冷却液流速恒定下的散热设备总功率,并用单位温度变化值除以散热设备的额定功率,得到第一单位功率温度变化值;记录饱和时间之前每个时间点处的第一单位功率温度变化值,并进行保存。4. According to claim 1, an operation monitoring method of an intelligent liquid cooling platform is characterized in that: the method for obtaining the first unit power temperature change value includes: splitting the time period from the start of initialization operation to the saturation time, and splitting the time period into multiple time points according to a fixed splitting interval, and obtaining the first temperature and the second temperature at each time point, wherein the first temperature is the temperature of the electronic device when the heat dissipation device is not turned on, and the second temperature is the temperature of the electronic device when the heat dissipation device is at rated power; calculating the difference between the first temperature and the second temperature to obtain the temperature difference, and then taking the ratio of the temperature difference to the splitting interval as the unit temperature change value at the time point; obtaining the rated power of the heat dissipation device, which is the total power of the heat dissipation device under constant fan speed and constant coolant flow rate, and dividing the unit temperature change value by the rated power of the heat dissipation device to obtain the first unit power temperature change value; recording the first unit power temperature change value at each time point before the saturation time and saving it. 5.根据权利要求1所述的一种智能液冷平台的运行监测方法,其特征在于:所述第二单位功率温度变化值的获取方法为:对第一峰值温度与第二峰值温度进行差值计算,并将计算结果与散热设备的额定功率之比作为第二单位功率温度变化值。5. According to the operation monitoring method of an intelligent liquid cooling platform according to claim 1, it is characterized in that: the method for obtaining the second unit power temperature change value is: calculating the difference between the first peak temperature and the second peak temperature, and taking the ratio of the calculation result to the rated power of the heat dissipation device as the second unit power temperature change value. 6.根据权利要求1所述的一种智能液冷平台的运行监测方法,其特征在于:在饱和时间之前,采用时序对应法进行散热设备输出功率的调整量计算,在饱和时间之后,采用线性调整法进行散热设备输出功率的调整量计算。6. According to the operation monitoring method of an intelligent liquid cooling platform described in claim 1, it is characterized in that: before the saturation time, the timing correspondence method is used to calculate the adjustment amount of the output power of the heat dissipation device, and after the saturation time, the linear adjustment method is used to calculate the adjustment amount of the output power of the heat dissipation device. 7.根据权利要求6所述的一种智能液冷平台的运行监测方法,其特征在于:所述时序对应法包括以下步骤:将重新进行初始化运行的时间点设为初始时间,并按照拆分间隔对初始化运行时间进行标记,然后对计算出的所有第一单位功率温度变化值进行均值计算,得到第一单位功率温度变化均值,并根据该变化均值和电子设备的预期温度以及散热设备的额定功率计算散热设备的输出功率调整量。7. According to claim 6, an operation monitoring method for an intelligent liquid cooling platform is characterized in that: the timing correspondence method includes the following steps: setting the time point for re-initialization operation as the initial time, and marking the initialization operation time according to the split interval, and then calculating the mean of all calculated first unit power temperature change values to obtain the first unit power temperature change mean, and calculating the output power adjustment amount of the heat dissipation device based on the change mean and the expected temperature of the electronic equipment and the rated power of the heat dissipation device. 8.根据权利要求6所述的一种智能液冷平台的运行监测方法,其特征在于:所述线性调整法包括以下步骤:在到达饱和时间后,根据第二单位功率温度变化值与电子设备的预期温度,结合第一峰值温度和第二峰值温度计算散热设备在饱和时间之后的输出功率调整量。8. According to the operation monitoring method of an intelligent liquid cooling platform according to claim 6, it is characterized in that: the linear adjustment method includes the following steps: after reaching the saturation time, according to the second unit power temperature change value and the expected temperature of the electronic equipment, combined with the first peak temperature and the second peak temperature, the output power adjustment amount of the heat dissipation device after the saturation time is calculated. 9.一种智能液冷平台,其特征在于:该平台包括:初始化运行模块,用于对电子设备进行初始化运行,并接收初始化运行过程中来自采集设备所采集的温度数据,该温度数据具有时序信息,基于温度数据和时序信息获取温度变化曲线,并根据温度变化曲线获取第一峰值温度和第二峰值温度,以及第一峰值温度与第二峰值温度所在的饱和时间;参数获取模块,用于根据温度变化曲线获取在饱和时间之前的第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值;输出功率调整模块,用于重新进行初始化运行,并根据第一单位功率温度变化值以及在饱和时间之后的第二单位功率温度变化值对散热设备进行输出功率调整;散热效果验证模块,用于在对散热设备进行功率调整后,获取电子设备的温度数据,并判断温度数据的波动性,对散热效果进行验证。9. An intelligent liquid cooling platform, characterized in that: the platform includes: an initialization operation module, which is used to initialize the operation of the electronic device and receive the temperature data collected by the acquisition device during the initialization operation, the temperature data has timing information, and obtains the temperature change curve based on the temperature data and the timing information, and obtains the first peak temperature and the second peak temperature according to the temperature change curve, as well as the saturation time of the first peak temperature and the second peak temperature; a parameter acquisition module, which is used to obtain the first unit power temperature change value before the saturation time and the second unit power temperature change value after the saturation time according to the temperature change curve; an output power adjustment module, which is used to re-initialize the operation and adjust the output power of the heat dissipation device according to the first unit power temperature change value and the second unit power temperature change value after the saturation time; a heat dissipation effect verification module, which is used to obtain the temperature data of the electronic device after the power of the heat dissipation device is adjusted, and judge the volatility of the temperature data to verify the heat dissipation effect. 10.根据权利要求9所述的一种智能液冷平台,其特征在于:用于实施如权利要求1至8任一项所述的智能液冷平台的运行监测方法。10. An intelligent liquid cooling platform according to claim 9, characterized in that it is used to implement the operation monitoring method of the intelligent liquid cooling platform according to any one of claims 1 to 8.
CN202410961262.8A 2024-07-18 2024-07-18 Intelligent liquid cooling platform and operation monitoring method Active CN118502512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410961262.8A CN118502512B (en) 2024-07-18 2024-07-18 Intelligent liquid cooling platform and operation monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410961262.8A CN118502512B (en) 2024-07-18 2024-07-18 Intelligent liquid cooling platform and operation monitoring method

Publications (2)

Publication Number Publication Date
CN118502512A true CN118502512A (en) 2024-08-16
CN118502512B CN118502512B (en) 2024-09-13

Family

ID=92246933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410961262.8A Active CN118502512B (en) 2024-07-18 2024-07-18 Intelligent liquid cooling platform and operation monitoring method

Country Status (1)

Country Link
CN (1) CN118502512B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118690125A (en) * 2024-08-23 2024-09-24 四川华鲲振宇智能科技有限责任公司 AI-based chaos testing method and system for immersion liquid cooling server cabinets
CN119126647A (en) * 2024-11-08 2024-12-13 太原四联智能电气科技有限公司 An intelligent electrical cabinet with stable heat dissipation function and heat dissipation control method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6191546B1 (en) * 1997-10-22 2001-02-20 Hewlett-Packard Company Proportional integral cooling device controller for electronic device
US20130166095A1 (en) * 2011-12-22 2013-06-27 International Business Machines Corporation Proactive Cooling Of Chips Using Workload Information and Controls
CN110634816A (en) * 2019-09-17 2019-12-31 深圳市科太科技有限公司 Liquid cooling phase change vector heat transfer cooling system
CN112388040A (en) * 2019-08-14 2021-02-23 常州市军鼎机械制造有限公司 Quick refrigerated milling cutter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6191546B1 (en) * 1997-10-22 2001-02-20 Hewlett-Packard Company Proportional integral cooling device controller for electronic device
US20130166095A1 (en) * 2011-12-22 2013-06-27 International Business Machines Corporation Proactive Cooling Of Chips Using Workload Information and Controls
CN112388040A (en) * 2019-08-14 2021-02-23 常州市军鼎机械制造有限公司 Quick refrigerated milling cutter
CN110634816A (en) * 2019-09-17 2019-12-31 深圳市科太科技有限公司 Liquid cooling phase change vector heat transfer cooling system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐彬;王占阁;薛昆;吴振森;吴健;: "极区二维人工电离层加热数值仿真", 电波科学学报, no. 01, 15 February 2010 (2010-02-15), pages 14 - 19 *
李立清;朱正双;秦映心;宋剑飞;刘小燕;: "两组分有机气体等温吸附模拟与传热传质分析", 中国电机工程学报, no. 26, 15 September 2008 (2008-09-15), pages 46 - 52 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118690125A (en) * 2024-08-23 2024-09-24 四川华鲲振宇智能科技有限责任公司 AI-based chaos testing method and system for immersion liquid cooling server cabinets
CN119126647A (en) * 2024-11-08 2024-12-13 太原四联智能电气科技有限公司 An intelligent electrical cabinet with stable heat dissipation function and heat dissipation control method thereof

Also Published As

Publication number Publication date
CN118502512B (en) 2024-09-13

Similar Documents

Publication Publication Date Title
CN118502512B (en) Intelligent liquid cooling platform and operation monitoring method
CN109613352B (en) Method, device and system for testing service life of power module in converter
CN100382668C (en) Fan combination and fan speed regulation method
CN107269567A (en) A kind of realization method and system of the PID fan regulation and controlling strategies based on environment temperature
CN106704100B (en) Wind turbine, wind turbine power control method and device
CN103790846B (en) Fan rotational frequency control method and device
CN108691797B (en) A kind of radiator fan speed-regulating control device and method
CN105792606B (en) The heat dissipating method of fan rotational frequency control method, device and optical projection system
CN111124086A (en) A kind of server fan speed control method and device
CN104214121A (en) Fan revolution control system and method
CN109682621A (en) Fault detection method, device and system for cooling device for power module
CN118915890A (en) Intelligent monitoring management system based on data analysis
US20120269652A1 (en) Control method of fan rotation speed
GB2555010B (en) Determining loads on a wind turbine
WO2024109561A1 (en) Parameter adjustment method and apparatus, computer device, and storage medium
CN112181105A (en) Heat dissipation device, driving method and computer readable storage medium
CN114964825B (en) Method and system for evaluating heat dissipation performance of vehicle
CN111156187A (en) A method and device for controlling the rotational speed of a server fan
CN117212215B (en) A method, device, electronic device and storage medium for determining fan speed regulation parameters
CN114859990A (en) Heat dissipation method based on real-time temperature and temperature rise rate
CN116241360A (en) A Vehicle Thermal Management System Based on Intelligent Controller
CN115047953A (en) Server heat dissipation method, system, device and medium
CN114458612A (en) Operation detection method and device of frequency converter fan and computer readable medium
CN115247642A (en) Thermal management method, device and vehicle for vehicle
CN113346523A (en) Wind power plant subsynchronous oscillation risk assessment and suppression method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant