[go: up one dir, main page]

CN118383276A - A new type of multi-layer fully assembled pig house that is easy to clean and its construction process - Google Patents

A new type of multi-layer fully assembled pig house that is easy to clean and its construction process Download PDF

Info

Publication number
CN118383276A
CN118383276A CN202410667683.XA CN202410667683A CN118383276A CN 118383276 A CN118383276 A CN 118383276A CN 202410667683 A CN202410667683 A CN 202410667683A CN 118383276 A CN118383276 A CN 118383276A
Authority
CN
China
Prior art keywords
prefabricated
precast
pig house
concrete
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410667683.XA
Other languages
Chinese (zh)
Inventor
张伟生
颜新星
吴银兵
朱东烽
黄志坚
肖春发
曾继发
王欢
潘健明
张琪煌
王建区
陈祺荣
简立恒
黄云思
梁小燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jinghong Construction Co ltd
Guangdong Yuncheng Architectural Technology Co ltd
Wens Foodstuff Group Co Ltd
Original Assignee
Guangdong Jinghong Construction Co ltd
Guangdong Yuncheng Architectural Technology Co ltd
Wens Foodstuff Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jinghong Construction Co ltd, Guangdong Yuncheng Architectural Technology Co ltd, Wens Foodstuff Group Co Ltd filed Critical Guangdong Jinghong Construction Co ltd
Priority to CN202410667683.XA priority Critical patent/CN118383276A/en
Publication of CN118383276A publication Critical patent/CN118383276A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K1/00Housing animals; Equipment therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K1/00Housing animals; Equipment therefor
    • A01K1/015Floor coverings, e.g. bedding-down sheets ; Stable floors

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Zoology (AREA)
  • Animal Husbandry (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及猪舍建筑技术领域,尤其涉及一种便于清理的新型多层全装配式猪舍及其建造工艺,包括作为猪舍支撑载体的多个基础地面,所述基础地面上设有预制柱,多个预制柱上安装有呈矩形分布的预制梁,多个预制柱两两之间设有混凝土内腔,多个预制梁内设有预制板,预制板的底部固接有多个预制板暗梁,预制柱的外侧倾斜安装有两个支撑柱。本发明的结构体系免用支撑,建造速度快,施工工序少,提升施工效率;其次,免用支撑,施工作业空间大,施工作业便捷快速,减少劳动强度,降低造价成本,预制板拼缝处采用粗糙面加防水材料和现浇混凝土结合、预制梁采用结构防水加止水材料和防水材料结合,强化防水措施,有效杜绝了节点渗漏。

The present invention relates to the technical field of pig house construction, and more particularly to a novel multi-story fully assembled pig house that is easy to clean and a construction process thereof, including a plurality of foundation grounds as support carriers of the pig house, prefabricated columns are arranged on the foundation grounds, prefabricated beams distributed in a rectangular shape are installed on the plurality of prefabricated columns, concrete cavities are arranged between the plurality of prefabricated columns, prefabricated panels are arranged in the plurality of prefabricated beams, a plurality of prefabricated panel hidden beams are fixedly connected to the bottom of the prefabricated panels, and two supporting columns are obliquely installed on the outer sides of the prefabricated columns. The structural system of the present invention does not require support, has a fast construction speed, has fewer construction processes, and improves construction efficiency; secondly, it does not require support, has a large construction space, is convenient and fast in construction, reduces labor intensity, and reduces construction costs, the joints of the prefabricated panels are combined with rough surfaces, waterproof materials, and cast-in-place concrete, and the prefabricated beams are combined with structural waterproofing, water-stopping materials, and waterproof materials, so as to strengthen waterproof measures and effectively prevent node leakage.

Description

一种便于清理的新型多层全装配式猪舍及其建造工艺A new type of multi-layer fully assembled pig house that is easy to clean and its construction process

技术领域Technical Field

本发明涉及猪舍建筑技术领域,具体为一种便于清理的新型多层全装配式猪舍及其建造工艺。The invention relates to the technical field of pig house construction, and in particular to a novel multi-layer fully assembled pig house which is easy to clean and a construction process thereof.

背景技术Background technique

现有的猪舍建造方式采用砖混结构或轻钢结构,其结构施工方式先制作柱,待柱强度达到设计要求后,安装模板支架,安装梁、板模板,绑扎梁板钢筋,浇筑混凝土,待混凝土强度达到设计要求后,制作安装二次结构,进行建筑地面找坡等。The existing pig house construction method adopts brick-concrete structure or light steel structure. The structural construction method is to first make the columns, and after the column strength reaches the design requirements, install the formwork bracket, install the beam and slab formwork, tie the beam and slab steel bars, pour concrete, and after the concrete strength reaches the design requirements, make and install the secondary structure, and conduct ground slope adjustment.

但上述建造方式需要大量的支架与模板,增加施工造价成本;上层梁板施工需等待下层的柱混凝土强度达到设计要求后,才能施工上层的梁板,工序等待时间较长;每层施工顺序多,施工速度慢,效率低;轻钢结构受潮湿、腐蚀环境影响,耐久性差楼板产生渗漏;刮粪槽表面及侧边猪粪清刮不干净,易容造成细菌滋生,导致猪生病。However, the above construction method requires a large number of supports and formworks, which increases the construction cost; the construction of the upper beams and slabs must wait until the concrete strength of the lower columns reaches the design requirements before the upper beams and slabs can be constructed, and the waiting time for the process is relatively long; each floor has many construction sequences, slow construction speed, and low efficiency; the light steel structure is affected by the humid and corrosive environment, and its durability is poor, resulting in leakage in the floor; the pig manure on the surface and sides of the manure trough is not scraped clean, which can easily cause bacteria to breed and cause pigs to become sick.

发明内容Summary of the invention

针对现有技术的不足,本发明提供了一种便于清理的新型多层全装配式猪舍及其建造工艺,具备建造速度快,施工工序少,提升施工效率的优点,解决了每层施工顺序多,施工速度慢,效率低的问题。In view of the shortcomings of the prior art, the present invention provides a new multi-story fully assembled pig house and its construction process which are easy to clean. It has the advantages of fast construction speed, fewer construction processes and improved construction efficiency, and solves the problems of multiple construction sequences for each floor, slow construction speed and low efficiency.

为解决上述的技术问题,本发明提供如下技术方案:In order to solve the above technical problems, the present invention provides the following technical solutions:

一种便于清理的新型多层全装配式猪舍,包括作为猪舍支撑载体的多个基础地面,所述基础地面上设有预制柱,多个预制柱上安装有呈矩形分布的预制梁,多个预制柱两两之间设有混凝土内腔,多个预制梁内设有预制板,预制板的底部固接有多个预制板暗梁,预制柱的外侧倾斜安装有两个支撑柱。A novel multi-story fully assembled pig house which is easy to clean comprises a plurality of basic floors as supporting carriers of the pig house, wherein prefabricated columns are arranged on the basic floors, and prefabricated beams distributed in a rectangular shape are installed on the plurality of prefabricated columns, concrete cavities are arranged between the plurality of prefabricated columns, and prefabricated panels are arranged in the plurality of prefabricated beams, and a plurality of prefabricated panel hidden beams are fixedly connected to the bottom of the prefabricated panels, and two supporting columns are installed obliquely on the outer sides of the prefabricated columns.

优选的,所述预制板的中部开设有限位槽,预制板通过限位槽卡接有防水条,限位槽内两侧设有与防水条端部贴合的封堵块。Preferably, a limiting groove is provided in the middle of the prefabricated plate, a waterproof strip is clamped on the prefabricated plate through the limiting groove, and sealing blocks which fit with the ends of the waterproof strip are provided on both sides of the limiting groove.

优选的,所述预制板的表面两侧均开设有防水槽,防水槽内设有预埋钢筋a,防水槽内还设有预制板拼缝水洗面,防水槽上卡接有混凝土板。Preferably, waterproof grooves are provided on both sides of the surface of the prefabricated board, embedded steel bars a are provided in the waterproof grooves, prefabricated board joint water washing surfaces are also provided in the waterproof grooves, and concrete slabs are clamped on the waterproof grooves.

优选的,所述混凝土内腔处设有模板b,模板b通过紧固螺栓a固定于相近的预制梁上。Preferably, a template b is provided in the concrete inner cavity, and the template b is fixed to a nearby prefabricated beam by fastening bolts a.

优选的,所述预制板的表面设有多个吊点a,预制板上固接有自流平材料,预制板的外侧面均固接有水洗面a。Preferably, a plurality of hanging points a are provided on the surface of the prefabricated board, a self-leveling material is fixedly connected to the prefabricated board, and a washable surface a is fixedly connected to the outer side surfaces of the prefabricated board.

优选的,多个所述预制梁内侧均设有预制梁翼部,预制柱内侧固接有用于卡住预制梁翼部的模板a。Preferably, a precast beam wing is provided on the inner side of each of the plurality of precast beams, and a template a for clamping the precast beam wing is fixedly connected to the inner side of the precast column.

优选的,所述预制柱的顶端固接有牛腿,牛腿上设有水洗面b,牛腿上固接有吊顶b,牛腿的外侧设有多个预埋螺旋套筒a,预制柱上固接有预埋钢筋b,预制柱上还固接有预埋钢管,基础地面内固接有插入地面的定位预埋钢板,基础地面内设有混凝土墩,预埋钢管和定位预埋钢板相连接,预制柱插入到基础地面内。Preferably, a corbel is fixedly connected to the top of the prefabricated column, a water-washing surface b is provided on the corbel, a suspended ceiling b is fixedly connected to the corbel, a plurality of embedded spiral sleeves a are provided on the outer side of the corbel, embedded steel bars b are fixedly connected to the prefabricated column, embedded steel pipes are also fixedly connected to the prefabricated column, a positioning embedded steel plate inserted into the ground is fixedly connected to the foundation ground, a concrete pier is provided in the foundation ground, the embedded steel pipes and the positioning embedded steel plates are connected, and the prefabricated column is inserted into the foundation ground.

优选的,所述预制梁的上下两侧均固接有预埋钢筋c,预制梁上还固接有多个吊点c,预制梁上两侧均设有多个预埋螺旋套筒b。Preferably, the upper and lower sides of the precast beam are fixedly connected with embedded steel bars c, the precast beam is also fixedly connected with a plurality of hanging points c, and a plurality of embedded spiral sleeves b are provided on both sides of the precast beam.

优选的,所述预制梁和预制梁翼部的连接处开设有止水槽,止水槽内卡接有止水条,预制梁的外表面均设有水洗面c。Preferably, a water stop groove is provided at the connection between the prefabricated beam and the prefabricated beam wing, a water stop strip is clamped in the water stop groove, and the outer surface of the prefabricated beam is provided with a water wash surface c.

一种猪舍的建造工艺,包括以下步骤:A construction process for a pig house comprises the following steps:

S1、平面基础定位后,在基础地面的预制柱底部浇筑混凝土墩,混凝土墩的混凝土初凝前预埋定位预埋钢板与预埋钢管,制作基础构造;S1. After the plane foundation is positioned, a concrete pier is poured at the bottom of the prefabricated column on the foundation ground. The pre-embedded steel plates and pre-embedded steel pipes are pre-embedded before the initial setting of the concrete pier to make the foundation structure;

S2、把预制柱放至定位预埋钢板与预埋钢管上,调整预制柱的垂直化度,将预制柱的预埋钢筋b、预埋钢管与定位预埋钢板、基础地面进行焊接,浇筑基础构造,安装预制梁,安装预制梁与模板b,浇筑混凝土;S2. Place the prefabricated column on the positioning embedded steel plate and embedded steel pipe, adjust the verticality of the prefabricated column, weld the embedded steel bar b and embedded steel pipe of the prefabricated column to the positioning embedded steel plate and the foundation ground, cast the foundation structure, install the prefabricated beam, install the prefabricated beam and formwork b, and cast concrete;

S3、拆除预制梁与预埋螺旋套筒a,安放防水条,安装预制板,填堵预制板缝,浇灌防水材料;S3, dismantle the prefabricated beams and the embedded spiral sleeve a, place waterproof strips, install prefabricated panels, fill the prefabricated panel seams, and pour waterproof materials;

S4、浇筑预制板拼缝混凝土,浇灌预制柱与预制梁接触面防水材料内腔的防水材料,在预制板面上浇灌自流平材料。S4. Pour concrete at the joints of precast panels, pour waterproof material into the inner cavity of waterproof material at the contact surface between precast columns and precast beams, and pour self-leveling material on the surface of precast panels.

借由上述技术方案,本发明提供了一种便于清理的新型多层全装配式猪舍及其建造工艺,至少具备以下有益效果:By means of the above technical solution, the present invention provides a novel multi-layer fully assembled pig house and its construction process which is easy to clean, and has at least the following beneficial effects:

1、该便于清理的新型多层全装配式猪舍及其建造工艺,该结构体系免用支撑,建造速度快,施工工序少,提升施工效率;其次,免用支撑,施工作业空间大,施工作业便捷快速,减少劳动强度,降低造价成本。1. The new multi-story fully assembled pig house and its construction process that are easy to clean. The structural system does not require support, has a fast construction speed, and has fewer construction processes, which improves construction efficiency. Secondly, it does not require support, has a large construction space, and the construction work is convenient and fast, which reduces labor intensity and reduces construction costs.

2、该便于清理的新型多层全装配式猪舍及其建造工艺,预制板拼缝处采用粗糙面加防水材料和现浇混凝土结合、预制梁采用结构防水加止水材料和防水材料结合,强化防水措施,有效杜绝了节点渗漏。2. This new multi-story fully assembled pig house and its construction process are easy to clean. The joints of prefabricated panels are made of rough surface plus waterproof materials and cast-in-place concrete, and the prefabricated beams are made of structural waterproof plus water-stopping materials and waterproof materials. The waterproof measures are strengthened and the node leakage is effectively prevented.

3、该便于清理的新型多层全装配式猪舍及其建造工艺,预制板与暗梁结合,实现大跨度无梁支撑结构,既保证结构整体受力,又使建筑外观美观。3. The new multi-story fully assembled pig house and its construction process that are easy to clean combine prefabricated panels with hidden beams to achieve a large-span beamless support structure, which not only ensures the overall stress of the structure, but also makes the building look beautiful.

4、该便于清理的新型多层全装配式猪舍及其建造工艺,构配件采用预制,施工现场不产生建筑垃圾,实现绿色建造;构配件预制梁侧面、预制板板表面光滑,并在预制板表面上施工自流平材料,营运过程中刮粪更加干净,粪便不积聚,易清理,降低了细菌滋生。4. The new multi-story fully assembled pig house and its construction process are easy to clean. The components are prefabricated, and no construction waste is generated at the construction site, realizing green construction. The sides of the prefabricated beams and the surfaces of the prefabricated panels are smooth, and self-leveling materials are constructed on the surfaces of the prefabricated panels. During operation, the manure is scraped more cleanly, the manure does not accumulate, and it is easy to clean, reducing the growth of bacteria.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

此处所说明的附图用来提供对本发明的进一步理解,构成本申请的一部分:The accompanying drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application:

图1为本发明正视方向的爆炸示意图;FIG1 is an exploded schematic diagram of the present invention in a front view direction;

图2为本发明正视方向的拆分示意图;FIG2 is a schematic diagram of the splitting of the present invention in the front view direction;

图3为本发明预制柱的外部链接结构示意图;FIG3 is a schematic diagram of the external connection structure of the prefabricated column of the present invention;

图4为本发明预制梁的外部链接结构示意图;FIG4 is a schematic diagram of the external connection structure of the prefabricated beam of the present invention;

图5为本发明预制板的仰视图。FIG. 5 is a bottom view of the prefabricated panel of the present invention.

附图标记:Reference numerals:

1、基础地面;2、预制柱;3、预制梁;4、混凝土内腔;5、预制板;6、支撑柱;7、自流平材料;8、防水槽;9、吊点a;10、混凝土板;11、防水条;12、封堵块;13、水洗面a;14、预制梁翼部;15、模板a;16、预埋钢筋a;17、预制板拼缝水洗面;18、模板b;19、紧固螺栓a;20、预制板暗梁;21、混凝土墩;22、定位预埋钢板;23、预埋钢管;24、水洗面b;25、牛腿;26、预埋钢筋b;27、吊顶b;28、预埋螺旋套筒a;29、水洗面c;30、预埋钢筋c;31、预埋螺旋套筒b;32、吊点c;33、止水槽;34、止水条。1. Foundation ground; 2. Precast column; 3. Precast beam; 4. Concrete cavity; 5. Precast board; 6. Support column; 7. Self-leveling material; 8. Waterproof groove; 9. Hanging point a; 10. Concrete board; 11. Waterproof strip; 12. Blocking block; 13. Washing surface a; 14. Precast beam wing; 15. Formwork a; 16. Embedded steel bar a; 17. Washing surface of precast board joint; 18. Formwork b; 19. Fastening bolt a; 20. Prefabricated board hidden beam; 21. Concrete pier; 22. Positioning embedded steel plate; 23. Embedded steel pipe; 24. Washed surface b; 25. Corbel; 26. Embedded steel bar b; 27. Ceiling b; 28. Embedded spiral sleeve a; 29. Washed surface c; 30. Embedded steel bar c; 31. Embedded spiral sleeve b; 32. Hanging point c; 33. Water stop groove; 34. Water stop strip.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

下面结合附图描述本发明的一些实施例提供的一种便于清理的新型多层全装配式猪舍及其建造工艺。A novel multi-story fully assembled pig house that is easy to clean and its construction process are described below in conjunction with the accompanying drawings in some embodiments of the present invention.

实施例一:Embodiment 1:

结合图1-图5所示,本发明提供的一种便于清理的新型多层全装配式猪舍及其建造工艺,包括作为猪舍支撑载体的多个基础地面1,基础地面1上设有预制柱2,多个预制柱2上安装有呈矩形分布的预制梁3,多个预制柱2两两之间设有混凝土内腔4,多个预制梁3内设有预制板5,预制板5的底部固接有多个预制板暗梁20,预制板5与预制板暗梁20结合,实现大跨度无梁支撑结构,既保证结构整体受力,又使建筑外观美观,预制柱2的外侧倾斜安装有两个支撑柱6支撑柱6,建造的构配件采取预制,构配件节点部位造型采用粗糙面结合现浇方式,使新旧混凝土结合密实,增强了结构整体性,防止新旧混凝土结合面渗漏。As shown in Figures 1 to 5, the present invention provides a new type of multi-story fully assembled pig house that is easy to clean and its construction process, including multiple basic floors 1 as supporting carriers of the pig house, prefabricated columns 2 are arranged on the basic floors 1, and prefabricated beams 3 distributed in a rectangular shape are installed on the multiple prefabricated columns 2, concrete cavities 4 are arranged between the multiple prefabricated columns 2, and prefabricated panels 5 are arranged in the multiple prefabricated beams 3. The bottom of the prefabricated panels 5 is fixedly connected with multiple prefabricated panel hidden beams 20. The prefabricated panels 5 are combined with the prefabricated panel hidden beams 20 to realize a large-span beamless support structure, which not only ensures the overall stress of the structure, but also makes the appearance of the building beautiful. Two supporting columns 6 are installed obliquely on the outer side of the prefabricated columns 2. The constructed components are prefabricated, and the node parts of the components are shaped by a rough surface combined with a cast-in-place method, so that the new and old concrete are tightly combined, the integrity of the structure is enhanced, and leakage of the new and old concrete joints is prevented.

具体的,预制板5的中部开设有限位槽,预制板5通过限位槽卡接有防水条11,限位槽内两侧设有与防水条11端部贴合的封堵块12。Specifically, a limiting groove is provided in the middle of the prefabricated plate 5 , and the prefabricated plate 5 is clamped with a waterproof strip 11 through the limiting groove. Blocking blocks 12 that fit with the ends of the waterproof strip 11 are provided on both sides of the limiting groove.

进一步的,预制板5的表面两侧均开设有防水槽8,防水槽8内设有预埋钢筋a16,防水槽8内还设有预制板拼缝水洗面17,防水槽8上卡接有混凝土板10。Furthermore, waterproof grooves 8 are provided on both sides of the surface of the prefabricated panel 5 , embedded steel bars a16 are provided in the waterproof grooves 8 , and prefabricated panel joint water-washing surfaces 17 are also provided in the waterproof grooves 8 , and a concrete panel 10 is clamped on the waterproof grooves 8 .

混凝土内腔4处设有模板b18,模板b18通过紧固螺栓a19固定于相近的预制梁3上。A template b18 is provided at the concrete inner cavity 4, and the template b18 is fixed to the adjacent prefabricated beam 3 by fastening bolts a19.

预制板5的表面设有多个吊点a9,预制板5上固接有自流平材料7,预制板5的外侧面均固接有水洗面a13,使新旧混凝土接触面积增大,增加新混凝土粘结力,浇筑更密实,从而提高新旧混凝土相互咬合力。The surface of the precast panel 5 is provided with a plurality of hanging points a9, the precast panel 5 is fixed with a self-leveling material 7, and the outer side surfaces of the precast panel 5 are fixed with a water-washable surface a13, so that the contact area between the new and old concrete is increased, the bonding strength of the new concrete is increased, the casting is denser, and the mutual bite force of the new and old concrete is improved.

根据实施例可知,构配件预制梁3侧面、预制板5板表面光滑,并在预制板5表面上施工自流平材料7,营运过程中刮粪更加干净,粪便不积聚,易清理,降低了细菌滋生。According to the embodiment, the side surfaces of the precast beam 3 and the precast board 5 of the component are smooth, and the self-leveling material 7 is constructed on the surface of the precast board 5. During operation, the feces can be scraped more cleanly, the feces will not accumulate, it is easy to clean, and the bacterial growth is reduced.

实施例二:Embodiment 2:

结合图1-图5所示,在实施例一的基础上,多个预制梁3内侧均设有预制梁翼部14,预制柱2内侧固接有用于卡住预制梁翼部14的模板a15。As shown in FIG. 1 to FIG. 5 , on the basis of the first embodiment, a plurality of precast beams 3 are provided with precast beam wings 14 on the inner side, and a template a15 for clamping the precast beam wings 14 is fixedly connected to the inner side of the precast column 2 .

具体的,预制柱2的顶端固接有牛腿25,牛腿25上设有水洗面b24,牛腿25上固接有吊顶b27,牛腿25的外侧设有多个预埋螺旋套筒a28,预制柱2上固接有预埋钢筋b26,预制柱2上还固接有预埋钢管23,基础地面1内固接有插入地面的定位预埋钢板22,基础地面1内设有混凝土墩21,预埋钢管23和定位预埋钢板22相连接,预制柱2插入到基础地面1内,建造的构配件预制柱2预制时预制搁置牛腿25,安装预制梁3、预制板5免用支撑,降低劳动强度,提高工作效率,工程成本节省,降低造价成本。Specifically, a corbel 25 is fixed to the top of the prefabricated column 2, a wash surface b24 is provided on the corbel 25, a suspended ceiling b27 is fixed to the corbel 25, a plurality of embedded spiral sleeves a28 are provided on the outer side of the corbel 25, embedded steel bars b26 are fixed to the prefabricated column 2, embedded steel pipes 23 are also fixed to the prefabricated column 2, a positioning embedded steel plate 22 inserted into the ground is fixed in the foundation ground 1, a concrete pier 21 is provided in the foundation ground 1, the embedded steel pipe 23 is connected to the positioning embedded steel plate 22, the prefabricated column 2 is inserted into the foundation ground 1, the corbel 25 is prefabricated when the prefabricated column 2 of the constructed component is prefabricated, and the prefabricated beam 3 and the prefabricated plate 5 are installed without support, which reduces labor intensity, improves work efficiency, saves engineering costs, and reduces construction costs.

进一步的,预制梁3的上下两侧均固接有预埋钢筋c30,预制梁3上还固接有多个吊点c32,预制梁3预制梁3上两侧均设有多个预埋螺旋套筒b31预埋螺旋套筒b31,预制板5拼缝处采用粗糙面加防水材料和现浇混凝土结合、预制梁3采用结构防水加止水材料和防水材料结合,强化防水措施,有效杜绝了节点渗漏。Furthermore, the upper and lower sides of the precast beam 3 are fixedly connected with embedded steel bars c30, and a plurality of hanging points c32 are fixedly connected to the precast beam 3. Both sides of the precast beam 3 are provided with a plurality of embedded spiral sleeves b31. The joints of the precast panels 5 are made of a combination of rough surface, waterproof material and cast-in-place concrete, and the precast beam 3 is made of a combination of structural waterproofing, water-stopping material and waterproof material to strengthen the waterproofing measures and effectively prevent node leakage.

预制梁3和预制梁翼部14的连接处开设有止水槽33,止水槽33内卡接有止水条34,预制梁3的外表面均设有水洗面c29。A water stop groove 33 is provided at the connection between the precast beam 3 and the precast beam wing 14, a water stop strip 34 is clamped in the water stop groove 33, and the outer surface of the precast beam 3 is provided with a water wash surface c29.

实施例三:Embodiment three:

结合图1-图5所示,一种猪舍的建造工艺,包括以下步骤:As shown in Figures 1 to 5, a construction process of a pig house includes the following steps:

S1、平面基础定位后,在基础地面1的预制柱2底部浇筑混凝土墩21,混凝土墩21的混凝土初凝前预埋定位预埋钢板22与预埋钢管23,制作基础构造;S1. After the plane foundation is positioned, a concrete pier 21 is poured at the bottom of the prefabricated column 2 of the foundation ground 1. The pre-embedded steel plate 22 and the pre-embedded steel pipe 23 are pre-embedded before the initial setting of the concrete of the concrete pier 21 to make the foundation structure;

S2、把预制柱2放至定位预埋钢板22与预埋钢管23上,调整预制柱2的垂直化度,将预制柱2的预埋钢筋b26、预埋钢管23与定位预埋钢板22、基础地面1进行焊接,浇筑基础构造,安装预制梁3,安装预制梁3与模板b18,浇筑混凝土;S2, place the prefabricated column 2 on the positioning embedded steel plate 22 and the embedded steel pipe 23, adjust the verticality of the prefabricated column 2, weld the embedded steel bars b26 and embedded steel pipe 23 of the prefabricated column 2 with the positioning embedded steel plate 22 and the foundation ground 1, cast the foundation structure, install the prefabricated beam 3, install the prefabricated beam 3 and the template b18, and cast concrete;

S3、拆除预制梁3与预埋螺旋套筒a28,安放防水条11,安装预制板5,进行填堵缝隙,浇灌防水材料;S3, dismantle the prefabricated beam 3 and the embedded spiral sleeve a28, place the waterproof strip 11, install the prefabricated board 5, fill the gap, and pour the waterproof material;

S4、浇筑预制板5拼缝混凝土,浇灌预制柱2与预制梁3接触面防水材料内腔的防水材料,在预制板5面上浇灌自流平材料7。S4, pouring concrete at the joints of the precast panels 5, pouring waterproof material in the inner cavity of the waterproof material at the contact surface between the precast columns 2 and the precast beams 3, and pouring self-leveling material 7 on the surface of the precast panels 5.

通过上述实施例可知:通过上述实施例可知:基础平面定位后,在基础地面1浇筑混凝土墩21,在混凝土墩21初凝前把定位预埋钢管23板与钢管放在混凝土墩21上面,待混凝土墩21达到强度后,通过吊点c32,把多个预制柱2的预埋钢管23分别对准对应的定位预埋钢管23板与钢管进行安装,调整预制柱2垂直度,安装支撑柱6,把预埋钢管23与定位预埋钢管23板与钢管进行焊接固定,把预埋钢筋c30与基础地面1进行焊接固定,基础地面1浇筑混凝土,待基础地面1达到强度后拆除支撑柱6;Through the above embodiments, it can be known that: through the above embodiments, it can be known that: after the foundation plane is positioned, the concrete pier 21 is poured on the foundation ground 1, and the positioning embedded steel pipe 23 plate and the steel pipe are placed on the concrete pier 21 before the concrete pier 21 is initially set. After the concrete pier 21 reaches the strength, the embedded steel pipes 23 of the plurality of prefabricated columns 2 are respectively aligned with the corresponding positioning embedded steel pipe 23 plate and the steel pipe for installation through the hanging point c32, the verticality of the prefabricated column 2 is adjusted, the support column 6 is installed, the embedded steel pipe 23 and the positioning embedded steel pipe 23 plate and the steel pipe are welded and fixed, the embedded steel bar c30 is welded and fixed to the foundation ground 1, and the foundation ground 1 is poured with concrete, and the support column 6 is removed after the foundation ground 1 reaches the strength;

通过吊点a9把预制梁3、安装预制柱2上,预制梁3两端分别搁置在牛腿25上,形成混凝土内腔4;分别把预制柱2的预埋钢筋b26进行连接,安装模板b18通过紧固螺栓a19、预埋螺旋套筒b31固定在预制柱2的牛腿25上;浇筑混凝土内腔4的混凝土,待混凝土内腔4的混凝土达到强度后,拆除模板b18模板;The precast beam 3 is installed on the precast column 2 through the hanging point a9, and the two ends of the precast beam 3 are placed on the corbels 25 respectively to form a concrete cavity 4; the embedded steel bars b26 of the precast column 2 are connected respectively, and the installation template b18 is fixed on the corbels 25 of the precast column 2 through the fastening bolts a19 and the embedded spiral sleeves b31; the concrete of the concrete cavity 4 is poured, and the template b18 template is removed after the concrete of the concrete cavity 4 reaches the strength;

在预制梁翼部14的结构止水槽33上粘贴止水材料;Paste water-stop material on the structural water-stop groove 33 of the prefabricated beam wing 14;

通过吊点a9把预制板5安装至预制梁翼部14上,使预制板5底面均匀紧压在止水材料上,安装时预制板5之间预留防水材料内腔、防水内腔,预制板5之间与预制梁3之间预留防水材料内腔;预制板5安装完毕,连接预埋钢筋a16,在防水内腔堵防水条11,防水材料凝固后,在预制板5平方混凝土内腔4浇筑现浇混凝土,现浇混凝土达到强度后,把防水材料浇灌在防水槽8内腔内,切除吊点a9;The precast panel 5 is installed on the precast beam wing 14 through the hanging point a9, so that the bottom surface of the precast panel 5 is evenly pressed on the water-stopping material. When installing, a waterproof material cavity and a waterproof cavity are reserved between the precast panels 5, and a waterproof material cavity is reserved between the precast panels 5 and the precast beam 3; after the precast panel 5 is installed, the embedded steel bar a16 is connected, and the waterproof strip 11 is blocked in the waterproof cavity. After the waterproof material solidifies, cast-in-place concrete is poured in the square concrete cavity 4 of the precast panel 5. After the cast-in-place concrete reaches the strength, the waterproof material is poured into the inner cavity of the waterproof groove 8, and the hanging point a9 is cut off;

防水材料凝固后,在预制板5、现浇混凝土面上浇灌自流平材料7。After the waterproof material solidifies, pour the self-leveling material 7 on the prefabricated board 5 and the cast-in-place concrete surface.

需要说明的是,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims (10)

1. Novel multilayer full-assembled pig house convenient to clearance, including a plurality of foundation ground (1) as pig house support carrier, its characterized in that: be equipped with precast column (2) on foundation ground (1), install precast beam (3) that are the rectangle and distribute on a plurality of precast columns (2), be equipped with concrete inner chamber (4) between a plurality of precast columns (2) two by two, be equipped with prefabricated plate (5) in a plurality of precast beam (3), the bottom rigid coupling of prefabricated plate (5) has a plurality of prefabricated plate hidden beams (20), two support columns (6) are installed in the outside slope of precast column (2).
2. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: the middle part of prefabricated plate (5) has seted up the spacing groove, and prefabricated plate (5) have waterproof strip (11) through spacing groove joint, and the spacing inslot both sides are equipped with shutoff piece (12) with waterproof strip (11) tip laminating.
3. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: waterproof grooves (8) are formed in two sides of the surface of the precast slab (5), embedded bars a (16) are arranged in the waterproof grooves (8), precast slab joint washing surfaces (17) are further arranged in the waterproof grooves (8), and concrete slabs (10) are clamped on the waterproof grooves (8).
4. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: a template b (18) is arranged at the position of the concrete inner cavity (4), and the template b (18) is fixed on the similar precast beam (3) through a fastening bolt a (19).
5. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: the surface of prefabricated plate (5) is equipped with a plurality of hoisting points a (9), and the rigid coupling has from leveling material (7) on prefabricated plate (5), and the lateral surface of prefabricated plate (5) all rigid coupling has washing face a (13).
6. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: the inner sides of the precast beams (3) are respectively provided with precast beam wing parts (14), and the inner sides of the precast columns (2) are fixedly connected with templates a (15) for clamping the precast beam wing parts (14).
7. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: the utility model discloses a prefabricated post, including prefabricated post (2), support (2), concrete pier (21) are equipped with on the top rigid coupling of prefabricated post (2), be equipped with water face b (24) on support (25), the rigid coupling has furred ceiling b (27) on support (25), the outside of support (25) is equipped with a plurality of pre-buried spiral sleeve a (28), the rigid coupling has pre-buried reinforcing bar b (26) on prefabricated post (2), still the rigid coupling has pre-buried steel pipe (23) on prefabricated post (2), the rigid coupling has location pre-buried steel sheet (22) of inserting ground in foundation ground (1), be equipped with concrete pier (21) in foundation ground (1), pre-buried steel pipe (23) are connected with location pre-buried steel sheet (22), prefabricated post (2) inserts in foundation ground (1).
8. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: the upper side and the lower side of the precast beam (3) are fixedly connected with embedded bars c (30), a plurality of hanging points c (32) are fixedly connected on the precast beam (3), and a plurality of embedded spiral sleeves b (31) are arranged on the two sides of the precast beam (3).
9. The novel multi-layer fully assembled pig house convenient to clean according to claim 1, wherein: a water stopping groove (33) is formed in the joint of the precast beam (3) and the precast beam wing part (14), a water stopping strip (34) is clamped in the water stopping groove (33), and water washing faces c (29) are arranged on the outer surface of the precast beam (3).
10. Construction process of a pig house according to any one of claims 1-9, comprising the steps of:
S1, after a plane foundation is positioned, pouring a concrete pier (21) at the bottom of a precast column (2) of a foundation ground (1), and pre-burying a positioning pre-buried steel plate (22) and a pre-buried steel pipe (23) before initial setting of concrete of the concrete pier (21) to manufacture a foundation structure;
S2, placing the prefabricated column (2) on a positioning embedded steel plate (22) and an embedded steel pipe (23), adjusting the verticality of the prefabricated column (2), welding an embedded steel bar b (26) of the prefabricated column (2), the embedded steel pipe (23), the positioning embedded steel plate (22) and a foundation ground (1), pouring a foundation structure, installing a prefabricated beam (3), installing the prefabricated beam (3) and a template b (18), and pouring concrete;
S3, removing the precast beam (3) and the embedded spiral sleeve a (28), placing waterproof strips (11), installing precast slabs (5), filling gaps of the precast slabs (5), and pouring waterproof materials;
s4, pouring the precast slab (5) joint concrete, pouring the waterproof material of the waterproof material inner cavity of the contact surface of the precast column (2) and the precast beam (3), and pouring the self-leveling material (7) on the precast slab (5).
CN202410667683.XA 2024-05-28 2024-05-28 A new type of multi-layer fully assembled pig house that is easy to clean and its construction process Pending CN118383276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410667683.XA CN118383276A (en) 2024-05-28 2024-05-28 A new type of multi-layer fully assembled pig house that is easy to clean and its construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410667683.XA CN118383276A (en) 2024-05-28 2024-05-28 A new type of multi-layer fully assembled pig house that is easy to clean and its construction process

Publications (1)

Publication Number Publication Date
CN118383276A true CN118383276A (en) 2024-07-26

Family

ID=91992745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410667683.XA Pending CN118383276A (en) 2024-05-28 2024-05-28 A new type of multi-layer fully assembled pig house that is easy to clean and its construction process

Country Status (1)

Country Link
CN (1) CN118383276A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201200992D0 (en) * 2012-01-20 2012-03-07 Vion Food Group Ltd Livestock enclosure
CN107396836A (en) * 2017-08-24 2017-11-28 广东精宏建设有限公司 A kind of full assembled pig house
CN207219703U (en) * 2017-08-24 2018-04-13 广东精宏建设有限公司 A kind of full assembled pig house
CN109874683A (en) * 2019-04-12 2019-06-14 湖南大宗农牧有限责任公司 A kind of environmental protection assembled Large-scale pig farm and method of construction
CN110978256A (en) * 2019-12-20 2020-04-10 辽宁衍水水工水泥制品集团有限公司 Method for vertically producing precast concrete box culvert
US20220015327A1 (en) * 2018-11-20 2022-01-20 Ynsect Temperature control of a climatic zone of an insect-breeding facility

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201200992D0 (en) * 2012-01-20 2012-03-07 Vion Food Group Ltd Livestock enclosure
CN107396836A (en) * 2017-08-24 2017-11-28 广东精宏建设有限公司 A kind of full assembled pig house
CN207219703U (en) * 2017-08-24 2018-04-13 广东精宏建设有限公司 A kind of full assembled pig house
US20220015327A1 (en) * 2018-11-20 2022-01-20 Ynsect Temperature control of a climatic zone of an insect-breeding facility
CN109874683A (en) * 2019-04-12 2019-06-14 湖南大宗农牧有限责任公司 A kind of environmental protection assembled Large-scale pig farm and method of construction
CN110978256A (en) * 2019-12-20 2020-04-10 辽宁衍水水工水泥制品集团有限公司 Method for vertically producing precast concrete box culvert

Similar Documents

Publication Publication Date Title
CN206667459U (en) A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN106284846A (en) A kind of assembled steel reinforced concrete-constituted pile and utilize the system of this post, construction method
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
CN208668596U (en) A reinforced concrete beam-slab system and prefabricated column assembly nodes
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN213174773U (en) Support system is exempted from to tear open type post-cast strip structure
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN118383276A (en) A new type of multi-layer fully assembled pig house that is easy to clean and its construction process
CN115324249B (en) Full-prefabricated kitchen and bathroom floor slab and inverse sill integral pouring construction method
CN216713983U (en) Prefabricated side plate for assembled concrete pool
CN110700297A (en) A kind of sump stereotyped combined steel formwork and installation method thereof
CN109518769A (en) A kind of method and structure using PVC waterstop joint installation sewer pipe
CN213979911U (en) Basement outer wall post-cast strip template structure
CN217974502U (en) Basement post-cast strip retaining wall structure
CN210657851U (en) Precast concrete pavement slab capable of being hoisted quickly
CN112982692A (en) One-way superimposed sheet joint connecting structure and construction method
CN205822605U (en) A kind of assembled pitched roof
CN112127501A (en) Combined wall structure and construction method thereof
MY115475A (en) Semi precast method of construction of multi- storey buildings.
CN218562703U (en) Low-density steel bar polyphenyl granule concrete floor convenient to installation
CN220840824U (en) Prestressed concrete goose-shaped roof plate mould system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination