CN117474366B - Intelligent energy consumption monitoring and management system and method - Google Patents

Intelligent energy consumption monitoring and management system and method Download PDF

Info

Publication number
CN117474366B
CN117474366B CN202311812273.1A CN202311812273A CN117474366B CN 117474366 B CN117474366 B CN 117474366B CN 202311812273 A CN202311812273 A CN 202311812273A CN 117474366 B CN117474366 B CN 117474366B
Authority
CN
China
Prior art keywords
energy consumption
energy
preset
monitoring
variance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311812273.1A
Other languages
Chinese (zh)
Other versions
CN117474366A (en
Inventor
李瑶
刘志军
张宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University of Technology
Original Assignee
Tianjin University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University of Technology filed Critical Tianjin University of Technology
Priority to CN202311812273.1A priority Critical patent/CN117474366B/en
Publication of CN117474366A publication Critical patent/CN117474366A/en
Application granted granted Critical
Publication of CN117474366B publication Critical patent/CN117474366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/18Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Pure & Applied Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Mathematical Physics (AREA)
  • Mathematical Optimization (AREA)
  • Educational Administration (AREA)
  • Mathematical Analysis (AREA)
  • Computational Mathematics (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Evolutionary Biology (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Probability & Statistics with Applications (AREA)
  • Quality & Reliability (AREA)
  • Algebra (AREA)
  • Game Theory and Decision Science (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Feedback Control In General (AREA)

Abstract

本发明涉及能耗监测技术领域,尤其涉及一种智慧能耗监测管理系统及方法,包括:能耗控制模块,用以根据对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;运行稳定性监测单元,用以根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积重新配置以输出第一对应分区面积,或,发出针对第一控制信号;恢复有效性监测单元,用以根据能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积;输送稳定性监测模块,用以在对所述第一控制信号产生响应时,根据能耗设备的崩溃数量对能源调配信号的接收周期进行调节。本发明实现了能耗监测管理系统检测准确性和运行稳定性的提高。

The present invention relates to the technical field of energy consumption monitoring, and in particular to an intelligent energy consumption monitoring and management system and method, including: an energy consumption control module to adjust the rated energy consumption per unit period, or to issue a signal that the energy consumption equipment is running stably. sexual monitoring signal; the operation stability monitoring unit is used to reconfigure the partition area of the energy-consuming equipment according to the energy consumption variance of different energy-consuming equipment within the unit period to output the first corresponding partition area, or to issue a first control signal; The recovery effectiveness monitoring unit is used to reconfigure the first corresponding partition area to output the second corresponding partition area according to the crash recovery time of the energy-consuming equipment; the transport stability monitoring module is used to control the first When the signal generates a response, the reception period of the energy deployment signal is adjusted according to the number of crashes of the energy-consuming equipment. The invention improves the detection accuracy and operation stability of the energy consumption monitoring and management system.

Description

一种智慧能耗监测管理系统及方法A smart energy consumption monitoring and management system and method

技术领域Technical field

本发明涉及能耗监测技术领域,尤其涉及一种智慧能耗监测管理系统及方法。The present invention relates to the technical field of energy consumption monitoring, and in particular to an intelligent energy consumption monitoring and management system and method.

背景技术Background technique

智慧能耗监测管理系统是一项先进的技术,旨在实现对能源使用的实时监测和精准管理。通过整合传感器、大数据分析和云计算,该系统能够实时追踪建筑、设备或生产线的能源消耗情况,为企业提供详尽的用能数据和分析报告。通过智慧能耗监测管理系统,企业能够更高效地运营,实现能源资源的可持续利用,同时对环境产生更小的影响。The smart energy consumption monitoring and management system is an advanced technology designed to achieve real-time monitoring and precise management of energy usage. By integrating sensors, big data analysis and cloud computing, the system can track the energy consumption of buildings, equipment or production lines in real time, providing enterprises with detailed energy usage data and analysis reports. Through smart energy consumption monitoring and management systems, companies can operate more efficiently, achieve sustainable use of energy resources, and have less impact on the environment.

中国专利公开号:CN116070967A公开了一种综合能耗监测管理系统,所述系统包括:数据获取模块,用于获取单位能耗监测数据包;单位分类模块,用于根据分类设备清单进行单位匹配性分析,根据单位之间的匹配情况对单位进行分类;能耗曲线分析模块,用于对所有单位对应分类设备能耗数据进行分析,形成单类设备分析曲线;异常分析模块,用于将属于同一类别的单位对应的单类设备分析曲线进行对比,判定是否存在异常设备类型,由此可见,所述综合能耗监测管理系统存在以下问题:由于对能耗设备的崩溃恢复时长反映出的能耗设备恢复有效性的判定不准确导致能耗监测稳定性的降低。Chinese Patent Publication No.: CN116070967A discloses a comprehensive energy consumption monitoring and management system. The system includes: a data acquisition module for obtaining unit energy consumption monitoring data packets; a unit classification module for performing unit matching according to the classified equipment list analysis, classifying units according to the matching situation between units; the energy consumption curve analysis module is used to analyze the energy consumption data of all units' corresponding classified equipment to form a single category equipment analysis curve; the anomaly analysis module is used to analyze the energy consumption data of all units belonging to the same category. Compare the single-category equipment analysis curve corresponding to the category unit to determine whether there is an abnormal device type. It can be seen that the comprehensive energy consumption monitoring and management system has the following problems: due to the energy consumption reflected in the crash recovery time of the energy-consuming equipment Inaccurate determination of equipment recovery effectiveness leads to a reduction in the stability of energy consumption monitoring.

发明内容Contents of the invention

为此,本发明提供一种智慧能耗监测管理系统及方法,用以克服现有技术中由于对能耗设备的崩溃恢复时长反映出的能耗设备恢复有效性的判定不准确导致能耗监测稳定性的降低的问题。To this end, the present invention provides an intelligent energy consumption monitoring and management system and method to overcome the energy consumption monitoring in the prior art due to inaccurate determination of the recovery effectiveness of energy-consuming equipment reflected in the crash recovery time of the energy-consuming equipment. The problem of reduced stability.

为实现上述目的,本发明提供一种智慧能耗监测管理系统,包括:能耗控制模块,用以根据能耗温度比对能耗监测的准确性进行判定,并在判定能耗监测的准确性低于允许范围时对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;能耗设备监测模块,其与所述能耗控制模块相连,用以对能耗设备的分区面积进行控制,包括运行稳定性监测单元和恢复有效性监测单元,其中,所述运行稳定性监测单元用以在对所述能耗设备运行稳定性监测信号产生响应时根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积重新配置以输出第一对应分区面积,或,发出第一控制信号;所述恢复有效性监测单元与所述运行稳定性监测单元相连,用以根据输出第一对应分区面积后的能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积;输送稳定性监测模块,其与所述能耗设备监测模块相连,用以在对所述第一控制信号产生响应时根据能耗设备的崩溃数量对能耗设备的能源调配信号的接收周期进行调节。In order to achieve the above purpose, the present invention provides an intelligent energy consumption monitoring and management system, including: an energy consumption control module to determine the accuracy of energy consumption monitoring based on the energy consumption temperature comparison, and to determine the accuracy of energy consumption monitoring. When the rated energy consumption per unit period is lower than the allowable range, the rated energy consumption per unit period is adjusted, or an energy-consuming equipment operation stability monitoring signal is sent; an energy-consuming equipment monitoring module is connected to the energy consumption control module to monitor the energy-consuming equipment. The partition area is controlled and includes an operation stability monitoring unit and a recovery effectiveness monitoring unit. The operation stability monitoring unit is used to respond to the operation stability monitoring signal of the energy-consuming equipment according to different energy levels within the unit period. The energy consumption variance of the energy consuming equipment reconfigures the partition area of the energy consuming equipment to output the first corresponding partition area, or send a first control signal; the recovery effectiveness monitoring unit is connected to the operation stability monitoring unit to The first corresponding partition area is reconfigured to output the second corresponding partition area according to the crash recovery time of the energy-consuming equipment after the first corresponding partition area is output; a transportation stability monitoring module is configured with the energy-consuming equipment monitoring module Connected to adjust the receiving period of the energy allocation signal of the energy consuming device according to the number of crashes of the energy consuming device when responding to the first control signal.

进一步地,所述能耗控制模块包括:Further, the energy consumption control module includes:

能耗统计组件,用以对达到额定能耗的单位周期内的总使用能耗进行统计并对能耗温度比进行计算;其中,所述能耗温度比为单位周期内单个分区面积中若干能耗设备的总使用能耗与能耗设备的平均温度的比值;The energy consumption statistics component is used to count the total energy consumption within the unit period when the rated energy consumption is reached and calculate the energy consumption temperature ratio; wherein the energy consumption temperature ratio is the number of energy consumption in a single partition area within the unit period. The ratio of the total energy consumption of energy-consuming equipment to the average temperature of energy-consuming equipment;

能耗监测准确性判定组件,其与所述能耗统计组件相连,用以在能耗温度比满足预设第一比值条件或预设第二比值条件时判定能耗监测的准确性低于允许范围;An energy consumption monitoring accuracy determination component is connected to the energy consumption statistics component to determine that the accuracy of energy consumption monitoring is lower than allowed when the energy consumption temperature ratio meets the preset first ratio condition or the preset second ratio condition. scope;

其中,所述预设第一比值条件为,能耗温度比大于预设第一比值且小于等于预设第二比值;所述预设第二比值条件为,能耗温度比大于预设第二比值;所述预设第一比值小于所述预设第二比值。Wherein, the preset first ratio condition is that the energy consumption temperature ratio is greater than the preset first ratio and less than or equal to the preset second ratio; the preset second ratio condition is that the energy consumption temperature ratio is greater than the preset second ratio. Ratio; the preset first ratio is smaller than the preset second ratio.

进一步地,所述能耗控制模块还包括:Further, the energy consumption control module also includes:

额定能耗更新组件,其与所述能耗监测准确性判定组件相连,用以在所述能耗温度比仅满足预设第一比值条件时根据能耗温度比和预设第一比值的差值对单位周期的额定能耗进行调升;A rated energy consumption update component, which is connected to the energy consumption monitoring accuracy determination component, and is used to calculate the difference between the energy consumption temperature ratio and the preset first ratio when the energy consumption temperature ratio only meets the preset first ratio condition. The value increases the rated energy consumption per unit cycle;

运行稳定性监测信号发射端,其与所述能耗监测准确性判定组件相连,用以在所述能耗温度比仅满足预设第二比值条件时发出能耗设备运行稳定性监测信号。An operation stability monitoring signal transmitting end is connected to the energy consumption monitoring accuracy determination component, and is used to send an energy consumption equipment operation stability monitoring signal when the energy consumption temperature ratio only meets the preset second ratio condition.

进一步地,所述运行稳定性监测单元包括:Further, the operation stability monitoring unit includes:

方差计算组件,其与所述能耗控制模块相连,用以在对所述能耗设备运行稳定性监测信号发生响应时对单位周期内不同能耗设备的能耗方差进行计算;A variance calculation component, which is connected to the energy consumption control module and is used to calculate the energy consumption variance of different energy consumption equipment within a unit period when responding to the operation stability monitoring signal of the energy consumption equipment;

运行稳定性判定组件,其与所述方差计算组件相连,用以在单位周期内不同能耗设备的能耗方差满足预设第一方差条件或预设第二方差条件时判定能耗设备运行稳定性低于允许范围,An operation stability determination component, which is connected to the variance calculation component and is used to determine the operation of the energy consumption equipment when the energy consumption variance of different energy consumption equipment in the unit period meets the preset first variance condition or the preset second variance condition. The stability is lower than the allowable range,

其中,所述预设第一方差条件为,单位周期内不同能耗设备的能耗方差大于预设第一方差且小于等于预设第二方差;所述预设第二方差条件为,单位周期内不同能耗设备的能耗方差大于预设第二方差;所述预设第一方差小于所述预设第二方差。Wherein, the preset first variance condition is that the energy consumption variance of different energy consuming equipment within a unit period is greater than the preset first variance and less than or equal to the preset second variance; the preset second variance condition is, The energy consumption variance of different energy consuming devices within a unit period is greater than the preset second variance; the preset first variance is less than the preset second variance.

进一步地,所述运行稳定性监测单元还包括:Further, the operation stability monitoring unit also includes:

分区面积配置组件,其与所述运行稳定性判定组件相连,用以在所述单位周期内不同能耗设备的能耗方差仅满足预设第一方差条件时根据单位周期内不同能耗设备的能耗方差与预设第一方差的差值对能耗设备的分区面积进行重新配置以输出第一对应分区面积;A partition area configuration component, which is connected to the operation stability determination component, and is used to determine the energy consumption of different energy-consuming devices within the unit period when the energy consumption variance of the different energy-consuming devices only meets the preset first variance condition. The difference between the energy consumption variance and the preset first variance reconfigures the partition area of the energy-consuming device to output the first corresponding partition area;

控制信号发射端,其与所述运行稳定性判定组件相连,用以在所述单位周期内不同能耗设备的能耗方差仅满足预设第二方差条件时发出针对第一控制信号;A control signal transmitting end connected to the operation stability determination component to send a first control signal when the energy consumption variance of different energy consuming equipment within the unit period only meets the preset second variance condition;

其中,所述第一对应分区面积与所述单位周期内不同能耗设备的能耗方差与预设第一方差的差值成反比。Wherein, the first corresponding partition area is inversely proportional to the difference between the energy consumption variance of different energy consuming devices in the unit period and the preset first variance.

进一步地,所述恢复有效性监测单元包括:Further, the recovery effectiveness monitoring unit includes:

时长统计组件,用以对输出第一对应分区面积后的能耗设备的崩溃恢复时长进行统计;The duration statistics component is used to count the crash recovery duration of energy-consuming equipment after outputting the first corresponding partition area;

有效性监测组件,其与所述时长统计组件相连,用以在能耗设备的崩溃恢复时长满足预设时长条件时判定能耗设备恢复有效性低于允许范围;A validity monitoring component, which is connected to the duration statistics component, and is used to determine that the recovery effectiveness of the energy consuming device is lower than the allowed range when the crash recovery duration of the energy consuming device meets the preset duration condition;

其中,所述预设时长条件为,能耗设备的崩溃恢复时长大于预设时长。Wherein, the preset duration condition is that the crash recovery duration of the energy-consuming equipment is greater than the preset duration.

进一步地,所述恢复有效性监测单元还包括与所述有效性监测组件相连用以在预设时长条件下根据能耗设备的崩溃恢复时长与预设时长的差值对所述第一对应分区面积进行再次配置以输出第二对应分区面积的分区面积确定组件。Further, the recovery effectiveness monitoring unit further includes a method connected to the effectiveness monitoring component for performing the calculation of the first corresponding partition according to the difference between the crash recovery time of the energy consuming equipment and the preset time under a preset time condition. The area is reconfigured to output a partition area determination component corresponding to a second partition area.

进一步地,所述输送稳定性监测模块包括与所述运行稳定性监测单元相连用以根据对第一控制信号发生响应后单位周期能耗设备的崩溃数量在预设数量条件下判定输送有效性低于允许范围的输送监测组件;其中,所述预设数量条件为,单位周期能耗设备的崩溃数量大于预设崩溃数量。Further, the transportation stability monitoring module includes a module connected to the operation stability monitoring unit for determining low transportation effectiveness under a preset quantity condition based on the number of crashes of energy-consuming equipment per unit period after responding to the first control signal. A transportation monitoring component within the allowable range; wherein the preset quantity condition is that the number of crashes of energy consuming equipment per unit period is greater than the preset number of crashes.

进一步地,所述能源调配信号的接收周期通过单位周期能耗设备的崩溃数量与所述预设崩溃数量的差值进行调节,其中,所述能源调配信号的接收周期与所述差值成反比关系。Further, the reception period of the energy allocation signal is adjusted by the difference between the number of crashes of the energy consuming equipment per unit period and the preset number of crashes, wherein the reception period of the energy allocation signal is inversely proportional to the difference. relation.

本发明还提供一种智慧能耗监测管理方法,包括:The invention also provides a smart energy consumption monitoring and management method, including:

步骤S1,对达到额定能耗的单位周期内的总使用能耗进行统计并对能耗温度比进行计算,能耗控制模块根据能耗温度比对能耗监测的准确性进行判定;Step S1, collect statistics on the total energy consumption within the unit period that reaches the rated energy consumption and calculate the energy consumption-temperature ratio. The energy consumption control module determines the accuracy of energy consumption monitoring based on the energy consumption-temperature ratio;

步骤S2,当能耗控制模块判定能耗监测的准确性低于允许范围时,对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;Step S2, when the energy consumption control module determines that the accuracy of energy consumption monitoring is lower than the allowed range, adjust the rated energy consumption per unit period, or send out an energy-consuming equipment operation stability monitoring signal;

步骤S3,当运行稳定性监测单元对所述能耗设备运行稳定性监测信号发生响应时,根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积进行重新配置以输出第一对应分区面积,或,输送稳定性监测模块根据单位周期能耗设备的崩溃数量对能源调配信号的接收周期进行调节;Step S3: When the operation stability monitoring unit responds to the operation stability monitoring signal of the energy-consuming equipment, it reconfigures the partition area of the energy-consuming equipment according to the energy consumption variance of different energy-consuming equipment within the unit period to output the first Corresponding to the partition area, or the transportation stability monitoring module adjusts the receiving period of the energy deployment signal according to the number of crashes of energy consuming equipment per unit period;

步骤S4,当运行稳定性监测单元完成对于第一对应分区面积的输出时,恢复有效性监测单元根据能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积。Step S4: When the operation stability monitoring unit completes the output of the first corresponding partition area, the recovery effectiveness monitoring unit reconfigures the first corresponding partition area according to the crash recovery time of the energy consuming equipment to output the second corresponding partition. area.

与现有技术相比,本发明的有益效果在于,本发明所述系统在对能耗进行检测时,由于温度变化对流体体积的影响,导致在温度升高时流体能源的体积增大导致监测到的消耗量也随之增大,使检测的准确性下降,本发明对单位周期的额定能耗进行增大,实现了对能耗的弹性检测,减少由于温度变化而发出的错误预警信息,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。Compared with the existing technology, the beneficial effect of the present invention is that when the system of the present invention detects energy consumption, due to the impact of temperature changes on the fluid volume, the volume of the fluid energy increases when the temperature rises, resulting in monitoring The consumption also increases, which reduces the accuracy of detection. The present invention increases the rated energy consumption per unit period, realizes elastic detection of energy consumption, and reduces false warning messages due to temperature changes. This further improves the detection accuracy and operational stability of the energy consumption monitoring and management system.

本发明所述系统在运行过程中对能耗设备的能耗进行统计并计算单位周期内不同能耗设备的能耗方差,根据计算结果对设备运行的稳定性进行判定,由于设备的故障或者是设备非正常运行导致非必要能耗的增加,通过减小能耗设备的分区面积,使得能更快锁定设备故障的区域,排除故障对系统运行的影响,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。The system of the present invention collects statistics on the energy consumption of energy-consuming equipment during operation and calculates the energy consumption variance of different energy-consuming equipment within a unit period, and determines the stability of equipment operation based on the calculation results. Due to equipment failure or Abnormal operation of equipment leads to an increase in unnecessary energy consumption. By reducing the partition area of energy-consuming equipment, the area of equipment failure can be quickly identified, and the impact of the failure on system operation can be eliminated, further achieving accurate detection of the energy consumption monitoring and management system. Improvement of performance and operational stability.

本发明所述系统在对能耗设备的分区面积进行重新配置后,由于减小了能耗设备的分区面积,同一分区面积内的能耗设备也随之减小,在能耗设备发生故障时,由于数据的获取来源减少,导致自主恢复的能力减弱,拉长崩溃恢复所需的时长甚至无法自主恢复,通过对能耗设备的分区面积的二次调节,实现了系统在分区和运行中的均衡发展,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。After the system of the present invention reconfigures the partition area of the energy-consuming equipment, since the partition area of the energy-consuming equipment is reduced, the energy-consuming equipment in the same partition area is also reduced. When the energy-consuming equipment fails, , due to the reduction of data acquisition sources, the ability to autonomously recover is weakened, the time required for crash recovery is lengthened, and even autonomous recovery cannot be achieved. Through the secondary adjustment of the partition area of energy-consuming equipment, the system is realized during partitioning and operation. Balanced development has further improved the detection accuracy and operational stability of the energy consumption monitoring and management system.

本发明所述系统通过在单位周期能耗设备的崩溃数量超出允许范围后,对能源调配信号的接收周期进行调节,一方面能耗设备的崩溃可能是由于能耗设备获取到的网络病毒信息导致,通过减小能源调配信号的接收周期,使自主恢复后的能耗设备能及时接收正确的能源配置信号,另一方面,减小能源调配信号的接收周期可以使系统更加及时的响应变化,更及时地调整能源的分配,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。The system of the present invention adjusts the reception period of the energy allocation signal after the number of crashes of energy-consuming equipment per unit period exceeds the allowed range. On the one hand, the collapse of energy-consuming equipment may be caused by network virus information obtained by the energy-consuming equipment. , by reducing the reception period of the energy deployment signal, the energy-consuming equipment after autonomous recovery can receive the correct energy configuration signal in time. On the other hand, reducing the reception period of the energy deployment signal can make the system respond to changes more timely, and more Timely adjustment of energy distribution further improves the detection accuracy and operational stability of the energy consumption monitoring and management system.

附图说明Description of the drawings

图1为本发明实施例智慧能耗监测管理系统的整体结构框图;Figure 1 is an overall structural block diagram of a smart energy consumption monitoring and management system according to an embodiment of the present invention;

图2为本发明实施例智慧能耗监测管理系统的能耗设备监测模块的具体结构框图;Figure 2 is a specific structural block diagram of the energy consumption equipment monitoring module of the smart energy consumption monitoring and management system according to the embodiment of the present invention;

图3为本发明实施例智慧能耗监测管理系统的能耗控制模块的具体结构框图;Figure 3 is a specific structural block diagram of the energy consumption control module of the smart energy consumption monitoring and management system according to the embodiment of the present invention;

图4为本发明实施例智慧能耗监测管理方法的整体流程图。Figure 4 is an overall flow chart of the smart energy consumption monitoring and management method according to the embodiment of the present invention.

具体实施方式Detailed ways

为了使本发明的目的和优点更加清楚明白,下面结合实施例对本发明作进一步描述;应当理解,此处所描述的具体实施例仅仅用于解释本发明,并不用于限定本发明。In order to make the purpose and advantages of the present invention more clear, the present invention will be further described below in conjunction with the examples; it should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the present invention.

下面参照附图来描述本发明的优选实施方式。本领域技术人员应当理解的是,这些实施方式仅仅用于解释本发明的技术原理,并非在限制本发明的保护范围。Preferred embodiments of the present invention will be described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the scope of the present invention.

请参阅图1、图2、图3以及图4所示,其分别为本发明实施例智慧能耗监测管理系统的整体结构框图、能耗设备监测模块的具体结构框图、能耗控制模块的具体结构框图以及智慧能耗监测管理方法的整体流程图。本发明一种智慧能耗监测管理系统,包括:Please refer to Figure 1, Figure 2, Figure 3 and Figure 4, which are respectively the overall structural block diagram of the smart energy consumption monitoring and management system, the specific structural block diagram of the energy consumption equipment monitoring module, and the specific structural block diagram of the energy consumption control module according to the embodiment of the present invention. Structural block diagram and overall flow chart of smart energy consumption monitoring and management methods. An intelligent energy consumption monitoring and management system of the present invention includes:

能耗控制模块,用以根据能耗温度比对能耗监测的准确性进行判定,并在判定能耗监测的准确性低于允许范围时对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;The energy consumption control module is used to determine the accuracy of energy consumption monitoring based on the energy consumption temperature ratio, and when it is determined that the accuracy of energy consumption monitoring is lower than the allowable range, adjust the rated energy consumption per unit period, or emit energy Consuming equipment operation stability monitoring signals;

能耗设备监测模块,其与所述能耗控制模块相连,用以对能耗设备的分区面积进行控制,包括运行稳定性监测单元和恢复有效性监测单元,其中,An energy-consuming equipment monitoring module, which is connected to the energy-consuming control module and is used to control the partition area of energy-consuming equipment, including an operation stability monitoring unit and a recovery effectiveness monitoring unit, wherein,

所述运行稳定性监测单元用以在对所述能耗设备运行稳定性监测信号产生响应时根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积重新配置以输出第一对应分区面积,或,发出第一控制信号;The operation stability monitoring unit is used to reconfigure the partition area of the energy consumption equipment according to the energy consumption variance of different energy consumption equipment within the unit period when responding to the energy consumption equipment operation stability monitoring signal to output the first corresponding Partition area, or, sends the first control signal;

所述恢复有效性监测单元与所述运行稳定性监测单元相连,用以根据输出第一对应分区面积后的能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积;The recovery effectiveness monitoring unit is connected to the operation stability monitoring unit and is used to reconfigure the first corresponding partition area to output the second corresponding partition area according to the crash recovery time of the energy consuming equipment after outputting the first corresponding partition area. Corresponding partition area;

输送稳定性监测模块,其与所述能耗设备监测模块相连,用以在对所述第一控制信号产生响应时根据能耗设备的崩溃数量对能耗设备的能源调配信号的接收周期进行调节。A transportation stability monitoring module, connected to the energy-consuming equipment monitoring module, used to adjust the reception period of the energy deployment signal of the energy-consuming equipment according to the number of crashes of the energy-consuming equipment when responding to the first control signal. .

具体而言,所述第一控制信号为对输送稳定性监测模块运行进行控制的控制信号,当单位周期内不同能耗设备的能耗方差满足预设第二方差条件时,运行稳定性监测单元将第一控制信号发送至输送稳定性监测模块,使输送稳定性监测模块对能耗设备的崩溃数量进行检测。Specifically, the first control signal is a control signal for controlling the operation of the transportation stability monitoring module. When the energy consumption variance of different energy consuming equipment within the unit period meets the preset second variance condition, the operation stability monitoring unit The first control signal is sent to the transportation stability monitoring module, so that the transportation stability monitoring module detects the number of crashes of the energy-consuming equipment.

具体而言,所述能耗设备监测模块还包括:Specifically, the energy consumption equipment monitoring module also includes:

温度传感器,其与所述能耗设备相连,用以检测能耗设备温度;A temperature sensor connected to the energy-consuming equipment to detect the temperature of the energy-consuming equipment;

第一能耗传感器,其与所述能耗设备相连,用以检测能耗设备的能耗;A first energy consumption sensor connected to the energy consumption device to detect the energy consumption of the energy consumption device;

第二能耗传感器,其与所述第一能耗传感器相连,用以获取分区面积中若干能耗设备的总使用能耗。A second energy consumption sensor is connected to the first energy consumption sensor to obtain the total energy consumption of several energy consuming devices in the partition area.

作为本发明的优选的实施例,第一能耗传感器可以为电子燃气表,第二能耗传感器可以为与若干电子燃气表相连的电子燃气总表。As a preferred embodiment of the present invention, the first energy consumption sensor may be an electronic gas meter, and the second energy consumption sensor may be an electronic gas master meter connected to several electronic gas meters.

具体而言,所述能耗包括用水量,用电量、燃气使用量。Specifically, the energy consumption includes water consumption, electricity consumption, and gas usage.

具体而言,当能耗设备发生故障,如设备出现振动或设备停机时,判定能耗设备发生崩溃。Specifically, when the energy-consuming equipment fails, such as the equipment vibrates or the equipment shuts down, it is determined that the energy-consuming equipment has collapsed.

具体而言,所述单位周期的额定能耗为同一分区面积内的若干能耗设备的总额定能耗,分区面积为若干功能相同的能耗设备所在区域的面积,在对额定能耗进行调节时,并未对能耗设备的分区面积产生影响,反之,在对能耗设备的分区面积进行调节时,单位周期的额定能耗是随之改变的,单位周期的额定能耗的变化幅度同能耗设备的分区面积变化幅度。Specifically, the rated energy consumption per unit period is the total rated energy consumption of several energy-consuming devices within the same partition area, and the partition area is the area where several energy-consuming devices with the same functions are located. After adjusting the rated energy consumption , it has no impact on the partition area of the energy-consuming equipment. On the contrary, when the partition area of the energy-consuming equipment is adjusted, the rated energy consumption per unit period changes accordingly, and the change range of the rated energy consumption per unit period is the same. The change range of the partition area of energy-consuming equipment.

具体而言,所述能耗设备设有能源调配信号的接收周期,能源调配信号的接收周期为单个分区面积内所有功能相同的能耗设备的能源调配信号的接收周期,能耗设备在接收到对应能源调配信号后进行能源的使用。Specifically, the energy-consuming equipment is provided with a receiving period for the energy allocation signal. The receiving period for the energy-consuming equipment is the receiving period for the energy allocation signals of all energy-consuming equipment with the same function within a single partition area. The energy-consuming equipment receives the The energy is used after corresponding to the energy deployment signal.

请继续参阅图3所示,所述能耗控制模块包括:Please continue to refer to Figure 3. The energy consumption control module includes:

能耗统计组件,用以对达到额定能耗的单位周期内的总使用能耗进行统计并对能耗温度比进行计算;其中,所述能耗温度比为单位周期内分区面积中若干能耗设备的总使用能耗与能耗设备的平均温度的比值;The energy consumption statistics component is used to count the total energy consumption within the unit period that reaches the rated energy consumption and calculate the energy consumption to temperature ratio; wherein the energy consumption to temperature ratio is a certain amount of energy consumption in the partition area within the unit period. The ratio of the total energy consumption of the equipment to the average temperature of the energy-consuming equipment;

能耗监测准确性判定组件,其与所述能耗统计组件相连,用以在能耗温度比满足预设第一比值条件或预设第二比值条件时判定能耗监测的准确性低于允许范围;An energy consumption monitoring accuracy determination component is connected to the energy consumption statistics component to determine that the accuracy of energy consumption monitoring is lower than allowed when the energy consumption temperature ratio meets the preset first ratio condition or the preset second ratio condition. scope;

其中,所述预设第一比值条件为,能耗温度比大于预设第一比值且小于等于预设第二比值;所述预设第二比值条件为,能耗温度比大于预设第二比值;所述预设第一比值小于所述预设第二比值。Wherein, the preset first ratio condition is that the energy consumption temperature ratio is greater than the preset first ratio and less than or equal to the preset second ratio; the preset second ratio condition is that the energy consumption temperature ratio is greater than the preset second ratio. Ratio; the preset first ratio is smaller than the preset second ratio.

请继续参阅图3所示,所述能耗控制模块还包括:Please continue to refer to Figure 3. The energy consumption control module also includes:

额定能耗更新组件,其与所述能耗监测准确性判定组件相连,用以在所述能耗温度比仅满足预设第一比值条件时根据能耗温度比和预设第一比值的差值对单位周期的额定能耗进行调升;Rated energy consumption update component, which is connected to the energy consumption monitoring accuracy determination component, and is used to calculate the difference between the energy consumption temperature ratio and the preset first ratio when the energy consumption temperature ratio only meets the preset first ratio condition. The rated energy consumption per unit cycle is increased by the value;

运行稳定性监测信号发射端,其与所述能耗监测准确性判定组件相连,用以在所述能耗温度比仅满足预设第二比值条件时发出能耗设备运行稳定性监测信号。An operation stability monitoring signal transmitting end is connected to the energy consumption monitoring accuracy determination component, and is used to send an energy consumption equipment operation stability monitoring signal when the energy consumption temperature ratio only meets the preset second ratio condition.

具体而言,能耗温度比记为B,预设第一比值记为B1,预设第二比值记为B2,能耗温度比和预设第一比值的差值记为△B,设定△B=B-B1,预设比值差值记为△B0,Specifically, the energy consumption temperature ratio is recorded as B, the preset first ratio is recorded as B1, the preset second ratio is recorded as B2, the difference between the energy consumption temperature ratio and the preset first ratio is recorded as △B, and the setting △B=B-B1, the preset ratio difference is recorded as △B0,

若△B≤△B0,所述额定能耗更新组件使用预设第一能耗调节系数α1对单位周期的额定能耗W进行调节;If △B ≤ △B0, the rated energy consumption update component uses the preset first energy consumption adjustment coefficient α1 to adjust the rated energy consumption W per unit period;

若△B>△B0,所述额定能耗更新组件使用预设第二能耗调节系数α2对单位周期的额定能耗W进行调节;If △B>△B0, the rated energy consumption update component uses the preset second energy consumption adjustment coefficient α2 to adjust the rated energy consumption W per unit period;

其中,1<α1<α2,调节后的单位周期的额定能耗W’=W×αi,其中,αi为预设第i能耗调节系数,设定i=1,2。Among them, 1<α1<α2, the adjusted rated energy consumption per unit period W’=W×αi, where αi is the preset i-th energy consumption adjustment coefficient, and i=1,2.

本发明所述系统在对能耗进行检测时,由于温度变化对流体体积的影响,导致在温度升高时流体能源的体积增大导致监测到的消耗量也随之增大,使检测的准确性下降,本发明对单位周期的额定能耗进行增大,实现了对能耗的弹性检测,减少由于温度变化而发出的错误预警信息,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。When the system of the present invention detects energy consumption, due to the influence of temperature changes on the fluid volume, the volume of the fluid energy increases when the temperature rises, resulting in an increase in the monitored consumption, making the detection more accurate. The invention increases the rated energy consumption per unit period, realizes elastic detection of energy consumption, reduces false warning information due to temperature changes, and further achieves detection accuracy and stable operation of the energy consumption monitoring management system. Sexual improvement.

请继续参阅图2所示,所述运行稳定性监测单元包括:Please continue to refer to Figure 2. The operational stability monitoring unit includes:

方差计算组件,其与所述能耗控制模块相连,用以在对所述能耗设备运行稳定性监测信号发生响应时对单位周期内不同能耗设备的能耗方差进行计算;A variance calculation component, which is connected to the energy consumption control module and is used to calculate the energy consumption variance of different energy consumption equipment within a unit period when responding to the operation stability monitoring signal of the energy consumption equipment;

运行稳定性判定组件,其与所述方差计算组件相连,用以在单位周期内不同能耗设备的能耗方差满足预设第一方差条件或预设第二方差条件时判定能耗设备运行稳定性低于允许范围,An operation stability determination component, which is connected to the variance calculation component and is used to determine the operation of the energy consumption equipment when the energy consumption variance of different energy consumption equipment in the unit period meets the preset first variance condition or the preset second variance condition. The stability is lower than the allowable range,

其中,所述预设第一方差条件为,单位周期内不同能耗设备的能耗方差大于预设第一方差且小于等于预设第二方差;所述预设第二方差条件为,单位周期内不同能耗设备的能耗方差大于预设第二方差;所述预设第一方差小于所述预设第二方差。Wherein, the preset first variance condition is that the energy consumption variance of different energy consuming equipment within a unit period is greater than the preset first variance and less than or equal to the preset second variance; the preset second variance condition is, The energy consumption variance of different energy consuming devices within a unit period is greater than the preset second variance; the preset first variance is less than the preset second variance.

请继续参阅图2所示,所述运行稳定性监测单元还包括:Please continue to refer to Figure 2. The operational stability monitoring unit also includes:

分区面积配置组件,其与所述运行稳定性判定组件相连,用以在所述单位周期内不同能耗设备的能耗方差仅满足预设第一方差条件时根据单位周期内不同能耗设备的能耗方差与预设第一方差的差值对能耗设备的分区面积进行重新配置以输出第一对应分区面积;A partition area configuration component, which is connected to the operation stability determination component, and is used to determine the energy consumption of different energy-consuming devices within the unit period when the energy consumption variance of the different energy-consuming devices only meets the preset first variance condition. The difference between the energy consumption variance and the preset first variance reconfigures the partition area of the energy-consuming device to output the first corresponding partition area;

控制信号发射端,其与所述运行稳定性判定组件相连,用以在所述单位周期内不同能耗设备的能耗方差仅满足预设第二方差条件时发出针对第一控制信号;A control signal transmitting end connected to the operation stability determination component to send a first control signal when the energy consumption variance of different energy consuming equipment within the unit period only meets the preset second variance condition;

其中,所述第一对应分区面积与所述单位周期内不同能耗设备的能耗方差与预设第一方差的差值成反比。Wherein, the first corresponding partition area is inversely proportional to the difference between the energy consumption variance of different energy consuming devices in the unit period and the preset first variance.

具体而言,单位周期内不同能耗设备的能耗方差为单位周期内同一分区面积中不同不同功能相同的能耗设备的能耗的方差,所述同一分区面积为达到额定能耗的某一个分区面积,可以理解的是单位周期内不同能耗设备的能耗方差的计算方法为本领域技术人员常用的技术手段,在此不做赘述。Specifically, the energy consumption variance of different energy-consuming equipment within a unit period is the variance of the energy consumption of different energy-consuming equipment with the same functions in the same partition area within the unit period, and the same partition area is a certain area that reaches the rated energy consumption. As for the partition area, it can be understood that the calculation method of the energy consumption variance of different energy-consuming equipment within a unit period is a technical method commonly used by those skilled in the art, and will not be described in detail here.

具体而言,单位周期内不同能耗设备的能耗方差记为X,预设第一方差记为X1,预设第二方差记为X2,单位周期内不同能耗设备的能耗方差与预设第一方差的差值记为△X,设定△X=X-X1,预设方差差值记为△X0,Specifically, the energy consumption variance of different energy-consuming equipment within the unit period is recorded as X, the preset first variance is marked as X1, and the preset second variance is marked as The difference of the preset first variance is recorded as △X, set △X=X-X1, and the difference of the preset variance is recorded as △X0,

若△X≤△X0,所述分区面积配置组件使用预设第一面积配置系数β1对能耗设备的分区面积M进行重新配置;If △X ≤ △X0, the partition area configuration component uses the preset first area configuration coefficient β1 to reconfigure the partition area M of the energy-consuming equipment;

若△X>△X0,所述分区面积配置组件使用预设第二面积配置系数β2对能耗设备的分区面积M进行重新配置;If △X>△X0, the partition area configuration component uses the preset second area configuration coefficient β2 to reconfigure the partition area M of the energy-consuming equipment;

0<β1<β2<1,第一对应分区面积M’=M×(1-βj),其中,βj为预设第j面积配置系数,设定j=1,2。0<β1<β2<1, the first corresponding partition area M’=M×(1-βj), where βj is the preset j-th area configuration coefficient, and j=1,2 is set.

本发明所述系统在运行过程中对能耗设备的能耗进行统计并计算单位周期内不同能耗设备的能耗方差,根据计算结果对设备运行的稳定性进行判定,由于设备的故障或者是设备非正常运行导致非必要能耗的增加,通过减小能耗设备的分区面积,使得能更快锁定设备故障的区域,排除故障对系统运行的影响,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。The system of the present invention collects statistics on the energy consumption of energy-consuming equipment during operation and calculates the energy consumption variance of different energy-consuming equipment within a unit period, and determines the stability of equipment operation based on the calculation results. Due to equipment failure or Abnormal operation of equipment leads to an increase in unnecessary energy consumption. By reducing the partition area of energy-consuming equipment, the area of equipment failure can be quickly identified, and the impact of the failure on system operation can be eliminated, further achieving accurate detection of the energy consumption monitoring and management system. Improvement of performance and operational stability.

请继续参阅图2所示,所述恢复有效性监测单元包括:Please continue to refer to Figure 2. The recovery effectiveness monitoring unit includes:

时长统计组件,用以对输出第一对应分区面积后的能耗设备的崩溃恢复时长进行统计;The duration statistics component is used to count the crash recovery duration of energy-consuming equipment after outputting the first corresponding partition area;

有效性监测组件,其与所述时长统计组件相连,用以在能耗设备的崩溃恢复时长满足预设时长条件时判定能耗设备恢复有效性低于允许范围;A validity monitoring component, which is connected to the duration statistics component, and is used to determine that the recovery effectiveness of the energy consuming device is lower than the allowed range when the crash recovery duration of the energy consuming device meets the preset duration condition;

其中,所述预设时长条件为,能耗设备的崩溃恢复时长大于预设时长。Wherein, the preset duration condition is that the crash recovery duration of the energy-consuming equipment is greater than the preset duration.

请继续参阅图2所示,所述恢复有效性监测单元还包括与所述有效性监测组件相连用以在预设时长条件下根据能耗设备的崩溃恢复时长与预设时长的差值对所述第一对应分区面积进行再次配置以输出第二对应分区面积的分区面积确定组件。Please continue to refer to FIG. 2. The recovery effectiveness monitoring unit also includes a device connected to the effectiveness monitoring component for calculating the recovery time based on the difference between the crash recovery time of the energy-consuming equipment and the preset time under the preset time condition. The first corresponding partition area is reconfigured to output the partition area determination component of the second corresponding partition area.

具体而言,能耗设备的崩溃恢复时长记为T,预设时长记为T0,能耗设备的崩溃恢复时长与预设时长的差值记为△T,设定△T=T-T0,预设时长差值记为△T0,Specifically, the crash recovery time of energy-consuming equipment is recorded as T, the default time is recorded as T0, the difference between the crash recovery time of energy-consuming equipment and the preset time is recorded as △T, and △T=T-T0 is set. The default duration difference is recorded as △T0,

若△T≤△T0,所述分区面积确定组件使用预设第三面积配置系数β3对第一对应分区面积M’进行再次配置;If △T ≤ △T0, the partition area determination component uses the preset third area configuration coefficient β3 to reconfigure the first corresponding partition area M’;

若△T>△T0,所述分区面积确定组件使用预设第四面积配置系数β4对第一对应分区面积M’进行再次配置;If △T>△T0, the partition area determination component uses the preset fourth area configuration coefficient β4 to reconfigure the first corresponding partition area M’;

其中,1<β3<β4,第二对应分区面积M”=M’×βg,其中,βg为预设第g面积配置系数,设定g=3,4。Among them, 1<β3<β4, the second corresponding partition area M”=M’×βg, where βg is the preset g-th area configuration coefficient, and set g=3, 4.

具体而言,能耗设备设有自主恢复功能,同一分区面积内的能耗设备互相连通,相互进行数据备份,在发生设备故障时获取同一分区面积内的其他能耗设备数据完成本机的自主修复。Specifically, energy-consuming equipment has an autonomous recovery function. Energy-consuming equipment within the same partition area is connected to each other and performs data backup for each other. When an equipment failure occurs, the data of other energy-consuming equipment within the same partition area is obtained to complete the autonomous recovery of the machine. repair.

具体而言,所述能耗设备的崩溃恢复时长为能耗设备发生崩溃至能耗设备完成自主修复所需时长。Specifically, the crash recovery time of the energy-consuming device is the time required from the crash of the energy-consuming device to the completion of autonomous repair of the energy-consuming device.

本发明所述系统在对能耗设备的分区面积进行重新配置后,由于减小了能耗设备的分区面积,同一分区面积内的能耗设备也随之减小,在能耗设备发生故障时,由于数据的获取来源减少,导致自主恢复的能力减弱,拉长崩溃恢复所需的时长甚至无法自主恢复,通过对能耗设备的分区面积的二次调节,实现了系统在分区和运行中的均衡发展,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。After the system of the present invention reconfigures the partition area of the energy-consuming equipment, since the partition area of the energy-consuming equipment is reduced, the energy-consuming equipment in the same partition area is also reduced. When the energy-consuming equipment fails, , due to the reduction of data acquisition sources, the ability to autonomously recover is weakened, the time required for crash recovery is lengthened, and even autonomous recovery cannot be achieved. Through the secondary adjustment of the partition area of energy-consuming equipment, the system is realized during partitioning and operation. Balanced development has further improved the detection accuracy and operational stability of the energy consumption monitoring and management system.

请继续参阅图1所示,所述输送稳定性监测模块包括与所述运行稳定性监测单元相连用以根据对第一控制信号发生响应后单位周期能耗设备的崩溃数量在预设数量条件下判定输送有效性低于允许范围的输送监测组件;其中,所述预设数量条件为,单位周期能耗设备的崩溃数量大于预设崩溃数量。Please continue to refer to FIG. 1 . The transportation stability monitoring module includes a module connected to the operation stability monitoring unit to determine the number of crashes of energy-consuming equipment per unit period after responding to the first control signal under a preset number of conditions. A transportation monitoring component that determines that the transportation effectiveness is lower than the allowable range; wherein the preset quantity condition is that the number of crashes of energy-consuming equipment per unit period is greater than the preset number of crashes.

请继续参阅图1所示,所述能源调配信号的接收周期通过单位周期能耗设备的崩溃数量与所述预设崩溃数量的差值进行调节,其中,所述能源调配信号的接收周期与所述差值成反比关系。Please continue to refer to Figure 1. The receiving period of the energy allocation signal is adjusted by the difference between the number of crashes of the energy consuming equipment per unit period and the preset number of crashes, wherein the receiving period of the energy allocation signal is The above difference is inversely proportional to the relationship.

具体而言,单位周期能耗设备的崩溃数量记为S,预设数量记为S0,单位周期能耗设备的崩溃数量与预设数量的差值记为△S,设定△S=S-S0,预设数量差值记为△S0,Specifically, the number of crashes of energy-consuming equipment per unit period is recorded as S, the preset number is recorded as S0, the difference between the number of crashes of energy-consuming equipment per unit period and the preset number is recorded as △S, and △S=S- S0, the preset quantity difference is recorded as △S0,

若△S≤△S0,使用预设第二周期调节系数ζ1对能源调配信号的接收周期D进行调节;If △S ≤ △S0, use the preset second period adjustment coefficient ζ1 to adjust the receiving period D of the energy deployment signal;

若△S>△S0,使用预设第一周期调节系数ζ2对能源调配信号的接收周期D进行调节;If △S>△S0, use the preset first period adjustment coefficient ζ2 to adjust the receiving period D of the energy deployment signal;

其中,0<ζ1<ζ2<1,调节后的能源调配信号的接收周期D’=D×ζk,其中,ζk为预设第k周期调节系数,设定k=1,2。Among them, 0<ζ1<ζ2<1, the reception period of the adjusted energy deployment signal is D’=D×ζk, where ζk is the preset k-th period adjustment coefficient, and k=1,2 is set.

本发明所述系统通过在单位周期能耗设备的崩溃数量超出允许范围后,对能源调配信号的接收周期进行调节,一方面能耗设备的崩溃可能是由于能耗设备获取到的病毒信息导致,通过减小能源调配信号的接收周期,使自主恢复后的能耗设备能及时接收正确的能源配置信号,另一方面,减小能源调配信号的接收周期可以使系统更加及时的响应变化,更及时地调整能源的分配,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。The system of the present invention adjusts the reception period of the energy allocation signal after the number of crashes of energy-consuming equipment per unit period exceeds the allowed range. On the one hand, the collapse of energy-consuming equipment may be caused by virus information obtained by the energy-consuming equipment. By reducing the reception cycle of the energy deployment signal, the energy-consuming equipment after autonomous recovery can receive the correct energy configuration signal in time. On the other hand, reducing the reception cycle of the energy deployment signal can make the system respond to changes in a more timely manner and in a more timely manner. The distribution of energy can be adjusted accordingly, further improving the detection accuracy and operational stability of the energy consumption monitoring and management system.

请继续参阅图4所示,本发明还提供一种智慧能耗监测管理方法,包括:Please continue to refer to Figure 4. The present invention also provides a smart energy consumption monitoring and management method, including:

步骤S1,对达到额定能耗的单位周期内的总使用能耗进行统计并对能耗温度比进行计算,能耗控制模块根据能耗温度比对能耗监测的准确性进行判定;Step S1, collect statistics on the total energy consumption within the unit period that reaches the rated energy consumption and calculate the energy consumption-temperature ratio. The energy consumption control module determines the accuracy of energy consumption monitoring based on the energy consumption-temperature ratio;

步骤S2,当能耗控制模块判定能耗监测的准确性低于允许范围时,对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;Step S2, when the energy consumption control module determines that the accuracy of energy consumption monitoring is lower than the allowed range, adjust the rated energy consumption per unit period, or send out an energy-consuming equipment operation stability monitoring signal;

步骤S3,当运行稳定性监测单元对所述能耗设备运行稳定性监测信号发生响应时,根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积进行重新配置以输出第一对应分区面积,或,输送稳定性监测模块根据单位周期能耗设备的崩溃数量对能源调配信号的接收周期进行调节;Step S3: When the operation stability monitoring unit responds to the operation stability monitoring signal of the energy-consuming equipment, it reconfigures the partition area of the energy-consuming equipment according to the energy consumption variance of different energy-consuming equipment within the unit period to output the first Corresponding to the partition area, or the transportation stability monitoring module adjusts the receiving period of the energy deployment signal according to the number of crashes of energy consuming equipment per unit period;

步骤S4,当运行稳定性监测单元完成对于第一对应分区面积的输出时,恢复有效性监测单元根据能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积。Step S4: When the operation stability monitoring unit completes the output of the first corresponding partition area, the recovery effectiveness monitoring unit reconfigures the first corresponding partition area according to the crash recovery time of the energy consuming equipment to output the second corresponding partition. area.

实施例1,本实施例1在对酒店能耗的监测和管理中设有预设燃气使用体积方差差值△X0=0.9(m3)2,并求得一个周期内一个分区面积M=20m2内不同燃气设备的使用体积方差与预设第一方差的差值△X=0.6(m3)2Embodiment 1. In this embodiment 1, in the monitoring and management of hotel energy consumption, a preset gas usage volume variance difference value Δ The difference between the usage volume variance of different gas equipment within 2 years and the preset first variance △X=0.6(m 3 ) 2 ,

判定△X≤△X0并使用预设第一面积配置系数β1=0.2对分区面积M=20m2进行重新配置,第一对应分区面积M’=20m2×(1-0.2)=16m2Determine △X ≤ △X0 and use the preset first area configuration coefficient β1 = 0.2 to reconfigure the partition area M = 20m 2 . The first corresponding partition area M' = 20m 2 × (1-0.2) = 16m 2 .

本实施例通过根据燃气的使用体积方差对分区面积进行调节,通过减小分区面积能更准确获取故障设备所在的区域,进一步实现了能耗监测管理系统检测准确性和运行稳定性的提高。This embodiment adjusts the partition area according to the gas usage volume variance, and by reducing the partition area, the area where the faulty equipment is located can be more accurately obtained, further improving the detection accuracy and operation stability of the energy consumption monitoring management system.

至此,已经结合附图所示的优选实施方式描述了本发明的技术方案,但是,本领域技术人员容易理解的是,本发明的保护范围显然不局限于这些具体实施方式。在不偏离本发明的原理的前提下,本领域技术人员可以对相关技术特征做出等同的更改或替换,这些更改或替换之后的技术方案都将落入本发明的保护范围之内。So far, the technical solution of the present invention has been described with reference to the preferred embodiments shown in the drawings. However, those skilled in the art can easily understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or replacements to relevant technical features, and the technical solutions after these changes or replacements will fall within the protection scope of the present invention.

Claims (4)

1.一种智慧能耗监测管理系统,其特征在于,包括:1. A smart energy consumption monitoring and management system, which is characterized by including: 能耗控制模块,用以根据能耗温度比对能耗监测的准确性进行判定,并在判定能耗监测的准确性低于允许范围时对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;The energy consumption control module is used to determine the accuracy of energy consumption monitoring based on the energy consumption temperature ratio, and when it is determined that the accuracy of energy consumption monitoring is lower than the allowable range, adjust the rated energy consumption per unit period, or emit energy Consuming equipment operation stability monitoring signals; 能耗设备监测模块,其与所述能耗控制模块相连,用以对能耗设备的分区面积进行控制,包括运行稳定性监测单元和恢复有效性监测单元,其中,An energy-consuming equipment monitoring module, which is connected to the energy-consuming control module and is used to control the partition area of energy-consuming equipment, including an operation stability monitoring unit and a recovery effectiveness monitoring unit, wherein, 所述运行稳定性监测单元用以在对所述能耗设备运行稳定性监测信号产生响应时根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积重新配置以输出第一对应分区面积,或,发出第一控制信号;The operation stability monitoring unit is used to reconfigure the partition area of the energy consumption equipment according to the energy consumption variance of different energy consumption equipment within the unit period when responding to the energy consumption equipment operation stability monitoring signal to output the first corresponding Partition area, or, sends the first control signal; 所述恢复有效性监测单元与所述运行稳定性监测单元相连,用以根据输出第一对应分区面积后的能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积;The recovery effectiveness monitoring unit is connected to the operation stability monitoring unit and is used to reconfigure the first corresponding partition area to output the second corresponding partition area according to the crash recovery time of the energy consuming equipment after outputting the first corresponding partition area. Corresponding partition area; 输送稳定性监测模块,其与所述能耗设备监测模块相连,用以在对所述第一控制信号产生响应时根据能耗设备的崩溃数量对能耗设备的能源调配信号的接收周期进行调节;A transportation stability monitoring module, connected to the energy-consuming equipment monitoring module, used to adjust the reception period of the energy deployment signal of the energy-consuming equipment according to the number of crashes of the energy-consuming equipment when responding to the first control signal. ; 所述能耗控制模块包括:The energy consumption control module includes: 能耗统计组件,用以对达到额定能耗的单位周期内的总使用能耗进行统计并对能耗温度比进行计算;其中,所述能耗温度比为单位周期内单个分区面积中若干能耗设备的总使用能耗与能耗设备的平均温度的比值;The energy consumption statistics component is used to count the total energy consumption within the unit period when the rated energy consumption is reached and calculate the energy consumption temperature ratio; wherein the energy consumption temperature ratio is the number of energy consumption in a single partition area within the unit period. The ratio of the total energy consumption of energy-consuming equipment to the average temperature of energy-consuming equipment; 能耗监测准确性判定组件,其与所述能耗统计组件相连,用以在能耗温度比满足预设第一比值条件或预设第二比值条件时判定能耗监测的准确性低于允许范围;An energy consumption monitoring accuracy determination component is connected to the energy consumption statistics component to determine that the accuracy of energy consumption monitoring is lower than allowed when the energy consumption temperature ratio meets the preset first ratio condition or the preset second ratio condition. scope; 其中,所述预设第一比值条件为,能耗温度比大于预设第一比值且小于等于预设第二比值;所述预设第二比值条件为,能耗温度比大于预设第二比值;所述预设第一比值小于所述预设第二比值;Wherein, the preset first ratio condition is that the energy consumption temperature ratio is greater than the preset first ratio and less than or equal to the preset second ratio; the preset second ratio condition is that the energy consumption temperature ratio is greater than the preset second ratio. Ratio; the preset first ratio is less than the preset second ratio; 所述运行稳定性监测单元包括:The operational stability monitoring unit includes: 方差计算组件,其与所述能耗控制模块相连,用以在对所述能耗设备运行稳定性监测信号发生响应时对单位周期内不同能耗设备的能耗方差进行计算;A variance calculation component, which is connected to the energy consumption control module and is used to calculate the energy consumption variance of different energy consumption equipment within a unit period when responding to the operation stability monitoring signal of the energy consumption equipment; 运行稳定性判定组件,其与所述方差计算组件相连,用以在单位周期内不同能耗设备的能耗方差满足预设第一方差条件或预设第二方差条件时判定能耗设备运行稳定性低于允许范围,An operation stability determination component, which is connected to the variance calculation component and is used to determine the operation of the energy consumption equipment when the energy consumption variance of different energy consumption equipment in the unit period meets the preset first variance condition or the preset second variance condition. The stability is lower than the allowable range, 其中,所述预设第一方差条件为,单位周期内不同能耗设备的能耗方差大于预设第一方差且小于等于预设第二方差;所述预设第二方差条件为,单位周期内不同能耗设备的能耗方差大于预设第二方差;所述预设第一方差小于所述预设第二方差;Wherein, the preset first variance condition is that the energy consumption variance of different energy consuming equipment within a unit period is greater than the preset first variance and less than or equal to the preset second variance; the preset second variance condition is, The energy consumption variance of different energy-consuming equipment within the unit period is greater than the preset second variance; the preset first variance is less than the preset second variance; 所述运行稳定性监测单元还包括:The operational stability monitoring unit also includes: 分区面积配置组件,其与所述运行稳定性判定组件相连,用以在所述单位周期内不同能耗设备的能耗方差仅满足预设第一方差条件时根据单位周期内不同能耗设备的能耗方差与预设第一方差的差值对能耗设备的分区面积进行重新配置以输出第一对应分区面积;A partition area configuration component, which is connected to the operation stability determination component, and is used to determine the energy consumption of different energy-consuming devices within the unit period when the energy consumption variance of the different energy-consuming devices only meets the preset first variance condition. The difference between the energy consumption variance and the preset first variance reconfigures the partition area of the energy-consuming device to output the first corresponding partition area; 控制信号发射端,其与所述运行稳定性判定组件相连,用以在所述单位周期内不同能耗设备的能耗方差仅满足预设第二方差条件时发出针对第一控制信号;A control signal transmitting end connected to the operation stability determination component to send a first control signal when the energy consumption variance of different energy consuming equipment within the unit period only meets the preset second variance condition; 其中,所述第一对应分区面积与所述单位周期内不同能耗设备的能耗方差与预设第一方差的差值成反比;Wherein, the first corresponding partition area is inversely proportional to the difference between the energy consumption variance of different energy-consuming devices in the unit period and the preset first variance; 所述恢复有效性监测单元包括:The recovery effectiveness monitoring unit includes: 时长统计组件,用以对输出第一对应分区面积后的能耗设备的崩溃恢复时长进行统计;The duration statistics component is used to count the crash recovery duration of energy-consuming equipment after outputting the first corresponding partition area; 有效性监测组件,其与所述时长统计组件相连,用以在能耗设备的崩溃恢复时长满足预设时长条件时判定能耗设备恢复有效性低于允许范围;A validity monitoring component, which is connected to the duration statistics component, and is used to determine that the recovery effectiveness of the energy consuming device is lower than the allowed range when the crash recovery duration of the energy consuming device meets the preset duration condition; 其中,所述预设时长条件为,能耗设备的崩溃恢复时长大于预设时长;Wherein, the preset duration condition is that the crash recovery duration of the energy-consuming equipment is greater than the preset duration; 所述恢复有效性监测单元还包括与所述有效性监测组件相连用以在预设时长条件下根据能耗设备的崩溃恢复时长与预设时长的差值对所述第一对应分区面积进行再次配置以输出第二对应分区面积的分区面积确定组件;The recovery effectiveness monitoring unit also includes a method connected to the effectiveness monitoring component for re-evaluating the first corresponding partition area according to the difference between the crash recovery time of the energy-consuming equipment and the preset time under a preset time condition. a partition area determination component configured to output a second corresponding partition area; 所述能源调配信号的接收周期通过单位周期能耗设备的崩溃数量与所述预设崩溃数量的差值进行调节,其中,所述能源调配信号的接收周期与所述差值成反比关系。The reception period of the energy deployment signal is adjusted by the difference between the number of crashes of the energy consuming equipment per unit period and the preset number of crashes, wherein the reception period of the energy deployment signal is inversely proportional to the difference. 2.根据权利要求1所述的智慧能耗监测管理系统,其特征在于,所述能耗控制模块还包括:2. The smart energy consumption monitoring and management system according to claim 1, characterized in that the energy consumption control module further includes: 额定能耗更新组件,其与所述能耗监测准确性判定组件相连,用以在所述能耗温度比仅满足预设第一比值条件时根据能耗温度比和预设第一比值的差值对单位周期的额定能耗进行调节;Rated energy consumption update component, which is connected to the energy consumption monitoring accuracy determination component, and is used to calculate the difference between the energy consumption temperature ratio and the preset first ratio when the energy consumption temperature ratio only meets the preset first ratio condition. The value adjusts the rated energy consumption per unit cycle; 运行稳定性监测信号发射端,其与所述能耗监测准确性判定组件相连,用以在所述能耗温度比仅满足预设第二比值条件时发出能耗设备运行稳定性监测信号。An operation stability monitoring signal transmitting end is connected to the energy consumption monitoring accuracy determination component, and is used to send an energy consumption equipment operation stability monitoring signal when the energy consumption temperature ratio only meets the preset second ratio condition. 3.根据权利要求1所述的智慧能耗监测管理系统,其特征在于,所述输送稳定性监测模块包括与所述运行稳定性监测单元相连用以根据对第一控制信号发生响应后单位周期能耗设备的崩溃数量在预设数量条件下判定输送有效性低于允许范围的输送监测组件;其中,所述预设数量条件为,单位周期能耗设备的崩溃数量大于预设崩溃数量;3. The smart energy consumption monitoring and management system according to claim 1, characterized in that the transportation stability monitoring module includes a unit connected to the operation stability monitoring unit for responding to the first control signal according to the unit cycle. A transportation monitoring component that determines that the number of crashes of energy-consuming equipment is lower than the allowed range under a preset quantity condition; wherein the preset quantity condition is that the number of crashes of energy-consuming equipment per unit period is greater than the preset number of crashes; 所述能源调配信号的接收周期通过单位周期能耗设备的崩溃数量与所述预设崩溃数量的差值进行调节,其中,所述能源调配信号的接收周期与所述差值成反比关系。The reception period of the energy deployment signal is adjusted by the difference between the number of crashes of the energy consuming equipment per unit period and the preset number of crashes, wherein the reception period of the energy deployment signal is inversely proportional to the difference. 4.一种应用于权利要求1-3任一权利要求所述的智慧能耗监测管理系统的能耗监测管理方法,其特征在于,包括:4. An energy consumption monitoring and management method applied to the smart energy consumption monitoring and management system according to any one of claims 1 to 3, characterized in that it includes: 步骤S1,对达到额定能耗的单位周期内的总使用能耗进行统计并对能耗温度比进行计算,能耗控制模块根据能耗温度比对能耗监测的准确性进行判定;Step S1, collect statistics on the total energy consumption within the unit period that reaches the rated energy consumption and calculate the energy consumption-temperature ratio. The energy consumption control module determines the accuracy of energy consumption monitoring based on the energy consumption-temperature ratio; 步骤S2,当能耗控制模块判定能耗监测的准确性低于允许范围时,对单位周期的额定能耗进行调节,或,发出能耗设备运行稳定性监测信号;Step S2, when the energy consumption control module determines that the accuracy of energy consumption monitoring is lower than the allowed range, adjust the rated energy consumption per unit period, or send out an energy-consuming equipment operation stability monitoring signal; 步骤S3,当运行稳定性监测单元对所述能耗设备运行稳定性监测信号发生响应时,根据单位周期内不同能耗设备的能耗方差对能耗设备的分区面积进行重新配置以输出第一对应分区面积,或,输送稳定性监测模块根据单位周期能耗设备的崩溃数量对能源调配信号的接收周期进行调节;Step S3: When the operation stability monitoring unit responds to the operation stability monitoring signal of the energy-consuming equipment, it reconfigures the partition area of the energy-consuming equipment according to the energy consumption variance of different energy-consuming equipment within the unit period to output the first Corresponding to the partition area, or the transportation stability monitoring module adjusts the receiving period of the energy deployment signal according to the number of crashes of energy consuming equipment per unit period; 步骤S4,当运行稳定性监测单元完成对于第一对应分区面积的输出时,恢复有效性监测单元根据能耗设备的崩溃恢复时长对所述第一对应分区面积进行再次配置以输出第二对应分区面积。Step S4: When the operation stability monitoring unit completes the output of the first corresponding partition area, the recovery effectiveness monitoring unit reconfigures the first corresponding partition area according to the crash recovery time of the energy consuming equipment to output the second corresponding partition. area.
CN202311812273.1A 2023-12-27 2023-12-27 Intelligent energy consumption monitoring and management system and method Active CN117474366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311812273.1A CN117474366B (en) 2023-12-27 2023-12-27 Intelligent energy consumption monitoring and management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311812273.1A CN117474366B (en) 2023-12-27 2023-12-27 Intelligent energy consumption monitoring and management system and method

Publications (2)

Publication Number Publication Date
CN117474366A CN117474366A (en) 2024-01-30
CN117474366B true CN117474366B (en) 2024-03-19

Family

ID=89624098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311812273.1A Active CN117474366B (en) 2023-12-27 2023-12-27 Intelligent energy consumption monitoring and management system and method

Country Status (1)

Country Link
CN (1) CN117474366B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102193544A (en) * 2011-03-25 2011-09-21 汉鼎信息科技股份有限公司 Intelligent building energy management system
CA2839192A1 (en) * 2011-06-13 2012-12-20 Gridpoint, Inc. Controlling the setback and setback recovery of a power-consuming device
CN110276699A (en) * 2019-06-21 2019-09-24 广州远正智能科技股份有限公司 A kind of public organizations' energy consumption quota index formulating method, system and storage medium
CN111915124A (en) * 2020-06-08 2020-11-10 国网江西省电力有限公司赣州供电分公司 A distribution network management and control method applied to new energy access parks
CN113028596A (en) * 2021-03-18 2021-06-25 清华大学 Energy consumption evaluation and diagnosis method and system for air conditioning system
CN116207866A (en) * 2023-05-05 2023-06-02 攀枝花钢城集团瑞泰电器有限公司 Comprehensive evaluation system for power quality of power distribution network and treatment method thereof
CN116823531A (en) * 2023-07-13 2023-09-29 广州市第二市政工程有限公司 Building energy consumption management system based on BIM building
CN117057670A (en) * 2023-09-21 2023-11-14 江西嘉和物业有限公司 Property intelligent energy management system based on Internet of things
CN117097030A (en) * 2023-10-19 2023-11-21 北京爱朗格瑞科技有限公司 Intelligent operation monitoring system for power grid distribution terminal
CN117176473A (en) * 2023-11-02 2023-12-05 北京创元天成科技发展有限公司 Client information management method and system based on Internet of things

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2973928A4 (en) * 2013-03-14 2016-11-02 Powerwise Group Inc Autonomous smart grid demand measurement system and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102193544A (en) * 2011-03-25 2011-09-21 汉鼎信息科技股份有限公司 Intelligent building energy management system
CA2839192A1 (en) * 2011-06-13 2012-12-20 Gridpoint, Inc. Controlling the setback and setback recovery of a power-consuming device
CN110276699A (en) * 2019-06-21 2019-09-24 广州远正智能科技股份有限公司 A kind of public organizations' energy consumption quota index formulating method, system and storage medium
CN111915124A (en) * 2020-06-08 2020-11-10 国网江西省电力有限公司赣州供电分公司 A distribution network management and control method applied to new energy access parks
CN113028596A (en) * 2021-03-18 2021-06-25 清华大学 Energy consumption evaluation and diagnosis method and system for air conditioning system
CN116207866A (en) * 2023-05-05 2023-06-02 攀枝花钢城集团瑞泰电器有限公司 Comprehensive evaluation system for power quality of power distribution network and treatment method thereof
CN116823531A (en) * 2023-07-13 2023-09-29 广州市第二市政工程有限公司 Building energy consumption management system based on BIM building
CN117057670A (en) * 2023-09-21 2023-11-14 江西嘉和物业有限公司 Property intelligent energy management system based on Internet of things
CN117097030A (en) * 2023-10-19 2023-11-21 北京爱朗格瑞科技有限公司 Intelligent operation monitoring system for power grid distribution terminal
CN117176473A (en) * 2023-11-02 2023-12-05 北京创元天成科技发展有限公司 Client information management method and system based on Internet of things

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
冯志强 ; .电力系统安全监测控制研究.中国高新技术企业.2016,(04),全文. *
工业能源监控系统功能研究;章帆;;科技展望;20160430(12);全文 *
电力系统安全监测控制研究;冯志强;;中国高新技术企业;20160201(04);全文 *
章帆 ; .工业能源监控系统功能研究.科技展望.2016,(12),全文. *

Also Published As

Publication number Publication date
CN117474366A (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN105915388B (en) A kind of Transducer-fault Detecting Method and system based on distributed network
CN106110889B (en) A kind of counter-infiltration system Breakdown forecast and diagnosis method, apparatus and system
US12044604B2 (en) Method and smart gas internet of things (IoT) system for metering anti-interference of gas ultrasonic meter
CN108919935A (en) Monitoring method, device and equipment for power supply on server mainboard
US20240003501A1 (en) Methods and smart gas internet of things (iot) systems for remote control of ultrasonic metering devices
CN112751726B (en) Data processing method and device, electronic equipment and storage medium
CN110285853A (en) A LoRaWAN-based transmission line monitoring device and system
KR102059112B1 (en) IoT STREAM DATA QUALITY MEASUREMENT INDICATORS AND PROFILING METHOD FOR INTERNET OF THINGS AND SYSTEM THEREFORE
TWM605603U (en) Electronic device for detecting abnormality of equipment based on machine learning
CN118552183A (en) Intelligent water affair state on-line monitoring management system
CN111309502A (en) Solid state disk service life prediction method
CN111682925B (en) Data acquisition and processing method for intelligent street lamp
CN117474366B (en) Intelligent energy consumption monitoring and management system and method
CN208296201U (en) A kind of air quantity automatic regulating system
CN109990946B (en) Pressure transmitter with fault self-checking function and fault self-checking method thereof
CN109990803A (en) The method, apparatus of method, apparatus and the sensor processing of detection system exception
CN106195247A (en) A kind of control system of speed variator based on big Db Management Model
CA3004773C (en) Detecting an error condition by monitoring a resource flow at a premises
CN117786331A (en) Water meter consumption real-time monitoring and control system
CN102736588B (en) Monitoring method and system
Timotheou et al. Moving horizon fault-tolerant traffic state estimation for the cell transmission model
CN113915535B (en) Urban gas pipe network monitoring system and control method thereof
CN110455370A (en) Flood-control and drought relief long-haul telemetry display system
CN111989896A (en) Dependency control in a network of devices
CN116108686A (en) Water supply network operation and maintenance wisdom water affair management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant