CN116951439A - Prefabricated middle pipeline butt joint structure with compensation function - Google Patents
Prefabricated middle pipeline butt joint structure with compensation function Download PDFInfo
- Publication number
- CN116951439A CN116951439A CN202310389781.7A CN202310389781A CN116951439A CN 116951439 A CN116951439 A CN 116951439A CN 202310389781 A CN202310389781 A CN 202310389781A CN 116951439 A CN116951439 A CN 116951439A
- Authority
- CN
- China
- Prior art keywords
- pipe
- notch
- pipeline
- socket
- butt joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 210000001503 joint Anatomy 0.000 title claims abstract description 10
- 238000007789 sealing Methods 0.000 claims abstract description 41
- 239000000565 sealant Substances 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 6
- 230000008602 contraction Effects 0.000 abstract description 4
- 239000000779 smoke Substances 0.000 abstract description 4
- 230000005856 abnormality Effects 0.000 abstract description 3
- 206010022000 influenza Diseases 0.000 abstract 1
- 238000003032 molecular docking Methods 0.000 description 12
- 238000009434 installation Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 5
- 238000011900 installation process Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J13/00—Fittings for chimneys or flues
- F23J13/04—Joints; Connections
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L51/00—Expansion-compensation arrangements for pipe-lines
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Joints Allowing Movement (AREA)
Abstract
Description
技术领域Technical field
本方面涉及烟囱设备技术领域,特别涉及一种具有补偿功能的预制式中间管道对接结构。This aspect relates to the technical field of chimney equipment, and in particular to a prefabricated intermediate pipe docking structure with a compensation function.
背景技术Background technique
在烟囱系统项目安装过程中,现场安装管线错综复杂,管道走向相互影响,经常会出现管道前后安装完成后需要在中间将管道进行对接,而预留空间一般与管道长度一致,且法兰面上连接口需要打上密封绳或密封胶,导致在安装过程中存在以下问题和缺点:1、安装对接过程困难;2、管道间为刚性连接,管道需在有变形或破坏的情况下对接完成,影响产品质量;3、中间对接时因管道需要挤压进去,法兰面上的密封绳或密封胶在安装后存在错位的问题,且无法检查,影响管道的密封性能和使用性能。During the installation process of the chimney system project, the on-site installation pipelines are complicated and the pipeline directions affect each other. It often happens that the pipelines need to be docked in the middle after the front and rear pipelines are installed. The reserved space is generally consistent with the length of the pipeline, and the flange surface is connected The mouth needs to be sealed with a sealing rope or sealant, which leads to the following problems and shortcomings during the installation process: 1. The installation and docking process is difficult; 2. The pipes are rigidly connected, and the pipes need to be docked if they are deformed or damaged, which affects the product. Quality; 3. Because the pipeline needs to be squeezed in during the middle joint, the sealing rope or sealant on the flange surface will be misaligned after installation and cannot be inspected, affecting the sealing performance and performance of the pipeline.
发明内容Contents of the invention
针对现有技术存在的不足,本方面的主要目的在于提供一种能够解决负压管道及正压管道的中间烟道对接时产生的质量及密封问题,避免管道使用后产生漏烟、漏气等异常。同时该结构放在高温管道内能吸收管道膨胀量,解决管道热胀冷缩的问题的具有补偿功能的预制式中间管道对接结构。In view of the shortcomings of the existing technology, the main purpose of this aspect is to provide a method that can solve the quality and sealing problems caused by the docking of the intermediate flue of the negative pressure pipeline and the positive pressure pipeline, and avoid smoke leakage, air leakage, etc. after the pipeline is used. abnormal. At the same time, this structure is a prefabricated intermediate pipe docking structure with compensation function that can absorb the expansion of the pipe when placed in a high-temperature pipe and solve the problem of thermal expansion and contraction of the pipe.
为实现上述目的,本方面提供了如下技术方案:一种具有补偿功能的预制式中间管道对接结构,包括已安装上管、已安装下管以及设置在已安装上管和已安装下管之间的中间承插组合管,所述中间承插组合管包括内层固定管以及套设在内层固定管上的承插活动管,所述承插活动管的顶部设置有若干个槽口,每个槽口处均设置有槽口扣件以及设置在槽口扣件上且能够将槽口紧固的锁紧螺栓,所述内层固定管可在承插活动管内移动并通过若干个槽口处的锁紧螺栓紧固,所述已安装上管的底部和已安装下管的顶部均设置有连接法兰,所述内层固定管的顶部设置有与已安装上管连接法兰对接的上口法兰,所述承插活动管的底部设置有与已安装下管连接法兰对接的下口法兰。In order to achieve the above purpose, this aspect provides the following technical solution: a prefabricated intermediate pipe docking structure with compensation function, including an installed upper pipe, an installed lower pipe, and is arranged between the installed upper pipe and the installed lower pipe. The intermediate socket combined pipe includes an inner fixed pipe and a socket movable pipe sleeved on the inner fixed pipe. The top of the socket movable pipe is provided with several notches. Each notch is provided with a notch fastener and a locking bolt provided on the notch fastener and capable of tightening the notch. The inner fixed tube can move within the socket movable tube and pass through several notches. The locking bolts at The upper flange is provided at the bottom of the socket movable pipe with a lower flange that is connected to the installed lower pipe connecting flange.
优选的,所述承插活动管上在所述若干个槽口的下方设置有密封压槽,所述密封压槽内设置有能够贴附内层活动管的密封圈。Preferably, the socket movable tube is provided with a sealing pressure groove below the plurality of notches, and a sealing ring capable of adhering to the inner movable tube is provided in the sealing pressure groove.
优选的,所述上口法兰与下口法兰上均设置有密封绳或密封胶。Preferably, the upper flange and the lower flange are both provided with sealing ropes or sealants.
优选的,所述上口法兰与已安装上管连接法兰之间通过U型卡圈固定密封连接,所述下口法兰与已安装下管连接法兰之间同样通过U型卡圈固定密封连接。Preferably, the upper opening flange and the installed upper pipe connecting flange are fixedly and sealedly connected through a U-shaped clamp ring, and the lower opening flange and the installed lower pipe connecting flange are also connected through a U-shaped clamping ring. Fixed sealed connection.
本方面相对于现有技术具有如下优点,能够解决负压管道及正压管道的中间烟道对接时产生的质量及密封问题,避免管道使用后产生漏烟、漏气等异常。同时该结构放在高温管道内能吸收管道膨胀量,解决管道热胀冷缩的问题。Compared with the existing technology, this aspect has the following advantages: it can solve the quality and sealing problems caused when the middle flue of the negative pressure pipeline and the positive pressure pipeline are connected, and avoid smoke leakage, air leakage and other abnormalities after the pipeline is used. At the same time, the structure placed in a high-temperature pipeline can absorb the expansion of the pipeline and solve the problem of thermal expansion and contraction of the pipeline.
具体结构方面,中间承插组合管包括内层固定管、承插活动管、密封压槽、密封圈、承插管槽口、槽口扣件以及锁紧螺栓。其中承插活动管的内管径尺寸略大于内层固定管的外管径尺寸,承插活动管一端有密封压槽及承插管槽口,密封压槽内填充密封圈,承插槽口两侧均点焊槽口扣件。安装时,由承插活动管插入内层固定管,当插到需要的位置时,均匀拧紧槽口扣件上的锁紧螺栓,将承插活动管一端收紧,以确保内层固定管与承插活动管固定牢固,并通过密封压槽内的密封圈将管道空隙密封严实。In terms of specific structure, the intermediate socket combined pipe includes an inner fixed pipe, a movable socket pipe, a sealing pressure groove, a sealing ring, a socket pipe notch, a notch fastener and a locking bolt. The inner diameter of the socket movable pipe is slightly larger than the outer diameter of the inner fixed pipe. One end of the socket movable pipe has a sealing pressure groove and a socket pipe notch. The sealing pressure groove is filled with a sealing ring, and the socket notch is filled with a sealing ring. Spot welded notch fasteners on both sides. During installation, insert the socket movable tube into the inner fixed tube. When it is inserted into the required position, tighten the locking bolts on the notch fastener evenly and tighten one end of the socket movable tube to ensure that the inner fixed tube is in contact with the inner fixed tube. The socket movable pipe is firmly fixed, and the pipe gap is tightly sealed through the sealing ring in the sealing pressure groove.
中间承插组合管在于已安装上管和已安装下管连接时,在上口法兰和下口法兰的两端打上密封绳或密封胶,将其装进已安装上管和已安装下管的中间,并将上口法兰安装固定好,松开槽口扣件的锁紧螺栓,将承插活动管拉至已安装管位置,固定牢固后,将下口法兰安装完成,同时锁紧槽口扣件上的锁紧螺栓。When the intermediate socket combined pipe is connected to the installed upper pipe and the installed lower pipe, put sealing rope or sealant on both ends of the upper flange and the lower flange, and install them into the installed upper pipe and the installed lower pipe. In the middle of the pipe, install and fix the upper flange, loosen the locking bolt of the notch fastener, and pull the socket movable pipe to the position of the installed pipe. After it is firmly fixed, complete the installation of the lower flange. Tighten the locking bolt on the notch fastener.
其中高温管道补偿工作原理是:已经安装完成的管道,对于中间承插组合管,因其内层固定管与承插活动管不是刚性固定连接,且承插活动管上的密封圈紧贴内层固定管后无限位结构,其相对于内层固定管可以自由地上下滑动,当管道受热膨胀时,单节结构管可以吸收管道的热膨胀量,进而对管道起到保护的作用。Among them, the working principle of high-temperature pipeline compensation is: for the installed pipeline, for the intermediate socket combined pipe, the inner fixed pipe and the socket movable pipe are not rigidly fixed, and the sealing ring on the socket movable pipe is close to the inner layer There is an infinite structure behind the fixed pipe, which can slide up and down freely relative to the inner fixed pipe. When the pipe expands due to heat, the single-section structural pipe can absorb the thermal expansion of the pipe, thereby protecting the pipe.
本方案的优势在于:1、方便工程安装;2、避免在管道安装对接过程中的变形和破坏;3、可以更加直观地对密封垫进行检查,保证管道的密封性能和使用性能;4、此结构无论正压、负压管道均能适用。。The advantages of this solution are: 1. Convenient engineering installation; 2. Avoid deformation and damage during the pipeline installation and docking process; 3. The sealing gasket can be inspected more intuitively to ensure the sealing performance and usability of the pipeline; 4. This The structure can be applied to both positive pressure and negative pressure pipelines. .
附图说明Description of the drawings
图1为本方面的中间承插组合管的结构示意图;Figure 1 is a schematic structural diagram of the intermediate socket combined pipe in this aspect;
图2为图1中A部放大结构示意图;Figure 2 is an enlarged structural diagram of part A in Figure 1;
图3为本方面的中间承插组合管的部分剖视图;Figure 3 is a partial cross-sectional view of the intermediate socket combined pipe in this aspect;
图4为本方面的承插活动管的结构示意图;Figure 4 is a schematic structural diagram of the socket movable pipe in this aspect;
图5为本方面对接安装过程中的结构示意图;Figure 5 is a schematic structural diagram of the docking installation process in this aspect;
图6为本方面对接安装完成后的结构示意图。Figure 6 is a schematic structural diagram of this aspect after the docking installation is completed.
图中:1、已安装上管;2、已安装下管;3、中间承插组合管;4、内层固定管;5、承插活动管;6、槽口;7、槽口扣件;8、锁紧螺栓;9、连接法兰;10、上口法兰;11、下口法兰;12、密封压槽;13、密封圈;14、U型卡圈。In the picture: 1. The upper tube has been installed; 2. The lower tube has been installed; 3. The middle socket combination tube; 4. The inner fixed tube; 5. The socket movable tube; 6. The notch; 7. The notch fastener ; 8. Locking bolt; 9. Connecting flange; 10. Upper flange; 11. Lower flange; 12. Seal pressure groove; 13. Seal ring; 14. U-shaped clamp ring.
实施方式Implementation
下面结合附图对本方面作进一步说明。This aspect will be further explained below in conjunction with the accompanying drawings.
如图1所示,一种具有补偿功能的预制式中间管道对接结构,包括已安装上管1、已安装下管2以及设置在已安装上管1和已安装下管2之间的中间承插组合管3,所述中间承插组合管3包括内层固定管4以及套设在内层固定管4上的承插活动管5,所述承插活动管5的顶部设置有若干个槽口6,每个槽口6处均设置有槽口扣件7以及设置在槽口扣件7上且能够将槽口6紧固的锁紧螺栓8,所述内层固定管4可在承插活动管5内移动并通过若干个槽口6处的锁紧螺栓8紧固,所述已安装上管1的底部和已安装下管2的顶部均设置有连接法兰9,所述内层固定管4的顶部设置有与已安装上管1连接法兰9对接的上口法兰10,所述承插活动管5的底部设置有与已安装下管2连接法兰9对接的下口法兰11。As shown in Figure 1, a prefabricated intermediate pipe docking structure with compensation function includes an installed upper pipe 1, an installed lower pipe 2, and an intermediate bearing arranged between the installed upper pipe 1 and the installed lower pipe 2. The middle socket combination pipe 3 includes an inner fixed tube 4 and a socket movable tube 5 sleeved on the inner fixed tube 4. The top of the socket movable tube 5 is provided with several grooves. Each notch 6 is provided with a notch fastener 7 and a locking bolt 8 provided on the notch fastener 7 and capable of tightening the notch 6. The inner fixed tube 4 can be mounted on the bearing. The movable tube 5 is inserted and moved inside and tightened by locking bolts 8 at several notches 6. The bottom of the installed upper tube 1 and the top of the installed lower tube 2 are both provided with connecting flanges 9. The inner The top of the layer fixed pipe 4 is provided with an upper flange 10 that is connected to the connecting flange 9 of the installed upper pipe 1, and the bottom of the socket movable pipe 5 is provided with a lower flange that is connected to the connecting flange 9 of the installed lower pipe 2. Mouth flange 11.
优选的,所述承插活动管5上在所述若干个槽口6的下方设置有密封压槽12,所述密封压槽12内设置有能够贴附内层活动管的密封圈13。Preferably, the socket movable tube 5 is provided with a sealing pressure groove 12 below the plurality of notches 6, and a sealing ring 13 capable of adhering to the inner movable tube is provided in the sealing pressure groove 12.
优选的,所述上口法兰10与下口法兰11上均设置有密封绳或密封胶。Preferably, the upper flange 10 and the lower flange 11 are both provided with sealing ropes or sealants.
优选的,所述上口法兰10与已安装上管1连接法兰9之间通过U型卡圈14固定密封连接,所述下口法兰11与已安装下管2连接法兰9之间同样通过U型卡圈14固定密封连接。Preferably, the upper flange 10 and the connecting flange 9 of the installed upper tube 1 are fixed and sealed through a U-shaped clamp ring 14, and the lower flange 11 and the connecting flange 9 of the installed lower tube 2 are connected. They are also fixedly and tightly connected through U-shaped clamping rings 14.
本方案的一种具有补偿功能的预制式中间管道对接结构,能够解决负压管道及正压管道的中间烟道对接时产生的质量及密封问题,避免管道使用后产生漏烟、漏气等异常。同时该结构放在高温管道内能吸收管道膨胀量,解决管道热胀冷缩的问题。This solution is a prefabricated intermediate pipe docking structure with compensation function, which can solve the quality and sealing problems caused by the docking of the intermediate flue of negative pressure pipes and positive pressure pipes, and avoid smoke leakage, air leakage and other abnormalities after the pipe is used. . At the same time, the structure placed in a high-temperature pipeline can absorb the expansion of the pipeline and solve the problem of thermal expansion and contraction of the pipeline.
具体结构方面,中间承插组合管3包括内层固定管4、承插活动管5、密封压槽12、密封圈13、承插管槽口6、槽口扣件7以及锁紧螺栓8。其中承插活动管5的内管径尺寸略大于内层固定管4的外管径尺寸,承插活动管5一端有密封压槽12及承插管槽口6,密封压槽12内填充密封圈13,承插槽口6两侧均点焊槽口扣件7。安装时,由承插活动管5插入内层固定管4,当插到需要的位置时,均匀拧紧槽口扣件7上的锁紧螺栓8,将承插活动管5一端收紧,以确保内层固定管4与承插活动管5固定牢固,并通过密封压槽12内的密封圈13将管道空隙密封严实。In terms of specific structure, the intermediate socket combined pipe 3 includes an inner fixed pipe 4, a movable socket pipe 5, a sealing pressure groove 12, a sealing ring 13, a socket pipe notch 6, a notch fastener 7 and a locking bolt 8. The inner diameter of the socket movable pipe 5 is slightly larger than the outer diameter of the inner fixed pipe 4. One end of the socket movable pipe 5 has a sealing pressure groove 12 and a socket pipe notch 6. The sealing pressure groove 12 is filled with a seal. Ring 13, the notch fasteners 7 are spot welded on both sides of the socket notch 6. During installation, insert the socket movable tube 5 into the inner fixed tube 4. When it is inserted into the required position, evenly tighten the locking bolts 8 on the notch fastener 7 and tighten one end of the socket movable tube 5 to ensure The inner fixed pipe 4 and the socket movable pipe 5 are firmly fixed, and the pipe gap is tightly sealed by the sealing ring 13 in the sealing pressure groove 12.
中间承插组合管3在于已安装上管1和已安装下管2连接时,在上口法兰10和下口法兰11的两端打上密封绳或密封胶,将其装进已安装上管1和已安装下管2的中间,并将上口法兰10安装固定好,松开槽口扣件7的锁紧螺栓8,将承插活动管5拉至已安装管位置,固定牢固后,将下口法兰11安装完成,同时锁紧槽口扣件7上的锁紧螺栓8。When the intermediate socket combined pipe 3 is connected to the installed upper pipe 1 and the installed lower pipe 2, put sealing rope or sealant on both ends of the upper flange 10 and the lower flange 11, and install them into the installed upper pipe. Between pipe 1 and the installed lower pipe 2, install and fix the upper flange 10, loosen the locking bolt 8 of the notch fastener 7, pull the socket movable pipe 5 to the position of the installed pipe, and fix it firmly Finally, the lower flange 11 is installed, and the locking bolt 8 on the notch fastener 7 is locked at the same time.
其中高温管道补偿工作原理是:已经安装完成的管道,对于中间承插组合管3,因其内层固定管4与承插活动管5不是刚性固定连接,且承插活动管5上的密封圈13紧贴内层固定管4后无限位结构,其相对于内层固定管4可以自由地上下滑动,当管道受热膨胀时,单节结构管可以吸收管道的热膨胀量,进而对管道起到保护的作用。The working principle of high-temperature pipeline compensation is: for the installed pipeline, for the intermediate socket combined pipe 3, the inner fixed pipe 4 and the socket movable pipe 5 are not rigidly connected, and the sealing ring on the socket movable pipe 5 13. It is an infinite structure after being close to the inner fixed pipe 4. It can slide up and down freely relative to the inner fixed pipe 4. When the pipe expands due to heat, the single-section structural pipe can absorb the thermal expansion of the pipe, thereby protecting the pipe. role.
本方案的优势在于:1、方便工程安装;2、避免在管道安装对接过程中的变形和破坏;3、可以更加直观地对密封垫进行检查,保证管道的密封性能和使用性能;4、此结构无论正压、负压管道均能适用。The advantages of this solution are: 1. Convenient engineering installation; 2. Avoid deformation and damage during the pipeline installation and docking process; 3. The sealing gasket can be inspected more intuitively to ensure the sealing performance and usability of the pipeline; 4. This The structure can be applied to both positive pressure and negative pressure pipelines.
以上所述仅是本方面的优选实施方式,本方面的保护范围并不仅局限于上述实施例,凡属于本方面思路下的技术方案均属于本方面的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本方面原理前提下的若干改进和润饰,这些改进和润饰也应视为本方面的保护范围。The above are only preferred embodiments of this aspect. The protection scope of this aspect is not limited to the above-mentioned embodiments. All technical solutions that fall under the idea of this aspect fall within the protection scope of this aspect. It should be pointed out that for those of ordinary skill in the art, several improvements and modifications can be made without departing from the principles of this aspect, and these improvements and modifications should also be regarded as the protection scope of this aspect.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310389781.7A CN116951439A (en) | 2023-04-12 | 2023-04-12 | Prefabricated middle pipeline butt joint structure with compensation function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310389781.7A CN116951439A (en) | 2023-04-12 | 2023-04-12 | Prefabricated middle pipeline butt joint structure with compensation function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116951439A true CN116951439A (en) | 2023-10-27 |
Family
ID=88445068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310389781.7A Pending CN116951439A (en) | 2023-04-12 | 2023-04-12 | Prefabricated middle pipeline butt joint structure with compensation function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116951439A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1415887A (en) * | 2002-11-25 | 2003-05-07 | 孙仁中 | Socket joint type pipe head |
EP2295841A1 (en) * | 2009-09-15 | 2011-03-16 | ELB-Form GmbH | Method for connecting tubes and tube connections |
CN202835403U (en) * | 2012-09-03 | 2013-03-27 | 柳志明 | External thermal-preservation high-temperature fume pipeline |
CN215671431U (en) * | 2021-05-10 | 2022-01-28 | 上海必立结构设计事务所有限公司 | Double-wall glass fibre reinforced plastic smoke exhaust tube |
CN218408915U (en) * | 2022-10-12 | 2023-01-31 | 昝世杰 | Pipeline connecting structure for desulfurization flue |
-
2023
- 2023-04-12 CN CN202310389781.7A patent/CN116951439A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1415887A (en) * | 2002-11-25 | 2003-05-07 | 孙仁中 | Socket joint type pipe head |
EP2295841A1 (en) * | 2009-09-15 | 2011-03-16 | ELB-Form GmbH | Method for connecting tubes and tube connections |
CN202835403U (en) * | 2012-09-03 | 2013-03-27 | 柳志明 | External thermal-preservation high-temperature fume pipeline |
CN215671431U (en) * | 2021-05-10 | 2022-01-28 | 上海必立结构设计事务所有限公司 | Double-wall glass fibre reinforced plastic smoke exhaust tube |
CN218408915U (en) * | 2022-10-12 | 2023-01-31 | 昝世杰 | Pipeline connecting structure for desulfurization flue |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS60184794A (en) | Remotely detachable joint | |
CN116951439A (en) | Prefabricated middle pipeline butt joint structure with compensation function | |
CN206988671U (en) | A kind of heat-insulated chimney expanded telescopic joint of antiseep | |
CN219673586U (en) | Fire control pipeline connecting device | |
CN110043724A (en) | A kind of flaring hoop type pipeline connector | |
JPS61160690A (en) | High-pressure pipe joint | |
CN216242802U (en) | Insulating tube convenient to connect | |
CN210830649U (en) | High-temperature fireproof gas sealing valve | |
CN211059547U (en) | Quick coupling mechanism of pipeline based on municipal hydraulic engineering uses | |
EP2946144B1 (en) | Mounting structure comprising a flue pipe mounting apparatus | |
WO2016155582A1 (en) | Tube heat exchanger tube-header sealing structure | |
CN211398860U (en) | Clamp formula annular pipe connects flexible line connection structure | |
JPH10227380A (en) | Flanged pipe joint | |
CN201517668U (en) | Pipeline connecting structure | |
CN216408050U (en) | Pipeline sealing connecting mechanism | |
CN215721609U (en) | Expansion joint leak protection water installation | |
CN221257967U (en) | Flexible sealing structure of wall penetrating pipeline | |
CN220354725U (en) | Plugging equipment with high tightness of prefabricated directly-buried insulating pipe | |
CN221145627U (en) | Quick-connection waterproof thermal pipeline | |
CN220647234U (en) | Clamp for pipeline pressurized plugging | |
CN213871542U (en) | Socket type compensation sealing assembly with lining for high-temperature pipeline | |
CN213871537U (en) | Large-diameter high-pressure pipeline connecting assembly | |
CN217815722U (en) | Explosion-proof ventilation pipe with heat preservation effect | |
CN220623205U (en) | A convenient emergency repair structure with adjustable length | |
KR102449830B1 (en) | Sealing method for chimney with nonflammable fiber O-ring gasket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |