CN116621003A - A method for assembling multiple suspension beams - Google Patents
A method for assembling multiple suspension beams Download PDFInfo
- Publication number
- CN116621003A CN116621003A CN202310746635.5A CN202310746635A CN116621003A CN 116621003 A CN116621003 A CN 116621003A CN 202310746635 A CN202310746635 A CN 202310746635A CN 116621003 A CN116621003 A CN 116621003A
- Authority
- CN
- China
- Prior art keywords
- main body
- bolt
- beam main
- hanging beam
- short
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C15/00—Safety gear
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明提供一种多吊梁的装配方法,包括用于承重的长吊梁主体、防跳绳装置和活动插销,其中,吊梁主体主体包括短吊梁主体和长吊梁主体,活动插销包括销轴和设置在销轴两侧的插销套,所述短吊梁主体和所述长吊梁主体设置有两个以上,闭环钢丝绳的一端缠绕在所述短吊梁主体上固定插销的一端,闭环钢丝绳的另一端分别绕过所述长吊梁主体上活动插销的两端后缠绕在固定插销的另一端,所述短吊梁主体和所述长吊梁主体之间通过闭环钢丝绳首尾连接形成一具有中空结构的方形框体;本发明的装配方法装配简单且可靠,同时使得装配之后的吊取货物过程可靠。
The invention provides a method for assembling multiple suspension beams, which includes a long suspension beam main body for load-bearing, a rope skipping prevention device and a movable bolt, wherein the suspension beam main body includes a short suspension beam main body and a long suspension beam main body, and the movable bolt includes a pin The shaft and the pin sleeves arranged on both sides of the pin shaft, the short suspension beam main body and the long suspension beam main body are provided with more than two, one end of the closed-loop steel wire rope is wound on the short suspension beam main body to fix one end of the bolt, and the closed-loop The other ends of the steel wire ropes respectively go around the two ends of the movable bolt on the long suspension beam body and are wound on the other end of the fixed bolt. The square frame body has a hollow structure; the assembly method of the present invention is simple and reliable in assembly, and at the same time makes the process of lifting and picking up goods after assembly reliable.
Description
技术领域technical field
本发明涉及吊具技术领域,具体涉及一种多吊梁的装配方法。The invention relates to the technical field of hangers, in particular to an assembly method of multiple hanging beams.
背景技术Background technique
吊具广泛应用于工矿企业、港 口码头、车站仓库、建筑工地、海洋开发、宇宙航行等各个工业部分,在现代化生产制造运输中发挥重大作用,在大型工业中,无论是船舶,还是其他大型工业产品,经常会用到吊梁对重物进行起吊和移位,由于重物体积比较大,吊点分布比较远,吊装时必须借用吊梁,由于大型工业中的分段、分块种类繁多,体积较大,为方便吊装,通常采用大跨度长吊梁来满足吊装要求,如中国专利申请号为201922150188.9,公告日为2020.08.28,其公开了一种组合式吊梁的装配方法,包括至少一根支撑梁、至少两个吊环组件;各个支撑梁的两个端部均与吊环组件进行可拆卸连接;吊环组件包括吊板,吊板上设置有上吊孔和下吊孔;吊板的中部垂直固定设置两个上下分布的连接板,连接板的左右两端均设置有两个螺纹连接孔;支撑梁呈方管结构,支撑梁两端设置有贯通支撑梁上、下壁的螺纹配合孔;连接板的端部嵌入支撑梁对应端部的上、下内壁之间,上、下配合的螺纹配合孔,该采用非一体式设计,由多个可更换的支撑梁、吊环组件组合而成,能够根据吊装需要组装多种承重规格,并根据不同吊点数量实现多组支撑梁的串联,增强通用性,同时可以根据不同吊物的尺寸设置多种长度规格,随时更换。但是该结构在装配过程中,需要将一长吊梁两端的连接板相连形成另一长度的长吊梁,然后再通过吊耳将长吊梁进行固定最后通过另一长度的长吊梁进行吊取货物,这样需要将多个连接板连接之后的长吊梁具有一定的长度,从而使得将该长吊梁安装到起吊设备上时安装不方便,另外该结构仅仅能在长度方向上对多个货物进行吊取,对于大型货物需要从四个方向进行吊装货物时,仅仅依靠一根长吊梁实现吊取货物若没有吊取在货物的重心位置容易出现在吊取过程中出现货物晃动的问题,从而影响吊装效果。Spreaders are widely used in various industrial sectors such as industrial and mining enterprises, ports, station warehouses, construction sites, ocean development, space navigation, etc., and play an important role in modern production, manufacturing and transportation. In large industries, whether it is ships or other large industries Products often use hanging beams to lift and shift heavy objects. Due to the relatively large volume of heavy objects and the distribution of lifting points far away, hanging beams must be used for hoisting. Due to the variety of segments and blocks in large-scale industries, The volume is relatively large, and in order to facilitate hoisting, large-span and long hanging beams are usually used to meet the hoisting requirements. For example, the Chinese patent application number is 201922150188.9, and the announcement date is 2020.08.28. It discloses an assembly method for a combined hanging beam, including at least One support beam and at least two suspension ring assemblies; the two ends of each support beam are detachably connected to the suspension ring assembly; the suspension ring assembly includes a suspension plate, and the suspension plate is provided with upper and lower suspension holes; the middle part of the suspension plate Two connecting plates distributed up and down are vertically fixed, and the left and right ends of the connecting plates are provided with two threaded connection holes; the supporting beam is in a square tube structure, and the two ends of the supporting beam are provided with threaded matching holes passing through the upper and lower walls of the supporting beam; The end of the plate is embedded between the upper and lower inner walls of the corresponding end of the support beam, and the upper and lower matching threaded holes are designed in a non-integrated manner, which is composed of multiple replaceable support beams and suspension ring components. Various load-bearing specifications are assembled according to hoisting needs, and multiple sets of support beams are connected in series according to the number of different lifting points to enhance versatility. At the same time, various length specifications can be set according to the size of different hanging objects, and can be replaced at any time. However, during the assembly process of this structure, it is necessary to connect the connecting plates at both ends of a long suspension beam to form a long suspension beam of another length, and then fix the long suspension beam through lifting lugs, and finally hang it through another length of long suspension beam. To pick up the goods, the long hanging beam after connecting multiple connecting plates needs to have a certain length, which makes it inconvenient to install the long hanging beam on the lifting equipment. In addition, the structure can only be used in the length direction for multiple For hoisting of goods, when large-scale goods need to be hoisted from four directions, only one long lifting beam is used to lift the goods. If the goods are not hoisted at the center of gravity of the goods, it is easy to cause the goods to shake during the hoisting process. , thus affecting the lifting effect.
发明内容Contents of the invention
本发明目的在于提供一种多吊梁的装配方法,装配简单且可靠,同时使得装配之后的吊取货物过程可靠。The purpose of the present invention is to provide a multi-hanging beam assembling method, which is simple and reliable in assembling, and at the same time makes the process of hoisting and picking up goods after assembling reliable.
为达到上述目的,本发明的技术方案是:一种多吊梁的装配方法,包括用于承重的吊梁主体、防跳绳装置和活动插销,吊梁主体包括短吊梁主体和长吊梁主体,活动插销包括销轴和设置在销轴两侧的插销套,所述短吊梁主体上设置有固定插销和与固定插销相匹配的第一通孔,第一通孔沿着所述短吊梁主体的长度方向并排地设置在所述短吊梁主体的两侧面上,固定插销穿过第一通孔固定在所述短吊梁主体上;In order to achieve the above object, the technical solution of the present invention is: a multi-hanging beam assembly method, including a load-bearing hanging beam main body, an anti-skip device and a movable bolt, and the hanging beam main body includes a short hanging beam main body and a long hanging beam main body The movable bolt includes a pin shaft and pin sleeves arranged on both sides of the pin shaft. The main body of the short hanging beam is provided with a fixed pin and a first through hole matching the fixed pin. The first through hole is along the short hanging beam. The length direction of the beam main body is arranged side by side on the two sides of the short suspension beam main body, and the fixing bolt is fixed on the short suspension beam main body through the first through hole;
所述长吊梁主体上设置有与销轴相匹配的第二通孔,第二通孔沿着所述长吊梁主体的长度方向并排地设置在所述长吊梁主体的两侧面上,销轴穿过通孔,插销套通过插销可拆卸地分别套接在销轴的两端,插销套靠近长吊梁主体的一端设置有限位部,限位部的一端自插销套的外侧壁向外凸出设置,限位部的另一端穿插入销轴内;The main body of the long suspension beam is provided with a second through hole matching the pin shaft, and the second through holes are arranged side by side along the length direction of the main body of the long suspension beam on both sides of the main body of the long suspension beam. The pin shaft passes through the through hole, and the pin sleeve is detachably sleeved on both ends of the pin shaft through the pin. The end of the pin sleeve close to the main body of the long suspension beam is provided with a limiting part. The outer protrusion is set, and the other end of the limit part is inserted into the pin shaft;
所述短吊梁主体和所述长吊梁主体设置有两个以上,闭环钢丝绳的一端缠绕在所述短吊梁主体上固定插销的一端,闭环钢丝绳的另一端分别绕过所述长吊梁主体上活动插销的两端后缠绕在固定插销的另一端,所述短吊梁主体和所述长吊梁主体之间通过闭环钢丝绳首尾连接形成一方形框体;The short suspension beam main body and the long suspension beam main body are provided with more than two, one end of the closed-loop steel wire rope is wound on one end of the fixed bolt on the short suspension beam main body, and the other end of the closed-loop steel wire rope is respectively bypassed to the long suspension beam The two ends of the movable bolt on the main body are wrapped around the other end of the fixed bolt, and the main body of the short suspension beam and the main body of the long suspension beam are connected end-to-end by a closed-loop steel wire rope to form a square frame;
还包括以下步骤:Also includes the following steps:
(1)将固定插销依次穿过第一通孔焊接固定在短吊梁主体上,然后将防跳绳装置安装到短吊梁主体上端面的吊耳上;(1) Weld and fix the fixed pins on the main body of the short hanging beam through the first through hole in sequence, and then install the anti-skip device on the lifting lug on the upper end surface of the main body of the short hanging beam;
(2)将活动插销依次穿过长吊梁主体上的第二通孔,并通过插销和限位部将活动插销锁紧在长吊梁主体上,然后将防跳绳装置安装到长吊梁主体上端面的吊耳上;(2) Pass the movable pin through the second through hole on the main body of the long hanging beam in turn, and lock the movable pin on the main body of the long hanging beam through the pin and the limit part, and then install the anti-skip device on the main body of the long hanging beam On the lifting lug of the upper end face;
(3)将钢丝绳的一端缠绕在短吊梁主体上,钢丝绳的另一端挂接在起吊装置上,启动起吊装置将短吊梁主体移动到长吊梁主体的上方,同时调整短吊梁主体的高度,并移动长吊梁主体之间的距离,使得长吊梁主体之间的距离与短吊梁主体的长度相匹配;(3) Wrap one end of the wire rope on the main body of the short suspension beam, and hang the other end of the wire rope on the lifting device, start the lifting device to move the main body of the short suspension beam to the top of the main body of the long suspension beam, and adjust the height of the main body of the short suspension beam at the same time. height, and move the distance between the main bodies of the long suspension beams so that the distance between the main bodies of the long suspension beams matches the length of the main bodies of the short suspension beams;
(4)通过闭环钢丝绳依次穿过短吊梁主体的一固定插销、长吊梁的一活动插销、短吊梁的另一固定插销以及长吊梁的另一活动插销,使得两个以上长吊梁和两个以上短吊梁形成一方形框体,完成吊梁主体的装配。(4) The closed-loop wire rope passes through a fixed pin of the main body of the short suspension beam, a movable pin of the long suspension beam, another fixed pin of the short suspension beam and another movable pin of the long suspension beam in sequence, so that more than two long suspension beams The beam and more than two short suspension beams form a square frame to complete the assembly of the suspension beam main body.
以上设置,通过在短吊梁主体的两侧面并排设置第一通孔,能够使得固定插销穿过第一通孔后焊接固定在短吊梁主体上,而在长吊梁主体的两侧面并排设置第二通孔,并使得活动插销的销轴穿过第二通孔,而插销套则通过插销和限位部可拆卸地分别套接在销轴的两端,这样能够使得闭环钢丝绳一端缠绕在短吊梁主体上固定插销上,闭环钢丝绳另一端绕过活动插销两端的插销套后缠绕在固定插销的另一端,同时在使用钢丝绳将短吊梁主体吊起时,缠绕连接在短吊梁主体和长吊梁主体之间闭环钢丝绳会拉伸绷紧,使得短吊梁主体和长吊梁主体之间通过闭环钢丝绳首尾连接形成方形框体,从而只需要先将短吊梁安装在起吊装置上,然后通过调整短吊梁与长吊梁之间的距离并通过闭环钢丝绳将短吊梁以及长吊梁之间进行连接形成方形框体结构,无需先对长吊梁进行安装然后再对长度过长的长吊梁进行高度安装,装配方法简单,且在装配之后的吊梁从而能从前后左右多个方向吊取多个货物,且也能利用形成的方形框体结构吊取同一个货物,以适应不同重物的不同重心位置,另外由于形成方形框体结构是通过多个闭环钢丝绳实现,从而在吊取同一货物时,在收到外界影响时,在其中一个吊梁主体移动时其他位置的吊梁能跟随移动从而防止其中一个移动另一个不移动导致重心不确定的问题,提高吊取的安全性。With the above arrangement, by arranging the first through holes side by side on the two sides of the main body of the short suspension beam, the fixing bolt can be welded and fixed on the main body of the short suspension beam after passing through the first through hole, and arranged side by side on the two sides of the main body of the long suspension beam. The second through hole, and the pin shaft of the movable bolt passes through the second through hole, and the pin sleeve is detachably sleeved on both ends of the pin shaft through the pin and the limiting part, so that one end of the closed-loop steel rope can be wound on the On the fixed bolt on the main body of the short hanging beam, the other end of the closed-loop steel wire rope bypasses the pin sleeves at both ends of the movable bolt and is wound on the other end of the fixed bolt. The closed-loop steel wire rope between the main body of the long suspension beam and the main body of the long suspension beam will be stretched and tightened, so that the main body of the short suspension beam and the main body of the long suspension beam are connected end-to-end through a closed-loop steel wire rope to form a square frame, so that only the short suspension beam needs to be installed on the lifting device first , and then by adjusting the distance between the short suspension beam and the long suspension beam and connecting the short suspension beam and the long suspension beam through a closed-loop steel wire rope to form a square frame structure, there is no need to install the long suspension beam first and then adjust the length The long hanging beam is installed at a high height, and the assembly method is simple. After the assembly, the hanging beam can lift multiple goods from multiple directions, front, rear, left, and right, and can also use the formed square frame structure to lift the same goods. In order to adapt to the different positions of the center of gravity of different heavy objects, and because the formation of the square frame structure is realized by multiple closed-loop steel wire ropes, when lifting the same cargo, when receiving external influences, when the main body of one of the lifting beams moves, other positions The lifting beam can follow the movement to prevent the problem of uncertain center of gravity caused by one moving and the other not moving, improving the safety of lifting.
进一步的,所述吊梁主体的底端面上设置有圆柱体,圆柱体沿着所述吊梁主体的长度方向设置在所述吊梁主体底端的两侧,两侧圆柱体之间的距离与所述吊梁主体的宽度相匹配,位于所述吊梁主体底端一侧的圆柱体设置有两个以上,且同一侧相邻圆柱体之间设置有空隙。Further, cylinders are arranged on the bottom end surface of the main body of the suspension beam, and the cylinders are arranged on both sides of the bottom end of the main body of the suspension beam along the length direction of the main body of the suspension beam. The distance between the cylinders on both sides is the same as The width of the main body of the hanging beam matches, and there are more than two cylinders located on one side of the bottom end of the main body of the hanging beam, and there are gaps between adjacent cylinders on the same side.
以上设置,在吊梁主体的底端面设置圆柱体,并使得圆柱体沿着吊梁主体的长度均匀设置在底端的两侧,这样能够使得钢丝绳下放后吊重物的过程中,避免了钢丝绳直接与吊梁主体底端两侧的棱角进行摩擦,从而防止钢丝绳磨损而影响作业,进而防止钢丝绳磨损,另外通过设置空隙使得在吊梁主体放置时,能够通过空隙放置在支撑架上,这样不会直接压坏圆柱体。With the above settings, a cylinder is arranged on the bottom end surface of the main body of the suspension beam, and the cylinder is evenly arranged on both sides of the bottom end along the length of the main body of the suspension beam, so that the steel wire rope can be lowered and the process of lifting heavy objects can be avoided. Friction with the edges and corners on both sides of the bottom of the main body of the hanging beam, so as to prevent the wear of the steel wire rope from affecting the operation, thereby preventing the wear of the steel wire rope. In addition, by setting a gap so that when the main body of the hanging beam is placed, it can be placed on the support frame through the gap, so that it will not directly crush the cylinder.
进一步的,所述插销套上沿着插销套的长度方向设置有两个以上第一插销孔,销轴外侧壁上与插销孔对应的位置处设置有两个以上第二插销孔,远离所述长吊梁主体一侧的第一插销孔和第二插销孔内设置有插销,插销的另一端设置有可拆卸的锁固装置,插销套上位于第一插销孔和限位部之间设置有第一绕绳部。Further, more than two first pin holes are provided on the pin sleeve along the length direction of the pin sleeve, and more than two second pin holes are provided on the outer wall of the pin shaft at positions corresponding to the pin holes, away from the The first pin hole and the second pin hole on one side of the main body of the long suspension beam are provided with a pin, the other end of the pin is provided with a detachable locking device, and the pin sleeve is located between the first pin hole and the limiting part. The first roping part.
以上设置,通过在销轴的两端通过第一插销孔和第二插销孔内设置有插销,然后两端套入插销套然后在插销套的第一插销孔以及销轴的第二插销孔内插入插销并在另一端设置上锁固装置,从而实现固定,并通过设置在销轴内侧的限位部对插入在吊梁的销轴进行限位,确保销轴能更好地固定在吊梁内,在需要调整钢丝绳在吊梁上缠绕的位置时,只需将锁固装置从插销中移出,并将限位部和插销分别从第一插销孔和第二插销孔中拔出,然后将活动插销的销轴插入吊梁的通孔处,再次安装限位部和插销在活动插销上即可,操作方便且结构简单。The above setting, through the two ends of the pin shaft through the first pin hole and the second pin hole is provided with a pin, then the two ends are inserted into the pin sleeve and then in the first pin hole of the pin sleeve and the second pin hole of the pin shaft Insert the pin and set the upper locking device at the other end to achieve fixation, and limit the pin inserted into the suspension beam through the limit part set inside the pin shaft to ensure that the pin shaft can be better fixed on the suspension beam Inside, when it is necessary to adjust the winding position of the wire rope on the hanging beam, just remove the locking device from the bolt, and pull out the limiting part and the bolt from the first bolt hole and the second bolt hole respectively, and then insert the The pin shaft of the movable bolt is inserted into the through hole of the suspension beam, and the limit part and the latch are installed on the movable bolt again, and the operation is convenient and the structure is simple.
进一步的,所述限位部设置为2个以上,两个限位部设置在插销套的一端,限位部为自插销套的外侧壁向外凸设的柱体结构,所述长吊梁主体与限位部的对应位置处设置有第一限位部,第一限位部包括两个向外凸设的限位块,两个限位块之间形成限位槽,限位部位于限位槽内;Further, there are more than two limiting parts, and the two limiting parts are arranged at one end of the bolt sleeve. The limiting part is a cylindrical structure protruding outward from the outer wall of the bolt sleeve. The long suspension beam The corresponding position of the main body and the limiting portion is provided with a first limiting portion, the first limiting portion includes two outwardly protruding limiting blocks, a limiting groove is formed between the two limiting blocks, and the limiting portion is located at In the limit slot;
步骤(2)中具体还包括将销轴在长吊梁主体上依次穿过第二通孔,然后在销轴的两端套接插销套,插销套上的限位部进入限位槽内,同时通过插销和限位部分别插入第一插销孔和第二插销孔内,对销轴进行限位,锁住在长吊梁主体上。The step (2) also specifically includes passing the pin shaft through the second through hole on the main body of the long suspension beam in turn, and then inserting the pin sleeve at both ends of the pin shaft, and the limit part on the pin sleeve enters the limit groove, At the same time, the pin and the limiting part are respectively inserted into the first pin hole and the second pin hole to limit the pin shaft and lock it on the main body of the long suspension beam.
以上设置,通过将限位部移动到限位槽内可以限制销轴穿入长吊梁主体后轴向方向的移动,也能实现对插销套在圆周方向移动进行限位,结构稳定性更好。With the above settings, by moving the limiting part into the limiting groove, the movement of the pin shaft in the axial direction after penetrating the main body of the long suspension beam can be restricted, and the movement of the bolt sleeve in the circumferential direction can also be limited, and the structural stability is better. .
进一步的,所述第一绕绳部包括沿着插销套向外凸设的两个固定块,两个固定块对称设置在插销套的两侧,且两个固定块沿着所述长吊梁主体的长度方向向外凸设,两个固定块所在直线与插销中心轴所在直线垂直设置;Further, the first rope winding part includes two fixed blocks protruding outwards along the bolt sleeve, the two fixed blocks are symmetrically arranged on both sides of the bolt sleeve, and the two fixed blocks are arranged along the long suspension beam. The length direction of the main body is protruding outward, and the straight line where the two fixed blocks are located is vertical to the straight line where the central axis of the bolt is located;
步骤(4)中具体还包括闭环钢丝绳的一端缠绕在固定插销一端的第二绕绳部上,闭环钢丝绳的另一端绕过活动插销两端的第一绕绳部后缠绕在固定插销另一端的第二绕绳部上。Step (4) specifically includes that one end of the closed-loop steel wire rope is wound on the second rope winding part at one end of the fixed bolt, and the other end of the closed-loop steel wire rope is wound around the first rope winding parts at both ends of the movable bolt and then wound on the second rope winding part at the other end of the fixed bolt. On the second winding part.
以上设置,由于固定块沿着长吊梁主体的长度方向凸设,且固定块与销轴设置方向垂直,既能使得沿着长吊梁主体方向进行饶绳,同时也能防止固定块的设置对销轴的插入造成影响。With the above arrangement, since the fixed block is protruded along the length direction of the main body of the long hanging beam, and the fixed block is perpendicular to the installation direction of the pin shaft, it can not only make the rope rake along the main body of the long hanging beam, but also prevent the setting of the fixed block. Affects the insertion of the pin.
进一步的,所述短吊梁主体和所述长吊梁主体的上端面上均设有两个以上的吊耳,可拆卸的防跳绳装置通过锁固件可拆卸地安装在吊耳上,防跳绳装置包括底座,底座固定在吊梁的上端面,在底座上设有一组以上的阻挡组件,阻挡组件包括第一阻挡件和第二阻挡件,第一阻挡件设置在底座的一侧,第二阻挡件设置在底座的另一侧,阻挡组件还包括第三阻挡件,第三阻挡件设置在第一阻挡件和第二阻挡件上方,且与第一阻挡件和第二阻挡件可拆卸连接;在第一阻挡件、第二阻挡件和第三阻挡件之间形成有限位腔,限位腔用于容置钢丝绳;Further, the upper end surfaces of the short suspension beam main body and the long suspension beam main body are provided with more than two lifting lugs, and the detachable anti-skip device is detachably installed on the lifting lugs through the locking piece, and the anti-skip rope The device includes a base, the base is fixed on the upper surface of the suspension beam, and more than one set of blocking components are arranged on the base. The blocking element is arranged on the other side of the base, and the blocking assembly further includes a third blocking element, the third blocking element is arranged above the first blocking element and the second blocking element, and is detachably connected with the first blocking element and the second blocking element ; A limiting cavity is formed between the first blocking piece, the second blocking piece and the third blocking piece, and the limiting cavity is used for accommodating the wire rope;
步骤(2)中具体还包括将设置在底座两侧的第一阻挡件和第二阻挡件通过螺栓安装到设置在长吊梁主体上端面的吊耳上。The step (2) also specifically includes installing the first blocking piece and the second blocking piece arranged on both sides of the base to the lifting lugs arranged on the upper end surface of the main body of the long suspension beam through bolts.
以上设置,通过第一阻挡件和第二阻挡件对钢丝绳横向限位,通过第三阻挡件对钢丝绳纵向限位,使得钢丝绳容置在限位腔内;当吊梁伴随船舶在海上起伏时,钢丝绳不会脱离限位腔,防止钢丝绳与吊梁的连接位置发生变化。同时第三阻挡件与第一阻挡件、第二阻挡件之间可拆卸连接,便于钢丝绳安装。With the above settings, the steel wire rope is laterally limited by the first stopper and the second stopper, and the steel wire rope is longitudinally limited by the third stopper, so that the steel wire rope is accommodated in the limit cavity; The steel wire rope will not break away from the limiting cavity, preventing the connection position of the steel wire rope and the hanging beam from changing. At the same time, the third blocking piece is detachably connected to the first blocking piece and the second blocking piece, which facilitates the installation of the wire rope.
进一步的,第三阻挡件包括连接件一、连接件二和限位件,连接件一与限位件的一端连接且与第一阻挡件铰接;连接件二与限位件的另一端连接且与第二阻挡件铰接;第一阻挡件设有第一连接孔,第二阻挡件设有第二连接孔;连接件一设有第一穿孔,连接件二设有第二穿孔,第一连接孔与第一穿孔对应设置,锁固件穿过第一穿孔与第一连接孔连接;第二连接孔与第二穿孔对应设置,锁固件穿过第二穿孔与第二连接孔连接。Further, the third blocking piece includes a connecting piece 1, a connecting piece 2 and a limiting piece, the connecting piece 1 is connected to one end of the limiting piece and hinged to the first blocking piece; the connecting piece 2 is connected to the other end of the limiting piece and Hinged with the second blocking piece; the first blocking piece is provided with a first connecting hole, the second blocking piece is provided with a second connecting hole; the connecting piece one is provided with a first through hole, the connecting piece two is provided with a second through hole, the first connecting The hole is set corresponding to the first through hole, and the locking piece is connected to the first connecting hole through the first through hole; the second connecting hole is set corresponding to the second through hole, and the locking piece is connected to the second connecting hole through the second through hole.
以上设置,通过锁固件与第一穿孔和第一连接孔配合,实现连接件一与第一阻挡件之前的活动连接;通过锁固件与第二穿孔和第二连接孔配合,实现连接件二与第二阻挡件之前的活动连接。With the above arrangement, the joint between the first connecting piece and the first blocking piece is realized through the cooperation of the locking piece with the first through hole and the first connecting hole; through the cooperation of the locking piece with the second through hole and the second connecting hole, the connection between the second connecting piece and the second connecting hole is realized. Articulation before the second stop.
进一步的,所述第一连接孔和第二连接孔都为螺纹孔,所述锁固件为螺栓,沿底座长度方向,第一阻挡件靠近底座一端的宽度大于第一阻挡件远离底座一端的宽度,第二阻挡件靠近底座一端的宽度大于第二阻挡件远离底座一端的宽度。Further, both the first connecting hole and the second connecting hole are threaded holes, the locking member is a bolt, and along the length direction of the base, the width of the end of the first blocking member close to the base is greater than the width of the end of the first blocking member away from the base , the width of the end of the second blocking member close to the base is greater than the width of the end of the second blocking member away from the base.
以上设置,增大第一阻挡件与底座之间的接触面积,使得第一阻挡件稳定设置在底座上;增大第二阻挡件与底座之间的接触面积,使得第二阻挡件稳定设置在底座上。The above arrangement increases the contact area between the first stopper and the base, so that the first stopper is stably arranged on the base; increases the contact area between the second stopper and the base, so that the second stopper is stably arranged on the base on the base.
进一步的,所述固定插销的两端固定连接有挡块,挡块向外凸出设置,且挡块与所述短吊梁主体的侧面之间具有间隙,间隙中设置有第二绕绳部,所述活动插销的长度大于所述长吊梁主体的宽度。Further, the two ends of the fixed bolt are fixedly connected with stoppers, and the stoppers protrude outwards, and there is a gap between the stoppers and the side of the main body of the short suspension beam, and the second winding part is arranged in the gap , the length of the movable bolt is greater than the width of the main body of the long suspension beam.
以上设置,这样便于钢丝绳缠绕在固定插销两端的第二绕绳部,在起吊短吊梁主体时,防止钢丝绳滑出固定插销的两端;便于在活动插销穿过通孔后,便于通过插销和限位部将活动插销固定在长吊梁主体上,同时方便钢丝绳缠绕在活动插销两端的第一绕绳部,防止钢丝绳滑出活动插销的两端。The above arrangement makes it easy for the steel wire rope to wrap around the second rope winding part at both ends of the fixed bolt, and prevent the steel wire rope from slipping out of the two ends of the fixed bolt when lifting the main body of the short suspension beam; The limiting part fixes the movable bolt on the main body of the long suspension beam, and simultaneously facilitates the winding of the steel wire rope on the first rope winding part at both ends of the movable bolt to prevent the steel wire rope from slipping out of the two ends of the movable bolt.
进一步的,所述插销包括主体,主体的一端设置有挡板,主体的另一端设置有第三通孔,锁固装置为插接柱,插接柱插入第三通孔设置;挡块和固定块的横截面为半圆形,销轴和插销套为中空的柱体结构。Further, the latch includes a main body, one end of the main body is provided with a baffle plate, the other end of the main body is provided with a third through hole, the locking device is a plug-in column, and the plug-in post is inserted into the third through-hole to set; the stopper and the fixing The cross section of the block is a semicircle, and the pin shaft and the latch sleeve are hollow cylindrical structures.
以上设置,通过截面为T形的插销,且另一端通过插接柱进行插入实现对插销的固定,且也能方便拆卸和安装;挡块和固定块的一端为圆形,另一端为平面,从而通过平面能增加钢丝绳与绕绳部之间的摩擦,防止钢丝绳容易从绕绳部滑出。For the above settings, the bolt with a T-shaped cross section is used, and the other end is inserted through the plug-in column to realize the fixing of the bolt, and it can also be easily disassembled and installed; one end of the stopper and the fixed block is circular, and the other end is flat. Therefore, the friction between the steel wire rope and the rope wrapping portion can be increased by the plane, preventing the steel wire rope from easily slipping out of the rope wrapping portion.
附图说明Description of drawings
图1为本发明的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the present invention.
图2为本发明的主视图。Fig. 2 is a front view of the present invention.
图3为本发明的俯视图。Figure 3 is a top view of the present invention.
图4为本发明的侧视图。Figure 4 is a side view of the present invention.
图5为本发明中长吊梁主体的结构示意图。Fig. 5 is a schematic structural view of the main body of the medium-length suspension beam of the present invention.
图6为本发明中短吊梁主体的结构示意图。Fig. 6 is a schematic structural view of the main body of the medium and short suspension beams of the present invention.
图7为图6中C-C处剖视图。Fig. 7 is a cross-sectional view at C-C in Fig. 6 .
图8为图6中B处放大图。Fig. 8 is an enlarged view of B in Fig. 6 .
图9为本发明中防跳绳装置的立体示意图。Fig. 9 is a three-dimensional schematic view of the rope skipping prevention device in the present invention.
图10为本发明中防跳绳装置的侧视图。Fig. 10 is a side view of the rope skipping prevention device of the present invention.
图11为本发明中第三阻挡件的立体示意图。Fig. 11 is a schematic perspective view of a third blocking member in the present invention.
图12为本发明中第一阻挡件的主视图。Fig. 12 is a front view of the first blocking member in the present invention.
图13为本发明中活动插销的主视图。Fig. 13 is a front view of the movable bolt in the present invention.
图14为图13中A-A处剖视图。Fig. 14 is a cross-sectional view at A-A in Fig. 13 .
图15为本发明中活动插销的侧视图。Fig. 15 is a side view of the movable latch in the present invention.
图16为本发明中活动插销的俯视图。Fig. 16 is a top view of the movable latch in the present invention.
图17为图5中C处放大图。Fig. 17 is an enlarged view of point C in Fig. 5 .
图18为发明的工作流程图。Fig. 18 is the working flowchart of the invention.
具体实施方式Detailed ways
下面结合附图和具体实施方式对本发明做进一步的详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
如图1-17所示,本发明实施例提供了一种多吊梁的装配方法,包括用于承重的吊梁主体、防跳绳装置和活动插销2,其中,吊梁主体包括短吊梁主体2a和长吊梁主体1a,本实施例中,短吊梁主体2a设置为两个,长吊梁主体1a设置为两个,活动插销2包括销轴a1和设置在销轴a1两侧的插销套a2,短吊梁主体2a上设置有固定插销9和与固定插销9相匹配的第一通孔91,本实施例中,一个短吊梁主体2a上第一通孔91的数量为10个,第一通孔91沿着短吊梁主体2a的长度方向并排地设置在短吊梁主体2a的两侧面上,固定插销9穿过第一通孔91焊接固定在短吊梁主体2a上,固定插销9的两端固定连接有挡块93,挡块93向外沿着短吊梁主体2a的长度方向凸出设置,且挡块93与短吊梁主体2a的侧面之间具有间隙,间隙中设置有第二绕绳部92,这样便于钢丝绳缠绕在固定插销9两端的第二绕绳部92,在起吊短吊梁主体2a时,防止钢丝绳滑出固定插销9的两端;As shown in Figures 1-17, the embodiment of the present invention provides a multi-hanging beam assembly method, including a load-bearing hanging beam main body, an anti-skip device and a movable bolt 2, wherein the hanging beam main body includes a short hanging beam main body 2a and the long suspension beam main body 1a, in this embodiment, two short suspension beam main bodies 2a are provided, two long suspension beam main bodies 1a are provided, and the movable bolt 2 includes the pin shaft a1 and the bolts arranged on both sides of the pin shaft a1 Set a2, the short hanging beam main body 2a is provided with a fixed pin 9 and a first through hole 91 matching the fixed pin 9, in this embodiment, the number of first through holes 91 on a short hanging beam main body 2a is 10 , the first through hole 91 is arranged side by side along the length direction of the short suspension beam main body 2a on both sides of the short suspension beam main body 2a, and the fixing pin 9 is welded and fixed on the short suspension beam main body 2a through the first through hole 91, The two ends of fixed bolt 9 are fixedly connected with stopper 93, and stopper 93 protrudes outwards along the length direction of short suspension beam main body 2a, and there is a gap between stopper 93 and the side of short suspension beam main body 2a, gap A second rope-winding portion 92 is arranged in the middle, so that the steel wire rope is wound around the second rope-winding portion 92 at both ends of the fixed bolt 9, and when the short suspension beam main body 2a is hoisted, the steel wire rope is prevented from slipping out of the two ends of the fixed bolt 9;
长吊梁主体1a上设置有与销轴a1相匹配的第二通孔11,第二通孔11沿着长吊梁主体1a的长度方向并排地设置在长吊梁主体1a的两侧面上,本实施例中,一个长吊梁主体1a上的第二通孔11设置为16个,且活动插销2的长度大于长吊梁主体1a的宽度,能够使得活动插销完全穿过第二通孔11,活动插销2穿过第二通孔11后,插销套a2可拆卸地分别套接在销轴a1的两端,插销套a2靠近长吊梁主体2a的一端设置有限位部a3,限位部a3自插销套a2的外侧壁向外凸出设置,插销套a2上沿着插销套a2的长度方向设置有两个以上第一插销孔a21,销轴a1外侧壁上与第一插销孔a21对应位置处设置有两个以上第二插销孔a11,远离长吊梁主体1a一侧的第一插销孔a21和第二插销孔a11内设置有插销a4,插销a4的另一端设置有可拆卸的锁固装置a5,插销套a2上位于第一插销孔a11和限位部a3之间设置有第一绕绳部a6,在本实施例中,锁固装置a5设置为插接柱;The long suspension beam main body 1a is provided with a second through hole 11 matching the pin shaft a1, and the second through holes 11 are arranged side by side along the length direction of the long suspension beam main body 1a on both sides of the long suspension beam main body 1a, In this embodiment, the number of second through holes 11 on a long suspension beam main body 1a is set to 16, and the length of the movable bolt 2 is greater than the width of the long suspension beam main body 1a, so that the movable bolt can completely pass through the second through holes 11 , after the movable bolt 2 passes through the second through hole 11, the bolt sleeve a2 is detachably socketed on both ends of the pin shaft a1 respectively, and the end of the bolt sleeve a2 close to the long suspension beam main body 2a is provided with a limit portion a3, the limit portion a3 protrudes outward from the outer wall of the pin sleeve a2, and the pin sleeve a2 is provided with more than two first pin holes a21 along the length direction of the pin sleeve a2, and the outer wall of the pin shaft a1 corresponds to the first pin hole a21 There are more than two second pin holes a11 at the position, and a pin a4 is set in the first pin hole a21 and the second pin hole a11 on the side away from the main body 1a of the long suspension beam, and the other end of the pin a4 is provided with a detachable lock. The locking device a5, the first rope winding part a6 is arranged on the pin sleeve a2 between the first pin hole a11 and the limiting part a3, and in this embodiment, the locking device a5 is set as an insertion post;
本实施例中,短吊梁主体2a设置在长吊梁主体1a的上方,闭环钢丝绳4a的一端缠绕在固定插销9一端的第二绕绳部92上,闭环钢丝绳4a的另一端分别绕过活动插销两端的第一绕绳部a6后缠绕在固定插销9另一端的第二绕绳部92上,在使用钢丝绳将短吊梁主体2a吊起时,缠绕连接在短吊梁主体2a和长吊梁主体1a之间闭环钢丝绳4a会拉伸绷紧,使得短吊梁主体2a和长吊梁主体1a之间通过闭环钢丝绳4a首尾连接形成具有中空结构的方形框体,同时可以从不同方向调整活动插销在长吊梁主体1a上的位置,以适应重物的不同形状和不同重量的吊装,避免了由于重物的重心不同而影响重物吊装,确保了吊装过程的安全性。In this embodiment, the short suspension beam main body 2a is arranged above the long suspension beam main body 1a, one end of the closed-loop steel wire rope 4a is wound on the second rope winding part 92 at one end of the fixed bolt 9, and the other end of the closed-loop steel wire rope 4a is respectively wound around the movable The first rope-winding parts a6 at both ends of the bolt are then wound on the second rope-winding part 92 at the other end of the fixed bolt 9, and when the short suspension beam main body 2a is hoisted with a steel wire rope, the short suspension beam main body 2a and the long suspension beam main body 2a are wound and connected to the long suspension beam main body 2a. The closed-loop steel wire rope 4a between the beam main body 1a will be stretched and tightened, so that the short suspension beam main body 2a and the long suspension beam main body 1a are connected end-to-end through the closed-loop steel wire rope 4a to form a square frame with a hollow structure, and the activities can be adjusted from different directions at the same time The position of the bolt on the main body 1a of the long suspension beam is adapted to the hoisting of different shapes and weights of heavy objects, avoiding the influence of the weight hoisting due to the difference in the center of gravity of the heavy objects, and ensuring the safety of the hoisting process.
如图13和14所示,第一绕绳部a6包括沿着插销套a2向外凸设的两个固定块a61,两个固定块a61对称设置在插销套a2的两侧,且两个固定块a61沿着长吊梁主体1a的长度方向向外凸设,两个固定块a61所在直线与插销a4中心轴所在直线垂直设置,本实施例中,固定块a61与插销套a2一体设置,由于固定块a61沿着长吊梁主体1a的长度方向凸设,且固定块a61与插销a4设置方向垂直,既能使得钢丝绳沿着长吊梁主体1a方向进行绕绳,同时也能防止固定块a61的设置对插销的插入造成影响。本实施例中,挡块93和固定块a61的横截面为半圆形,销轴a1和插销套a2为中空的柱体结构,使得挡块93和固定块a61的一端为圆形,另一端为平面,从而通过平面能增加钢丝绳与绕绳部之间的摩擦,防止钢丝绳容易从绕绳部滑出。As shown in Figures 13 and 14, the first rope winding part a6 includes two fixed blocks a61 protruding outward along the bolt sleeve a2. The two fixed blocks a61 are symmetrically arranged on both sides of the latch sleeve a2, and the two fixed The block a61 protrudes outward along the length direction of the long suspension beam main body 1a, and the straight line where the two fixed blocks a61 is located is perpendicular to the line where the central axis of the latch a4 is located. In this embodiment, the fixed block a61 and the latch sleeve a2 are integrated. The fixed block a61 protrudes along the length direction of the long hanging beam main body 1a, and the fixed block a61 is perpendicular to the installation direction of the bolt a4, which can not only make the wire rope wrap around the long hanging beam main body 1a, but also prevent the fixed block a61 from The setting of , affects the insertion of the pin. In this embodiment, the cross section of the block 93 and the fixed block a61 is semicircular, and the pin shaft a1 and the pin sleeve a2 are hollow cylindrical structures, so that one end of the stop block 93 and the fixed block a61 is circular, and the other end is circular. It is a plane, so that the friction between the steel wire rope and the rope wrapping part can be increased through the plane surface, preventing the steel wire rope from easily slipping out of the rope wrapping part.
如图13和14所示,插销a4包括主体a12,主体a12的一端设置有挡板a13,主体a12的另一端设置有第三通孔a14,插接柱插入第三通孔a14设置,在一实施例中,插接柱为柔性插接柱,插入之后插接柱之后,通过插接柱的两端进行缠绕实现固定,在其他实施例中,插接柱也可以是带有螺纹的螺钉,第三通孔a14内设置有与螺纹对应的螺钉,通过螺钉与第三通孔a14实现可拆卸连接。本实施例中,插销a1的截面设置为T形,且另一端通过插接柱进行插入实现对插销的固定,且也能方便拆卸和安装。As shown in Figures 13 and 14, the latch a4 includes a main body a12, one end of the main body a12 is provided with a baffle a13, and the other end of the main body a12 is provided with a third through hole a14, and the insertion post is inserted into the third through hole a14 to be set. In the embodiment, the plug-in post is a flexible plug-in post. After the plug-in post is inserted, the two ends of the plug-in post are wound to achieve fixation. In other embodiments, the plug-in post can also be a threaded screw. A screw corresponding to the thread is disposed in the third through hole a14, and a detachable connection with the third through hole a14 is realized through the screw. In this embodiment, the cross-section of the pin a1 is set to be T-shaped, and the other end is inserted through the plug post to fix the pin, and it can also be easily disassembled and installed.
本实施例中,一个活动插销中设置限位部a3的数量为2个,两个限位部a3设置在插销套a2的一端,限位部a3为自插销套a2的外侧壁向外凸设的柱体结构,长吊梁主体1a与限位部a3的对应位置处设置有第一限位部a01,第一限位部a01包括两个向外凸设的限位块a011,两个限位块a011之间形成限位槽a012,限位部a3位于限位槽a012内;In this embodiment, the number of limiting parts a3 in one movable bolt is 2, and the two limiting parts a3 are arranged at one end of the latch sleeve a2, and the limiting parts a3 are designed to protrude outward from the outer wall of the latch sleeve a2. The column structure, the long suspension beam main body 1a and the corresponding position of the limit part a3 are provided with a first limit part a01, the first limit part a01 includes two outwardly protruding limit blocks a011, two limit blocks a011 A limiting groove a012 is formed between the positioning blocks a011, and the limiting part a3 is located in the limiting groove a012;
通过将限位部a3移动到限位槽a012内可以实现对插销套a2套入销轴a1内进行锁住,也能实现对插销套a2在圆周方向移动进行限位,结构稳定性更好。By moving the limiting part a3 into the limiting groove a012, the locking of the latch sleeve a2 inserted into the pin shaft a1 can be realized, and the movement of the latch sleeve a2 in the circumferential direction can also be limited, and the structural stability is better.
如图5和6所示,短吊梁主体2a和长吊梁主体1a的上端面的两侧都设有两个以上的吊耳1,防跳绳装置通过锁固件安装在吊耳1上,本实施例中,如图8-12所示,防跳绳装置包括底座1a,底座1a固定在长吊梁主体1a的上端面,在底座1a上设有一组以上的阻挡组件3a,阻挡组件3a包括第一阻挡件31a、第二阻挡件32a和第三阻挡件33a,第一阻挡件31a设置在底座1a的一侧,第二阻挡件32a设置在底座1a的另一侧,第三阻挡件33a设置在第一阻挡件31a和第二阻挡件32a上方,且与第一阻挡件31a和第二阻挡件32a可拆卸连接;在第一阻挡件31a、第二阻挡件32a和第三阻挡件33a之间形成有限位腔34a,限位腔34a用于容置钢丝绳5a。As shown in Figures 5 and 6, both sides of the upper end faces of the short suspension beam main body 2a and the long suspension beam main body 1a are provided with more than two lifting lugs 1, and the anti-skip device is installed on the lifting lugs 1 through a locking member. In the embodiment, as shown in Figures 8-12, the anti-skipping device includes a base 1a, the base 1a is fixed on the upper end surface of the long suspension beam main body 1a, and more than one set of blocking components 3a are arranged on the base 1a, and the blocking components 3a include the first A stopper 31a, a second stopper 32a and a third stopper 33a, the first stopper 31a is set on one side of the base 1a, the second stopper 32a is set on the other side of the base 1a, and the third stopper 33a is set Above the first stopper 31a and the second stopper 32a, and detachably connected with the first stopper 31a and the second stopper 32a; between the first stopper 31a, the second stopper 32a and the third stopper 33a A limiting cavity 34a is formed between them, and the limiting cavity 34a is used to accommodate the steel wire rope 5a.
通过第一阻挡件31a和第二阻挡件32a对钢丝绳5a横向限位,通过第三阻挡件33a对钢丝绳5a纵向限位,使得钢丝绳5a容置在限位腔34a内;当长吊梁主体1a伴随船舶在海上起伏时,钢丝绳5a不会脱离限位腔34a,防止钢丝绳5a与长吊梁主体1a的连接位置发生变化。同时第三阻挡件33a与第一阻挡件31a、第二阻挡件32a之间可拆卸连接,便于钢丝绳5a安装。The steel wire rope 5a is laterally limited by the first stopper 31a and the second stopper 32a, and the steel wire rope 5a is longitudinally limited by the third stopper 33a, so that the steel wire rope 5a is accommodated in the limit cavity 34a; when the long suspension beam main body 1a When the ship moves up and down on the sea, the wire rope 5a will not escape from the limiting cavity 34a, preventing the connection position between the wire rope 5a and the long suspension beam main body 1a from changing. At the same time, the third blocking piece 33a is detachably connected to the first blocking piece 31a and the second blocking piece 32a, which facilitates the installation of the wire rope 5a.
在本实施例中,底座1a设有两个,在每个底座1a上都设有两组阻挡组件3a,一组阻挡组件3a设置在底座1a的一端;另一组阻挡组件3a设置在底座1a的另一端;两个底座1a靠近同一端的两第三阻挡件33a一体式设置。In this embodiment, there are two bases 1a, and two sets of blocking assemblies 3a are arranged on each base 1a, one set of blocking assemblies 3a is arranged at one end of the base 1a; the other set of blocking assemblies 3a is arranged on the base 1a The other end; the two bases 1a are integrally arranged near the two third stoppers 33a at the same end.
第三阻挡件33a包括连接件一331a、连接件二331a和限位件333a,连接件一331a与限位件333a的一端连接且与第一阻挡件31a铰接;连接件二331a与限位件333a的另一端连接且与第二阻挡件32a铰接。这样连接结构简单。The third stopper 33a comprises a connector one 331a, a connector two 331a and a limiter 333a, the connector one 331a is connected to one end of the limiter 333a and is hinged with the first stopper 31a; the second connector 331a is connected to the limiter The other end of 333a is connected and hinged to the second blocking member 32a. The connection structure is simple like this.
第一阻挡件31a设有第一连接孔311a,第二阻挡件32a设有第二连接孔(图中未示出);连接件一331a设有第一穿孔334a,连接件二331a设有第二穿孔335a,第一连接孔311a与第一穿孔334a对应设置,锁固件4a穿过第一穿孔334a与第一连接孔311a连接;第二连接孔与第二穿孔335a对应设置,锁固件4a穿过第二穿孔335a与第二连接孔连接。通过锁固件4a与第一穿孔334a和第一连接孔311a配合,实现连接件一331a与第一阻挡件31a之前的活动连接;通过锁固件4a与第二穿孔335a和第二连接孔配合,实现连接件二331a与第二阻挡件32a之前的活动连接。The first blocking member 31a is provided with a first connecting hole 311a, and the second blocking member 32a is provided with a second connecting hole (not shown in the figure); the first connecting member 331a is provided with a first through hole 334a, and the second connecting member 331a is provided with a second connecting hole. Two through holes 335a, the first connecting hole 311a is set corresponding to the first through hole 334a, and the locking member 4a is connected to the first connecting hole 311a through the first through hole 334a; the second connecting hole is correspondingly set to the second through hole 335a, and the locking member 4a is passed through Connect with the second connection hole through the second through hole 335a. Through the cooperation of the first through hole 334a and the first connecting hole 311a by the locking member 4a, the movable connection between the first connecting member 331a and the first blocking member 31a is realized; by the cooperation of the second through hole 335a and the second connecting hole by the locking member 4a, the The second connecting piece 331a is movably connected to the front of the second blocking piece 32a.
在本实施例中,所述第一连接孔311a和第二连接孔都为螺纹孔,所述锁固件4a为螺栓。连接结构简单,方便拆卸。In this embodiment, both the first connecting hole 311a and the second connecting hole are threaded holes, and the locking member 4a is a bolt. The connection structure is simple and easy to disassemble.
在本实施例中,沿底座1a长度方向,第一阻挡件31a靠近底座1a一端的宽度L2大于第一阻挡件31a远离底座1a一端的宽度L1;第二阻挡件32a靠近底座1a一端的宽度大于第二阻挡件32a远离底座1a一端的宽度。增大第一阻挡件31a与底座1a之间的接触面积,使得第一阻挡件31a稳定设置在底座1a上。增大第二阻挡件32a与底座1a之间的接触面积,使得第二阻挡件32a稳定设置在底座1a上。In this embodiment, along the length direction of the base 1a, the width L2 of the end of the first blocking member 31a close to the base 1a is greater than the width L1 of the end of the first blocking member 31a away from the base 1a; the width of the end of the second blocking member 32a near the base 1a is larger than The width of the end of the second blocking member 32a away from the base 1a. The contact area between the first stopper 31a and the base 1a is increased so that the first stopper 31a is stably disposed on the base 1a. The contact area between the second stopper 32a and the base 1a is increased, so that the second stopper 32a is stably disposed on the base 1a.
如图5-7所示,短吊梁主体2a和长吊梁主体1a的底端面上设置有圆柱体4,圆柱体4沿着短吊梁主体2a和长吊梁主体1a的长度均匀设置在短吊梁主体2a和长吊梁主体1a底端的两侧,两侧圆柱体4之间的距离与吊梁主体的宽度相匹配,这样能够使得钢丝绳下放后吊重物的过程中,避免了钢丝绳直接与吊梁主体底端两侧的棱角进行摩擦,从而防止钢丝绳磨损而影响作业;本实施例中,吊梁主体底端同一侧圆柱体4之间设置有空隙5,通过设置空隙5使得在吊梁主体放置时,能够通过空隙5放置在支撑架上,这样不会直接压坏圆柱体4。As shown in Figures 5-7, cylinders 4 are arranged on the bottom end surfaces of the short suspension beam main body 2a and the long suspension beam main body 1a, and the cylinders 4 are evenly arranged on the lengths of the short suspension beam main body 2a and the long suspension beam main body 1a. On both sides of the bottom of the short suspension beam main body 2a and the long suspension beam main body 1a, the distance between the cylinders 4 on both sides matches the width of the suspension beam main body, so that the steel wire rope can be avoided when the steel wire rope is lowered to lift heavy objects. Directly rub against the edges and corners on both sides of the bottom end of the main body of the hanging beam, thereby preventing the wire rope from being worn and affecting the operation; When the main body of the suspension beam is placed, it can be placed on the support frame through the gap 5, so that the cylinder 4 cannot be directly crushed.
如图18所示,本实施例中,一种多吊梁的装配方法,包括以下具体步骤:As shown in Figure 18, in this embodiment, a multi-hanging beam assembly method includes the following specific steps:
(1)将固定插销依次穿过第一通孔焊接固定在短吊梁主体上,然后将防跳绳装置通过螺栓安装到短吊梁主体上端面的吊耳上;(1) Weld and fix the fixing pins on the main body of the short hanging beam through the first through hole in turn, and then install the anti-skip device on the lifting lug on the upper end surface of the main body of the short hanging beam through bolts;
(2)将活动插销的销轴在长吊梁主体上依次穿过第二通孔,然后在销轴的两端套接插销套,同时通过插销和限位部分别插入第一插销孔和第二插销孔内,对销轴进行限位,使得通过插销和限位部将活动插销锁紧在长吊梁主体上,然后将防跳绳装置中底座两侧的第一阻挡件和第二阻挡件通过螺栓安装到设置在长吊梁主体上端面的吊耳上;(2) Put the pin shaft of the movable bolt through the second through hole in sequence on the main body of the long suspension beam, and then insert the pin sleeves at both ends of the pin shaft, and insert the pin and the limit part into the first pin hole and the second through the pin respectively. In the second pin hole, the pin shaft is limited, so that the movable pin is locked on the main body of the long suspension beam through the pin and the limit part, and then the first stopper and the second stopper on both sides of the base in the anti-skip device Installed by bolts to the lifting lugs arranged on the upper end face of the main body of the long suspension beam;
(3)将钢丝绳的一端缠绕在短吊梁主体上,钢丝绳的另一端挂接在起吊装置上,启动起吊装置将短吊梁主体移动到长吊梁主体的上方,同时调整短吊梁主体的高度,并移动长吊梁主体之间的距离,使得长吊梁主体之间的距离与短吊梁主体的长度相匹配;本实施例中,起吊装置可以为起重机的吊臂的吊钩。(3) Wrap one end of the wire rope on the main body of the short suspension beam, and hang the other end of the wire rope on the lifting device, start the lifting device to move the main body of the short suspension beam to the top of the main body of the long suspension beam, and adjust the height of the main body of the short suspension beam at the same time. height, and move the distance between the main bodies of the long suspension beams so that the distance between the main bodies of the long suspension beams matches the length of the main bodies of the short suspension beams; in this embodiment, the lifting device can be the hook of the boom of the crane.
(4)通过闭环钢丝绳依次穿过短吊梁主体的一固定插销、长吊梁的一活动插销、短吊梁的另一固定插销以及长吊梁的另一活动插销,使得两个以上长吊梁和两个以上短吊梁形成一方形框体,完成吊梁主体的装配。一实施例中,闭环钢丝绳为一封闭的钢丝绳,然后通过将封闭的钢丝绳套在短吊梁的一固定插销、长吊梁的一活动插销、短吊梁的另一固定插销以及长吊梁的另一活动插销之后使得两个以上长吊梁以及两个以上短吊梁形成一方形框体结构,在另一实施例中,闭环钢丝绳也可以是一绳体结构,将绳体的一端依次穿过短吊梁的一固定插销、长吊梁的一活动插销、短吊梁的另一固定插销以及长吊梁的另一活动插销之后然后将绳体的两端固定连接然后形成一个闭环的钢丝绳结构。具体地,步骤(4)中具体还包括闭环钢丝绳的一端缠绕在固定插销一端的第二绕绳部上,闭环钢丝绳的另一端绕过活动插销两端的第一绕绳部后缠绕在固定插销另一端的第二绕绳部上。(4) The closed-loop wire rope passes through a fixed pin of the main body of the short suspension beam, a movable pin of the long suspension beam, another fixed pin of the short suspension beam and another movable pin of the long suspension beam in sequence, so that more than two long suspension beams The beam and more than two short suspension beams form a square frame to complete the assembly of the suspension beam main body. In one embodiment, the closed-loop wire rope is a closed wire rope, and then the closed wire rope is placed on a fixed bolt of the short suspension beam, a movable bolt of the long suspension beam, another fixed bolt of the short suspension beam, and a fixed bolt of the long suspension beam. After another movable bolt, more than two long hanging beams and more than two short hanging beams form a square frame structure. In another embodiment, the closed-loop steel wire rope can also be a rope body structure, and one end of the rope body is passed through one end in turn. A fixed pin for the short suspension beam, a movable pin for the long suspension beam, another fixed pin for the short suspension beam, and another movable pin for the long suspension beam, and then the two ends of the rope body are fixedly connected to form a closed-loop wire rope structure. Specifically, step (4) further includes winding one end of the closed-loop steel wire rope on the second rope winding part at one end of the fixed bolt, and winding the other end of the closed-loop steel wire rope around the first rope winding parts at both ends of the movable bolt and on the other end of the fixed bolt. on the second rope wrap at one end.
在一实施例中,步骤(2)中具体还包括将销轴在长吊梁主体上依次穿过第二通孔,然后在销轴的两端套接插销套,插销套上的限位部进入限位槽内,同时通过插销和限位部分别插入第一插销孔和第二插销孔内,对销轴进行限位,锁住在长吊梁主体上。将设置在底座两侧的第一阻挡件和第二阻挡件通过螺栓安装到设置在长吊梁主体上端面的吊耳上。In one embodiment, the step (2) further includes passing the pin shaft through the second through hole on the main body of the long suspension beam in sequence, and then fitting the pin sleeves on both ends of the pin shaft, and the stopper on the pin sleeve Enter into the limit slot, and insert the pin and the limit part into the first pin hole and the second pin hole respectively at the same time, limit the pin shaft, and lock it on the main body of the long suspension beam. Install the first blocking piece and the second blocking piece arranged on both sides of the base to the lifting lugs arranged on the upper end surface of the main body of the long suspension beam through bolts.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310746635.5A CN116621003A (en) | 2023-06-25 | 2023-06-25 | A method for assembling multiple suspension beams |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310746635.5A CN116621003A (en) | 2023-06-25 | 2023-06-25 | A method for assembling multiple suspension beams |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116621003A true CN116621003A (en) | 2023-08-22 |
Family
ID=87636633
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310746635.5A Pending CN116621003A (en) | 2023-06-25 | 2023-06-25 | A method for assembling multiple suspension beams |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116621003A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116621004A (en) * | 2023-06-25 | 2023-08-22 | 广州中船德内斯船用设备有限公司 | An assembled suspension beam formed by different suspension beams |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201842567U (en) * | 2010-04-22 | 2011-05-25 | 东方日立锅炉有限公司 | Lifting frame for modular tube panel of waste heat boiler |
| WO2017105252A1 (en) * | 2015-12-15 | 2017-06-22 | Øren Anders Kjell | A system and method for covering a structure on a seabed |
| CN110255359A (en) * | 2019-06-03 | 2019-09-20 | 中铁大桥局集团有限公司 | It is a kind of for lifting the suspender of segment girder steel |
| CN213011542U (en) * | 2020-06-12 | 2021-04-20 | 中建科技武汉有限公司 | Multifunctional combined adjustable hanging frame |
| CN215516331U (en) * | 2021-10-12 | 2022-01-14 | 河南卫华重型机械股份有限公司 | Three hoisting point self-balancing and load self-distribution special lifting appliance |
| CN219239040U (en) * | 2023-02-17 | 2023-06-23 | 上海玫克生储能科技有限公司 | A battery pack lifting device |
-
2023
- 2023-06-25 CN CN202310746635.5A patent/CN116621003A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201842567U (en) * | 2010-04-22 | 2011-05-25 | 东方日立锅炉有限公司 | Lifting frame for modular tube panel of waste heat boiler |
| WO2017105252A1 (en) * | 2015-12-15 | 2017-06-22 | Øren Anders Kjell | A system and method for covering a structure on a seabed |
| CN110255359A (en) * | 2019-06-03 | 2019-09-20 | 中铁大桥局集团有限公司 | It is a kind of for lifting the suspender of segment girder steel |
| CN213011542U (en) * | 2020-06-12 | 2021-04-20 | 中建科技武汉有限公司 | Multifunctional combined adjustable hanging frame |
| CN215516331U (en) * | 2021-10-12 | 2022-01-14 | 河南卫华重型机械股份有限公司 | Three hoisting point self-balancing and load self-distribution special lifting appliance |
| CN219239040U (en) * | 2023-02-17 | 2023-06-23 | 上海玫克生储能科技有限公司 | A battery pack lifting device |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116621004A (en) * | 2023-06-25 | 2023-08-22 | 广州中船德内斯船用设备有限公司 | An assembled suspension beam formed by different suspension beams |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109095343A (en) | Assembled hanger | |
| CN116621003A (en) | A method for assembling multiple suspension beams | |
| US20140175039A1 (en) | Construction Machinery Body | |
| JP6098453B2 (en) | Jib hanger | |
| KR20080096143A (en) | Tower Crane Jib | |
| KR100634465B1 (en) | Reinforcement device for tower crane | |
| CN220148978U (en) | Combined hanging beam | |
| CN116730164A (en) | Working method of combined hanging beam | |
| CN116621004A (en) | An assembled suspension beam formed by different suspension beams | |
| US20140175040A1 (en) | Construction Machinery | |
| CN211496571U (en) | Self-balancing lifting appliance | |
| EP4317045B1 (en) | Crane for confined spaces and base for installing such crane on corresponding target surfaces of building structures or similar supporting structures | |
| KR100833970B1 (en) | Slewing device for tower crane | |
| JPH03192093A (en) | Suspension attitude control for curved plate and suspending tool for curved plate | |
| CN209098021U (en) | The energy-saving open triangle boom hoisting of prefabricated component single base | |
| EP3670961B1 (en) | A rope connector for connecting prepared ends of two rope segments, a rope extension system and a hoisting system comprising such rope connector | |
| CN220519188U (en) | Erecting device, storage robot and storage system | |
| CN216971705U (en) | Steel box girder sling | |
| CN214141218U (en) | Ton bag lifting appliance | |
| CN215854573U (en) | Two precast beam hoists | |
| CN220283267U (en) | Combined hanging beam | |
| CN215439252U (en) | Hoisting mechanism for pipe gallery | |
| CN214031441U (en) | Hoisting equipment suitable for multiple traveling cranes and asymmetric balanced loads | |
| CN220148977U (en) | Long hanging beam for hanging goods | |
| CN221253583U (en) | Special lifting appliance and lifting system for superstructure with adjustable distance |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |