CN116464169B - Beam side embedded part and mounting method thereof - Google Patents
Beam side embedded part and mounting method thereof Download PDFInfo
- Publication number
- CN116464169B CN116464169B CN202310612776.8A CN202310612776A CN116464169B CN 116464169 B CN116464169 B CN 116464169B CN 202310612776 A CN202310612776 A CN 202310612776A CN 116464169 B CN116464169 B CN 116464169B
- Authority
- CN
- China
- Prior art keywords
- rod
- matched
- embedded part
- sliding
- beam side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4114—Elements with sockets
- E04B1/4128—Elements with sockets receiving adjustable or removal nuts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a beam side embedded part and an installation method thereof, wherein the beam side embedded part comprises a concrete beam, a plurality of round holes are formed in the concrete beam, a holding rod is plugged in each round hole, a sliding rod is slidably installed on each holding rod, a screw rod is fixedly installed on each holding rod and each sliding rod, a steel plate is sleeved on the matched screw rods, and a backing plate matched with the corresponding steel plate is sleeved on each screw rod. The advantages are that: the reinforcement measures of the double-sided buried plates and the bolts are adopted, so that the stress safety of the components is ensured, the difficulty in grouting of the rear buried parts on the side surfaces of the vertical components is solved, the stress safety of the rear buried parts is effectively ensured, and meanwhile, the rib plates are added everywhere in the buried plates and the connecting rods, so that the connection stability of the connecting parts is effectively ensured.
Description
Technical Field
The invention relates to the technical field of beam side embedded parts, in particular to a beam side embedded part and an installation method thereof.
Background
In the engineering construction process, a larger and heavier member is required to be additionally arranged on the side surface of the finished structure, and an embedded part is required to be additionally arranged on the original structure for connecting the pre-added member, so that the requirement on the reinforcing quality of the embedded part is higher, and the embedded part and the installation method can effectively ensure the safety of the pre-added structure
In the construction process of modern building engineering, the phenomenon that the practice is increased because of needs increase function is difficult to avoid, especially increase great weight's component in original structure side, need increase the buried part in order to satisfy the effective connection of increase component and current structure in existing structure side, current practice is to plant the muscle on current structure, weld steel sheet and the reinforcing bar of planting again, the gap between steel sheet and the original structure uses grouting material to irritate reality, but the width of some roof beam is insufficient for satisfying the anchor length of crab-bolt, the buried part is difficult to bear great load, there is the potential safety hazard in the later stage use.
Therefore, the defects of the prior art can be overcome by adopting a novel beam side embedded part and an installation method thereof.
Disclosure of Invention
The invention aims to solve the problems in the prior art and provides a beam side embedded part and an installation method thereof.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
A beam side embedded part and an installation method thereof comprise a concrete beam, a plurality of round holes are formed in the concrete beam, a holding rod is plugged in each round hole, a sliding rod is slidably installed on each holding rod, a screw rod is fixedly installed on each holding rod and each sliding rod, a plurality of steel plates are sleeved on the matched screw rods together, a backing plate matched with the corresponding steel plate is sleeved on each screw rod, a nut is rotatably installed on each screw rod in a threaded mode, a rear component connecting piece is fixedly installed on each steel plate, and a plurality of rib adding plates are fixedly installed on each rear component connecting piece.
In the above-mentioned beam side embedded part and the installation method thereof, each holding rod is provided with a storage groove, each storage groove is provided with an inserting rod in a sliding manner, and each sliding rod is provided with a plurality of slots matched with the corresponding inserting rod.
In the beam side embedded part and the mounting method thereof, a plurality of inserting posts are fixedly mounted on each backing plate, and a plurality of positioning grooves matched with the corresponding inserting posts are formed in each of the two steel plates.
In the above-mentioned beam side embedded part and the installation method thereof, a plurality of groove bodies are formed in one of the steel plates, each groove body is provided with a first insertion block in a clamping manner, each first insertion block is fixedly provided with a locking rod, each locking rod is provided with a connecting rod in a sliding manner, each connecting rod is fixedly provided with a limiting rod, each limiting rod is fixedly provided with a second insertion block, and each screw rod is provided with two inner hexagonal grooves matched with the first insertion block.
In the beam side embedded part and the installation method thereof, a plurality of brackets are fixedly installed on the connecting rod, each bracket is rotatably provided with a roller, and the locking rod is provided with a groove body matched with the plurality of rollers.
In the beam side embedded part and the mounting method thereof, the connecting rod and the groove body are fixedly provided with the gaskets, and the two gaskets are fixedly provided with the spring together.
In the beam side embedded part and the installation method thereof, the connecting rod is fixedly provided with two sliding blocks, and the locking rod is provided with two sliding grooves matched with the corresponding sliding blocks.
Compared with the prior art, the invention has the advantages that:
1. The invention relates to an installation method for solving the problem that a rear embedded part bears a large load, and under the condition that the section size of a concrete member is insufficient, the stress safety of the member is ensured by adopting the reinforcement measures of a double-sided embedded plate and a bolt;
2. The structural adhesive is smeared in the lower gap of the embedded part in advance, so that the difficulty in grouting the rear embedded part on the side surface of the vertical member is solved, and the stress safety of the rear embedded part is effectively ensured.
3. According to the invention, four rib plates are added on the buried plate and the connecting rod piece, so that the connection stability of the connecting position is effectively ensured.
In summary, the invention adopts the reinforcement measures of the double-sided buried plates and the bolts, ensures the stress safety of the components, solves the grouting difficulty of the rear buried piece on the side surface of the vertical component, effectively ensures the stress safety of the rear buried piece, and simultaneously increases the rib plates at all positions on the buried plates and the connecting rod pieces, and effectively ensures the connection stability of the connecting positions.
Drawings
The invention is described in further detail below with reference to the attached drawing figures, wherein:
FIG. 1 is a schematic view of a beam side embedded part and a method for installing the same according to the present invention;
FIG. 2 is an enlarged schematic detail side view of the steel plate portion of FIG. 1;
FIG. 3 is an enlarged schematic detail view of a portion of the screw portion of FIG. 1;
FIG. 4 is an enlarged schematic detail view of the locking lever portion of FIG. 1;
FIG. 5 is an enlarged schematic detail view of the pad section of FIG. 1;
fig. 6 is an enlarged schematic detail view of the roller portion of fig. 4.
In the figure: 1 concrete beam, 2 steel plates, 3 backing plates, 4 nuts, 5 structural adhesive, 6 screw rods, 7 inner hexagonal grooves, 8 inserting columns, 9 locking rods, 10 rear component connecting pieces, 11 ribbed plates, 12 holding rods, 13 sliding rods, 14 inserting grooves, 15 inserting rods, 16 accommodating grooves, 17 inserting block I, 18 connecting rods, 19 limiting rods, 20 inserting block II, 21 groove bodies, 22 springs, 23 sliding blocks, 24 sliding grooves, 25 rolling wheels and 26 brackets.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-6, a beam side embedded part and an installation method thereof, the beam side embedded part comprises a concrete beam 1, a plurality of round holes are formed in the concrete beam 1, a holding rod 12 is plugged in each round hole, a sliding rod 13 is slidably installed on each holding rod 12, a screw rod 6 is fixedly installed on each holding rod 12 and each sliding rod 13, a steel plate 2 is sleeved on each of the plurality of matched screw rods 6, a backing plate 3 matched with the corresponding steel plate 2 is sleeved on each screw rod 6, a nut 4 is rotatably installed on each screw rod 6 in a threaded manner, a rear component connecting piece 10 is fixedly installed on each steel plate 2, and a plurality of rib plates 11 are fixedly installed on each rear component connecting piece 10;
the following points are notable:
1. Each holding rod 12 is provided with a storage groove 16, each storage groove 16 is provided with an inserting rod 15 in a sliding manner, each sliding rod 13 is provided with a plurality of slots 14 matched with the corresponding inserting rod 15, and the function of the arrangement is to lock the holding rod 12 and the sliding rod 13 and prevent the sliding rod 13 from sliding automatically.
2. Every backing plate 3 is last a plurality of posts 8 of all fixed mounting, all offers a plurality of and corresponding post 8 matched with constant head tank on two steel sheets 2, and the effect of setting up like this is in order to carry out spacingly to backing plate 3, prevents backing plate 3 and rotates along with nut 4.
3. One of them steel sheet 2 is last to have offered a plurality of cell bodies, all block installs a plug one 17 on every cell body, all fixed mounting has a locking lever 9 on every plug one 17, all slidable mounting has a connecting rod 18 on every locking lever 9, all fixed mounting has a gag lever post 19 on every connecting rod 18, all fixed mounting has a plug two 20 on every gag lever post 19, all offered two on every lead screw 6 with plug two 20 matched with interior hexagonal groove 7, the effect of setting like this is in order to carry out spacingly to lead screw 6, prevent to rotate at the in-process lead screw 6 of nut 4.
4. The connecting rod 18 is fixedly provided with a plurality of brackets 26, each bracket 26 is rotatably provided with a roller 25, the locking rod 9 is provided with a groove body 21 matched with the plurality of rollers 25, and the function of the arrangement is to reduce friction force, so that the connecting rod 18 slides on the locking rod 9 more smoothly.
5. The connecting rod 18 and the groove body 21 are fixedly provided with a gasket, and a spring 22 is fixedly arranged between the two gaskets together, so that the connecting rod 18 can be automatically recovered.
6. The connecting rod 18 is fixedly provided with two sliding blocks 23, the locking rod 9 is provided with two sliding grooves 24 matched with the corresponding sliding blocks 23, and the function of the arrangement is to limit the connecting rod 18 and prevent the connecting rod 18 from being separated from the locking rod 9.
The construction process flow comprises the following steps: measuring paying-off positioning, steel bar detection, drilling, concrete roughening under a buried plate, installing an anchor bolt, and installing a connecting rod of the buried plate and a member
1. And (5) measuring and paying-off positioning.
According to the drawing design, paying-off positioning is carried out on the position of the embedded part by using a total station;
2. and (5) detecting and drilling steel bars.
In order to avoid damage to the stressed steel bars due to drilling, a steel bar detector is used for detecting the positions of the steel bars in the beam, drilling is carried out at the positions without the steel bars, and after the drilling is finished, a high-pressure air gun is used for blowing out scraps and dust in the holes;
3. and (5) roughening the concrete below the buried plate.
Roughening the concrete on the bonding surface by using a roughening machine, roughening into pits and grooves, removing floating blocks, broken slag and powder on the concrete surface, and cleaning by using a high-pressure water gun;
4. and (5) installing an anchor bolt.
And cleaning floating ash and dust in the hole by using tools such as an air pressure blowpipe and the like, and keeping the hole clean. Extruding the modified epoxy resin adhesive or the modified vinyl adhesive into the hole, and rotating the bolt into the hole to ensure that the gap between the anchor bolt and the hole wall is filled with the medicament;
5. And installing a connecting rod of the buried plate and the member.
And (3) after the anchor bolts are installed, coating structural adhesive 5 with the thickness of 50mm on the concrete below the anchor plate in time, installing the anchor plate before the modified epoxy resin adhesive or the modified vinyl adhesive and the structural adhesive 5 are cured, and welding connecting pieces of components to be added on the buried plate after the modified epoxy resin adhesive or the modified vinyl adhesive and the structural adhesive 5 are cured.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.
Claims (3)
1. The utility model provides a roof beam side buries piece, includes concrete beam (1), its characterized in that, a plurality of round holes have been seted up on concrete beam (1), every all stopper has a holding rod (12) in the round hole, every on holding rod (12) all slidable mounting have a slide bar (13), every on holding rod (12) and each slide bar (13) all fixed mounting have a lead screw (6), a steel sheet (2) are overlapped jointly on a plurality of matched with lead screws (6), every all overlap on lead screw (6) be equipped with one with corresponding steel sheet (2) matched with backing plate (3), every equal screw thread rotation is installed on lead screw (6) has a nut (4), two on steel sheet (2) all fixed mounting have a rear-end component connecting piece (10), two on rear-end component connecting piece (10) all fixed mounting have a plurality of ribbed plates (11);
One of the steel plates (2) is provided with a plurality of groove bodies, each groove body is provided with a first inserting block (17) in a clamping mode, each first inserting block (17) is provided with a locking rod (9) in a fixed mode, each locking rod (9) is provided with a connecting rod (18) in a sliding mode, each connecting rod (18) is provided with a limiting rod (19) in a fixed mode, each limiting rod (19) is provided with a second inserting block (20) in a fixed mode, and each screw rod (6) is provided with two inner hexagonal grooves (7) matched with the second inserting block (20);
A plurality of brackets (26) are fixedly arranged on the connecting rod (18), each bracket (26) is rotatably provided with a roller (25), and the locking rod (9) is provided with a groove body (21) matched with the plurality of rollers (25);
A gasket is fixedly arranged on each of the connecting rod (18) and the groove body (21), and a spring (22) is fixedly arranged between the two gaskets;
two sliding blocks (23) are fixedly arranged on the connecting rod (18), and two sliding grooves (24) matched with the corresponding sliding blocks (23) are formed in the locking rod (9).
2. A beam side embedded part according to claim 1, wherein each holding rod (12) is provided with a storage groove (16), each storage groove (16) is provided with an inserting rod (15) in a sliding manner, and each sliding rod (13) is provided with a plurality of inserting grooves (14) matched with the corresponding inserting rod (15).
3. A beam side embedded part according to claim 1, wherein a plurality of inserting posts (8) are fixedly arranged on each backing plate (3), and a plurality of positioning grooves matched with the corresponding inserting posts (8) are formed in each of the two steel plates (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310612776.8A CN116464169B (en) | 2023-05-29 | 2023-05-29 | Beam side embedded part and mounting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310612776.8A CN116464169B (en) | 2023-05-29 | 2023-05-29 | Beam side embedded part and mounting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116464169A CN116464169A (en) | 2023-07-21 |
CN116464169B true CN116464169B (en) | 2024-10-18 |
Family
ID=87184556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310612776.8A Active CN116464169B (en) | 2023-05-29 | 2023-05-29 | Beam side embedded part and mounting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116464169B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN210597650U (en) * | 2019-08-26 | 2020-05-22 | 北京国电德安电力工程有限公司 | Beam bottom rear embedded bar embedded part structure |
CN210827866U (en) * | 2019-08-08 | 2020-06-23 | 武汉华科永信建筑工程有限公司 | Steel beam concrete beam hinge structure |
CN211569042U (en) * | 2020-01-10 | 2020-09-25 | 建艺建设工程有限公司 | Floor brick hand-held device for architectural decoration |
CN218204953U (en) * | 2022-08-18 | 2023-01-03 | 中信建筑设计研究总院有限公司 | Connection structure of circular steel tube beam and existing concrete side beam |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105003088B (en) * | 2015-07-16 | 2018-01-05 | 广州市第一建筑工程有限公司 | The construction method of embedded part is leaked in a kind of Construction of Steel Structure |
CN211816998U (en) * | 2020-03-02 | 2020-10-30 | 哈尔滨石油学院 | Concrete embedded part for construction |
CN212130012U (en) * | 2020-04-20 | 2020-12-11 | 中机国能电力工程有限公司 | A reinforced anchor bolt rear anchoring embedded part node |
CN212641762U (en) * | 2020-04-29 | 2021-03-02 | 玉茗建设集团有限责任公司 | Embedded part applied to assembly type building |
CN112095808B (en) * | 2020-09-23 | 2021-11-16 | 广东龙越建筑工程有限公司 | Assembled building embedded part |
CN216613830U (en) * | 2021-11-12 | 2022-05-27 | 吉林市第一建筑工程股份有限公司 | Recoverable tower crane adheres to and buries a structure |
CN217419992U (en) * | 2022-06-02 | 2022-09-13 | 中国建筑西北设计研究院有限公司 | Connecting joint structure for steel beam and reinforced concrete core tube |
-
2023
- 2023-05-29 CN CN202310612776.8A patent/CN116464169B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN210827866U (en) * | 2019-08-08 | 2020-06-23 | 武汉华科永信建筑工程有限公司 | Steel beam concrete beam hinge structure |
CN210597650U (en) * | 2019-08-26 | 2020-05-22 | 北京国电德安电力工程有限公司 | Beam bottom rear embedded bar embedded part structure |
CN211569042U (en) * | 2020-01-10 | 2020-09-25 | 建艺建设工程有限公司 | Floor brick hand-held device for architectural decoration |
CN218204953U (en) * | 2022-08-18 | 2023-01-03 | 中信建筑设计研究总院有限公司 | Connection structure of circular steel tube beam and existing concrete side beam |
Also Published As
Publication number | Publication date |
---|---|
CN116464169A (en) | 2023-07-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210946426U (en) | Road and bridge crack reinforcing structure | |
CN110644428B (en) | Temporary support device is built to ecological bank protection of water conservancy | |
CN104563499B (en) | Three-dimensional scalable combines rod-type inner support instrument and construction method thereof and application | |
CN211330043U (en) | Old and useless steel pipe coating covering device | |
CN116464169B (en) | Beam side embedded part and mounting method thereof | |
CN201778643U (en) | Movable ladder stand | |
CN202117336U (en) | An adjustable large-area concrete surface leveling construction device | |
CN204960289U (en) | Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly | |
CN111977432A (en) | Waterproofing membrane system of processing | |
CN209820964U (en) | Steel pipe bending resistance detection device for building construction | |
CN205604083U (en) | A wedge system that slides for steel pipe support unloads | |
CN211395296U (en) | Crack prosthetic devices that public road bridge roof beam was used | |
CN204455779U (en) | Combined type channel-section steel formwork leverage | |
CN216831483U (en) | Hole reservation structure of large-scale prefabricated component | |
CN112854749B (en) | A tool-type formwork for a non-support system in a renovation project and a construction method thereof | |
CN211499679U (en) | Scaffold for reservoir construction | |
CN213418456U (en) | Building scaffold wall connecting piece | |
CN216460587U (en) | Friction type removing device for reinforced concrete | |
CN204386140U (en) | A kind of recoverable suspension scaffold shaped steel anchor device | |
CN211100802U (en) | Guide crossbeam locking structure of short stress rolling mill | |
CN210659317U (en) | Steel bar cushion block placing tool | |
CN220851013U (en) | Long-distance pipeline construction pipe stabilizing mechanism | |
CN220184258U (en) | Constructional engineering steel structure supporting equipment | |
CN222782113U (en) | Pit repairing and positioning device | |
CN211473379U (en) | Adjustable support jacking for formwork support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |