Construction method for painting house building wall surface Download PDF

Info

Publication number
CN116378335A
CN116378335A CN202310326354.4A CN202310326354A CN116378335A CN 116378335 A CN116378335 A CN 116378335A CN 202310326354 A CN202310326354 A CN 202310326354A CN 116378335 A CN116378335 A CN 116378335A
Authority
CN
China
Prior art keywords
putty
primer
wall
construction
wall surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310326354.4A
Other languages
Chinese (zh)
Inventor
余冠源
蔡民亮
邓锦波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhongcheng Construction Group Co ltd
Original Assignee
Guangdong Zhongcheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhongcheng Construction Group Co ltd filed Critical Guangdong Zhongcheng Construction Group Co ltd
Priority to CN202310326354.4A priority Critical patent/CN116378335A/en
Publication of CN116378335A publication Critical patent/CN116378335A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

本发明涉及房屋建筑涂刷技术领域,且公开了一种房屋建筑墙面涂刷施工方法,包括以下具体步骤,步骤一、基层处理;步骤二、腻子涂刷;步骤三、底漆施工;步骤四、面漆施工;步骤五、清洁和检查。本发明通过在腻子粉找平墙体基层后涂刷一层防水底胶可降低腻子粉后期的粉化现象,并在墙体打磨后的腻子粉表面喷洒液体,进一步提高腻子粉的附着性,从而降低后期腻子粉成型后由于干裂脱落导致大量粉尘从而影响面漆涂刷质量的问题,提高墙体面漆涂刷后的整洁性,并通过在底漆施工步骤中加入黑色盘pe膜进行密封,可降低底漆的成膜效率,从而提高底漆与墙体间的渗透率,从而提高腻子与墙体的附着性。

Figure 202310326354

The present invention relates to the technical field of house construction painting, and discloses a construction method of house construction wall painting, comprising the following specific steps, step 1, base treatment; step 2, putty painting; step 3, primer construction; step Fourth, topcoat construction; step five, cleaning and inspection. The present invention can reduce the pulverization phenomenon of the putty powder in the later stage by applying a layer of waterproof primer after the putty powder has leveled the base layer of the wall, and spray liquid on the surface of the putty powder after the wall is polished to further improve the adhesion of the putty powder, thereby Reduce the problem of a large amount of dust caused by dry cracking and falling off after the putty powder is formed in the later stage, which affects the quality of the topcoat, improve the cleanliness of the wall topcoat after brushing, and seal it by adding a black disc PE film in the primer construction step, It can reduce the film-forming efficiency of the primer, thereby increasing the permeability between the primer and the wall, thereby improving the adhesion between the putty and the wall.

Figure 202310326354

Description

一种房屋建筑墙面涂刷施工方法A kind of building construction wall painting construction method

技术领域technical field

本发明涉及房屋建筑涂刷技术领域,具体为一种房屋建筑墙面涂刷施工方法。The invention relates to the technical field of house construction painting, in particular to a construction method for house construction wall painting.

背景技术Background technique

建筑涂刷施工通过将涂料涂敷在建筑物的表面上,形成连续的薄膜,厚度适中,有一定的硬度和韧性,并具有耐磨、耐候、耐化学侵蚀以及抗污染等功能,可以提高建筑物的使用寿命,建筑涂料所形成的涂层能装饰美化建筑物。Architectural painting construction forms a continuous film by applying paint on the surface of the building, with moderate thickness, certain hardness and toughness, and has functions such as wear resistance, weather resistance, chemical erosion resistance and anti-pollution, which can improve the quality of buildings. The coating formed by architectural coatings can decorate and beautify buildings.

目前的建筑涂刷施工过程包括基层处理、填补腻子、底漆施工、面漆施工和涂料修整,是通过将涂料涂抹在墙面上对墙面进行保护,但是在进行涂料的涂抹时,由于腻子粉在涂刷过程中会出现开裂或脱落的现象,这样会产生大量的粉尘,当完成对墙面的涂刷后,这些粉尘容易粘粘在墙面上,进而会污染最后涂刷的乳胶漆,导致墙面存在污渍。The current building painting construction process includes base treatment, filling putty, primer construction, topcoat construction and paint trimming. It is to protect the wall surface by applying paint to the wall surface. The powder will crack or fall off during the painting process, which will generate a lot of dust. After the wall is painted, the dust will easily stick to the wall, which will contaminate the final latex paint , resulting in stains on the walls.

发明内容Contents of the invention

(一)解决的技术问题(1) Solved technical problems

针对现有技术的不足,本发明提供了一种房屋建筑墙面涂刷施工方法,通过在腻子粉中加入胶水,可初步提高腻子粉与墙体之间的附着性,并通过在腻子粉找平墙体基层后再次涂刷一层防水底胶可降低腻子粉后期的粉化现象,并在墙体打磨后的腻子粉表面喷洒液体,进一步提高腻子粉的附着性,从而降低后期腻子粉成型后由于干裂脱落导致大量粉尘从而影响面漆涂刷质量的问题,提高墙体面漆涂刷后整洁性的优点,解决了目前的建筑涂刷施工过程包括基层处理、填补腻子、底漆施工、面漆施工和涂料修整,是通过将涂料涂抹在墙面上对墙面进行保护,但是在进行涂料的涂抹时,由于需要多次的对墙面的腻子粉进行打磨,这样产生大量的粉尘,当完成对墙面的涂刷后,这些粉尘容易粘粘在墙面上,进而会污染最后涂刷的乳胶漆,导致墙面存在污渍的问题。Aiming at the deficiencies of the prior art, the present invention provides a construction method for painting the walls of house construction. By adding glue to the putty powder, the adhesion between the putty powder and the wall can be preliminarily improved, and by leveling the putty powder After the base layer of the wall, apply a layer of waterproof primer again to reduce the pulverization of the putty powder in the later stage, and spray liquid on the surface of the putty powder after the wall is polished to further improve the adhesion of the putty powder, thereby reducing the post-forming putty powder. Due to dry cracking and falling off, a large amount of dust will affect the quality of the topcoat, and the advantage of improving the cleanliness of the wall topcoat after painting has solved the current construction process of building painting, including base treatment, filling putty, primer construction, and surface coating. Paint construction and paint finishing are to protect the wall surface by applying the paint on the wall surface. However, when the paint is applied, it is necessary to polish the putty powder on the wall surface many times, which will generate a lot of dust. After the wall is painted, the dust is easy to stick to the wall, which will contaminate the last painted latex paint, resulting in stains on the wall.

(二)技术方案(2) Technical solution

为实现上述目的,本发明提供如下技术方案:一种房屋建筑墙面涂刷施工方法,包括以下具体步骤:In order to achieve the above object, the present invention provides the following technical solutions: a construction method for building wall painting, comprising the following specific steps:

步骤一、基层处理:首先通过打磨设备将墙面上起皮、松动以及鼓包等地方进行清除,将残留在基层表面上的杂物清除干净,然后通过碱水将现浇混凝土表面的隔离剂、油污清刷干净,所述杂物包括但不限于灰尘、污垢、砂浆;Step 1. Base treatment: First, use grinding equipment to remove peeling, looseness, and bulges on the wall, and remove debris remaining on the surface of the base, and then use alkaline water to remove the release agent, The oil stains are cleaned, and the sundries include but not limited to dust, dirt, mortar;

步骤二、腻子涂刷:待步骤一的中基层处理完成后,先用腻子粉将墙面磕碰的凹陷地方分别找平,待腻子粉干燥后,打磨平整,之后采用采用防水涂料底胶对墙面基层进行涂刷,之后在墙面基层涂刷腻子粉,待干燥后用1号砂纸将凸出处磨平,并将依附在墙面基层上的浮尘清扫干净;Step 2. Putty painting: After the treatment of the middle and base layers in step 1 is completed, use putty powder to level the concave parts of the wall respectively. After the putty powder is dry, polish it to a smooth surface. Brush the base layer, and then apply putty powder on the base layer of the wall surface. After drying, smooth the protrusion with No. 1 sandpaper, and clean the floating dust attached to the base layer of the wall surface;

步骤三、底漆施工:当步骤二中腻子涂刷完成后,选用透明封闭底漆,并在使用前向底漆中加入水进行搅拌,使底漆保持在一定粘稠度,之后将稀释后的底漆均匀涂抹在墙面;Step 3. Primer construction: After the putty is painted in step 2, choose a transparent sealing primer, and add water to the primer before use for stirring to keep the primer at a certain viscosity, and then dilute it The primer is evenly applied to the wall;

步骤四、面漆施工:待步骤三中底漆施工完成后,在墙面上涂刷三层乳胶漆,刷第一遍乳胶漆:涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,先将墙面清扫干净,用布将墙面粉尘擦掉;刷第二遍乳胶漆:要求同第一遍,使用前充分搅拌,如不粘稠,不宜加水,以防透底,刷第三遍乳胶漆:做法同第二遍乳胶漆,由于乳胶漆膜干燥较快,应连续迅速作业,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔,避免出现干燥后接头的现象;Step 4. Topcoat construction: After the primer construction in step 3 is completed, paint three layers of latex paint on the wall, and brush the first coat of latex paint: the painting sequence is to paint the top plate first and then the wall. The wall is First up and then down, clean the wall first, wipe off the dust on the wall with a cloth; brush the latex paint for the second time: the requirements are the same as the first time, stir well before use, if it is not sticky, it is not suitable to add water to prevent the bottom from showing through 1. Brush the latex paint for the third time: the method is the same as the second time for the latex paint. Since the latex paint film dries quickly, it should be worked continuously and quickly. When painting, start from one end and gradually brush to the other end. A row of pens is next to the previous row of pens to avoid joints after drying;

步骤五、清洁和检查:待步骤四中面漆施工完成后,检查墙面颜色是否符合设计要求,涂漆表面颜色是否相同,检查墙体是否存在发泡、漏刷等质量缺陷。Step 5. Cleaning and inspection: After the topcoat construction in step 4 is completed, check whether the color of the wall meets the design requirements, whether the color of the painted surface is the same, and check whether there are quality defects such as foaming and missing paint on the wall.

优选的,所述步骤二中的腻子涂刷步骤具体包括:腻子找平、底胶涂刷、腻子涂刷和腻子养护,其中腻子找平是用腻子粉将墙面磕碰的凹陷地方分别找平,在施工过程当中,采用刮刀进行填补基层孔洞和裂缝位置,然后把食指紧压在刀片,把腻子压进缺陷之内,必须要填满、填实,来回涂抹,之后待腻子粉干燥后,打磨平整即可。Preferably, the putty brushing step in the step 2 specifically includes: putty leveling, primer coating, putty brushing and putty maintenance, wherein the putty leveling is to use putty powder to level the depressions bumped by the wall respectively, and then put them in place during construction. During the process, use a scraper to fill the holes and cracks in the base layer, and then press your index finger tightly against the blade to press the putty into the defect. It must be filled, filled, and smeared back and forth. After the putty powder is dry, it is polished and smooth. Can.

优选的,所述底胶涂刷步骤将防水涂料底胶搅拌均匀,再用长把滚刷或用橡胶刷刮板,刮涂把防水材料,均匀的涂刷到基层上,涂刷时不得堆积和露白见底,涂刷量,每遍以0.4kg/平方米-0.5kg/平方米为宜,第一遍完全干燥后方能再涂刷第二遍。Preferably, the primer brushing step is to stir the waterproof paint primer evenly, and then use a long roller brush or scraper with a rubber brush to scrape the waterproof material onto the base layer evenly, and do not pile up when brushing And Lubai see the bottom, the amount of brushing, each time 0.4kg/square meter -0.5kg/square meter is appropriate, the first coat is completely dry before painting the second time.

优选的,所述腻子涂刷和腻子养护过程是在底胶涂刷完成后在墙面基层涂刷腻子粉,且腻子粉中加入胶水,待干燥后用1号砂纸将凸出处磨平,并将依附在上的浮尘清扫干净的同时在腻子粉表面喷洒水进行养护。Preferably, the putty brushing and putty maintenance process is to paint the putty powder on the base of the wall after the primer is painted, and add glue to the putty powder, and after drying, smooth the protrusion with No. 1 sandpaper, and While cleaning the floating dust attached to it, spray water on the surface of the putty powder for maintenance.

优选的,所述腻子找平和腻子涂刷过程中的腻子粉采用石膏腻子、纤维素大白腻子或胶水腻子中的一种,所述腻子养护步骤养护时间为14天,至PH值小于10、含水率小于10%后方可进行下一道工序的施工。Preferably, the putty powder in the putty leveling and putty brushing process is one of gypsum putty, cellulose white putty or glue putty, and the curing time of the putty curing step is 14 days until the pH value is less than 10 and contains water. The construction of the next process can only be carried out after the rate is less than 10%.

优选的,所述步骤三中的底漆采用封闭底漆,且底漆涂刷前应将墙面基层打磨平整,清理浮尘,施工工具应保持清洁,确保封闭底漆不受到任何污染,不带任何杂物,且底漆在涂刷后采用黑色pe膜对墙体进行覆盖,待底漆干燥成膜后,揭下pe膜即可进行后续流程。Preferably, the primer in the step 3 is a sealing primer, and before the primer is painted, the base layer of the wall surface should be polished smooth, the floating dust should be cleaned, and the construction tools should be kept clean to ensure that the sealing primer is not subject to any pollution, without Any debris, and the primer is covered with a black PE film after the primer is painted. After the primer dries and forms a film, the PE film can be removed to proceed to the subsequent process.

优选的,所述步骤四中的面漆施工顺序为:首先天花板、线条和墙体,且三层乳胶漆中第一层加入5-10%的水以促进墙壁吸收,并采用粗滚刷,而后两层乳胶漆无需加水,采用细滚刷。Preferably, the sequence of topcoat construction in step 4 is: firstly the ceiling, lines and walls, and 5-10% of water is added to the first layer of the three-layer latex paint to promote wall absorption, and a rough roller brush is used, The last two layers of latex paint do not need to be added with water, and a fine roller brush is used.

(三)有益效果(3) Beneficial effects

与现有技术相比,本发明提供了一种房屋建筑墙面涂刷施工方法,具备以下有益效果:Compared with the prior art, the present invention provides a construction method for painting the walls of house construction, which has the following beneficial effects:

1、本发明通过在腻子粉中加入胶水,可初步提高腻子粉与墙体之间的附着性,并通过在腻子粉找平墙体基层后再次涂刷一层防水底胶可降低腻子粉后期的粉化现象,并在墙体打磨后的腻子粉表面喷洒液体,进一步提高腻子粉的附着性,从而降低后期腻子粉成型后由于干裂脱落导致大量粉尘从而影响面漆涂刷质量的问题,提高墙体面漆涂刷后的整洁性。1. The present invention can preliminarily improve the adhesion between the putty powder and the wall by adding glue to the putty powder, and can reduce the later stage of the putty powder by applying a layer of waterproof primer after the putty powder has leveled the base layer of the wall. The pulverization phenomenon, and spray liquid on the surface of the putty powder after the wall is polished, further improve the adhesion of the putty powder, thereby reducing the problem of a large amount of dust caused by dry cracking and falling off after the putty powder is formed in the later stage, which affects the quality of the topcoat, and improves the quality of the wall. Cleanliness after application of a decent topcoat.

2、本发明通过在底漆施工步骤中加入黑色盘pe膜进行密封,可降低底漆在涂刷过程中由于外界温度过高导致底漆成膜过快,从而使得底漆不能够渗透到外墙基层里,造成附着力差情况,并通过在底漆中加入适量液体,使底漆充分渗透到腻子基层里,从而提高腻子与墙体的附着性。2. The present invention seals the primer by adding a black disc PE film in the construction step of the primer, which can reduce the excessive film formation of the primer due to the high external temperature during the painting process, so that the primer cannot penetrate into the outside. In the base layer of the wall, the adhesion is poor, and by adding an appropriate amount of liquid to the primer, the primer can fully penetrate into the putty base layer, thereby improving the adhesion between the putty and the wall.

附图说明Description of drawings

图1为本发明施工方法系统流程图;Fig. 1 is the system flowchart of construction method of the present invention;

图2为本发明腻子涂刷步骤系统流程图。Fig. 2 is a system flow chart of the putty brushing steps of the present invention.

具体实施方式Detailed ways

下面将结合本发明实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

实施例一:Embodiment one:

一种房屋建筑墙面涂刷施工方法,包括以下具体步骤:A construction method for painting a building wall, comprising the following specific steps:

步骤一、基层处理:首先通过打磨设备将墙面上起皮、松动以及鼓包等地方进行清除,将残留在基层表面上的杂物清除干净,然后通过碱水将现浇混凝土表面的隔离剂、油污清刷干净,其中杂物包括但不限于灰尘、砂浆、污垢。Step 1. Base treatment: First, use grinding equipment to remove peeling, looseness, and bulges on the wall, and remove debris remaining on the surface of the base, and then use alkaline water to remove the release agent, The oil stains are cleaned, and the sundries include but not limited to dust, mortar, and dirt.

步骤二、腻子涂刷,腻子涂刷步骤具体包括:腻子找平、底胶涂刷、腻子涂刷和腻子养护,其中腻子找平是用腻子粉将墙面磕碰的凹陷地方分别找平,在施工过程当中,采用刮刀进行填补基层孔洞和裂缝位置,然后把食指紧压在刀片,把腻子压进缺陷之内,必须要填满、填实,来回涂抹,之后待腻子粉干燥后,打磨平整即可,而底胶涂刷是在墙体表面打磨平整后将防水涂料底胶搅拌均匀,再用长把滚刷或用橡胶刷刮板,刮涂把防水材料均匀的涂刷到基层上,涂刷时不得堆积和露白见底,涂刷量,每遍以0.4kg/平方米-0.5kg/平方米为宜,第一遍完全干燥后方能再涂刷第二遍,之后所述腻子涂刷和腻子养护过程是在底胶涂刷完成后在墙面基层涂刷腻子粉,且腻子粉中加入适量胶水,待干燥后用1号砂纸将凸出处磨平,并将依附在上的浮尘清扫干净的同时在腻子粉表面喷洒水进行养护,待养护时间后即可开始下一流程。Step 2. Putty brushing. The steps of putty brushing include: putty leveling, primer coating, putty brushing and putty maintenance. The putty leveling is to use putty powder to level the depressions on the wall respectively. During the construction process , Use a scraper to fill the holes and cracks in the base layer, then press your index finger tightly against the blade, press the putty into the defect, it must be filled, filled, and applied back and forth, and then after the putty powder is dry, it can be polished and smoothed. The primer coating is to mix the waterproof paint primer evenly after the surface of the wall is polished, and then use a long roller brush or a rubber brush to scrape the waterproof material evenly on the base layer. Do not pile up or reveal the bottom. The amount of painting should be 0.4kg/square meter to 0.5kg/square meter each time. The second time can be applied after the first time is completely dry, and then the putty is applied and putty The maintenance process is to apply putty powder on the base of the wall after the primer is painted, and add an appropriate amount of glue to the putty powder. After drying, use No. 1 sandpaper to smooth the protrusion and clean the floating dust attached to it. At the same time, spray water on the surface of the putty powder for maintenance, and start the next process after the maintenance time.

其中腻子找平和腻子涂刷过程中的腻子粉采用石膏腻子、纤维素大白腻子或胶水腻子中的一种,腻子养护步骤养护时间为14天,至PH值小于10、含水率小于10%后方可进行下一道工序的施工。Among them, the putty powder used in the putty leveling and putty brushing process is gypsum putty, cellulose white putty or glue putty, and the curing time of the putty is 14 days, until the pH value is less than 10 and the moisture content is less than 10%. Carry out the construction of the next process.

步骤三、底漆施工:当步骤二中腻子涂刷完成后,选用透明封闭底漆,并在使用前向底漆中加入适量水进行搅拌,使底漆保持在一定粘稠度,之后将稀释后的底漆均匀涂抹在墙面,且底漆在涂刷后采用黑色pe膜对墙体进行覆盖,待底漆干燥成膜后,揭下pe膜即可进行后续流程。Step 3. Primer construction: After the putty painting in step 2 is completed, choose a transparent sealing primer, and add an appropriate amount of water to the primer before use for stirring to keep the primer at a certain viscosity, and then dilute it The final primer is evenly applied on the wall, and the primer is covered with a black PE film after the primer is applied. After the primer is dried and formed into a film, the PE film can be removed to carry out the subsequent process.

步骤四、面漆施工:待步骤三中底漆施工完成后,在墙面上涂刷三层乳胶漆,刷第一遍乳胶漆:涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,先将墙面清扫干净,用布将墙面粉尘擦掉;刷第二遍乳胶漆:要求同第一遍,使用前充分搅拌,如不粘稠,不宜加水,以防透底,刷第三遍乳胶漆:做法同第二遍乳胶漆,由于乳胶漆膜干燥较快,应连续迅速作业,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔,避免出现干燥后接头,且三层乳胶漆中第一层加入5-10%的水以促进墙壁吸收,并采用粗滚刷,而后两层乳胶漆无需加水,采用细滚刷。Step 4. Topcoat construction: After the primer construction in step 3 is completed, paint three layers of latex paint on the wall, and brush the first coat of latex paint: the painting sequence is to paint the top plate first and then the wall. The wall is First up and then down, clean the wall first, wipe off the dust on the wall with a cloth; brush the latex paint for the second time: the requirements are the same as the first time, stir well before use, if it is not sticky, it is not suitable to add water to prevent the bottom from showing through 1. Brush the latex paint for the third time: the method is the same as the second time for the latex paint. Since the latex paint film dries quickly, it should be worked continuously and quickly. When painting, start from one end and gradually brush to the other end. One row of pens is next to the previous row of pens to avoid joints after drying, and add 5-10% water to the first layer of the three-layer latex paint to promote wall absorption, and use a rough roller brush, and then the last two layers of latex paint do not need to add water , with a fine roller brush.

步骤五、清洁和检查:待步骤四中面漆施工完成后,检查墙面颜色是否符合设计要求,涂漆表面颜色是否相同,检查墙体是否存在发泡、漏刷等质量缺陷。Step 5. Cleaning and inspection: After the topcoat construction in step 4 is completed, check whether the color of the wall meets the design requirements, whether the color of the painted surface is the same, and check whether there are quality defects such as foaming and missing paint on the wall.

对比例一:Comparative example one:

一种房屋建筑墙面涂刷施工方法,包括以下具体步骤:A construction method for painting a building wall, comprising the following specific steps:

步骤一、基层处理:首先通过打磨设备将墙面上起皮、松动以及鼓包等地方进行清除,将残留在基层表面上的杂物清除干净,然后通过碱水将现浇混凝土表面的隔离剂、油污清刷干净,杂物包括但不限于灰尘、污垢和砂浆;Step 1. Base treatment: First, use grinding equipment to remove peeling, looseness, and bulges on the wall, and remove debris remaining on the surface of the base, and then use alkaline water to remove the release agent, The oil stains are cleaned, and the sundries include but not limited to dust, dirt and mortar;

步骤二、腻子涂刷,腻子涂刷步骤具体包括:腻子找平、腻子涂刷和腻子养护,其中腻子找平是用腻子粉将墙面磕碰的凹陷地方分别找平,在施工过程当中,采用刮刀进行填补基层孔洞和裂缝位置,然后把食指紧压在刀片,把腻子压进缺陷之内,必须要填满、填实,来回涂抹,之后待腻子粉干燥后,打磨平整即可,之后腻子涂刷和腻子养护过程是在腻子找平完成后在墙面基层涂刷腻子粉,待腻子干燥后用1号砂纸将凸出处磨平,并将依附在上的浮尘清扫干净的同时在腻子粉表面喷洒水进行养护,待养护时间后即可开始下一流程;Step 2. Putty brushing. The steps of putty brushing include: putty leveling, putty brushing and putty maintenance. The putty leveling is to use putty powder to level the depressions on the wall respectively. During the construction process, use a scraper to fill them up. The position of holes and cracks in the base layer, and then press the index finger tightly on the blade to press the putty into the defect. It must be filled, filled, and applied back and forth. After the putty powder is dry, it can be polished and smoothed. The putty maintenance process is to apply putty powder on the base layer of the wall after the putty leveling is completed. After the putty is dry, use No. 1 sandpaper to smooth the protrusions, clean the floating dust attached to it, and spray water on the surface of the putty powder Maintenance, the next process can start after the maintenance time;

其中腻子找平和腻子涂刷过程中的腻子粉采用石膏腻子、纤维素大白腻子或胶水腻子中的一种,所述腻子养护步骤养护时间为14天,至PH值小于10、含水率小于10%后方可进行下一道工序的施工;Wherein the putty powder in the putty leveling and putty brushing process adopts one of gypsum putty, cellulose white putty or glue putty, and the curing time of the putty curing step is 14 days until the pH value is less than 10 and the moisture content is less than 10%. Only then can the construction of the next process be carried out;

步骤三、底漆施工:当步骤二中腻子涂刷完成后,选用透明封闭底漆,并在使用前向底漆中加入适量水进行搅拌,使底漆保持在一定粘稠度,之后将稀释后的底漆均匀涂抹在墙面,待底漆干燥成膜后,即可进行后续流程;Step 3. Primer construction: After the putty painting in step 2 is completed, choose a transparent sealing primer, and add an appropriate amount of water to the primer before use for stirring to keep the primer at a certain viscosity, and then dilute it The final primer is evenly applied on the wall, and the subsequent process can be carried out after the primer dries and forms a film;

步骤四、面漆施工:待步骤三中底漆施工完成后,在墙面上涂刷三层乳胶漆,刷第一遍乳胶漆:涂刷顺序是先刷顶板后刷墙面,墙面是先上后下,先将墙面清扫干净,用布将墙面粉尘擦掉;刷第二遍乳胶漆:要求同第一遍,使用前充分搅拌,如不粘稠,不宜加水,以防透底,刷第三遍乳胶漆:做法同第二遍乳胶漆,由于乳胶漆膜干燥较快,应连续迅速作业,涂刷时从一头开始,逐渐刷向另一头,要上下顺刷互相衔接,后一排笔紧接前一排笔,避免出现干燥后接头的现象,且三层乳胶漆中第一层加入5-10%的水以促进墙壁吸收,并采用粗滚刷,而后两层乳胶漆无需加水,采用细滚刷;Step 4. Topcoat construction: After the primer construction in step 3 is completed, paint three layers of latex paint on the wall, and brush the first coat of latex paint: the painting sequence is to paint the top plate first and then the wall. The wall is First up and then down, clean the wall first, wipe off the dust on the wall with a cloth; brush the latex paint for the second time: the requirements are the same as the first time, stir well before use, if it is not sticky, it is not suitable to add water to prevent the bottom from showing through 1. Brush the latex paint for the third time: the method is the same as the second time for the latex paint. Since the latex paint film dries quickly, it should be worked continuously and quickly. When painting, start from one end and gradually brush to the other end. One row of pens is followed by the previous row of pens to avoid the phenomenon of joints after drying, and the first layer of three-layer latex paint adds 5-10% water to promote wall absorption, and uses a coarse roller brush, and then two layers of latex paint No need to add water, use a fine roller brush;

步骤五、清洁和检查:待步骤四中面漆施工完成后,检查墙面颜色是否符合设计要求,涂漆表面颜色是否相同,检查墙体是否存在发泡、漏刷等质量缺陷。Step 5. Cleaning and inspection: After the topcoat construction in step 4 is completed, check whether the color of the wall meets the design requirements, whether the color of the painted surface is the same, and check whether there are quality defects such as foaming and missing paint on the wall.

对上述实施例一和对比例一进行施工过程观测,可得知实施例一中由于在腻子涂刷过程中增加底胶涂刷步骤,可降低腻子后期粉化现象,提高面漆施工过程中的整洁性,而黑色pe膜的增加可降低底漆在涂刷过程中由于外界温度过高导致底漆成膜过快,从而使得底漆不能够渗透到外墙基层里,造成附着力差情况,比较对比例一提高腻子与墙体之间的附着性。Observing the construction process of the above-mentioned embodiment one and comparative example one, it can be known that in the embodiment one, due to the increase of the primer brushing step in the putty brushing process, the pulverization phenomenon in the later stage of the putty can be reduced, and the surface coating in the construction process of the topcoat can be improved. Cleanliness, and the increase of black PE film can reduce the primer film formation too fast due to the high external temperature during the painting process, so that the primer cannot penetrate into the base layer of the exterior wall, resulting in poor adhesion, Comparative example 1 improves the adhesion between the putty and the wall.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (7)

1. The house building wall painting construction method is characterized by comprising the following specific steps of:
step one, base layer treatment: firstly, removing the peeling, loosening and swelling places on the wall surface through polishing equipment, removing impurities remained on the surface of a base layer, and then cleaning a release agent and greasy dirt on the surface of cast-in-place concrete through alkaline water, wherein the impurities comprise but are not limited to dust, dirt and mortar;
step two, putty coating: after the base layer treatment in the first step is finished, firstly leveling the sunken parts where the wall surface collides with by using putty powder, after the putty powder is dried, polishing and leveling, then coating the base layer of the wall surface by using waterproof paint primer, then coating the base layer of the wall surface with the putty powder, after the putty powder is dried, polishing the protruding parts by using No. 1 sand paper, and cleaning floating dust attached to the base layer of the wall surface;
thirdly, primer construction: after the putty is coated in the second step, selecting transparent seal primer, adding a proper amount of water into the primer before using, stirring to ensure that the primer keeps a certain viscosity, and uniformly coating the diluted primer on a wall surface;
step four, finishing coat construction: after the primer construction in the third step is completed, three layers of emulsion paints are painted on the wall surface, and the emulsion paints are painted for the first time: the painting sequence is to brush the top plate and then brush the wall surface, the wall surface is cleaned firstly from top to bottom, and the dust on the wall surface is wiped off by cloth; brushing the emulsion paint for the second time: the requirements are the same as the first time, the emulsion paint is fully stirred before use, if not sticky, water is not added, so that the emulsion paint is prevented from penetrating through the bottom, and the emulsion paint is brushed for the third time: the method is the same as that of the emulsion paint for the second time, as the emulsion paint dries faster, continuous and rapid operation should be carried out, when the emulsion paint is painted, the emulsion paint is gradually brushed from one end to the other end, the emulsion paint is required to be mutually connected up and down, and the next pen row is immediately connected with the previous pen row, so that the phenomenon of joint after drying is avoided;
step five, cleaning and checking: after finishing the finish construction in the fourth step, checking whether the color of the wall surface meets the design requirement, checking whether the color of the painted surface is the same, and checking whether the quality defect of foaming and brushing leakage exists in the wall body.
2. The method for painting and constructing the wall surface of the building according to claim 1, wherein the step of painting and brushing the putty in the step two specifically comprises the following steps: the method comprises the steps of putty leveling, primer coating, putty coating and putty maintenance, wherein the putty leveling is to level the sinking places where the wall surface collides with putty powder respectively, in the construction process, a scraper is adopted to fill holes and cracks of a base layer, then an index finger is pressed on a blade, the putty is pressed into the defect, the defect needs to be filled and filled, the putty is coated back and forth, and then the putty powder is polished to be flat after being dried.
3. The house building wall painting construction method according to claim 2, characterized in that: the primer brushing step specifically comprises the following steps: the waterproof paint primer is stirred uniformly, then a long rolling brush or a rubber brush scraper is used for scraping and coating the waterproof material on the base layer, the waterproof material is uniformly coated, the waterproof paint cannot be piled up and exposed to the bottom when being coated, the coating amount is preferably 0.4 kg/square meter-0.5 kg/square meter, and the waterproof paint can be coated for the second time after being completely dried in the first time.
4. The house building wall painting construction method according to claim 2, characterized in that: the putty coating and putty maintenance process is to coat putty powder on a wall surface base layer after the primer coating is finished, and to add a proper amount of glue into the putty powder, to grind the protruding part flat by No. 1 sand paper after drying, and to clean floating dust attached on the protruding part flat and to spray water on the surface of the putty powder for maintenance.
5. The method for coating and constructing the wall surface of the building according to claim 4, which is characterized in that: the putty powder in the putty leveling and brushing process adopts one of gypsum putty, cellulose white putty or glue putty, and the curing time of the putty curing step is 14 days until the PH value is less than 10 and the water content is less than 10 percent, and then the construction of the next working procedure can be carried out.
6. The house building wall painting construction method according to claim 1, wherein: the primer in the third step adopts seal primer, the wall surface base layer is polished and leveled before the primer is painted, floating dust is cleaned, a construction tool is kept clean, the seal primer is ensured not to be polluted and does not contain any sundries, the wall body is covered by adopting a black pe film after the primer is painted, and after the primer is dried to form a film, the pe film is removed for subsequent flow.
7. The house building wall painting construction method according to claim 1, wherein: the finishing paint construction sequence in the fourth step is as follows: firstly, ceilings, lines and walls, wherein 5-10% of water is added into the first layer of the three-layer emulsion paint to promote wall absorption, a coarse rolling brush is adopted, and the second two layers of emulsion paint do not need to be added with water, and a fine rolling brush is adopted.
CN202310326354.4A 2023-03-30 2023-03-30 Construction method for painting house building wall surface Pending CN116378335A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310326354.4A CN116378335A (en) 2023-03-30 2023-03-30 Construction method for painting house building wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310326354.4A CN116378335A (en) 2023-03-30 2023-03-30 Construction method for painting house building wall surface

Publications (1)

Publication Number Publication Date
CN116378335A true CN116378335A (en) 2023-07-04

Family

ID=86962824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310326354.4A Pending CN116378335A (en) 2023-03-30 2023-03-30 Construction method for painting house building wall surface

Country Status (1)

Country Link
CN (1) CN116378335A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117868321A (en) * 2023-12-20 2024-04-12 广东恒森建设工程有限公司 Room wall decoration method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204492051U (en) * 2015-02-07 2015-07-22 台州市美屋建材有限公司 Be applicable to the interior wall coating structure of dark surrounds
KR20160091643A (en) * 2015-01-26 2016-08-03 함영백 Wall finishing construction method
CN109138423A (en) * 2018-09-21 2019-01-04 北京城建远东建设投资集团有限公司 External wall thermal insulation/decoration integration board construction technology
CN208362242U (en) * 2018-04-18 2019-01-11 苏州新中德新型材料有限公司 Wear-resisting type automobile finish protective film
CN110359651A (en) * 2018-04-09 2019-10-22 刘珠娇 A kind of metope brushing latex lacquer craftwork

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160091643A (en) * 2015-01-26 2016-08-03 함영백 Wall finishing construction method
CN204492051U (en) * 2015-02-07 2015-07-22 台州市美屋建材有限公司 Be applicable to the interior wall coating structure of dark surrounds
CN110359651A (en) * 2018-04-09 2019-10-22 刘珠娇 A kind of metope brushing latex lacquer craftwork
CN208362242U (en) * 2018-04-18 2019-01-11 苏州新中德新型材料有限公司 Wear-resisting type automobile finish protective film
CN109138423A (en) * 2018-09-21 2019-01-04 北京城建远东建设投资集团有限公司 External wall thermal insulation/decoration integration board construction technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
住房和城乡建设部干部学院: "《油漆工(第二版)》", 31 May 2017, 华中科技大学出版社, pages: 114 *
赵云龙: "《石膏应用技术问答》", 30 September 2016, 中国建材工业出版社, pages: 247 *
赵俊学: "《室内装饰材料与施工工艺》", 28 February 2019, 黑龙江人民出版社, pages: 136 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117868321A (en) * 2023-12-20 2024-04-12 广东恒森建设工程有限公司 Room wall decoration method

Similar Documents

Publication Publication Date Title
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN101538918B (en) Method for refreshing ceramic tiles of exterior wall finish of building
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN109797920B (en) Indoor decoration construction method
CN107044196A (en) A kind of concrete is plastered face emulsion paint brushing technique
CN102828589B (en) Construction method for making replica of paint on fair-faced concrete surface
CN108343203A (en) A kind of metope anticracking batch embedding technology
CN106592898A (en) Construction method of inner wall putty
CN100560667C (en) Marble paint for building, production method and construction technology thereof
CN109424135A (en) The technique that the putty of metope in building is coated
CN106592926A (en) Construction method for epoxy micro-coarse self-leveling floor paint
CN116378335A (en) Construction method for painting house building wall surface
CN106760285A (en) The technique coated to indoor wall using putty in furniture factory building
CN108385998B (en) Repairing process for external wall leakage water
CN107489251A (en) A kind of insulation and fire-proof paint exterior wall and its construction method
CN111305592A (en) Composition layer structure and application thereof in renovation of old ceramic tile wall surface
CN108979034A (en) Wall surface construction technology
CN109679457A (en) It is a kind of can Quick-air-drying waterborne epoxy floor paint
CN107476448A (en) A kind of construction method for waterproof at toilet doorway
CN107419858A (en) A kind of inner wall render smears construction method
CN109555316A (en) Environment protection architecture construction method
CN109594748A (en) Reflective heat-insulation paint and its construction technology
CN107620434A (en) The technique coated in furniture factory building using putty to indoor wall
CN115029062A (en) Tunnel concrete surface anti-pollution brightening protection system and construction method thereof
CN109138480B (en) Antique-finishing method for wall surface painted by water-brushed stone on outer wall of historical building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination