[go: up one dir, main page]

CN116378327A - A green building roof structure - Google Patents

A green building roof structure Download PDF

Info

Publication number
CN116378327A
CN116378327A CN202310265408.0A CN202310265408A CN116378327A CN 116378327 A CN116378327 A CN 116378327A CN 202310265408 A CN202310265408 A CN 202310265408A CN 116378327 A CN116378327 A CN 116378327A
Authority
CN
China
Prior art keywords
groove
rotating
solar panel
mounting plate
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310265408.0A
Other languages
Chinese (zh)
Inventor
林竞渊
陈臻恒
吴启辉
潘美虹
叶盛俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Nan'an No1 Construction Co ltd
Original Assignee
Fujian Nan'an No1 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Nan'an No1 Construction Co ltd filed Critical Fujian Nan'an No1 Construction Co ltd
Priority to CN202310265408.0A priority Critical patent/CN116378327A/en
Publication of CN116378327A publication Critical patent/CN116378327A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0409Drainage outlets, e.g. gullies
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0445Drainage channels
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S20/00Supporting structures for PV modules
    • H02S20/20Supporting structures directly fixed to an immovable object
    • H02S20/22Supporting structures directly fixed to an immovable object specially adapted for buildings
    • H02S20/23Supporting structures directly fixed to an immovable object specially adapted for buildings specially adapted for roof structures
    • H02S20/24Supporting structures directly fixed to an immovable object specially adapted for buildings specially adapted for roof structures specially adapted for flat roofs
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S20/00Supporting structures for PV modules
    • H02S20/30Supporting structures being movable or adjustable, e.g. for angle adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0409Drainage outlets, e.g. gullies
    • E04D2013/0413Strainers for drainage outlets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • Environmental Sciences (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

本申请涉及一种绿色建筑屋顶结构,包括屋顶本体以及设置于屋顶本体顶部的安装板,安装板远离屋顶本体的板面固定有若干太阳能板;屋顶本体的顶壁开设有用于容纳安装板的容纳槽,安装板的侧壁设有转动杆,转动杆与容纳槽之间设有转动架,转动架的一端转动连接于转动杆,另一端转动连接于容纳槽的侧壁,转动杆设有用于驱使转动杆转动的转动组件,当转动架驱使安装板朝靠近容纳槽的一侧转动时,转动组件迫使安装板绕转动杆的中轴线转动并使安装板收纳于容纳槽内,转动架远离安装板的一端设有用于驱使转动架转动的驱动组件。本申请的一种绿色建筑屋顶结构能够降低人们在屋顶本体活动时,太阳能板对屋顶本体的空间占用率。

Figure 202310265408

The application relates to a green building roof structure, which includes a roof body and a mounting plate arranged on the top of the roof body. A number of solar panels are fixed on the surface of the mounting plate away from the roof body; groove, the side wall of the mounting plate is provided with a rotating rod, and a rotating frame is arranged between the rotating rod and the receiving groove, one end of the rotating frame is connected to the rotating rod, and the other end is connected to the side wall of the receiving groove, and the rotating rod is provided for The rotating assembly that drives the rotating rod to rotate. When the rotating frame drives the mounting plate to rotate toward the side close to the receiving groove, the rotating assembly forces the mounting plate to rotate around the central axis of the rotating rod and accommodates the mounting plate in the receiving groove. The rotating frame is far away from the mounting plate. One end of the plate is provided with a driving assembly for driving the turret to rotate. A green building roof structure of the present application can reduce the space occupancy rate of solar panels on the roof body when people are active on the roof body.

Figure 202310265408

Description

一种绿色建筑屋顶结构A green building roof structure

技术领域technical field

本申请涉及市政建筑的技术领域,特别是涉及一种绿色建筑屋顶结构。The application relates to the technical field of municipal buildings, in particular to a green building roof structure.

背景技术Background technique

绿色建筑是对节能、环保的建筑实践的需求和渴望,它通常强调资源可再生利用,包括环境、经济以及社会效益,减小环境负荷,优化系统。Green building is the demand and desire for energy-saving and environmentally friendly building practices. It usually emphasizes the renewable utilization of resources, including environmental, economic and social benefits, reducing environmental loads, and optimizing systems.

随着城市经济和工业的发展,我国的用电量日益增加,人们日常生活的用电也越来越紧张,为减轻城市用电压力,人们选择在屋顶处安装太阳能板,太阳能板能够吸收部分太阳能,并转化为电能或热能,实现了资源再利用,建设绿色环保型的屋顶。With the development of urban economy and industry, my country's electricity consumption is increasing day by day, and people's daily electricity consumption is becoming more and more tense. In order to reduce the pressure of urban electricity consumption, people choose to install solar panels on the roof, which can absorb part of Solar energy is converted into electrical energy or heat energy to realize resource reuse and build a green and environmentally friendly roof.

现有的太阳能板安装于屋顶的过程中,通常在屋顶表面焊接用于安装太阳能板的安装架,将太阳能板固定安装于或转动安装于安装架,从而实现太阳能板与屋顶之间的安装;然而,当人们需要在屋顶活动时,此类的安装方式中太阳能板和安装架均占用了屋顶的空间,造成人们的正常活动受限,因此需要进一步改进。In the process of installing the existing solar panel on the roof, the installation frame for installing the solar panel is usually welded on the roof surface, and the solar panel is fixed or rotated on the installation frame, so as to realize the installation between the solar panel and the roof; However, when people need to move on the roof, both the solar panel and the installation frame occupy the space on the roof in this type of installation, causing people's normal activities to be limited, so further improvement is needed.

发明内容Contents of the invention

为了降低人们在屋顶本体活动时,太阳能板对屋顶本体的空间占用率,本申请提供了一种绿色建筑屋顶结构。In order to reduce the space occupancy rate of solar panels on the roof body when people are active on the roof body, the application provides a green building roof structure.

本申请提供的一种绿色建筑屋顶结构采用如下技术方案:A green building roof structure provided by the application adopts the following technical scheme:

一种绿色建筑屋顶结构,包括屋顶本体以及设置于所述屋顶本体顶部的安装板,所述安装板远离所述屋顶本体的板面固定有若干太阳能板;所述屋顶本体的顶壁开设有用于容纳所述安装板的容纳槽,所述安装板的侧壁设有转动杆,所述转动杆与所述容纳槽之间设有转动架,所述转动架的一端转动连接于所述转动杆,另一端转动连接于所述容纳槽的侧壁,所述转动杆设有用于驱使所述转动杆转动的转动组件,当所述转动架驱使所述安装板朝靠近所述容纳槽的一侧转动时,所述转动组件迫使所述安装板绕所述转动杆的中轴线转动并使所述安装板收纳于所述容纳槽内,所述转动架远离所述安装板的一端设有用于驱使所述转动架转动的驱动组件。A green building roof structure, comprising a roof body and a mounting plate arranged on the top of the roof body, the mounting plate is fixed with a number of solar panels away from the surface of the roof body; the top wall of the roof body is provided with a Accommodating the accommodating groove of the mounting plate, the side wall of the mounting plate is provided with a rotating rod, a turret is arranged between the rotating rod and the accommodating groove, and one end of the turret is rotatably connected to the rotating rod , the other end is rotatably connected to the side wall of the accommodating groove, the rotating rod is provided with a rotating assembly for driving the rotating rod to rotate, when the turret drives the mounting plate toward the side close to the accommodating groove When rotating, the rotating assembly forces the mounting plate to rotate around the central axis of the rotating rod and allows the mounting plate to be accommodated in the accommodating groove, and the end of the rotating frame away from the mounting plate is provided for driving The drive assembly for the rotation of the turret.

通过采用上述的技术方案,通过转动架和转动杆的设置,太阳能板常态通过转动架和安装板架设于屋顶本体的顶部,通过转动架和驱动组件能够控制安装板的转动角度,使用者可根据阳光的角度变化调节太阳能板的转动角度,从而更好的吸收太阳能,提高太阳能板的工作效果;当需要收纳太阳能板时,通过驱动组件带动转动架朝靠近容纳槽的一侧转动,转动架转动过程中通过转动组件带动安装板绕转动杆转动,从而迫使安装板的板面能够进入容纳槽并收纳于容纳槽内,降低太阳能板在屋顶本体上表面的空间占用率,从而降低人们在屋顶本体活动时,太阳能板对屋顶本体的空间占用率。By adopting the above-mentioned technical scheme, through the setting of the turret and the rotating rod, the solar panel is normally erected on the top of the roof body through the turret and the installation plate, and the rotation angle of the installation plate can be controlled by the turret and the drive assembly, and the user can according to The angle of sunlight changes to adjust the rotation angle of the solar panel, so as to better absorb solar energy and improve the working effect of the solar panel; when the solar panel needs to be stored, the drive assembly drives the turret to rotate toward the side close to the receiving groove, and the turret rotates During the process, the rotating assembly drives the mounting plate to rotate around the rotating rod, so that the surface of the mounting plate can be forced to enter the accommodation groove and be stored in the accommodation groove, reducing the space occupancy rate of the solar panel on the upper surface of the roof body, thereby reducing the number of people on the roof body. When active, the space occupancy rate of the solar panel on the roof body.

可选的,所述转动组件包括齿轮、齿条以及拉杆,所述齿轮同轴固定于所述转动杆,所述齿条滑移安装于所述转动架且所述齿条与所述齿轮之间啮合传动,所述拉杆一端铰接于所述齿条的侧壁,另一端铰接于所述容纳槽的侧壁,当所述转动架转动至所述容纳槽内时,所述拉杆迫使所述安装板绕所述转动杆转动至水平状态并收纳于所述容纳槽内,且所述太阳能板转动至所述安装板的底部。Optionally, the rotating assembly includes a gear, a rack and a pull rod, the gear is coaxially fixed to the rotating rod, the rack is slidably mounted on the rotating frame, and the connection between the rack and the gear One end of the pull rod is hinged to the side wall of the rack, and the other end is hinged to the side wall of the accommodating groove. When the turret rotates into the accommodating groove, the pull rod forces the The mounting plate rotates around the rotating rod to a horizontal state and is accommodated in the receiving groove, and the solar panel rotates to the bottom of the mounting plate.

通过采用上述的技术方案,通过齿轮、齿条以及拉杆的设置,收纳太阳能板时,通过驱动组件带动转动架朝靠近容纳槽的一侧转动,拉杆能够拉动齿条滑动,迫使齿条与齿轮之间发生啮合传动,从而迫使转动杆转动并迫使安装板转动以进入容纳槽内,当安装板转动至容纳槽内后,太阳能板转动至安装板的底部,从而隐藏于安装板的底部,安装板为人们提供踩踏平台,降低人们在屋顶本体活动时,人们直接踩踏太阳能板而导致太阳能板发生损坏的可能性。By adopting the above-mentioned technical solution, through the setting of the gear, the rack and the pull rod, when the solar panel is stored, the driving assembly drives the turret to rotate toward the side close to the receiving groove, and the pull rod can pull the rack to slide, forcing the gap between the rack and the gear. The meshing transmission occurs between them, so that the rotating rod is forced to rotate and the mounting plate is forced to rotate to enter the receiving groove. When the mounting plate rotates into the receiving groove, the solar panel rotates to the bottom of the mounting plate, thereby hiding it at the bottom of the mounting plate. The mounting plate Provide people with a stepping platform to reduce the possibility of damage to the solar panels caused by people directly stepping on the solar panels when they are active on the roof.

可选的,所述安装板的板面开设有第一安装槽,所有所述太阳能板均安装于所述第一安装槽内;所述容纳槽的底壁开设有第二安装槽,所述第一安装槽的形状与所述第二安装槽的形状相适配,当所述安装板转动并收纳于所述容纳槽内时,所述第一安装槽和所述第二安装槽相对设置且所述容纳槽的底壁支撑于所述安装板的板面。Optionally, a first installation groove is opened on the surface of the installation board, and all the solar panels are installed in the first installation groove; a second installation groove is opened on the bottom wall of the accommodation groove, and the The shape of the first installation groove matches the shape of the second installation groove, and when the installation plate is rotated and accommodated in the receiving groove, the first installation groove and the second installation groove are oppositely arranged And the bottom wall of the receiving groove is supported on the board surface of the installation board.

通过采用上述的技术方案,通过第一安装槽和第二安装槽的设置,第一安装槽为太阳能板提供安装空间,当安装板收纳于容纳槽且外界人员踩踏安装板时,容纳槽的底壁支撑于安装板,降低太阳能板受人们踩踏而受力损坏的可能性,提高太阳能板的使用寿命。By adopting the above-mentioned technical scheme, through the setting of the first installation groove and the second installation groove, the first installation groove provides installation space for the solar panel. The wall is supported on the installation board, which reduces the possibility of the solar panel being damaged by force caused by people stepping on it, and improves the service life of the solar panel.

可选的,所述屋顶本体的顶部分别设有用于收集雨水的收集槽和用于储存雨水的蓄水池,所述收集槽的底壁开设有排水槽,所述排水槽连通于所述蓄水池,所述蓄水池连接有用于对植被浇灌的喷洒组件。Optionally, the top of the roof body is respectively provided with a collection tank for collecting rainwater and a storage tank for storing rainwater, the bottom wall of the collection tank is provided with a drainage groove, and the drainage groove is connected to the storage tank. A water pool, the water storage pool is connected with a spray assembly for watering the vegetation.

通过采用上述的技术方案,通过收集槽和蓄水池的设置,下雨天时,雨水能够通过收集于收集槽,并通过排水槽储存于蓄水池,当屋顶本体的植被需要浇灌时,启动喷洒组件将雨水从蓄水池抽出并用于浇灌植被,提高雨水的利用率,减轻城市的生活用水压力。By adopting the above-mentioned technical scheme, through the setting of the collection tank and the storage tank, when it rains, the rainwater can be collected in the collection tank and stored in the storage tank through the drainage tank. When the vegetation on the roof body needs to be watered, the spraying is started The components draw rainwater from the storage tank and use it to irrigate vegetation, improve the utilization rate of rainwater, and reduce the pressure of domestic water in the city.

可选的,所述第二安装槽的底壁固定有清洗管,所述清洗管的周壁设有多个朝所述太阳能板喷水的清洗孔,所述蓄水池内安装有第一抽水泵,所述清洗管的进水端连接于所述第一抽水泵的出水端;所述第二安装槽内滑移安装有刷条,当所述太阳能板收纳于所述容纳槽时,所述刷条抵接于所述太阳能板的板面,所述刷条设有用于驱使所述刷条滑移以对所述太阳能板进行清洗的滑动组件。Optionally, a cleaning pipe is fixed on the bottom wall of the second installation tank, and the surrounding wall of the cleaning pipe is provided with a plurality of cleaning holes for spraying water toward the solar panel, and a first water pump is installed in the reservoir , the water inlet end of the cleaning pipe is connected to the water outlet end of the first water pump; a brush strip is slidably installed in the second installation groove, and when the solar panel is stored in the accommodation groove, the The brush bar abuts against the surface of the solar panel, and the brush bar is provided with a sliding assembly for driving the brush bar to slide to clean the solar panel.

通过采用上述的技术方案,通过清洗管和刷条的设置,当太阳能板收纳于容纳槽后,启动第一抽水泵向清洗管供水,雨水能够喷洒于太阳能板的板面,接着通过滑动组件带动刷条滑移,刷条能够刷除附着于太阳能板表面的灰尘,提高太阳能板表面的清洁度。By adopting the above-mentioned technical scheme, through the setting of the cleaning pipe and the brush bar, when the solar panel is stored in the storage tank, the first pump is started to supply water to the cleaning pipe, and the rainwater can be sprayed on the surface of the solar panel, and then driven by the sliding assembly The brush bar slides, and the brush bar can brush off the dust attached to the surface of the solar panel to improve the cleanliness of the surface of the solar panel.

可选的,所述第二安装槽的底壁开设有连通于所述蓄水池的排水孔,所述第二安装槽的底壁由远离所述排水孔的一侧向靠近所述排水孔的一侧逐渐向下倾斜。Optionally, the bottom wall of the second installation groove is provided with a drainage hole communicating with the reservoir, and the bottom wall of the second installation groove is laterally close to the drainage hole from a side far away from the drainage hole. One side slopes down gradually.

通过采用上述的技术方案,通过排水孔的设置,当清洗管的雨水对太阳能板进行清洗过程中,雨水对太阳能板清洗完毕后能够通过排水孔重新流向蓄水池,以循环利用水资源;第二安装槽倾斜的底壁能够引导雨水进入排水孔,降低雨水滞留于第二安装槽内的可能性。By adopting the above-mentioned technical scheme, through the setting of the drainage hole, when the rainwater in the cleaning pipe is cleaning the solar panel, the rainwater can flow back to the reservoir through the drainage hole after cleaning the solar panel, so as to recycle water resources; The inclined bottom wall of the second installation groove can guide rainwater into the drainage hole, reducing the possibility of rainwater stagnating in the second installation groove.

可选的,所述蓄水池侧壁固定有分隔板,所述分隔板使所述蓄水池形成净水区和污水区,所述第一抽水泵位于所述净水区,所述排水槽连通于所述净水区,所述排水孔连通于所述污水区,所述污水区内安装有第二抽水泵,所述第二抽水泵与所述收集槽之间连接有排污管,所述排水槽设有用于过滤异物的过滤组件。Optionally, a partition plate is fixed on the side wall of the water storage tank, and the partition board makes the water storage tank form a water purification area and a sewage area, the first water pump is located in the water purification area, and the The drainage tank is connected to the water purification area, the drainage hole is connected to the sewage area, a second water pump is installed in the sewage area, and a sewage discharge pump is connected between the second water pump and the collection tank. pipe, and the drain tank is provided with a filter assembly for filtering foreign matter.

通过采用上述的技术方案,通过净水区和污水区的设置,收集槽收集的雨水通过排水槽进入净水区,清洗太阳能板时,将净水区的雨水用于喷洒于太阳能板,雨水冲刷太阳能板后,雨水和太阳能板表面的灰尘通过排水孔进入污水区,接着启动第二抽水泵将污水区的污水输送至收集槽,进入收集槽的污水经过排水槽进入净水区时通过过滤组件过滤,从而能够过滤雨水中的灰尘,从而使净水区内的雨水保持一定的清洁度,以便于下次对太阳能板的清洗作业。By adopting the above technical scheme, through the setting of the water purification area and the sewage area, the rainwater collected by the collection tank enters the water purification area through the drainage tank. When cleaning the solar panels, the rainwater in the water purification area is used to spray on the solar panels, and the rainwater washes away After the solar panel, rainwater and dust on the surface of the solar panel enter the sewage area through the drain hole, and then start the second pump to transport the sewage in the sewage area to the collection tank, and the sewage entering the collection tank passes through the drainage tank and enters the water purification area through the filter assembly Filter, so that the dust in the rainwater can be filtered, so that the rainwater in the water purification area can maintain a certain degree of cleanliness, so as to facilitate the cleaning of the solar panels next time.

可选的,所述过滤组件包括安装于所述排水槽槽口的收集盒以及安装于所述收集盒内的过滤板,所述收集盒的底壁和所述过滤板的板面均开设有多个过滤孔,所述过滤板的过滤孔孔径大于所述收集盒的过滤孔孔径。Optionally, the filter assembly includes a collection box installed in the notch of the drain tank and a filter plate installed in the collection box, the bottom wall of the collection box and the surface of the filter plate are provided with A plurality of filter holes, the filter hole diameter of the filter plate is larger than the filter hole diameter of the collection box.

通过采用上述的技术方案,通过收集盒和过滤板的设置,雨水通过排水槽槽口进入收集盒,并依次通过过滤板的过滤孔和收集盒底壁的过滤孔,从而能够过滤雨水中的灰尘,降低灰尘进入净水区的可能性;通过将过滤板的过滤孔孔径设置于大于收集盒的过滤孔孔径,过滤板的过滤孔和收集盒的过滤孔分别用于过滤不同大小的灰尘,进一步降低灰尘进入净水区的可能性。By adopting the above-mentioned technical scheme, through the setting of the collection box and the filter plate, the rainwater enters the collection box through the notch of the drainage groove, and passes through the filter holes of the filter plate and the filter holes of the bottom wall of the collection box in turn, so that the dust in the rainwater can be filtered , to reduce the possibility of dust entering the water purification area; by setting the filter hole diameter of the filter plate to be larger than the filter hole diameter of the collection box, the filter holes of the filter plate and the filter holes of the collection box are used to filter dust of different sizes, further Reduce the possibility of dust entering the water purification area.

可选的,所述第二安装槽内滑移安装有滑条,所述刷条固定于所述滑条靠近所述太阳能板的侧壁;所述滑动组件包括丝杆、导向杆以及驱动电机,所述丝杆穿设于所述滑条且所述丝杆的两端转动安装于所述第二安装槽两相对的侧壁,所述丝杆与所述滑条螺纹连接,所述导向杆穿设于所述滑条且所述导向杆的两端分别固定于所述第二安装槽两相对的侧壁,所述驱动电机固定于所述屋顶本体的顶部,所述驱动电机的输出轴同轴固定于所述丝杆。Optionally, a sliding bar is slidably installed in the second installation groove, and the brush bar is fixed on the side wall of the sliding bar close to the solar panel; the sliding assembly includes a screw rod, a guide rod and a driving motor , the screw rod passes through the slide bar and the two ends of the screw rod are rotatably mounted on the two opposite side walls of the second installation groove, the screw rod is screwed to the slide bar, and the guide The rod is passed through the slide bar and the two ends of the guide rod are respectively fixed on the two opposite side walls of the second installation groove, the driving motor is fixed on the top of the roof body, and the output of the driving motor The shaft is coaxially fixed to the screw rod.

通过采用上述的技术方案,通过丝杆、导向杆以及驱动电机的设置,启动驱动电机带动丝杆转动,丝杆能够迫使滑条沿导向杆的长度方向滑移,从而迫使刷条沿导向杆的长度方向滑移,以用于刷除太阳能板表面附着的灰尘。By adopting the above-mentioned technical scheme, through the setting of the screw rod, the guide rod and the drive motor, the drive motor is started to drive the screw rod to rotate, and the screw rod can force the slide bar to slide along the length direction of the guide rod, thereby forcing the brush bar to slide along the direction of the guide rod. Sliding in the length direction is used to brush off the dust attached to the surface of the solar panel.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.通过转动架和转动杆的设置,太阳能板常态通过转动架和安装板架设于屋顶本体的顶部,通过转动架和驱动组件能够控制安装板的转动角度,使用者可根据阳光的角度变化调节太阳能板的转动角度,从而更好的吸收太阳能,提高太阳能板的工作效果;当需要收纳太阳能板时,通过驱动组件带动转动架朝靠近容纳槽的一侧转动,转动架转动过程中通过转动组件带动安装板绕转动杆转动,从而迫使安装板的板面能够进入容纳槽并收纳于容纳槽内,降低太阳能板在屋顶本体上表面的空间占用率,从而降低人们在屋顶本体活动时,太阳能板对屋顶本体的空间占用率;1. Through the setting of the turret and the rotating rod, the solar panel is normally erected on the top of the roof body through the turret and the installation plate, and the rotation angle of the installation plate can be controlled through the turret and the drive assembly, and the user can adjust it according to the angle of the sun. The rotation angle of the solar panel, so as to better absorb solar energy and improve the working effect of the solar panel; when the solar panel needs to be stored, the driving component drives the turret to rotate toward the side close to the receiving groove, and the turret rotates through the rotating component during the rotation process Drive the mounting plate to rotate around the rotating rod, thereby forcing the surface of the mounting plate to enter the accommodation groove and be stored in the accommodation groove, reducing the space occupancy rate of the solar panel on the upper surface of the roof body, thereby reducing the energy consumption of the solar panel when people are active on the roof body. The space occupancy rate of the roof body;

2.通过第一安装槽和第二安装槽的设置,第一安装槽为太阳能板提供安装空间,当安装板收纳于容纳槽且外界人员踩踏安装板时,容纳槽的底壁支撑于安装板,降低太阳能板受人们踩踏而受力损坏的可能性,提高太阳能板的使用寿命;2. Through the setting of the first installation groove and the second installation groove, the first installation groove provides installation space for the solar panel. When the installation plate is stored in the accommodation groove and outsiders step on the installation plate, the bottom wall of the accommodation groove is supported by the installation plate , reduce the possibility of solar panels being damaged by people's trampling, and improve the service life of solar panels;

3.通过净水区和污水区的设置,收集槽收集的雨水通过排水槽进入净水区,清洗太阳能板时,将净水区的雨水用于喷洒于太阳能板,雨水冲刷太阳能板后,雨水和太阳能板表面的灰尘通过排水孔进入污水区,接着启动第二抽水泵将污水区的污水输送至收集槽,进入收集槽的污水经过排水槽进入净水区时通过过滤组件过滤,从而能够过滤雨水中的灰尘,从而使净水区内的雨水保持一定的清洁度,以便于下次对太阳能板的清洗作业。3. Through the setting of the water purification area and the sewage area, the rainwater collected by the collection tank enters the water purification area through the drainage tank. When cleaning the solar panels, the rainwater in the water purification area is used to spray the solar panels. After the rain washes the solar panels, the rainwater And the dust on the surface of the solar panel enters the sewage area through the drainage hole, and then starts the second pump to transport the sewage in the sewage area to the collection tank. Dust in the rainwater, so that the rainwater in the water purification area can maintain a certain degree of cleanliness, so as to facilitate the next cleaning of the solar panels.

附图说明Description of drawings

图1是本实施例的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present embodiment;

图2是体现第二安装槽内部结构的局部剖视图;Fig. 2 is a partial cross-sectional view embodying the internal structure of the second installation groove;

图3是体现过滤组件的局部剖视图;Fig. 3 is a partial sectional view embodying a filter assembly;

图4是体现安装板收纳于容纳槽的结构示意图;Fig. 4 is a schematic structural view showing that the mounting plate is stored in the receiving groove;

图5是图1中A处的放大图;Fig. 5 is an enlarged view of place A in Fig. 1;

图6是图2中A处的放大图。Fig. 6 is an enlarged view of A in Fig. 2 .

附图标记说明:1、屋顶本体;11、容纳槽;12、第二安装槽;121、清洗管;122、清洗孔;123、刷条;124、排水孔;125、滑条;13、收集槽;14、蓄水池;141、第一抽水泵;142、分隔板;143、净水区;144、污水区;145、第二抽水泵;146、排污管;15、排水槽;16、种植区;17、第二避让槽;18、第三避让槽;2、安装板;21、太阳能板;22、转动杆;23、第一安装槽;3、转动架;31、滑移板;4、转动组件;41、齿轮;42、齿条;43、拉杆;5、驱动组件;51、转动轴;52、转动电机;6、喷洒组件;61、喷洒管;62、第三抽水泵;7、滑动组件;71、丝杆;72、导向杆;73、驱动电机;8、过滤组件;81、收集盒;811、抵接环板;812、把手;813、滑移槽;814、第一避让槽;82、过滤板;83、过滤孔。Explanation of reference numerals: 1. roof body; 11. accommodating groove; 12. second installation groove; 121. cleaning pipe; 122. cleaning hole; 123. brush bar; 124. drainage hole; 125. sliding bar; Groove; 14, reservoir; 141, the first water pump; 142, partition plate; 143, clean water area; 144, sewage area; 145, the second water pump; 146, sewage pipe; 15, drainage tank; 16 , planting area; 17, second avoidance groove; 18, third avoidance groove; 2, installation plate; 21, solar panel; 22, rotating rod; 23, first installation groove; 3, turret; 31, sliding plate ;4, rotating assembly; 41, gear; 42, rack; 43, pull rod; 5, driving assembly; 51, rotating shaft; 52, rotating motor; 6, spraying assembly; 61, spraying pipe; 62, the third pump ; 7, sliding assembly; 71, screw mandrel; 72, guide rod; 73, drive motor; 8, filter assembly; 81, collection box; 811, contact ring plate; 812, handle; The first avoidance tank; 82, the filter plate; 83, the filter hole.

具体实施方式Detailed ways

以下结合附图1-6对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-6.

本申请实施例公开了一种绿色建筑屋顶结构。The embodiment of the present application discloses a green building roof structure.

参照图1、图2,一种绿色建筑屋顶结构,包括屋顶本体1,本实施例中,屋顶本体1的上表面设置有用于种植植被的种植区16,屋顶本体1的上表面开设有用于收集雨水的收集槽13,本实施例中,收集槽13呈矩形环状分布于屋顶本体1上表面的四周;屋顶本体1内设有蓄水池14,收集槽13的底壁开设有排水槽15,排水槽15连通于蓄水池14,蓄水池14连接有用于对种植区16浇灌的喷洒组件6;如此设计,下雨天时,雨水通过收集槽13储存于蓄水池14,当种植区16内的植被需要浇灌时,通过喷洒组件6将蓄水池14储存的雨水浇灌于种植区16,提高雨水的利用率。With reference to Fig. 1, Fig. 2, a kind of green building roof structure comprises roof body 1, and in the present embodiment, the upper surface of roof body 1 is provided with the planting area 16 that is used for planting vegetation, and the upper surface of roof body 1 is provided with for collecting The rainwater collection tank 13, in the present embodiment, the collection tank 13 is distributed around the upper surface of the roof body 1 in a rectangular shape; , the drainage groove 15 is communicated with the reservoir 14, and the reservoir 14 is connected with the sprinkler assembly 6 for watering the planting area 16; in this way, when it rains, the rainwater is stored in the reservoir 14 through the collecting tank 13, when the planting area When the vegetation in 16 needs to be watered, the rainwater stored in the reservoir 14 is irrigated in the planting area 16 by the spraying assembly 6, so as to improve the utilization rate of rainwater.

参照图1、图2,喷洒组件6包括喷洒管61和第三抽水泵62,喷洒管61架设于屋顶本体1的顶部,喷洒管61位于种植区16的一侧,喷洒管61的外周壁开设有多个连通于喷洒管61内部的喷洒孔,所有喷洒孔沿喷洒管61的长度方向间隔设置,所有喷洒孔均朝向种植区16;第三抽水泵62固定安装于蓄水池14内,喷洒管61的进水端连接于第三抽水泵62的出水端;如此设计,启动第三抽水泵62向喷洒管61供水,喷洒管61能够将蓄水池14收集的雨水喷洒于种植区16,提高雨水利用率。With reference to Fig. 1, Fig. 2, spray assembly 6 comprises spray pipe 61 and the 3rd suction pump 62, and spray pipe 61 is erected on the top of roof body 1, and spray pipe 61 is positioned at the side of planting area 16, and the peripheral wall of spray pipe 61 is opened There are a plurality of spraying holes connected to the inside of the spraying pipe 61, all spraying holes are arranged at intervals along the length direction of the spraying pipe 61, and all spraying holes are all facing the planting area 16; the third water pump 62 is fixedly installed in the reservoir 14, spraying The water inlet end of the pipe 61 is connected to the water outlet end of the third water pump 62; in this way, the third water pump 62 is started to supply water to the spray pipe 61, and the spray pipe 61 can spray the rainwater collected by the reservoir 14 on the planting area 16, Improve rainwater utilization.

参照图1、图3,排水槽15安装有用于过滤异物的过滤组件8,过滤组件8包括收集盒81和过滤板82,本实施例中,收集盒81为顶部敞口设置的矩形状结构,收集盒81位于排水槽15内,收集盒81的顶壁固定安装有抵接环板811,抵接环板811用于抵接于收集槽13的底壁,抵接环板811远离收集盒81的侧壁固定安装有用于提拉收集盒81的把手812;如此设计,当收集盒81收集一定量的异物后,拉动把手812,能够将收集盒81从排水槽15中提出,以便于异物的清理。With reference to Fig. 1, Fig. 3, gutter 15 is equipped with the filter assembly 8 that is used for filtering foreign matter, and filter assembly 8 comprises collection box 81 and filter plate 82, and in the present embodiment, collection box 81 is the rectangular structure that top opening is provided with, The collection box 81 is located in the drainage tank 15, and the top wall of the collection box 81 is fixedly equipped with an abutment ring plate 811, which is used to abut against the bottom wall of the collection tank 13, and the abutment ring plate 811 is far away from the collection box 81 A handle 812 for lifting the collection box 81 is fixedly installed on the side wall; in this way, when the collection box 81 collects a certain amount of foreign matter, the handle 812 can be pulled to lift the collection box 81 out of the drain 15, so that the foreign matter can be removed. clean up.

参照图2、图3,收集盒81的侧壁开设有多个沿收集盒81高度方向间隔设置的滑移槽813,所有滑移槽813均连通于收集盒81的内部;过滤板82设置多个且所有过滤板82与所有滑移槽813一一对应设置,每一过滤板82均滑移安装于对应的滑移槽813,每一滑移槽813的槽口处侧壁均开设有用于拿取过滤板82的第一避让槽814;本实施例中,收集盒81的底壁和所有过滤板82的板面均开设有多个过滤孔83,所有过滤孔83沿收集盒81的底壁或过滤板82的板面均布,所有过滤板82的过滤孔83孔径均大于收集盒81的过滤孔83孔径,所有过滤板82的过滤孔83孔径由靠近收集盒81底壁的一侧向远离收集盒81底壁的一侧逐渐变大;如此设计,收集盒81和多个过滤板82能够过滤收集槽13雨水中的异物,降低外界异物沿排水槽15进入蓄水池14而导致蓄水池14发生堵塞的可能性。With reference to Fig. 2, Fig. 3, the side wall of collection box 81 is provided with a plurality of sliding grooves 813 that are arranged at intervals along the height direction of collection box 81, and all sliding grooves 813 are all communicated with the inside of collection box 81; One and all filter plates 82 are arranged in one-to-one correspondence with all sliding grooves 813, and each filter plate 82 is all slidably installed in the corresponding sliding groove 813, and the side wall at the notch of each sliding groove 813 is provided with for Take the first escape groove 814 of the filter plate 82; The plate surface of wall or filter plate 82 is evenly distributed, and the filter holes 83 apertures of all filter plates 82 are all greater than the filter holes 83 apertures of the collection box 81, and the filter holes 83 apertures of all filter plates 82 are formed by the side near the bottom wall of the collection box 81 The side away from the bottom wall of the collection box 81 gradually becomes larger; in this way, the collection box 81 and a plurality of filter plates 82 can filter the foreign matter in the rainwater of the collection tank 13, and reduce the external foreign matter entering the reservoir 14 along the drainage groove 15. Possibility of clogging of the reservoir 14 .

参照图1、图4,屋顶本体1的顶壁开设有容纳槽11,容纳槽11位于种植区16的一侧,容纳槽11的侧壁转动安装有转动架3,本实施例中,转动架3设置有两个并对称设置于容纳槽11两相对的侧壁,转动架3的一端转动连接于容纳槽11,转动架3的另一端转动安装有安装板2,安装板2两相对的侧壁均固定有转动杆22,转动杆22转动安装于转动架3远离容纳槽11的一端,安装板2通过转动杆22转动安装于转动架3。With reference to Fig. 1, Fig. 4, the top wall of roof body 1 is provided with accommodating groove 11, and accommodating groove 11 is positioned at the side of planting area 16, and the side wall of accommodating groove 11 is rotatably installed with turret 3, and in the present embodiment, turret 3 is provided with two and symmetrically arranged on the two opposite side walls of the receiving tank 11, one end of the turret 3 is rotatably connected to the receiving tank 11, the other end of the turret 3 is rotatably installed with a mounting plate 2, and the two opposite sides of the mounting plate 2 The walls are fixed with a rotating rod 22 , the rotating rod 22 is rotatably mounted on the end of the turret 3 away from the receiving groove 11 , and the mounting plate 2 is rotatably mounted on the turret 3 through the rotating rod 22 .

参照图1、图2,安装板2远离屋顶本体1的板面开设有第一安装槽23,第一安装槽23内固定安装有多个太阳能板21,转动架3远离安装板2的一端安装有用于驱使转动架3转动的驱动组件5;如此设计,通过驱动组件5带动转动架3转动,从而调节太阳能板21板面的朝向,以便于太阳能板21的板面能够根据光线角度变化适应性调节,进而提高太阳能板21的工作效率。Referring to Fig. 1 and Fig. 2, a first mounting groove 23 is provided on the surface of the mounting plate 2 far away from the roof body 1, and a plurality of solar panels 21 are fixedly installed in the first mounting groove 23, and the end of the turret 3 far away from the mounting plate 2 is installed. There is a drive assembly 5 for driving the turret 3 to rotate; in such a design, the drive assembly 5 drives the turret 3 to rotate, thereby adjusting the orientation of the solar panel 21, so that the panel surface of the solar panel 21 can be adapted according to the angle of light Adjust, and then improve the working efficiency of the solar panel 21.

参照图2、图4,屋顶本体1的顶壁开设有第二避让槽17,第二避让槽17的槽口处安装有用于启闭第二避让槽17的第一盖板(图中未体现);驱动组件5包括转动轴51和转动电机52,转动轴51转动连接于容纳槽11的侧壁,转动架3远离安装板2的一端固定安装于转动轴51的外周壁;转动电机52安装于第二避让槽17内,转动电机52的输出轴贯穿第二避让槽17的侧壁并同轴连接于转动轴51;启动转动电机52,能够带动转动架3绕转动轴51的中轴线转动,从而带动太阳能板21绕转动架3转动。With reference to Fig. 2, Fig. 4, the top wall of roof body 1 is provided with the second avoidance groove 17, and the notch place of the second avoidance groove 17 is equipped with the first cover plate (not shown in the figure) that is used to open and close the second avoidance groove 17 ); the driving assembly 5 includes a rotating shaft 51 and a rotating motor 52, the rotating shaft 51 is rotatably connected to the side wall of the receiving groove 11, and the end of the rotating frame 3 away from the mounting plate 2 is fixedly installed on the outer peripheral wall of the rotating shaft 51; the rotating motor 52 is installed In the second avoidance groove 17, the output shaft of the rotating motor 52 runs through the side wall of the second avoiding groove 17 and is coaxially connected to the rotating shaft 51; starting the rotating motor 52 can drive the turret 3 to rotate around the central axis of the rotating shaft 51 , thereby driving the solar panel 21 to rotate around the turret 3 .

参照图1、图5,转动杆22安装有用于驱使转动杆22转动的转动组件4,当转动架3驱使安装板2朝靠近容纳槽11的一侧转动时,转动组件4迫使安装板2绕转动杆22的中轴线转动至水平状态并使安装板2收纳于容纳槽11内;如此设计,转动架3转动过程中驱使安装板2绕转动杆22的中轴线转动,从而能够使安装板2收纳于容纳槽11内,进而腾出安装板2的安装空间,以便于人们在屋顶本体1顶壁的活动。1 and 5, the rotating rod 22 is equipped with a rotating assembly 4 for driving the rotating rod 22 to rotate. When the rotating frame 3 drives the mounting plate 2 to rotate toward the side close to the receiving groove 11, the rotating assembly 4 forces the mounting plate 2 to rotate around The central axis of the rotating rod 22 is rotated to a horizontal state and the mounting plate 2 is accommodated in the receiving groove 11; in such a design, the rotating frame 3 drives the mounting plate 2 to rotate around the central axis of the rotating rod 22, so that the mounting plate 2 can It is stored in the receiving groove 11 , thereby freeing up the installation space of the installation board 2 , so as to facilitate people's activities on the top wall of the roof body 1 .

参照图1、图5,转动架3的侧壁开设有滑槽(图中未体现),滑槽的两端槽口沿转动架3的长度方向延伸设置,滑槽滑移安装有沿滑槽长度方向滑移的滑移板31;转动组件4包括齿轮41、齿条42以及拉杆43,齿轮41同轴固定于转动杆22的外周壁,齿条42固定安装于滑移板31的板面且齿条42的长度方向与滑槽的长度方向一致,齿条42与齿轮41啮合传动;拉杆43一端铰接于容纳槽11的侧壁,另一端铰接于滑移板31的侧壁,当转动架3转动至容纳槽11内时,拉杆43迫使安装板2绕转动杆22转动至水平状态并收纳于容纳槽11内,且太阳能板21转动至安装板2的底部。Referring to Fig. 1 and Fig. 5, the side wall of the turret 3 is provided with a chute (not shown in the figure), the notches at both ends of the chute extend along the length direction of the turret 3, and the chute slides are installed along the chute. The sliding plate 31 that slides in the longitudinal direction; the rotating assembly 4 includes a gear 41, a rack 42 and a pull rod 43, the gear 41 is coaxially fixed on the outer peripheral wall of the rotating rod 22, and the rack 42 is fixed on the surface of the sliding plate 31 And the length direction of the rack 42 is consistent with the length direction of the chute, and the rack 42 and the gear 41 are meshed for transmission; one end of the pull rod 43 is hinged to the side wall of the receiving groove 11, and the other end is hinged to the side wall of the sliding plate 31. When rotating When the frame 3 rotates into the receiving groove 11 , the pull rod 43 forces the mounting plate 2 to rotate around the rotating rod 22 to a horizontal state and be stored in the receiving groove 11 , and the solar panel 21 rotates to the bottom of the mounting plate 2 .

如此设计,转动电机52驱使转动架3转动过程中,拉杆43能够拉动滑移板31滑移,转动杆22在齿条42和齿轮41的啮合传动下转动,从而迫使安装板2收纳于容纳槽11内,降低安装板2的空间占用率,同时,太阳能板21能够转动至安装板2的底部,降低人们直接踩踏太阳能板21而导致太阳能板21发生损坏的可能性。In such a design, when the rotating motor 52 drives the turret 3 to rotate, the pull rod 43 can pull the sliding plate 31 to slide, and the rotating rod 22 rotates under the meshing transmission of the rack 42 and the gear 41, thereby forcing the mounting plate 2 to be accommodated in the receiving groove 11, the space occupancy rate of the installation board 2 is reduced, and at the same time, the solar panel 21 can be rotated to the bottom of the installation board 2, reducing the possibility of people directly stepping on the solar panel 21 and causing damage to the solar panel 21.

参照图1、图2,容纳槽11的底壁开设有第二安装槽12,第二安装槽12的形状与第一安装槽23的形状相适配,当安装板2转动并收纳于容纳槽11时,第一安装槽23和第二安装槽12相对设置且容纳槽11的底壁支撑于安装板2的板面;如此设计,容纳槽11的底壁支撑于安装板2的板面,降低人员踩踏安装板2时,太阳能板21受压而发生损坏的可能性,提高太阳能板21的使用寿命。Referring to Fig. 1 and Fig. 2, the bottom wall of the accommodation groove 11 is provided with a second installation groove 12, the shape of the second installation groove 12 matches the shape of the first installation groove 23, when the installation plate 2 rotates and is accommodated in the accommodation groove At 11 o'clock, the first installation groove 23 and the second installation groove 12 are arranged oppositely and the bottom wall of the accommodation groove 11 is supported on the board surface of the installation board 2; in this way, the bottom wall of the accommodation groove 11 is supported on the board surface of the installation board 2, The possibility of damaging the solar panel 21 due to pressure when people step on the installation panel 2 is reduced, and the service life of the solar panel 21 is improved.

参照图2、图5,第二安装槽12的底壁固定安装有清洗管121,本实施例中,清洗管121通过抱箍固定安装于第二安装槽12的底壁,清洗管121的外周壁开设有多个连通于清洗管121内部的清洗孔122,所有清洗孔122沿清洗管121的长度方向间隔设置,所有清洗孔122均朝向容纳槽11的槽口;蓄水池14内固定安装有第一抽水泵141,清洗管121的进水端连接于第一抽水泵141的出水端;如此设计,当太阳能板21转动至容纳槽11内时,启动第一抽水泵141,能够将蓄水池14内的雨水通过清洗管121喷洒于太阳能板21的表面,以冲洗附着于太阳能板21表面的灰尘,提高太阳能板21表面的清洁度。Referring to Fig. 2 and Fig. 5, the bottom wall of the second installation groove 12 is fixedly installed with a cleaning pipe 121. In this embodiment, the cleaning pipe 121 is fixedly installed on the bottom wall of the second installation groove 12 through a hoop, and the outer circumference of the cleaning pipe 121 The wall is provided with a plurality of cleaning holes 122 connected to the inside of the cleaning pipe 121, and all cleaning holes 122 are arranged at intervals along the length direction of the cleaning pipe 121, and all cleaning holes 122 are all facing the notch of the receiving tank 11; There is a first water pump 141, and the water inlet end of the cleaning pipe 121 is connected to the water outlet end of the first water pump 141; in such a design, when the solar panel 21 rotates into the holding tank 11, the first water pump 141 is started, and the storage The rainwater in the pool 14 is sprayed on the surface of the solar panel 21 through the cleaning pipe 121 to wash away the dust attached to the surface of the solar panel 21 and improve the cleanliness of the surface of the solar panel 21 .

参照图2、图6,第二安装槽12内滑移安装有滑条125,滑条125靠近太阳能板21的侧壁固定安装有刷条123,当太阳能板21收纳于容纳槽11时,刷条123抵接于太阳能板21的板面,滑条125安装有用于驱使刷条123滑移以对太阳能板21进行清洗的滑动组件7。Referring to Fig. 2 and Fig. 6, a slide bar 125 is slidably installed in the second installation groove 12, and a brush bar 123 is fixedly installed on the side wall of the slide bar 125 close to the solar panel 21. When the solar panel 21 is accommodated in the accommodation groove 11, the brush The bar 123 abuts against the surface of the solar panel 21 , and the sliding bar 125 is installed with a sliding assembly 7 for driving the brush bar 123 to slide to clean the solar panel 21 .

参照图1、图2、图4,屋顶本体1的顶壁开设有第三避让槽18,第三避让槽18的槽口处安装有用于启闭第三避让槽18的第二盖板(图中未体现);滑动组件7包括丝杆71、导向杆72以及驱动电机73,丝杆71穿设于滑条125且丝杆71的两端转动安装于第二安装槽12两相对的侧壁,丝杆71与滑条125之间螺纹连接;导向杆72穿设于滑条125且导向杆72的两端分别固定连接于第二安装槽12两相对的侧壁。With reference to Fig. 1, Fig. 2, Fig. 4, the top wall of roof body 1 is provided with the 3rd avoidance groove 18, and the notch place of the 3rd avoidance groove 18 is equipped with the second cover plate (Fig. not shown in); the sliding assembly 7 includes a screw rod 71, a guide rod 72 and a drive motor 73, the screw rod 71 is installed on the slide bar 125 and the two ends of the screw rod 71 are rotatably mounted on the two opposite side walls of the second installation groove 12 , the threaded connection between the screw rod 71 and the slide bar 125 ; the guide rod 72 passes through the slide bar 125 and the two ends of the guide rod 72 are respectively fixedly connected to two opposite side walls of the second installation groove 12 .

参照图2、图4,驱动电机73固定安装于第三避让槽18内,驱动电机73的输出轴贯穿第三避让槽18的侧壁并同轴连接于丝杆71;启动驱动电机73带动丝杆71转动,从而迫使刷条123沿丝杆71的长度方向滑移,以刷除太阳能板21表面的灰尘,提高太阳能板21表面的清洁度。With reference to Fig. 2, Fig. 4, drive motor 73 is fixedly installed in the 3rd avoidance groove 18, and the output shaft of drive motor 73 runs through the side wall of the 3rd avoidance groove 18 and is coaxially connected to screw mandrel 71; The rod 71 rotates, thereby forcing the brush bar 123 to slide along the length direction of the screw rod 71 to brush off the dust on the surface of the solar panel 21 and improve the cleanliness of the surface of the solar panel 21 .

参照图2、图6,第二安装槽12的底壁开设有多个连通于蓄水池14的排水孔124,所有排水孔124位于第二安装槽12的一侧,第二安装槽12的底壁由远离排水孔124的一侧向靠近排水孔124的一侧逐渐向下倾斜。Referring to Fig. 2 and Fig. 6, the bottom wall of the second installation groove 12 is provided with a plurality of drainage holes 124 communicating with the reservoir 14, all the drainage holes 124 are located on one side of the second installation groove 12, and the second installation groove 12 The bottom wall is gradually inclined downward from a side away from the drain hole 124 to a side close to the drain hole 124 .

参照图2、图6,本实施例中,蓄水池14侧壁固定安装有竖直设置的分隔板142,分隔板142使蓄水池14形成净水区143和污水区144,第一抽水泵141和第三抽水泵62位于净水区143,排水槽15连通于净水区143;排水孔124连通于污水区144,污水区144内安装有第二抽水泵145,抽水泵于收集槽13之间连接有排污管146,排污管146一端连接于第二抽水泵145的出水端,另一端连通收集槽13。Referring to Fig. 2 and Fig. 6, in the present embodiment, the side wall of the reservoir 14 is fixedly installed with a partition plate 142 vertically arranged, and the partition plate 142 makes the reservoir 14 form a clean water area 143 and a sewage area 144. A water pump 141 and the 3rd water pump 62 are positioned at the clean water area 143, and the drainage groove 15 is communicated with the water clear area 143; A sewage pipe 146 is connected between the collection tanks 13 , one end of the sewage pipe 146 is connected to the water outlet of the second water pump 145 , and the other end is connected to the collection tank 13 .

本申请实施例一种绿色建筑屋顶结构的实施原理为:太阳能板21作业时,通过转动电机52带动转动架3转动,并在拉杆43的拉动下能够控制太阳能板21的转动角度,使太阳能板21更好的接收太阳能;当人们需要在屋顶本体1顶部活动时,通过转动电机52带动转动架3朝靠近容纳槽11的一侧移动,安装板2能够在拉杆43的拉动下转动至水平状态并收纳于容纳槽11内,降低安装板2的空间占用率,以便于人们的活动;当需要清洗太阳能板21时,通过清洗管121向太阳能板21进行喷洒雨水,雨水对太阳能板21清洗后经排水孔124流向污水区144,接着通过第二抽水泵145输送至收集槽13,雨水经收集槽13流向排水槽15时通过过滤板82,过滤板82能够过滤雨水中的灰尘,降低灰尘进入净水区143的可能性,使净水区143内的雨水保持一定的清洁度,以用于下次对太阳能板21的清洗作业,提高雨水的利用率。The implementation principle of a green building roof structure in the embodiment of the present application is: when the solar panel 21 is in operation, the turret 3 is driven to rotate by the rotating motor 52, and the rotation angle of the solar panel 21 can be controlled under the pull of the pull rod 43, so that the solar panel 21 to better receive solar energy; when people need to move on the top of the roof body 1, the rotating frame 3 is driven by the rotating motor 52 to move toward the side close to the accommodating groove 11, and the mounting plate 2 can be rotated to a horizontal state under the pull of the pull rod 43 And be accommodated in the accommodating groove 11, reduce the space occupancy rate of installation board 2, so that people's activities; It flows to the sewage area 144 through the drainage hole 124, and then is transported to the collection tank 13 by the second pump 145. When the rainwater flows to the drainage tank 15 through the collection tank 13, it passes through the filter plate 82. The filter plate 82 can filter the dust in the rainwater and reduce the dust from entering. The possibility of the water purification area 143 makes the rainwater in the water purification area 143 maintain a certain degree of cleanliness for the next cleaning operation to the solar panel 21 and improves the utilization rate of rainwater.

以上为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are the preferred embodiments of the application, and are not intended to limit the protection scope of the application, so: all equivalent changes made according to the structure, shape, and principle of the application should be covered within the protection scope of the application .

Claims (9)

1. A green building roof structure, characterized in that: the solar energy roof comprises a roof body (1) and a mounting plate (2) arranged at the top of the roof body (1), wherein a plurality of solar panels (21) are fixed on the surface of the mounting plate (2) away from the roof body (1); roof body (1) roof has been seted up and has been used for holding tank (11) of mounting panel (2), the lateral wall of mounting panel (2) is equipped with dwang (22), dwang (22) with be equipped with rotating turret (3) between holding tank (11), the one end rotation of rotating turret (3) connect in dwang (22), the other end rotate connect in the lateral wall of holding tank (11), dwang (22) are equipped with and are used for driving dwang (22) pivoted rotating assembly (4), works as rotating turret (3) drive mounting panel (2) towards being close to when one side of holding tank (11) rotates, rotating assembly (4) force mounting panel (2) around the axis rotation of dwang (22) and make mounting panel (2) accomodate in holding tank (11), one end that rotating turret (3) kept away from mounting panel (2) is equipped with and is used for driving rotating assembly (5) of rotating turret (3).
2. A green building roof structure according to claim 1, wherein: the rotating assembly (4) comprises a gear (41), a rack (42) and a pull rod (43), the gear (41) is coaxially fixed on the rotating rod (22), the rack (42) is slidably installed on the rotating frame (3) and is in meshed transmission with the gear (41), one end of the pull rod (43) is hinged to the side wall of the rack (42), the other end of the pull rod is hinged to the side wall of the accommodating groove (11), when the rotating frame (3) rotates into the accommodating groove (11), the pull rod (43) forces the mounting plate (2) to rotate around the rotating rod (22) to a horizontal state and be accommodated in the accommodating groove (11), and the solar panel (21) rotates to the bottom of the mounting plate (2).
3. A green building roof structure according to claim 2, wherein: a first mounting groove (23) is formed in the plate surface of the mounting plate (2), and all the solar panels (21) are mounted in the first mounting groove (23); the second mounting groove (12) has been seted up to the diapire of holding tank (11), the shape of first mounting groove (23) with the shape looks adaptation of second mounting groove (12), works as mounting panel (2) rotate and accomodate in holding tank (11), first mounting groove (23) with second mounting groove (12) set up relatively just the diapire of holding tank (11) support in the face of mounting panel (2).
4. A green building roof structure according to claim 3, wherein: the roof body (1) top is equipped with collecting vat (13) and cistern (14) that are used for collecting the rainwater respectively, water drainage tank (15) have been seted up to the diapire of collecting vat (13), water drainage tank (15) communicate in cistern (14), cistern (14) are connected with and are used for spraying subassembly (6) to the vegetation watering.
5. A green building roof structure according to claim 4, wherein: a cleaning pipe (121) is fixed on the bottom wall of the second mounting groove (12), a plurality of cleaning holes (122) for spraying water towards the solar panel (21) are formed in the peripheral wall of the cleaning pipe (121), a first water suction pump (141) is mounted in the reservoir (14), and the water inlet end of the cleaning pipe (121) is connected with the water outlet end of the first water suction pump (141); the brush strip (123) is slidably installed in the second installation groove (12), when the solar panel (21) is stored in the containing groove (11), the brush strip (123) is abutted to the plate surface of the solar panel (21), and the brush strip (123) is provided with a sliding component (7) for driving the brush strip (123) to slide so as to clean the solar panel (21).
6. A green building roof structure according to claim 5, wherein: the bottom wall of the second mounting groove (12) is provided with a drain hole (124) communicated with the reservoir (14), and the bottom wall of the second mounting groove (12) gradually inclines downwards from one side far away from the drain hole (124) to one side close to the drain hole (124).
7. A green building roof structure according to claim 6, wherein: the utility model discloses a sewage treatment device, including cistern (14), baffle (142) make cistern (14) form water purification district (143) and sewage district (144), first suction pump (141) are located water purification district (143), water drainage tank (15) communicate in water purification district (143), wash port (124) communicate in sewage district (144), install second suction pump (145) in sewage district (144), second suction pump (145) with be connected with blow off pipe (146) between collecting vat (13), water drainage tank (15) are equipped with filter assembly (8) that are used for filtering the foreign matter.
8. A green building roof structure according to claim 7, wherein: the filter assembly (8) comprises a collecting box (81) arranged at the notch of the drainage groove (15) and a filter plate (82) arranged in the collecting box (81), wherein a plurality of filter holes (83) are formed in the bottom wall of the collecting box (81) and the plate surface of the filter plate (82), and the aperture of the filter hole (83) of the filter plate (82) is larger than that of the filter hole (83) of the collecting box (81).
9. A green building roof structure according to claim 5, wherein: a sliding strip (125) is slidably arranged in the second mounting groove (12), and the brush strip (123) is fixed on the side wall, close to the solar panel (21), of the sliding strip (125); the sliding assembly (7) comprises a screw rod (71), a guide rod (72) and a driving motor (73), wherein the screw rod (71) penetrates through the sliding strip (125) and two ends of the screw rod (71) are rotatably installed on two opposite side walls of the second installation groove (12), the screw rod (71) is in threaded connection with the sliding strip (125), the guide rod (72) penetrates through the sliding strip (125) and two ends of the guide rod (72) are respectively fixed on two opposite side walls of the second installation groove (12), and the driving motor (73) is fixed on the top of the roof body (1) and an output shaft of the driving motor (73) is coaxially fixed on the screw rod (71).
CN202310265408.0A 2023-03-18 2023-03-18 A green building roof structure Pending CN116378327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310265408.0A CN116378327A (en) 2023-03-18 2023-03-18 A green building roof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310265408.0A CN116378327A (en) 2023-03-18 2023-03-18 A green building roof structure

Publications (1)

Publication Number Publication Date
CN116378327A true CN116378327A (en) 2023-07-04

Family

ID=86966696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310265408.0A Pending CN116378327A (en) 2023-03-18 2023-03-18 A green building roof structure

Country Status (1)

Country Link
CN (1) CN116378327A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118756903A (en) * 2024-09-06 2024-10-11 宁波宏昌建筑有限公司 A green building roof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209151087U (en) * 2018-11-16 2019-07-23 张骞 A kind of green building roof photovoltaic panel protective device
CN110326953A (en) * 2019-05-21 2019-10-15 刘山平 It is a kind of based on solar powered curtain Controller
CN210469221U (en) * 2019-10-23 2020-05-05 上海季为智能科技有限公司 Automatic wash photovoltaic module
CN214461929U (en) * 2021-03-24 2021-10-22 广东汇晟建设有限公司 Solar building roof
CN216587370U (en) * 2021-07-05 2022-05-24 宋红飞 Green energy-saving building
CN115573421A (en) * 2022-10-17 2023-01-06 中核华辰工程管理有限公司 Green building roof structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209151087U (en) * 2018-11-16 2019-07-23 张骞 A kind of green building roof photovoltaic panel protective device
CN110326953A (en) * 2019-05-21 2019-10-15 刘山平 It is a kind of based on solar powered curtain Controller
CN210469221U (en) * 2019-10-23 2020-05-05 上海季为智能科技有限公司 Automatic wash photovoltaic module
CN214461929U (en) * 2021-03-24 2021-10-22 广东汇晟建设有限公司 Solar building roof
CN216587370U (en) * 2021-07-05 2022-05-24 宋红飞 Green energy-saving building
CN115573421A (en) * 2022-10-17 2023-01-06 中核华辰工程管理有限公司 Green building roof structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118756903A (en) * 2024-09-06 2024-10-11 宁波宏昌建筑有限公司 A green building roof

Similar Documents

Publication Publication Date Title
CN207251543U (en) A kind of photovoltaic power generation equipment with rain-proof and cleaning function based on Internet of Things
CN207158044U (en) A kind of solar energy dustbin using rainwater automated cleaning
CN112554303B (en) Intelligent waterlogging prevention flood diversion system device and method based on smart sponge city
CN116378327A (en) A green building roof structure
CN115573421A (en) Green building roof structure
CN216130460U (en) Building energy-saving house
CN205402550U (en) Self-cleaning solar energy saving lamp
CN221236292U (en) Photovoltaic building roof
CN218327870U (en) Energy-conserving street lamp of town road
CN217407175U (en) Rainwater collecting and irrigating device for roof based on building ecological greening
CN116667773A (en) Solar photovoltaic panel cleaning device and cleaning method thereof
CN213774634U (en) Environment-friendly energy-saving green building
CN115095087A (en) A green building energy-saving roof
CN210507774U (en) Novel energy-saving device for green building
CN208604673U (en) A kind of garden architecture object roof rain water collecting reuse means
CN209762914U (en) energy-saving street lamp system
CN111919627A (en) Road greening flower box capable of automatically cleaning surface
CN208739774U (en) A kind of energy saving and environment friendly gardens watering device
CN216174483U (en) Agricultural photovoltaic power plant is with irrigating washing integrated device
CN221877973U (en) Water conservancy construction slope protection mechanism
CN216276508U (en) Roof structure of a green energy-saving building
CN222764386U (en) A modern BIPV photovoltaic integrated agricultural facility greenhouse
CN217896708U (en) Storage pond with water purification effect
CN217487165U (en) An energy-saving and water-saving irrigation device for roof gardens
CN216640846U (en) Sponge urban rainwater collection and purification equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination