CN116181040A - Construction hanging basket suitable for steel structure main body high-altitude construction - Google Patents
Construction hanging basket suitable for steel structure main body high-altitude construction Download PDFInfo
- Publication number
- CN116181040A CN116181040A CN202310189201.XA CN202310189201A CN116181040A CN 116181040 A CN116181040 A CN 116181040A CN 202310189201 A CN202310189201 A CN 202310189201A CN 116181040 A CN116181040 A CN 116181040A
- Authority
- CN
- China
- Prior art keywords
- construction
- basket
- moving
- main body
- bearing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 84
- 239000010959 steel Substances 0.000 title claims abstract description 84
- 238000010276 construction Methods 0.000 title claims abstract description 45
- 230000007246 mechanism Effects 0.000 claims abstract description 49
- 230000005540 biological transmission Effects 0.000 claims description 14
- 210000001503 joint Anatomy 0.000 claims 1
- 238000005096 rolling process Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 230000009977 dual effect Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 210000005069 ears Anatomy 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Movable Scaffolding (AREA)
Abstract
本申请涉及一种适用于钢结构主体高空作业的施工吊篮,涉及钢结构施工工具的技术领域,其包括篮体;移动机构,滑动设置在钢结构主体H型钢梁上翼缘板上;承重架,连接在篮体与移动机构之间;防倾倒机构,设置在承重架的两侧;所述篮体设有两个,对称设置在承重架的两侧;移动机构包括:移动箱;移动轮,转动连接在移动箱两侧;螺纹套,转动连接在移动箱上;锁定螺杆,螺纹连接螺纹套并向下穿出移动箱;防滑板,连接在锁定螺杆下端。本申请具有方便施工作业,提高施工作业安全性的效果。
The application relates to a construction hanging basket suitable for high-altitude operations of the steel structure main body, and relates to the technical field of steel structure construction tools, which includes a basket body; a moving mechanism, which is slidably arranged on the upper flange of the H-shaped steel beam of the steel structure main body; a load-bearing frame , connected between the basket and the moving mechanism; the anti-dumping mechanism is arranged on both sides of the load-bearing frame; the basket is provided with two symmetrically arranged on both sides of the load-bearing frame; the moving mechanism includes: a moving box; a moving wheel , rotated and connected to both sides of the moving box; threaded sleeve, rotated and connected to the moving box; locking screw, threaded with the threaded sleeve and passed out of the moving box downwards; anti-skid plate, connected to the lower end of the locking screw. The application has the effects of facilitating construction operations and improving the safety of construction operations.
Description
技术领域technical field
本申请涉及钢结构施工工具的技术领域,尤其是涉及一种适用于钢结构主体高空作业的施工吊篮。The present application relates to the technical field of steel structure construction tools, in particular to a construction basket suitable for high-altitude operations of steel structure main bodies.
背景技术Background technique
目前来说伴随着社会经济的发展,以及装配式建筑的普及,在城市房建项目中钢结构主体以自身优势应用较为广泛,在近几年的发展过程中,由于钢结构主体内在施工要求的不断提高和相应法规的不断完善,自新安法颁布实施以来,在钢结构主体施工中对安全管理提出了更高的要求。At present, with the development of social economy and the popularization of prefabricated buildings, the steel structure main body is widely used in urban housing construction projects due to its own advantages. In the development process in recent years, due to the inherent construction requirements of the steel structure main body Continuous improvement and corresponding regulations have been continuously improved. Since the promulgation and implementation of the new safety law, higher requirements have been put forward for safety management in the construction of the main body of steel structures.
在钢结构主体施工过程中,由于受深结构形式的影响,搭建施工平台难度较大,通常施工作业人员在进行钢构件螺栓紧固、节点焊接过程中只能站在钢结构上,在身上捆绑安全绳进行施工作业。During the construction of the main body of the steel structure, due to the influence of the deep structure, it is difficult to build the construction platform. Usually, the construction workers can only stand on the steel structure and tie the Safety rope for construction work.
针对上述中的相关技术,发明人发现,受钢结构角度等因素影响,部分焊口焊接操作不便,可能产生焊接不牢固可能存在漏焊的情况;作业人员在高空作业的危险系数也比较大。In view of the above-mentioned related technologies, the inventors found that due to factors such as the angle of the steel structure, the welding operation of some welds is inconvenient, and there may be situations where the welding is not firm and there may be missing welds; the risk factor for operators working at high altitudes is also relatively large.
发明内容Contents of the invention
为了方便施工作业,提高施工作业的安全性,本申请提供一种适用于钢结构主体高空作业的施工吊篮。In order to facilitate the construction work and improve the safety of the construction work, the application provides a construction hanging basket suitable for the high-altitude operation of the steel structure main body.
本申请提供的一种适用于钢结构主体高空作业的施工吊篮采用如下的技术方案:A construction hanging basket suitable for high-altitude operations of the steel structure main body provided by this application adopts the following technical scheme:
一种适用于钢结构主体高空作业的施工吊篮,包括:A construction hanging basket suitable for high-altitude operations of a steel structure main body, comprising:
篮体;basket;
移动机构,滑动设置在钢结构主体H型钢梁上翼缘板上;The moving mechanism is slidingly arranged on the upper flange of the H-shaped steel beam of the steel structure main body;
承重架,连接在篮体与移动机构之间;The load-bearing frame is connected between the basket body and the moving mechanism;
防倾倒机构,设置在承重架的两侧;Anti-dumping mechanism, set on both sides of the load-bearing frame;
所述篮体设有两个,对称设置在承重架的两侧。Two baskets are arranged symmetrically on both sides of the load-bearing frame.
通过采用上述技术方案,移动机构可以沿钢结构主体H型钢梁移动并支撑承重架,篮体分别设置在H型钢梁两侧,能够起到一定平衡配重的作用;因为有可能作业人员只会下到一侧的篮体内,防倾倒机构可以在两侧篮体重量不同时平衡吊篮,使吊篮不易倾斜;作业人员在篮体内进行焊接、紧固螺栓等操作时,移动和操作更加便捷,同时也提高了高空作业的安全性。By adopting the above-mentioned technical scheme, the moving mechanism can move along the H-shaped steel beam of the main steel structure and support the load-bearing frame. The baskets are respectively arranged on both sides of the H-shaped steel beam, which can play a certain role of balancing weight; because it is possible that the operator It will only go down into the basket on one side, and the anti-dumping mechanism can balance the hanging basket when the weights of the baskets on both sides are different, so that the hanging basket is not easy to tilt; when the operator performs operations such as welding and tightening bolts in the basket, it is safe to move and operate More convenient, but also improve the safety of high-altitude operations.
可选的,所述移动机构包括:Optionally, the moving mechanism includes:
移动箱;mobile box;
移动轮,转动连接在移动箱两侧;The moving wheel is rotatably connected to both sides of the moving box;
螺纹套,转动连接在移动箱上;The threaded sleeve is rotatably connected to the moving box;
锁定螺杆,螺纹连接螺纹套并向下穿出移动箱;Lock the screw, thread the threaded sleeve and pass down through the moving box;
防滑板,连接在锁定螺杆下端。The anti-skid plate is connected to the lower end of the locking screw.
通过采用上述技术方案,转动螺纹套,锁定螺杆就会沿螺纹套方向移动,当移动箱移动到位后,转动螺纹套使锁定螺杆下降,防滑板就能抵住H型钢梁上翼缘板的顶面,起到固定吊篮位置的作用,使吊篮在施工作业时不易偏离位置。By adopting the above technical scheme, turning the threaded sleeve, the locking screw will move along the direction of the threaded sleeve. When the moving box is in place, turn the threaded sleeve to lower the locking screw, and the anti-skid plate can be against the top surface of the upper flange plate of the H-shaped steel beam. , Play the role of fixing the position of the hanging basket, so that the hanging basket is not easy to deviate from the position during construction work.
可选的,所述移动机构还包括连接两个相对移动轮的连接轴,施工吊篮还包括刹停机构,刹停机构包括:Optionally, the moving mechanism also includes a connecting shaft connecting two relatively moving wheels, and the construction basket also includes a braking mechanism, which includes:
刹停板,铰接在移动箱内;The stop plate is hinged in the moving box;
刹停片,设置在刹停板朝向连接轴的侧壁上。The brake plate is arranged on the side wall of the brake plate facing the connecting shaft.
通过采用上述技术方案,将刹停板向连接轴转动,刹停片就会被压到连接轴上,与连接轴之间就会存在摩擦力,将移动轮刹停,使移动箱不能移动,与防滑板共同将吊篮位置固定,提升了对吊篮的控制效果。By adopting the above-mentioned technical scheme, the brake plate is rotated toward the connecting shaft, and the brake plate will be pressed onto the connecting shaft, and there will be a friction force between the brake plate and the connecting shaft, and the moving wheel will be braked so that the moving box cannot move. Together with the anti-skid plate, the position of the hanging platform is fixed, which improves the control effect of the hanging platform.
可选的,所述刹停机构还包括:Optionally, the braking mechanism also includes:
刹停螺杆,转动设置在移动箱内;Stop the screw, rotate it and set it in the moving box;
滑块,螺纹连接刹停螺杆并与刹停板滑动连接;The slider is threadedly connected to the brake screw rod and slidably connected with the brake plate;
传动组件,连接在螺纹套与刹停螺杆之间。The transmission assembly is connected between the threaded sleeve and the brake screw rod.
通过采用上述技术方案,当转动螺纹套使防滑板下降时,传动组件会将转矩传递到刹停螺杆,刹停螺杆与螺纹套会同步转动,刹停螺杆带动滑块滑动,滑块将刹停板向连接轴推动,实现刹停连接轴的效果,只转动螺纹套就可以实现防滑板和刹停板对吊篮的双重位置固定,方便快捷。By adopting the above technical scheme, when the threaded sleeve is turned to lower the anti-skid plate, the transmission component will transmit the torque to the brake screw, the brake screw and the threaded sleeve will rotate synchronously, the brake screw will drive the slider to slide, and the slider will brake The stop plate is pushed towards the connecting shaft to achieve the effect of braking the connecting shaft. Only by turning the threaded sleeve can the dual positions of the anti-skid plate and the brake stop plate be fixed to the hanging basket, which is convenient and quick.
可选的,所述传动组件是锥齿轮组或交错轴斜齿轮组。Optionally, the transmission assembly is a bevel gear set or a cross-axis helical gear set.
通过采用上述技术方案,使用锥齿轮组或交错轴斜齿轮组都可以实现将螺纹套转动矩变化方向传递到刹停螺杆上。By adopting the above technical solution, the use of the bevel gear set or the cross-axis helical gear set can realize the transmission of the direction of the thread turning torque change to the brake screw rod.
可选的,所述连接轴和移动轮的组合设有两组;所述刹停螺杆包括螺纹旋向相反的两端,两端分别螺纹连接一个滑块。Optionally, there are two sets of combinations of the connecting shaft and the moving wheel; the braking screw includes two ends with opposite helical directions, and the two ends are respectively threaded with a slider.
通过采用上述技术方案,当刹停螺杆转动时,两个滑块会同步滑动,两个刹停板也会同步运动,实现刹停螺杆控制两个刹停板的工作,提高了吊篮刹停的效果,同时简化了操作。By adopting the above technical scheme, when the brake screw rotates, the two sliders will slide synchronously, and the two brake plates will also move synchronously, realizing the work of the brake screw controlling the two brake plates, and improving the suspension of the hanging basket. effect while simplifying the operation.
可选的,所述防倾倒机构包括:Optionally, the anti-dumping mechanism includes:
防倾倒架,设置在承重架上;Anti-dumping frame, set on the load-bearing frame;
防倾倒轮,转动连接在防倾倒架上,滚动抵接钢结构主体H型钢梁上翼缘板的底面。The anti-dumping wheel is rotatably connected to the anti-dumping frame, and rolls against the bottom surface of the upper flange plate of the H-shaped steel beam of the steel structure main body.
通过采用上述技术方案,移动轮和防倾倒轮分别位于钢结构主体H型钢梁上翼缘板的上下两侧,当移动箱有水平方向倾斜的趋势时,对应的移动轮或防倾倒轮会抵紧H型钢梁,起到防倾倒作用。By adopting the above technical scheme, the moving wheels and anti-dumping wheels are respectively located on the upper and lower sides of the upper flange plate of the H-shaped steel beam of the steel structure main body. When the moving box tends to tilt in the horizontal direction, the corresponding moving wheels or anti-dumping wheels will be tight H-shaped steel beams play the role of anti-dumping.
可选的,所述防倾倒机构还包括连接杆,连接杆一端滑动连接承重架,另一端连接防倾倒架。Optionally, the anti-dumping mechanism further includes a connecting rod, one end of the connecting rod is slidably connected to the load-bearing frame, and the other end is connected to the anti-dumping frame.
通过采用上述技术方案,在将吊篮安装至H型钢梁上时,可以将连接杆滑开,移动机构到位后,再将连接杆向H型钢梁滑动,直至防倾倒轮到达安装位置,使吊篮安装更加方便;同时连接杆可滑动也可以使吊篮适用于对种截面尺寸的H型钢梁,提升吊篮的适用性。By adopting the above technical solution, when installing the hanging basket on the H-shaped steel beam, the connecting rod can be slid away, and after the moving mechanism is in place, the connecting rod can be slid towards the H-shaped steel beam until the anti-dumping wheel reaches the installation position. It makes the installation of the hanging basket more convenient; at the same time, the sliding connection rod can also make the hanging basket suitable for H-shaped steel beams of the same cross-sectional size, improving the applicability of the hanging basket.
可选的,所述防倾倒架滑动连接在连接杆上。Optionally, the anti-dumping frame is slidably connected to the connecting rod.
通过采用上述技术方案,调节防倾倒架在连接杆上的高度位置,可以使防倾倒轮更好的抵接H型钢梁,使吊篮在H型钢梁上移动或停放更加平稳;同时防倾倒架可升降,也能使吊篮适用于多种不同截面尺寸的H型钢梁。By adopting the above technical scheme, adjusting the height position of the anti-dumping frame on the connecting rod can make the anti-dumping wheel better touch the H-shaped steel beam, and make the moving or parking of the hanging basket on the H-shaped steel beam more stable; The tipping frame can be lifted and lowered, which also makes the hanging basket suitable for H-shaped steel beams of various cross-sectional sizes.
可选的,所述承重架上固定连接有吊装耳。Optionally, lifting ears are fixedly connected to the bearing frame.
通过采用上述技术方案,吊装耳可以便于吊篮的吊装和运输,在工地上用塔吊即可将吊篮送上钢结构主体H型钢梁上,操作方便。By adopting the above technical scheme, the hoisting lugs can facilitate the hoisting and transportation of the hanging basket, and the hanging basket can be sent to the H-shaped steel beam of the steel structure main body with a tower crane on the construction site, which is easy to operate.
综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:
1.移动机构可以沿钢结构主体H型钢梁移动并支撑承重架,篮体分别设置在H型钢梁两侧,能够起到一定平衡配重的作用;因为有可能作业人员只会下到一侧的篮体内,防倾倒机构可以在两侧篮体重量不同时平衡吊篮,使吊篮不易倾斜;作业人员在篮体内进行焊接、紧固螺栓等操作时,移动和操作更加便捷,同时也提高了高空作业的安全性;1. The moving mechanism can move along the H-shaped steel beam of the main steel structure and support the load-bearing frame. The baskets are respectively arranged on both sides of the H-shaped steel beam, which can play a certain role in balancing the weight; because it is possible that the operator will only go down to the In the basket on one side, the anti-dumping mechanism can balance the hanging basket when the weight of the baskets on both sides is different, so that the hanging basket is not easy to tilt; when the operator performs operations such as welding and fastening bolts in the basket, the movement and operation are more convenient, and at the same time It also improves the safety of working at heights;
2.当转动螺纹套使防滑板下降时,传动组件会将转矩传递到刹停螺杆,刹停螺杆与螺纹套会同步转动,刹停螺杆带动滑块滑动,滑块将刹停板向连接轴推动,实现刹停连接轴的效果,只转动螺纹套就可以实现防滑板和刹停板对吊篮的双重位置固定,方便快捷;2. When the threaded sleeve is turned to lower the anti-skid plate, the transmission component will transmit the torque to the brake screw, the brake screw and the threaded sleeve will rotate synchronously, the brake screw will drive the slider to slide, and the slider will connect the brake plate to the The shaft is pushed to achieve the effect of braking the connecting shaft. Only by turning the threaded sleeve can the dual position fixation of the anti-skid plate and the braking plate to the hanging basket be realized, which is convenient and quick;
3.移动轮和防倾倒轮分别位于钢结构主体H型钢梁上翼缘板的上下两侧,当移动箱有水平方向倾斜的趋势时,对应的移动轮或防倾倒轮会抵紧H型钢梁,起到防倾倒作用;3. The moving wheels and anti-dumping wheels are respectively located on the upper and lower sides of the upper flange plate of the H-shaped steel beam of the main steel structure. When the moving box has a tendency to tilt in the horizontal direction, the corresponding moving wheels or anti-dumping wheels will press against the H-shaped steel beam , play the role of anti-dumping;
4.在将吊篮安装至H型钢梁上时,可以将连接杆滑开,移动机构到位后,再将连接杆向H型钢梁滑动,直至防倾倒轮到达安装位置,使吊篮安装更加方便;同时连接杆可滑动也可以使吊篮适用于对种截面尺寸的H型钢梁,提升吊篮的适用性;4. When installing the hanging basket on the H-shaped steel beam, you can slide the connecting rod away. After the moving mechanism is in place, slide the connecting rod to the H-shaped steel beam until the anti-dumping wheel reaches the installation position, so that the hanging basket can be installed It is more convenient; at the same time, the connecting rod can be slid to make the hanging basket suitable for H-shaped steel beams of different cross-sectional sizes, which improves the applicability of the hanging basket;
5.调节防倾倒架在连接杆上的高度位置,可以使防倾倒轮更好的抵接H型钢梁,使吊篮在H型钢梁上移动或停放更加平稳;同时防倾倒架可升降,也能使吊篮适用于多种不同截面尺寸的H型钢梁。5. Adjust the height position of the anti-dumping frame on the connecting rod, so that the anti-dumping wheel can better touch the H-shaped steel beam, so that the hanging basket can move or park on the H-shaped steel beam more smoothly; at the same time, the anti-dumping frame can be lifted , can also make the basket suitable for a variety of H-shaped steel beams with different cross-sectional sizes.
附图说明Description of drawings
图1是本申请实施例的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the embodiment of the present application;
图2是本申请实施例吊篮与H型钢梁的连接结构示意图;Fig. 2 is the connection structure schematic diagram of hanging basket and H-shaped steel beam of the embodiment of the application;
图3是本申请实施例移动机构和刹停机构的剖视结构示意图;Fig. 3 is a schematic cross-sectional structure diagram of the moving mechanism and the braking mechanism of the embodiment of the present application;
图4是本申请实施例移动机构、承重架、刹停机构和防倾倒机构的连接结构示意图;Fig. 4 is a schematic diagram of the connection structure of the moving mechanism, load-bearing frame, braking mechanism and anti-dumping mechanism of the embodiment of the present application;
图5是本申请实施例防倾倒结构的局部剖视示意图;Fig. 5 is a partial cross-sectional schematic diagram of the anti-dumping structure of the embodiment of the present application;
图中,1、篮体;2、移动机构;21、移动箱;22、移动轮;23、螺纹套;24、锁定螺杆;25、防滑板;26、连接轴;27、导向杆;3、承重架;31、吊装耳;4、防倾倒机构;41、防倾倒架;42、防倾倒轮;43、连接杆;44、限位螺栓;45、定位螺杆;46、齿条;47、升降齿轮;5、刹停机构;51、刹停板;52、刹停片;53、刹停螺杆;54、滑块;55、传动组件。Among the figure, 1. basket body; 2. moving mechanism; 21. moving box; 22. moving wheel; 23. thread sleeve; 24. locking screw; 25. anti-skid plate; 26. connecting shaft; 27. guide rod; Load-bearing frame; 31. Lifting lug; 4. Anti-dumping mechanism; 41. Anti-dumping frame; 42. Anti-dumping wheel; 43. Connecting rod; 44. Limit bolt; 45. Locating screw; 46. Rack; 47. Lifting Gear; 5, brake mechanism; 51, brake plate; 52, brake sheet; 53, brake screw; 54, slider; 55, transmission assembly.
具体实施方式Detailed ways
以下结合附图1-附图5,对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1 to 5 .
本申请提出一种适用于钢结构主体高空作业的施工吊篮,参照图1和图2,包括移动机构2、承重架3、篮体1、刹停机构5以及防倾倒机构4。移动机构2设置在钢结构主体H型钢梁上,承重架3固定连接在移动机构2上,刹停机构5设置在移动机构2上,承重架3上两侧设有防倾倒机构4,篮体1分别固定连接在承重架3的两侧。This application proposes a construction hanging basket suitable for high-altitude operations of steel structure main bodies. Referring to Figures 1 and 2, it includes a moving
参照图1和图3,移动机构2包括移动箱21、移动轮22、螺纹套23、锁定螺杆24、防滑板25、连接轴26以及导向杆27。移动箱21为矩形箱体,内设有空腔。连接轴26转动连接在移动箱21上,两端穿出移动箱21并分别螺栓连接有移动轮22。连接轴26和移动轮22的组合设有两组,设置在移动箱21移动方向上的前后两侧。移动箱21的顶壁上垂直转动连接有螺纹套23,螺纹套23内设有内螺纹,锁定螺杆24垂直滑动穿设在移动箱21的底壁上,上端与螺纹套23螺纹连接。螺纹套23的顶部固定焊接有手轮,便于作业人员旋转螺纹套23。Referring to FIGS. 1 and 3 , the moving
防滑板25为矩形钢板,固定焊接在锁定螺杆24的底端,朝向H型钢梁的一侧设有防滑纹。导向杆27垂直固定焊接在防滑板25连接锁定螺杆24的一侧,并滑动穿设在移动箱21的箱底壁上,对防滑板25起到竖直方向移动导向的作用。导向杆27设有四个,分别位于防滑板25的四角处。The
刹停机构5包括刹停板51、刹停片52、刹停螺杆53、滑块54以及传动组件55。刹停板51铰接在移动箱21的内侧壁上,设有弧形的凹槽,凹槽内粘接有刹停片52,刹停片52为弹性材质。刹停板51设有四个,分别设置在移动箱21移动方向上两端的内侧壁上。连接轴26上一体成型设有直径较大的凸环,当刹停板51转动时,可以将刹停片52挤压到凸环外侧壁,凸环与刹停片52之间产生摩擦,使连接轴26不能转动,起到刹停作用。The
刹停螺杆53沿移动箱21移动方向转动连接在移动箱21上,刹停螺杆53的两端设有不同旋向的螺纹,并分别螺纹连接有滑块54。滑块54为矩形块,朝向刹停板51的一侧设有滑动柱。刹停板51上设有腰圆孔,滑动柱滑动穿设在腰圆孔内,当刹停螺杆53转动时,两个滑块54会相对或相向移动,同时带动刹停板51转动,实现对连接轴26的刹停和解除。传动组件55连接在螺纹套23和刹停螺杆53之间,传动组件55可以是锥齿轮组或交错轴斜齿轮组。本申请实施例中,传动组件55为锥齿轮组,每组四个相同的锥齿轮。移动箱21内底壁上竖直焊接有支撑板,支撑板上转动连接有转动轴,螺纹套23通过一组锥齿轮将转矩传递到转动轴,转动轴通过一组锥齿轮将转矩传递到刹停螺杆53上。刹停螺杆53、滑块54和传动组件55的组合设有两组,分别控制两侧的刹停板51。The
在本申请另一中可能实现的方式中,传动组件55为交错轴斜齿轮组,螺纹套23上同轴连接有第一交错轴斜齿轮,两个刹停螺杆53上分别设有一个与第一交错轴斜齿轮啮合的第二交错轴斜齿轮,实现螺纹套23对两个刹停螺杆53的同步驱动。In another possible implementation mode of the present application, the
当需要将吊篮位置固定时,转动螺纹套23上的手轮,就可以同时实现防滑板25的下移和刹停板51的转动,进而同时实现防滑板25抵接H型钢梁和刹停板51刹停连接轴26的双重防移动控制。When it is necessary to fix the position of the hanging basket, turning the hand wheel on the threaded
参照图1和图4,承重架3为矩形架体,使用槽钢焊接而成,底部与移动箱21的顶部焊接。承重架3的两侧焊接有吊装耳31,可以便于使用吊装设备对吊篮进行吊装。承重架3包括两侧垂直于移动箱21焊接的横梁。Referring to Fig. 1 and Fig. 4, the load-
参照图4和图5,防倾倒机构4包括防倾倒架41、防倾倒轮42、连接杆43、限位螺栓44、定位螺杆45、齿条46以及升降齿轮47。连接杆43为矩形截面杆,顶端滑动套设在承重架3的横梁上,与横梁垂直。连接杆43的顶端螺纹连接有定位螺杆45,定位螺杆45顶端连接有手轮,转动手轮就可以将定位螺杆45旋紧抵住横梁,固定连接杆43在横梁上的位置。连接杆43上沿长度方向螺栓连接有齿条46。Referring to FIG. 4 and FIG. 5 , the
防倾倒架41为Y形,一端滑动套设在连接杆43上,另外两端分别转动连接设有防倾倒轮42。防倾倒架41上转动连接有升降齿轮47,升降齿轮47与齿条46啮合。连接杆43上螺纹孔,限位螺栓44旋在螺纹孔内,从防倾倒架41下方支撑防倾倒架41。螺纹孔沿连接杆43长度方向设有多个,选择不同的螺纹孔旋入限位螺栓44可以适配不同的H型钢梁。升降齿轮47同轴连接有手轮,便于调节防倾倒架41的升降。防倾倒轮42滚动抵接H型钢梁上翼板的底面,防倾倒轮42一体成型设有凸缘,凸缘位于H型钢梁的外侧,对吊篮的移动可以起到导向的作用,使吊篮移动更加平稳。The
移动轮22和防倾倒轮42分别位于钢结构主体H型钢梁上翼缘板的上下两侧,当移动箱21有水平方向倾斜的趋势时,对应的移动轮22或防倾倒轮42会抵紧H型钢梁,起到防倾倒作用。The moving
参照图1和图2,篮体1使用角钢为主龙骨、光圆钢筋为次龙骨焊接而成,篮体1内底部焊接有花纹钢防滑板25,供作业人员踩踏。篮体1设有两个,分别焊接在承重架3的两侧,在H型钢梁两侧对吊篮起到平衡作用。With reference to Fig. 1 and Fig. 2, basket body 1 uses angle steel as the main keel, and the light round steel bar is welded as the secondary keel, and the bottom of basket body 1 is welded with patterned
本申请实施例的实施原理为:需要对钢结构主体部分进行作业时,先将防倾倒架41调节位置,安装限位螺栓44后,将吊篮放至H型钢梁上;移动机构2对正H型钢梁的长度方向,再将两侧连接杆43向H型钢梁移动,直到防倾倒轮42移动至H型钢梁上翼缘板下,旋紧定位螺杆45;将吊篮整体移至待作业处,旋拧螺纹套23上的手轮,使防滑板25抵接H型钢梁、刹停片52压紧连接轴26,作业人员佩戴五点式安全带即可进入篮体1中进行作业。The implementation principle of the embodiment of the present application is: when it is necessary to work on the main part of the steel structure, first adjust the position of the
本具体实施方式的实施例均为本申请的较佳实施例,并非依此限制本申请的保护范围,其中相同的零部件用相同的附图标记表示。故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present application, and do not limit the protection scope of the present application accordingly, wherein the same components are represented by the same reference numerals. Therefore: all equivalent changes made according to the structure, shape, and principle of this application should be covered within the scope of protection of this application.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310189201.XA CN116181040B (en) | 2023-02-23 | 2023-02-23 | A construction hanging basket suitable for high-altitude operations of steel structure main body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310189201.XA CN116181040B (en) | 2023-02-23 | 2023-02-23 | A construction hanging basket suitable for high-altitude operations of steel structure main body |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116181040A true CN116181040A (en) | 2023-05-30 |
CN116181040B CN116181040B (en) | 2024-08-23 |
Family
ID=86448445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310189201.XA Active CN116181040B (en) | 2023-02-23 | 2023-02-23 | A construction hanging basket suitable for high-altitude operations of steel structure main body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116181040B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116950374A (en) * | 2023-06-07 | 2023-10-27 | 上海宝冶集团有限公司 | A docking interface construction operation platform that can slide to adapt to various steel sections and changes in section height and width. |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3124057U (en) * | 2006-05-25 | 2006-08-03 | 有限会社江南地研 | Unic arm suspension scaffold |
JP2009228358A (en) * | 2008-03-25 | 2009-10-08 | Nihon Bisoh Co Ltd | Gondola with curing device |
CN105952135A (en) * | 2016-06-17 | 2016-09-21 | 佛山市联智新创科技有限公司 | Chain transmission type automatic positioning hanging basket device |
CN106677513A (en) * | 2017-01-21 | 2017-05-17 | 浙江精工钢结构集团有限公司 | Moveable fabricated construction operating platform mechanism and construction method thereof |
JP2017172113A (en) * | 2016-03-18 | 2017-09-28 | Ihi運搬機械株式会社 | Scaffold installation method, and tray for temporarily installing scaffold used therewith |
CN207513140U (en) * | 2017-11-24 | 2018-06-19 | 湖北太岳园林古建工程股份有限公司 | Steel construction moves construction platform |
CN212053710U (en) * | 2020-04-02 | 2020-12-01 | 中建八局第二建设有限公司 | Height-adjustable movable type cantilever operation platform |
CN212078629U (en) * | 2020-04-14 | 2020-12-04 | 河北建设集团股份有限公司 | Double movable hanging basket for mounting steel beam |
CN212224600U (en) * | 2020-01-15 | 2020-12-25 | 倡创(上海)咨询管理事务所 | Shaped hanging basket for overhead installation of section steel beam |
CN215254455U (en) * | 2021-01-28 | 2021-12-21 | 中铁十六局集团城市建设发展有限公司 | Fireproof hanging basket for high-altitude welding of steel structure |
CN216007755U (en) * | 2021-08-23 | 2022-03-11 | 深圳市中装科技幕墙工程有限公司 | Hanging basket equipment |
CN217151155U (en) * | 2022-01-20 | 2022-08-09 | 青岛东建建设有限公司 | Movable bearing device for high-altitude construction based on steel structure |
-
2023
- 2023-02-23 CN CN202310189201.XA patent/CN116181040B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3124057U (en) * | 2006-05-25 | 2006-08-03 | 有限会社江南地研 | Unic arm suspension scaffold |
JP2009228358A (en) * | 2008-03-25 | 2009-10-08 | Nihon Bisoh Co Ltd | Gondola with curing device |
JP2017172113A (en) * | 2016-03-18 | 2017-09-28 | Ihi運搬機械株式会社 | Scaffold installation method, and tray for temporarily installing scaffold used therewith |
CN105952135A (en) * | 2016-06-17 | 2016-09-21 | 佛山市联智新创科技有限公司 | Chain transmission type automatic positioning hanging basket device |
CN106677513A (en) * | 2017-01-21 | 2017-05-17 | 浙江精工钢结构集团有限公司 | Moveable fabricated construction operating platform mechanism and construction method thereof |
CN207513140U (en) * | 2017-11-24 | 2018-06-19 | 湖北太岳园林古建工程股份有限公司 | Steel construction moves construction platform |
CN212224600U (en) * | 2020-01-15 | 2020-12-25 | 倡创(上海)咨询管理事务所 | Shaped hanging basket for overhead installation of section steel beam |
CN212053710U (en) * | 2020-04-02 | 2020-12-01 | 中建八局第二建设有限公司 | Height-adjustable movable type cantilever operation platform |
CN212078629U (en) * | 2020-04-14 | 2020-12-04 | 河北建设集团股份有限公司 | Double movable hanging basket for mounting steel beam |
CN215254455U (en) * | 2021-01-28 | 2021-12-21 | 中铁十六局集团城市建设发展有限公司 | Fireproof hanging basket for high-altitude welding of steel structure |
CN216007755U (en) * | 2021-08-23 | 2022-03-11 | 深圳市中装科技幕墙工程有限公司 | Hanging basket equipment |
CN217151155U (en) * | 2022-01-20 | 2022-08-09 | 青岛东建建设有限公司 | Movable bearing device for high-altitude construction based on steel structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116950374A (en) * | 2023-06-07 | 2023-10-27 | 上海宝冶集团有限公司 | A docking interface construction operation platform that can slide to adapt to various steel sections and changes in section height and width. |
Also Published As
Publication number | Publication date |
---|---|
CN116181040B (en) | 2024-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105252242B (en) | Large-scale component is moved and pose adjustment platform | |
CN110512879B (en) | Fabricated building spot-mounting wallboard butt joint device | |
WO2017020539A1 (en) | Tower crane with a traveling mechanism | |
CN103894872B (en) | Large workpiece 180 degree upset positioners | |
CN210713874U (en) | A kind of prefabricated building wall panel butt joint device | |
CN110655015B (en) | A trackless self-propelled platform vehicle for subway tunnel maintenance | |
WO2017071053A1 (en) | Automatic leveling device and method for variable-slope obliquely-running container | |
CN105667829A (en) | Assembly/maintenance plane dock for planes in same series | |
CN203496955U (en) | Movable type lifting trolley | |
CN116181040A (en) | Construction hanging basket suitable for steel structure main body high-altitude construction | |
CN206569936U (en) | A kind of loop wheel machine for being used to fit up | |
CN113202020A (en) | Arch rib maintenance vehicle suitable for box type arch rib inspection | |
CN208122749U (en) | A kind of liftoff locking alarm step ladder of telescopic | |
CN111501545A (en) | Maintenance truss vehicle for arch bridge of large-span steel truss arch | |
CN205739546U (en) | Piled bricks loading apparatus | |
CN214006473U (en) | Novel high strength aluminum alloy attached lifting scaffold | |
CN214459672U (en) | Bridge floor crane and front walking supporting mechanism thereof | |
CN110668322A (en) | Hoisting accessory for building that stability is good | |
CN206615135U (en) | Great-leap-forward anti-collision wall template construction car | |
CN215405581U (en) | Arch rib maintenance vehicle suitable for box type arch rib inspection | |
CN209618789U (en) | A kind of fluid-link steering platform | |
CN204079355U (en) | A kind of everything regulates lifting device | |
CN215626625U (en) | Cargo lifting and operating platform | |
CN211136015U (en) | Welding device for production of hanging beam box body | |
CN112695641A (en) | Bridge floor crane and front walking supporting mechanism thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |