CN116020197A - A kind of iron and steel smelting slag blocking device - Google Patents
A kind of iron and steel smelting slag blocking device Download PDFInfo
- Publication number
- CN116020197A CN116020197A CN202310233243.9A CN202310233243A CN116020197A CN 116020197 A CN116020197 A CN 116020197A CN 202310233243 A CN202310233243 A CN 202310233243A CN 116020197 A CN116020197 A CN 116020197A
- Authority
- CN
- China
- Prior art keywords
- filter
- wall
- hole
- box
- iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
Abstract
本发明公开了一种钢铁冶炼拦渣装置,涉及钢铁冶炼技术领域,包括过滤箱,所述过滤箱内设置有拦渣机构,且拦渣机构包括引料口、滤桶、滤孔一、桶盖、滤孔二、螺纹环边、架臂、滤板、滤孔三,所述过滤箱上设置有冷却机构和安装组件,且冷却机构包括直线电机、U架、制冷片、散热孔,所述安装组件包括箱盖、安装板、螺孔、密封垫,所述过滤箱上还设置有引导机构,且引导机构包括进料孔、引流槽、遮罩、出料管、阀门。本发明通过启动制冷片,通过其散热端向散热孔排热,并置换能量将冷气吹向过滤箱外壁,通过反复吹冷气使过滤箱快速降温,并使箱内降温到安全温度,避免人员清洁作业造成烫伤的风险。
The invention discloses a slag blocking device for iron and steel smelting, which relates to the technical field of iron and steel smelting, and comprises a filter box. A slag blocking mechanism is arranged in the filter box, and the slag blocking mechanism includes a material introduction port, a filter barrel, a filter hole 1, and a barrel cover , filter hole two, threaded ring edge, frame arm, filter plate, filter hole three, the filter box is provided with a cooling mechanism and installation components, and the cooling mechanism includes a linear motor, a U frame, a cooling sheet, and a heat dissipation hole. The installation assembly includes a box cover, a mounting plate, screw holes, and a sealing gasket. A guide mechanism is also provided on the filter box, and the guide mechanism includes a feed hole, a drainage groove, a shield, a discharge pipe, and a valve. The invention activates the refrigerating sheet, discharges heat to the heat dissipation hole through its heat dissipation end, and replaces the energy to blow cold air to the outer wall of the filter box. By repeatedly blowing cold air, the filter box is quickly cooled, and the temperature inside the box is cooled to a safe temperature, avoiding personnel cleaning Risk of burns due to work.
Description
技术领域technical field
本发明涉及钢铁冶炼技术领域,具体涉及一种钢铁冶炼拦渣装置。The invention relates to the technical field of iron and steel smelting, in particular to a slag blocking device for iron and steel smelting.
背景技术Background technique
钢铁冶炼,是钢、铁冶金工艺过程的总称。工业生产的铁根据含碳量分为生铁和钢,现代炼铁绝大部分采用高炉炼铁,个别采用直接还原炼铁法和电炉炼铁法。炼钢主要是以高炉炼成的生铁和直接还原炼铁法炼成的海绵铁以及废钢为原料,用不同的方法炼成钢。其基本生产过程是在炼铁炉内把铁矿石炼成生铁,再以生铁为原料,用不同方法炼成钢,再铸成钢锭或连铸坯。Iron and steel smelting is the general term for steel and iron metallurgical processes. Industrially produced iron is divided into pig iron and steel according to the carbon content. Most modern ironmaking uses blast furnace ironmaking, and some use direct reduction ironmaking method and electric furnace ironmaking method. Steelmaking mainly uses pig iron smelted in blast furnaces, sponge iron smelted by direct reduction ironmaking, and scrap steel as raw materials, which are smelted into steel by different methods. The basic production process is to smelt iron ore into pig iron in an iron-smelting furnace, then use pig iron as raw material to smelt steel by different methods, and then cast it into ingots or continuous casting slabs.
根据中国专利公开号为CN211394535U,该专利提供一种钢铁冶炼拦渣系统装置,包括壳体、进料口和出料口,所述壳体的一端设有进料口,壳体的另一端设有出料口,所述进料口和出料口处焊接有法兰,所述壳体的两侧对称开设有滑槽,滑槽内安装有活动架一和活动架二,所述活动架一上焊接有固定套,固定套上插装有横杆,横杆上套装有滑套,滑套上设有横梁,所述滑套和固定套之间设有弹簧,弹簧套装横杆外侧,所述横梁上端设有防护网,所述壳体靠近活动架二的一侧安装有控制箱,控制箱内插装有升降杆,且控制箱外壁对应升降杆设有开槽,升降杆滑动连接开槽,所述控制箱内安装有调节丝杆,调节丝杆转动连接控制箱,且调节丝杆垂直于控制箱底面,调节丝杆下端处套装有螺纹套,螺纹套两端焊接升降杆,所述螺纹套与控制箱底面之间设有涡轮,且涡轮固定连接调节丝杆,涡轮螺纹连接蜗杆,蜗杆转动连接控制箱内壁,且蜗杆与调节丝杆相互垂直设置,蜗杆的一端贯穿控制箱,且蜗杆的端口处焊接把手,钢水从进料口进入壳体内,经过过滤网一和过滤网二过滤后,过滤网一可将较大的残渣进行拦截,过滤网二可将较小的残渣进行拦截,能有效提高拦渣的效率,可将残渣过滤的更加彻底,提高生产加工的质量,过滤后的钢水从出料口流出。According to the Chinese Patent Publication No. CN211394535U, this patent provides a slag blocking system device for iron and steel smelting, including a shell, a feed port and a discharge port. One end of the shell is provided with a feed port, and the other end of the shell is provided with a There is a discharge port, flanges are welded at the feed port and the discharge port, chute is symmetrically opened on both sides of the housing, and
但是钢水流出的温度非常高,该专利依靠过滤网进行过滤,对网绳的材料要求十分苛刻,容易造成高温融化网绳的风险,且残渣残留高温,人员接触处理会造成烫伤的风险。However, the temperature of the molten steel flowing out is very high. This patent relies on a filter for filtering, which requires very strict requirements on the material of the mesh rope, which may easily cause the risk of melting the mesh rope at high temperature, and the residue remains at a high temperature, which may cause burns if contacted by personnel.
发明内容Contents of the invention
本发明提供一种钢铁冶炼拦渣装置,以解决上述背景技术中提出的问题。The present invention provides a slag blocking device for iron and steel smelting to solve the problems raised in the above-mentioned background technology.
为解决上述技术问题,本发明所采用的技术方案是:一种钢铁冶炼拦渣装置,包括过滤箱,所述过滤箱内设置有拦渣机构,且拦渣机构包括引料口、滤桶、滤孔一、桶盖、滤孔二、螺纹环边、架臂、滤板、滤孔三;In order to solve the above technical problems, the technical solution adopted in the present invention is: a slag blocking device for iron and steel smelting, including a filter box, a slag blocking mechanism is arranged in the filter box, and the slag blocking mechanism includes a material introduction port, a filter barrel, a
所述过滤箱上设置有冷却机构和安装组件,且冷却机构包括直线电机、U架、制冷片、散热孔,所述安装组件包括箱盖、安装板、螺孔、密封垫;The filter box is provided with a cooling mechanism and a mounting assembly, and the cooling mechanism includes a linear motor, a U frame, a cooling plate, and a cooling hole, and the mounting assembly includes a box cover, a mounting plate, a screw hole, and a gasket;
所述过滤箱上还设置有引导机构,且引导机构包括进料孔、引流槽、遮罩、出料管、阀门。The filter box is also provided with a guide mechanism, and the guide mechanism includes a feed hole, a drainage groove, a shield, a discharge pipe, and a valve.
本发明技术方案的进一步改进在于:所述引料口固定安装在过滤箱的内壁之间,所述滤桶的顶端固定连接在引料口的底端并连通设置,所述滤孔一数量有若干个,并环绕开设在滤桶的外壁一周,所述滤孔二的数量有若干个,并依次开设在桶盖的外壁底部,所述桶盖的顶部开口设置,所述螺纹环边固定安装在桶盖的开口处外壁,所述引料口内壁的最下方是螺纹设置,所述桶盖通过螺纹环边与引料口的内壁螺纹连接。The further improvement of the technical solution of the present invention lies in that: the material introduction port is fixedly installed between the inner walls of the filter box, the top of the filter bucket is fixedly connected to the bottom end of the material introduction port and communicated with each other, and the number of the filter holes is several , and surround the outer wall of the filter barrel for a week, the number of the second filter hole is several, and they are successively opened at the bottom of the outer wall of the barrel cover, the top opening of the barrel cover is set, and the threaded ring edge is fixed on the barrel The outer wall of the opening of the lid and the bottom of the inner wall of the material introduction port are threaded, and the bung is threaded with the inner wall of the material introduction port through a threaded ring edge.
采用上述技术方案,该方案中的钢水从滤孔一挤出,同时也将钢水从滤孔二挤出进行第一阶段过滤,较大残留物会停留在桶盖内壁进行暂存。With the above technical scheme, the molten steel in this scheme is squeezed out from the first filter hole, and at the same time, the molten steel is squeezed out from the second filter hole for the first-stage filtration, and the larger residues will stay on the inner wall of the barrel lid for temporary storage.
本发明技术方案的进一步改进在于:所述架臂的数量有两个,两个所述架臂分别固定安装在过滤箱的内壁背面、内壁正面,所述滤板的底部前侧、底部后侧分别与两个架臂的顶部贴合,所述滤孔三的数量有若干个,并依次开设在滤板的顶部。The further improvement of the technical solution of the present invention is that: there are two frame arms, and the two frame arms are respectively fixedly installed on the back of the inner wall and the front of the inner wall of the filter box, and the bottom front side and the bottom rear side of the filter plate The tops of the two frame arms are attached respectively, and the number of the third filter holes is several, and are sequentially opened on the top of the filter plate.
采用上述技术方案,该方案中的滤板上可以配置氧化锆过滤片,伸手向上推动滤板,使滤板翻转远离架臂,并便捷从两个架臂之间取出。With the above technical solution, the filter plate in this solution can be equipped with a zirconia filter sheet, and the filter plate can be pushed upwards by reaching out, so that the filter plate can be turned away from the frame arms, and can be easily taken out from between the two frame arms.
本发明技术方案的进一步改进在于:所述直线电机的数量有两个,两个所述直线电机分别固定安装在过滤箱的外壁两侧,并对称设置,两个所述直线电机的动子端分别与U架的两个耳端固定连接,所述U架的内壁开设有安装槽,所述制冷片固定安装在安装槽的内壁,所述散热孔的数量有三个,三个所述散热孔均与安装槽的内壁连通设置,并同时与制冷片的散热端连通设置。The further improvement of the technical solution of the present invention is that: there are two linear motors, and the two linear motors are fixedly installed on both sides of the outer wall of the filter box respectively, and arranged symmetrically, and the mover ends of the two linear motors They are respectively fixedly connected with the two ear ends of the U frame, the inner wall of the U frame is provided with a mounting groove, and the refrigerating plate is fixedly installed on the inner wall of the mounting groove, the number of the heat dissipation holes is three, and the three heat dissipation holes They are all communicated with the inner wall of the installation groove, and at the same time communicated with the heat dissipation end of the cooling fin.
采用上述技术方案,该方案中的制冷片散热端向散热孔排热,并置换能量将冷气吹向过滤箱外壁。With the above technical solution, the radiating end of the refrigerating fin in this solution discharges heat to the radiating holes, and displaces energy to blow the cold air to the outer wall of the filter box.
本发明技术方案的进一步改进在于:所述安装板的数量有八个,每两个所述安装板分别固定安装在箱盖的外壁四边,所述螺孔的数量有八个,并分别开设在每个安装板远离箱盖的一端上,所述密封垫固定安装在箱盖的顶端外壁。The further improvement of the technical solution of the present invention is that: there are eight mounting plates, and every two mounting plates are respectively fixedly installed on the four sides of the outer wall of the box cover, and the screw holes are eight in number, and are set in On one end of each mounting plate away from the case cover, the sealing gasket is fixedly installed on the top outer wall of the case cover.
采用上述技术方案,该方案中的箱盖通过密封垫抵在过滤箱的底部开口处进行密封。With the above technical solution, the box cover in this solution is sealed against the bottom opening of the filter box through the sealing gasket.
本发明技术方案的进一步改进在于:所述过滤箱的底部开口设置,所述箱盖通过密封垫贴合在过滤箱的底部开口处,所述过滤箱外壁四边分别开设有两个螺纹槽,且螺纹槽的数量共有八个,每个所述螺纹槽分别与每个螺孔对齐,并螺纹连接有螺栓。The further improvement of the technical solution of the present invention is that: the bottom opening of the filter box is set, the box cover is attached to the bottom opening of the filter box through a gasket, and two thread grooves are respectively opened on the four sides of the outer wall of the filter box, and There are eight thread grooves in total, and each thread groove is respectively aligned with each screw hole, and is threadedly connected with a bolt.
采用上述技术方案,该方案中的拧紧螺栓并通过安装板将箱盖安装在过滤箱底部。Adopt the above technical scheme, in this scheme, tighten the bolts and install the box cover on the bottom of the filter box through the installation plate.
本发明技术方案的进一步改进在于:所述过滤箱的内壁背面开设有进料孔,且进料孔位于引料口上方,所述引料口是上宽下窄,且内壁弧形结构。The further improvement of the technical solution of the present invention lies in that: the back of the inner wall of the filter box is provided with a feed hole, and the feed hole is located above the feed inlet, the feed inlet is wide at the top and narrow at the bottom, and the inner wall is arc-shaped.
采用上述技术方案,该方案中的钢水沿着引料口的内壁弧面向滤桶流动,避免钢水停留,便于快速钢水流动。By adopting the above-mentioned technical scheme, the molten steel in this scheme flows along the arc surface of the inner wall of the feed opening to the filter barrel, avoiding the stagnation of the molten steel and facilitating the rapid flow of the molten steel.
本发明技术方案的进一步改进在于:所述过滤箱的外壁背面固定连接有引流槽的一端,且引流槽的连接端与进料孔连通设置。The further improvement of the technical solution of the present invention lies in that: one end of the drainage groove is fixedly connected to the back of the outer wall of the filter box, and the connection end of the drainage groove is connected with the feeding hole.
本发明技术方案的进一步改进在于:所述引流槽的外壁顶部固定安装有遮罩,且遮罩的一端与进料孔连通设置。The further improvement of the technical solution of the present invention lies in that: a cover is fixedly installed on the top of the outer wall of the drainage groove, and one end of the cover is communicated with the feeding hole.
采用上述技术方案,该方案中的钢水经过进料孔进入过滤箱中。By adopting the above technical scheme, the molten steel in this scheme enters the filter box through the feeding hole.
本发明技术方案的进一步改进在于:所述引流槽远离进料孔的一端上依次设置有三个出料管,三个所述出料管远离引流槽的一端上固定安装有阀门,并连通设置有钢铁冶炼炉。The further improvement of the technical solution of the present invention lies in that: the end of the drainage groove away from the feed hole is provided with three discharge pipes in sequence, and the end of the three discharge pipes away from the drainage groove is fixedly installed with a valve, and is connected with a valve. Steel smelting furnace.
采用上述技术方案,该方案中的调节阀门促使钢水从出料管流向引流槽中。By adopting the above technical scheme, the regulating valve in this scheme promotes the flow of molten steel from the discharge pipe to the drainage groove.
由于采用了上述技术方案,本发明相对现有技术来说,取得的技术进步是:Owing to adopting above-mentioned technical scheme, relative to the prior art, the technical progress of the present invention is:
1、本发明提供一种钢铁冶炼拦渣装置,采用启动制冷片,通过其散热端向散热孔排热,并置换能量将冷气吹向过滤箱外壁,通过反复吹冷气使过滤箱快速降温,并使箱内降温到安全温度,避免人员清洁作业造成烫伤的风险。1. The present invention provides a slag-retaining device for iron and steel smelting, which adopts a start-up refrigeration sheet, discharges heat to the heat dissipation hole through its heat dissipation end, and replaces energy to blow cold air to the outer wall of the filter box, and quickly cools the filter box by repeatedly blowing cold air, and Cool the inside of the box to a safe temperature to avoid the risk of burns caused by personnel cleaning operations.
2、本发明提供一种钢铁冶炼拦渣装置,采用钢水堆积在滤桶内,并通过自身压力将钢水从滤孔一挤出,同时也将钢水从滤孔二挤出进行第一阶段过滤,滤板上可以配置氧化锆过滤片,并通过钢水自身压力和重力再次向下挤压穿过氧化锆过滤片进行过滤,再从滤孔三进行第二阶段过滤,对钢水内残渣过滤更加彻底。2. The present invention provides a slag blocking device for iron and steel smelting, which uses molten steel to accumulate in the filter barrel, and squeezes the molten steel from the first filter hole through its own pressure, and at the same time squeezes the molten steel from the second filter hole to perform the first-stage filtration. The filter plate can be equipped with a zirconia filter, and the pressure and gravity of the molten steel can be pressed down again through the zirconia filter for filtration, and then the second stage of filtration can be carried out from the third filter hole to filter the residue in the molten steel more thoroughly.
3、本发明提供一种钢铁冶炼拦渣装置,采用旋转桶盖使其通过螺纹环边远离滤桶内壁,将内部残留物进行倒掉清洗,将箱盖通过密封垫抵在过滤箱的底部开口处进行密封,同时拧紧螺栓并通过安装板将箱盖安装在过滤箱底部,便于对整个拦渣装置进行保存和搬运。3. The present invention provides a slag blocking device for iron and steel smelting, which uses a rotating barrel cover to keep it away from the inner wall of the filter barrel through the threaded ring edge, pours out and cleans the internal residue, and presses the box cover against the bottom opening of the filter box through a gasket At the same time, tighten the bolts and install the box cover on the bottom of the filter box through the installation plate, which is convenient for the storage and transportation of the entire slag blocking device.
附图说明Description of drawings
图1为本发明立体图;Fig. 1 is a perspective view of the present invention;
图2为本发明过滤箱的内剖图;Fig. 2 is the internal sectional view of filter case of the present invention;
图3为本发明滤桶和桶盖的结构示意图;Fig. 3 is the structural representation of filter barrel and bung of the present invention;
图4为本发明U架的内壁结构示意图;Fig. 4 is the inner wall structure schematic diagram of U frame of the present invention;
图5为本发明箱盖的结构示意图;Fig. 5 is the structural representation of lid of the present invention;
图6为本发明引流槽的结构示意图;Fig. 6 is a schematic structural view of the drainage groove of the present invention;
图7为本发明遮罩的结构示意图。Fig. 7 is a schematic structural diagram of the mask of the present invention.
图中:1、过滤箱;2、拦渣机构;201、引料口;202、滤桶;203、滤孔一;204、桶盖;205、滤孔二;206、螺纹环边;207、架臂;208、滤板;209、滤孔三;3、冷却机构;301、直线电机;302、U架;303、制冷片;304、散热孔;4、安装组件;401、箱盖;402、安装板;403、螺孔;404、密封垫;5、进料孔;6、引流槽;7、遮罩;8、出料管;9、阀门。In the figure: 1, filter box; 2, slag blocking mechanism; 201, material introduction port; 202, filter barrel; 203, filter hole one; 204, barrel cover; 205, filter hole two; 206, thread ring edge; 207, frame Arm; 208, filter plate; 209, filter hole three; 3, cooling mechanism; 301, linear motor; 302, U frame; 303, refrigeration plate; Mounting plate; 403, screw hole; 404, sealing gasket; 5, feed hole; 6, drainage groove; 7, mask; 8, discharge pipe; 9, valve.
具体实施方式Detailed ways
下面结合实施例对本发明做进一步详细说明:Below in conjunction with embodiment the present invention is described in further detail:
实施例一Embodiment one
如图1-7所示,本发明提供一种钢铁冶炼拦渣装置,包括过滤箱1,过滤箱1内设置有拦渣机构2,且拦渣机构2包括引料口201、滤桶202、滤孔一203、桶盖204、滤孔二205、螺纹环边206、架臂207、滤板208、滤孔三209,过滤箱1上设置有冷却机构3和安装组件4,且冷却机构3包括直线电机301、U架302、制冷片303、散热孔304,安装组件4包括箱盖401、安装板402、螺孔403、密封垫404,过滤箱1上还设置有引导机构,且引导机构包括进料孔5、引流槽6、遮罩7、出料管8、阀门9,引料口201固定安装在过滤箱1的内壁之间,滤桶202的顶端固定连接在引料口201的底端并连通设置,滤孔一203数量有若干个,并环绕开设在滤桶202的外壁一周,滤孔二205的数量有若干个,并依次开设在桶盖204的外壁底部,桶盖204的顶部开口设置,螺纹环边206固定安装在桶盖204的开口处外壁,引料口201内壁的最下方是螺纹设置,桶盖204通过螺纹环边206与引料口201的内壁螺纹连接,钢水从滤孔一203挤出,同时也将钢水从滤孔二205挤出进行第一阶段过滤,较大残留物会停留在桶盖204内壁进行暂存,架臂207的数量有两个,两个架臂207分别固定安装在过滤箱1的内壁背面、内壁正面,滤板208的底部前侧、底部后侧分别与两个架臂207的顶部贴合,滤孔三209的数量有若干个,并依次开设在滤板208的顶部,滤板208上可以配置氧化锆过滤片,伸手向上推动滤板208,使滤板208翻转远离架臂207,并便捷从两个架臂207之间取出。As shown in Figures 1-7, the present invention provides a slag blocking device for iron and steel smelting, including a
在本实施例中,通过钢水堆积在滤桶202内,并通过自身压力将钢水从滤孔一203挤出,同时也将钢水从滤孔二205挤出进行第一阶段过滤,滤板208上可以配置氧化锆过滤片,并通过钢水自身压力和重力再次向下挤压穿过氧化锆过滤片进行过滤,再从滤孔三209进行第二阶段过滤,对钢水内残渣过滤更加彻底。In this embodiment, the molten steel is accumulated in the
实施例二Embodiment two
如图1-4所示,在实施例一的基础上,本发明提供一种技术方案:优选的,直线电机301的数量有两个,两个直线电机301分别固定安装在过滤箱1的外壁两侧,并对称设置,两个直线电机301的动子端分别与U架302的两个耳端固定连接,U架302的内壁开设有安装槽,制冷片303固定安装在安装槽的内壁,散热孔304的数量有三个,三个散热孔304均与安装槽的内壁连通设置,并同时与制冷片303的散热端连通设置,制冷片303散热端向散热孔304排热,并置换能量将冷气吹向过滤箱1外壁。As shown in Figures 1-4, on the basis of
在本实施例中,通过启动制冷片303,通过其散热端向散热孔304排热,并置换能量将冷气吹向过滤箱1外壁,通过反复吹冷气使过滤箱1快速降温,并使箱内降温到安全温度,避免人员清洁作业造成烫伤的风险。In this embodiment, by starting the
实施例三Embodiment Three
如图1、2、5、6、7所示,在实施例一的基础上,本发明提供一种技术方案:优选的,安装板402的数量有八个,每两个安装板402分别固定安装在箱盖401的外壁四边,螺孔403的数量有八个,并分别开设在每个安装板402远离箱盖401的一端上,密封垫404固定安装在箱盖401的顶端外壁,箱盖401通过密封垫404抵在过滤箱1的底部开口处进行密封,过滤箱1的底部开口设置,箱盖401通过密封垫404贴合在过滤箱1的底部开口处,过滤箱1外壁四边分别开设有两个螺纹槽,且螺纹槽的数量共有八个,每个螺纹槽分别与每个螺孔403对齐,并螺纹连接有螺栓,拧紧螺栓并通过安装板402将箱盖401安装在过滤箱1底部,过滤箱1的内壁背面开设有进料孔5,且进料孔5位于引料口201上方,引料口201是上宽下窄,且内壁弧形结构,钢水沿着引料口201的内壁弧面向滤桶202流动,避免钢水停留,便于快速钢水流动,过滤箱1的外壁背面固定连接有引流槽6的一端,且引流槽6的连接端与进料孔5连通设置,引流槽6的外壁顶部固定安装有遮罩7,且遮罩7的一端与进料孔5连通设置,钢水经过进料孔5进入过滤箱1中,引流槽6远离进料孔5的一端上依次设置有三个出料管8,三个出料管8远离引流槽6的一端上固定安装有阀门9,并连通设置有钢铁冶炼炉,调节阀门9促使钢水从出料管8流向引流槽6中。As shown in Figures 1, 2, 5, 6, and 7, on the basis of
在本实施例中,通过旋转桶盖204使其通过螺纹环边206远离滤桶202内壁,将内部残留物进行倒掉清洗,将箱盖401通过密封垫404抵在过滤箱1的底部开口处进行密封,同时拧紧螺栓并通过安装板402将箱盖401安装在过滤箱1底部,便于对整个拦渣装置进行保存和搬运。In this embodiment, by rotating the
下面具体说一下该钢铁冶炼拦渣装置的工作原理。Let's talk about the working principle of the iron and steel smelting slag blocking device in detail.
如图1-7所示,本案中提供的所有结构组成一个拦渣装置,并且该拦渣装置需要应用到钢铁冶炼炉上,将三个出料管8远离引流槽6的一端通过管接头连通在钢铁冶炼炉的排钢水的管道上,过滤箱1需要通过相关支架进行支撑,并促使引流槽6的内壁对齐出料管8远离炉子的一端,通过调节阀门9促使钢水从出料管8流向引流槽6中,钢水经过进料孔5进入过滤箱1中,并沿着引料口201的内壁弧面向滤桶202流动,钢水堆积在滤桶202内,并通过自身压力将钢水从滤孔一203挤出,同时也将钢水从滤孔二205挤出进行第一阶段过滤,较大残留物会停留在桶盖204内壁进行暂存,过滤后的钢水填充在过滤箱1内,同时滤板208上可以配置氧化锆过滤片,并通过钢水自身压力和重力再次向下挤压穿过氧化锆过滤片进行过滤,再从滤孔三209进行第二阶段过滤,使其他残留物停留在滤板208上,二次过滤后的钢水从过滤箱1的底部开口处向外排放回收,当钢水全部过滤完成后,启动直线电机301,促使其动子端带动U架302进行反复升降运动,同时启动制冷片303,通过其散热端向散热孔304排热,并置换能量将冷气吹向过滤箱1外壁,通过反复吹冷气使过滤箱1快速降温,并使箱内降温到安全温度,避免人员清洁作业造成烫伤的风险,从过滤箱1的底部开口处伸手向上推动滤板208,使滤板208翻转远离架臂207,并从两个架臂207之间取出,同时取出氧化锆过滤片进行替换,旋转桶盖204使其通过螺纹环边206远离滤桶202内壁,将内部残留物进行倒掉清洗,最后复位各个结构,将箱盖401通过密封垫404抵在过滤箱1的底部开口处进行密封,同时拧紧螺栓并通过安装板402将箱盖401安装在过滤箱1底部,便于对整个拦渣装置进行保存和搬运,降低空气和灰尘污染,遮罩7遮挡钢水,保证钢水稳定从引流槽6中流动,避免溅射。As shown in Figure 1-7, all the structures provided in this case form a slag-stopping device, and the slag-stopping device needs to be applied to iron and steel smelting furnaces, and the ends of the three
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310233243.9A CN116020197A (en) | 2023-03-13 | 2023-03-13 | A kind of iron and steel smelting slag blocking device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310233243.9A CN116020197A (en) | 2023-03-13 | 2023-03-13 | A kind of iron and steel smelting slag blocking device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116020197A true CN116020197A (en) | 2023-04-28 |
Family
ID=86076190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310233243.9A Withdrawn CN116020197A (en) | 2023-03-13 | 2023-03-13 | A kind of iron and steel smelting slag blocking device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116020197A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6942786B1 (en) * | 2000-02-03 | 2005-09-13 | Salnes Filter As | Cleaning device for waste water |
CN204656254U (en) * | 2015-05-19 | 2015-09-23 | 焦作市铝鑫铝业有限公司 | A kind of aluminium ash separator |
CN105855531A (en) * | 2015-12-04 | 2016-08-17 | 重庆市渝西钢铁(集团)有限公司 | Slag blocking system for steel smelting |
CN213668716U (en) * | 2020-09-22 | 2021-07-13 | 肇庆国华电子有限公司 | Impurity removing device for surface treatment liquid |
CN215276032U (en) * | 2021-07-27 | 2021-12-24 | 兆亿智能科技河北有限公司 | Medicine filter equipment is used in synthetic production of multi-functional chemical drug |
-
2023
- 2023-03-13 CN CN202310233243.9A patent/CN116020197A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6942786B1 (en) * | 2000-02-03 | 2005-09-13 | Salnes Filter As | Cleaning device for waste water |
CN204656254U (en) * | 2015-05-19 | 2015-09-23 | 焦作市铝鑫铝业有限公司 | A kind of aluminium ash separator |
CN105855531A (en) * | 2015-12-04 | 2016-08-17 | 重庆市渝西钢铁(集团)有限公司 | Slag blocking system for steel smelting |
CN213668716U (en) * | 2020-09-22 | 2021-07-13 | 肇庆国华电子有限公司 | Impurity removing device for surface treatment liquid |
CN215276032U (en) * | 2021-07-27 | 2021-12-24 | 兆亿智能科技河北有限公司 | Medicine filter equipment is used in synthetic production of multi-functional chemical drug |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1756320B1 (en) | Heat exchanger system used in steel making | |
US6890479B2 (en) | System and method for steel making | |
WO2025040194A1 (en) | Energy-saving silicon-manganese alloy casting device and production method using same | |
US12181221B2 (en) | Cassette design drop out box, combustion chamber, duct and electric arc furnace upper shell system | |
JPH0375616B2 (en) | ||
CN116020197A (en) | A kind of iron and steel smelting slag blocking device | |
CN215998679U (en) | Casting machine holding furnace for casting | |
CN216898357U (en) | High-efficient iron and steel smelting furnace | |
CN113981236B (en) | Continuous electron beam cold bed smelting equipment | |
CN208071638U (en) | Sectional type water cooled casing | |
CN210711683U (en) | Aluminum ash separator | |
CN219603632U (en) | An Improved Equipment for Refining High Chromium Cast Iron | |
CN115612861B (en) | Method for producing metallic tin product by treating and recycling waste tin slag | |
CN119144839B (en) | Vacuum arc remelting furnace | |
CN221959278U (en) | Smelting furnace convenient to clearance | |
CN218666416U (en) | Rectangular anti-oxidation graphite crucible | |
CN214133951U (en) | A new type of SACBN low-silver lead-free solder melting and casting equipment | |
CN215766394U (en) | Cupola for desulfurization and dust and waste gas treatment | |
CN222434580U (en) | Molten aluminum refining unit | |
CN217433287U (en) | Intelligent brazing furnace | |
CN115673305B (en) | Pouring equipment for steel manufacturing | |
CN209431888U (en) | A kind of dedicated smelting furnace of soft Mold Making | |
CN210036226U (en) | Novel furnace body device of horizontal continuous charging electric arc furnace | |
CN108342206B (en) | Segmented water cooling casing | |
CN208171032U (en) | A kind of cupola well of hot-blast stove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20230428 |