CN115872255A - Installation method of fast loading shaft for sundries freight elevator - Google Patents
Installation method of fast loading shaft for sundries freight elevator Download PDFInfo
- Publication number
- CN115872255A CN115872255A CN202211565573.XA CN202211565573A CN115872255A CN 115872255 A CN115872255 A CN 115872255A CN 202211565573 A CN202211565573 A CN 202211565573A CN 115872255 A CN115872255 A CN 115872255A
- Authority
- CN
- China
- Prior art keywords
- vertical
- transverse
- door
- door body
- installing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Elevator Door Apparatuses (AREA)
Abstract
Description
技术领域technical field
本发明涉及电梯井道,具体涉及一种杂物货梯快装井道安装方法。The invention relates to an elevator shaft, in particular to a method for installing the quick-installed shaft of a miscellaneous cargo elevator.
背景技术Background technique
在电梯系统中,为了实现为轿厢的升降提供一个升降空间,因此设置了电梯井道。在一般居民楼中,电梯井道都是混凝土围成的电梯井道,这个需要在修建房屋的时候,就需要预设电梯井道。而有一些老楼需要加装电梯井道在楼房旁边,为了提高安装效率,因此设计了快装式电梯井道。In the elevator system, in order to provide a lifting space for the lifting of the car, an elevator shaft is provided. In general residential buildings, the elevator shafts are all elevator shafts surrounded by concrete. When building a house, it is necessary to preset the elevator shaft. However, some old buildings need to install an elevator shaft next to the building. In order to improve the installation efficiency, a quick-installed elevator shaft is designed.
现有技术中,快装式电梯井道包括:若干节骨架,骨架包括:导向锥头、竖直梁以及横向梁,竖直梁有四根,四根竖直梁中部被横向梁连接,每根竖直梁底端均延伸有导向锥头,竖直梁为钢管结构,下一节的骨架中竖直梁供上一节的骨架中导向锥头插入,从而方便自傲吊装的时候,上一节骨架与下一节骨架对准。虽然能够提高电梯井道现场的安装效率,但是该快装式电梯井道仍然存在的缺点为:In the prior art, the quick-installed elevator shaft includes: several section skeletons, and the skeleton includes: guide cone heads, vertical beams and transverse beams, there are four vertical beams, and the middle parts of the four vertical beams are connected by transverse beams, each There are guide cones extending from the bottom of the vertical beams. The vertical beams are steel pipe structures. The vertical beams in the skeleton of the next section are inserted into the guide cones in the skeleton of the previous section, so that it is convenient for self-prosperous hoisting. The skeleton is aligned with the skeleton of the next section. Although the on-site installation efficiency of the elevator shaft can be improved, the disadvantages that still exist in the quick-installed elevator shaft are:
但是生产过程中,需要在出厂之前将竖直梁和横向梁焊接在一起,同时也需要在竖直梁底端生产导向锥头,导致生产效率低,导致需要足够长的时间才能出厂,对于货梯这种安全性要求不高,又需要快速安装的场景来说,时间等不起。However, in the production process, the vertical beam and the horizontal beam need to be welded together before leaving the factory. At the same time, the guide cone needs to be produced at the bottom of the vertical beam, resulting in low production efficiency and a long enough time to leave the factory. For freight elevators For a scenario where the security requirements are not high and quick installation is required, time cannot afford to wait.
发明内容Contents of the invention
本发明要提供一种杂物货梯快装井道安装方法,解决现有技术中因在出厂之前需要将竖直梁和横向梁焊接而导致生产效率低的问题。The present invention provides a quick-loading hoistway installation method for sundry cargo elevators, which solves the problem of low production efficiency in the prior art due to the need to weld the vertical beams and transverse beams before leaving the factory.
为实现上述目的,本发明采用了如下的技术方案:To achieve the above object, the present invention adopts the following technical solutions:
本发明公开了一种杂物货梯快装井道安装方法,包括如下步骤:The invention discloses a method for installing a fast-loading hoistway of a miscellaneous cargo elevator, which comprises the following steps:
S1、备好如下部件:竖直梁、导向轨道以及横向梁,竖直梁有四根,竖直梁的水平截面均为L形结构,每一横向梁均为方框形结构,导向轨道用于导向电梯轿厢升降,横向梁对应层门口一侧的内壁为层门内壁,另外三侧内壁为基本内壁;S1. Prepare the following components: vertical beams, guide rails and transverse beams. There are four vertical beams. The horizontal sections of the vertical beams are all L-shaped structures. For the elevator car to go up and down, the inner wall of the horizontal beam corresponding to the landing door is the inner wall of the landing door, and the inner walls of the other three sides are the basic inner walls;
S2、安装竖直梁:在地面上浇筑混凝土层,混凝土层内插入竖直梁;S2. Install vertical beams: pour a concrete layer on the ground, and insert vertical beams into the concrete layer;
S3、安装横向梁:将横向梁置入四根竖直梁之间,四根竖直梁均环绕在每一横向梁的四个角落处;S3, install the transverse beam: place the transverse beam between the four vertical beams, and the four vertical beams surround the four corners of each transverse beam;
S4、安装导向轨道:横向梁的基本内壁中部均设置有一导向轨道,导向轨道通过螺钉与横向梁中部连接。S4. Installing the guide rail: the middle part of the basic inner wall of the transverse beam is provided with a guide track, and the guide track is connected with the middle part of the transverse beam through screws.
优选的是,步骤S3中,使用卡接机构将竖直梁与横向梁连接。Preferably, in step S3, the vertical beams are connected to the horizontal beams using a snap-fit mechanism.
优选的是,卡接机构包括:压紧螺栓以及卡爪,卡爪被压紧螺栓压紧在竖直梁上,压紧螺栓安装在横向梁上。Preferably, the clamping mechanism includes: a clamping bolt and a clamping claw, the clamping claw is clamped on the vertical beam by the clamping bolt, and the clamping bolt is installed on the transverse beam.
优选的是,卡爪包括:盘体以及爪部,盘体一端面凸出形成有至少三爪部,盘体与压紧螺栓大端紧贴,爪部被压紧在竖直梁和横向梁上。Preferably, the jaws include: a disc body and claws, at least three claws protrude from one end of the disc body, the disc body is in close contact with the big end of the compression bolt, and the claws are pressed against the vertical beam and the transverse beam superior.
优选的是,步骤S1中同时还备好如下部件:门导轨以及层门装置,步骤S3完成后还执行以下步骤:Preferably, the following components are also prepared in step S1: door guide rail and landing door device, and the following steps are performed after step S3 is completed:
S5、安装门导轨:在横向梁与竖直梁的连接处安装门导轨;S5, install the door guide rail: install the door guide rail at the junction of the horizontal beam and the vertical beam;
S6、安装层门装置:门导轨上安装层门装置,且层门装置对应相邻两横向梁安装。S6. Install the landing door device: install the landing door device on the door guide rail, and install the landing door device corresponding to two adjacent transverse beams.
优选的是,步骤S1中备好的层门装置包括如下部件:上门体、下门体以及竖直驱动机构;Preferably, the landing door device prepared in step S1 includes the following components: an upper door body, a lower door body and a vertical driving mechanism;
步骤S3包括如下步骤:Step S3 comprises the following steps:
S31、将上门体和下门体安装在电梯井中安装的门导轨上,上门体和下门体能在门导轨导向下在竖直方向上运动;S31, installing the upper door body and the lower door body on the door guide rail installed in the elevator shaft, the upper door body and the lower door body can move in the vertical direction under the guidance of the door guide rail;
S32、将在门导轨旁安装竖直驱动机构,竖直驱动机构有两个,一个竖直驱动机构的输出端连接至上门体,另一个竖直驱动机构的输出端连接至下门体。S32. A vertical drive mechanism will be installed next to the door guide rail. There are two vertical drive mechanisms. The output end of one vertical drive mechanism is connected to the upper door body, and the output end of the other vertical drive mechanism is connected to the lower door body.
优选的是,对应每一层门装置中两横向梁中一横向梁为第一横筋,另一横向梁为第二横筋;Preferably, one of the two transverse beams corresponding to each floor door device is the first transverse rib, and the other transverse beam is the second transverse rib;
步骤S1中备好上门体和下门体的步骤为:The steps for preparing the upper door body and the lower door body in step S1 are:
S11、备好上门体和下门体包括的部件:上门体和下门体均包括:门板、阻挡板以及导向板:门板包括:板体以及边框,边框有两个,每一边框均由两边块构成;S11. Prepare the parts included in the upper door body and the lower door body: both the upper door body and the lower door body include: door panel, blocking plate and guide plate; the door panel includes: panel body and frame. block composition;
S12、安装边框:将两边块夹紧在板体一侧形成一边框,将两边块夹紧在板体另一侧形成另一边框;S12. Install the frame: clamp the two side blocks on one side of the board body to form a frame, and clamp the two side blocks on the other side of the board body to form another frame;
S13、安装导向板:通过第一安装螺栓和第一螺帽将导向板安装在两边框上,第一安装螺栓大端和第一螺帽夹紧边框的两边块以及导向板,板体上端和下端均安装导向板;S13. Install the guide plate: install the guide plate on the two frames through the first installation bolt and the first nut, the large end of the first installation bolt and the first nut clamp the two side blocks of the frame and the guide plate, the upper end of the plate body and the guide plate Guide plates are installed at the lower end;
S14、安装阻挡板:在边框端部上安装阻挡板,阻挡板勾住第一横筋或第二横筋。S14. Install the blocking plate: Install the blocking plate on the end of the frame, and the blocking plate hooks the first transverse rib or the second transverse rib.
优选的是,阻挡板呈现为“ㄣ”形结构,阻挡板一侧开设有两第一定位孔,阻挡板另一侧开设有两第二定位孔,第一定位孔和第二定位孔均供第二安装螺栓穿过,第二安装螺栓穿过边框,第二安装螺栓与第二螺帽配合夹紧阻挡板以及边框。Preferably, the blocking plate has a "ㄣ"-shaped structure, two first positioning holes are opened on one side of the blocking plate, and two second positioning holes are opened on the other side of the blocking plate, and both the first positioning hole and the second positioning hole are used for The second installation bolt passes through, the second installation bolt passes through the frame, and the second installation bolt cooperates with the second nut to clamp the blocking plate and the frame.
相比于现有技术,本发明具有如下有益效果:Compared with the prior art, the present invention has the following beneficial effects:
实现了电梯井道的骨架仅仅由竖直梁和横向梁制成,且在出厂之前不需要焊接竖直梁和横向梁,且不需要在竖直梁上形成导向锥头,减少了骨架在工厂生产的时间,且在现场组装的时候,仅仅需要将横向梁焊接在竖直梁上,不需要耗费大量的人力和物力来吊装现有技术的骨架节,提高了生产效率。当然本申请中是因为杂物货梯要求不高,仅仅将电梯井道安装牢靠即可,同时整个杂物货梯快装井道安装方法高度也不高,因此仅仅设置整根竖直梁来形成杂物货梯快装井道安装方法,应用方向的特殊性。Realized that the skeleton of the elevator shaft is only made of vertical beams and transverse beams, and does not need to weld the vertical beams and transverse beams before leaving the factory, and does not need to form a guide cone on the vertical beams, which reduces the production time of the skeleton in the factory , and during on-site assembly, only the transverse beams need to be welded to the vertical beams, without spending a lot of manpower and material resources to hoist the skeleton joints of the prior art, which improves the production efficiency. Of course, in this application, because the requirements for the sundry goods elevator are not high, it is only necessary to install the elevator shaft firmly, and at the same time, the installation method of the quick-installation shaft of the sundry goods elevator is not high, so only the entire vertical beam is set to form the sundries goods elevator The installation method of the quick-loading shaft and the particularity of the application direction.
本发明的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本发明的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the present invention will partly be embodied through the following descriptions, and partly will be understood by those skilled in the art through the study and practice of the present invention.
附图说明Description of drawings
图1为杂物货梯快装井道安装方法的结构示意图;Fig. 1 is the structural representation of the fast loading hoistway installation method of sundry cargo elevator;
图2为图1中I处的放大图。Fig. 2 is an enlarged view of position I in Fig. 1 .
图3为层门装置处的结构示意图。Fig. 3 is a schematic diagram of the structure of the landing door device.
附图标记:竖直梁1、导向轨道2、横向梁3、卡接机构4、压紧螺栓41、卡爪42、盘体421、爪部422、层门装置5、上门体51、下门体52、门板511、阻挡板512、导向板513、板体514、边框515、第一定位孔516、第二定位孔517、第二安装螺栓518、门导轨6。Reference signs: vertical beam 1, guide rail 2, transverse beam 3, clamping mechanism 4,
具体实施方式Detailed ways
为了使本发明实现的技术手段、创作特征、达成目的与作用更加清楚及易于了解,下面结合附图和具体实施方式对本发明作进一步阐述:In order to make the technical means, creative features, goals and functions achieved by the present invention clearer and easier to understand, the present invention will be further elaborated below in conjunction with the accompanying drawings and specific embodiments:
实施例1:Example 1:
如图1以及图2所示,本实施例公开了一种杂物货梯快装井道安装方法,包括:竖直梁1、导向轨道2以及横向梁3,竖直梁1有四根,竖直梁1的水平截面均为L形结构,每一横向梁3均为方框形结构,四根竖直梁1均环绕在每一横向梁3的四个角落处,在每一横向梁3的内侧立有导向轨道2,导向轨道2用于导向电梯轿厢升降,横向梁3对应层门口一侧的内壁为层门内壁,另外三侧内壁为基本内壁,横向梁3的三个基本内壁中部均设置有一导向轨道2,导向轨道2通过螺钉与横向梁3中部连接。As shown in Fig. 1 and Fig. 2, the present embodiment discloses a method for installing a quick-installation hoistway of a miscellaneous cargo elevator, including: vertical beams 1, guide rails 2 and transverse beams 3, there are four vertical beams 1, vertical The horizontal section of the beam 1 is an L-shaped structure, and each transverse beam 3 is a square frame structure, and four vertical beams 1 surround the four corners of each transverse beam 3, and each transverse beam 3 There is a guide rail 2 on the inner side, and the guide rail 2 is used to guide the elevator car to go up and down. The inner wall of the side of the horizontal beam 3 corresponding to the landing door is the inner wall of the landing door, and the inner walls of the other three sides are the basic inner walls. The middle part of the three basic inner walls of the transverse beam 3 All are provided with a guide rail 2, and the guide rail 2 is connected with the middle part of the transverse beam 3 by screws.
竖直梁1通过卡接机构4与横向梁3连接。以竖直梁1为基础,竖直梁1的设置为横向梁3提供了安装基础,横向梁3起到的是抱起四根竖直梁1的作用,同时也为层门的设置提供了安装基础。The vertical beam 1 is connected to the transverse beam 3 through a clamping mechanism 4 . Based on the vertical beam 1, the setting of the vertical beam 1 provides the installation foundation for the horizontal beam 3, and the horizontal beam 3 plays the role of holding up the four vertical beams 1, and also provides a basis for the setting of the landing door. Install base.
卡接机构4包括:压紧螺栓41以及卡爪42,卡爪42被压紧螺栓41压紧在竖直梁1上,压紧螺栓41安装在横向梁3上。实现了压紧螺栓41安装在横向梁3上,卡爪42被压紧螺栓41压紧在竖直梁1上,从而限制横向梁3在竖直梁1上运动。The clamping mechanism 4 includes: a
卡爪42包括:盘体421以及爪部422,盘体421一端面凸出形成有至少三爪部422,盘体421与压紧螺栓41大端紧贴,爪部422被压紧在竖直梁1和横向梁3上。盘体421与压紧螺栓41配合提供了基础,爪部422则是抓紧在竖直梁1上。The
在电梯井道底部安装有支撑电梯轿厢的缓冲支撑装置(图中未示)。避免了轿厢冲击电梯井道底部而导致轿厢损坏。A buffer support device (not shown) for supporting the elevator car is installed at the bottom of the elevator shaft. The car is prevented from being damaged by impacting the bottom of the elevator shaft.
缓冲支撑装置包括:缓冲头以及支撑柱,支撑柱安装在底坑,支撑柱顶部安装有缓冲头,缓冲头采用弹性材料制成,缓冲头向着电梯轿厢延伸。缓冲头用于与电梯轿厢接触,缓冲头连接支撑柱,从而为缓冲头提供安装基础。The buffer support device includes: a buffer head and a support column, the support column is installed in the bottom pit, the buffer head is installed on the top of the support column, the buffer head is made of elastic material, and the buffer head extends toward the elevator car. The buffer head is used to contact the elevator car, and the buffer head is connected to the support column, thus providing the installation base for the buffer head.
横向梁3的层门内壁上安装层门装置5。横向梁3为层门装置5的开闭提供了基础,也就是对应两相邻横向梁3之间,层门装置5对应安装。A
层门装置5包括:上门体51、下门体52以及竖直驱动机构,上门体51和下门体52安装在电梯井中安装的门导轨6上(图中,门导轨6和竖直梁1长短不一致,由于图只是示意图,门导轨6和竖直梁1在实际中长短一致),上门体51和下门体52能在门导轨6导向下在竖直方向上运动;对应每一楼层均设置有两相互间隔的横向梁3,对应每一楼层的横向梁3中一横向梁3为第一横筋,另一横向梁3为第二横筋,第一横筋和第二横筋位于门导轨6旁,对应每一楼层均设置有一组第一横筋和第二横筋,每组中第一横筋和第二横筋之间有间隙;上门体51和下门体52均包括:门板511、阻挡板512以及导向板513,门板511上安装有阻挡板512,阻挡板512用于通过与第一横筋和第二横筋配合限制上门体51和下门体52的运行范围,门板511上安装有导向板513,导向板513在能滑动地伸入至门导轨6,门导轨6位于竖直方向上;在电梯井中安装有竖直驱动机构(图中未示),竖直驱动机构地输出端连接至上门体51和下门体52,竖直驱动机构用于驱动上门体51和下门体52开闭。横向梁3不但将竖直梁1连接在了一起,同时横向梁3与阻挡板512配合,限制了层门的运行范围。在竖直梁1处安装门导轨6,门导轨6通过导向板513导向上门体51和下门体52的运行,使得上门体51和下门体52按照指定范围运行。The landing door device 5 includes: an upper door body 51, a lower door body 52 and a vertical drive mechanism, and the upper door body 51 and the lower door body 52 are installed on the door guide rail 6 installed in the elevator shaft (in the figure, the door guide rail 6 and the vertical beam 1 Inconsistent in length, because the figure is only a schematic diagram, the door guide rail 6 and the vertical beam 1 are consistent in length in reality), the upper door body 51 and the lower door body 52 can move in the vertical direction under the guidance of the door guide rail 6; corresponding to each floor There are two transverse beams 3 spaced apart from each other, one of the transverse beams 3 corresponding to each floor is the first transverse bar, and the other transverse beam 3 is the second transverse bar, and the first transverse bar and the second transverse bar are located beside the door guide rail 6 , each floor is provided with a group of first and second cross bars, and there is a gap between the first and second bars in each group; the upper door body 51 and the lower door body 52 include: a door panel 511, a blocking plate 512 and Guide plate 513, a blocking plate 512 is installed on the door plate 511, and the blocking plate 512 is used to limit the operating range of the upper door body 51 and the lower door body 52 by cooperating with the first transverse rib and the second transverse rib, and the door plate 511 is equipped with a guide plate 513, The guide plate 513 is slidably stretched into the door guide rail 6, and the door guide rail 6 is positioned in the vertical direction; a vertical drive mechanism (not shown) is installed in the elevator shaft, and the output end of the vertical drive mechanism is connected to the upper door body 51 and the lower door body 52, the vertical drive mechanism is used to drive the upper door body 51 and the lower door body 52 to open and close. The transverse beam 3 not only connects the vertical beams 1 together, but also cooperates with the blocking
装整个杂货电梯快装井道的时候,首先,将竖直梁1通过混凝土结构预埋在地面上,混凝土结构保证整个竖直梁1处于竖直状态,也保证竖直梁1处于站立状态;然后,将横向梁3放置于四根竖直梁1之间,保持所有横向梁3相互间隔地设置在竖直梁1上,横向梁3通过卡接机构4安装在竖直梁1上,卡接机构4仅能需要旋转压紧螺栓41到位即可,压紧螺栓41与穿过盘体421,从而通过盘体421将爪部422压紧在竖直梁1上,爪部422将每根竖直梁1向着四根竖直梁1的中心拉,从而使得四根竖直梁1能够被抱紧在一起,避免竖直梁1向着四根竖直梁1外偏倒,从而保证竖直梁1位于竖直方向上,同时竖直梁1通过与爪部422的摩擦而限制横向梁3在竖直梁1上滑动;再后,安装门导轨6,门导轨6焊接在横向梁3和竖直梁1上;最后,安装上门体51和下门体52。When installing the entire cargo elevator for fast-loading the hoistway, firstly, the vertical beam 1 is pre-embedded on the ground through a concrete structure, and the concrete structure ensures that the entire vertical beam 1 is in a vertical state, and also ensures that the vertical beam 1 is in a standing state; then , placing the transverse beams 3 between the four vertical beams 1, keeping all the transverse beams 3 spaced apart from each other on the vertical beams 1, the transverse beams 3 are installed on the vertical beams 1 through the clamping mechanism 4, and the clamping The mechanism 4 only needs to rotate the compression bolt 41 to put it in place, and the compression bolt 41 passes through the disc body 421, so that the claw part 422 is pressed on the vertical beam 1 by the disc body 421, and the claw part 422 pushes each vertical beam The straight beam 1 is pulled toward the center of the four vertical beams 1, so that the four vertical beams 1 can be tightly held together, and the vertical beam 1 is prevented from tilting toward the outside of the four vertical beams 1, thereby ensuring that the vertical beams 1 is located in the vertical direction, while the vertical beam 1 limits the sliding of the horizontal beam 3 on the vertical beam 1 by friction with the claw part 422; then, install the door guide rail 6, and the door guide rail 6 is welded on the horizontal beam 3 and the vertical beam 1 On the straight beam 1; finally, install the upper door body 51 and the lower door body 52.
实施例2:Example 2:
如图1至图3所示,基于实施例1,本实施例公开了一种杂物货梯快装井道安装方法,包括如下步骤:As shown in Figures 1 to 3, based on Embodiment 1, this embodiment discloses a method for installing a fast-loading hoistway for a sundry cargo elevator, including the following steps:
S1、备好如下部件:竖直梁1、导向轨道2以及横向梁3,竖直梁1有四根,竖直梁1的水平截面均为L形结构,每一横向梁3均为方框形结构,导向轨道2用于导向电梯轿厢升降,横向梁3对应层门口一侧的内壁为层门内壁,另外三侧内壁为基本内壁;S1. Prepare the following components: vertical beam 1, guide rail 2 and horizontal beam 3, there are four vertical beams 1, the horizontal section of vertical beam 1 is L-shaped structure, and each horizontal beam 3 is a square frame Shaped structure, the guide track 2 is used to guide the elevator car up and down, the inner wall of the transverse beam 3 corresponding to the landing door side is the inner wall of the landing door, and the inner walls of the other three sides are the basic inner walls;
S2、安装竖直梁1:在地面上浇筑混凝土层,混凝土层内插入竖直梁1;S2. Installing the vertical beam 1: pouring a concrete layer on the ground, inserting the vertical beam 1 in the concrete layer;
S3、安装横向梁3:将横向梁3置入四根竖直梁1之间,四根竖直梁1均环绕在每一横向梁3的四个角落处;S3, install the transverse beam 3: place the transverse beam 3 between the four vertical beams 1, and the four vertical beams 1 surround the four corners of each transverse beam 3;
S4、安装导向轨道2:横向梁3的基本内壁中部均设置有一导向轨道2,导向轨道2通过螺钉与横向梁3中部连接。S4. Install the guide rail 2: the middle part of the basic inner wall of the transverse beam 3 is provided with a guide track 2, and the guide track 2 is connected with the middle part of the transverse beam 3 by screws.
步骤S3中,使用卡接机构4将竖直梁1与横向梁3连接。In step S3 , the vertical beam 1 is connected to the transverse beam 3 using the clamping mechanism 4 .
卡接机构4包括:压紧螺栓41以及卡爪42,卡爪42被压紧螺栓41压紧在竖直梁1上,压紧螺栓41安装在横向梁3上。The clamping mechanism 4 includes: a
卡爪42包括:盘体421以及爪部422,盘体421一端面凸出形成有至少三爪部422,盘体421与压紧螺栓41大端紧贴,爪部422被压紧在竖直梁1和横向梁3上。The
优选的是,步骤S1中同时还备好如下部件:门导轨6以及层门装置5,步骤S3完成后还执行以下步骤:Preferably, the following components are also prepared in step S1: door guide rail 6 and
S5、安装门导轨6:在横向梁3与竖直梁1的连接处安装门导轨6;S5, install the door guide rail 6: install the door guide rail 6 at the junction of the transverse beam 3 and the vertical beam 1;
S6、安装层门装置5:门导轨6上安装层门装置5,且层门装置5对应相邻两横向梁3安装。S6. Installing the landing door device 5: the landing
步骤S1中备好的层门装置5包括如下部件:上门体51、下门体52以及竖直驱动机构;The
步骤S3包括如下步骤:Step S3 comprises the following steps:
S31、将上门体51和下门体52安装在电梯井中安装的门导轨6上,上门体51和下门体52能在门导轨6导向下在竖直方向上运动;S31, the
S32、将在门导轨6旁安装竖直驱动机构,竖直驱动机构有两个,一个竖直驱动机构的输出端连接至上门体51,另一个竖直驱动机构的输出端连接至下门体52。S32. A vertical drive mechanism will be installed next to the door guide rail 6. There are two vertical drive mechanisms. The output end of one vertical drive mechanism is connected to the
优选的是,对应每一层门装置5中两横向梁3中一横向梁3为第一横筋,另一横向梁3为第二横筋;Preferably, one of the two transverse beams 3 corresponding to each
步骤S1中备好上门体51和下门体52的步骤为:The steps of getting the
S11、备好上门体51和下门体52包括的部件:上门体51和下门体52均包括:门板511、阻挡板512以及导向板513:门板511包括:板体514以及边框515,边框515有两个,每一边框515均由两边块构成;S11. Prepare the parts included in the
S12、安装边框515:将两边块夹紧在板体514一侧形成一边框515,将两边块夹紧在板体514另一侧形成另一边框515;S12, install the frame 515: clamp the two side blocks on one side of the
S13、安装导向板513:通过第一安装螺栓和第一螺帽将导向板513安装在两边框515上,第一安装螺栓大端和第一螺帽夹紧边框515的两边块以及导向板513,板体514上端和下端均安装导向板513;S13. Install the guide plate 513: install the
S14、安装阻挡板512:在边框515端部上安装阻挡板512,阻挡板512勾住第一横筋或第二横筋。S14. Install the blocking plate 512: install the blocking
阻挡板512呈现为“ㄣ”形结构,阻挡板512一侧开设有两第一定位孔516,阻挡板512另一侧开设有两第二定位孔517,第一定位孔516和第二定位孔517均供第二安装螺栓518穿过,第二安装螺栓518穿过边框515,第二安装螺栓518与第二螺帽配合夹紧阻挡板512以及边框515。The blocking
本申请中,首先,为了整个井道能够站立,因此设置了混凝土层,混凝土层将竖直梁1树立在地面上,避免了竖直梁1偏倒,整个竖直梁1后续承担所有部件的重量,因此混凝土层为基础处,要牢靠;然后,设置了横向梁3,横向梁3上安装卡接机构4,卡接机构4使得四根竖直梁1向中间拉,从而避免了竖直梁1有偏倒的倾向,同时将横向梁3定位在竖直梁1上,横向梁3的设置为后续层门装置5的设置提供了基础,特别是与层门装置5中阻挡板512配合,限制了上门体51和下门体52的运行范围;再后,为了方便安装成上门体51和下门体52,因此设置了边块将板体514两侧夹紧,避免了因此板体514较薄而导致人被割伤,同时边框515安装导向板513,可以将两边块配合定位在板体514上;再后,为了设置上门体51和下门体52的运行范围,因此设置了阻挡板512,阻挡板512与横向梁3形成的第一横筋和第二横筋,从而限定了阻挡板512的运行范围;最后,通过设置阻挡板512呈现为“ㄣ”形结构,同时阻挡板512一侧设置第一定位孔516,阻挡板512另一侧设置第二定位孔517,实现了安装阻挡板512的时候,不需要注意阻挡板512的方向,从而使得阻挡板512能够勾住第一横筋和第二横筋,安装的时候不需要注意阻挡板512第一定位孔516处与边框515紧贴,还是阻挡板512第二定位孔517处与边框515紧贴;当阻挡板512第一定位孔516处与边框515紧贴的时候,第二安装螺栓518穿过第一定位孔516,第二安装螺栓518大端与第二螺帽配合阻挡板512以及边框515即可;当阻挡板512第二定位孔517处与边框515紧贴的时候,第二安装螺栓518穿过第二定位孔517,第二安装螺栓518大端与第二螺帽配合阻挡板512以及边框515即可,使得阻挡板512在边框515上的安装更加方便。In this application, first of all, in order that the entire hoistway can stand, a concrete layer is set up, and the concrete layer erects the vertical beam 1 on the ground, avoiding the vertical beam 1 from tilting, and the entire vertical beam 1 subsequently bears the weight of all components , so the concrete layer is the foundation, and it must be firm; then, a horizontal beam 3 is installed, and a clamping mechanism 4 is installed on the horizontal beam 3. The clamping mechanism 4 makes the four vertical beams 1 pull toward the middle, thereby avoiding the vertical beam 1 has a tendency to be tilted, and at the same time, the transverse beam 3 is positioned on the vertical beam 1. The setting of the transverse beam 3 provides a basis for the setting of the subsequent
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present invention without limitation. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be carried out Modifications or equivalent replacements without departing from the spirit and scope of the technical solution of the present invention shall be covered by the claims of the present invention.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211565573.XA CN115872255A (en) | 2022-12-07 | 2022-12-07 | Installation method of fast loading shaft for sundries freight elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211565573.XA CN115872255A (en) | 2022-12-07 | 2022-12-07 | Installation method of fast loading shaft for sundries freight elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115872255A true CN115872255A (en) | 2023-03-31 |
Family
ID=85766329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211565573.XA Pending CN115872255A (en) | 2022-12-07 | 2022-12-07 | Installation method of fast loading shaft for sundries freight elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115872255A (en) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001097650A (en) * | 1999-10-01 | 2001-04-10 | Otis Elevator Co | Construction method for installing elevator without machine room |
CN201751354U (en) * | 2010-05-19 | 2011-02-23 | 陈显森 | Sundry elevator door structure |
CN102583131A (en) * | 2011-01-04 | 2012-07-18 | 张向阳 | Elevator shaft wall assembled by combined shaft frames |
CN206069177U (en) * | 2016-08-29 | 2017-04-05 | 四川科莱电梯股份有限公司 | A kind of dumb waiter safety landing door system |
CN107352358A (en) * | 2017-07-19 | 2017-11-17 | 苏州天梭电梯有限公司 | Elevator frame |
CN107447952A (en) * | 2017-08-18 | 2017-12-08 | 江苏天奥电梯有限公司 | A kind of dismountable steel structure lift shaft |
CN108217387A (en) * | 2016-12-21 | 2018-06-29 | 齐茂山 | A kind of novel biography dish elevator |
CN207597605U (en) * | 2017-11-27 | 2018-07-10 | 海芙德建筑产品(上海)有限公司 | The connection structure of aluminium alloy elevator shaft column and crossbeam |
CN109279480A (en) * | 2018-11-02 | 2019-01-29 | 广州广日电梯工业有限公司 | A kind of steel structure lift shaft splicing apparatus and method |
CN209835337U (en) * | 2019-04-19 | 2019-12-24 | 西继迅达(许昌)电梯有限公司 | Household elevator shaft with glass outer seal and simple and convenient to install |
CN210025480U (en) * | 2018-10-11 | 2020-02-07 | 安徽源和堂药业股份有限公司 | Herbal pieces-slicer |
CN211225943U (en) * | 2019-08-27 | 2020-08-11 | 江苏菱智电梯制造有限公司 | Elevator steel constructs well |
CN214456075U (en) * | 2021-02-24 | 2021-10-22 | 中国新兴建设开发有限责任公司 | Construction stage indoor elevator baffle protector |
CN113602937A (en) * | 2021-08-12 | 2021-11-05 | 广东奥菱电梯有限公司 | Installation process of elevator hoistway |
-
2022
- 2022-12-07 CN CN202211565573.XA patent/CN115872255A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001097650A (en) * | 1999-10-01 | 2001-04-10 | Otis Elevator Co | Construction method for installing elevator without machine room |
CN201751354U (en) * | 2010-05-19 | 2011-02-23 | 陈显森 | Sundry elevator door structure |
CN102583131A (en) * | 2011-01-04 | 2012-07-18 | 张向阳 | Elevator shaft wall assembled by combined shaft frames |
CN206069177U (en) * | 2016-08-29 | 2017-04-05 | 四川科莱电梯股份有限公司 | A kind of dumb waiter safety landing door system |
CN108217387A (en) * | 2016-12-21 | 2018-06-29 | 齐茂山 | A kind of novel biography dish elevator |
CN107352358A (en) * | 2017-07-19 | 2017-11-17 | 苏州天梭电梯有限公司 | Elevator frame |
CN107447952A (en) * | 2017-08-18 | 2017-12-08 | 江苏天奥电梯有限公司 | A kind of dismountable steel structure lift shaft |
CN207597605U (en) * | 2017-11-27 | 2018-07-10 | 海芙德建筑产品(上海)有限公司 | The connection structure of aluminium alloy elevator shaft column and crossbeam |
CN210025480U (en) * | 2018-10-11 | 2020-02-07 | 安徽源和堂药业股份有限公司 | Herbal pieces-slicer |
CN109279480A (en) * | 2018-11-02 | 2019-01-29 | 广州广日电梯工业有限公司 | A kind of steel structure lift shaft splicing apparatus and method |
CN209835337U (en) * | 2019-04-19 | 2019-12-24 | 西继迅达(许昌)电梯有限公司 | Household elevator shaft with glass outer seal and simple and convenient to install |
CN211225943U (en) * | 2019-08-27 | 2020-08-11 | 江苏菱智电梯制造有限公司 | Elevator steel constructs well |
CN214456075U (en) * | 2021-02-24 | 2021-10-22 | 中国新兴建设开发有限责任公司 | Construction stage indoor elevator baffle protector |
CN113602937A (en) * | 2021-08-12 | 2021-11-05 | 广东奥菱电梯有限公司 | Installation process of elevator hoistway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20200217087A1 (en) | Elevator system | |
WO2023240813A1 (en) | Steel platform deformation construction structure and method for construction of sloping wall of core tube | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
WO2019015243A1 (en) | Shaft module splicing system and splicing method therefor | |
CN106121253B (en) | Installation component adjustable auxiliary installation device and method | |
CN115872255A (en) | Installation method of fast loading shaft for sundries freight elevator | |
CN218809757U (en) | Sundry goods elevator fast-assembling well | |
CN104806001A (en) | Safety operation platform for sliding and lifting of elevator shaft guide rail and construction method | |
CN109138492A (en) | A kind of curtain wall removes device and method for dismounting | |
CN115676559A (en) | Steel construction elevator well | |
CN114933238A (en) | Self-unloading type hoisting device for steel beam and construction method thereof | |
CN113216593A (en) | Anti-falling hoisting device for elevator shaft of high-rise building | |
CN209244309U (en) | A kind of curtain wall dismounting device | |
JPH0842153A (en) | Construction method of long steel members and joint structure of steel beams | |
JPH05319729A (en) | Attaching work device of guide rail of elevator and attaching work method of guide rail using that device | |
CN118581967A (en) | A green building construction method for assembled wall | |
CN211895621U (en) | A return rope pulley frame assembly for a construction hoist | |
JPH0826622A (en) | Construction method of guide rail of elevator | |
WO2019138545A1 (en) | Elevator and refurbishing method therefor | |
JP3237999B2 (en) | Elevator device and method of forming elevator device | |
CN222976444U (en) | Auxiliary device for butt-jointing installation of I-beams in prefabricated building steel structures | |
CN220058756U (en) | Externally hung operating platform | |
JP3253441B2 (en) | Elevator installation method | |
JPH07286368A (en) | Method and device for lifting up the top floor frame for structure construction | |
JP2002060158A (en) | Installation method for elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230331 |