CN115782702A - Installation and adjustment method for expansion joint of rigid contact network - Google Patents
Installation and adjustment method for expansion joint of rigid contact network Download PDFInfo
- Publication number
- CN115782702A CN115782702A CN202210693181.5A CN202210693181A CN115782702A CN 115782702 A CN115782702 A CN 115782702A CN 202210693181 A CN202210693181 A CN 202210693181A CN 115782702 A CN115782702 A CN 115782702A
- Authority
- CN
- China
- Prior art keywords
- expansion joint
- contact line
- contact
- reserved
- length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
Description
技术领域technical field
本发明属于地铁供电接触网施工技术领域,具体涉及一种刚性接触网膨胀接头安装调整方法。The invention belongs to the technical field of subway power supply catenary construction, and in particular relates to a method for installing and adjusting a rigid catenary expansion joint.
背景技术Background technique
刚性接触网是电气化铁路的重要组成部分,是轨道交通车辆的动力源泉,担负着给轨道机车提供动力的作用。锚段是指将接触网沿线分成一定长度并在结构上有独立机械稳定性的关键部位,可以缩小事故范围及便于维修。目前地铁刚性接触网通常采用锚段关节式机械分段方案,但由于锚段关节式机械分段安装难度大、安装后电客车通行后然弧率高、弓网受流质量差,长期运行对接触线及受电弓的磨损很大,对此需总结出科学可行的机械分段安装方式,来确保弓网稳定受流,减少异常拉弧。Rigid catenary is an important part of electrified railway, it is the power source of rail transit vehicles, and it is responsible for providing power to rail locomotives. The anchor section refers to the key part that divides the catenary line into a certain length and has independent mechanical stability in structure, which can reduce the scope of accidents and facilitate maintenance. At present, the rigid catenary of the subway usually adopts the anchor section joint mechanical segmentation scheme, but due to the difficulty of installation of the anchor section joint mechanical section, the high arc rate after the electric passenger car passes after installation, and the poor flow quality of the pantograph and catenary, long-term operation is harmful. Contact wires and pantographs wear a lot, so it is necessary to summarize scientific and feasible mechanical segmented installation methods to ensure stable pantograph-catenary current reception and reduce abnormal arcing.
发明内容Contents of the invention
本发明为了解决现有地铁刚性接触网施工存在作业干扰大、施工周期长、工作效率低的技术问题,提供一种刚性接触网膨胀接头安装调整方法。In order to solve the technical problems of large operation interference, long construction period and low work efficiency in the existing metro rigid catenary construction, the present invention provides a rigid catenary expansion joint installation and adjustment method.
本发明采取以下技术方案:一种刚性接触网膨胀接头安装调整方法,包括以下步骤,S100:预留膨胀接头安装空间;S200:打磨汇流排预留接触线端头,与膨胀接头两端连接的汇流排端部必须预留膨胀接头滑道长度+300mm的接触线,同时对预留接触线进行校直,不得出现硬折点,在安装膨胀接头前,将预留接触线长度切断至膨胀接头滑道长度±5mm,并将接触端部打磨成斜角;S300:安装膨胀接头;S400:装卡接触线。The present invention adopts the following technical solutions: a method for installing and adjusting rigid catenary expansion joints, including the following steps, S100: reserve space for installation of expansion joints; S200: polish busbar reserved contact wire ends, and connect with both ends of expansion joints At the end of the busbar, a contact line with the length of the expansion joint slideway + 300mm must be reserved. At the same time, the reserved contact line must be straightened to avoid hard folding points. Before installing the expansion joint, cut off the reserved contact line length to the expansion joint The length of the slideway is ±5mm, and the contact end is ground into a bevel; S300: install the expansion joint; S400: install the contact wire.
步骤S100中,在膨胀接头的安装部位提前在两端汇流排中间预留出膨胀接头的安装空间,预留间隙的长度G根据安装汇流排时的环境温度“膨胀接头安装间隙控制温度曲线”确定。In step S100, an installation space for the expansion joint is reserved in the middle of the busbars at both ends at the installation position of the expansion joint in advance, and the length G of the reserved gap is determined according to the "expansion joint installation gap control temperature curve" of the ambient temperature when the busbar is installed .
膨胀接头包括500型膨胀接头和1000型膨胀接头,500型膨胀接头:G=1925mm+10a,1000型膨胀接头:G=2725mm+10a,其中a为膨胀接头标尺刻度值;为方便膨胀接头长度调整,根据G值对应的a值进行调整,偏差不得大于±20mm。Expansion joints include 500-type expansion joints and 1000-type expansion joints, 500-type expansion joints: G=1925mm+10a, 1000-type expansion joints: G=2725mm+10a, where a is the scale value of the expansion joint scale; for the convenience of expansion joint length adjustment , adjust according to the a value corresponding to the G value, and the deviation shall not be greater than ±20mm.
步骤S200具体打磨方法如下,S201:将接触线端头设置在接触线打磨夹具中,接触线打磨夹具内部具有直径大于接触线直径的圆孔,接触线端头插入在圆孔中,接触线打磨夹具一侧带有切口,接触线打磨夹具顶部穿设有顶部螺栓,顶部螺栓底部固定接触线,同时保证接触线与接触线打磨夹具左右对称;S202:采用角磨机对接触线端头磨斜角,斜角最终与接触线打磨夹具斜角一致;S203:拆卸接触线打磨夹具,检查接触线斜角面是否光滑平整。The specific grinding method of step S200 is as follows, S201: set the contact wire end in the contact wire grinding jig, the contact wire grinding jig has a round hole with a diameter larger than the contact wire diameter inside, the contact wire end is inserted in the round hole, and the contact wire is polished There is a cutout on one side of the fixture, and the top bolt is pierced on the top of the contact wire grinding fixture, and the bottom of the top bolt fixes the contact wire, while ensuring the left and right symmetry between the contact wire and the contact wire grinding fixture; S202: use an angle grinder to grind the end of the contact wire The bevel angle is finally consistent with the bevel angle of the contact line grinding jig; S203: Disassemble the contact line grinding jig, and check whether the bevel surface of the contact line is smooth.
步骤S300具体安装方法如下,S301:将膨胀接头长度调整到预留间隙的长度G,放入前期预留的位置上,在当前环境温度下,G值满足“膨胀接头安装间隙控制温度曲线”要求,偏差不超过±20mm;S302:拉伸膨胀接头与两端汇流排端面对齐;S303:将膨胀接头与两端汇流排对接,通过外包接头固定,保证膨胀接头与两端汇流排紧密贴合,交替紧固M12螺栓,紧固力矩为56N·m。The specific installation method of step S300 is as follows, S301: Adjust the length of the expansion joint to the length G of the reserved gap, and put it in the position reserved in the previous stage. Under the current ambient temperature, the G value meets the requirements of the "expansion joint installation gap control temperature curve" , the deviation does not exceed ±20mm; S302: stretch the expansion joint to align with the end faces of the bus bars at both ends; S303: connect the expansion joint to the bus bars at both ends, and fix it through the outsourcing joint to ensure that the expansion joint is closely attached to the bus bars at both ends. Alternately tighten the M12 bolts with a tightening torque of 56N·m.
步骤S302中要求:a.膨胀接头本体与连接汇流排必须处在同一直线上;b.两者不得出现拧面;c.接头缝隙不得大于0.5mm。Requirements in step S302: a. The body of the expansion joint and the connecting busbar must be on the same straight line; b. There must be no twisted surface between the two; c. The gap between the joints must not be greater than 0.5mm.
步骤S400包括以下步骤,S401:对膨胀接头处预留的接触线进行矫直和线面调正,确认接触线端头已打磨完成,截取与滑道等长度接触线;S402:在接触线线槽内涂抹导电油脂,打开膨胀接头压线夹板,将接触线顺入本体牙形与压线夹板之间,从从汇流排端头向接触线末端紧固M8螺栓。Step S400 includes the following steps, S401: Straighten and adjust the surface of the contact line reserved at the expansion joint, confirm that the end of the contact line has been polished, and intercept the contact line with the same length as the slideway; S402: In the contact line Apply conductive grease to the groove, open the clamping plate of the expansion joint, insert the contact wire between the tooth shape of the body and the clamping plate, and fasten the M8 bolts from the end of the busbar to the end of the contact wire.
与现有技术相比,本发明通过将膨胀接头用于刚性悬挂接触网系统锚段关节处,补偿锚段内汇流排因温度变化而产生的纵向膨胀量或收缩量,实现了锚段间的电气续接及受电弓在锚段间的平滑过渡,改进了我国刚性接触网锚段关节施工技术,取得了良好的经济效益和社会效益。Compared with the prior art, the present invention uses the expansion joint at the joint of the anchor section of the rigid suspension catenary system to compensate the longitudinal expansion or contraction of the busbar in the anchor section due to temperature changes, and realizes the connection between the anchor sections. The electrical connection and the smooth transition of the pantograph between the anchor sections have improved the construction technology of the anchor section joints of the rigid catenary in my country, and achieved good economic and social benefits.
附图说明Description of drawings
图1为本发明的膨胀接头安装示意图;Fig. 1 is the installation diagram of expansion joint of the present invention;
图2为本发明的膨胀接头本体示意图;Fig. 2 is a schematic diagram of the expansion joint body of the present invention;
图3为本发明的500型膨胀接头安装间隙控制温度曲线图;Fig. 3 is the temperature curve diagram of the installation gap control of the 500 type expansion joint of the present invention;
图4为本发明的1000型膨胀接头安装间隙控制温度曲线图;Fig. 4 is the temperature curve diagram of the installation gap control of the 1000 type expansion joint of the present invention;
图5为本发明的接触线打磨示意图;Fig. 5 is a schematic diagram of contact line grinding of the present invention;
图6为本发明的接触线打磨剖面图;Fig. 6 is the grinding sectional view of the contact line of the present invention;
图7为本发明的膨胀接头安装用外包接头安装示意图;Fig. 7 is a schematic diagram of installation of an outsourcing joint for installation of an expansion joint of the present invention;
图中:1-左滑道;2-右滑道;3-压线夹板;4-M8螺栓;5-M8平垫片;6-M8弹垫;7、外包接头;8、汇流排;12、刚性悬挂点;13、接触线打磨夹具;14、M12紧固螺栓;15接触线;L-两悬挂点间距;G-预留间隙;h-接触线打磨厚度;M-接触线打磨长度。In the figure: 1-left slideway; 2-right slideway; 3-crimping splint; 4-M8 bolt; 5-M8 flat gasket; 6-M8 spring washer; 1. Rigid suspension point; 13. Contact wire grinding fixture; 14. M12 fastening bolt; 15 Contact wire; L- distance between two suspension points; G- reserved gap; h- contact wire grinding thickness; M- contact wire grinding length.
具体实施方式Detailed ways
一种刚性接触网膨胀接头安装调整方法,如图1-图6所示,包括以下步骤:A method for installing and adjusting rigid catenary expansion joints, as shown in Figures 1-6, includes the following steps:
S100:预留膨胀接头安装空间。S100: Reserve space for expansion joint installation.
(1)500型膨胀接头两端相邻刚性悬挂点为3.5m;1000型膨胀接头两端相邻刚性悬挂点为4m,误差不大于±100mm。(1) The adjacent rigid suspension points at both ends of the 500-type expansion joint are 3.5m; the adjacent rigid suspension points at both ends of the 1000-type expansion joint are 4m, and the error is not greater than ±100mm.
(2)在膨胀接头的安装部位应提前在两端汇流排中间预留出膨胀接头的安装空间,预留间隙尺寸G值应根据安装汇流排时的环境温度参照“膨胀接头安装间隙控制温度曲线”确定,为方便膨胀接头长度调整,可根据G值对应的a值进行调整,偏差不得大于±20mm。(2) At the installation position of the expansion joint, an installation space for the expansion joint should be reserved in the middle of the busbars at both ends in advance, and the reserved gap size G value should be based on the ambient temperature when the busbar is installed. Refer to the "expansion joint installation gap control temperature curve "Confirmed, in order to facilitate the adjustment of the expansion joint length, it can be adjusted according to the a value corresponding to the G value, and the deviation shall not be greater than ±20mm.
500型膨胀接头:G=1925+10a (a:膨胀接头标尺刻度值);500 type expansion joint: G=1925+10a (a: expansion joint scale scale value);
1000型膨胀接头:G=2725+10a (a:膨胀接头标尺刻度值)。1000 type expansion joint: G=2725+10a (a: expansion joint scale scale value).
S200:汇流排预留接触线端头打磨:S200: Grinding of the end of the reserved contact wire of the busbar:
为有效保证膨胀接头的使用,与膨胀接头两端连接的汇流排端部须预留膨胀接头滑道长度+300mm的接触线,同时对预留接触线进行校直,不得出现硬折点,在安装膨胀接头前,将预留接触线长度切断至膨胀接头滑道长度±5mm,并将接触端部打磨成斜角,采用专用斜角打磨辅助夹具进行,打磨方法如下:In order to effectively ensure the use of the expansion joint, the end of the bus bar connected to both ends of the expansion joint must reserve a contact line with a slideway length of the expansion joint + 300mm. Before installing the expansion joint, cut off the length of the reserved contact line to the length of the expansion joint slideway ±5mm, and grind the contact end into a bevel, using a special bevel grinding auxiliary fixture, and the grinding method is as follows:
S201:如图6、7所示,将接触线端头设置在接触线打磨夹具13中,接触线打磨夹具13内部具有直径大于接触线直径的圆孔,接触线端头插入在圆孔中,接触线打磨夹具13一侧带有切口,接触线打磨夹具13顶部穿设有顶部螺栓14,顶部螺栓14底部固定接触线,同时保证接触线与接触线打磨夹具13左右对称。S201: As shown in Figures 6 and 7, set the contact wire end in the contact
S202:采用角磨机对接触线端头磨斜角,斜角最终与接触线打磨夹具13斜角一致。S202: Use an angle grinder to grind the bevel angle of the end of the contact wire, and the bevel angle is finally consistent with the bevel angle of the contact
S203:拆卸接触线打磨夹具13,检查接触线斜角面是否光滑平整。S203: Disassemble the contact
S300:膨胀接头安装:S300: Expansion joint installation:
(1)将膨胀接头长度调整到间隙值尺寸G,放入前期预留的位置上(在当前环境温度下,G值满足“膨胀接头安装间隙控制温度曲线”要求,偏差不超过±20mm)。(1) Adjust the length of the expansion joint to the gap value dimension G, and put it in the position reserved in the early stage (under the current ambient temperature, the G value meets the requirements of the "expansion joint installation gap control temperature curve", and the deviation does not exceed ±20mm).
(2)拉伸膨胀接头与两端汇流排端面对齐,要求:(2) The tensile expansion joint is aligned with the end faces of the busbars at both ends, requiring:
a.膨胀接头本体与连接汇流排必须处在同一直线上;a. The expansion joint body and the connecting busbar must be on the same straight line;
b.两者不得出现拧面;b. The two shall not be twisted;
c.接头缝隙不得大于0.5mm。c. Joint gap shall not be greater than 0.5mm.
(3)将膨胀接头与两端汇流排对接,通过外包接头固定。保证膨胀接头与两端汇流排紧密贴合,交替紧固M12螺栓,紧固力矩为56N·m。(3) Butt the expansion joint with the busbars at both ends, and fix it through the outsourcing joint. Ensure that the expansion joints are closely attached to the bus bars at both ends, and alternately tighten the M12 bolts with a tightening torque of 56N·m.
(4)安装注意事项(4) Precautions for installation
1)膨胀接头相邻四个悬挂点应等高,中间两个悬挂点允许略高1-3mm;1) The four adjacent suspension points of the expansion joint should be of the same height, and the middle two suspension points are allowed to be slightly higher than 1-3mm;
2)外包接头长度中心应与接缝对齐;2) The length center of the outsourcing joint should be aligned with the seam;
3)紧固时应将膨胀接头略微向上抬起,以消除因自重产生的下垂度;3) When tightening, the expansion joint should be lifted up slightly to eliminate the sag caused by its own weight;
4)膨胀接头安装应在轨道中轴线正上方、拉出值为零的位置上;4) The expansion joint should be installed directly above the central axis of the track, where the pull-out value is zero;
5)膨胀接头安装应在汇流排放线前;5) The expansion joint should be installed before the confluence discharge line;
6)膨胀接头应安装在跨中位置,允许误差±100mm;6) The expansion joint should be installed at the mid-span position, with an allowable error of ±100mm;
7)G值应满足“膨胀接头安装间隙控制温度曲线”要求,偏差不超过±20mm。7) The G value should meet the requirements of "expansion joint installation gap control temperature curve", and the deviation should not exceed ±20mm.
S400:装卡接触线:S400: Card-mounted contact wire:
(1)对膨胀接头处预留的接触线进行矫直和线面调正,确认接触线端头已打磨完成,截取与滑道等长度接触线。(500型长度1395mm~1400mm;1000型长度2095mm ~2100mm)。(1) Straighten and adjust the surface of the contact line reserved at the expansion joint, confirm that the end of the contact line has been polished, and intercept the contact line at the same length as the slideway. (The length of the 500 type is 1395mm~1400mm; the length of the 1000 type is 2095mm~2100mm).
(2)在接触线线槽内涂抹导电油脂,打开膨胀接头压线夹板,将接触线顺入本体牙形与压线夹板之间,从从汇流排端头向接触线末端紧固M8螺栓,紧固力矩13N.m。(2) Apply conductive grease in the contact line groove, open the expansion joint crimping splint, insert the contact line between the body tooth shape and the crimping splint, tighten the M8 bolts from the end of the busbar to the end of the contact wire, Tightening torque 13N.m.
工程实例Engineering example
该方法用于北京地铁新机场线及19号线全线接触网。该方法是首次在地铁供电系统中使用,有效减少了锚段关节式电分段,由于安装调整不到位然弧率高、弓网受流质量差,接触线与受电弓磨耗严重的问题,同时由于膨胀关节式机械分段结构简单,便于调整,提高了膨胀管节处接触线的平顺度,保证了受电弓在两锚段交界处自然平稳过渡,降低了接触网燃弧率,大大提高了运营速度。This method is used in the catenary of Beijing Metro New Airport Line and Line 19. This method is used for the first time in the subway power supply system, which effectively reduces the problem of the joint electric segment of the anchor section. Due to the improper installation and adjustment, the arc rate is high, the pantograph-catenary current quality is poor, and the contact wire and pantograph are seriously worn. At the same time, due to the simple structure of the expansion joint mechanical section, it is easy to adjust, which improves the smoothness of the contact line at the expansion joint, ensures the natural and smooth transition of the pantograph at the junction of the two anchor sections, reduces the arcing rate of the catenary, and greatly Increased speed of operation.
北京地铁新机场线接触网工程全线一次性送电成功,并顺利通过竣工验收。在开通运营两年多期间膨胀接触处零事故,验证了接触网膨胀接头施工方法的安全性和可靠性。实践证明,该技术方案先进,实用性强,经济环保效益好,提高了我国地铁刚性接触网膨胀接头施工技术的稳定性,推广前景好。The catenary project of the new airport line of the Beijing Metro was successfully transmitted to the whole line at one time, and passed the completion acceptance. During more than two years of operation, there was no accident at the expansion contact point, which verified the safety and reliability of the construction method of the catenary expansion joint. Practice has proved that this technical solution is advanced, practical, economical and environmentally friendly, and has improved the stability of the construction technology of my country's subway rigid catenary expansion joints, and has a good promotion prospect.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210693181.5A CN115782702A (en) | 2022-06-19 | 2022-06-19 | Installation and adjustment method for expansion joint of rigid contact network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210693181.5A CN115782702A (en) | 2022-06-19 | 2022-06-19 | Installation and adjustment method for expansion joint of rigid contact network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115782702A true CN115782702A (en) | 2023-03-14 |
Family
ID=85431199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210693181.5A Pending CN115782702A (en) | 2022-06-19 | 2022-06-19 | Installation and adjustment method for expansion joint of rigid contact network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115782702A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117781878A (en) * | 2024-02-28 | 2024-03-29 | 四川拓及轨道交通设备股份有限公司 | A method for detecting the status of empty rail contact network |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105059139A (en) * | 2015-08-25 | 2015-11-18 | 中铁电气化局集团宝鸡器材有限公司 | Rigid overhead contact catenary temperature compensation device |
CN108394316A (en) * | 2018-05-10 | 2018-08-14 | 西南交通大学 | A kind of underslung rigid contact net expansion joint |
CN112389282A (en) * | 2020-11-17 | 2021-02-23 | 中铁十二局集团电气化工程有限公司 | Construction method for expansion joint of overhead rigid contact network at speed of 160km per hour |
RU2746700C1 (en) * | 2020-07-21 | 2021-04-19 | Общество с ограниченной ответственностью "ЦЕНТР ЖЕЛЕЗНОДОРОЖНЫХ ИННОВАЦИЙ" | Device for replacing the butt clamp of contact wire |
CN114103736A (en) * | 2020-08-28 | 2022-03-01 | 富雷尔福莱电气化设备(广州)有限公司 | Expansion joint of bus bar |
-
2022
- 2022-06-19 CN CN202210693181.5A patent/CN115782702A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105059139A (en) * | 2015-08-25 | 2015-11-18 | 中铁电气化局集团宝鸡器材有限公司 | Rigid overhead contact catenary temperature compensation device |
CN108394316A (en) * | 2018-05-10 | 2018-08-14 | 西南交通大学 | A kind of underslung rigid contact net expansion joint |
RU2746700C1 (en) * | 2020-07-21 | 2021-04-19 | Общество с ограниченной ответственностью "ЦЕНТР ЖЕЛЕЗНОДОРОЖНЫХ ИННОВАЦИЙ" | Device for replacing the butt clamp of contact wire |
CN114103736A (en) * | 2020-08-28 | 2022-03-01 | 富雷尔福莱电气化设备(广州)有限公司 | Expansion joint of bus bar |
CN112389282A (en) * | 2020-11-17 | 2021-02-23 | 中铁十二局集团电气化工程有限公司 | Construction method for expansion joint of overhead rigid contact network at speed of 160km per hour |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117781878A (en) * | 2024-02-28 | 2024-03-29 | 四川拓及轨道交通设备股份有限公司 | A method for detecting the status of empty rail contact network |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103991391B (en) | A kind of insulation support device that power rail is installed | |
CN115782702A (en) | Installation and adjustment method for expansion joint of rigid contact network | |
CN110303949B (en) | Rigid-flexible transition construction method for overhead rigid contact network of rapid rail transit at speed of 160km per hour | |
KR101902361B1 (en) | Section insulator for rigid trolley line | |
CN112389282A (en) | Construction method for expansion joint of overhead rigid contact network at speed of 160km per hour | |
AU2020203578A1 (en) | Beveled-end steel railroad | |
CN202243063U (en) | Stainless steel positioning wire clamp for rigid hanging contact network | |
CN208827637U (en) | Exchange 160 kilometers of rigid suspension catenary section insulators of 25kV speed per hour | |
CN105345322B (en) | Welding process of full load van side panel | |
CN104627027A (en) | DC (direct current) 750V-3 kV flexible hanging section insulator | |
KR101980943B1 (en) | Power collector and vehicle | |
WO2022241936A1 (en) | Seamless track railway structure for normal conductive short stator magnetic levitation system | |
CN114542094A (en) | Arrangement mode for battery car group rail transfer in miniature shield tunnel | |
CN113954699A (en) | Rigid-flexible transition system of variable cross-section busbar | |
CN204488532U (en) | DC750V ~ 3kV flexible suspension section insulator | |
CN106522043A (en) | Installation method of contact rail of magnetic-levitation train | |
CN111591172A (en) | busbar bracket | |
CN114851919A (en) | A comprehensive adjustment method for installation of segmented insulators of subway rigid catenary | |
CN206528368U (en) | Electrification railway contact net spacing positioning apparatus | |
CN202573856U (en) | Medium-low speed magnetic levitation-side current collection steel aluminum composite contact rail-end elbow | |
CN217545194U (en) | First-aid device for low-carbon steel contact rail joint | |
CN213705239U (en) | Small-radius bus bar device at crossover line | |
CN208733405U (en) | A kind of rail defects and failures weld seam bracing means | |
KR101316676B1 (en) | a device for clamping with repair of catenary | |
CN213354234U (en) | Gapless disconnected expansion joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |