CN115627675A
CN115627675A CN202211309887.3A CN202211309887A CN115627675A CN 115627675 A CN115627675 A CN 115627675A CN 202211309887 A CN202211309887 A CN 202211309887A CN 115627675 A CN115627675 A CN 115627675A
Authority
CN
China
Prior art keywords
layer
lawn
plastic
soil
runway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211309887.3A
Other languages
Chinese (zh)
Inventor
田云生
张晓林
翟敬博
贺磊
贾世文
鲁奕
贾金和
王振
袁星
陈宇航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202211309887.3A priority Critical patent/CN115627675A/en
Publication of CN115627675A publication Critical patent/CN115627675A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/04Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明涉及体育运动场地施工技术领域,具体为一种体育运动场地的结构及其塑胶跑道和草坪的施工方法;结构从内往外为草坪结构、排水沟和塑胶跑道结构;最下层为素土基层;从下往上:塑胶跑道结构依次为包括防水混凝土层和细粒式改性沥青混凝土层的跑道基础层、预制环保塑胶层;草坪结构依次为设有渗透排水管的草坪基础层、人造草坪层;塑胶跑道施工方法为铺设素土基层、铺设跑道基础层及其的防水混凝土层和细粒式改性沥青混凝土层、铺设预制环保塑胶层;草坪的施工方法为铺设素土基层、铺设设有渗透排水管的草坪基础层,铺设人造草坪层。可渗透施工环保胶代替沥青的使用,保护人体健康;防水混凝土层隔绝了水向下的侵蚀,避免跑道下沉影响使用。

Figure 202211309887

The invention relates to the technical field of sports field construction, in particular to a structure of a sports field and a construction method for a plastic runway and a lawn; the structure is a lawn structure, a drainage ditch and a plastic runway structure from the inside to the outside; the bottom layer is a plain soil base ;From bottom to top: the structure of the plastic runway is the runway base layer including the waterproof concrete layer and the fine-grained modified asphalt concrete layer, and the prefabricated environmental protection plastic layer; the lawn structure is the lawn base layer with permeable drainage pipes, artificial turf layer; the construction method of the plastic runway is to lay the plain soil base layer, lay the runway base layer and its waterproof concrete layer and fine-grained modified asphalt concrete layer, and lay the prefabricated environmental protection plastic layer; the construction method of the lawn is to lay the plain soil base layer, lay the Lawn base layer with permeable drains, laying artificial turf layer. The use of permeable construction environmental protection glue replaces asphalt to protect human health; the waterproof concrete layer isolates the downward erosion of water and prevents the sinking of the runway from affecting the use.

Figure 202211309887

Description

一种体育运动场地的结构及其塑胶跑道和草坪的施工方法The structure of a kind of sports field and the construction method of its plastic runway and lawn

技术领域technical field

本发明涉及体育运动场地施工技术领域,具体为一种体育运动场地的结构及其塑胶跑道和草坪的施工方法。The invention relates to the technical field of sports field construction, in particular to a structure of a sports field and a construction method for a plastic runway and a lawn.

背景技术Background technique

像学校的操场和室外的运动场等都是比较常见的体育运动场,其主要用于训练、比赛,是学校或城市不可缺少的一部分;一般的体育运动场地主要包括外部的一圈塑胶跑道和内部的草坪。School playgrounds and outdoor playgrounds are relatively common sports fields, which are mainly used for training and competitions, and are an indispensable part of schools or cities; general sports fields mainly include an external plastic track and an internal track. lawn.

目前,运动场地的塑胶跑道的基础层一般是使用传统水泥混凝土基础层或沥青基础层,上面铺设塑胶面层。传统的混凝土基础层施工难度大、平整度难以掌握,容易起砂,会导致塑胶面层与基础层粘结不充分、粘接不牢,产生空鼓(鼓包);下雨天塑胶跑道的水会向下渗透,暴雨天气水会渗透到地下土层,导致塑胶跑道局部下沉,影响使用;塑胶跑道夏天经太阳暴晒后表面温度高达70℃以上,高温会加速塑胶面层老化,最主要的沥青基础层的沥青粘结层软化,与塑胶面层在高温下容易分解出有害气体,不利于人的健康。雨天时,草坪作为足球场由于地基表面渗透性比较差导致容易积水,在雨水和草坪的作用下运动员很容易滑倒受伤,限制了草坪作为足球场地的使用。At present, the base layer of the plastic runway in the sports field generally uses a traditional cement concrete base layer or an asphalt base layer, and a plastic surface layer is laid on it. The traditional concrete base layer is difficult to construct, the flatness is difficult to control, and it is easy to sand, which will lead to insufficient bonding between the plastic surface layer and the base layer, and the bonding will not be strong, resulting in hollowing (bulging); the water on the plastic track in rainy days will Penetrating downwards, water in rainy weather will penetrate into the underground soil layer, causing the plastic runway to partially sink and affect the use; the surface temperature of the plastic runway after being exposed to the sun in summer is as high as 70°C, and high temperature will accelerate the aging of the plastic surface layer, the most important asphalt The asphalt bonding layer of the base layer is softened, and it is easy to decompose harmful gases with the plastic surface layer at high temperature, which is not conducive to human health. In rainy days, the lawn used as a football field is prone to water accumulation due to the relatively poor permeability of the foundation surface. Under the action of rain and lawn, athletes are prone to slip and be injured, which limits the use of lawn as a football field.

发明内容Contents of the invention

本发明针对现有技术中塑胶面层容易鼓包、暴雨天气导致塑胶跑道局部下沉,草坪的地基表面渗透性较差容易积水的技术问题,提出了一种体育运动场地的结构及其塑胶跑道和草坪的施工方法。Aiming at the technical problems in the prior art that the plastic surface layer is easy to bulge, the plastic runway partially sinks due to heavy rain, and the foundation surface of the lawn has poor permeability and is prone to water accumulation, the invention proposes a structure of a sports field and its plastic runway and lawn construction methods.

为了达到上述目的,本发明采用的技术方案为:一种体育运动场地的结构,包括内部的草坪结构,以及围绕在草坪结构外部一圈的塑胶跑道结构;所述草坪结构与塑胶跑道结构之间还设有一圈排水沟;所述塑胶跑道结构与草坪结构的最下层均为素土基层;所述塑胶跑道结构在素土基层上方从下往上还依次设有跑道基础层和预制环保塑胶层;所述草坪结构在素土基层上方从下往上还依次设有草坪基础层和人造草坪层;所述跑道基础层从下往上依次为灰土层、二灰碎石层、防水混凝土层和细粒式改性沥青混凝土层;所述草坪基础层从下往上依次为级配碎石层、加强型土工布和中粗砂层;所述级配碎石层内设有渗透排水管,所述渗透排水管延伸到排水沟,且与排水沟连通。In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a structure of a sports field, including an internal lawn structure, and a plastic runway structure around the outside of the lawn structure; the structure between the lawn structure and the plastic runway structure There is also a circle of drains; the bottom layer of the plastic runway structure and the lawn structure are plain soil bases; the plastic runway structure is also provided with a runway base layer and a prefabricated environmental protection plastic layer from bottom to top above the plain soil base ; The lawn structure is also provided with a lawn base layer and an artificial turf layer from bottom to top above the plain soil base layer; the runway base layer is successively a lime soil layer, a fly ash gravel layer, a waterproof concrete layer, and an artificial turf layer from bottom to top. A fine-grained modified asphalt concrete layer; the lawn base layer is a graded gravel layer, a reinforced geotextile and a medium-coarse sand layer from bottom to top; the graded gravel layer is provided with a permeable drainage pipe, The percolation drain extends to and communicates with the drain.

防水混凝土层隔绝水向下的侵蚀,避免跑道的下沉;减少沥青使用,降低危害气体的产生;加强型土工布隔绝了泥土、沙的同时,保证了水向下渗透,渗透排水管收集到雨水后排到排水沟。The waterproof concrete layer isolates the downward erosion of water and avoids the sinking of the runway; reduces the use of asphalt and reduces the generation of harmful gases; while the reinforced geotextile isolates the soil and sand, it ensures that the water penetrates downward and is collected by the drainage pipe Drains into gutters after rain.

优选的,所述预制环保塑胶层与细粒式改性沥青混凝土层之间涂有可渗透施工环保胶;所述人造草坪层包括种植土层及其上铺设的人造草坪;可渗透施工环保胶将跑道基础层与预制环保塑胶层紧紧粘结在一起,代替沥青的作用。Preferably, the permeable construction environmental protection adhesive is coated between the prefabricated environmental protection plastic layer and the fine-grained modified asphalt concrete layer; the artificial turf layer includes the planting soil layer and the artificial turf laid on it; the permeable construction environmental protection adhesive Tightly bond the base layer of the runway with the prefabricated environmentally friendly plastic layer to replace the role of asphalt.

优选的,所述渗透排水管沿草坪结构的中心向四周排布,且高度逐渐降低;使雨水收集更加高效,还能防止雨水出现滞留、回渗。Preferably, the permeable drainage pipes are arranged along the center of the lawn structure to the surroundings, and the height gradually decreases; the rainwater collection is more efficient, and the rainwater can also be prevented from stagnation and back seepage.

优选的,所述级配碎石层的下方设有与所述渗透排水管相同排布的集水槽,所述渗透排水管设置在集水槽内。Preferably, a sump arranged in the same arrangement as the seepage drainage pipe is provided under the graded gravel layer, and the permeation drainage pipe is arranged in the sump.

优选的,所述灰土层的石灰与土的体积比为2:8。Preferably, the lime soil layer has a volume ratio of lime to soil of 2:8.

优选的,在所述排水沟下方,沿其延长方向,均衡的设有多个与排水沟连通的集水井;所述排水沟至少在对应集水井的正上方的位置处设有井盖;雨水从草坪基础层内的渗透排水管流进排水沟,进而到集水井内,集水井的水可以二次利用,比如抽出来浇到过热的预制环保塑胶层上。Preferably, under the drainage ditch, along its extending direction, a plurality of water collection wells connected with the drainage ditch are evenly provided; the drainage ditch is provided with a manhole cover at least directly above the corresponding water collection well; The seepage drainage pipe in the lawn base layer flows into the drainage ditch, and then into the sump well, and the water in the sump well can be reused, such as being pumped out and poured on the overheated prefabricated environmental protection plastic layer.

本发明还提供了一种体育运动场地的塑胶跑道的施工方法,其特征在于,包括以下步骤:The present invention also provides a construction method for a plastic runway in a sports field, which is characterized in that it comprises the following steps:

步骤一 摊铺素土,并夯实,形成素土基层;Step 1 Spread plain soil and compact it to form plain soil base;

步骤二 摊铺并碾压石灰与土的体积比为2:8的灰土,形成灰土层;Step 2 paving and rolling the lime soil with a volume ratio of lime and soil of 2:8 to form a lime soil layer;

步骤三 摊铺并碾压二灰碎石,形成二灰碎石层;Step 3 Spreading and rolling the limestone macadam to form a limestone macadam layer;

步骤四 浇筑抗渗混凝土,形成防水混凝土层;Step 4 Pouring impermeable concrete to form a waterproof concrete layer;

步骤五 铺设细粒式改性沥青混凝土,形成细粒式改性沥青混凝土层;Step 5 laying fine-grained modified asphalt concrete to form a fine-grained modified asphalt concrete layer;

步骤六 在细粒式改性沥青混凝土层上涂一层可渗透施工环保胶,并在其上铺设预制环保塑胶层;Step 6: Apply a layer of permeable construction environmental protection adhesive on the fine-grained modified asphalt concrete layer, and lay a prefabricated environmental protection plastic layer on it;

步骤七 在铺好的预制环保塑胶层上进行场地划线,并清理,形成塑胶跑道。Step 7 Mark the site on the paved prefabricated environmentally friendly plastic layer and clean it up to form a plastic runway.

优选的,所述步骤二中将灰土分成多层,逐步摊铺并碾压每一层。Preferably, in the second step, the lime soil is divided into multiple layers, and each layer is gradually spread and rolled.

本发明还提供了一种体育运动场地的草坪的施工方法,包括以下步骤:The present invention also provides a kind of construction method of the lawn of sports field, comprises the following steps:

步骤一 摊铺素土,并夯实,形成素土基层,同时集水槽,集水槽沿草坪结构的中心向四周排布;Step 1 Spread plain soil and compact it to form a plain soil base. At the same time, the water collection tanks are arranged along the center of the lawn structure to the surrounding areas;

步骤二 在集水槽内搭设渗透排水管,渗透排水管向四周高度逐渐降低;Step 2 Set up the seepage drainage pipe in the sump, and the height of the seepage drainage pipe gradually decreases to the surrounding;

步骤三 摊铺并碾压级配碎石,形成级配碎石层;Step 3 Spreading and rolling the graded crushed stone to form a graded crushed stone layer;

步骤四 铺设一层加强型土工布;Step 4 laying a layer of reinforced geotextile;

步骤五 摊铺并碾压中粗砂,形成中粗砂层;Step 5 Pave and roll medium-coarse sand to form a medium-coarse sand layer;

步骤六 摊铺一层种植土,形成种植土层,并在其上铺设人造草坪;Step 6 Spread a layer of planting soil to form a planting soil layer, and lay artificial turf on it;

步骤七 填充塑胶颗粒,清理草坪。Step 7 Fill the plastic pellets and clean up the lawn.

优选的,所述素土通过平地机摊铺;所述集水槽通过平地机造型而成。Preferably, the plain soil is spread by a grader; the sump is shaped by a grader.

与现有技术相比,本发明的优点和积极效果在于:(1)可渗透施工环保胶将跑道基础层与预制环保塑胶层紧紧粘结在一起,减少沥青的使用,降低危害气体的产生,保护人体健康;(2)设置防水混凝土层,隔绝了水向下的侵蚀,避免后期跑道的部分下沉,影响使用;(3)加强型土工布隔绝泥土、砂土的同时,保证了水向下层的顺利渗透,便于排出;(4)渗透排水管收集到雨水后排到排水沟,进而到集水井内,集水井的水可以二次利用,比如抽出来浇到过热的预制环保塑胶层上进行降温;(5)渗透排水管向四周高度逐渐降低,使雨水收集更加高效,还能防止雨水出现滞留、回渗。Compared with the prior art, the advantages and positive effects of the present invention are: (1) The permeable construction environmental protection adhesive tightly bonds the runway base layer and the prefabricated environmental protection plastic layer together, reduces the use of asphalt, and reduces the generation of harmful gases , to protect human health; (2) Set up a waterproof concrete layer to isolate the downward erosion of water, avoid the partial subsidence of the runway in the later stage, and affect the use; (3) The reinforced geotextile isolates soil and sand while ensuring water Smooth infiltration to the lower layer, easy to discharge; (4) The infiltration drainage pipe collects rainwater and discharges it to the drainage ditch, and then to the water collection well. The water in the water collection well can be reused, such as pumped out and poured into the overheated prefabricated environmental protection plastic layer (5) The height of the infiltration drainage pipe gradually decreases to the surroundings, which makes rainwater collection more efficient and prevents rainwater from stagnation and back seepage.

附图说明Description of drawings

为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the drawings that need to be used in the description of the embodiments.

图1为本体育运动场地的俯视图;Fig. 1 is the top view of this sports field;

图2为渗透排水管的排布示意图;Figure 2 is a schematic diagram of the arrangement of permeate drainage pipes;

图3为图1中A-A处的剖视图;Fig. 3 is the sectional view of A-A place among Fig. 1;

图4为图2中B-B处的剖视图。Fig. 4 is a cross-sectional view at B-B in Fig. 2 .

附图标记说明:Explanation of reference signs:

1-塑胶跑道结构;1-Plastic runway structure;

2-草坪结构;21-集水槽2- lawn structure; 21- sump

3-排水沟,31-集水井,32-井盖;3-drainage ditch, 31-collection well, 32-well cover;

4-渗透排水管;4 - percolation drains;

5-素土基层;5- plain soil base;

6-跑道基础层,61-灰土层,62-二灰碎石层,63-防水混凝土层,64-细粒式改性沥青混凝土层;6-runway base layer, 61-lime soil layer, 62-fly ash macadam layer, 63-waterproof concrete layer, 64-fine-grained modified asphalt concrete layer;

7-预制环保塑胶层,71-可渗透施工环保胶;7-prefabricated environmental protection plastic layer, 71-permeable construction environmental protection glue;

8-草坪基础层,81-级配碎石层,82-加强型土工布,83-中粗砂层;8-lawn base layer, 81-graded gravel layer, 82-reinforced geotextile, 83-medium coarse sand layer;

9-人造草坪层,91-种植土层,92-人造草坪。9-artificial turf layer, 91-planting soil layer, 92-artificial turf.

具体实施方式Detailed ways

为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和实施例对本发明做进一步说明。In order to more clearly understand the above objects, features and advantages of the present invention, the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用不同于在此描述的其他方式来实施,因此,本发明并不限于下面公开说明书的具体实施例的限制。In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention can also be implemented in other ways than described here. Therefore, the present invention is not limited to the specific embodiments disclosed below. limit.

实施例1Example 1

下面结合附图1-4对本发明进一步说明,一种体育运动场地的结构,包括内部的草坪结构2,以及围绕在草坪结构2外部一圈的塑胶跑道结构1;所述草坪结构2与塑胶跑道结构1之间还设有一圈排水沟3;所述塑胶跑道结构1与草坪结构2的最下层均为素土基层5;所述塑胶跑道结构1在素土基层5上方从下往上还依次设有跑道基础层6和预制环保塑胶层7;所述草坪结构2在素土基层5上方从下往上还依次设有草坪基础层8和人造草坪层9;所述跑道基础层6从下往上依次为灰土层61、二灰碎石层62、防水混凝土层63和细粒式改性沥青混凝土层64;所述草坪基础层8从下往上依次为级配碎石层81、加强型土工布82和中粗砂层83;所述级配碎石层81内设有渗透排水管4,所述渗透排水管4延伸到排水沟3,且与排水沟3连通;Below in conjunction with accompanying drawing 1-4, the present invention is further described, a kind of structure of sports field, comprises internal lawn structure 2, and the plastic runway structure 1 that surrounds lawn structure 2 outer laps; Described lawn structure 2 and plastic runway There is also a circle of drainage ditches 3 between the structures 1; the bottom layer of the plastic runway structure 1 and the lawn structure 2 are plain soil bases 5; the plastic runway structure 1 is above the plain soil base 5 from bottom to top A runway base layer 6 and a prefabricated environmental protection plastic layer 7 are provided; the lawn structure 2 is provided with a lawn base layer 8 and an artificial turf layer 9 from bottom to top above the plain soil base layer 5; Upwards are lime soil layer 61, fly ash macadam layer 62, waterproof concrete layer 63 and fine-grained modified asphalt concrete layer 64; the lawn base layer 8 is successively graded macadam layer 81, reinforced A geotextile 82 and a medium-coarse sand layer 83; the graded crushed stone layer 81 is provided with a permeable drainage pipe 4, and the permeable drainage pipe 4 extends to the drainage ditch 3 and communicates with the drainage ditch 3;

设置防水混凝土层63,隔绝了水向下的侵蚀,避免后期跑道的部分下沉;减少沥青作为粘层的使用,降低危害气体的产生;加强型土工布82隔绝了泥土、沙的同时,保证了水向下渗透,渗透排水管4收集到雨水后排到排水沟3,将水排出。The waterproof concrete layer 63 is set to isolate the downward erosion of water and avoid the partial subsidence of the runway in the later stage; the use of asphalt as a sticky layer is reduced to reduce the generation of harmful gases; the reinforced geotextile 82 isolates the soil and sand at the same time, ensuring The water infiltrates downwards, and the infiltration drain pipe 4 collects the rainwater and discharges it to the gutter 3 to discharge the water.

如图3所示,所述预制环保塑胶层7与细粒式改性沥青混凝土层64之间涂有可渗透施工环保胶71;所述人造草坪层9包括种植土层91及其上铺设的人造草坪92。As shown in Figure 3, permeable construction environmental protection glue 71 is coated between the prefabricated environmental protection plastic layer 7 and the fine-grained modified asphalt concrete layer 64; Artificial turf92.

如图2所示,所述渗透排水管4沿草坪结构2的中心向四周排布,且高度逐渐降低。As shown in FIG. 2 , the seepage drainage pipes 4 are arranged along the center of the lawn structure 2 to the surroundings, and the height gradually decreases.

如图2和3所示,所述级配碎石层81的下方设有与所述渗透排水管4相同排布的集水槽21,所述渗透排水管4设置在集水槽21内。As shown in FIGS. 2 and 3 , below the graded gravel layer 81 there is a sump 21 arranged in the same arrangement as the permeate drainage pipe 4 , and the permeate drainage pipe 4 is arranged in the sump 21 .

所述灰土层61的石灰与土的体积比为2:8。The volume ratio of lime to soil in the lime soil layer 61 is 2:8.

如图2和4所示,在所述排水沟3下方,沿其延长方向,每隔30m均衡的设有多个与排水沟3连通的集水井31;所述排水沟3至少在对应集水井31的正上方的位置处设有井盖32;雨水从草坪基础层8内的渗透排水管4流进排水沟3,进而到集水井31内,集水井31的水可以二次利用,比如抽出来浇到过热的预制环保塑胶层7上。As shown in Figures 2 and 4, below the drainage ditch 3, along its extension direction, a plurality of water collection wells 31 communicated with the drainage ditch 3 are evenly arranged every 30m; The position directly above 31 is provided with a well cover 32; rainwater flows into the drainage ditch 3 from the permeable drainage pipe 4 in the lawn base layer 8, and then into the water collection well 31, and the water in the water collection well 31 can be reused, such as pumped out Pour on the overheated prefabricated environmental protection plastic layer 7.

实施例2Example 2

一种体育运动场地的塑胶跑道的施工方法,包括以下步骤:A construction method for a plastic runway in a sports field, comprising the following steps:

步骤一 摊铺素土,并夯实,压实度达到90%-95%,形成素土基层5;Step 1 Spread plain soil and compact it until the compaction reaches 90%-95%, forming plain soil base 5;

步骤二 摊铺并碾压石灰与土的体积比为2:8的灰土,形成灰土层61,厚度达到1000mm上下;具体为:首先摊铺一层250mm上下厚度的灰土、压实,重复四次,直到完成;Step 2 spread and roll lime soil with a volume ratio of lime to soil of 2:8 to form a lime soil layer 61 with a thickness of about 1000 mm; specifically: first spread a layer of lime soil with a thickness of about 250 mm and compact it, repeat four times , until complete;

步骤三 摊铺并碾压二灰碎石,形成二灰碎石层62,厚度达到250mm上下;Step 3 Spreading and rolling the fly ash macadam to form a fly ash macadam layer 62 with a thickness of about 250mm;

步骤四 浇筑抗渗混凝土,形成防水混凝土层63,厚度达到100mm上下;抗渗混凝土可以提高跑道整体刚度的同时,防止水破坏基层,有效阻绝了水的侵蚀,避免后期跑道的部分下沉;Step 4 Pouring impermeable concrete to form a waterproof concrete layer 63 with a thickness of about 100mm; impermeable concrete can improve the overall rigidity of the runway while preventing water from damaging the base layer, effectively preventing water erosion and avoiding partial subsidence of the runway in the later stage;

步骤五 铺设细粒式改性沥青混凝土,形成细粒式改性沥青混凝土层64,厚度达到30mm上下;Step 5 laying fine-grained modified asphalt concrete to form a fine-grained modified asphalt concrete layer 64 with a thickness of about 30mm;

步骤六 在细粒式改性沥青混凝土层64上涂一层可渗透施工环保胶71,并在其上铺设预制环保塑胶层7,将跑道基础层6与预制环保塑胶层7紧紧粘结在一起,减少沥青的使用,避免在热天产生有害气体;Step 6: Apply a layer of permeable construction environmental protection adhesive 71 on the fine-grained modified asphalt concrete layer 64, and lay a prefabricated environmental protection plastic layer 7 on it, and tightly bond the runway base layer 6 and the prefabricated environmental protection plastic layer 7. Together, reduce the use of asphalt and avoid the generation of harmful gases in hot weather;

步骤七 在铺好的预制环保塑胶层7上进行场地划线,并清理,形成塑胶跑道。Step 7 Carry out field marking and cleaning on the paved prefabricated environmental protection plastic layer 7 to form a plastic runway.

实施例3Example 3

一种体育运动场地的草坪的施工方法,包括以下步骤:A construction method for a lawn in a sports field, comprising the following steps:

步骤一 通过GPS平地机摊铺素土,并夯实,压实度达到90%-95%,形成素土基层5;同时,通过GPS平地机造型挖出集水槽21,集水槽21沿草坪结构2的中心向四周排布;平地机一机两用,节省了一个步骤;Step 1: Pave plain soil with a GPS grader and compact it until the compaction reaches 90%-95%, forming a plain soil base 5; at the same time, dig out a water collection tank 21 through a GPS grader, and the water collection tank 21 is along the lawn structure 2 The center of the machine is arranged around; the motor grader has two functions, saving one step;

步骤二 在集水槽21内搭设型号为DN100PE的渗透排水管4,渗透排水管4向四周高度逐渐降低,使雨水收集更加高效,还能防止雨水出现滞留、回渗;Step 2 Set up a permeable drainage pipe 4 of model DN100PE in the sump 21, and the height of the permeable drainage pipe 4 gradually decreases to the surroundings, so that the rainwater collection is more efficient, and it can also prevent rainwater from stagnation and back seepage;

步骤三 摊铺并碾压级配碎石,形成级配碎石层81,厚度约为150mm上下,其最大粒径小于40mm;级配碎石铺在素土基层5上和集水槽21内,从上层留下的雨水在级配碎石层81内逐渐流进集水槽21的渗透排水管4,并排出;Step 3: Paving and rolling graded gravel to form a graded gravel layer 81 with a thickness of about 150mm and a maximum particle size of less than 40mm; The rainwater left from the upper layer gradually flows into the permeable drainage pipe 4 of the sump 21 in the graded crushed stone layer 81, and is discharged;

步骤四 铺设一层加强型土工布82,保证一平米大小的土工布82质量在110-130克之间,用于隔绝泥土、砂土的同时,保证了水向下层的顺利渗透;Step 4 Lay a layer of reinforced geotextile 82 to ensure that the mass of geotextile 82 per square meter is between 110-130 grams, which is used to isolate soil and sand while ensuring the smooth penetration of water to the lower layer;

步骤五 摊铺并碾压中粗砂,形成中粗砂层83,厚度达到100mm上下;Step 5 Paving and rolling medium-coarse sand to form a medium-coarse sand layer 83 with a thickness of about 100mm;

步骤六 摊铺一层种植土,形成种植土层91,厚度达到250mm上下,并在其上铺设人造草坪92;Step 6 Spread a layer of planting soil to form a planting soil layer 91 with a thickness of up to 250 mm, and lay artificial turf 92 thereon;

步骤七 填充塑胶颗粒,清理草坪。Step 7 Fill the plastic pellets and clean up the lawn.

以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其他形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其他领域,但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化,仍属于本发明技术方案的保护范围。The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention to other forms. Any skilled person who is familiar with this profession may use the technical content disclosed above to change or modify the equivalent of the equivalent change. The embodiments are applied to other fields, but any simple modification or equivalent change made to the above embodiments according to the technical essence of the present invention still belongs to the protection scope of the technical solutions of the present invention, as long as they do not depart from the content of the technical solutions of the present invention.

Claims (10)

1. A structure of a sports field is characterized by comprising an internal lawn structure (2) and a plastic track structure (1) which surrounds a circle of the lawn structure (2); a circle of drainage ditch (3) is also arranged between the lawn structure (2) and the plastic track structure (1);
the lowest layers of the plastic track structure (1) and the lawn structure (2) are all plain soil base layers (5); the plastic track structure (1) is also sequentially provided with a track base layer (6) and a prefabricated environment-friendly plastic layer (7) from bottom to top above the plain soil base layer (5); the lawn structure (2) is also sequentially provided with a lawn foundation layer (8) and an artificial lawn layer (9) from bottom to top above the plain soil foundation layer (5);
the runway foundation layer (6) sequentially comprises a grey soil layer (61), a second grey gravel layer (62), a waterproof concrete layer (63) and a fine grain type modified asphalt concrete layer (64) from bottom to top;
the lawn foundation layer (8) is sequentially provided with a graded gravel layer (81), reinforced geotextile (82) and a medium-coarse sand layer (83) from bottom to top;
be equipped with infiltration drain pipe (4) in level gradation gravel layer (81), infiltration drain pipe (4) extend to escape canal (3), and communicate with escape canal (3).
2. A sports ground structure, according to claim 1, characterized in that said layer of pre-fabricated environmental protection plastic (7) is coated with a permeable construction environmental protection plastic (71) between said layer of fine grain modified asphalt concrete (64);
the artificial turf layer (9) comprises a planting soil layer (91) and an artificial turf (92) laid on the planting soil layer.
3. A sports arena structure as claimed in claim 1, wherein the said percolation drain (4) is arranged along the lawn structure (2) from the centre towards the periphery and gradually decreasing in height.
4. A sports arena structure according to claim 3, characterized in that, the graded gravel layer (81) has a water collection tank (21) under it in the same arrangement as the infiltration drainage pipe (4), and the infiltration drainage pipe (4) is arranged in the water collection tank (21).
5. A sports arena structure according to claim 1, characterized in that the lime to soil volume ratio of the lime layer (61) is 2.
6. A sports arena structure according to claim 1, characterized in that, under the drainage ditch (3), along its elongation direction, there are evenly provided a plurality of water collecting wells (31) communicating with the drainage ditch (3); the drainage ditch (3) is provided with a well cover (32) at least at the position right above the corresponding water collecting well (31).
7. A construction method of a plastic track of a sports ground is characterized by comprising the following steps:
step one, paving plain soil, and tamping to form a plain soil base layer (5);
step two, paving and rolling lime soil with the volume ratio of lime to soil being 2;
thirdly, paving and rolling the lime-fly ash gravel to form a lime-fly ash gravel layer (62);
pouring impervious concrete to form a waterproof concrete layer (63);
laying fine particle type modified asphalt concrete to form a fine particle type modified asphalt concrete layer (64);
sixthly, coating a layer of permeable construction environment-friendly glue (71) on the fine particle type modified asphalt concrete layer (64), and laying a prefabricated environment-friendly plastic layer (7) on the permeable construction environment-friendly glue;
and seventhly, carrying out field scribing on the paved prefabricated environment-friendly plastic layer (7), and cleaning to form the plastic track.
8. The method as claimed in claim 7, wherein the second step is a step of dividing the soil into a plurality of layers, and paving and rolling each layer.
9. A construction method of a lawn of a sports field is characterized by comprising the following steps:
step one, paving plain soil, compacting to form a plain soil base layer (5), and digging out the water collecting tank (21) as claimed in claim 4;
step two, setting up a penetration drain pipe (4) according to claim 3 in a water collecting tank (21);
thirdly, paving and rolling graded broken stones to form a graded broken stone layer (81);
fourthly, laying a layer of reinforced geotextile (82);
fifthly, paving and rolling the medium coarse sand to form a medium coarse sand layer (83);
sixthly, paving a layer of planting soil to form a planting soil layer (91), and paving an artificial lawn (92) on the planting soil layer;
and step seven, filling plastic particles and cleaning the lawn.
10. A method as claimed in claim 9, wherein the plain soil is spread by a grader; the water collecting tank (21) is formed by modeling a land leveler.
CN202211309887.3A 2022-10-25 2022-10-25 The structure of a kind of sports field and the construction method of its plastic runway and lawn Pending CN115627675A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211309887.3A CN115627675A (en) 2022-10-25 2022-10-25 The structure of a kind of sports field and the construction method of its plastic runway and lawn

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211309887.3A CN115627675A (en) 2022-10-25 2022-10-25 The structure of a kind of sports field and the construction method of its plastic runway and lawn

Publications (1)

Publication Number Publication Date
CN115627675A true CN115627675A (en) 2023-01-20

Family

ID=84906088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211309887.3A Pending CN115627675A (en) 2022-10-25 2022-10-25 The structure of a kind of sports field and the construction method of its plastic runway and lawn

Country Status (1)

Country Link
CN (1) CN115627675A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971239A (en) * 2023-07-26 2023-10-31 广州星卫草业股份有限公司 Construction method for changing football field artificial lawn into mixed lawn

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014105508A (en) * 2012-11-28 2014-06-09 Takeshi Nakagawa Structure for laying artificial lawn
CN206692989U (en) * 2017-04-17 2017-12-01 东莞市箭鱼体育设施有限公司 A light PU flexible runway
CN208685396U (en) * 2018-07-28 2019-04-02 青岛昌洲建筑工程有限公司 Permeable plastic cement race track
CN111335112A (en) * 2020-03-27 2020-06-26 闫宝生 Environment-friendly sponge artificial lawn and construction method thereof
CN215629144U (en) * 2021-09-10 2022-01-25 广东盛天体育股份有限公司 Compound plastic course
CN216891844U (en) * 2020-09-22 2022-07-05 深圳市凯仕澜高分子建材有限公司 Stadium runway terrace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014105508A (en) * 2012-11-28 2014-06-09 Takeshi Nakagawa Structure for laying artificial lawn
CN206692989U (en) * 2017-04-17 2017-12-01 东莞市箭鱼体育设施有限公司 A light PU flexible runway
CN208685396U (en) * 2018-07-28 2019-04-02 青岛昌洲建筑工程有限公司 Permeable plastic cement race track
CN111335112A (en) * 2020-03-27 2020-06-26 闫宝生 Environment-friendly sponge artificial lawn and construction method thereof
CN216891844U (en) * 2020-09-22 2022-07-05 深圳市凯仕澜高分子建材有限公司 Stadium runway terrace
CN215629144U (en) * 2021-09-10 2022-01-25 广东盛天体育股份有限公司 Compound plastic course

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘丽芬: "塑胶跑道田径场的设计与施工", 建筑技术开发, vol. 30, no. 6, 15 June 2003 (2003-06-15), pages 57 - 59 *
姚建平: ""海绵城市"低影响开发设施改造技术在大型住宅小区中的应用", 建筑施工, no. 7, 25 July 2018 (2018-07-25), pages 1233 - 1236 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971239A (en) * 2023-07-26 2023-10-31 广州星卫草业股份有限公司 Construction method for changing football field artificial lawn into mixed lawn

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN203188065U (en) Ballastless track railway expansion soil cutting bedding and slope protection structure
CN106638918A (en) Construction method for sponge city rainwater collection system
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN104831599B (en) Composite water storage and drainage environment-friendly ground
CN113445396A (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN107989153A (en) A kind of novel construction method for building sponge city
CN216712589U (en) Water permeability cement concrete road surface
CN111535098A (en) Rainwater drainage system for green belts and sidewalks of town roads and construction method
CN208219340U (en) A kind of new city road permeable pavement structure
CN104695298A (en) Complete permeable compound type road surface structure
CN202627166U (en) Novel water-discharging ecological zone for town road
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN108086459A (en) A kind of construction method of sponge urban green space water storage system
CN105544341B (en) A kind of Quick drainage pavement structure of the low-lying place's road in reply city
CN115627675A (en) The structure of a kind of sports field and the construction method of its plastic runway and lawn
CN206581379U (en) A kind of garden way tooth drainage system
CN207739092U (en) Landscape ecology Pavement Construction
CN212052138U (en) Urban road structure applied to collapsible loess mountain area
CN108611948A (en) A kind of urban road permeable pavement structure
CN204589747U (en) A kind of water permeability composite pavement structure completely
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN209723194U (en) highway drainage system
CN107829347B (en) Sidewalk structure for urban natural turf and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20230120