[go: up one dir, main page]

CN115522890A - Drilling and hole sealing process - Google Patents

Drilling and hole sealing process Download PDF

Info

Publication number
CN115522890A
CN115522890A CN202211326551.8A CN202211326551A CN115522890A CN 115522890 A CN115522890 A CN 115522890A CN 202211326551 A CN202211326551 A CN 202211326551A CN 115522890 A CN115522890 A CN 115522890A
Authority
CN
China
Prior art keywords
coal
pipe
drilling
grouting
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211326551.8A
Other languages
Chinese (zh)
Inventor
刘海波
单勇杰
王爽
肖旭诚
束志航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN202211326551.8A priority Critical patent/CN115522890A/en
Publication of CN115522890A publication Critical patent/CN115522890A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a drilling and hole sealing process, and belongs to the technical field of coal mine gas extraction. The drilling and sealing process comprises the following steps: s010, after the drilling construction is carried out to the coal seam, withdrawing the drill rod, replacing the drill bit with a punching drill bit, and enabling the drill bit to be matched with the drill rod to be lowered to the coal seam again; step S020, a hydraulic pump is started to punch a hole, the drilling depth penetrates through a coal seam and enters a coal seam roof, a coal body is partially crushed through cutting of a drill bit and impact of water jet, stress in the coal rock is damaged, instability of gas is caused, and the crushed coal body and gas are induced to protrude out of a jet hole; and S030, sealing holes after hydraulic punching, drilling and pore forming so as to discharge coal slime and water flow in the drilled holes naturally. The drilling and sealing process adopts a hydraulic punching technology and a hydraulic fracturing technology, achieves better application effects in different coal seams, causes the stress of coal and rock mass around the drill hole to be reduced, relieves pressure and increases the permeability, adopts a permeability increasing method, enlarges the effective influence range of the drill hole, and improves the gas extraction effect.

Description

一种钻孔封孔工艺A drilling and sealing process

技术领域technical field

本发明涉及煤矿瓦斯抽采技术领域,具体涉及一种钻孔封孔工艺。The invention relates to the technical field of coal mine gas drainage, in particular to a drilling sealing process.

背景技术Background technique

随着开采深度的增加和开采强度的提高,矿井受瓦斯灾害威胁日益加剧,煤层的开采技术条件将更为恶劣,煤矿瓦斯灾害将进一步威胁煤矿的可持续开采。With the increase of mining depth and mining intensity, mines are increasingly threatened by gas disasters, the mining technical conditions of coal seams will be worse, and coal mine gas disasters will further threaten the sustainable mining of coal mines.

由于我国煤炭产量持续迅猛增加,煤矿开采正经历着一个由浅到深、开采环境由简单到复杂、开采强度显著增大的过程。随着开采深度的增加,地应力加大,煤层瓦斯压力与含量增高,原来的低瓦斯、高瓦斯矿井部分升级为突出矿井,而原来的突出矿井的突出危险性越来越严重,突出等动力灾害特大事故仍时有发生,突出已成为威胁矿区安全生产主要问题之一。As my country's coal output continues to increase rapidly, coal mining is experiencing a process from shallow to deep, from simple to complex mining environments, and with a significant increase in mining intensity. With the increase of mining depth, the ground stress increases, and the gas pressure and content of coal seams increase. The original low-gas and high-gas mines are partially upgraded to outburst mines, and the outburst danger of the original outburst mines is becoming more and more serious. Disasters and catastrophic accidents still occur from time to time, and their prominence has become one of the main problems threatening the safety of production in mining areas.

同时钻孔瓦斯抽采是单一、低渗煤层瓦斯治理的最主要措施之一,由于我国许多高瓦斯煤层属于低透气性煤层,常规的瓦斯抽采方法难以起到理想效果,同时钻孔有效影响范围小,工作面钻孔施工工程量大,抽采效率低。若要做到抽采达标,消除煤层瓦斯灾害,常规的瓦斯抽采方法难以实现。At the same time, drilling gas drainage is one of the most important measures for gas control in single and low-permeability coal seams. Since many high-gas coal seams in my country are low-permeability coal seams, conventional gas drainage methods cannot achieve ideal results. The scope is small, the drilling construction volume of the working face is large, and the extraction efficiency is low. In order to meet the standard of drainage and eliminate coal seam gas disasters, conventional gas drainage methods are difficult to achieve.

发明内容Contents of the invention

本发明的目的是为了克服现有技术中的问题,提供一种钻孔封孔工艺。The object of the present invention is to provide a drilling and sealing process in order to overcome the problems in the prior art.

本发明提供了一种钻孔封孔工艺,包括:步骤S010,钻孔施工至煤层后,退出钻杆,将钻头更换为冲孔钻头,配合钻杆,重新下至煤层;步骤S020,液压泵开泵进行冲孔,钻孔深度穿过煤层并进入煤层顶板,通过钻头的切割和水射流的冲击,部分地破碎煤体,破坏煤岩内部的应力,造成瓦斯的不稳定,诱导破碎了的煤体与瓦斯突出喷孔;步骤S030,水力冲孔、钻孔、成孔后进行封孔,以便钻孔内煤泥及水流自然排泄;突出的煤、瓦斯和水流顺着钻杆和钻孔间的空隙向煤层外部流出流并导入三通管,通过三通管的分支将煤块、瓦斯和水流导入分离器,瓦斯气体在分离器内被抽走,水和煤块进入沉淀池;步骤S040,封孔管使用双抗管,送至煤层中部,进入煤层部分为花管,采用普通水泥和膨胀水泥联合封孔方式,进行多次注浆,封孔至煤岩交界处。The present invention provides a drilling and sealing process, including: Step S010, after drilling to the coal seam, withdraw the drill pipe, replace the drill bit with a punching drill bit, cooperate with the drill pipe, and go down to the coal seam again; Step S020, the hydraulic pump Open the pump for punching, the drilling depth goes through the coal seam and enters the coal seam roof, through the cutting of the drill bit and the impact of the water jet, the coal body is partially broken, the internal stress of the coal rock is destroyed, the gas is unstable, and the broken coal is induced. Protruding coal and gas injection holes; step S030, sealing the holes after hydraulic punching, drilling, and forming holes, so that the coal slime and water flow in the drill holes can be discharged naturally; the protruding coal, gas and water flow along the drill pipe and the drill hole The gap between the coal seams flows out to the outside of the coal seam and is introduced into the three-way pipe, and the coal, gas and water flow are introduced into the separator through the branch of the three-way pipe, and the gas gas is pumped away in the separator, and the water and coal block enter the sedimentation tank; steps S040, the sealing pipe is sent to the middle of the coal seam with double-resistance pipe, and the part entering the coal seam is a flower pipe. The joint sealing method of ordinary cement and expanded cement is used for multiple grouting, and the hole is sealed to the junction of coal and rock.

较佳地,所述步骤S010中,打出多个钻孔,并对多个钻孔进行冲孔,通过采取逐步增压的方式向钻孔压注高压水,临近钻孔出煤或出水后,将出煤或出水的钻孔封堵或一同注入高压水,直至多个钻孔出煤或出水,使多个网格布置的钻孔之间相互压穿,形成大面积贯通裂隙带,使煤体裂隙畅通,以增大煤体透气性,增加瓦斯排放量,从而达到防治突出的目的,压裂结束,拆下高压管,连接抽采管抽采。Preferably, in the step S010, a plurality of boreholes are drilled and punched, and the boreholes are pressurized and injected with high-pressure water by adopting a step-by-step pressurization method. Block the drill holes for coal or water discharge or inject high-pressure water together until multiple drill holes discharge coal or water, so that multiple grid-arranged drill holes are pressed through each other to form a large-area penetrating fracture zone, so that the coal The fissures in the coal body should be unblocked to increase the air permeability of the coal body and increase the gas discharge, so as to achieve the purpose of preventing outbursts. After the fracturing is completed, the high-pressure pipe is removed and connected to the drainage pipe for drainage.

较佳地,所述步骤S010中,钻孔、冲孔时采取能够防治瓦斯喷出超限事故的孔口防喷孔装置。Preferably, in the step S010, an orifice blowout prevention hole device capable of preventing accidents of gas spraying out of limit is adopted during drilling and punching.

较佳地,所述的钻孔封孔工艺,还包括步骤S011,在钻孔内插入抽采管和注浆管,注浆管在孔口外端安设球形阀门;将树脂材料均匀混合后快速缠在抽采管和注浆管上,用铁丝适当捆扎毛巾后,送入钻孔口;等待树脂材料发泡膨胀,逐渐硬化,钻孔口即封好。Preferably, the drilling sealing process further includes step S011, inserting a drainage pipe and a grouting pipe in the borehole, and installing a spherical valve at the outer end of the grouting pipe; mixing the resin material evenly and quickly Wrap it around the extraction pipe and grouting pipe, tie the towel properly with iron wire, and send it into the drilling hole; wait for the resin material to foam and expand, gradually harden, and the drilling hole is sealed.

较佳地,所述步骤S040中,将注浆管外端与注浆泵连接;将水、普通水泥和添加剂按比例混合搅拌并过筛;开启注浆泵进行注浆,开始时压力不超过0.2MPa,约2min之后可适当将压力增大;当抽采管内有浆液流出时,立即停止注浆;先关闭注浆管阀门,将注浆连接管拆除,后再打开注浆阀门,使注浆管中水泥浆回流;一个圆班后;对钻孔进行二次注浆;注浆完成后拆除管路,清洗泵具,孔口注浆管阀门12h后即可回收。Preferably, in the step S040, the outer end of the grouting pipe is connected to the grouting pump; water, ordinary cement and additives are mixed and stirred in proportion and screened; the grouting pump is turned on for grouting, and the pressure does not exceed 0.2MPa, after about 2 minutes, the pressure can be increased appropriately; when the grout flows out of the extraction pipe, stop the grouting immediately; first close the valve of the grouting pipe, remove the connecting pipe for grouting, and then open the valve The cement slurry in the slurry pipe is reflowed; after one round shift; perform secondary grouting to the drilled hole; after the grouting is completed, the pipeline is removed, the pump is cleaned, and the valve of the orifice grouting pipe can be recovered after 12 hours.

较佳地,所述添加剂为膨胀水泥,水:普通水泥:膨胀水泥的比例为2:2:1。Preferably, the additive is expansive cement, and the ratio of water: common cement: expansive cement is 2:2:1.

较佳地,所述步骤S030中,水力冲孔、钻孔、成孔至少8小时,再进行封孔。Preferably, in the step S030, the hydraulic punching, drilling, and hole forming are performed for at least 8 hours, and then the holes are sealed.

与现有技术相比,本发明的有益效果是:本发明的钻孔封孔工艺采用水力冲孔技术和水力压裂技术,在不同煤层均取得较好的应用效果,通过实施水力冲孔和水力压裂措施,引起钻孔周边煤岩体应力降低,卸压增透,强化抽放效果,采取增透的方法,扩大钻孔有效影响范围,提高瓦斯抽采效果。Compared with the prior art, the beneficial effects of the present invention are: the drilling and sealing process of the present invention adopts hydraulic punching technology and hydraulic fracturing technology, and achieves better application effects in different coal seams. Hydraulic fracturing measures reduce the stress of the coal and rock mass around the borehole, relieve the pressure and increase the permeability, and enhance the drainage effect. The method of increasing the permeability is adopted to expand the effective impact range of the borehole and improve the gas drainage effect.

水力冲孔是在突出煤层中利用煤与瓦斯突出煤层所具有的特点,在钻冲孔时,随着钻孔的钻进,喷孔持续不断的发生,煤、水、瓦斯经过孔道向孔外排出,孔道周围媒体激烈向孔道方向位移。同时发生煤体的膨胀变形和顶底板的相向位移,引起在钻冲影响范围内地应力降低、煤层卸压、裂隙增加,使煤层透气性增高,促进瓦斯的解吸和排放,煤的强度增高和湿度增加,再配合瓦斯抽放,大大提高抽放效率,有效降低冲孔附近煤体的煤层瓦斯含量。达到既消除了突出的动力,又改变了突出煤层的性质,从而达到消突的作用;Hydraulic punching is to use the characteristics of coal and gas outburst coal seams in the outburst coal seam. When drilling and punching, as the hole is drilled, the injection holes will continue to occur, and the coal, water, and gas will flow out of the hole through the hole. When discharged, the medium around the channel moves violently to the direction of the channel. At the same time, the expansion deformation of the coal body and the relative displacement of the roof and the floor will cause the ground stress to decrease, the pressure of the coal seam to be relieved, and the cracks to increase in the area affected by drilling punching, which will increase the air permeability of the coal seam, promote the desorption and discharge of gas, and increase the strength and humidity of the coal. Increase, combined with gas drainage, greatly improve the drainage efficiency, effectively reduce the coal seam gas content near the punching hole. It not only eliminates the power of outburst, but also changes the nature of outburst coal seams, so as to achieve the effect of outburst elimination;

水力冲孔增透工艺相较于常规的钻孔封孔工艺,抽采浓度显著提高,实施水力冲孔增透措施后,相较于水力冲孔工艺抽采浓度又显著提高;同时,实施水力冲孔增透措施后,钻孔瓦斯的抽采浓度衰减速度相较于水力冲孔增透工艺显著降低,水力冲孔增透工艺相较于常规的钻孔封孔工艺钻孔瓦斯的抽采浓度衰减速度也显著降低;采取水力增透措施后,煤层的透气性明显增加,采取水力冲孔措施后,煤层的透气性与非增透区相比增加;采取水力压穿增透措施后,煤层的透气性与采取水力冲孔措施相比增加。Compared with the conventional drilling and sealing process, the hydraulic punching anti-reflection process has significantly increased the extraction concentration. After punching anti-reflection measures, the concentration decay rate of drilling gas drainage is significantly lower than that of hydraulic punching anti-reflection technology. The concentration attenuation rate also decreased significantly; after adopting hydraulic permeability enhancement measures, the air permeability of the coal seam increased significantly; The air permeability of the coal seam is increased compared with the adoption of hydraulic punching measures.

附图说明Description of drawings

图1为本发明的水力冲孔工艺流程示意图;Fig. 1 is the hydraulic punching technological process schematic diagram of the present invention;

图2为本发明的上向抽采钻孔封孔方式示意图。Fig. 2 is a schematic diagram of the upward drainage drilling sealing method of the present invention.

附图标记说明:Explanation of reference signs:

1.煤层,3.钻孔,4.抽采管,5.水泥浆,6.注浆管,7.树脂材料,8.钻杆,9.三通管,10.注浆泵,11.分离器。1. Coal seam, 3. Borehole, 4. Drainage pipe, 5. Cement slurry, 6. Grouting pipe, 7. Resin material, 8. Drill pipe, 9. Tee pipe, 10. Grouting pump, 11. Splitter.

具体实施方式detailed description

下面结合附图1-2,对本发明的具体实施方式进行详细描述,但应当理解本发明的保护范围并不受具体实施方式的限制。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings 1-2, but it should be understood that the protection scope of the present invention is not limited by the specific embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

第一实施例水力冲孔工艺流程示意图,水力冲孔增透Schematic diagram of the hydraulic punching process of the first embodiment, hydraulic punching anti-reflection

本发明提供的一种钻孔封孔工艺,如图1包括:A kind of drilling and sealing process provided by the present invention, as shown in Figure 1, includes:

步骤S010,钻孔3施工至煤层1后,退出钻杆8,将钻头更换为冲孔钻头,配合钻杆8,重新下至煤层1;Step S010, after the drill hole 3 is constructed to the coal seam 1, withdraw the drill pipe 8, replace the drill bit with a punching drill bit, cooperate with the drill pipe 8, and go down to the coal seam 1 again;

步骤S011,在钻孔3内插入抽采管4(管径Φ50mmPVC双抗管)和注浆管6(Φ20mm铝塑管,注浆管6伸直距抽采管4前端的花管21m位置),注浆管6在孔口外端安设球形阀门;将树脂材料7(马丽散)均匀混合后快速缠在抽采管4和注浆管6上(缠绕长度0.5m。一般需要3~4组,保持注浆管6外端露出0.2m),用铁丝适当捆扎毛巾后,送入钻孔3口;等待树脂材料7发泡膨胀,逐渐硬化,钻孔3口即封好;Step S011, insert the extraction pipe 4 (diameter Φ50mm PVC double resistance pipe) and grouting pipe 6 (Φ20mm aluminum-plastic pipe, the grouting pipe 6 is stretched straight to the flower pipe 21m away from the front end of the extraction pipe 4) into the borehole 3 , the grouting pipe 6 is installed with a spherical valve at the outer end of the orifice; the resin material 7 (Ma Lisan) is evenly mixed and then quickly wound on the extraction pipe 4 and the grouting pipe 6 (the winding length is 0.5m. Generally, it takes 3 to 4 group, keeping the outer end of the grouting pipe 6 exposed by 0.2m), after properly binding the towel with iron wire, send it into the hole 3; wait for the resin material 7 to foam and expand, and gradually harden, and the hole 3 is sealed;

步骤S020,液压泵开泵进行冲孔,供水水压3~4MPa(适用于煤质松软的煤层,水压过高会导致穿层钻孔3泄煤量过大,影响煤巷掘进),钻孔3深度穿过煤层1并进入煤层1顶板,通过钻头的切割和水射流的冲击,部分地破碎煤体,破坏煤岩内部的应力,造成瓦斯的不稳定,诱导破碎了的煤体与瓦斯突出喷孔;Step S020, the hydraulic pump is turned on for punching, the water supply pressure is 3-4MPa (suitable for coal seams with soft coal quality, too high water pressure will cause excessive coal discharge in the layer-crossing drilling 3, which will affect the coal roadway excavation), and the drilling 3 Depth through the coal seam 1 and into the roof of the coal seam 1, through the cutting of the drill bit and the impact of the water jet, the coal body is partially broken, the stress inside the coal rock is destroyed, the gas is unstable, and the broken coal body and gas outburst are induced orifice;

步骤S030,水力冲孔、钻孔3、成孔至少8小时后进行封孔,以便钻孔3内煤泥及水流自然排泄;突出的煤、瓦斯和水流顺着钻杆8和钻孔3间的空隙向煤层1外部流出流并导入三通管9,通过三通管9的分支将煤块、瓦斯和水流导入分离器11,瓦斯气体在分离器11内被抽走,水和煤块进入沉淀池;Step S030, hydraulic punching, drilling 3, sealing the hole after forming the hole for at least 8 hours, so that the coal slime and water flow in the drill hole 3 can be discharged naturally; the protruding coal, gas and water flow along the drill pipe 8 and the drill hole 3 The gaps in the coal seam 1 flow out to the outside of the coal seam 1 and lead into the three-way pipe 9. Through the branches of the three-way pipe 9, the coal block, gas and water flow are introduced into the separator 11. The gas gas is pumped away in the separator 11, and the water and coal block enter Sedimentation tank;

步骤S040,封孔管使用双抗管,送至煤层1中部,进入煤层1部分为花管2,采用普通水泥和膨胀水泥联合封孔方式,进行多次注浆,封孔至煤岩交界处;将注浆管6外端与注浆泵10连接;将水、普通水泥和添加剂按比例混合搅拌并过筛;开启注浆泵10进行注浆,开始时压力不超过0.2MPa,约2min之后可适当将压力增大;当抽采管4内有浆液流出时,立即停止注浆;先关闭注浆管6阀门,将注浆连接管拆除,后再打开注浆阀门,使注浆管6中水泥浆5回流;一个圆班后;对钻孔3进行二次注浆;注浆完成后拆除管路,清洗泵具,孔口注浆管6阀门12h后即可回收;所述添加剂为膨胀水泥,水:普通水泥:膨胀水泥的比例为2:2:1;使用水:普通水泥:膨胀水泥=2:2:1的混合浆液作为注浆液时,钻孔封孔质量较好,可以达到预期的封孔深度。Step S040, the sealing pipe is sent to the middle of the coal seam 1 using a double-resistance pipe, and the part entering the coal seam 1 is the flower pipe 2. The joint sealing method of ordinary cement and expanded cement is used to perform multiple grouting, and the hole is sealed to the junction of coal and rock. ; Connect the outer end of the grouting pipe 6 to the grouting pump 10; mix water, ordinary cement and additives in proportion and sieve; turn on the grouting pump 10 for grouting, the pressure does not exceed 0.2MPa at the beginning, and after about 2 minutes The pressure can be increased appropriately; when there is slurry flowing out in the extraction pipe 4, stop the grouting immediately; first close the valve of the grouting pipe 6, remove the grouting connecting pipe, and then open the grouting valve to make the grouting pipe 6 Medium cement slurry 5 reflows; after one round shift; carries out secondary grouting to borehole 3; removes pipeline after grouting is finished, cleans pump equipment, can reclaim after 12h of orifice grouting pipe 6 valves; described additive is Expansion cement, water: ordinary cement: the ratio of expansion cement is 2:2:1; when using water: ordinary cement: expansion cement = 2:2:1 as the grouting fluid, the quality of drilling and sealing is better. The expected sealing depth can be achieved.

第二实施例如图2上向抽采钻孔封孔方式示意图,水力压穿增透The second embodiment is shown in Figure 2 as a schematic diagram of the drilling sealing method for upward drainage, hydraulic pressure penetration and anti-permeability

步骤S010,钻孔3施工至煤层1后,退出钻杆8,将钻头更换为冲孔钻头,配合钻杆8,重新下至煤层1,钻孔、冲孔时采取能够防治瓦斯喷出超限事故的孔口防喷孔装置;打出多个钻孔3,并对多个钻孔3进行冲孔,通过采取逐步增压的方式向钻孔3压注高压水,临近钻孔3出煤或出水后,将出煤或出水的钻孔3封堵或一同注入高压水,直至多个钻孔3出煤或出水,使多个网格布置的钻孔3之间相互压穿,形成大面积贯通裂隙带,使煤体裂隙畅通,以增大煤体透气性,增加瓦斯排放量,从而达到防治突出的目的,压裂结束,拆下高压管,连接抽采管4抽采。Step S010, after the drilling 3 reaches the coal seam 1, withdraw the drill pipe 8, replace the drill bit with a punching drill bit, cooperate with the drill pipe 8, and go down to the coal seam 1 again. Accident orifice blowout prevention device; multiple boreholes 3 are drilled, and multiple boreholes 3 are punched, and high-pressure water is injected into the boreholes 3 by gradually increasing the pressure, and the adjacent boreholes 3 are discharged coal or After the water comes out, the coal or water outlet holes 3 are blocked or high-pressure water is injected together until multiple holes 3 come out of coal or water, so that the holes 3 arranged in grids are pressed through each other to form a large area. Through the fissure zone, make the coal fissure unimpeded, so as to increase the air permeability of the coal body and increase the gas discharge, so as to achieve the purpose of preventing outburst.

钻孔3成孔后先采用水力冲孔,形成一定得卸压空间,然后选择钻孔3进行水力压裂,增加煤体裂隙。在压裂过程中,缓慢间隔地升压,在每一个压力值的工况下稳定1~5min,使压力充分传递,钻孔3周围均匀受压破坏。达到设定压力值后,稳定压力约30min。压裂结束,拆下高压管,连接抽采管4抽采;After borehole 3 is formed, hydraulic punching is used to form a certain pressure relief space, and then borehole 3 is selected for hydraulic fracturing to increase coal fractures. During the fracturing process, the pressure is slowly increased at intervals, and the pressure is stabilized for 1 to 5 minutes under each pressure value, so that the pressure is fully transmitted, and the surroundings of the borehole 3 are evenly compressed and destroyed. After reaching the set pressure value, stabilize the pressure for about 30 minutes. After the fracturing is completed, remove the high-pressure pipe and connect the extraction pipe 4 for extraction;

步骤S011,在钻孔3内插入抽采管4(管径Φ50mmPVC双抗管)和注浆管6(Φ20mm铝塑管,注浆管6伸直距抽采管4前端的花管21m位置),注浆管6在孔口外端安设球形阀门;将树脂材料7(马丽散)均匀混合后快速缠在抽采管4和注浆管6上(缠绕长度0.5m。一般需要3~4组,保持注浆管6外端露出0.2m),用铁丝适当捆扎毛巾后,送入钻孔3口;等待树脂材料7发泡膨胀,逐渐硬化,钻孔3口即封好。Step S011, insert the extraction pipe 4 (diameter Φ50mm PVC double resistance pipe) and grouting pipe 6 (Φ20mm aluminum-plastic pipe, the grouting pipe 6 is stretched straight to the flower pipe 21m away from the front end of the extraction pipe 4) into the borehole 3 , the grouting pipe 6 is installed with a spherical valve at the outer end of the orifice; the resin material 7 (Ma Lisan) is evenly mixed and then quickly wound on the extraction pipe 4 and the grouting pipe 6 (the winding length is 0.5m. Generally, it takes 3 to 4 group, keep the outer end of the grouting pipe 6 exposed 0.2m), tie the towel properly with iron wire, and send it into the hole 3; wait for the resin material 7 to foam and expand, and gradually harden, and the hole 3 is sealed.

步骤S020,液压泵开泵进行冲孔,供水水压3~4MPa(适用于煤质松软的煤层,水压过高会导致穿层钻孔3泄煤量过大,影响煤巷掘进),钻孔3深度穿过煤层1并进入煤层1顶板,通过钻头的切割和水射流的冲击,部分地破碎煤体,破坏煤岩内部的应力,造成瓦斯的不稳定,诱导破碎了的煤体与瓦斯突出喷孔;Step S020, the hydraulic pump is turned on for punching, the water supply pressure is 3-4MPa (suitable for coal seams with soft coal quality, too high water pressure will cause excessive coal discharge in the layer-crossing drilling 3, which will affect the coal roadway excavation), and the drilling 3 Depth through the coal seam 1 and into the roof of the coal seam 1, through the cutting of the drill bit and the impact of the water jet, the coal body is partially broken, the stress inside the coal rock is destroyed, the gas is unstable, and the broken coal body and gas outburst are induced orifice;

步骤S030,水力冲孔、钻孔3、成孔至少8小时后进行封孔,以便钻孔3内煤泥及水流自然排泄;突出的煤、瓦斯和水流顺着钻杆8和钻孔3间的空隙向煤层1外部流出流并导入三通管9,通过三通管9的分支将煤块、瓦斯和水流导入分离器11,瓦斯气体在分离器11内被抽走,水和煤块进入沉淀池;Step S030, hydraulic punching, drilling 3, sealing the hole after forming the hole for at least 8 hours, so that the coal slime and water flow in the drill hole 3 can be discharged naturally; the protruding coal, gas and water flow along the drill pipe 8 and the drill hole 3 The gaps in the coal seam 1 flow out to the outside of the coal seam 1 and lead into the three-way pipe 9. Through the branches of the three-way pipe 9, the coal block, gas and water flow are introduced into the separator 11. The gas gas is pumped away in the separator 11, and the water and coal block enter Sedimentation tank;

步骤S040,封孔管使用双抗管,送至煤层1中部,进入煤层1部分为花管2,采用普通水泥和膨胀水泥联合封孔方式,进行多次注浆,封孔至煤岩交界处;将注浆管6外端与注浆泵10连接;将水、普通水泥和添加剂按比例混合搅拌并过筛;开启注浆泵10进行注浆,开始时压力不超过0.2MPa,约2min之后可适当将压力增大;当抽采管4内有浆液流出时,立即停止注浆;先关闭注浆管6阀门,将注浆连接管拆除,后再打开注浆阀门,使注浆管6中水泥浆5回流;一个圆班后;对钻孔3进行二次注浆;注浆完成后拆除管路,清洗泵具,孔口注浆管6阀门12h后即可回收;所述添加剂为膨胀水泥,水:普通水泥:膨胀水泥的比例为2:2:1;使用水:普通水泥:膨胀水泥=2:2:1的混合浆液作为注浆液时,钻孔封孔质量较好,可以达到预期的封孔深度。Step S040, the sealing pipe is sent to the middle of the coal seam 1 using a double-resistance pipe, and the part entering the coal seam 1 is the flower pipe 2. The joint sealing method of ordinary cement and expanded cement is used to perform multiple grouting, and the hole is sealed to the junction of coal and rock. ; Connect the outer end of the grouting pipe 6 to the grouting pump 10; mix water, ordinary cement and additives in proportion and sieve; turn on the grouting pump 10 for grouting, the pressure does not exceed 0.2MPa at the beginning, and after about 2 minutes The pressure can be increased appropriately; when there is slurry flowing out in the extraction pipe 4, stop the grouting immediately; first close the valve of the grouting pipe 6, remove the grouting connecting pipe, and then open the grouting valve to make the grouting pipe 6 Medium cement slurry 5 reflows; after one round shift; carries out secondary grouting to borehole 3; removes pipeline after grouting is finished, cleans pump equipment, can reclaim after 12h of orifice grouting pipe 6 valves; described additive is Expansion cement, water: ordinary cement: the ratio of expansion cement is 2:2:1; when using water: ordinary cement: expansion cement = 2:2:1 as the grouting fluid, the quality of drilling and sealing is better. The expected sealing depth can be achieved.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (7)

1.一种钻孔封孔工艺,其特征在于,包括1. A drilling and sealing process, characterized in that, comprising 步骤S010,钻孔(3)施工至煤层(1)后,退出钻杆(8),将钻头更换为冲孔钻头,配合钻杆(8),重新下至煤层(1);Step S010, after drilling (3) to the coal seam (1), withdraw the drill pipe (8), replace the drill bit with a punching drill bit, cooperate with the drill pipe (8), and go down to the coal seam (1); 步骤S020,液压泵开泵进行冲孔,钻孔(3)深度穿过煤层(1)并进入煤层(1)顶板,通过钻头的切割和水射流的冲击,部分地破碎煤体,破坏煤岩内部的应力,造成瓦斯的不稳定,诱导破碎了的煤体与瓦斯突出喷孔;Step S020, the hydraulic pump is turned on to punch holes, the drill hole (3) penetrates the coal seam (1) deeply and enters the roof of the coal seam (1), and through the cutting of the drill bit and the impact of the water jet, the coal body is partially broken and the coal rock is destroyed Internal stress causes gas instability and induces broken coal bodies and gas outburst nozzles; 步骤S030,水力冲孔、钻孔(3)、成孔后进行封孔,以便钻孔(3)内煤泥及水流自然排泄;突出的煤、瓦斯和水流顺着钻杆(8)和钻孔(3)间的空隙向煤层(1)外部流出流并导入三通管(9),通过三通管(9)的分支将煤块、瓦斯和水流导入分离器(11),瓦斯气体在分离器(11)内被抽走,水和煤块进入沉淀池;Step S030, hydraulic punching, drilling (3), sealing the hole after forming the hole, so that the coal slime and water flow in the drill hole (3) can be discharged naturally; the protruding coal, gas and water flow along the drill pipe (8) and the drill The gap between the holes (3) flows out to the outside of the coal seam (1) and is introduced into the three-way pipe (9), and the coal block, gas and water flow are introduced into the separator (11) through the branch of the three-way pipe (9), and the gas gas is discharged into the separator (11). The inside of the separator (11) is pumped away, and water and coal lumps enter the settling tank; 步骤S040,封孔管使用双抗管,送至煤层(1)中部,进入煤层(1)部分为花管(2),采用普通水泥和膨胀水泥联合封孔方式,进行多次注浆,封孔至煤岩交界处。Step S040, the sealing pipe is sent to the middle of the coal seam (1) using a double-resistance pipe, and the part entering the coal seam (1) is a flower pipe (2). The joint sealing method of ordinary cement and expansive cement is used to perform multiple times of grouting to seal the hole. hole to the coal-rock junction. 2.如权利要求1所述的钻孔封孔工艺,其特征在于,所述步骤S010中,打出多个钻孔(3),并对多个钻孔(3)进行冲孔,通过采取逐步增压的方式向钻孔(3)压注高压水,临近钻孔(3)出煤或出水后,将出煤或出水的钻孔(3)封堵或一同注入高压水,直至多个钻孔(3)出煤或出水,使多个网格布置的钻孔(3)之间相互压穿,形成大面积贯通裂隙带,使煤体裂隙畅通,以增大煤体透气性,增加瓦斯排放量,从而达到防治突出的目的,压裂结束,拆下高压管,连接抽采管(4)抽采。2. The drilling and sealing process according to claim 1, characterized in that, in the step S010, a plurality of boreholes (3) are drilled, and a plurality of boreholes (3) are punched, by taking step by step Inject high-pressure water into the borehole (3) by means of pressurization. After coal or water is discharged from the adjacent borehole (3), the borehole (3) that produces coal or water is blocked or injected with high-pressure water together until multiple boreholes (3) are discharged. The holes (3) discharge coal or water, so that the multiple grid-arranged drill holes (3) are pressed through each other to form a large-area penetrating fissure zone, so that the coal fissures are unblocked, so as to increase the air permeability of the coal body and increase the gas consumption. discharge, so as to achieve the purpose of prevention and control, when the fracturing is over, the high-pressure pipe is removed, and the drainage pipe (4) is connected for drainage. 3.如权利要求1所述的钻孔封孔工艺,其特征在于,所述步骤S010中,钻孔、冲孔时采取能够防治瓦斯喷出超限事故的孔口防喷孔装置。3 . The drilling and sealing process according to claim 1 , characterized in that, in the step S010 , when drilling and punching holes, an orifice blowout prevention device capable of preventing accidents of gas ejection exceeding limits is adopted. 4 . 4.如权利要求1所述的钻孔封孔工艺,其特征在于,还包括步骤S011,在钻孔(3)内插入抽采管(4)和注浆管(6),注浆管(6)在孔口外端安设球形阀门;将树脂材料(7)均匀混合后快速缠在抽采管(4)和注浆管(6)上,用铁丝适当捆扎毛巾后,送入钻孔(3)口;等待树脂材料(7)发泡膨胀,逐渐硬化,钻孔(3)口即封好。4. The drilling sealing process according to claim 1, further comprising step S011, inserting a drainage pipe (4) and a grouting pipe (6) in the borehole (3), the grouting pipe ( 6) Install a spherical valve at the outer end of the orifice; mix the resin material (7) evenly and quickly wrap it on the extraction pipe (4) and the grouting pipe (6), tie the towel properly with iron wire, and send it into the borehole ( 3) mouth; wait for the resin material (7) to expand and gradually harden, and the hole (3) is sealed. 5.如权利要求1所述的钻孔封孔工艺,其特征在于,所述步骤S040中,将注浆管(6)外端与注浆泵(10)连接;将水、普通水泥和添加剂按比例混合搅拌并过筛;开启注浆泵(10)进行注浆,开始时压力不超过0.2MPa,约2min之后可适当将压力增大;当抽采管(4)内有浆液流出时,立即停止注浆;先关闭注浆管(6)阀门,将注浆连接管拆除,后再打开注浆阀门,使注浆管(6)中水泥浆(5)回流;一个圆班后;对钻孔(3)进行二次注浆;注浆完成后拆除管路,清洗泵具,孔口注浆管(6)阀门12h后即可回收。5. The drilling and sealing process according to claim 1, characterized in that, in said step S040, the outer end of the grouting pipe (6) is connected to the grouting pump (10); water, common cement and additives are Mix and stir in proportion and sieve; open the grouting pump (10) to carry out grouting, the pressure is not more than 0.2MPa at the beginning, and the pressure can be increased appropriately after about 2min; when there is slurry flowing out in the extraction pipe (4), Stop the grouting immediately; first close the valve of the grouting pipe (6), remove the grouting connecting pipe, and then open the grouting valve to make the grout (5) in the grouting pipe (6) flow back; after one round shift; Drill the hole (3) for secondary grouting; remove the pipeline after the grouting is completed, clean the pump, and the valve of the orifice grouting pipe (6) can be recovered after 12 hours. 6.如权利要求5所述的钻孔封孔工艺,其特征在于,所述添加剂为膨胀水泥,水:普通水泥:膨胀水泥的比例为2:2:1。6. The drilling and sealing process according to claim 5, wherein the additive is expansive cement, and the ratio of water: common cement: expansive cement is 2:2:1. 7.如权利要求1所述的钻孔封孔工艺,其特征在于,所述步骤S030中,水力冲孔、钻孔(3)、成孔至少8小时,再进行封孔。7. The drilling and sealing process according to claim 1, characterized in that, in the step S030, the hydraulic punching, drilling (3), and hole forming are carried out for at least 8 hours, and then the holes are sealed.
CN202211326551.8A 2022-10-25 2022-10-25 Drilling and hole sealing process Pending CN115522890A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211326551.8A CN115522890A (en) 2022-10-25 2022-10-25 Drilling and hole sealing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211326551.8A CN115522890A (en) 2022-10-25 2022-10-25 Drilling and hole sealing process

Publications (1)

Publication Number Publication Date
CN115522890A true CN115522890A (en) 2022-12-27

Family

ID=84704392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211326551.8A Pending CN115522890A (en) 2022-10-25 2022-10-25 Drilling and hole sealing process

Country Status (1)

Country Link
CN (1) CN115522890A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116591640A (en) * 2023-04-11 2023-08-15 中国矿业大学(北京) A high-pressure gas-water mixed pressure permeability enhancement method and system for displacing gas in low-permeability coal seams
CN116752934A (en) * 2023-08-21 2023-09-15 中煤科工集团沈阳研究院有限公司 Drilling inner wall spraying hole protection technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170370156A1 (en) * 2015-11-30 2017-12-28 China University Of Mining And Technology Method of performing combined drilling, flushing, and cutting operations on coal seam having high gas content and prone to bursts to relieve pressure and increase permeability
CN110578505A (en) * 2019-07-23 2019-12-17 重庆大学 A nanofluid-based system and method for drilling slag removal and hydraulic oscillating fracturing to enhance gas drainage
CN110778356A (en) * 2019-11-05 2020-02-11 河南工程学院 A system and method for protecting and sealing holes in deep-buried loose and soft coal seams with full-hole depth and different diameters
CN110905589A (en) * 2019-12-10 2020-03-24 河南能源化工集团研究总院有限公司 Gas extraction drilling and punching coordination operation system and method
CN112324337A (en) * 2020-11-05 2021-02-05 河南神火煤电股份有限公司 Whole-process gas extraction method for through-layer top comb-shaped drilling of bottom plate of soft coal seam
CN114183114A (en) * 2021-12-07 2022-03-15 中国矿业大学 Hydraulic punching and cave-making cooperative steam injection enhanced gas extraction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170370156A1 (en) * 2015-11-30 2017-12-28 China University Of Mining And Technology Method of performing combined drilling, flushing, and cutting operations on coal seam having high gas content and prone to bursts to relieve pressure and increase permeability
CN110578505A (en) * 2019-07-23 2019-12-17 重庆大学 A nanofluid-based system and method for drilling slag removal and hydraulic oscillating fracturing to enhance gas drainage
CN110778356A (en) * 2019-11-05 2020-02-11 河南工程学院 A system and method for protecting and sealing holes in deep-buried loose and soft coal seams with full-hole depth and different diameters
CN110905589A (en) * 2019-12-10 2020-03-24 河南能源化工集团研究总院有限公司 Gas extraction drilling and punching coordination operation system and method
CN112324337A (en) * 2020-11-05 2021-02-05 河南神火煤电股份有限公司 Whole-process gas extraction method for through-layer top comb-shaped drilling of bottom plate of soft coal seam
CN114183114A (en) * 2021-12-07 2022-03-15 中国矿业大学 Hydraulic punching and cave-making cooperative steam injection enhanced gas extraction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116591640A (en) * 2023-04-11 2023-08-15 中国矿业大学(北京) A high-pressure gas-water mixed pressure permeability enhancement method and system for displacing gas in low-permeability coal seams
CN116752934A (en) * 2023-08-21 2023-09-15 中煤科工集团沈阳研究院有限公司 Drilling inner wall spraying hole protection technology
CN116752934B (en) * 2023-08-21 2023-10-20 中煤科工集团沈阳研究院有限公司 Drilling inner wall spraying hole protection technology

Similar Documents

Publication Publication Date Title
CN109339736B (en) A solid-liquid two-phase hole sealing device and process for gas drainage drilling
CN108757000B (en) A kind of quick slot orientation fracturing system in underground based on drilling machine power and method
CN104533452B (en) A kind of underground coal mine crushes coal body stagewise grouting strengthening method
CN109209472B (en) A method of coal seam pressure relief and outburst prevention with mutual coupling of punching, blasting and water injection
AU2014336858B2 (en) Method for enhanced fuel gas extraction by coal mine underground gas-liquid dual-phase alternating phase-driven fracturing of coal body
WO2018201706A1 (en) Method for efficient gas drainage in coal roadway strips and regional outburst elimination through staged fracturing with long borehole floor beddings
CN101666241B (en) Integrated drilling-blasting-pressurizing-drawing protrusion preventing method for regional gas control
CN108643877A (en) Coal mine underground coal seam long drilling staged fracturing permeability-increasing and gas extraction method
CN105756599A (en) Coal mine two-end gas plug and middle water seal layer penetrating drill hole sealing device and method
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN105114116B (en) A kind of hydrothermal reaction coupling pressure break strengthening region gas pumping method
CN115522890A (en) Drilling and hole sealing process
CN209179725U (en) A solid-liquid two-phase hole sealing device for gas drainage drilling
CN111075478A (en) Pre-grouting reinforcement process for ground construction of broken belt of excavation working face structure
CN214330681U (en) Three-blocking two-injection hole packer for coal mine gas extraction drill hole
CN102926774B (en) Bolting and grouting process for governing roadway floor heave
WO2020006870A1 (en) Gas extraction hole drilling and hole sealing method for building anti-seepage barrier based on grooving-backfilling method
CN207974823U (en) A kind of grouting pipeline structure of deep hole grouting
CN104389559A (en) Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN105178910A (en) Horizontal well water plugging process pipe column and method
CN105003294B (en) One kind is based on hydrothermal reaction coupling pressure break coal body coal uncovering method
CN110924900A (en) A method for hydraulic-liquid nitrogen composite uniform fracturing of coal
CN203035203U (en) Pressure-isolating, permeating and cementing grouting device of borehole casing for roadway water-surrounded broken rock
CN110374673A (en) A kind of suction road downlink layer-through drilling is calmed the anger drainage and hole sealing method
CN117108258A (en) Accurate advanced gas treatment method for large area of underground thick coal seam of coal mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination