CN115492350A - Construction device for subway smoke-discharge-preventing pipeline - Google Patents

Construction device for subway smoke-discharge-preventing pipeline Download PDF

Info

Publication number
CN115492350A
CN115492350A CN202211191307.5A CN202211191307A CN115492350A CN 115492350 A CN115492350 A CN 115492350A CN 202211191307 A CN202211191307 A CN 202211191307A CN 115492350 A CN115492350 A CN 115492350A
Authority
CN
China
Prior art keywords
lifting
fixedly connected
platform assembly
plate
construction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211191307.5A
Other languages
Chinese (zh)
Inventor
骆晓
刘稳
宋跃均
危兵星
李增全
骆翔翔
杜银龙
刘国彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Original Assignee
Electric Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Engineering Co Ltd of China Railway First Engineering Group Co Ltd filed Critical Electric Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Priority to CN202211191307.5A priority Critical patent/CN115492350A/en
Publication of CN115492350A publication Critical patent/CN115492350A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/003Devices for storing material on the scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本申请公开了一种地铁防排烟管道施工装置,包括升降机构、平台组件、两个提升机构和两个抬升机构;所述平台组件设置于所述升降机构的升降端;两个所述提升机构设置于所述平台组件两端;两个所述抬升机构设置于所述平台组件的顶面的两端;所述抬升机构包括抬升部、限位板、铰接板、置物板、固定杆和扭簧;所述抬升部设置于所述平台组件顶面,所述抬升部的升降端固定连接所述限位板;所述铰接板固定连接于所述限位板侧面,所述固定杆两端与所述铰接板固定连接;所述置物板与所述固定杆转动连接;所述扭簧套设于所述固定杆的外侧。本申请实现了单人进行登高作业就可以将管道安装完成,避免管道被抬升至最高处时解除捆绑,降低了工人的危险系数。

Figure 202211191307

The application discloses a construction device for subway smoke prevention and exhaust pipes, which includes a lifting mechanism, a platform assembly, two lifting mechanisms, and two lifting mechanisms; the platform assembly is arranged at the lifting end of the lifting mechanism; the two lifting Mechanisms are arranged at both ends of the platform assembly; two lifting mechanisms are arranged at both ends of the top surface of the platform assembly; Torsion spring; the lifting part is arranged on the top surface of the platform assembly, and the lifting end of the lifting part is fixedly connected to the limit plate; the hinge plate is fixedly connected to the side of the limit plate, and the two fixed rods The end is fixedly connected with the hinge plate; the storage plate is rotatably connected with the fixed rod; the torsion spring is sleeved on the outside of the fixed rod. The application realizes that a single person can complete the installation of the pipeline by carrying out the climbing operation, avoiding unbundling of the pipeline when it is lifted to the highest point, and reducing the risk factor of the workers.

Figure 202211191307

Description

一种地铁防排烟管道施工装置Construction device for subway smoke prevention and exhaust pipes

技术领域technical field

本申请涉及防排烟管道施工技术领域,尤其涉及一种地铁防排烟管道施工装置。The present application relates to the technical field of smoke prevention and exhaust pipeline construction, in particular to a subway smoke prevention and exhaust pipeline construction device.

背景技术Background technique

防排烟系统是防烟系统和排烟系统的总称。防烟系统采用机械加压送风方式或自然通风方式,防止烟气进入疏散通道的系统;排烟系统采用机械排烟方式或自然通风方式,将烟气排至建筑物外的系统。The smoke prevention and exhaust system is the general term for the smoke prevention system and the smoke exhaust system. The smoke prevention system adopts the mechanical pressurized air supply method or the natural ventilation method to prevent the smoke from entering the evacuation channel; the smoke exhaust system adopts the mechanical smoke exhaust method or the natural ventilation method to exhaust the smoke to the outside of the building.

在地铁站中,有的空间相对封闭,因此其对防排烟系统要求较高,在防排烟系统施工时需要布设烟气管道,烟气管道通常是吊设在顶部,在施工时通常需要吊装设备辅助进行,且需要至少两人进行爬高作业,增加了危险性,使用较多器械,增加了施工成本及人工成本,安装效率低。In subway stations, some spaces are relatively closed, so they have high requirements for the smoke control and exhaust system. During the construction of the smoke control and exhaust system, it is necessary to arrange smoke pipes. The smoke pipes are usually hoisted on the top. The lifting equipment is assisted, and at least two people are required to carry out climbing operations, which increases the risk, uses more equipment, increases construction costs and labor costs, and has low installation efficiency.

发明内容Contents of the invention

本申请通过提供一种地铁防排烟管道施工装置,解决了现有技术中地铁站在安装防排烟管道时,需要通过吊装设备辅助进行,且需要至少两人进行爬高作业,增加了危险性和施工成本,整体安装效率低下的技术问题,实现了单人进行登高作业就可以将管道安装完成,管道通过两次抬升动作最终被托举至指定位置,管道的两次抬升动作之间衔接平顺,而且管道在两次抬升动作衔接时解除捆绑,避免管道被抬升至最高处时解除捆绑,降低了工人的危险系数。This application provides a construction device for subway smoke prevention and exhaust pipes, which solves the problem that in the prior art, when installing smoke prevention and exhaust pipes in subway stations, it needs to be assisted by hoisting equipment, and at least two people are required to perform climbing operations, which increases the risk. The technical problems of low safety and construction cost and low overall installation efficiency have realized that a single person can complete the installation of the pipeline by performing climbing operations. The pipeline is finally lifted to the designated position through two lifting actions, and the connection between the two lifting actions of the pipeline is achieved. It is smooth, and the pipeline is unbundled when the two lifting actions are connected, which prevents the unbundling of the pipeline when it is lifted to the highest point, and reduces the risk factor of workers.

本申请提供的一种地铁防排烟管道施工装置,包括升降机构、平台组件、两个提升机构和两个抬升机构;所述平台组件设置于所述升降机构的升降端,能够在所述升降机构的带动下做升降运动;两个所述提升机构分别设置于所述平台组件的两端,且所述提升机构的升降端能够与管道可拆卸连接;两个所述抬升机构分别设置于所述平台组件的顶面的两端;所述抬升机构包括抬升部、限位板、铰接板、置物板、固定杆和扭簧;所述抬升部设置于所述平台组件的顶面,且所述抬升部的升降端固定连接有所述限位板;所述铰接板固定连接于所述限位板的侧面,且所述铰接板贯通开设有通槽;所述固定杆处于所述通槽中,且所述固定杆的两端与所述铰接板固定连接;所述置物板放置于所述限位板的顶面,且所述置物板与所述固定杆转动连接;所述扭簧套设于所述固定杆的外侧,且所述扭簧的两端分别卡接于所述铰接板和所述置物板的侧面。A construction device for smoke prevention and exhaust pipes for subways provided by the application includes a lifting mechanism, a platform component, two lifting mechanisms and two lifting mechanisms; the platform component is arranged at the lifting end of the lifting mechanism, and can The lifting mechanism is driven by the lifting mechanism; the two lifting mechanisms are respectively arranged at both ends of the platform assembly, and the lifting ends of the lifting mechanisms can be detachably connected with the pipeline; the two lifting mechanisms are respectively arranged at the two ends of the platform assembly. Both ends of the top surface of the platform assembly; the lifting mechanism includes a lifting part, a limit plate, a hinge plate, a storage plate, a fixed rod and a torsion spring; the lifting part is arranged on the top surface of the platform component, and the The lifting end of the lifting part is fixedly connected with the limit plate; the hinge plate is fixedly connected to the side of the limit plate, and the hinge plate is provided with a through groove; the fixed rod is in the through groove , and the two ends of the fixed rod are fixedly connected with the hinge plate; the storage plate is placed on the top surface of the limit plate, and the storage plate is connected to the fixed rod in rotation; the torsion spring It is sheathed on the outside of the fixed rod, and the two ends of the torsion spring are clamped to the side surfaces of the hinge plate and the storage plate respectively.

在一种可能的实现方式中,所述升降机构包括固定底座、伸缩部、滑座和多个升降杆组件;所述伸缩部的机体固定连接于所述固定底座的侧面,所述伸缩部的输出端与所述固定底座的侧面滑动连接;所述滑座固定连接于所述平台组件的底面;所述升降杆组件包括交叉设置的第一举升臂和第二举升臂,所述第一举升臂和所述第二举升臂之间转动连接;处于下方的所述第一举升臂的底端与所述伸缩部的输出端转动连接,处于所述下方的所述第二举升臂的底端与所述固定底座转动连接,处于上方的所述第一举升臂的顶端与所述平台组件的底面转动连接,处于上方的所述第二举升臂的顶端与所述滑座转动连接同时能够与所述滑座滑动连接;上下相邻的所述第一举升臂和所述第二举升臂的端部之间转动连接。In a possible implementation manner, the lifting mechanism includes a fixed base, a telescopic part, a sliding seat and a plurality of lifting rod assemblies; the body of the telescopic part is fixedly connected to the side of the fixed base, and the body of the telescopic part The output end is slidingly connected to the side of the fixed base; the sliding seat is fixedly connected to the bottom surface of the platform assembly; the lifting rod assembly includes a first lifting arm and a second lifting arm arranged crosswise, the first lifting arm A lifting arm is rotationally connected with the second lifting arm; the bottom end of the first lifting arm at the bottom is rotationally connected with the output end of the telescopic part, and the second lifting arm at the bottom The bottom end of the lifting arm is rotatably connected to the fixed base, the top end of the first lifting arm above is rotatably connected to the bottom surface of the platform assembly, and the top end of the second lifting arm above is connected to the bottom surface of the platform assembly. The sliding seat is rotatably connected to the sliding seat and can be slidably connected to the sliding seat; the upper and lower adjacent ends of the first lifting arm and the end of the second lifting arm are rotatably connected.

在一种可能的实现方式中,所述固定底座和所述滑座上分别开设有第一滑槽和第二滑槽;所述伸缩部的输出端处于所述第一滑槽中,并与所述第一滑槽滑动连接;处于上方的所述第二举升臂的顶端处于所述第二滑槽中,并与所述第二滑槽滑动连接。In a possible implementation manner, a first chute and a second chute are respectively provided on the fixed base and the sliding seat; the output end of the telescopic part is in the first chute, and The first chute is slidably connected; the top end of the upper second lifting arm is in the second chute and is slidably connected with the second chute.

在一种可能的实现方式中,所述平台组件包括工作平台和两个第一支撑柱;两个所述第一支撑柱的底端分别固定连接于所述工作平台的前端的顶面;两个所述提升机构分别设置于两个所述第一支撑柱的顶端;所述工作平台的底面与所述升降机构的升降端连接,所述工作平台的顶面设置有所述抬升机构。In a possible implementation manner, the platform assembly includes a working platform and two first supporting columns; the bottom ends of the two first supporting columns are respectively fixedly connected to the top surface of the front end of the working platform; The two lifting mechanisms are respectively arranged on the top ends of the two first support columns; the bottom surface of the working platform is connected to the lifting end of the lifting mechanism, and the lifting mechanism is arranged on the top surface of the working platform.

在一种可能的实现方式中,所述提升机构包括U形固定架、绕线轮、绑绳和电机;所述U形固定架固定连接于所述第一支撑柱的顶端;所述绕线轮转动连接于所述U形固定架内,且所述绑绳缠绕于所述绕线轮的外侧;所述电机的机体与所述U形固定架固定连接,所述电机的输出端与所述绕线轮的中心固定连接。In a possible implementation manner, the lifting mechanism includes a U-shaped fixed frame, a winding wheel, a rope and a motor; the U-shaped fixed frame is fixedly connected to the top of the first support column; the winding The wheel is rotatably connected in the U-shaped fixed frame, and the binding rope is wound on the outside of the reel; the body of the motor is fixedly connected with the U-shaped fixed frame, and the output end of the motor is connected to the The central fixed connection of the reel described above.

在一种可能的实现方式中,所述限位板倾斜设置,且所述限位板的底面与水平面的夹角为0°<α≤5°。In a possible implementation manner, the limiting plate is arranged obliquely, and the angle between the bottom surface of the limiting plate and the horizontal plane is 0°<α≤5°.

在一种可能的实现方式中,本申请提供的一种地铁防排烟管道施工装置还包括止动机构;所述止动机构包括固定块、螺纹杆、摇动转盘和橡胶垫;所述固定块固定连接于所述固定底座的外侧;所述螺纹杆贯通所述固定块,并与所述固定块螺纹连接;所述螺纹杆的顶端设置有所述摇动转盘,所述螺纹杆底端设置有所述橡胶垫。In a possible implementation, the construction device for smoke prevention and exhaust pipes for subways provided by the application further includes a stop mechanism; the stop mechanism includes a fixed block, a threaded rod, a shaking turntable and a rubber pad; the fixed block fixedly connected to the outside of the fixed base; the threaded rod passes through the fixed block and is threadedly connected with the fixed block; the top end of the threaded rod is provided with the shaking turntable, and the bottom end of the threaded rod is provided with The rubber pad.

在一种可能的实现方式中,本申请提供的一种地铁防排烟管道施工装置还包括万向轮,所述万向轮设置于所述固定底座的底面。In a possible implementation manner, the subway smoke prevention and exhaust pipeline construction device provided by the present application further includes universal wheels, and the universal wheels are arranged on the bottom surface of the fixed base.

在一种可能的实现方式中,所述平台组件还包括两个第二支撑柱;两个所述第二支撑柱固定连接于所述工作平台的后端的顶面;两个所述第二支撑柱之间、所述第一支撑柱和所述第二支撑柱之间均设置有防护网。In a possible implementation manner, the platform assembly further includes two second support columns; the two second support columns are fixedly connected to the top surface of the rear end of the working platform; the two second support columns Protective nets are provided between the columns, between the first support column and the second support column.

本申请中提供的一个或多个技术方案,至少具有如下技术效果或优点:One or more technical solutions provided in this application have at least the following technical effects or advantages:

本申请通过采用升降机构、平台组件、两个提升机构和两个抬升机构;平台组件设置于升降机构的升降端,能够在升降机构的带动下做升降运动;两个提升机构分别设置于平台组件的两端,且提升机构的升降端能够与管道可拆卸连接;在施工时,工人站在平台组件上,通过升降机构将工人和抬升机构先上升至一定高度,然后地上的工人将管道捆绑连接在提升机构的升降端,通过控制提升机构带动管道从地面上升;This application adopts a lifting mechanism, a platform component, two lifting mechanisms and two lifting mechanisms; the platform component is arranged at the lifting end of the lifting mechanism, and can perform lifting movement under the drive of the lifting mechanism; the two lifting mechanisms are respectively arranged on the platform component Both ends of the lifting mechanism, and the lifting end of the lifting mechanism can be detachably connected to the pipeline; during construction, the worker stands on the platform assembly, and the worker and the lifting mechanism are first raised to a certain height through the lifting mechanism, and then the workers on the ground tie the pipeline. At the lifting end of the lifting mechanism, the lifting mechanism is controlled to drive the pipeline to rise from the ground;

然后进一步将两个抬升机构分别设置于平台组件的顶面的两端;设置抬升机构包括抬升部、限位板、铰接板、置物板、固定杆和扭簧;管道在通过提升机构带动上升的过程中,当管道升至置物板的高度时,挤压置物板,使得置物板相对于固定杆向上翻转,同时对扭簧产生一定的扭矩,当管道继续上升离开置物板后,置物板在扭簧的作用下向下翻转,使得置物板的底面卡接在限位板上,然后控制提升机构带动管道下降,并使得管道放置在置物板上,此时,在平台组件上的工人可以很容易地将管道从提升机构的升降端拆卸下来,使得管道提前解除捆绑,然后,控制抬升部动作,带动限位板、置物板整体上移,从而带动解除捆绑后的管道继续抬升,并最终抬升至指定的高度进行后续的安装,避免了现有技术中管道通过吊装至最高处(指定安装位置)时才能解除捆绑,增加了工人施工的危险系数,有效解决了现有技术中地铁站在安装防排烟管道时,需要通过吊装设备辅助进行,且需要至少两人进行爬高作业,增加了危险性和施工成本,整体安装效率低下的技术问题,实现了单人进行登高作业就可以将管道安装完成,管道通过两次抬升动作最终被托举至指定位置,管道的两次抬升动作之间衔接平顺,而且管道在两次抬升动作衔接时解除捆绑,避免管道被抬升至最高处时解除捆绑,降低了工人的危险系数。Then two lifting mechanisms are respectively arranged on the two ends of the top surface of the platform assembly; the lifting mechanism is set to include a lifting part, a limit plate, a hinge plate, a storage plate, a fixed rod and a torsion spring; the pipeline is driven by the lifting mechanism to rise During the process, when the pipeline rises to the height of the storage plate, the storage plate is squeezed, so that the storage plate is turned up relative to the fixed rod, and a certain torque is generated on the torsion spring. When the pipe continues to rise and leaves the storage plate, the storage plate is twisted Under the action of the spring, it is flipped downwards, so that the bottom surface of the storage board is clamped on the limit plate, and then the lifting mechanism is controlled to drive the pipeline down, and the pipeline is placed on the storage board. At this time, the workers on the platform assembly can easily Disassemble the pipeline from the lifting end of the lifting mechanism in a timely manner, so that the pipeline is unbundled in advance. Then, control the movement of the lifting part to drive the limit plate and the storage plate to move up as a whole, thereby driving the unbundled pipeline to continue to lift, and finally lift to Subsequent installation at the specified height avoids the unbundling of the pipes in the prior art when they are hoisted to the highest point (designated installation position), increases the risk factor of workers' construction, and effectively solves the problem of the installation of subway stations in the prior art. The smoke exhaust pipe needs to be assisted by hoisting equipment, and at least two people are required to carry out the climbing operation, which increases the risk and construction cost, and the overall installation efficiency is low. The technical problem is that the pipe can be installed by a single person performing the climbing operation Completed, the pipeline is finally lifted to the designated position through two lifting actions. The connection between the two lifting actions of the pipeline is smooth, and the pipeline is unbound when the two lifting actions are connected to avoid unbundling when the pipeline is lifted to the highest point. Reduce the risk factor of workers.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对本发明实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments of the present invention or the prior art. Obviously, the accompanying drawings in the following description These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本申请实施例提供的一种地铁防排烟管道施工装置的主视结构示意图;Fig. 1 is the front structural schematic diagram of a kind of subway smoke prevention and exhaust pipeline construction device provided by the embodiment of the application;

图2为本申请实施例提供的抬升机构去除抬升部后的轴测图;Fig. 2 is an axonometric view of the lifting mechanism provided by the embodiment of the present application after the lifting part is removed;

图3为图2中去除置物板和扭簧后的轴测图;Fig. 3 is the axonometric view after removing the storage plate and the torsion spring in Fig. 2;

图4为图1中A区域的局部放大图;Fig. 4 is a partial enlarged view of area A in Fig. 1;

图5为本申请实施例提供的平台组件的轴测图;Figure 5 is an axonometric view of the platform assembly provided by the embodiment of the present application;

图6为本申请实施例提供的限位板的主视图。Fig. 6 is a front view of the limiting plate provided by the embodiment of the present application.

附图标记:1-升降机构;11-固定底座;111-第一滑槽;12-伸缩部;13-滑座;131-第二滑槽;14-升降杆组件;141-第一举升臂;142-第二举升臂;2-平台组件;21-工作平台;22-第一支撑柱;23-第二支撑柱;24-防护网;3-提升机构;31-U形固定架;32-绕线轮;33-绑绳;34-电机;4-抬升机构;41-抬升部;42-限位板;43-铰接板;431-通槽;44-置物板;45-固定杆;46-扭簧;5-管道;6-止动机构;61-固定块;62-螺纹杆;63-摇动转盘;64-橡胶垫;7-万向轮;8-控制器。Reference signs: 1-lifting mechanism; 11-fixed base; 111-first chute; 12-telescopic part; 13-sliding seat; 131-second chute; 14-lifting rod assembly; 141-first lifting Arm; 142-second lifting arm; 2-platform assembly; 21-working platform; 22-first support column; 23-second support column; 24-protective net; 3-lifting mechanism; 31-U-shaped fixed frame ;32-winding wheel; 33-tie rope; 34-motor; 4-lift mechanism; 41-lift part; 42-limit plate; 43-hinge plate; 431-through slot; Rod; 46-torsion spring; 5-pipeline; 6-stop mechanism; 61-fixed block; 62-threaded rod; 63-shake turntable; 64-rubber pad;

具体实施方式detailed description

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

在本发明实施例的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明实施例和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。此外,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明实施例中的具体含义。In the description of the embodiments of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer " and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, Constructed and operative in a particular orientation and therefore are not to be construed as limitations of the invention. The terms "first", "second", and "third" are used for descriptive purposes only, and should not be construed as indicating or implying relative importance. In addition, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be fixed connection, detachable connection, or integral connection; it can be mechanical connection or electrical connection; it can be It can be directly connected, or indirectly connected through an intermediary, and can be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the embodiments of the present invention according to specific situations.

参照图1-3,本申请实施例提供的一种地铁防排烟管道施工装置,包括升降机构1、平台组件2、两个提升机构3和两个抬升机构4;平台组件2设置于升降机构1的升降端,能够在升降机构1的带动下做升降运动;两个提升机构3分别设置于平台组件2的两端,且提升机构3的升降端能够与管道5可拆卸连接;两个抬升机构4分别设置于平台组件2的顶面的两端;抬升机构4包括抬升部41、限位板42、铰接板43、置物板44、固定杆45和扭簧46;抬升部41设置于平台组件2的顶面,且抬升部41的升降端固定连接有限位板42;铰接板43固定连接于限位板42的侧面,且铰接板43贯通开设有通槽431;固定杆45处于通槽431中,且固定杆45的两端与铰接板43固定连接;置物板44放置于限位板42的顶面,且置物板44与固定杆45转动连接;扭簧46套设于固定杆45的外侧,且扭簧46的两端分别卡接于铰接板43和置物板44的侧面。本申请实施例中通过提升机构3和抬升机构4先后对管道5进行两次的抬升动作,使得管道5最终到达指定的高度进行安装,而且管道5在从提升机构3转移至抬升机构4时,由于管道5并未到达最高处(指定的安装高度),因而管道5能够在转移至抬升机构4时进行解除捆绑(解除与提升机构3之间的连接捆绑),之后管道5通过抬升机构4中的置物板44整体进行举升,避免了现有技术中管道5通过吊装至最高处(指定的安装高度)时才能解除捆绑,增加了工人施工的危险系数;在实际施工时,首先,一个工人站在平台组件2上,通过升降机构1将该工人和抬升机构4先上升至一定高度,然后地上的工人将管道5捆绑连接在提升机构3的升降端,通过控制提升机构3带动管道5从地面上升,当管道5升至置物板44的高度时,挤压置物板44,使得置物板44相对于固定杆45向上翻转,同时对扭簧46产生一定的扭矩,当管道5继续上升离开置物板44后,置物板44在扭簧46的作用下向下翻转,使得置物板44的底面卡接在限位板42上,然后控制提升机构3带动管道5下降,并使得管道5放置在置物板44上,此时,在平台组件2上的工人可以很容易地将管道5从提升机构3的升降端拆卸下来,使得管道5提前解除捆绑,然后,控制抬升部41动作,带动限位板42、置物板44整体上移,从而带动解除捆绑后的管道5继续抬升,并最终抬升至指定的高度进行后续的安装。Referring to Figures 1-3, a subway smoke prevention and exhaust pipeline construction device provided by the embodiment of the present application includes a lifting mechanism 1, a platform assembly 2, two lifting mechanisms 3 and two lifting mechanisms 4; the platform assembly 2 is arranged on the lifting mechanism The lifting end of 1 can be lifted and lowered by the lifting mechanism 1; two lifting mechanisms 3 are respectively arranged at both ends of the platform assembly 2, and the lifting ends of the lifting mechanism 3 can be detachably connected with the pipeline 5; the two lifting mechanisms Mechanism 4 is respectively arranged on the two ends of the top surface of platform assembly 2; Lifting mechanism 4 includes lifting part 41, limit plate 42, hinge plate 43, storage plate 44, fixed rod 45 and torsion spring 46; Lifting part 41 is arranged on the platform The top surface of the assembly 2, and the lifting end of the lifting part 41 is fixedly connected to the limit plate 42; the hinge plate 43 is fixedly connected to the side of the limit plate 42, and the hinge plate 43 is provided with a through groove 431; the fixed rod 45 is in the through groove 431, and the two ends of the fixed rod 45 are fixedly connected with the hinge plate 43; the object plate 44 is placed on the top surface of the limit plate 42, and the object plate 44 is connected with the fixed rod 45 in rotation; the torsion spring 46 is sleeved on the fixed rod 45 and the two ends of the torsion spring 46 are engaged with the side surfaces of the hinge plate 43 and the storage plate 44 respectively. In the embodiment of the present application, the lifting mechanism 3 and the lifting mechanism 4 successively lift the pipeline 5 twice, so that the pipeline 5 finally reaches the specified height for installation, and when the pipeline 5 is transferred from the lifting mechanism 3 to the lifting mechanism 4, Since the pipeline 5 has not reached the highest point (designated installation height), the pipeline 5 can be unbundled when it is transferred to the lifting mechanism 4 (releasing the connection and binding between the lifting mechanism 3), and then the pipeline 5 passes through the lifting mechanism 4. The storage plate 44 is lifted as a whole, avoiding the unbinding of the pipeline 5 in the prior art when it is hoisted to the highest point (designated installation height), which increases the risk factor of worker construction; in actual construction, first, a worker Standing on the platform assembly 2, the worker and the lifting mechanism 4 are first raised to a certain height through the lifting mechanism 1, and then the worker on the ground binds the pipeline 5 to the lifting end of the lifting mechanism 3, and drives the pipeline 5 from When the ground rises, when the pipeline 5 rises to the height of the storage plate 44, the storage plate 44 is squeezed, so that the storage plate 44 is turned up relative to the fixed rod 45, and a certain torque is generated to the torsion spring 46 at the same time. When the pipeline 5 continues to rise and leaves the storage After the plate 44, the storage plate 44 is turned downwards under the action of the torsion spring 46, so that the bottom surface of the storage plate 44 is clamped on the limit plate 42, and then the lifting mechanism 3 is controlled to drive the pipeline 5 to descend, and the pipeline 5 is placed on the storage space. At this time, the workers on the platform assembly 2 can easily disassemble the pipeline 5 from the lifting end of the lifting mechanism 3, so that the pipeline 5 is untied in advance, and then control the lifting part 41 to drive the limit plate 42. The storage plate 44 is moved up as a whole, thereby driving the unbundled pipe 5 to continue to lift, and finally lift to a specified height for subsequent installation.

参照图1,升降机构1包括固定底座11、伸缩部12、滑座13和多个升降杆组件14;伸缩部12的机体固定连接于固定底座11的侧面,伸缩部12的输出端与固定底座11的侧面滑动连接;滑座13固定连接于平台组件2的底面;升降杆组件14包括交叉设置的第一举升臂141和第二举升臂142,第一举升臂141和第二举升臂142之间转动连接;处于下方的第一举升臂141的底端与伸缩部12的输出端转动连接,处于下方的第二举升臂142的底端与固定底座11转动连接,处于上方的第一举升臂141的顶端与平台组件2的底面转动连接,处于上方的第二举升臂142的顶端与滑座13转动连接同时能够与滑座13滑动连接;上下相邻的第一举升臂141和第二举升臂142的端部之间转动连接。本申请实施例中伸缩部12选用液压缸,该液压缸倾斜设置在固定底座11的侧面,该液压缸的伸缩端设置有连接杆,连接杆与固定底座11的侧面滑动连接,连接杆与处于下方的第一举升臂141的底端之间铰接,根据实际的需要,选择合适数量的升降杆组件14,并将升降杆组件14叠加起来;在实际使用时,控制伸缩部12缩回,使得处于下方的第一举升臂141的底端向伸缩部12的方向移动,从而通过第一举升臂141、第二举升臂142以及滑座13的配合,使得平台组件2整体上移,从而能够将工人和抬升机构4整体上升至一定的高度。With reference to Fig. 1, lifting mechanism 1 comprises fixed base 11, telescopic part 12, slide seat 13 and a plurality of elevating rod assembly 14; The side sliding connection of 11; Slide seat 13 is fixedly connected to the bottom surface of platform assembly 2; The lifting arms 142 are rotatably connected; the bottom end of the first lifting arm 141 below is rotatably connected to the output end of the telescopic part 12, and the bottom end of the second lifting arm 142 below is rotatably connected to the fixed base 11. The top of the first lifting arm 141 above is rotatably connected to the bottom surface of the platform assembly 2, and the top of the second lifting arm 142 above is rotatably connected to the sliding seat 13 and can be slidably connected to the sliding seat 13 at the same time; The ends of the first lifting arm 141 and the second lifting arm 142 are rotatably connected. In the embodiment of the present application, the telescopic part 12 is a hydraulic cylinder, which is obliquely arranged on the side of the fixed base 11. The telescopic end of the hydraulic cylinder is provided with a connecting rod, which is slidingly connected to the side of the fixed base 11. The bottom ends of the first lifting arm 141 below are hinged. According to actual needs, select a suitable number of lifting rod assemblies 14, and stack the lifting rod assemblies 14; The bottom end of the lower first lifting arm 141 moves toward the telescopic portion 12, so that the platform assembly 2 moves up as a whole through the cooperation of the first lifting arm 141, the second lifting arm 142 and the sliding seat 13. , so that the worker and the lifting mechanism 4 can be raised to a certain height as a whole.

参照图1,固定底座11和滑座13上分别开设有第一滑槽111和第二滑槽131;伸缩部12的输出端处于第一滑槽111中,并与第一滑槽111滑动连接;处于上方的第二举升臂142的顶端处于第二滑槽131中,并与第二滑槽131滑动连接。本申请实施例中伸缩部12的输出端设置的连接杆能够插在第一滑槽111中,实现伸缩部12的输出端与固定底座11之间的滑动连接,处于上方的第二举升臂142的顶端转动设置同样的连接杆并同样插在第二滑槽131中,从而实现处于上方的第二举升臂142的顶端与滑座13之间的滑动连接。Referring to Figure 1, the fixed base 11 and the sliding seat 13 are provided with a first chute 111 and a second chute 131 respectively; The top of the second lifting arm 142 at the top is in the second sliding slot 131 and is slidably connected with the second sliding slot 131 ; In the embodiment of the present application, the connecting rod provided at the output end of the telescopic part 12 can be inserted into the first chute 111 to realize the sliding connection between the output end of the telescopic part 12 and the fixed base 11. The second lifting arm above The top end of 142 is rotatably provided with the same connecting rod and is also inserted in the second sliding groove 131 , thereby realizing the sliding connection between the top end of the second lifting arm 142 above and the sliding seat 13 .

参照图1、5,平台组件2包括工作平台21和两个第一支撑柱22;两个第一支撑柱22的底端分别固定连接于工作平台21的前端的顶面;两个提升机构3分别设置于两个第一支撑柱22的顶端;工作平台21的底面与升降机构1的升降端连接,工作平台21的顶面设置有抬升机构4。本申请实施例中工作平台21用于抬升工人时使用,实际设置时,工作平台21的底面与滑座13固定连接,工作平台21的底面与处于上方的第一举升臂141的顶端铰接。1 and 5, the platform assembly 2 includes a working platform 21 and two first supporting columns 22; the bottom ends of the two first supporting columns 22 are respectively fixedly connected to the top surface of the front end of the working platform 21; two lifting mechanisms 3 They are arranged on the tops of the two first supporting columns 22 respectively; the bottom surface of the working platform 21 is connected with the lifting end of the lifting mechanism 1 , and the top surface of the working platform 21 is provided with a lifting mechanism 4 . In the embodiment of the present application, the working platform 21 is used for lifting workers. In actual installation, the bottom surface of the working platform 21 is fixedly connected to the sliding seat 13, and the bottom surface of the working platform 21 is hinged to the top of the first lifting arm 141 above.

参照图4,提升机构3包括U形固定架31、绕线轮32、绑绳33和电机34;U形固定架31固定连接于第一支撑柱22的顶端;绕线轮32转动连接于U形固定架31内,且绑绳33缠绕于绕线轮32的外侧;电机34的机体与U形固定架31固定连接,电机34的输出端与绕线轮32的中心固定连接。本申请实施例中在对管道5进行提升时,首先在地面先通过绑绳33将管道5进行捆绑,然后控制电机34转动带动绕线轮32转动,从而绑绳33缠绕在绕线轮32上,使得管道5逐渐被抬升,当管道5在抬升并经过置物板44到达置物板44的上方后,控制电机34反转,使得管道5下降至置物板44的上方,此时在工作平台21上的工人将管道5上的绑绳33解除,便于后续继续通过抬升机构4对管道5进行再次的抬升;本申请实施例中可以在第一支撑柱22上设置控制器8,通过控制器8控制伸缩部12、电机34和抬升部41进行动作。With reference to Fig. 4, lifting mechanism 3 comprises U-shaped fixed frame 31, reel 32, binding rope 33 and motor 34; U-shaped fixed frame 31 is fixedly connected to the top of first support column 22; Shaped holder 31, and binding rope 33 is wound on the outside of reel 32; In the embodiment of the present application, when the pipeline 5 is lifted, the pipeline 5 is firstly bound on the ground by the binding rope 33, and then the motor 34 is controlled to rotate to drive the reel 32 to rotate, so that the binding rope 33 is wound on the reel 32 , so that the pipeline 5 is gradually lifted. When the pipeline 5 is lifted and passes through the storage plate 44 to reach the top of the storage plate 44, the control motor 34 is reversed, so that the pipeline 5 is lowered to the top of the storage plate 44. At this time, it is on the working platform 21 The worker releases the binding rope 33 on the pipeline 5, so as to continue to lift the pipeline 5 again through the lifting mechanism 4; The telescopic part 12, the motor 34 and the lifting part 41 operate.

参照图6,限位板42倾斜设置,且限位板42的底面与水平面的夹角为0°<α≤5°。本申请实施例中进一步将限位板42倾斜设置,使得管道5与绑绳33解除捆绑后,在置物板44带动其抬升的过程中可防止其出现滑落的情况,进一步保证施工的安全。Referring to FIG. 6 , the limiting plate 42 is arranged obliquely, and the angle between the bottom surface of the limiting plate 42 and the horizontal plane is 0°<α≦5°. In the embodiment of the present application, the limiting plate 42 is further inclined, so that after the pipe 5 is unbound from the binding rope 33, it can be prevented from slipping during the lifting process driven by the storage plate 44, thereby further ensuring the safety of construction.

参照图1,本申请实施例提供的一种地铁防排烟管道施工装置还包括止动机构6;止动机构6包括固定块61、螺纹杆62、摇动转盘63和橡胶垫64;固定块61固定连接于固定底座11的外侧;螺纹杆62贯通固定块61,并与固定块61螺纹连接;螺纹杆62的顶端设置有摇动转盘63,螺纹杆62底端设置有橡胶垫64。本申请实施例中通过设置止动机构6,使装置在使用时可提供稳定支撑,避免装置移动造成危险,实际使用时,将装置移动至施工位置后,通过转动摇动转盘63,使螺纹杆62下移并使橡胶垫64与地面紧密贴合即可。With reference to Fig. 1, a kind of subway anti-exhaust pipeline construction device provided by the embodiment of the present application also includes stop mechanism 6; Fixedly connected to the outside of the fixed base 11; the threaded rod 62 passes through the fixed block 61 and is threadedly connected with the fixed block 61; In the embodiment of the present application, by setting the stop mechanism 6, the device can provide stable support during use, and avoid the danger caused by the movement of the device. In actual use, after the device is moved to the construction position, the threaded rod 62 Move down and make the rubber pad 64 fit closely with the ground.

参照图1,本申请实施例提供的一种地铁防排烟管道施工装置还包括万向轮7,万向轮7设置于固定底座11的底面。本申请实施例中设置万向轮7,方便整体装置的移动。Referring to FIG. 1 , a subway smoke prevention and exhaust pipeline construction device provided by an embodiment of the present application further includes a universal wheel 7 , which is arranged on the bottom surface of a fixed base 11 . In the embodiment of the present application, universal wheels 7 are provided to facilitate the movement of the whole device.

参照图5,平台组件2还包括两个第二支撑柱23;两个第二支撑柱23固定连接于工作平台21的后端的顶面;两个第二支撑柱23之间、第一支撑柱22和第二支撑柱23之间均设置有防护网24。本申请实施例中进一步设置第二支撑柱23和防护网24,保证工人在工作平台21上施工时的安全。Referring to Fig. 5, the platform assembly 2 also includes two second support columns 23; the two second support columns 23 are fixedly connected to the top surface of the rear end of the working platform 21; between the two second support columns 23, the first support column 22 and the second support column 23 are provided with protective nets 24 . In the embodiment of the present application, a second support column 23 and a protective net 24 are further provided to ensure the safety of workers during construction on the working platform 21 .

本申请实施例提供的一种地铁防排烟管道施工装置的工作原理如下:The working principle of a subway smoke prevention and exhaust pipeline construction device provided in the embodiment of the present application is as follows:

在使用装置时,将装置移动至施工位置后,通过转动摇动转盘63,使螺纹杆62下移并使橡胶垫64与地面紧密贴合即可,一名工人站上工作平台21,通过控制器8控制伸缩部12缩回,通过第一举升臂141、第二举升臂142和滑座13的配合,使工作平台21升起,至合适高度为止,由地面上的工人将管道5绑在绑绳33上,通过控制器8启动两电机34,使两电机34同步控制,驱动绕线轮32转动,对绑绳33进行缠绕,使管道5升起,在管道5升起过程中会将置物板44向上顶起翻转,在管道5超过置物板44后,置物板44在扭簧46作用下恢复至原倾斜状态,然后控制两电机34反转,将管道5置于置物板44上,并由工作平台21上的工人将管道5上的绑绳33解除,然后通过控制器8同步控制抬升部41启动,抬升部41带动限位板42、铰接板43和置物板44整体上移,将管道5最终托举至指定的安装高度后停止,工人利用支架对管道5进行固定、安装即可。When using the device, after moving the device to the construction position, by rotating and shaking the turntable 63, the threaded rod 62 is moved down and the rubber pad 64 is closely attached to the ground. A worker stands on the working platform 21, and through the controller 8 Control the retraction of the telescopic part 12, and through the cooperation of the first lifting arm 141, the second lifting arm 142 and the sliding seat 13, the working platform 21 is raised to a suitable height, and the workers on the ground tie the pipeline 5 On the binding rope 33, start two motors 34 by controller 8, make two motors 34 synchronously control, drive reel 32 to rotate, the binding rope 33 is wound, and pipeline 5 is risen, and in pipeline 5 rising process will be Turn the storage plate 44 up and turn it over. After the pipe 5 exceeds the storage plate 44, the storage plate 44 returns to the original inclined state under the action of the torsion spring 46, and then controls the two motors 34 to reverse, and the pipeline 5 is placed on the storage plate 44 , and the worker on the working platform 21 releases the binding rope 33 on the pipeline 5, and then controls the lifting part 41 to start synchronously through the controller 8, and the lifting part 41 drives the limit plate 42, the hinge plate 43 and the storage plate 44 to move up as a whole , lift the pipe 5 to the specified installation height and stop, and the workers can fix and install the pipe 5 with the bracket.

本说明书中的各个实施方式采用递进的方式描述,各个实施方式之间相同或相似的部分互相参见即可,每个实施方式重点说明的都是与其他实施方式的不同之处。The various implementations in this specification are described in a progressive manner, the same or similar parts of the various implementations can be referred to each other, and each implementation focuses on the differences from other implementations.

以上实施例仅用以说明本申请的技术方案,而非对本申请限制;尽管参照前述实施例对本申请进行了详细的说明,本领域普通技术人员应当理解:其依然可以对前述实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本申请技术方案的范围。The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit the present application; although the present application has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still be described in the foregoing embodiments Modifications to the technical solutions, or equivalent replacement of some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the present application.

Claims (9)

1.一种地铁防排烟管道施工装置,其特征在于,包括升降机构(1)、平台组件(2)、两个提升机构(3)和两个抬升机构(4);1. A kind of subway smoke-proof pipeline construction device is characterized in that, comprises elevating mechanism (1), platform assembly (2), two elevating mechanisms (3) and two elevating mechanisms (4); 所述平台组件(2)设置于所述升降机构(1)的升降端,能够在所述升降机构(1)的带动下做升降运动;The platform assembly (2) is arranged at the lifting end of the lifting mechanism (1), and can perform lifting movement driven by the lifting mechanism (1); 两个所述提升机构(3)分别设置于所述平台组件(2)的两端,且所述提升机构(3)的升降端能够与管道(5)可拆卸连接;The two lifting mechanisms (3) are respectively arranged at both ends of the platform assembly (2), and the lifting ends of the lifting mechanisms (3) can be detachably connected to the pipeline (5); 两个所述抬升机构(4)分别设置于所述平台组件(2)的顶面的两端;The two lifting mechanisms (4) are respectively arranged at both ends of the top surface of the platform assembly (2); 所述抬升机构(4)包括抬升部(41)、限位板(42)、铰接板(43)、置物板(44)、固定杆(45)和扭簧(46);The lifting mechanism (4) includes a lifting part (41), a limit plate (42), a hinge plate (43), a storage plate (44), a fixed rod (45) and a torsion spring (46); 所述抬升部(41)设置于所述平台组件(2)的顶面,且所述抬升部(41)的升降端固定连接有所述限位板(42);The lifting part (41) is arranged on the top surface of the platform assembly (2), and the lifting end of the lifting part (41) is fixedly connected with the limiting plate (42); 所述铰接板(43)固定连接于所述限位板(42)的侧面,且所述铰接板(43)贯通开设有通槽(431);The hinged plate (43) is fixedly connected to the side of the limiting plate (42), and the hinged plate (43) is provided with a through groove (431); 所述固定杆(45)处于所述通槽(431)中,且所述固定杆(45)的两端与所述铰接板(43)固定连接;The fixed rod (45) is located in the through groove (431), and both ends of the fixed rod (45) are fixedly connected to the hinge plate (43); 所述置物板(44)放置于所述限位板(42)的顶面,且所述置物板(44)与所述固定杆(45)转动连接;The storage plate (44) is placed on the top surface of the limiting plate (42), and the storage plate (44) is rotatably connected to the fixed rod (45); 所述扭簧(46)套设于所述固定杆(45)的外侧,且所述扭簧(46)的两端分别卡接于所述铰接板(43)和所述置物板(44)的侧面。The torsion spring (46) is sheathed on the outside of the fixed rod (45), and the two ends of the torsion spring (46) are respectively clamped to the hinge plate (43) and the storage plate (44) side. 2.根据权利要求1所述的地铁防排烟管道施工装置,其特征在于,所述升降机构(1)包括固定底座(11)、伸缩部(12)、滑座(13)和多个升降杆组件(14);2. The subway smoke prevention and exhaust pipeline construction device according to claim 1, characterized in that, the lifting mechanism (1) includes a fixed base (11), a telescopic part (12), a sliding seat (13) and a plurality of lifting rod assembly (14); 所述伸缩部(12)的机体固定连接于所述固定底座(11)的侧面,所述伸缩部(12)的输出端与所述固定底座(11)的侧面滑动连接;The body of the telescopic part (12) is fixedly connected to the side of the fixed base (11), and the output end of the telescopic part (12) is slidably connected to the side of the fixed base (11); 所述滑座(13)固定连接于所述平台组件(2)的底面;The sliding seat (13) is fixedly connected to the bottom surface of the platform assembly (2); 所述升降杆组件(14)包括交叉设置的第一举升臂(141)和第二举升臂(142),所述第一举升臂(141)和所述第二举升臂(142)之间转动连接;The lifting rod assembly (14) includes a first lifting arm (141) and a second lifting arm (142) arranged crosswise, and the first lifting arm (141) and the second lifting arm (142) ) Rotation connection between; 处于下方的所述第一举升臂(141)的底端与所述伸缩部(12)的输出端转动连接,处于所述下方的所述第二举升臂(142)的底端与所述固定底座(11)转动连接,处于上方的所述第一举升臂(141)的顶端与所述平台组件(2)的底面转动连接,处于上方的所述第二举升臂(142)的顶端与所述滑座(13)转动连接同时能够与所述滑座(13)滑动连接;The bottom end of the first lifting arm (141) at the bottom is rotationally connected with the output end of the telescopic part (12), and the bottom end of the second lifting arm (142) at the bottom is connected with the output end of the telescopic part (12). The fixed base (11) is rotatably connected, the top of the first lifting arm (141) above is rotatably connected to the bottom surface of the platform assembly (2), and the second lifting arm (142) above is The top of the top is rotatably connected with the sliding seat (13) and can be slidably connected with the sliding seat (13); 上下相邻的所述第一举升臂(141)和所述第二举升臂(142)的端部之间转动连接。The ends of the first lifting arm (141) and the second lifting arm (142) adjacent up and down are rotationally connected. 3.根据权利要求2所述的地铁防排烟管道施工装置,其特征在于,所述固定底座(11)和所述滑座(13)上分别开设有第一滑槽(111)和第二滑槽(131);3. The subway smoke prevention and exhaust pipe construction device according to claim 2, characterized in that, the fixed base (11) and the sliding seat (13) are respectively provided with a first chute (111) and a second Chute (131); 所述伸缩部(12)的输出端处于所述第一滑槽(111)中,并与所述第一滑槽(111)滑动连接;The output end of the telescopic part (12) is in the first chute (111), and is slidably connected with the first chute (111); 处于上方的所述第二举升臂(142)的顶端处于所述第二滑槽(131)中,并与所述第二滑槽(131)滑动连接。The top end of the upper second lifting arm (142) is in the second sliding slot (131), and is slidably connected with the second sliding slot (131). 4.根据权利要求1所述的地铁防排烟管道施工装置,其特征在于,所述平台组件(2)包括工作平台(21)和两个第一支撑柱(22);4. The subway smoke prevention and exhaust pipeline construction device according to claim 1, characterized in that, said platform assembly (2) comprises a working platform (21) and two first support columns (22); 两个所述第一支撑柱(22)的底端分别固定连接于所述工作平台(21)的前端的顶面;The bottom ends of the two first support columns (22) are respectively fixedly connected to the top surface of the front end of the working platform (21); 两个所述提升机构(3)分别设置于两个所述第一支撑柱(22)的顶端;The two lifting mechanisms (3) are respectively arranged on the top ends of the two first support columns (22); 所述工作平台(21)的底面与所述升降机构(1)的升降端连接,所述工作平台(21)的顶面设置有所述抬升机构(4)。The bottom surface of the working platform (21) is connected to the lifting end of the lifting mechanism (1), and the lifting mechanism (4) is arranged on the top surface of the working platform (21). 5.根据权利要求4所述的地铁防排烟管道施工装置,其特征在于,所述提升机构(3)包括U形固定架(31)、绕线轮(32)、绑绳(33)和电机(34);5. The subway smoke prevention and exhaust pipeline construction device according to claim 4, characterized in that, the lifting mechanism (3) comprises a U-shaped fixed frame (31), a winding wheel (32), a binding rope (33) and Motor (34); 所述U形固定架(31)固定连接于所述第一支撑柱(22)的顶端;The U-shaped fixing bracket (31) is fixedly connected to the top of the first support column (22); 所述绕线轮(32)转动连接于所述U形固定架(31)内,且所述绑绳(33)缠绕于所述绕线轮(32)的外侧;The reel (32) is rotatably connected in the U-shaped fixed frame (31), and the binding rope (33) is wound on the outside of the reel (32); 所述电机(34)的机体与所述U形固定架(31)固定连接,所述电机(34)的输出端与所述绕线轮(32)的中心固定连接。The body of the motor (34) is fixedly connected to the U-shaped fixing frame (31), and the output end of the motor (34) is fixedly connected to the center of the winding wheel (32). 6.根据权利要求1所述的地铁防排烟管道施工装置,其特征在于,所述限位板(42)倾斜设置,且所述限位板(42)的底面与水平面的夹角为0°<α≤5°。6. The subway smoke prevention and exhaust pipeline construction device according to claim 1, characterized in that, the limiting plate (42) is arranged obliquely, and the angle between the bottom surface of the limiting plate (42) and the horizontal plane is 0 °<α≤5°. 7.根据权利要求2所述的地铁防排烟管道施工装置,其特征在于,还包括止动机构(6);7. The subway smoke prevention and exhaust pipe construction device according to claim 2, further comprising a stop mechanism (6); 所述止动机构(6)包括固定块(61)、螺纹杆(62)、摇动转盘(63)和橡胶垫(64);The stop mechanism (6) includes a fixed block (61), a threaded rod (62), a shaking turntable (63) and a rubber pad (64); 所述固定块(61)固定连接于所述固定底座(11)的外侧;The fixed block (61) is fixedly connected to the outside of the fixed base (11); 所述螺纹杆(62)贯通所述固定块(61),并与所述固定块(61)螺纹连接;The threaded rod (62) passes through the fixed block (61) and is threadedly connected with the fixed block (61); 所述螺纹杆(62)的顶端设置有所述摇动转盘(63),所述螺纹杆(62)底端设置有所述橡胶垫(64)。The top end of the threaded rod (62) is provided with the shaking turntable (63), and the bottom end of the threaded rod (62) is provided with the rubber pad (64). 8.根据权利要求2所述的地铁防排烟管道施工装置,其特征在于,还包括万向轮(7),所述万向轮(7)设置于所述固定底座(11)的底面。8. The subway smoke prevention and exhaust pipeline construction device according to claim 2, characterized in that it further comprises a universal wheel (7), and the universal wheel (7) is arranged on the bottom surface of the fixed base (11). 9.根据权利要求4所述的地铁防排烟管道施工装置,其特征在于,所述平台组件(2)还包括两个第二支撑柱(23);9. The subway smoke prevention and exhaust pipeline construction device according to claim 4, characterized in that, the platform assembly (2) also includes two second support columns (23); 两个所述第二支撑柱(23)固定连接于所述工作平台(21)的后端的顶面;The two second support columns (23) are fixedly connected to the top surface of the rear end of the working platform (21); 两个所述第二支撑柱(23)之间、所述第一支撑柱(22)和所述第二支撑柱(23)之间均设置有防护网(24)。A protective net (24) is arranged between the two second support columns (23), and between the first support column (22) and the second support column (23).
CN202211191307.5A 2022-09-28 2022-09-28 Construction device for subway smoke-discharge-preventing pipeline Pending CN115492350A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211191307.5A CN115492350A (en) 2022-09-28 2022-09-28 Construction device for subway smoke-discharge-preventing pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211191307.5A CN115492350A (en) 2022-09-28 2022-09-28 Construction device for subway smoke-discharge-preventing pipeline

Publications (1)

Publication Number Publication Date
CN115492350A true CN115492350A (en) 2022-12-20

Family

ID=84471528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211191307.5A Pending CN115492350A (en) 2022-09-28 2022-09-28 Construction device for subway smoke-discharge-preventing pipeline

Country Status (1)

Country Link
CN (1) CN115492350A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117466226A (en) * 2023-12-27 2024-01-30 德通建设集团有限公司 Installation device of water supply pipeline

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213868866U (en) * 2020-11-10 2021-08-03 泉州宜加机电有限公司 Overhauling platform
CN214531801U (en) * 2021-02-07 2021-10-29 安徽同建建设集团有限公司 Lifting device for building engineering
CN215756256U (en) * 2021-04-28 2022-02-08 中建八局第一建设有限公司 Novel aerial working platform
CN215888817U (en) * 2021-07-28 2022-02-22 浙江亚厦装饰股份有限公司 Overturning connecting piece for quick installation of ceiling board
CN216403776U (en) * 2021-12-17 2022-04-29 北京华祺洋消防安全有限公司 Elevating platform secondary lifting device for pipeline installation
CN216807824U (en) * 2022-03-22 2022-06-24 山东省水利勘测设计院有限公司 Pipeline mobile device for hydraulic engineering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213868866U (en) * 2020-11-10 2021-08-03 泉州宜加机电有限公司 Overhauling platform
CN214531801U (en) * 2021-02-07 2021-10-29 安徽同建建设集团有限公司 Lifting device for building engineering
CN215756256U (en) * 2021-04-28 2022-02-08 中建八局第一建设有限公司 Novel aerial working platform
CN215888817U (en) * 2021-07-28 2022-02-22 浙江亚厦装饰股份有限公司 Overturning connecting piece for quick installation of ceiling board
CN216403776U (en) * 2021-12-17 2022-04-29 北京华祺洋消防安全有限公司 Elevating platform secondary lifting device for pipeline installation
CN216807824U (en) * 2022-03-22 2022-06-24 山东省水利勘测设计院有限公司 Pipeline mobile device for hydraulic engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117466226A (en) * 2023-12-27 2024-01-30 德通建设集团有限公司 Installation device of water supply pipeline
CN117466226B (en) * 2023-12-27 2024-03-12 德通建设集团有限公司 Installation device of water supply pipeline

Similar Documents

Publication Publication Date Title
CN105490193B (en) High-altitude automatic ground wire hanging device for transformer substation
CN207328233U (en) A kind of lift work trailer for power equipment installation
CN205838427U (en) Movable small crane
CN115492350A (en) Construction device for subway smoke-discharge-preventing pipeline
CN204794599U (en) Motor is decided rotor punching and is folded pressure elevating gear
CN113833281A (en) Intelligent wallboard mounting robot with adjustable mounting range and mounting method
CN113501451B (en) Guardrail lifting device
CN214653309U (en) Efficient electromechanical component mounting and lifting equipment
CN207259080U (en) Air duct installation lifter
CN108381482B (en) GIL installation tool and control system and method
CN113955636A (en) Hoisting equipment for assembly type building construction
CN110552262B (en) Track laying machine
CN207260687U (en) A kind of car three-dimensional parking device
CN110725707A (en) Integral arch installing method and integral arch installing trolley
CN216662222U (en) Prefabricated case roof beam hoist
CN108750995A (en) A kind of lifting apparatus used for steel girder erection
CN211310745U (en) Lift actuating mechanism for lift
CN211396528U (en) Auxiliary platform for electric power operation and maintenance
CN116025208A (en) Hydraulic lifting type parking AGV, parking AGV system and parking method
CN211737158U (en) Segmented arch mounting trolley
CN114542103A (en) Tunnel operation platform for construction
CN219219846U (en) Plate loading machine
CN2649556Y (en) Movable light elevator
CN216235937U (en) A mine lifting equipment with high safety performance
CN220006662U (en) Gate valve body assembly devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221220