CN115467550A - Concrete crack repairing method - Google Patents
Concrete crack repairing method Download PDFInfo
- Publication number
- CN115467550A CN115467550A CN202211115688.9A CN202211115688A CN115467550A CN 115467550 A CN115467550 A CN 115467550A CN 202211115688 A CN202211115688 A CN 202211115688A CN 115467550 A CN115467550 A CN 115467550A
- Authority
- CN
- China
- Prior art keywords
- crack
- concrete
- vacuumizing
- cracks
- plastic film
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
- E04G23/0211—Arrangements for filling cracks or cavities in building constructions using injection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种混凝土裂缝修复方法,包括以下步骤:S1、裂缝预处理;S2、裂缝灌注;S3、裂缝封闭;S4、养护。本发明解决了传统裂缝修复过程中不清理裂缝内浮尘、灰尘的问题,从源头上保证了裂缝的可灌注性。
The invention discloses a method for repairing concrete cracks, which comprises the following steps: S1, crack pretreatment; S2, crack pouring; S3, crack sealing; S4, curing. The invention solves the problem of not cleaning the floating dust and dust in the cracks in the traditional crack repairing process, and ensures the perfusion of the cracks from the source.
Description
技术领域technical field
本发明涉及土木工程技术领域。更具体地说,本发明涉及一种混凝土裂缝修复方法。The invention relates to the technical field of civil engineering. More specifically, the present invention relates to a method for repairing cracks in concrete.
背景技术Background technique
混凝土是现代土木工程领域应用量最大、应用范围最为广泛的建筑材料,然而混凝土大多长期暴露在室外环境,且其自身为多孔结构,水和离子可通过其孔隙渗入其内部,引起混凝土霉化、碳化、开裂等病害,裂缝的存在会进一步导致钢筋锈蚀,严重影响混凝土结构的正常使用,降低混凝土结构承载能力,更甚者可能导致混凝土的结构破坏,因此需要对裂缝进行及时处理。Concrete is the most widely used building material in the field of modern civil engineering. However, most of the concrete is exposed to the outdoor environment for a long time, and it has a porous structure. Water and ions can penetrate into the interior through its pores, causing moldy, Carbonation, cracking and other diseases, the existence of cracks will further lead to corrosion of steel bars, seriously affect the normal use of concrete structures, reduce the bearing capacity of concrete structures, and even lead to structural damage of concrete, so cracks need to be dealt with in a timely manner.
目前,混凝土裂缝的修复的方法主要有:At present, the methods of repairing concrete cracks mainly include:
1、表面封闭法,该方法通过设备顺着裂缝的方向切割开槽,根据开槽的位置,通过钢刷清除裂缝杂物,并清洗裂缝处的两侧,往裂缝处刮抹并按压封缝胶对裂缝进行修复;1. Surface sealing method. This method cuts the groove along the direction of the crack through the equipment. According to the position of the groove, remove the sundries in the crack with a steel brush, clean both sides of the crack, scrape the crack and press to seal the crack Glue to repair cracks;
2、自动低压渗注法,该方法对裂缝表面处理后,沿裂缝中心,按设定间距粘贴固定注浆嘴,注浆嘴上拧插充了液剂的渗注器,凭液剂所受的压力持续向缝隙渗注,以实现对裂缝的修复;2. Automatic low-pressure infiltration method. After treating the surface of the crack, paste and fix the grouting nozzle along the center of the crack according to the set interval. The pressure continues to infiltrate into the cracks to repair the cracks;
3、压力灌注法,该方法对裂缝进行处理后,沿裂缝的走向布置注浆嘴,通过注浆嘴往裂缝内进行注浆,以实现对裂缝的修复;3. Pressure grouting method. After treating the cracks, the grouting nozzles are arranged along the direction of the cracks, and the grouting nozzles are used to inject grout into the cracks to realize the repair of the cracks;
以上三种方法,均未对裂缝内部进行任何处理,而当裂缝中有较多灰尘、粉尘时,会导致后续灌注、封闭效果不理想,最终会影响对混凝土裂缝的修复效果。The above three methods do not perform any treatment on the inside of the crack, and when there is a lot of dust and dust in the crack, it will lead to unsatisfactory subsequent pouring and sealing effects, which will eventually affect the repair effect of the concrete crack.
发明内容Contents of the invention
本发明还有一个目的是提供一种可解决传统裂缝修复过程中不清理裂缝内浮尘、灰尘的问题,从源头上保证裂缝的可灌注性的混凝土裂缝修复方法。Another purpose of the present invention is to provide a concrete crack repair method that can solve the problem of not cleaning the floating dust and dust in the crack during the traditional crack repair process, and ensure the pourability of the crack from the source.
为了实现根据本发明的这些目的和其它优点,提供了一种混凝土裂缝修复方法,包括以下步骤:In order to achieve these objects and other advantages according to the present invention, a method for repairing concrete cracks is provided, comprising the following steps:
S1、裂缝预处理;S1, crack pretreatment;
S11、用高压空气清理裂缝表面的浮尘;S11, use high-pressure air to clean the floating dust on the surface of the crack;
S12、在裂缝的左端设置灌注装置,灌注装置中加满水,水在自身重力的作用下自动流入到裂缝中;S12. Install a pouring device at the left end of the crack, fill the pouring device with water, and the water will automatically flow into the crack under the action of its own gravity;
S13、沿裂缝的长度方向在裂缝处间隔布设多个抽真空点,任一抽真空点上设有抽真空装置,水流入裂缝的同时,从左往右依次对抽真空点处负压抽真空,当抽真空装置抽出水后,停止工作,进行下一个抽真空点处的抽真空,直到水充满整个裂缝;S13. A plurality of vacuuming points are arranged at intervals along the length of the crack, and any vacuuming point is equipped with a vacuuming device. When water flows into the crack, the negative pressure at the vacuuming point is evacuated sequentially from left to right. , when the vacuum device pumps out the water, stop working, and carry out vacuuming at the next vacuuming point until the water fills the entire crack;
S14、持续灌注水和进行最后一个抽真空点处的负压抽真空,直至抽真空装置抽出水;S14, continuously pouring water and performing negative pressure vacuuming at the last vacuuming point until the vacuuming device pumps out water;
S15、在灌注装置处采用空压机往裂缝内压入高压空气,抽真空装置持续负压抽真空,直至裂缝内没有水抽出;S15. Use an air compressor to press high-pressure air into the crack at the pouring device, and the vacuum device continues to vacuumize under negative pressure until no water is drawn out from the crack;
S16、使用薄膜覆盖裂缝,待其干燥5-7天后进行后续作业;S16, use a film to cover the cracks, and perform follow-up operations after it dries for 5-7 days;
S2、裂缝灌注;S2, crack filling;
将灌注装置内部的水替换为环氧树脂胶,重复步骤S11-S13;Replace the water inside the perfusion device with epoxy glue, and repeat steps S11-S13;
S3、裂缝封闭;S3, crack sealing;
当裂缝表面布满胶液时,采用塑料薄膜覆盖裂缝,塑料薄膜与混凝土面接触部分充满胶液;When the surface of the crack is covered with glue, cover the crack with a plastic film, and the part where the plastic film contacts the concrete surface is filled with glue;
S4、养护;S4, maintenance;
持续灌注环氧树脂胶和抽真空1min,当塑料薄膜与混凝土面接触部分没有出现空洞时,关闭抽真空装置,并保持灌注装置中有一半以上的环氧树脂胶,待裂缝内的环氧树脂胶固化后,保持现场持续养护7d后开放。Continue pouring epoxy resin glue and vacuuming for 1 minute. When there is no cavity in the contact part of the plastic film and the concrete surface, turn off the vacuuming device and keep more than half of the epoxy resin glue in the pouring device. After the glue is cured, keep on-site continuous maintenance for 7 days before opening.
优选的是,所述步骤S2中,往裂缝中灌注环氧树脂胶时,环氧树脂胶接触表面张力T与混凝土接触角θ应满足0.05≤2Tcosθ。Preferably, in the step S2, when pouring the epoxy resin glue into the crack, the contact surface tension T of the epoxy resin glue and the concrete contact angle θ should satisfy 0.05≤2Tcosθ.
优选的是,所述步骤S3中,当裂缝表面未布满胶液时,采用注射装置将胶液涂满裂缝表面,然后用塑料薄膜从左往右覆盖裂缝,边覆盖边观察,当覆盖后的塑料薄膜与混凝土面接触部分出现空洞时,掀起塑料薄膜继续注满胶液后重新覆盖,直至整个裂缝被覆盖且塑料薄膜与混凝土面接触部分充满胶液。Preferably, in the step S3, when the surface of the crack is not covered with glue, use an injection device to coat the surface of the crack with glue, and then cover the crack with a plastic film from left to right, and observe while covering. When there is a void in the contact part of the plastic film and the concrete surface, lift the plastic film and continue to fill it with glue and cover it again until the entire crack is covered and the contact part of the plastic film and the concrete surface is filled with glue.
优选的是,塑料薄膜的厚度不低于0.05mm。Preferably, the thickness of the plastic film is not less than 0.05 mm.
优选的是,所述步骤S13中,抽真空负压为0-0.1MPa;步骤S15中高压空气压力不低于2MPa。Preferably, in the step S13, the vacuum negative pressure is 0-0.1 MPa; in the step S15, the high-pressure air pressure is not lower than 2 MPa.
优选的是,所述步骤S12中,采用0-10Mpa的压力辅助灌注。Preferably, in the step S12, a pressure of 0-10 MPa is used to assist perfusion.
优选的是,所述步骤S12中,灌注装置的底部与混凝土面接触部分处于密封状态。Preferably, in the step S12, the contact part between the bottom of the pouring device and the concrete surface is in a sealed state.
优选的是,在裂缝的修复过程中,采用粘贴碳纤维片材料加固法对裂缝进行加固处理,确保裂缝在修复过程中不会二次开裂。Preferably, during the repairing process of the cracks, the cracks are reinforced by pasting carbon fiber sheet materials to ensure that the cracks will not crack again during the repairing process.
本发明至少包括以下有益效果:The present invention at least includes the following beneficial effects:
1、本发明解决了传统裂缝修复过程中不清理裂缝内浮尘、灰尘的问题,从源头上保证了裂缝的可灌注性;1. The present invention solves the problem of not cleaning the floating dust and dust in the cracks during the traditional crack repair process, and ensures the perfusion of the cracks from the source;
2、本发明通过对灌注材料与混凝土接触角度的设定,使得在不设压力的情况下,灌注材料也可以在自身重力的作用下,渗透到裂缝的内部,进一步保证了裂缝的可灌注性;2. The present invention sets the contact angle between the pouring material and the concrete, so that the pouring material can also penetrate into the crack under the action of its own gravity without pressure, which further ensures the pourability of the crack ;
3、本发明的裂缝修复方法,是对传统裂缝修复方法的重大创新,为混凝土工程裂缝提供了合理、有效的修复技术,适用于各种场景的混凝土修复,可大大降低结构风险。3. The crack repair method of the present invention is a major innovation to the traditional crack repair method, which provides a reasonable and effective repair technology for cracks in concrete engineering, is applicable to concrete repair in various scenarios, and can greatly reduce structural risks.
本发明的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本发明的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the present invention will partly be embodied through the following descriptions, and partly will be understood by those skilled in the art through the study and practice of the present invention.
附图说明Description of drawings
图1为本发明抽真空点的布设位置示意图;Fig. 1 is the arrangement position schematic diagram of vacuum point of the present invention;
图2为本发明灌注过程示意图;Fig. 2 is a schematic diagram of the perfusion process of the present invention;
图3为本发明灌注完成示意图。Fig. 3 is a schematic diagram of the completion of perfusion in the present invention.
具体实施方式detailed description
下面结合附图对本发明做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.
需要说明的是,在本发明的描述中,术语“横向”、“纵向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,并不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。It should be noted that, in the description of the present invention, the terms "horizontal", "vertical", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship indicated by "horizontal", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, and It is not to indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, or operate in a particular orientation, and thus should not be construed as limiting the invention.
如图1-3所示,本发明提供一种混凝土裂缝修复方法,包括以下步骤:As shown in Figure 1-3, the present invention provides a kind of concrete crack repairing method, comprises the following steps:
S1、裂缝预处理;S1, crack pretreatment;
S11、用高压空气清理裂缝表面的浮尘,以防止在后续的施工过程中,裂缝表面的浮尘掉入到裂缝的内部,影响修复效果;S11. Use high-pressure air to clean the floating dust on the surface of the crack, so as to prevent the floating dust on the surface of the crack from falling into the inside of the crack during the subsequent construction process, which will affect the repair effect;
S12、在裂缝的左端设置灌注装置,灌注装置中加满水,水在自身重力的作用下自动流入到裂缝中;往裂缝内灌水,用于冲洗裂缝内部的杂质;S12. Install a pouring device at the left end of the crack, fill the pouring device with water, and the water will automatically flow into the crack under the action of its own gravity; water is poured into the crack to wash the impurities inside the crack;
S13、如图1所示,沿裂缝的长度方向在裂缝处间隔布设多个抽真空点,任一抽真空点上设有抽真空装置,水流入裂缝的同时,从左往右依次对抽真空点处负压抽真空,当抽真空装置抽出水后,停止工作,进行下一个抽真空点处的抽真空,如图3所示,直到水充满整个裂缝;通过灌注装置往裂缝内灌水,配合裂缝表面的抽真空装置依次抽真空,可使得水快速的充满整个裂缝,提高施工效率;S13. As shown in Figure 1, a plurality of vacuuming points are arranged at intervals along the length of the crack, and any vacuuming point is provided with a vacuuming device. When water flows into the crack, it is vacuumed sequentially from left to right. Vacuum at the point with negative pressure, when the vacuum device pumps out the water, stop working, and carry out the vacuum at the next vacuum point, as shown in Figure 3, until the water fills the entire crack; pour water into the crack through the perfusion device, cooperate with The vacuum device on the surface of the crack is vacuumed sequentially, which can make the water fill the entire crack quickly and improve the construction efficiency;
S14、持续灌注水和进行最后一个抽真空点处的负压抽真空,直至抽真空装置抽出水;水充满裂缝后,还进行最后一个抽真空点处的负压抽真空,目的是将带有杂质的水抽出裂缝外部,为后续填充环氧树脂胶做准备;S14. Continue to pour water and perform negative pressure vacuuming at the last vacuum point until the vacuum device pumps out water; after the water fills the cracks, perform negative pressure vacuuming at the last vacuum point to remove The impurity water is pumped out of the crack to prepare for the subsequent filling of epoxy resin glue;
S15、在灌注装置处采用空压机往裂缝内压入高压空气,抽真空装置持续负压抽真空,直至裂缝内没有水抽出;通过高压机在裂缝的一端压入高压空气,抽真空装置从裂缝的另一端持续抽真空,两者相互配合可加快裂缝内的水排出裂缝的外部,加快施工效率;S15. Use an air compressor to press high-pressure air into the crack at the pouring device, and the vacuum device continues to vacuumize under negative pressure until no water is drawn out from the crack; The other end of the crack is continuously vacuumed, and the cooperation between the two can accelerate the water in the crack to drain out of the crack and speed up the construction efficiency;
S16、使用具有防尘和透水效果的薄膜覆盖裂缝,待其干燥5-7天后进行后续作业;S16. Use a film with dustproof and water permeable effects to cover the cracks, and perform follow-up operations after it dries for 5-7 days;
S2、裂缝灌注;S2, crack filling;
将灌注装置内部的水替换为环氧树脂胶,重复步骤S11-S13;环氧树脂胶选用可在潮湿表面固化的一种,当裂缝存在潮湿部位时,环氧树脂胶可在潮湿表面固化的功能,也能很好的密封裂缝,保证裂缝的修复效果,且为保证后续的修复效果,选用的环氧树脂胶的强度需要大于被修补的混凝土裂缝的强度;Replace the water inside the filling device with epoxy resin glue, and repeat steps S11-S13; the epoxy resin glue can be cured on a wet surface, and when there is a wet part in the crack, the epoxy resin glue can be cured on a wet surface function, it can also seal the cracks well and ensure the repair effect of the cracks, and in order to ensure the subsequent repair effect, the strength of the epoxy resin glue selected needs to be greater than the strength of the repaired concrete cracks;
S3、裂缝封闭;S3, crack sealing;
当裂缝表面布满胶液时,采用塑料薄膜覆盖裂缝,塑料薄膜与混凝土面接触部分充满胶液;When the surface of the crack is covered with glue, cover the crack with a plastic film, and the part where the plastic film contacts the concrete surface is filled with glue;
S4、养护;S4, maintenance;
持续灌注环氧树脂胶和抽真空1min,当塑料薄膜与混凝土面接触部分没有出现空洞时,关闭抽真空装置,并保存灌注装置中有一半以上的环氧树脂胶,保持现场持续养护7d后开放。本发明对裂缝进行预处理,解决了传统裂缝修复过程中不清理裂缝内浮尘、灰尘的问题,从源头上保证了裂缝的可灌注性,保证了修复效果,为混凝土工程裂缝提供了合理、有效的修复技术,适用于各种场景的混凝土修复,可大大降低结构风险。Continue pouring epoxy resin glue and vacuuming for 1 minute. When there is no void in the contact part of the plastic film and the concrete surface, turn off the vacuuming device, and save more than half of the epoxy resin glue in the pouring device, and keep it open after 7 days of continuous maintenance on site . The invention pre-treats the cracks, solves the problem of not cleaning up the floating dust and dust in the cracks in the traditional crack repair process, ensures the pourability of the cracks from the source, ensures the repair effect, and provides a reasonable and effective solution for cracks in concrete engineering. Advanced repair technology, suitable for concrete repair in various scenarios, can greatly reduce structural risks.
在另一种技术方案中,所述步骤S2中,往裂缝中灌注环氧树脂胶时,环氧树脂胶接触表面张力T与混凝土接触角θ应满足0.05≤2Tcosθ。In another technical solution, in the step S2, when pouring the epoxy resin glue into the crack, the contact surface tension T of the epoxy resin glue and the concrete contact angle θ should satisfy 0.05≤2Tcosθ.
在本技术方案中,通过对灌注材料与混凝土接触角度的设定,可使得在不设压力的情况下,环氧树脂也可以在自身重力的作用下,渗透到裂缝的内部,进一步保证了裂缝的可灌注性。In this technical solution, by setting the contact angle between the pouring material and the concrete, the epoxy resin can also penetrate into the inside of the crack under the action of its own gravity without pressure, which further ensures the crack perfusability.
在另一种技术方案中,所述步骤S3中,当裂缝表面未布满胶液时,采用注射装置将胶液涂满裂缝表面,然后用塑料薄膜从左往右覆盖裂缝,边覆盖边观察,当覆盖后的塑料薄膜与混凝土面接触部分出现空洞时,掀起塑料薄膜继续注满胶液后重新覆盖,直至整个裂缝被覆盖且塑料薄膜与混凝土面接触部分充满胶液。In another technical solution, in step S3, when the surface of the crack is not covered with glue, use an injection device to coat the surface of the crack with glue, and then cover the crack with a plastic film from left to right, and observe while covering , when the covered plastic film and the concrete surface contact part appear void, lift the plastic film and continue to fill the glue and then cover again until the entire crack is covered and the plastic film and the concrete surface contact part is filled with glue.
在本技术方案中,为保证裂缝内部的胶液灌注饱满,裂缝内部充满胶液的情况下,其表面也需布满胶液,而当塑料薄膜与混凝土面接触部分出现空洞时,有可能是灌注不饱满导致的,所以需要重新注满胶液后重新覆盖薄膜,以保证后续裂缝的修复效果。In this technical solution, in order to ensure that the glue inside the crack is fully filled, when the inside of the crack is filled with glue, the surface also needs to be covered with glue, and when there is a cavity in the contact part of the plastic film and the concrete surface, it may be It is caused by insufficient perfusion, so it is necessary to refill the glue and cover the film again to ensure the repair effect of subsequent cracks.
在另一种技术方案中,塑料薄膜的厚度不低于0.05mm。In another technical solution, the thickness of the plastic film is not less than 0.05 mm.
在另一种技术方案中,所述步骤S13中,抽真空负压为0-0.1MPa;步骤S15中高压空气压力不低于2MPa。In another technical solution, in the step S13, the vacuum negative pressure is 0-0.1 MPa; in the step S15, the high-pressure air pressure is not lower than 2 MPa.
在另一种技术方案中,所述步骤S12中,采用0-10Mpa的压力辅助灌注。In another technical solution, in the step S12, a pressure of 0-10 MPa is used to assist perfusion.
在本技术方案中,通过压力辅助持续灌注,可以确保环氧树脂胶注入到裂缝的细微部位,进一步提高了灌注效果。In this technical solution, through pressure-assisted continuous perfusion, it is possible to ensure that the epoxy resin glue is injected into the fine parts of the cracks, further improving the perfusion effect.
在另一种技术方案中,所述步骤S12中,灌注装置的底部与混凝土面接触部分处于密封状态。In another technical solution, in the step S12, the contact part between the bottom of the pouring device and the concrete surface is in a sealed state.
在本技术方案中,灌注装置底部与混凝土面密封,可以保证灌注装置内的材料不会从接触面处流出,影响后续作业。In this technical solution, the bottom of the pouring device is sealed with the concrete surface, which can ensure that the materials in the pouring device will not flow out from the contact surface, affecting subsequent operations.
在另一种技术方案中,在裂缝的修复过程中,采用粘贴碳纤维片材料加固法对裂缝进行加固处理,确保裂缝在修复过程中不会二次开裂。In another technical solution, during the repairing process of the cracks, the cracks are reinforced by pasting carbon fiber sheet materials to ensure that the cracks will not crack again during the repairing process.
尽管本发明的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用,它完全可以被适用于各种适合本发明的领域,对于熟悉本领域的人员而言,可容易地实现另外的修改,因此在不背离权利要求及等同范围所限定的一般概念下,本发明并不限于特定的细节和这里示出与描述的图例。Although the embodiment of the present invention has been disclosed as above, it is not limited to the use listed in the specification and implementation, it can be applied to various fields suitable for the present invention, and it can be easily understood by those skilled in the art Therefore, the invention is not limited to the specific details and examples shown and described herein without departing from the general concept defined by the claims and their equivalents.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211115688.9A CN115467550A (en) | 2022-09-14 | 2022-09-14 | Concrete crack repairing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211115688.9A CN115467550A (en) | 2022-09-14 | 2022-09-14 | Concrete crack repairing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115467550A true CN115467550A (en) | 2022-12-13 |
Family
ID=84333913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211115688.9A Pending CN115467550A (en) | 2022-09-14 | 2022-09-14 | Concrete crack repairing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115467550A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116876877A (en) * | 2023-06-13 | 2023-10-13 | 铜陵有色建安钢构有限责任公司 | Methods for sealing smoke and dust in wall gaps |
CN119392972A (en) * | 2025-01-02 | 2025-02-07 | 福建诚铄建设工程有限公司 | Repairing member for concrete structure and repairing method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114616A (en) * | 2013-02-19 | 2013-05-22 | 青岛宝基利工程技术咨询有限公司 | Adhesive injecting method for concrete cracks with continuous surfaces and non-communicated insides |
CN103437432A (en) * | 2013-06-19 | 2013-12-11 | 中国葛洲坝集团国际工程有限公司 | Concrete crack surface cut groove sealing and blocking structure and method |
CN103835216A (en) * | 2012-11-20 | 2014-06-04 | 张晓群 | Hardened pavement and house roof crack restoration apparatus and construction method thereof |
CN108755334A (en) * | 2018-06-11 | 2018-11-06 | 中水电第十工程局(郑州)有限公司 | A kind of method that concrete road planar defect is quickly repaired |
CN110053410A (en) * | 2019-05-06 | 2019-07-26 | 江西服装学院 | A kind of large size sculpture anti-crack and anti-seepage reparation integral construction method |
CN110821205A (en) * | 2019-11-25 | 2020-02-21 | 王景瑞 | Concrete crack negative pressure repair construction device and construction method |
CN113738152A (en) * | 2021-09-22 | 2021-12-03 | 苏州佳固士新材料科技有限公司 | Leakage maintenance construction method for water-return beam |
-
2022
- 2022-09-14 CN CN202211115688.9A patent/CN115467550A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835216A (en) * | 2012-11-20 | 2014-06-04 | 张晓群 | Hardened pavement and house roof crack restoration apparatus and construction method thereof |
CN103114616A (en) * | 2013-02-19 | 2013-05-22 | 青岛宝基利工程技术咨询有限公司 | Adhesive injecting method for concrete cracks with continuous surfaces and non-communicated insides |
CN103437432A (en) * | 2013-06-19 | 2013-12-11 | 中国葛洲坝集团国际工程有限公司 | Concrete crack surface cut groove sealing and blocking structure and method |
CN108755334A (en) * | 2018-06-11 | 2018-11-06 | 中水电第十工程局(郑州)有限公司 | A kind of method that concrete road planar defect is quickly repaired |
CN110053410A (en) * | 2019-05-06 | 2019-07-26 | 江西服装学院 | A kind of large size sculpture anti-crack and anti-seepage reparation integral construction method |
CN110821205A (en) * | 2019-11-25 | 2020-02-21 | 王景瑞 | Concrete crack negative pressure repair construction device and construction method |
CN113738152A (en) * | 2021-09-22 | 2021-12-03 | 苏州佳固士新材料科技有限公司 | Leakage maintenance construction method for water-return beam |
Non-Patent Citations (2)
Title |
---|
梅锦煜: "低渗饱和软弱层带环氧灌浆研究与实践", 30 June 2013, 中国环境出版社, pages: 44 * |
董建军等: "丙烯酸盐灌浆材料在水工建筑物中的应用", 9 April 2019, 长江出版社, pages: 21 - 22 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116876877A (en) * | 2023-06-13 | 2023-10-13 | 铜陵有色建安钢构有限责任公司 | Methods for sealing smoke and dust in wall gaps |
CN119392972A (en) * | 2025-01-02 | 2025-02-07 | 福建诚铄建设工程有限公司 | Repairing member for concrete structure and repairing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104088254B (en) | Pressure-bearing reinforced concrete structure leakage repair device and construction method thereof | |
CN115467550A (en) | Concrete crack repairing method | |
CN106149554B (en) | Prefabricated bridge deck expansion joint connecting member, preparation method and construction method thereof | |
CN103046513A (en) | Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting | |
CN105274967A (en) | Repairing method for hydraulic concrete crack | |
CN106480993A (en) | Administration structure and construction method in a kind of exterior wall mending-leakage reinforcement of construction | |
CN203977368U (en) | Pressure-bearing reinforced concrete structure leakage repair device | |
CN101672187A (en) | Anti-seepage water treatment method | |
CN207904991U (en) | A kind of underground engineering repairing concrete crack construction | |
CN206220512U (en) | Split bolt and pouring template system thereof | |
CN104863273B (en) | A method and structure for sealing wall splicing joints with cement-based grouting material | |
CN215055299U (en) | Prevent mashed angle steel of root of concrete and seal thick liquid structure | |
CN208486388U (en) | Waterproof precast floor slab | |
CN206360137U (en) | Administration structure in one kind construction exterior wall mending-leakage reinforcement | |
CN107514150A (en) | A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant | |
CN217175732U (en) | Sizing seam plugging device | |
CN206360344U (en) | Framed column template root square steel tube anchor ear part | |
CN211597716U (en) | A shutoff structure for prefabricated outer wall is in milk | |
CN211774656U (en) | Basement stagnant water screw rod hole antiseep block structure | |
CN107724339B (en) | Engineering surface layer water stop template structure and construction method thereof | |
CN207620357U (en) | A kind of high-strength building formwork of maintenance easy to disassemble | |
CN103614990B (en) | The ruggedized construction of thin-wall hydraulic structure and reinforcement means | |
CN202248857U (en) | Brushing-free double-layer concrete formwork | |
CN207537974U (en) | A kind of engineering surface watertight seal formwork structure | |
CN206655379U (en) | It is a kind of to construct the building block for leading wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20221213 |
|
RJ01 | Rejection of invention patent application after publication |