[go: up one dir, main page]

CN115453195A - Insulation resistance detection method and detection circuit of a photovoltaic inverter system - Google Patents

Insulation resistance detection method and detection circuit of a photovoltaic inverter system Download PDF

Info

Publication number
CN115453195A
CN115453195A CN202210962565.2A CN202210962565A CN115453195A CN 115453195 A CN115453195 A CN 115453195A CN 202210962565 A CN202210962565 A CN 202210962565A CN 115453195 A CN115453195 A CN 115453195A
Authority
CN
China
Prior art keywords
circuit
photovoltaic
output
output circuit
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210962565.2A
Other languages
Chinese (zh)
Other versions
CN115453195B (en
Inventor
张万里
周木子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunjian Information Technology Co Ltd
Original Assignee
Yunjian Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunjian Information Technology Co ltd filed Critical Yunjian Information Technology Co ltd
Priority to CN202210962565.2A priority Critical patent/CN115453195B/en
Publication of CN115453195A publication Critical patent/CN115453195A/en
Application granted granted Critical
Publication of CN115453195B publication Critical patent/CN115453195B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Photovoltaic Devices (AREA)

Abstract

本申请涉及一种光伏逆变系统的绝缘阻抗检测方法及检测电路,包括:光伏逆变系统包括光伏输出电路、BOOST开关电路,绝缘阻抗检测电路包括检测子电路、泄放电路,通过控制单元控制BOOST开关电路、检测子电路、泄放电路。控制检测子电路中第一可控开关导通或断开,判断光伏输出电路的光伏方阵绝缘阻抗是否正常。在绝缘阻抗异常情况下,控制BOOST开关电路第二可控开关导通或断开,确定光伏输出电路中存在绝缘阻抗异常的光伏子阵。在控制第二可控开关断开时,控制泄放电路第三可控开关导通以泄放光伏输出电路输出的电能。采用本方法能准确定位阻抗偏低的光伏子阵,在弱光条件下让逆变器待机,降低功率继电器的故障率,消除因太阳能阵列短路带来的母线过压风险。

Figure 202210962565

The application relates to an insulation resistance detection method and a detection circuit of a photovoltaic inverter system, including: the photovoltaic inverter system includes a photovoltaic output circuit and a BOOST switch circuit, and the insulation resistance detection circuit includes a detection sub-circuit and a discharge circuit, controlled by a control unit BOOST switch circuit, detection sub-circuit, and discharge circuit. The first controllable switch in the detection sub-circuit is controlled to be turned on or off, and it is judged whether the insulation resistance of the photovoltaic array of the photovoltaic output circuit is normal. In the case of abnormal insulation resistance, control the second controllable switch of the BOOST switch circuit to turn on or off, and determine that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit. When the second controllable switch is controlled to be turned off, the third controllable switch of the discharge circuit is controlled to be turned on to discharge the electric energy output by the photovoltaic output circuit. Using this method can accurately locate the photovoltaic sub-array with low impedance, make the inverter stand by under weak light conditions, reduce the failure rate of the power relay, and eliminate the risk of bus overvoltage caused by the short circuit of the solar array.

Figure 202210962565

Description

一种光伏逆变系统的绝缘阻抗检测方法及检测电路Insulation resistance detection method and detection circuit of a photovoltaic inverter system

技术领域technical field

本申请涉及光伏技术领域,特别是涉及一种光伏逆变系统的绝缘阻抗检测方法及检测电路。The present application relates to the field of photovoltaic technology, in particular to an insulation resistance detection method and detection circuit of a photovoltaic inverter system.

背景技术Background technique

在光伏发电系统中太阳能电池板是根据半导体界面的光生伏特效应原理将太阳光能转换为电能的装置。而光伏组件、电缆及逆变器的光伏输入端长时间放置在露天的环境中,经受各种外力影响,导致整个光伏系统对地阻抗发生变化,进而影响到光伏发电系统的安全。因此,必须在并网前对绝缘阻抗进行检测。In the photovoltaic power generation system, the solar panel is a device that converts sunlight energy into electrical energy based on the photovoltaic effect principle of the semiconductor interface. However, photovoltaic modules, cables, and photovoltaic input terminals of inverters are placed in the open air for a long time, and are subjected to various external forces, resulting in changes in the impedance of the entire photovoltaic system to ground, which in turn affects the safety of the photovoltaic power generation system. Therefore, the insulation resistance must be tested before grid connection.

随着光伏并网技术的发展,当前的光伏逆变绝缘阻抗的检测是通过对整体的输入阻抗进行检测,判断是否存在阻抗异常的情况。若存在阻抗异常的情况,可以通过开关管来检测出现阻抗异常的支路。With the development of photovoltaic grid-connected technology, the current detection of photovoltaic inverter insulation resistance is to detect whether there is an abnormal impedance by detecting the overall input impedance. If there is abnormal impedance, the switch tube can be used to detect the branch with abnormal impedance.

然而,BOOST开关电路中的开关管由导通到断开的过程中,光伏逆变系统中电感所储存的能量就会转移到母线上,从而超过母线的过压值而导致器件损坏。However, when the switching tube in the BOOST switching circuit is turned on to off, the energy stored in the inductance in the photovoltaic inverter system will be transferred to the bus, which will exceed the overvoltage value of the bus and cause device damage.

发明内容Contents of the invention

基于此,有必要针对上述技术问题,提供一种能够保护母线上器件不被损坏的光伏逆变系统的绝缘阻抗检测方法及检测电路。Based on this, it is necessary to provide an insulation resistance detection method and a detection circuit of a photovoltaic inverter system capable of protecting the components on the bus from being damaged in view of the above technical problems.

第一方面,本申请提供了一种光伏逆变系统的绝缘阻抗检测方法。应用于绝缘阻抗检测电路,所述光伏逆变系统包括光伏输出电路以及与所述光伏输出电路连接的BOOST开关电路,所述绝缘阻抗检测电路包括与所述光伏输出电路连接的检测子电路、与所述光伏输出电路连接的泄放电路,以及与所述BOOST开关电路、所述检测子电路以及所述泄放电路连接的控制单元,所述方法包括:In a first aspect, the present application provides a method for detecting insulation resistance of a photovoltaic inverter system. Applied to an insulation resistance detection circuit, the photovoltaic inverter system includes a photovoltaic output circuit and a BOOST switch circuit connected to the photovoltaic output circuit, and the insulation resistance detection circuit includes a detection sub-circuit connected to the photovoltaic output circuit, and The discharge circuit connected to the photovoltaic output circuit, and the control unit connected to the BOOST switch circuit, the detection sub-circuit and the discharge circuit, the method includes:

控制所述检测子电路中的第一可控开关的导通或断开,判断所述光伏输出电路中的光伏方阵的绝缘阻抗是否正常;Controlling the conduction or disconnection of the first controllable switch in the detection sub-circuit, and judging whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal;

在绝缘阻抗异常的情况下,控制所述BOOST开关电路中的第二可控开关的导通或断开,确定所述光伏输出电路中存在绝缘阻抗异常的光伏子阵;In the case of abnormal insulation resistance, control the conduction or disconnection of the second controllable switch in the BOOST switch circuit, and determine that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit;

在控制所述第二可控开关断开时,控制所述泄放电路中的第三可控开关导通,以泄放所述光伏输出电路所输出的电能。When the second controllable switch is controlled to be turned off, the third controllable switch in the discharge circuit is controlled to be turned on, so as to discharge the electric energy output by the photovoltaic output circuit.

在其中一个实施例中,控制所述检测子电路中的第一可控开关的导通或断开,判断所述光伏输出电路中的光伏方阵的绝缘阻抗是否正常包括:In one of the embodiments, controlling the on or off of the first controllable switch in the detection sub-circuit, and judging whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal includes:

控制所述检测子电路中的第一可控开关的导通或断开,获得所述光伏输出电路的输出正极与公共地之间的第一并联阻抗以及所述光伏输出电路的输出负极与公共地之间的第二并联阻抗;Controlling the on or off of the first controllable switch in the detection sub-circuit to obtain the first parallel impedance between the output positive pole of the photovoltaic output circuit and the common ground and the output negative pole of the photovoltaic output circuit and the common ground a second parallel impedance between ground;

获取所述第一并联阻抗与所述第二并联阻抗的并联值;acquiring a parallel value of the first parallel impedance and the second parallel impedance;

基于所述并联值判断所述光伏输出电路中的光伏方阵的绝缘阻抗是否正常。Based on the parallel connection value, it is judged whether the insulation resistance of the photovoltaic square array in the photovoltaic output circuit is normal.

在其中一个实施例中,若所述并联值小于设定阈值时,则所述绝缘阻抗异常;反之,则所述绝缘阻抗正常。In one embodiment, if the parallel connection value is less than a set threshold, the insulation resistance is abnormal; otherwise, the insulation resistance is normal.

在其中一个实施例中,控制所述BOOST开关电路中的第二可控开关的导通或断开,确定所述光伏输出电路中存在绝缘阻抗异常的光伏子阵包括:In one of the embodiments, controlling the turn-on or disconnection of the second controllable switch in the BOOST switch circuit, and determining that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit includes:

依次控制所述光伏子阵所对应的所述第二可控开关导通,并根据公共地对所述光伏输出电路的输出负极的电压,判断对应的所述光伏子阵是否存在绝缘阻抗异常。Controlling the second controllable switch corresponding to the photovoltaic sub-array to turn on sequentially, and judging whether the corresponding photovoltaic sub-array has abnormal insulation resistance according to the voltage of the common ground to the negative output pole of the photovoltaic output circuit.

在其中一个实施例中,若所述公共地对所述光伏输出电路的输出负极的电压保持不变,则不是所述光伏子阵的输入出现对地绝缘阻抗异常的组件;否则所述光伏子阵输入阻抗异常。In one of the embodiments, if the voltage of the common ground to the negative output pole of the photovoltaic output circuit remains unchanged, it is not the component whose input of the photovoltaic sub-array has abnormal insulation resistance to ground; otherwise, the photovoltaic sub-array The array input impedance is abnormal.

在其中一个实施例中,在泄放所述光伏输出电路所输出的电能之后,还包括,In one of the embodiments, after discharging the electric energy output by the photovoltaic output circuit, it further includes,

当所述光伏输出电路的输出正极与所述光伏输出电路的输出负极恢复到原始电压时,将所述泄放电路的第三可控开关断开,停止能量的消耗。When the output positive pole of the photovoltaic output circuit and the output negative pole of the photovoltaic output circuit return to the original voltage, the third controllable switch of the discharge circuit is turned off to stop energy consumption.

在其中一个实施例中,获取各光伏子阵的最大功率点功率,基于所述各光伏子阵的最大功率点功率判断是否满足并网输出的需求。In one embodiment, the maximum power point power of each photovoltaic sub-array is obtained, and based on the maximum power point power of each photovoltaic sub-array, it is judged whether the requirement for grid-connected output is met.

第二方面,本申请还提供了一种光伏逆变系统的绝缘阻抗检测电路。所述电路包括:所述光伏逆变系统包括光伏输出电路以及与所述光伏输出电路连接的BOOST开关电路,其特征在于,所述绝缘阻抗检测电路包括与所述光伏输出电路连接的检测子电路、与所述光伏输出电路连接的泄放电路、以及与所述BOOST开关电路、所述检测子电路以及所述泄放电路连接的控制单元;其中,所述控制单元用于:In a second aspect, the present application also provides an insulation resistance detection circuit of a photovoltaic inverter system. The circuit includes: the photovoltaic inverter system includes a photovoltaic output circuit and a BOOST switch circuit connected to the photovoltaic output circuit, wherein the insulation resistance detection circuit includes a detection sub-circuit connected to the photovoltaic output circuit , a discharge circuit connected to the photovoltaic output circuit, and a control unit connected to the BOOST switch circuit, the detection sub-circuit and the discharge circuit; wherein the control unit is used for:

控制所述检测子电路中的第一可控开关的导通或断开,判断所述光伏输出电路中的光伏方阵的绝缘阻抗是否正常;Controlling the conduction or disconnection of the first controllable switch in the detection sub-circuit, and judging whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal;

在绝缘阻抗异常的情况下,控制所述BOOST开关电路中的第二可控开关的导通或断开,确定所述光伏输出电路中存在绝缘阻抗异常的光伏子阵;In the case of abnormal insulation resistance, control the conduction or disconnection of the second controllable switch in the BOOST switch circuit, and determine that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit;

在控制第二可控开关断开的同时,控制所述泄放电路中的第三可控开关导通,以泄放所述光伏输出电路所输出的电能。When the second controllable switch is controlled to be turned off, the third controllable switch in the discharge circuit is controlled to be turned on, so as to discharge the electric energy output by the photovoltaic output circuit.

在其中一个实施例中,所述检测子电路包括测试电阻R1、R2、R3、R4以及第一可控开关S1、S2;In one of the embodiments, the detection sub-circuit includes test resistors R1, R2, R3, R4 and first controllable switches S1, S2;

所述测试电阻R3与所述第一可控开关S1并联后,与所述测试电阻R2串联,串联后电路的输入端接所述光伏输出电路的输出正极,输出端接公共地;After the test resistor R3 is connected in parallel with the first controllable switch S1, it is connected in series with the test resistor R2, after the circuit is connected in series, the input terminal of the circuit is connected to the positive output pole of the photovoltaic output circuit, and the output terminal is connected to the common ground;

所述测试电阻R4与所述第一可控开关S2并联后,与所述测试电阻R1串联,串联后电路的输入端接所述公共地,输出端接所诉光伏输出电路的输出负极。After the test resistor R4 is connected in parallel with the first controllable switch S2, it is connected in series with the test resistor R1. After the circuit is connected in series, the input terminal of the circuit is connected to the common ground, and the output terminal is connected to the output cathode of the photovoltaic output circuit.

在其中一个实施例中,所述泄放电路包括泄放电阻Rd以及所述第三可控开关Qd;In one of the embodiments, the bleeder circuit includes a bleeder resistor Rd and the third controllable switch Qd;

所述泄放电阻Rd与所述第三可控开关Qd串联,串联后的电路并联在所述光伏输出电路的输出正极与所述光伏输出电路的输出负极上,输入端接所述光伏输出电路的输出正极,输出端接所述光伏输出电路的输出负极。The bleeder resistor Rd is connected in series with the third controllable switch Qd, the series connected circuit is connected in parallel to the positive output pole of the photovoltaic output circuit and the negative output pole of the photovoltaic output circuit, and the input terminal is connected to the photovoltaic output circuit The output positive pole of the photovoltaic output circuit is connected to the output negative pole of the photovoltaic output circuit.

上述光伏逆变系统的绝缘阻抗检测方法、电路,首先通过控制单元控制检测子电路,判断光伏输出电路的绝缘阻抗是否正常;若绝缘阻抗异常,则控制BOOST开关电路,确定光伏输出电路中存在绝缘阻抗异常的光伏子电路;而在控制BOOST开关电路的同时,控制泄放电路,用来泄放BOOST开关电路导通或断开过程光伏输出电路输出的电能,确保了在绝缘阻抗检测过程中,光伏输出电路上的器件不会因为过压而产生器件损坏。The insulation resistance detection method and circuit of the above-mentioned photovoltaic inverter system firstly control the detection sub-circuit through the control unit to judge whether the insulation resistance of the photovoltaic output circuit is normal; if the insulation resistance is abnormal, then control the BOOST switch circuit to determine whether there is insulation resistance in the photovoltaic output circuit The photovoltaic sub-circuit with abnormal impedance; while controlling the BOOST switch circuit, it also controls the discharge circuit, which is used to discharge the electric energy output by the photovoltaic output circuit during the conduction or disconnection of the BOOST switch circuit, ensuring that during the insulation resistance detection process, Devices on the photovoltaic output circuit will not be damaged due to overvoltage.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only It is an embodiment of the present invention, and those skilled in the art can also obtain other drawings according to the provided drawings without creative work.

图1为光伏逆变系统的结构示意图;Figure 1 is a schematic structural diagram of a photovoltaic inverter system;

图2为绝缘阻抗检测电路的结构示意图;Fig. 2 is a structural schematic diagram of an insulation resistance detection circuit;

图3为光伏逆变系统的绝缘阻抗检测方法的流程图;Fig. 3 is the flowchart of the insulation resistance detection method of photovoltaic inverter system;

图4为计算光伏逆变系统的光伏方阵绝缘阻抗的流程图;Fig. 4 is the flowchart of calculating the insulation resistance of the photovoltaic array of the photovoltaic inverter system;

图5为一个实施例中检测光伏输出功率是否满足并网输出的弱光检测流程图;Fig. 5 is a low-light detection flowchart for detecting whether the photovoltaic output power meets grid-connected output in an embodiment;

图6为一个示例实施例中绝缘阻抗检测电路的电路图;6 is a circuit diagram of an insulation resistance detection circuit in an exemplary embodiment;

图7为一个实施例中检测PV1支路绝缘阻抗的电路图;Fig. 7 is a circuit diagram for detecting PV1 branch insulation resistance in an embodiment;

图8为一个实施例中检测PV2支路绝缘阻抗的电路图;Fig. 8 is a circuit diagram for detecting PV2 branch insulation resistance in an embodiment;

图9为一个实施例中检测PV3支路绝缘阻抗的电路图。Fig. 9 is a circuit diagram of detecting PV3 branch insulation resistance in an embodiment.

具体实施方式detailed description

为了使本申请的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本申请进行描述和说明。应当理解,此处所描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。基于本申请提供的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都属于本申请保护的范围。此外,还可以理解的是,虽然这种开发过程中所作出的努力可能是复杂并且冗长的,然而对于与本申请公开的内容相关的本领域的普通技术人员而言,在本申请揭露的技术内容的基础上进行的一些设计,制造或者生产等变更只是常规的技术手段,不应当理解为本申请公开的内容不充分。In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the protection scope of the present application. In addition, it can also be understood that although such development efforts may be complex and lengthy, for those of ordinary skill in the art relevant to the content disclosed in this application, the technology disclosed in this application Some design, manufacturing or production changes based on the content are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

在本申请中提及“实施例”意味着,结合实施例描述的特定特征、结构或特性可以包含在本申请的至少一个实施例中。在说明书中的各个位置出现该短语并不一定均是指相同的实施例,也不是与其它实施例互斥的独立的或备选的实施例。本领域普通技术人员显式地和隐式地理解的是,本申请所描述的实施例在不冲突的情况下,可以与其它实施例相结合。Reference in this application to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present application. The occurrences of this phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is understood explicitly and implicitly by those of ordinary skill in the art that the embodiments described in this application can be combined with other embodiments without conflict.

除非另作定义,本申请所涉及的技术术语或者科学术语应当为本申请所属技术领域内具有一般技能的人士所理解的通常意义。本申请所涉及的“一”、“一个”、“一种”、“该”等类似词语并不表示数量限制,可表示单数或复数。本申请所涉及的术语“包括”、“包含”、“具有”以及它们任何变形,意图在于覆盖不排他的包含;例如包含了一系列步骤或模块(单元)的过程、方法、系统、产品或设备没有限定于已列出的步骤或单元,而是可以还包括没有列出的步骤或单元,或可以还包括对于这些过程、方法、产品或设备固有的其它步骤或单元。本申请所涉及的“连接”、“相连”、“耦接”等类似的词语并非限定于物理的或者机械的连接,而是可以包括电气的连接,不管是直接的还是间接的。本申请所涉及的“多个”是指大于或者等于两个。“和/或”描述关联对象的关联关系,表示可以存在三种关系,例如,“A和/或B”可以表示:单独存在A,同时存在A和B,单独存在B这三种情况。本申请所涉及的术语“第一”、“第二”、“第三”等仅仅是区别类似的对象,不代表针对对象的特定排序。Unless otherwise defined, the technical terms or scientific terms involved in the application shall have the usual meanings understood by those with ordinary skill in the technical field to which the application belongs. Words such as "a", "an", "an" and "the" involved in this application do not indicate a limitation on quantity, and may indicate singular or plural numbers. The terms "comprising", "comprising", "having" and any variations thereof involved in this application are intended to cover non-exclusive inclusion; for example, a process, method, system, product or process that includes a series of steps or modules (units). The apparatus is not limited to the listed steps or units, but may further include steps or units not listed, or may further include other steps or units inherent to the process, method, product or apparatus. The words "connected", "connected", "coupled" and similar words mentioned in this application are not limited to physical or mechanical connection, but may include electrical connection, no matter it is direct or indirect. "Multiple" referred to in the present application means greater than or equal to two. "And/or" describes the association relationship of associated objects, indicating that there may be three types of relationships. For example, "A and/or B" may indicate: A exists alone, A and B exist simultaneously, and B exists independently. The terms "first", "second", "third" and the like involved in this application are only used to distinguish similar objects, and do not represent a specific ordering of objects.

图1为光伏逆变系统的结构示意图。如图1所示,光伏逆变系统包括光伏输出电路101以及与光伏输出电路连接的BOOST开关电路102。图2为绝缘阻抗检测电路的结构示意图,其中,绝缘阻抗检测电路包括与光伏输出电路连接的检测子电路103、与光伏输出电路连接的泄放电路104。本申请实施例提供的光伏逆变系统的绝缘阻抗检测方法,可以应用于如图2所示的电路环境中。Figure 1 is a schematic structural diagram of a photovoltaic inverter system. As shown in FIG. 1 , the photovoltaic inverter system includes a photovoltaic output circuit 101 and a BOOST switch circuit 102 connected to the photovoltaic output circuit. 2 is a schematic structural diagram of an insulation resistance detection circuit, wherein the insulation resistance detection circuit includes a detection sub-circuit 103 connected to the photovoltaic output circuit, and a discharge circuit 104 connected to the photovoltaic output circuit. The insulation resistance detection method of the photovoltaic inverter system provided in the embodiment of the present application can be applied in the circuit environment as shown in FIG. 2 .

与BOOST开关电路102、检测子电路103以及泄放电路104连接的控制单元用于执行如下绝缘阻抗检测的方法。如图3,该光伏逆变系统的绝缘阻抗检测方法包括:The control unit connected to the BOOST switch circuit 102 , the detection sub-circuit 103 and the discharge circuit 104 is used to perform the following insulation resistance detection method. As shown in Figure 3, the insulation resistance detection method of the photovoltaic inverter system includes:

S101、控制检测子电路中的第一可控开关的导通或断开,判断光伏输出电路中的光伏方阵的绝缘阻抗是否正常。S101. Control the on or off of the first controllable switch in the detection sub-circuit, and judge whether the insulation resistance of the photovoltaic square array in the photovoltaic output circuit is normal.

控制检测子电路103上的第一可控开关的导通或断开,使电路上的测试电阻的阻值发生改变,根据基尔霍夫电流定律得到测试电阻阻值发生改变时回路电流的公式组,通过对公式组的计算,得到光伏输出电路的绝缘阻抗的并联值。根据并联值判断光伏输出电路中光伏方阵的绝缘阻抗是否正常。Control the conduction or disconnection of the first controllable switch on the detection sub-circuit 103, so that the resistance value of the test resistor on the circuit changes, and obtain the formula of the loop current when the resistance value of the test resistor changes according to Kirchhoff's current law Group, through the calculation of the formula group, the parallel value of the insulation resistance of the photovoltaic output circuit is obtained. Judging whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal or not according to the parallel connection value.

S102、在绝缘阻抗异常的情况下,控制BOOST开关电路中的第二可控开关的导通或断开,确定光伏输出电路中存在绝缘阻抗异常的光伏子阵。S102. In the case of abnormal insulation resistance, control the second controllable switch in the BOOST switch circuit to turn on or off, and determine that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit.

逐一控制各个BOOST开关电路102中的第二可控开关的导通或断开,在检测某一光伏子阵时,将其对应的第二可控开关导通,其余的第二可控开关断开,判断公共地端对光伏输出电路101的输出负极的电压是否保持不变,可以定位出哪一路光伏子阵出现绝缘阻抗异常的情况。Control the on or off of the second controllable switch in each BOOST switch circuit 102 one by one, when detecting a certain photovoltaic sub-array, turn on the corresponding second controllable switch, and turn off the other second controllable switches On, to determine whether the voltage of the common ground terminal to the output negative electrode of the photovoltaic output circuit 101 remains unchanged, and to locate which photovoltaic sub-array has abnormal insulation resistance.

S103、在控制第二可控开关断开时,控制泄放电路中的第三可控开关导通,以泄放光伏输出电路所输出的电能。S103. When controlling the second controllable switch to be turned off, control the third controllable switch in the discharge circuit to be turned on, so as to discharge the electric energy output by the photovoltaic output circuit.

当第二可控开关由闭合状态到断开状态的过程中,存储在电感上的能量释放,电流将从二极管流入光伏输出电路的母线上,此时将并联在母线上的泄放电路的第三可控开关导通,将原本全部流入母线的电流一分为二,部分电流流入泄放电路,通过泄放电路泄放掉多余的能量。When the second controllable switch is from the closed state to the open state, the energy stored in the inductance is released, and the current will flow from the diode to the busbar of the photovoltaic output circuit. The three controllable switches are turned on, which divides all the current flowing into the bus bar into two, and part of the current flows into the discharge circuit, and the excess energy is released through the discharge circuit.

在上述方法中,由于第二可控开关管的断开,会使电感释放的能量转化为电流,全部流入光伏输出电路的母线上,使母线上的器件过压而产生损坏,所以通过泄放电路分走泄放掉多余的电压,使得母线上的电压维持正常状态,保护光伏输出电路上的器件不受损。In the above method, due to the disconnection of the second controllable switch tube, the energy released by the inductance will be converted into current, which will all flow into the busbar of the photovoltaic output circuit, causing damage to the devices on the busbar due to overvoltage. The circuit divides the leakage to release the excess voltage, so that the voltage on the bus is maintained in a normal state, and the devices on the photovoltaic output circuit are not damaged.

在一些实施例中,如图4所示,控制检测子电路中的第一可控开关的导通或断开,判断光伏输出电路中的光伏方阵的绝缘阻抗是否正常包括:In some embodiments, as shown in FIG. 4 , controlling whether the first controllable switch in the detection sub-circuit is turned on or off, and judging whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal includes:

S201、控制检测子电路中的第一可控开关的导通或断开,获得光伏输出电路的输出正极与公共地之间的第一并联阻抗以及光伏输出电路的输出负极与公共地之间的第二并联阻抗。S201. Control the on or off of the first controllable switch in the detection sub-circuit to obtain the first parallel impedance between the output positive pole of the photovoltaic output circuit and the common ground and the first parallel impedance between the output negative pole of the photovoltaic output circuit and the common ground. second parallel impedance.

第一可控开关导通或者断开时,并入电路的测试电阻的阻值的不同,得到不同阻值情况下的电流公式。根据不同阻值情况下的电流公式,组成公式组,通过公式组内部的计算,得到第一并联阻抗与第二并联阻抗。When the first controllable switch is turned on or off, the resistance value of the test resistor incorporated into the circuit is different, and the current formula under different resistance values is obtained. According to the current formulas under different resistance conditions, a formula group is formed, and the first parallel impedance and the second parallel impedance are obtained through the calculation inside the formula group.

S202、获取第一并联阻抗与第二并联阻抗的并联值。S202. Obtain a parallel connection value of the first parallel impedance and the second parallel impedance.

将第一并联阻抗与第二并联阻抗进行并联阻抗计算,得到并联值。Perform parallel impedance calculation on the first parallel impedance and the second parallel impedance to obtain a parallel value.

S203、基于并联值判断光伏输出电路中光伏方阵的绝缘阻抗是否正常。S203. Determine whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal based on the parallel connection value.

若并联值小于设定阈值时,绝缘阻抗异常;反之,则绝缘阻抗正常。If the parallel connection value is less than the set threshold, the insulation resistance is abnormal; otherwise, the insulation resistance is normal.

其中,若得到的并联值小于光伏输出电路的最大输入电压比上30mA(光伏并网逆变器的基本要求),绝缘阻抗异常。Among them, if the obtained parallel value is less than the maximum input voltage of the photovoltaic output circuit than 30mA (the basic requirement of the photovoltaic grid-connected inverter), the insulation resistance is abnormal.

在步骤S201至步骤S203中,通过第一可控制开关的导通或断开,获得第一并联阻抗与第二并联阻抗的并联值,并根据并联值判断光伏方阵的绝缘阻抗是否异常,实现了在光伏并网前对光伏方阵是否存在绝缘阻抗异常的检测,避免绝缘阻抗异常影响光伏系统的安全。From step S201 to step S203, by turning on or off the first controllable switch, the parallel connection value of the first parallel impedance and the second parallel impedance is obtained, and according to the parallel value, it is judged whether the insulation resistance of the photovoltaic array is abnormal, realizing It detects whether there is abnormal insulation resistance in the photovoltaic array before the photovoltaic grid is connected, and avoids the abnormal insulation resistance from affecting the safety of the photovoltaic system.

在一些实施例中,控制BOOST开关电路102中的第二可控开关的断开或导通,确定光伏输出电路中存在绝缘阻抗异常的光伏子阵包括:In some embodiments, controlling the disconnection or conduction of the second controllable switch in the BOOST switch circuit 102, and determining that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit includes:

依次控制光伏子阵所对应的第二可控开关导通,并根据公共地对光伏输出电路的输出负极的电压,判断对应的光伏子阵是否存在绝缘阻抗异常。Sequentially control the second controllable switch corresponding to the photovoltaic sub-array to be turned on, and judge whether the corresponding photovoltaic sub-array has abnormal insulation resistance according to the voltage of the common ground to the output negative pole of the photovoltaic output circuit.

在上述实施例中,通过依次对光伏方阵的所有光伏子阵进行绝缘阻抗异常判断,提高了绝缘阻抗检测的准确性。In the above embodiment, the accuracy of insulation resistance detection is improved by sequentially performing insulation resistance abnormality judgment on all photovoltaic sub-arrays of the photovoltaic array.

在一些实施例中,若公共地对光伏输出电路的输出负极的电压保持不变,则不是此光伏子阵的输入出现对地绝缘阻抗异常的组件;否则此光伏子阵对地绝缘阻抗存在异常。In some embodiments, if the voltage of the common ground to the output cathode of the photovoltaic output circuit remains unchanged, it is not the component whose input of the photovoltaic sub-array has an abnormal insulation resistance to the ground; otherwise, the photovoltaic sub-array has an abnormal insulation resistance to the ground .

在一些实施例中,在泄放光伏输出电路所输出的电能之后,还包括:In some embodiments, after discharging the electric energy output by the photovoltaic output circuit, it also includes:

当光伏输出电路的输出正极与光伏输出电路的输出负极恢复到原始电压时,将泄放电路的第三可控开关断开,停止能量的消耗。When the output positive pole of the photovoltaic output circuit and the output negative pole of the photovoltaic output circuit return to the original voltage, the third controllable switch of the discharge circuit is turned off to stop energy consumption.

在上述实施例中,光伏输出电路的正负极电压在恢复到原始电压后,将第三可控开关断开,停止能量的消耗,既使得光伏逆变系统产生的能量不被浪费,又泄放掉由第二可控开关产生的多余的能量,保护了光伏逆变系统的光伏输出电路正负极间连接的电路以及电路器件不受损坏。In the above embodiment, after the positive and negative pole voltages of the photovoltaic output circuit return to the original voltage, the third controllable switch is turned off to stop energy consumption, so that the energy generated by the photovoltaic inverter system is not wasted and leaked. The redundant energy generated by the second controllable switch is discharged, and the circuit connected between the positive and negative poles of the photovoltaic output circuit of the photovoltaic inverter system and the circuit components are protected from damage.

在一个实施例中,如图5所示提供了一种检测光伏输出功率是否满足并网输出的弱光检测方法,以该方法应用于图2中的结构为例进行说明,包括以下步骤:In one embodiment, as shown in Figure 5, a weak light detection method for detecting whether the photovoltaic output power meets the grid-connected output is provided, and the application of the method to the structure in Figure 2 is used as an example for illustration, including the following steps:

计算各光伏子阵的最大功率点功率,基于各光伏子阵的最大功率点功率,判断是否满足并网输出的需求。Calculate the maximum power point power of each photovoltaic sub-array, and judge whether it meets the requirements of grid-connected output based on the maximum power point power of each photovoltaic sub-array.

在执行步骤S101的控制检测子电路的第一可控开关的导通或断开,判断光伏输出电路中光伏方阵的绝缘阻抗是否正常以及步骤S102当绝缘阻抗异常时,控制BOOST开关电路的第二可控开关的导通或断开,确定光伏输出电路中存在的绝缘阻抗异常的光伏子阵之后,执行步骤S301。In performing step S101, the first controllable switch of the control detection sub-circuit is turned on or off, and it is judged whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit is normal, and in step S102, when the insulation resistance is abnormal, control the first control of the BOOST switch circuit. Step S301 is performed after the controllable switch is turned on or off, and after the photovoltaic sub-arrays with abnormal insulation resistance in the photovoltaic output circuit are determined.

S301、计算各光伏子阵所在的支路的最大功率点功率。S301. Calculate the maximum power point power of the branch where each photovoltaic sub-array is located.

具体地,当某一光伏子阵所对应的第二可控开关导通,其余第二可控开关断开时,此时该光伏子阵的电池板输出短路,电压为0,电流最大,通过电流表读得此时的短路电流,再根据开路电压,就可以计算出该光伏子阵的最大功率点功率。Specifically, when the second controllable switch corresponding to a photovoltaic sub-array is turned on, and the other second controllable switches are turned off, the output of the battery panel of the photovoltaic sub-array is short-circuited at this time, the voltage is 0, and the current is the largest. The ammeter reads the short-circuit current at this time, and then according to the open-circuit voltage, the maximum power point power of the photovoltaic sub-array can be calculated.

S302、将所有光伏支路的最大功率点功率求和,得到光伏输出电路101的最大总功率。S302 , summing the maximum power point powers of all photovoltaic branches to obtain the maximum total power of the photovoltaic output circuit 101 .

S303、判断最大总功率是否满足并网输出的需求。S303. Determine whether the maximum total power satisfies the requirement for grid-connected output.

其中,并网输出的需求是由光伏方阵的光伏子阵数量确定的固定值。Among them, the demand for grid-connected output is a fixed value determined by the number of photovoltaic sub-arrays in the photovoltaic square array.

具体的,当最大总功率大于并网输出的需求时,就可以进行光伏并网的输出;当最大总功率小于并网输出的需求时,则不进行光伏并网的输出,并且可以判断此时为弱光条件。Specifically, when the maximum total power is greater than the demand for grid-connected output, photovoltaic grid-connected output can be performed; when the maximum total power is less than the demand for grid-connected output, photovoltaic grid-connected output will not be performed, and it can be judged that for low light conditions.

上述检测光伏输出功率是否满足并网输出的弱光检测方法中,通过计算各个光伏支路的最大功率点功率,得到光伏输出电路的最大总功率,判断最大总功率是否满足并网输出的需求,若不满足,可知此时处于弱光条件下。因为光伏组件受光照条件的影响非常大,特别是在早上和晚上太阳光比较弱的时候,如果光伏组件的输出电压较高,则能满足并网需求,如果能量非常弱,则会引起逆变器内部的继电器来回切断,进而影响继电器的使用寿命。因此在并网前进行弱光检测,可以让逆变器在弱光条件下待机,降低了功率继电器的故障率。In the above weak light detection method for detecting whether the photovoltaic output power meets the grid-connected output, the maximum total power of the photovoltaic output circuit is obtained by calculating the maximum power point power of each photovoltaic branch, and it is judged whether the maximum total power meets the requirements of the grid-connected output. If it is not satisfied, it can be known that it is under low-light conditions at this time. Because photovoltaic modules are greatly affected by lighting conditions, especially when the sun is weak in the morning and evening, if the output voltage of photovoltaic modules is high, it can meet the grid-connection requirements; if the energy is very weak, it will cause inverter The relay inside the device will be cut off back and forth, which will affect the service life of the relay. Therefore, performing low-light detection before grid connection can make the inverter stand by under low-light conditions, reducing the failure rate of power relays.

在一示例实施例中,如图6所示,光伏输出电路101包括光伏子阵PV1、PV2、PV3,在各个光伏子阵上分别串联BOOST开关电路102的电感L1、L2、L3以及二极管D1、D2、D3,第二可控开关Q1、Q2、Q3的输入端连接对应的光伏子阵PV1、PV2、PV3,输出端连接光伏输出电路101的输出负极BUS-。绝缘阻抗电路包括检测子电路103以及泄放电路104,检测子电路103包括测试电阻和第一可控开关,泄放电路104包括泄放电阻和第三可控开关。In an exemplary embodiment, as shown in FIG. 6 , the photovoltaic output circuit 101 includes photovoltaic sub-arrays PV1, PV2, and PV3, and inductors L1, L2, L3 and diodes D1, L3, and diodes D1, D2 , D3 , the input ends of the second controllable switches Q1 , Q2 , Q3 are connected to the corresponding photovoltaic sub-arrays PV1 , PV2 , PV3 , and the output ends are connected to the output negative electrode BUS− of the photovoltaic output circuit 101 . The insulation resistance circuit includes a detection sub-circuit 103 and a discharge circuit 104, the detection sub-circuit 103 includes a test resistor and a first controllable switch, and the discharge circuit 104 includes a discharge resistor and a third controllable switch.

假设光伏子阵PV1正对地的绝缘阻抗为Riso1,光伏子阵PV2正对地的绝缘阻抗为Riso2,光伏子阵PV3正对地的绝缘阻抗为Riso3,光伏输出电路的负对地的绝缘阻抗为Risoy。Assume that the insulation resistance of photovoltaic sub-array PV1 to ground is Riso1, the insulation resistance of photovoltaic sub-array PV2 to ground is Riso2, the insulation resistance of photovoltaic sub-array PV3 to ground is Riso3, and the insulation resistance of photovoltaic output circuit negative to ground is Riso2. For Risoy.

根据基尔霍夫电流定律,将第一可控开关S1、S2都断开,此时公共地端对光伏输出电路101的输出负极的电压为VE1,回路中流经绝缘阻抗Riso1、Riso2、Riso3以及测试电阻R2、R3的电流之和等于流经绝缘阻抗Risoy以及测试电阻R1、R4的电流之和,得到下列公式(1):According to Kirchhoff's current law, both the first controllable switches S1 and S2 are turned off. At this time, the voltage of the common ground terminal to the output negative pole of the photovoltaic output circuit 101 is V E1 , and the insulation resistance Riso1, Riso2, and Riso3 flow through the circuit. And the sum of the currents of the test resistors R2, R3 is equal to the sum of the currents flowing through the insulation resistance Risoy and the test resistors R1, R4, and the following formula (1) is obtained:

Figure BDA0003793755840000091
Figure BDA0003793755840000091

根据基尔霍夫电流定律,将第一可控开关S1闭合,第一可控开关S2断开,此时此时公共地端对光伏输出电路101的输出负极的电压为VE2,回路中流经绝缘阻抗Riso1、Riso2、Riso3以及测试电阻R2的电流之和等于流经绝缘阻抗Risoy以及测试电阻R1、R4的电流之和,得到下列公式(2):According to Kirchhoff's current law, the first controllable switch S1 is closed, and the first controllable switch S2 is opened. At this time, the voltage of the common ground terminal to the output negative pole of the photovoltaic output circuit 101 is V E2 , and the loop flows through The sum of the currents of the insulation resistance Riso1, Riso2, Riso3 and the test resistor R2 is equal to the sum of the currents flowing through the insulation resistance Risoy and the test resistors R1 and R4, and the following formula (2) is obtained:

Figure BDA0003793755840000092
Figure BDA0003793755840000092

根据基尔霍夫电流定律,将第一可控开关S1、S2都闭合,此时公共地端对光伏输出电路101的输出负极的电压为VE3,回路中流经绝缘阻抗Riso1、Riso2、Riso3以及测试电阻R2的电流之和等于流经绝缘阻抗Risoy以及测试电阻R1的电流之和,得到下列公式(3):According to Kirchhoff's current law, both the first controllable switches S1 and S2 are closed. At this time, the voltage of the common ground terminal to the output negative electrode of the photovoltaic output circuit 101 is V E3 , and the insulation resistance Riso1, Riso2, Riso3 and The sum of the currents of the test resistor R2 is equal to the sum of the currents flowing through the insulation resistance Risoy and the test resistor R1, and the following formula (3) is obtained:

Figure BDA0003793755840000093
Figure BDA0003793755840000093

根据基尔霍夫电流定律,将第一可控开关S1断开、S2闭合,此时公共地端对光伏输出电路101的输出负极的电压为VE4,回路中流经绝缘阻抗Riso1、Riso2、Riso3以及测试电阻R2、R3的电流之和等于流经绝缘阻抗Risoy以及测试电阻R1的电流之和,得到下列公式(4):According to Kirchhoff's current law, the first controllable switch S1 is opened and S2 is closed. At this time, the voltage of the common ground terminal to the output negative pole of the photovoltaic output circuit 101 is V E4 , and the insulation resistance Riso1, Riso2, and Riso3 flow through the circuit. And the sum of the currents of the test resistors R2 and R3 is equal to the sum of the currents flowing through the insulation resistance Risoy and the test resistor R1, and the following formula (4) is obtained:

Figure BDA0003793755840000094
Figure BDA0003793755840000094

根据上述得到公式,联立公式组,计算出光伏输出电路101的并联绝缘阻抗的并联值为:According to the formula obtained above, the parallel connection value of the parallel connection insulation resistance of the photovoltaic output circuit 101 is calculated as follows:

公式(1)减公式(2)得到结果(5):Subtract formula (2) from formula (1) to get result (5):

Figure BDA0003793755840000101
Figure BDA0003793755840000101

公式(3)减公式(4)得到结果(6):Subtract formula (4) from formula (3) to get result (6):

Figure BDA0003793755840000102
Figure BDA0003793755840000102

若得到的并联值小于光伏输出电路的最大输入电压比上30mA(光伏并网逆变器的标准要求),则绝缘阻抗异常。此时的判断结果为否,执行步骤S102。If the obtained parallel value is less than the maximum input voltage ratio of the photovoltaic output circuit by 30mA (the standard requirement of the photovoltaic grid-connected inverter), the insulation resistance is abnormal. At this time, the judgment result is negative, and step S102 is executed.

步骤S102、在绝缘阻抗异常的情况下,控制BOOST开关电路102中的第二可控开关的导通或断开,确定光伏输出电路中存在绝缘阻抗异常的光伏子阵。Step S102 , in the case of abnormal insulation resistance, turn on or off the second controllable switch in the BOOST switch circuit 102 , and determine that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit.

如图7所示,将BOOST开关电路102的第二可控开关Q1闭合,Q2、Q3断开,若此时公共地端对光伏输出电路101的输出负极电压保持不变,则不是光伏子阵PV1路出现对地绝缘阻抗异常,否则,光伏子阵PV1路存在对地绝缘阻抗异常。As shown in Figure 7, the second controllable switch Q1 of the BOOST switch circuit 102 is closed, and Q2 and Q3 are opened. If the output negative voltage of the common ground terminal to the photovoltaic output circuit 101 remains unchanged at this time, it is not a photovoltaic sub-array PV1 has an abnormal ground insulation resistance, otherwise, PV sub-array PV1 has abnormal ground insulation resistance.

此时,光伏子阵PV1电池板输出短路,电压为0,电流最大,通过电流表A1获得此时的短路电流I1,根据开路电压VPV1,计算光伏子阵PV1的最大功率点功率。At this time, the photovoltaic sub-array PV1 panel output is short-circuited, the voltage is 0, and the current is the maximum. The short-circuit current I1 at this time is obtained through the ammeter A1, and the maximum power point power of the photovoltaic sub-array PV1 is calculated according to the open-circuit voltage V PV1 .

如图8所示,将BOOST开关电路102的第二可控开关Q2闭合,Q1、Q3断开,若此时公共地端对光伏输出电路101的输出负极电压保持不变,则不是光伏子阵PV2路出现对地绝缘阻抗异常,否则,光伏子阵PV2路出现对地绝缘阻抗异常。As shown in Figure 8, the second controllable switch Q2 of the BOOST switch circuit 102 is closed, and Q1 and Q3 are opened. If the output negative voltage of the common ground terminal to the photovoltaic output circuit 101 remains unchanged at this time, it is not a photovoltaic sub-array There is an abnormal insulation resistance to the ground of the PV2 circuit, otherwise, the PV2 circuit of the photovoltaic sub-array has an abnormal insulation resistance to the ground.

此时,光伏子阵PV2电池板输出短路,电压为0,电流最大,通过电流表A2获得此时的短路电流I2,根据开路电压VPV2,计算光伏子阵PV2的最大功率点功率。At this time, the output of the photovoltaic sub-array PV2 panel is short-circuited, the voltage is 0, and the current is the maximum. The short-circuit current I2 at this time is obtained through the ammeter A2, and the maximum power point power of the photovoltaic sub-array PV2 is calculated according to the open-circuit voltage V PV2 .

如图9所示,将BOOST开关电路102的第二可控开关Q3闭合,Q1、Q2断开,若此时公共地端对光伏输出电路101的输出负极电压保持不变,则不是光伏子阵PV3路出现对地绝缘阻抗异常,否则,光伏子阵PV3路出现对地绝缘阻抗异常。As shown in Figure 9, the second controllable switch Q3 of the BOOST switch circuit 102 is closed, and Q1 and Q2 are opened. If the output negative voltage of the common ground terminal to the photovoltaic output circuit 101 remains unchanged at this time, it is not a photovoltaic sub-array There is an abnormal insulation resistance to the ground of the PV3 circuit, otherwise, the PV3 circuit of the photovoltaic sub-array has an abnormal insulation resistance to the ground.

此时,光伏子阵PV3电池板输出短路,电压为0,电流最大,通过电流表A3获得此时的短路电流I3,根据开路电压VPV3,计算光伏子阵PV3的最大功率点功率。At this time, the photovoltaic sub-array PV3 panel output is short-circuited, the voltage is 0, and the current is the maximum. The short-circuit current I3 at this time is obtained through the ammeter A3, and the maximum power point power of the photovoltaic sub-array PV3 is calculated according to the open-circuit voltage V PV3 .

当对某一路的光伏子阵的绝缘阻抗是否出现异常判断结束时,需要将对应的第二可控制开关由闭合状态调整为断开状态,此时执行步骤S103。When the judgment of whether the insulation resistance of the photovoltaic sub-array of a certain path is abnormal is completed, the corresponding second controllable switch needs to be adjusted from the closed state to the open state, and step S103 is executed at this time.

步骤S103、在控制第二可控开关断开时,控制泄放电路104中的第三可控开关导通,以泄放光伏输出电路所输出的电能。Step S103 , when the second controllable switch is controlled to be turned off, the third controllable switch in the discharge circuit 104 is controlled to be turned on, so as to discharge the electric energy output by the photovoltaic output circuit.

如图7所示,当第二可控开关Q1由闭合状态到断开状态过程中,原本流经Q1的电流将从二极管D1流入光伏输出电路的母线上,此时将并联在母线上的泄放电路104中的第三可控开关导通,原本流经母线的电流就会部分流入泄放电路,让泄放电阻Rd承载多余的电压,当母线上的电压恢复到正常状态时,令第三可控开关断开。As shown in Figure 7, when the second controllable switch Q1 changes from the closed state to the open state, the current flowing through Q1 will flow from the diode D1 into the busbar of the photovoltaic output circuit, and at this time, the leakage current on the busbar will be connected in parallel. The third controllable switch in the discharge circuit 104 is turned on, and the current originally flowing through the bus will partially flow into the discharge circuit, allowing the discharge resistor Rd to carry the excess voltage. When the voltage on the bus returns to a normal state, the first Three controllable switches are disconnected.

如图8所示,当第二可控开关Q2由闭合状态到断开状态过程中,原本流经Q2的电流将从二极管D2流入光伏输出电路的母线上,此时将并联在母线上的泄放电路104中的第三可控开关导通,原本流经母线的电流就会部分流入泄放电路,让泄放电阻Rd承载多余的电压,当母线上的电压恢复到正常状态时,令第三可控开关断开。As shown in Figure 8, when the second controllable switch Q2 is from the closed state to the open state, the current flowing through Q2 will flow from the diode D2 into the busbar of the photovoltaic output circuit, and at this time the leakage current on the busbar will be connected in parallel. The third controllable switch in the discharge circuit 104 is turned on, and the current originally flowing through the bus will partially flow into the discharge circuit, allowing the discharge resistor Rd to carry the excess voltage. When the voltage on the bus returns to a normal state, the first Three controllable switches are disconnected.

如图9所示,当第二可控开关Q3由闭合状态到断开状态过程中,原本流经Q3的电流将从二极管D3流入光伏输出电路的母线上,此时将并联在母线上的泄放电路104中的第三可控开关导通,原本流经母线的电流就会部分流入泄放电路,让泄放电阻Rd承载多余的电压,当母线上的电压恢复到正常状态时,令第三可控开关断开。As shown in Figure 9, when the second controllable switch Q3 is from the closed state to the open state, the current flowing through Q3 will flow from the diode D3 into the busbar of the photovoltaic output circuit, and at this time the leakage current on the busbar will be connected in parallel. The third controllable switch in the discharge circuit 104 is turned on, and the current originally flowing through the bus will partially flow into the discharge circuit, allowing the discharge resistor Rd to carry the excess voltage. When the voltage on the bus returns to a normal state, the first Three controllable switches are disconnected.

步骤S302、将所有光伏支路的最大功率点功率求和,得到光伏输出电路101的最大总功率。Step S302 , summing the maximum power point power of all photovoltaic branches to obtain the maximum total power of the photovoltaic output circuit 101 .

步骤S303、判断最大总功率是否满足并网输出的需求。Step S303, judging whether the maximum total power meets the requirement of grid-connected output.

其中,并网输出的需求是由光伏方阵的光伏子阵数量确定的固定值。Among them, the demand for grid-connected output is a fixed value determined by the number of photovoltaic sub-arrays in the photovoltaic square array.

具体的,当最大总功率大于并网输出的需求时,就可以进行光伏并网的输出;当最大总功率小于并网输出的需求时,则不进行光伏并网的输出,并且可以判断此时为弱光条件。Specifically, when the maximum total power is greater than the demand for grid-connected output, photovoltaic grid-connected output can be performed; when the maximum total power is less than the demand for grid-connected output, photovoltaic grid-connected output will not be performed, and it can be judged that for low light conditions.

应该理解的是,虽然如上所述的各实施例所涉及的流程图中的各个步骤按照箭头的指示依次显示,但是这些步骤并不是必然按照箭头指示的顺序依次执行。除非本文中有明确的说明,这些步骤的执行并没有严格的顺序限制,这些步骤可以以其它的顺序执行。而且,如上所述的各实施例所涉及的流程图中的至少一部分步骤可以包括多个步骤或者多个阶段,这些步骤或者阶段并不必然是在同一时刻执行完成,而是可以在不同的时刻执行,这些步骤或者阶段的执行顺序也不必然是依次进行,而是可以与其它步骤或者其它步骤中的步骤或者阶段的至少一部分轮流或者交替地执行。It should be understood that although the steps in the flow charts involved in the above embodiments are shown sequentially according to the arrows, these steps are not necessarily executed sequentially in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and these steps can be executed in other orders. Moreover, at least some of the steps in the flow charts involved in the above-mentioned embodiments may include multiple steps or stages, and these steps or stages are not necessarily executed at the same time, but may be performed at different times For execution, the execution order of these steps or stages is not necessarily performed sequentially, but may be executed in turn or alternately with other steps or at least a part of steps or stages in other steps.

基于同样的发明构思,本申请实施例还提供了提供了一种光伏逆变系统的绝缘阻抗检测电路,该电路所提供的解决问题的实现方案与上述方法中所记载的实现方案相似,故下面所提供的一个或多个光伏逆变系统的绝缘阻抗检测电路实施例中的具体限定可以参见上文中对于光伏逆变系统的绝缘阻抗检测方法的限定,在此不再赘述。Based on the same inventive concept, the embodiment of this application also provides an insulation resistance detection circuit for a photovoltaic inverter system. The solution to the problem provided by the circuit is similar to the solution described in the above method, so the following For the specific limitations of the provided one or more embodiments of the insulation resistance detection circuit of the photovoltaic inverter system, please refer to the above definition for the insulation resistance detection method of the photovoltaic inverter system, which will not be repeated here.

在一个实施例中,如图2所示,具体包括:绝缘阻抗检测电路包括与光伏输出电路连接的检测子电路103、与光伏输出电路连接的泄放电路104,以及与BOOST开关电路102、检测子电路103以及泄放电路104连接的控制单元,其中,控制单元用于:In one embodiment, as shown in Figure 2, it specifically includes: the insulation resistance detection circuit includes a detection sub-circuit 103 connected to the photovoltaic output circuit, a discharge circuit 104 connected to the photovoltaic output circuit, and a BOOST switch circuit 102, a detection sub-circuit A control unit connected to the sub-circuit 103 and the discharge circuit 104, wherein the control unit is used for:

控制检测子电路103中的第一可控开关的导通或断开,判断光伏输出电路101中的光伏方阵的绝缘阻抗是否正常;Control the conduction or disconnection of the first controllable switch in the detection sub-circuit 103, and judge whether the insulation resistance of the photovoltaic array in the photovoltaic output circuit 101 is normal;

在绝缘阻抗异常的情况下,控制BOOST开关电路102中的第二可控开关的导通或断开,确定光伏输出电路中存在绝缘阻抗异常的光伏子阵;In the case of abnormal insulation resistance, control the conduction or disconnection of the second controllable switch in the BOOST switch circuit 102, and determine that there is a photovoltaic sub-array with abnormal insulation resistance in the photovoltaic output circuit;

在控制第二可控开关断开的同时,控制泄放电路104中的第三可控开关导通,以泄放光伏输出电路所输出的电能。While the second controllable switch is controlled to be turned off, the third controllable switch in the discharge circuit 104 is controlled to be turned on, so as to discharge the electric energy output by the photovoltaic output circuit.

其中,检测子电路103包括连接在光伏输出电路101的输出正极BUS+与公共地端PE之间由测试电阻R3与第一控制开关S1并联后与测试电阻R2串联的部分以及连接在光伏输出电路101的输出负极BUS-与公共地端PE之间由测试电阻R4与第一控制开关S2并联后与测试电阻R1串联的部分。泄放电路104包括泄放电阻Rd以及第三可控开关Qd,泄放电阻Rd与第三可控开关Qd串联,串联后的电路并联在所述光伏输出电路101的输出正极与所述光伏输出电路101的输出负极上,输入端接所述光伏输出电路101的输出正极,输出端接所述光伏输出电路101的输出负极。Among them, the detection sub-circuit 103 includes a part connected in series between the output positive pole BUS+ of the photovoltaic output circuit 101 and the common ground terminal PE, connected in series with the test resistance R2 after the test resistor R3 is connected in parallel with the first control switch S1, and connected in the photovoltaic output circuit 101. The part between the negative output pole BUS- of the output terminal PE and the common ground terminal PE is connected in series with the test resistor R1 after the test resistor R4 is connected in parallel with the first control switch S2. The discharge circuit 104 includes a discharge resistor Rd and a third controllable switch Qd, the discharge resistor Rd is connected in series with the third controllable switch Qd, and the circuit connected in series is connected in parallel between the output positive pole of the photovoltaic output circuit 101 and the photovoltaic output On the output negative pole of the circuit 101 , the input terminal is connected to the output positive pole of the photovoltaic output circuit 101 , and the output terminal is connected to the output negative pole of the photovoltaic output circuit 101 .

以上实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above embodiments can be combined arbitrarily. To make the description concise, all possible combinations of the technical features in the above embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be It is considered to be within the range described in this specification.

以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the present application, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application should be determined by the appended claims.

Claims (10)

1. An insulation impedance detection method of a photovoltaic inverter system, applied to an insulation impedance detection circuit, the photovoltaic inverter system including a photovoltaic output circuit and a BOOST switch circuit connected to the photovoltaic output circuit, the insulation impedance detection circuit including a detection sub-circuit connected to the photovoltaic output circuit, a bleeder circuit connected to the photovoltaic output circuit, and a control unit connected to the BOOST switch circuit, the detection sub-circuit, and the bleeder circuit, the method comprising:
controlling the connection or disconnection of a first controllable switch in the detection sub-circuit, and judging whether the insulation impedance of a photovoltaic square matrix in the photovoltaic output circuit is normal or not;
under the condition of abnormal insulation impedance, controlling the conduction or the disconnection of a second controllable switch in the BOOST switch circuit, and determining that a photovoltaic sub-array with abnormal insulation impedance exists in the photovoltaic output circuit;
and when the second controllable switch is controlled to be switched off, the third controllable switch in the discharge circuit is controlled to be switched on so as to discharge the electric energy output by the photovoltaic output circuit.
2. The insulation impedance detection method of a photovoltaic inverter system according to claim 1, wherein controlling on or off of a first controllable switch in the detection sub-circuit and determining whether insulation impedance of a photovoltaic square matrix in the photovoltaic output circuit is normal comprises:
controlling the on or off of a first controllable switch in the detection sub-circuit to obtain a first parallel impedance between an output anode of the photovoltaic output circuit and a common ground and a second parallel impedance between an output cathode of the photovoltaic output circuit and the common ground;
acquiring a parallel value of the first parallel impedance and the second parallel impedance;
and judging whether the insulation impedance of the photovoltaic square matrix in the photovoltaic output circuit is normal or not based on the parallel connection value.
3. The insulation impedance detecting method of a photovoltaic inverter system according to claim 2,
if the parallel value is smaller than a set threshold value, the insulation impedance is abnormal; otherwise, the insulation resistance is normal.
4. The insulation impedance detection method of a photovoltaic inverter system according to claim 1, wherein the step of controlling the on or off of a second controllable switch in the BOOST switch circuit and determining that a photovoltaic subarray with abnormal insulation impedance exists in the photovoltaic output circuit comprises:
and sequentially controlling the second controllable switches corresponding to the photovoltaic sub-arrays to be conducted, and judging whether the corresponding photovoltaic sub-arrays have abnormal insulation impedance or not according to the voltage of the output cathode of the photovoltaic output circuit on the common ground.
5. The insulation impedance detection method of a photovoltaic inverter system according to claim 4,
if the voltage of the common ground to the output cathode of the photovoltaic output circuit is kept unchanged, the component is not the component with abnormal ground insulation impedance at the input of the photovoltaic sub-array; otherwise, the input impedance of the photovoltaic sub-array is abnormal.
6. The insulation impedance detection method of a photovoltaic inverter system according to claim 1, further comprising, after discharging the electric power output from the photovoltaic output circuit,
and when the output positive electrode of the photovoltaic output circuit and the output negative electrode of the photovoltaic output circuit recover to the original voltage, the third controllable switch of the bleeder circuit is switched off, and the energy consumption is stopped.
7. The insulation impedance detecting method of a photovoltaic inverter system according to claim 1,
and acquiring the maximum power point power of each photovoltaic sub-array, and judging whether the requirement of grid-connected output is met or not based on the maximum power point power of each photovoltaic sub-array.
8. An insulation resistance detection circuit of a photovoltaic inverter system, the photovoltaic inverter system comprising a photovoltaic output circuit and a BOOST switch circuit connected with the photovoltaic output circuit, characterized in that the insulation resistance detection circuit comprises a detection sub-circuit connected with the photovoltaic output circuit, a bleeder circuit connected with the photovoltaic output circuit, and a control unit connected with the BOOST switch circuit, the detection sub-circuit and the bleeder circuit; wherein the control unit is configured to:
controlling the connection or disconnection of a first controllable switch in the detection sub-circuit, and judging whether the insulation impedance of a photovoltaic square matrix in the photovoltaic output circuit is normal or not;
under the condition of abnormal insulation impedance, controlling the second controllable switch in the BOOST switch circuit to be switched on or switched off, and determining that a photovoltaic sub-array with abnormal insulation impedance exists in the photovoltaic output circuit;
and controlling the second controllable switch to be switched off and controlling the third controllable switch in the bleeder circuit to be switched on at the same time so as to bleed off the electric energy output by the photovoltaic output circuit.
9. The insulation impedance detection circuit of a photovoltaic inverter system according to claim 8,
the detection sub-circuit comprises test resistors R1, R2, R3 and R4 and first controllable switches S1 and S2;
the test resistor R3 is connected in parallel with the first controllable switch S1 and then connected in series with the test resistor R2, the input end of the series circuit is connected with the output anode of the photovoltaic output circuit, and the output end of the series circuit is connected with the common ground;
the test resistor R4 is connected with the first controllable switch S2 in parallel and then connected with the test resistor R1 in series, the input end of the circuit after series connection is connected with the common ground, and the output end of the circuit is connected with the output cathode of the photovoltaic output circuit.
10. The insulation impedance detection circuit of a photovoltaic inverter system according to claim 8, wherein:
the bleeder circuit comprises a bleeder resistor Rd and a third controllable switch Qd;
the leakage resistor Rd is connected in series with the third controllable switch Qd, the series circuit is connected in parallel with the output anode of the photovoltaic output circuit and the output cathode of the photovoltaic output circuit, the input end is connected with the output anode of the photovoltaic output circuit, and the output end is connected with the output cathode of the photovoltaic output circuit.
CN202210962565.2A 2022-08-11 2022-08-11 A method and circuit for detecting insulation impedance of photovoltaic inverter system Active CN115453195B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210962565.2A CN115453195B (en) 2022-08-11 2022-08-11 A method and circuit for detecting insulation impedance of photovoltaic inverter system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210962565.2A CN115453195B (en) 2022-08-11 2022-08-11 A method and circuit for detecting insulation impedance of photovoltaic inverter system

Publications (2)

Publication Number Publication Date
CN115453195A true CN115453195A (en) 2022-12-09
CN115453195B CN115453195B (en) 2024-09-03

Family

ID=84298742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210962565.2A Active CN115453195B (en) 2022-08-11 2022-08-11 A method and circuit for detecting insulation impedance of photovoltaic inverter system

Country Status (1)

Country Link
CN (1) CN115453195B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103048544A (en) * 2012-12-13 2013-04-17 常熟开关制造有限公司(原常熟开关厂) Insulation resistance monitoring method of photovoltaic power generation system
US20130241427A1 (en) * 2012-03-13 2013-09-19 Iwatt Inc. Power dissipation monitor for current sink function of power switching transistor
CN104300584A (en) * 2014-11-07 2015-01-21 深圳市永联科技有限公司 High-security PID effect inhibition method
CN104378068A (en) * 2014-11-21 2015-02-25 江苏兆伏爱索新能源有限公司 Detection method and circuit for ground insulation resistance of photovoltaic module array
CN104682757A (en) * 2015-03-24 2015-06-03 华为技术有限公司 Photovoltaic inverter
US9614458B1 (en) * 2013-02-15 2017-04-04 Ideal Power, Inc. Methods for determining maximum power point tracking in power converters
CN106888524A (en) * 2017-04-21 2017-06-23 矽力杰半导体技术(杭州)有限公司 LED drive circuit, circuit module and control method with controllable silicon dimmer
CN207704309U (en) * 2018-01-18 2018-08-07 湖南科比特新能源科技股份有限公司 A kind of weak power control circuit of photovoltaic motor driver
CN110401414A (en) * 2019-08-22 2019-11-01 深圳市禾望科技有限公司 Ground insulation impedance detection circuit and method, photovoltaic generating system
WO2020253876A1 (en) * 2019-06-20 2020-12-24 江苏固德威电源科技股份有限公司 Circuit and method for detecting insulation resistance of photovoltaic array to ground, and photovoltaic inverter
CN113328463A (en) * 2021-07-09 2021-08-31 阳光电源股份有限公司 Photovoltaic inverter system and insulation fault detection method thereof
CN114414893A (en) * 2022-03-30 2022-04-29 深圳市鼎泰佳创科技有限公司 Photovoltaic system input impedance detection circuit, method and equipment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130241427A1 (en) * 2012-03-13 2013-09-19 Iwatt Inc. Power dissipation monitor for current sink function of power switching transistor
CN103048544A (en) * 2012-12-13 2013-04-17 常熟开关制造有限公司(原常熟开关厂) Insulation resistance monitoring method of photovoltaic power generation system
US9614458B1 (en) * 2013-02-15 2017-04-04 Ideal Power, Inc. Methods for determining maximum power point tracking in power converters
CN104300584A (en) * 2014-11-07 2015-01-21 深圳市永联科技有限公司 High-security PID effect inhibition method
CN104378068A (en) * 2014-11-21 2015-02-25 江苏兆伏爱索新能源有限公司 Detection method and circuit for ground insulation resistance of photovoltaic module array
CN104682757A (en) * 2015-03-24 2015-06-03 华为技术有限公司 Photovoltaic inverter
CN106888524A (en) * 2017-04-21 2017-06-23 矽力杰半导体技术(杭州)有限公司 LED drive circuit, circuit module and control method with controllable silicon dimmer
CN207704309U (en) * 2018-01-18 2018-08-07 湖南科比特新能源科技股份有限公司 A kind of weak power control circuit of photovoltaic motor driver
WO2020253876A1 (en) * 2019-06-20 2020-12-24 江苏固德威电源科技股份有限公司 Circuit and method for detecting insulation resistance of photovoltaic array to ground, and photovoltaic inverter
CN110401414A (en) * 2019-08-22 2019-11-01 深圳市禾望科技有限公司 Ground insulation impedance detection circuit and method, photovoltaic generating system
CN113328463A (en) * 2021-07-09 2021-08-31 阳光电源股份有限公司 Photovoltaic inverter system and insulation fault detection method thereof
CN114414893A (en) * 2022-03-30 2022-04-29 深圳市鼎泰佳创科技有限公司 Photovoltaic system input impedance detection circuit, method and equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴兆吉;汪海宁;孙琳琳;耿爱玲;: "改进的光伏阵列直流绝缘检测方法", 太阳能, no. 10, 28 October 2016 (2016-10-28), pages 57 - 61 *
成林俞;戴瑜兴;刘红;曾国强;: "光伏阵列在线绝缘监测系统的研究", 电测与仪表, no. 01, 10 January 2015 (2015-01-10), pages 82 - 85 *

Also Published As

Publication number Publication date
CN115453195B (en) 2024-09-03

Similar Documents

Publication Publication Date Title
EP3264550B1 (en) Access control method for parallel direct current power supplies and device thereof
EP3407156A1 (en) Control apparatus and combiner box
WO2021207880A1 (en) Short circuit protection apparatus, short circuit protection method, and photovoltaic power generation system
US12375038B2 (en) Impedance detection method and photovoltaic system
WO2021103674A1 (en) Short-circuit detection method and apparatus for inverter, and inverter
CN103825299A (en) Grid-connected photovoltaic power generation system and control method thereof
CN204948018U (en) A kind of circuit of multi-machine parallel connection system prevention cell panel PID effect
CN103901315B (en) A kind of monopole earthed system, ground protection and fault monitoring device and method
CN206164112U (en) A attenuating device is inductiond to anti current potential for photovoltaic power generation system
EP3979492B1 (en) Electric energy backward-flow control method, converter, and photovoltaic power generation system
CN204168233U (en) Many groups optical crosstalk volt fault of converter testing circuit
CN111404142A (en) Voltage-stabilized constant-current underwater power supply with self-matched power and power supply method thereof
CN104333215A (en) Method and device for suppressing frequent starting and stopping of inverter
CN113544952A (en) a power system
CN111277009A (en) Battery management control system and control method
KR20190133389A (en) Apparatus and method for measuring insulation resistance
CN103983855A (en) Method and circuit for detecting insulation resistance
KR20220131617A (en) Control units of combiner-box which has a function with detecting the fault current by algorithm and disconnecting the circuit of PV plants
WO2021208045A1 (en) Power supply system
CN203734325U (en) Photovoltaic grid-connected power generation system
CN104143955B (en) A kind of Intelligent self-balancing photovoltaic series connection battery component
US20190386482A1 (en) Alternating current optimal yield control within a multi-power stack inverter
CN115453195A (en) Insulation resistance detection method and detection circuit of a photovoltaic inverter system
CN211860009U (en) A photovoltaic power generation system with an isolated string inverter
CN218449471U (en) Photovoltaic overvoltage protection device and inverter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 311200 Zhejiang Province, Hangzhou City, Xiaoshan District, Wenyi Street, Xiangbin Road No. 1501

Patentee after: Yunjian Information Technology Co., Ltd.

Country or region after: China

Address before: 311200 Zhejiang Province, Hangzhou City, Xiaoshan District, Wenyi Street, Wangjili Industrial Park, No. 368, Building 4, Room 210

Patentee before: Yunjian Information Technology Co.,Ltd.

Country or region before: China