CN115425580A - Electric pipe in-line threading construction device - Google Patents
Electric pipe in-line threading construction device Download PDFInfo
- Publication number
- CN115425580A CN115425580A CN202211032241.5A CN202211032241A CN115425580A CN 115425580 A CN115425580 A CN 115425580A CN 202211032241 A CN202211032241 A CN 202211032241A CN 115425580 A CN115425580 A CN 115425580A
- Authority
- CN
- China
- Prior art keywords
- support
- piece
- pulley
- top structure
- threading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
- H02G1/083—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using lines, e.g. needles, rods or tapes
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
- H02G1/088—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using pulling devices movable inside conduits
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
本发明涉及一种电气管内穿线施工装置,包括底座、支撑件及牵引装置;支撑件设置在所述底座上;牵引装置包括动力装置及牵引件,所述动力装置设置在所述底座上,所述牵引件一端连接于所述动力装置上,另一端绕经所述支撑件顶端,用于连接待牵引电缆线。通过使用本发明的施工装置替代了人工穿线的传统操作,无需花费大量人工和时间,能够提高施工效率、缩短施工工期、有效控制人力、降低安全风险。
The invention relates to a construction device for threading in electric pipes, comprising a base, a support and a traction device; the support is arranged on the base; the traction device includes a power device and a traction device, the power device is arranged on the base, and the One end of the traction member is connected to the power device, and the other end is wound around the top of the support member for connecting the cable to be towed. By using the construction device of the present invention to replace the traditional operation of manual threading, without spending a lot of labor and time, the construction efficiency can be improved, the construction period can be shortened, manpower can be effectively controlled, and safety risks can be reduced.
Description
技术领域technical field
本发明涉及电气工程中穿线施工技术领域,尤其是涉及一种电气管内穿线施工装置。The invention relates to the technical field of threading construction in electrical engineering, in particular to a threading construction device in electrical pipes.
背景技术Background technique
在建筑安装工程电气分部工程管内穿线分项工程施工时,在暗配管内敷设电缆和敷设导线时,由于配电箱的高度问题(规范要求地下室照明箱明装底边距地1.5米;1层在走道安装的照明及配电箱底边距地1.7米;控制箱的安装高度为中心距地1.5米;挂墙明装的配电箱中心距地1.3米(箱体高度大天0.8米)或1.5米(箱体高度小于0.8米))、配线管管径和电缆匹配问题、电气配管的弯曲位置弧度问题、配电管弯头数量的问题等,在现有的施工技术情况下直接就是使用人力拉,在时会出现穿线时人力无法拉动和几个人一起来出力拉动或出线管口高度较高角度不易于拉动的情况,需要操作人员站在活动架子上面作业等,造成施工效率底、浪费工期、浪费人工和高处作业安全风险等问题。When laying cables and laying wires in the concealed pipe during the construction of the sub-item project of the electrical branch of the building installation project, due to the height of the distribution box (the specification requires that the bottom edge of the basement lighting box should be 1.5 meters away from the ground; 1 The bottom edge of the lighting and distribution box installed in the aisle is 1.7 meters away from the ground; the installation height of the control box is 1.5 meters from the center of the ground; the center of the wall-mounted distribution box is 1.3 meters away from the ground (the height of the box is 0.8 meters). or 1.5 meters (the height of the box is less than 0.8 meters)), the diameter of the wiring pipe and the matching of the cable, the curvature of the bending position of the electrical piping, the number of elbows of the distribution pipe, etc., directly under the existing construction technology It is to use manpower to pull. Sometimes when threading, manpower cannot pull and several people come together to pull with force or the outlet pipe is not easy to pull at a high angle. The operator needs to stand on the movable shelf to work, etc., resulting in low construction efficiency. , waste of construction time, waste of labor and safety risks of high-altitude operations.
发明内容Contents of the invention
针对现有技术存在的不足,本发明的目的是提供一种电气管内穿线施工装置,包括:Aiming at the deficiencies in the prior art, the object of the present invention is to provide a construction device for threading in electric pipes, including:
底座;base;
支撑件,其设置在所述底座上;a support member disposed on the base;
牵引装置,其包括动力装置及牵引件,所述动力装置设置在所述底座上,所述牵引件一端连接于所述动力装置上,另一端绕经所述支撑件顶端,用于连接待牵引电缆线。A traction device, which includes a power device and a traction member, the power device is arranged on the base, one end of the traction member is connected to the power device, and the other end is wound around the top of the support member for connecting Cable.
优选地,所述支撑件包括第一支撑杆及第二支撑杆;所述第一支撑杆为设置在所述底座上的中空杆件,所述第二支撑杆可拆卸的设置在所述第一支撑杆的中空结构内;所述牵引件一端连接于所述动力装置上,另一端绕经所述第二支撑杆的顶端。Preferably, the supporting member includes a first supporting rod and a second supporting rod; the first supporting rod is a hollow rod arranged on the base, and the second supporting rod is detachably arranged on the second supporting rod. In the hollow structure of a support rod; one end of the traction member is connected to the power device, and the other end passes through the top end of the second support rod.
优选地,所述支撑件上还设置锁紧件;所述第一支撑杆及所述第二支撑杆上均设置通孔,所述锁紧件能够通过所述通孔将所述第一支撑杆及所述第二支撑杆连接在一起。Preferably, a locking member is also provided on the support member; through holes are provided on the first support rod and the second support rod, and the locking member can support the first support through the through hole. The rod and the second support rod are connected together.
优选地,所述支撑件上还设置斜撑;所述斜撑一端连接于所述底座上,另一端连接于所述支撑件上。Preferably, a diagonal brace is further provided on the support; one end of the diagonal brace is connected to the base, and the other end is connected to the support.
优选地,所述支撑件上还设置平衡件;所述平衡件连接于所述支撑杆上,用于启动动力装置时支撑件的平衡。Preferably, a balance piece is also provided on the support; the balance piece is connected to the support rod, and is used for balancing the support piece when the power device is started.
优选地,所述支撑件上还设置顶部结构,所述顶部结构连接于所述支撑件顶部,所述牵引件绕经所述顶部结构。Preferably, a top structure is further provided on the support, the top structure is connected to the top of the support, and the traction member passes through the top structure.
优选地,所述顶部结构上还设置第一滑轮,所述牵引件绕经所述第一滑轮。Preferably, a first pulley is further provided on the top structure, and the traction member passes through the first pulley.
优选地,所述顶部结构上还设置第二滑轮,所述第二滑轮与所述第一滑轮间隔预设距离设置;所述顶部结构上设置有滑槽,所述第二滑轮的轮轴能沿所述滑槽滑动。Preferably, a second pulley is also provided on the top structure, and the second pulley is set at a preset distance from the first pulley; a slide groove is provided on the top structure, and the axle of the second pulley can be moved along the The chute slides.
优选地,所述顶部结构上还设置防脱挡块,用于将所述第一滑轮及所述第二滑轮固定在所述顶部结构上。Preferably, an anti-off stopper is also provided on the top structure for fixing the first pulley and the second pulley on the top structure.
优选地,所述支撑件包括两个;所述两个支撑件之间还设置水平支撑,所述水平支撑连接于所述两个支撑件之间,用于提升所述两个支撑件之间的连接稳固性。Preferably, the support includes two; a horizontal support is also provided between the two supports, and the horizontal support is connected between the two supports for lifting the distance between the two supports. connection stability.
优选地,所述牵引件的自由端还设置拉线网套。Preferably, the free end of the traction member is also provided with a wire mesh sleeve.
优选地,所述滑槽一侧还设置固定件,所述固定件能够将所述第二滑轮的轮轴固定在所述滑槽的不同位置。Preferably, a fixing piece is provided on one side of the chute, and the fixing piece can fix the axle of the second pulley at different positions of the chute.
优选地,所述平衡件一端还设置连接结构,用于连接在穿线施工现场的建筑体上。Preferably, a connection structure is provided at one end of the balancer for connecting to a building on a threading construction site.
优选地,所述顶部结构的一端还套设橡胶垫。Preferably, a rubber pad is sheathed at one end of the top structure.
优选地,所述平衡件的一端还套设橡胶垫。Preferably, a rubber pad is sheathed at one end of the balance member.
综上所述,本发明的有益技术效果为:通过使用本发明的施工装置替代了人工穿线的传统操作,无需花费大量人工和时间,能够提高施工效率、缩短施工工期、有效控制人力、降低安全风险。In summary, the beneficial technical effects of the present invention are: by using the construction device of the present invention to replace the traditional operation of manual threading, without spending a lot of labor and time, the construction efficiency can be improved, the construction period can be shortened, manpower can be effectively controlled, and safety can be reduced. risk.
附图说明Description of drawings
通过以下参照附图对本发明实施例的描述,本发明的上述以及其他目的特征和优点将更为清楚。附图仅用于表示优选实施例方式的目的,而并不认为是对本发明的限制。而且在整个附图中,用相同的参考符号表示相同的部件。The above and other objects, features and advantages of the present invention will be more clearly described through the following description of the embodiments of the present invention with reference to the accompanying drawings. The drawings are only for the purpose of showing preferred embodiments and are not to be considered as limiting the invention. Also throughout the drawings, the same reference numerals are used to designate the same components.
图1是本发明的整体结构正视图;Fig. 1 is the whole structure front view of the present invention;
图2是本发明的整体结构侧视图;Fig. 2 is the overall structure side view of the present invention;
图中,1、底座,2、支撑件,3、牵引装置,4、橡胶垫;In the figure, 1. base, 2. support, 3. traction device, 4. rubber pad;
11、镀锌方管,12、电葫芦固定扣,13、钢槽,21、第一支撑杆,22、第二支撑杆,23、锁紧件,24、通孔,25、斜撑,26、平衡件,261、连接结构,27、顶部结构,271、第一滑轮,272、第二滑轮,273、滑槽,274、防脱挡块,275、固定件,28、水平支撑,31、动力装置,32、牵引件,321、拉线网套。11. Galvanized square pipe, 12. Electric hoist fixing buckle, 13. Steel channel, 21. First support rod, 22. Second support rod, 23. Locking piece, 24. Through hole, 25. Diagonal brace, 26 , balance piece, 261, connection structure, 27, top structure, 271, first pulley, 272, second pulley, 273, chute, 274, anti-off block, 275, fixing piece, 28, horizontal support, 31, Power unit, 32, traction piece, 321, backguy net cover.
具体实施方式detailed description
以下结合附图对本发明作进一步详细说明。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。The present invention will be described in further detail below in conjunction with the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided for more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
参照图1-2所示,为本发明公开的一种电气管内穿线施工装置,包括底座1、支撑件2及牵引装置3;支撑件2设置在所述底座1上;牵引装置3包括动力装置31及牵引件32,所述动力装置31设置在所述底座1上,所述牵引件32一端连接于所述动力装置31上,另一端绕经所述支撑件2顶端,用于连接待牵引电缆线。本实施例中,通过设置的支撑件2增加了牵引件32连接电缆线的高度位置,不需要人为踩高去匹配配电箱的高度,同时避免了踩高的危险;通过设置的动力装置31替代人力拉线节省工人工时,提高施工效率。Referring to Figures 1-2, it is a construction device for threading electrical pipes disclosed by the present invention, including a base 1, a
参照图1-2所示,支撑件2包括第一支撑杆21及第二支撑杆22;第一支撑杆21为设置在底座1上的中空杆件,第二支撑杆22可拆卸的设置在第一支撑杆21的中空结构内;牵引件32一端连接于动力装置31上,另一端绕经第二支撑杆22顶端。参照图1-2所示,支撑件2上还设置锁紧件23(附图中未标出);第一支撑杆21及第二支撑杆22上均设置通孔24,锁紧件23(附图中未标出)能够通过通孔24将第一支撑杆21及第二支撑杆22连接在一起。本实施例中,所述锁紧件23优选为螺栓连接杆,将螺栓连接杆插入到第一支撑杆21及第二支撑杆22的通孔24中,即实现对第一支撑杆21及第二支撑杆21的连接,且由于两个支撑杆上设置多个通孔24,当连接不同位置的通孔24时即实现了对支撑杆2高度的调节。本实施例中,通过设置的第一支撑杆21及第二支撑杆22,实现了对支撑件2的高度调节,以适应不同高度的配电箱的作业拉线。1-2, the
参照图1-2所示,支撑件2上还设置斜撑25;斜撑25一端连接于底座1上,另一端连接于支撑件2上。本实施例中,通过设置的斜撑25,进一步提升了支撑件2的稳固性,避免拉线过程中拉力增大时带动整个装置倾倒,提高了装置的安全性。参照图2所示,支撑件2包括两个;两个支撑件2之间还设置水平支撑28,水平支撑28连接于两个支撑件2之间,用于提升两个支撑件2之间的连接稳固性。Referring to Fig. 1-2, a
参照图1-2所示,支撑件2上还设置平衡件26;平衡件26连接于支撑杆2上,用于启动动力装置31时支撑件2的平衡。参照图1所示,平衡件26一端还设置连接结构261,用于连接在穿线施工现场的建筑体上。本实施例中,在具体实施时,可将平衡件26固定在附近的施工墙上,大大提高施工的安全性。参照图1所示,本实施例中,平衡件26的一端还套设橡胶垫4,用于缓解平衡件26冲击墙面的冲击力。Referring to Figures 1-2, a
参照图1-2所示,支撑件2上还设置顶部结构,顶部结构27连接于支撑件2顶部,牵引件32绕经顶部结构27。Referring to Figures 1-2, a top structure is also provided on the
参照图1所示,顶部结构27上还设置第一滑轮271,牵引件32绕经第一滑轮271。本实施例中,顶部结构27上还设置第二滑轮272,第二滑轮272与第一滑轮271间隔预设距离设置;顶部结构27上设置有滑槽273,第二滑轮272的轮轴能沿滑槽273滑动。本实施例中,滑槽273一侧还设置固定件275(附图中未示出),固定件275(附图中未示出)能够将第二滑轮272的轮轴固定在滑槽273的不同位置。本实施例中,通过设置的两个滑轮增加了牵引件32运动的顺畅性,避免牵引件32直接接触支撑件2或顶部结构造成对牵引件的磨损。Referring to FIG. 1 , a
参照图1-2所示,顶部结构27上还设置防脱挡块274,用于将第一滑轮271及第二滑轮272固定在顶部结构27上。Referring to FIGS. 1-2 , the
参照图1-2所示,牵引件32的自由端还设置拉线网套321。本实施例中,采用拉线网321套的用途:电力施工放线时连接各种钢芯铝绞线以及绝朽组档束缘导线、地弃她线、光纤、光缆、电缆,能通过各类型放线滑车,具有重量轻拉力负荷大,不损线,使用方便等优点。Referring to Fig. 1-2, the free end of the
参照图1所示,顶部结构27的一端还套设橡胶垫4,用于缓解顶部结构27端头接触墙面时对墙面的冲击力度。Referring to FIG. 1 , one end of the
综上,本发明的有益技术效果为:通过使用本发明的施工装置替代了人工穿线的传统操作,无需花费大量人工和时间,能够提高施工效率、缩短施工工期、有效控制人力、降低安全风险。In summary, the beneficial technical effects of the present invention are: by using the construction device of the present invention to replace the traditional operation of manual threading, without spending a lot of labor and time, the construction efficiency can be improved, the construction period can be shortened, manpower can be effectively controlled, and safety risks can be reduced.
应当说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.
最后应说明的是:显然,上述实施例仅仅是为清楚地说明本发明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引申出的显而易见的变化或变动仍处于本发明的保护范围之中。Finally, it should be noted that obviously, the above-mentioned embodiments are only examples for clearly illustrating the present invention, rather than limiting the implementation. For those of ordinary skill in the art, on the basis of the above description, other changes or changes in different forms can also be made. It is not necessary and impossible to exhaustively list all the implementation manners here. However, the obvious changes or variations derived therefrom are still within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211032241.5A CN115425580A (en) | 2022-08-26 | 2022-08-26 | Electric pipe in-line threading construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211032241.5A CN115425580A (en) | 2022-08-26 | 2022-08-26 | Electric pipe in-line threading construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115425580A true CN115425580A (en) | 2022-12-02 |
Family
ID=84199596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211032241.5A Pending CN115425580A (en) | 2022-08-26 | 2022-08-26 | Electric pipe in-line threading construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115425580A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204030457U (en) * | 2014-07-31 | 2014-12-17 | 国家电网公司 | Embedded table case cable discharges movable draw bar |
CN105496678A (en) * | 2015-12-23 | 2016-04-20 | 高翠霞 | Synchronous multifunctional nursing device capable of achieving traction turning |
CN212849626U (en) * | 2020-08-05 | 2021-03-30 | 中建八局第一建设有限公司 | Electric threading device for assembling portable embedded pipe |
CN112952661A (en) * | 2021-04-08 | 2021-06-11 | 北京市第三建筑工程有限公司 | Installation structure and construction method for laying cable in narrow space |
CN113044666A (en) * | 2021-03-26 | 2021-06-29 | 广州市电力工程有限公司 | Paying-off pulley device, cable laying system and laying method |
CN215326564U (en) * | 2021-05-26 | 2021-12-28 | 中建科工集团有限公司 | Support hoisting device |
KR20220004363A (en) * | 2020-07-03 | 2022-01-11 | 이희정 | A prefab crain for vehicle |
CN113979328A (en) * | 2021-11-22 | 2022-01-28 | 中国二十冶集团有限公司 | Power distribution device hoisting equipment, power distribution device installation system and installation method |
-
2022
- 2022-08-26 CN CN202211032241.5A patent/CN115425580A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204030457U (en) * | 2014-07-31 | 2014-12-17 | 国家电网公司 | Embedded table case cable discharges movable draw bar |
CN105496678A (en) * | 2015-12-23 | 2016-04-20 | 高翠霞 | Synchronous multifunctional nursing device capable of achieving traction turning |
KR20220004363A (en) * | 2020-07-03 | 2022-01-11 | 이희정 | A prefab crain for vehicle |
CN212849626U (en) * | 2020-08-05 | 2021-03-30 | 中建八局第一建设有限公司 | Electric threading device for assembling portable embedded pipe |
CN113044666A (en) * | 2021-03-26 | 2021-06-29 | 广州市电力工程有限公司 | Paying-off pulley device, cable laying system and laying method |
CN112952661A (en) * | 2021-04-08 | 2021-06-11 | 北京市第三建筑工程有限公司 | Installation structure and construction method for laying cable in narrow space |
CN215326564U (en) * | 2021-05-26 | 2021-12-28 | 中建科工集团有限公司 | Support hoisting device |
CN113979328A (en) * | 2021-11-22 | 2022-01-28 | 中国二十冶集团有限公司 | Power distribution device hoisting equipment, power distribution device installation system and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109687349B (en) | Bypass cable wiring method and special equipment thereof | |
CN106099768B (en) | Outdoor complicated piping lane cable laying of bridge frame method | |
CN207406939U (en) | Socket joint underwater pipeline stabilizing system is drawn in concrete drain pipeline | |
CN103696371B (en) | A kind of tensioning equipment for self-anchored suspension bridge hoist cable and method | |
CN115425580A (en) | Electric pipe in-line threading construction device | |
CN103601087B (en) | A kind of lifting device of transformer | |
CN115207837A (en) | A kind of high-altitude cable laying method and its safety protection auxiliary device | |
US20120049140A1 (en) | APPARATUS (Sheave) FOR GUIDING CABLE IN AND OUT OF MANHOLES AND CONDUITS | |
CN205595695U (en) | High altitude block system | |
CN209267015U (en) | A cable deployment device for the cable tray of the basement distribution station | |
CN207164331U (en) | A kind of anti-optical cable drop device | |
CN204178640U (en) | Optical cable sign board suspender | |
CN204835397U (en) | Cable fixed bolster | |
CN104836156A (en) | Synthetic insulator simple ladder | |
CN213202202U (en) | Light tower cable laying device | |
CN112271632A (en) | Standing type high-voltage cable operation device | |
CN201598761U (en) | Wiring device for electric system high altitude steel rope mounting | |
CN216794475U (en) | Supplementary hanging wire device in high altitude | |
CN213685598U (en) | Gallows of pipeline swift installation in tall and big space upper portion rack | |
CN211351627U (en) | Overhead pay-off device for near-source time-frequency electromagnetic acquisition | |
CN210005766U (en) | guiding device for pulling inspection well optical cable | |
CN211183155U (en) | Device for easily laying cable in bridge | |
CN207801363U (en) | A kind of interim fast installation support of erecting cable | |
CN206915608U (en) | Sliding support for electric armour clamp detection experiment | |
CN210480473U (en) | Underground coal mine engineering rope knotting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |