CN115401430A CN202211266835.2A CN202211266835A CN115401430A CN 115401430 A CN115401430 A CN 115401430A CN 202211266835 A CN202211266835 A CN 202211266835A CN 115401430 A CN115401430 A CN 115401430A
Authority
CN
China
Prior art keywords
cone
welding
pipe system
process comprises
cleaning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211266835.2A
Other languages
Chinese (zh)
Inventor
秦国东
屈宝丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tongliu Aerospace Technology Co ltd
Original Assignee
Jiangsu Tongliu Aerospace Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tongliu Aerospace Technology Co ltd filed Critical Jiangsu Tongliu Aerospace Technology Co ltd
Priority to CN202211266835.2A priority Critical patent/CN115401430A/en
Publication of CN115401430A publication Critical patent/CN115401430A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

The invention provides a front cone and pipe system processing technology, which can effectively ensure that the precision and the integral smoothness of a product meet the quality requirement, thereby ensuring the integral quality of subsequent products, and the invention also provides a test device which is characterized in that: the method comprises the steps of assembling, surface treatment, welding, testing, cleaning and checking, wherein the assembling process comprises pipe system bending, shape correction and front assembly connection, the surface treatment process comprises connecting and pickling a cone and a pipe system part to be welded, and then carrying out surface nickel plating treatment, the welding process comprises welding and connecting the bending pipe and the cone, then carrying out endoscopic and flaw detection on the welding part, the testing process comprises pipe system leakage prevention and pressure resistance testing on the whole welded by the bending pipe and the cone through a testing device, the cleaning process comprises cleaning a product, and the checking process comprises integral checking on the whole product, so that the whole product is machined.

Description

一种前锥及管系加工工艺A processing technology of nose cone and pipe system

技术领域technical field

本发明涉及产品加工的技术领域,特别涉及一种前锥及管系加工工艺。The invention relates to the technical field of product processing, in particular to a nose cone and pipe system processing technology.

背景技术Background technique

见图1所示产品为锥体与管道连接结构,该锥体与管道连接结构在加工完成后要与后续的其他零部件组合而成产品的整体,所以该前锥及管系在加工时不但要保证一定的精度,而且还要保证产品整体的光洁度,以保证后续产品组装时能满足产品的质量要求,现有的加工工艺不能满足上述要求,生产出来的产品其精度和整体光洁度都不能保证产品的质量要求,从而影响了后续产品的整体质量。As shown in Figure 1, the product is the connection structure between the cone and the pipe. The connection structure between the cone and the pipe must be combined with other subsequent parts to form a whole product after processing. Therefore, the front cone and the pipe system not only To ensure a certain accuracy, but also to ensure the overall smoothness of the product, so as to ensure that the subsequent product assembly can meet the quality requirements of the product. The existing processing technology cannot meet the above requirements, and the precision and overall smoothness of the produced products cannot be guaranteed. The quality requirements of the product affect the overall quality of subsequent products.

发明内容Contents of the invention

针对现有技术之不足,本发明提供一种前锥及管系加工工艺,其能有效保证产品其精度和整体光洁度都符合质量要求,从而保证了后续产品的整体质量。Aiming at the deficiencies of the existing technology, the present invention provides a nose cone and pipe system processing technology, which can effectively ensure that the precision and overall smoothness of the product meet the quality requirements, thereby ensuring the overall quality of subsequent products.

其技术方案是这样的:一种前锥及管系加工工艺,其特征在于:其包括组装,焊接,表面处理,试验,清洗,检验工艺;The technical solution is as follows: a nose cone and pipe system processing technology, which is characterized in that it includes assembly, welding, surface treatment, testing, cleaning and inspection processes;

所述装配工艺包括对管系弯管、校形,之后与前进行装配连接;The assembly process includes bending and correcting the shape of the pipe system, and then assembling and connecting with the front;

所述表面处理工艺包括表面处理工艺包括将锥体与管系待焊接部分进行连接酸洗、之后进行表面镀镍处理;The surface treatment process includes that the surface treatment process includes pickling the cone and the pipe system to be welded, and then performing nickel plating on the surface;

所述焊接工艺包括将弯管与锥体进行焊接连接,然后对焊接部位进行内窥和探伤检测;The welding process includes welding the elbow and the cone, and then performing endoscopic and flaw detection on the welded part;

所述试验工艺包括通过试验装置对弯管与锥体焊接后的整体进行管系防漏和耐压实验;The test process includes conducting leak-proof and pressure-resistant tests on the whole welded elbow and cone through the test device;

所述清洗工艺包括对产品进行清洗;The cleaning process includes cleaning the product;

所述检验工艺包括对整个产品进行整体检验,从而完成整个产品加工。The inspection process includes an overall inspection of the entire product, thereby completing the entire product processing.

其进一步特征在于:所述焊接工艺采用真空钎焊,在焊接完成后关掉焰火后保持气体停留3到5秒钟;所述试验工艺保证前锥的斜面附加应力不大于700N。It is further characterized in that: the welding process adopts vacuum brazing, and after the welding is completed, the flame is turned off and the gas is kept for 3 to 5 seconds; the test process ensures that the additional stress on the slope of the front cone is not greater than 700N.

本发明采用上述方案,其包括组装,焊接,表面处理,试验,清洗,检验工艺,所述装配工艺包括对管系弯管、校形,之后与前进行装配连接,所述表面处理工艺包括表面处理工艺包括将锥体与管系待焊接部分进行连接酸洗、之后进行表面镀镍处理,焊接工艺包括将弯管与锥体进行焊接连接,然后对焊接部位进行内窥和探伤检测,试验工艺包括通过试验装置对弯管与锥体焊接后的整体进行管系防漏和耐压实验,清洗工艺包括对产品进行清洗,检验工艺包括对整个产品进行整体检验,从而完成整个产品加工,其能有效保证产品其精度和整体光洁度都符合质量要求,从而保证了后续产品的整体质量,本发明同时还提供了一种试验装置。The present invention adopts the above-mentioned scheme, which includes assembly, welding, surface treatment, testing, cleaning, and inspection processes. The treatment process includes pickling the connection between the cone and the pipe system to be welded, and then performing nickel plating on the surface. The welding process includes welding the elbow and the cone, and then performing endoscopic and flaw detection on the welded part. The test process Including the leak-proof and pressure-resistant test of the pipe system after welding the elbow and the cone through the test device, the cleaning process includes cleaning the product, and the inspection process includes the overall inspection of the entire product, so as to complete the entire product processing. It can effectively ensure that the precision and the overall smoothness of the product meet the quality requirements, thereby ensuring the overall quality of subsequent products. The invention also provides a test device at the same time.

附图说明Description of drawings

图1为前锥及管系结构图。Figure 1 is a structural diagram of the front cone and piping system.

具体实施方式Detailed ways

一种前锥及管系加工工艺,其包括组装,焊接,表面处理,试验,清洗,检验工艺;装配工艺包括对管系弯管、校形,之后与前进行装配连接;所述表面处理工艺包括表面处理工艺包括将锥体与管系待焊接部分进行连接酸洗、之后进行表面镀镍处理,焊接工艺包括将弯管与锥体进行焊接连接,然后对焊接部位进行内窥和探伤检测;试验工艺包括通过试验装置对弯管与锥体焊接后的整体进行管系防漏和耐压实验;清洗工艺包括对产品进行清洗;检验工艺包括对整个产品进行整体检验,从而完成整个产品加工。A nose cone and pipe system processing technology, which includes assembly, welding, surface treatment, testing, cleaning, and inspection processes; the assembly process includes bending and correcting the pipe system, and then assembling and connecting with the front; the surface treatment process Including the surface treatment process including pickling the connection between the cone and the pipe system to be welded, followed by nickel plating on the surface, the welding process includes welding the elbow and the cone, and then performing endoscopic and flaw detection on the welded part; The test process includes the leak-proof and pressure-resistant test of the pipe system after welding the elbow and the cone through the test device; the cleaning process includes cleaning the product; the inspection process includes the overall inspection of the entire product, so as to complete the entire product processing.

本发明采用上述工艺,其能有效保证产品其精度和整体光洁度都符合质量要求,从而保证了后续产品的整体质量,本发明同时还提供了一种试验装置。The present invention adopts the above process, which can effectively ensure that the precision and overall smoothness of the product meet the quality requirements, thereby ensuring the overall quality of subsequent products. The present invention also provides a test device at the same time.

对焊接部位进行内窥和探伤检测,内窥保证了焊接部位内壁的焊接质量,探伤保证了焊缝的质量。Endoscopy and flaw detection are carried out on the welded parts. The endoscope ensures the welding quality of the inner wall of the welded part, and the flaw detection ensures the quality of the weld.

真空钎焊为在真空炉中进行,先将前锥及管系装配好,在焊接部位放置好钎料,放置于真空炉内,真空炉内先抽真空,在加热到钎焊所需温度,保持3到5秒钟时间,在冲氩气冷却,不使用火焰,防止空气进入焊缝中,较好地保证了焊缝的质量,从而保证了产品的质量。Vacuum brazing is carried out in a vacuum furnace. First, assemble the front cone and the pipe system, place the solder on the welding part, and place it in the vacuum furnace. The vacuum furnace is first evacuated and heated to the required temperature for brazing. Hold for 3 to 5 seconds, cool with argon gas, do not use flames, prevent air from entering the weld seam, and better ensure the quality of the weld seam, thereby ensuring the quality of the product.

以上示意性地对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的结构并不局限于此,只要本领域的普通技术人员受其启示,在不脱离本创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。The present invention and its implementation have been described schematically above, the description is not restrictive, and what is shown in the accompanying drawings is only one of the implementation of the present invention, and the actual structure is not limited thereto, as long as those skilled in the art Inspired by it, without departing from the purpose of the invention, any structural means and embodiments similar to the technical solution without creative design shall fall within the scope of protection of the present invention.

Claims (4)

1. A front cone and pipe system processing technology is characterized in that: the method comprises the processes of assembly, welding, surface treatment, test, cleaning and inspection;
the assembly process comprises pipe bending and shape correction of a pipe system, and then assembly connection with the pipe system before;
the surface treatment process comprises the steps of connecting and pickling the cone and the part to be welded of the pipe system, and then carrying out surface nickel plating treatment;
the welding process comprises the steps of welding and connecting the bent pipe and the cone, and then carrying out endoscopic and flaw detection on the welding part;
the test process comprises the steps of performing a piping leakage prevention and pressure resistance test on the whole welded elbow and cone by using a test device;
the cleaning process comprises cleaning a product;
the inspection process includes an overall inspection of the entire product, thereby completing the entire product processing.
2. The process of claim 1 wherein the at least one cutting element comprises at least one cutting element selected from the group consisting of: the welding process adopts vacuum brazing, and after the welding is finished, the flame is turned off, and then the gas is kept for a certain time.
3. The process of claim 2 wherein the forward cone and tube system is produced by: the vacuum brazing is carried out in a vacuum furnace, a front cone and a pipe system are assembled, brazing filler metal is placed at a welding position and placed in the vacuum furnace, the vacuum furnace is vacuumized firstly, the brazing filler metal is heated to the temperature required by brazing and is kept for 3-5 seconds, argon is filled for cooling, and flame is not used.
4. The process of claim 1 wherein the forward cone and tube system is prepared by: the test process ensures that the bevel additional stress of the nose cone is not greater than 700N.
CN202211266835.2A 2022-10-17 2022-10-17 A processing technology of nose cone and pipe system Pending CN115401430A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211266835.2A CN115401430A (en) 2022-10-17 2022-10-17 A processing technology of nose cone and pipe system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211266835.2A CN115401430A (en) 2022-10-17 2022-10-17 A processing technology of nose cone and pipe system

Publications (1)

Publication Number Publication Date
CN115401430A true CN115401430A (en) 2022-11-29

Family

ID=84168673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211266835.2A Pending CN115401430A (en) 2022-10-17 2022-10-17 A processing technology of nose cone and pipe system

Country Status (1)

Country Link
CN (1) CN115401430A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1375374A (en) * 2002-04-18 2002-10-23 南京工业大学 Manufacturing process of stainless steel plate fin type heat exchanger
CN102950390A (en) * 2012-11-09 2013-03-06 航天材料及工艺研究所 Dissimilar metal welding structure and method of titanium alloy flange and stainless steel pipeline
CN104972213A (en) * 2015-05-25 2015-10-14 北京控制工程研究所 Installing and clamping tool and method for conducting capillary tube welding through installing and clamping tool
CN107999981A (en) * 2017-11-30 2018-05-08 中国航发沈阳黎明航空发动机有限责任公司 A kind of welding technique of Split type structure high-pressure turbine guide vane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1375374A (en) * 2002-04-18 2002-10-23 南京工业大学 Manufacturing process of stainless steel plate fin type heat exchanger
CN102950390A (en) * 2012-11-09 2013-03-06 航天材料及工艺研究所 Dissimilar metal welding structure and method of titanium alloy flange and stainless steel pipeline
CN104972213A (en) * 2015-05-25 2015-10-14 北京控制工程研究所 Installing and clamping tool and method for conducting capillary tube welding through installing and clamping tool
CN107999981A (en) * 2017-11-30 2018-05-08 中国航发沈阳黎明航空发动机有限责任公司 A kind of welding technique of Split type structure high-pressure turbine guide vane

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
洪松涛: "钎焊一本通", vol. 1, 31 January 2014, 上海科技技术出版社, pages: 215 *
美国金属学会: "现代机械工程系列精品教材 机械制造基础", vol. 2, 30 June 2021, 机械工业出版社, pages: 1057 *
美国金属学会: "金属手册 第八版 第六卷 焊接与钎焊", vol. 1, 机械工业出版社, pages: 1057 *

Similar Documents

Publication Publication Date Title
CN101704154B (en) Patch welding repair method for machining liner of nickle-based wrought superalloy overhaul machine
CN103354771A (en) Method for repairing a sound attenuation panel
CN103978292B (en) Bimetal metallurgy multiple tube that four roads have welded and process thereof
CN109277672B (en) Correcting process for butt welding bending deformation of stainless steel small-diameter thin-walled tube
CN104977354B (en) High temperature detection method is reprocessed in a kind of steel-casting repair welding
CN103350320A (en) Production method of corrosion-resistant bimetal composite pipe
CN110026712B (en) Preheating device and preheating method for high-strength titanium alloy surface before repair welding
CN109648178A (en) A kind of shell-and-tube exchanger exchanger tubes and tubesheets banjo fixing butt jointing preparation process
CN108296305A (en) A kind of manufacturing method of heavy caliber thick wall composite bimetal pipe
CN106001825A (en) Connecting method for corrosion-resistant high-temperature alloy pipe and corrosion-resistant high-temperature pipe plate and heat exchanger
CN115401430A (en) A processing technology of nose cone and pipe system
CN105290554A (en) Vacuum brazing process of niobium-tungsten alloy and stainless steel annular part
CN111702301A (en) Welding process of UNS N07208 high-temperature alloy tube for boiler with temperature exceeding 700 DEG C
CN101628354B (en) Bore welding method of heat exchange tube and tube plate in heat exchanger
CN106956053B (en) Vacuum brazing method for titanium alloy pipeline
CN101332529B (en) A welding process for thin-walled hexagonal tubes
CN109317787A (en) An all-position narrow gap TIG automatic welding process for steel pipes
CN109807438A (en) A method of for water heater porcelain enamel steel liner girth welding
CN106216554A (en) A kind of air-conditioning heat exchanger technique
CN114713959B (en) Double-sided forming welding joint of aero-engine cylinder assembly and forming method thereof
CN102451971A (en) Manufacturing process of coil type copper heat sink for spacecraft thermal test
CN103639561A (en) Method for brazing stainless steel pipe and aluminum alloy pipe
CN103817398B (en) A kind of welding procedure that prevents that pipe part weldering from leaking
CN114799752A (en) Manufacturing method for water collecting pipe in vacuum chamber of Tokamak device
CN105983748A (en) Before-welding preparation and joint pairing method for pressure pipelines

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221129

RJ01 Rejection of invention patent application after publication