CN115234014A - Quick and safe installation positioning assembly and installation method for cup mouth column - Google Patents
Quick and safe installation positioning assembly and installation method for cup mouth column Download PDFInfo
- Publication number
- CN115234014A CN115234014A CN202210749682.0A CN202210749682A CN115234014A CN 115234014 A CN115234014 A CN 115234014A CN 202210749682 A CN202210749682 A CN 202210749682A CN 115234014 A CN115234014 A CN 115234014A
- Authority
- CN
- China
- Prior art keywords
- column
- cup
- mouth
- installation
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 238000007689 inspection Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000002994 raw material Substances 0.000 abstract description 3
- 238000011900 installation process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 101150038956 cup-4 gene Proteins 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000009628 steelmaking Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种杯口立柱快速安全安装定位组件及安装方法,以解决现有技术费时费力、安全性较差且立柱垂直度无法有效调整的问题。所述组件包括三角楔、液压千斤顶顶推装置和揽风绳手动葫芦张拉装置。所述方法实现立柱底部、顶部双重定位调节,底部调整立柱轴线对齐,顶部调整立柱垂直度,实现立柱的高精度快速安装定位。本发明可有效提高安装效率和安装质量;千斤顶油缸底部和本体被双重固定在支架上,立柱侧向调整时不至于带动油缸侧移歪斜,确保使用安全;原材料简单易得,不需要特备配备,成本低;一次制作,重复使用,适用不同形式的杯口立柱安装。
The invention discloses a positioning assembly for quick and safe installation of a cup-mouth column and an installation method, so as to solve the problems of time-consuming, labor-intensive, poor safety and inability to effectively adjust the verticality of the column in the prior art. The assembly includes a triangular wedge, a hydraulic jack pushing device and a wind rope manual hoist tensioning device. The method realizes the double positioning adjustment of the bottom and the top of the column, the bottom is adjusted to align the axis of the column, and the top is adjusted to the verticality of the column, so as to realize the high-precision and rapid installation and positioning of the column. The invention can effectively improve the installation efficiency and installation quality; the bottom of the cylinder of the jack and the main body are double-fixed on the bracket, and the vertical column will not drive the cylinder to move sideways and skew when it is adjusted laterally, so as to ensure safe use; the raw materials are simple and easy to obtain, and no special equipment is required , low cost; one-time production, repeated use, suitable for different forms of cup mouth column installation.
Description
技术领域technical field
本发明涉及建筑施工技术领域,更具体地,涉及一种杯口立柱快速安全安装定位组件及安装方法。The invention relates to the technical field of building construction, and more particularly, to a quick and safe installation and positioning component and an installation method of a cup mouth column.
背景技术Background technique
杯口基础立柱安装,在立柱插入杯口后,需要对立柱平面轴线位置、标高、垂直度进行精确调整控制,任何一项出现偏差,立柱都无法进行定位,验收将无法通过并进入下一道工序。此外,一般立柱吊装属于高度危险作业,起重设备吊装到杯口后,需要不断调整位置、标高,来满足规范要求的立柱安装要求,整个安装过程可能持续几个小时。对更快、更精准高效的杯口立柱安装尤为迫切,这样可以大量节省人工、机械台班成本,也降低了安全风险。立柱构件普遍是各个构筑物里面最大最重的构件,单靠人力进行调整,基本很难实现,所以在常规安装中,现场作业人员及管理人员,会根据实际,加工制作楔子等辅助工具,协助配合人工进行立柱安装加快安装进度。然而,传统工具存在费时费力,且安装精确度低等问题。For the installation of the base column of the cup mouth, after the column is inserted into the cup mouth, it is necessary to precisely adjust and control the axis position, elevation, and verticality of the column plane. If there is any deviation in any item, the column cannot be positioned, and the acceptance will fail to pass and enter the next process . In addition, general column hoisting is a highly dangerous operation. After the lifting equipment is hoisted to the mouth of the cup, the position and elevation need to be adjusted continuously to meet the requirements of the column installation required by the code. The entire installation process may last for several hours. It is particularly urgent for faster, more accurate and efficient installation of the cup column, which can save a lot of labor and mechanical shift costs, and also reduce safety risks. Column components are generally the largest and heaviest components in each structure, and it is basically difficult to adjust them only by manpower. Therefore, in conventional installation, on-site operators and management personnel will process and make auxiliary tools such as wedges according to the actual situation to assist in coordination. Manual column installation speeds up the installation process. However, traditional tools have problems such as time-consuming and labor-intensive, and low installation accuracy.
申请号为CN202020673342.0的中国实用新型专利公开了一种杯口基础立柱安装组件,包括第一定位件,设置在杯口中立柱的下端面;第二定位件,设置在所述杯口的上端口;所述第一定位件限制所述立柱在所述杯口中进行前后移动;所述第二定位件,对所述立柱在所述杯口中的位置进行左右调整。该方案解决了由于在处理杯口基础立柱安装中杯口尺寸略大于立柱的尺寸时,采用楔子进行X轴和Y轴的位置调节造成杯口基础立柱安装过程费时费力,且安装精确度低的技术问题,然而,该方案的第二定位件的安全措施较少,易出现顶推时油缸歪斜伤人的情况,而且该方案无法对立柱垂直度进行调整。The Chinese utility model patent with the application number CN202020673342.0 discloses a base column installation assembly for the cup mouth, including a first positioning part arranged on the lower end surface of the center column of the cup mouth; a second positioning part arranged on the upper surface of the cup mouth The port; the first positioning part restricts the upright column from moving forward and backward in the cup opening; the second positioning part adjusts the position of the upright column in the cup opening left and right. This solution solves the time-consuming and labor-intensive installation process of the cup foundation column due to the use of wedges to adjust the position of the X-axis and Y-axis when the cup mouth size is slightly larger than the size of the column in the installation of the cup foundation column, and the installation accuracy is low. Technical problem, however, the second positioning part of this scheme has less safety measures, and it is easy to cause the oil cylinder to skew and hurt people when pushing, and this scheme cannot adjust the verticality of the column.
因此,开发一种杯口立柱快速安全安装定位组件及安装方法是一个亟待解决的技术问题。Therefore, it is a technical problem to be solved urgently to develop a fast and safe installation positioning component and installation method of the cup mouth column.
发明内容Contents of the invention
由于现有技术存在上述缺陷,本发明提供了一种杯口立柱快速安全安装定位组件及安装方法,以解决现有技术费时费力、安全性较差且立柱垂直度无法有效调整的问题。Due to the above-mentioned defects in the prior art, the present invention provides a fast and safe installation and positioning component and installation method for the cup mouth column to solve the problems of the prior art that are time-consuming, labor-intensive, poor in safety, and the verticality of the column cannot be effectively adjusted.
为实现上述目的,一方面,本发明提供一种杯口立柱安装定位组件,包括三角楔,其特征在于:还包括液压千斤顶顶推装置、揽风绳手动葫芦张拉装置;所述液压千斤顶顶推装置包括液压千斤顶及其固定支架;所述支架整体呈之字型;支架下板插入所述杯口,钩住杯口壁混凝土;所述千斤顶水平放置在支架水平板上,后部顶在支架上板上;支架上板的千斤顶一侧焊接一圈圆形的千斤顶限位板;所述揽风绳手动葫芦张拉装置包括钢丝绳和手拉葫芦;所述钢丝绳上段固定在立柱顶中间的固定点上,下段固定在地面可靠固定点上,中间用手拉葫芦连接张拉;所述立柱四个侧面方向各设置一套所述揽风绳手动葫芦张拉装置。In order to achieve the above object, on the one hand, the present invention provides a cup mouth column installation and positioning assembly, which includes a triangular wedge, and is characterized in that: it also includes a hydraulic jack pushing device, a wind rope manual hoist tensioning device; The pushing device includes a hydraulic jack and its fixed bracket; the bracket is in a zigzag shape overall; the lower plate of the bracket is inserted into the mouth of the cup to hook the concrete on the wall of the cup; the jack is placed horizontally on the horizontal plate of the bracket, and the rear part is placed on the The upper plate of the bracket; the jack side of the upper plate of the bracket is welded with a circular jack limit plate; the tensioning device of the manual hoist of the wind rope includes a steel wire rope and a chain hoist; the upper section of the steel wire rope is fixed on the middle of the column top On the fixed point, the lower section is fixed on a reliable fixed point on the ground, and a hand chain hoist is used in the middle to connect and tension; the four side directions of the column are respectively provided with a set of the wind rope manual hoist tensioning device.
进一步地,所述支架水平板上设置可开启的固定卡,千斤顶油缸就位后,所述固定卡卡住油缸本体。此特征使得千斤顶固定牢固,顶推时不易侧移歪斜伤人,安全性更高。Further, an openable fixing card is arranged on the horizontal plate of the support, and after the jack cylinder is in place, the fixing card clamps the cylinder body. This feature makes the jack firmly fixed, and it is not easy to move sideways and injure people when pushing, and the safety is higher.
进一步地,所述固定卡为4mm厚50mm宽钢板制作而成。Further, the fixed card is made of a steel plate with a thickness of 4mm and a width of 50mm.
进一步地,所述支架上板整体焊接在水平板上,所述支架上板外侧设有两块三角形支撑板焊接在水平板上。Furthermore, the upper plate of the bracket is integrally welded to the horizontal plate, and two triangular support plates are arranged on the outer side of the upper plate of the bracket and are welded to the horizontal plate.
进一步地,所述液压千斤顶顶推装置在立柱四周设置四套。液压千斤顶顶推装置,主要起调整立柱轴线定位作用,通过调整四个方向的千斤顶顶进行程,来达到立柱底部中心线与基础轴线对齐的目的,更加高效。Further, four sets of hydraulic jack pushing devices are arranged around the column. The hydraulic jack pushing device mainly plays the role of adjusting the positioning of the column axis. By adjusting the stroke of the jack in four directions, the center line of the bottom of the column is aligned with the axis of the foundation, which is more efficient.
进一步地,所述三角楔呈单面楔形,整体长300mm,宽150mm,楔形上口高50mm,下口高200mm,上下口用钢板封头。Further, the triangular wedge is single-sided wedge-shaped, with an overall length of 300mm and a width of 150mm. The wedge-shaped upper opening is 50mm high, and the lower opening is 200mm high. The upper and lower openings are sealed with steel plates.
进一步地,所述三角楔采用12mmQ235-B钢板加工而成。Further, the triangular wedge is processed by 12mm Q235-B steel plate.
进一步地,所述千斤顶限位板为4mm厚30mm宽钢板围成圆形焊接在支架上板上。Further, the jack limit plate is a 4mm thick and 30mm wide steel plate welded on the upper plate of the bracket in a circle.
另一方面,本发明提供一种杯口立柱安装方法,其特征在于,采用上述的一种杯口立柱安装定位组件,包括以下步骤:On the other hand, the present invention provides a method for installing a cup-mouth column, characterized in that, using the above-mentioned cup-mouth column installation and positioning assembly, comprising the following steps:
S1、立柱吊装入杯口后,杯口插入所述三角楔做初步固定,使柱轴线与基础轴线大致对齐;S1. After the column is hoisted into the mouth of the cup, insert the triangular wedge into the mouth of the cup for preliminary fixation, so that the axis of the column is roughly aligned with the axis of the foundation;
S2、根据轴线偏移情况,在偏斜一侧,放入所述液压千斤顶顶推装置,根据轴线偏差情况,逐步顶推到要求的位置;S2. According to the deviation of the axis, put the hydraulic jack pushing device on the side of the deviation, and gradually push it to the required position according to the deviation of the axis;
S3、把立柱四个侧面上的所述三角楔打入,对立柱进行固定;放松千斤顶油缸,取出顶推装置;S3, drive the triangular wedges on the four sides of the column to fix the column; loosen the jack cylinder, and take out the pushing device;
S4、进行立柱柱身垂直度校正检查;存在垂直度偏差时,张紧或者松开相应偏差方向的揽风绳手拉葫芦,以此来实现满足柱身垂直度要求;S4. Carry out the verticality correction inspection of the column body; when there is a verticality deviation, tighten or loosen the wind rope chain hoist in the corresponding deviation direction, so as to meet the verticality requirements of the column body;
S5、进行柱脚一次灌浆,待混凝土强度满足要求后,拆除三角楔和揽风绳。S5. Carry out one-time grouting at the base of the column, and remove the triangular wedge and the wind rope after the concrete strength meets the requirements.
优选地,利用经纬仪或者全站仪进行所述立柱柱身垂直度校正检查。Preferably, a theodolite or a total station is used to check the verticality of the column shaft.
与现有技术相比,上述发明具有如下优点或者有益效果:Compared with the prior art, the above invention has the following advantages or beneficial effects:
(1)安装装置和方法可有效提高安装效率和安装质量;(1) The installation device and method can effectively improve the installation efficiency and installation quality;
(2)千斤顶油缸底部和本体被双重固定在支架上,立柱侧向调整时不至于带动油缸侧移歪斜,确保使用安全;(2) The bottom of the cylinder and the body of the jack are double fixed on the bracket, so that when the column is adjusted laterally, it will not drive the cylinder to move sideways and skew, ensuring safe use;
(3)实现立柱底部、顶部双重定位调节,底部调整立柱轴线对齐,顶部调整立柱垂直度,实现立柱的高精度快速安装定位;(3) Realize the dual positioning adjustment of the bottom and top of the column, adjust the axis alignment of the column at the bottom, and adjust the verticality of the column at the top, so as to realize the high-precision and fast installation and positioning of the column;
(4)原材料简单易得,不需要特备配备,成本低;一次制作,重复使用,适用不同形式的杯口立柱安装,推广性强。(4) The raw materials are simple and easy to obtain, no special equipment is required, and the cost is low; one-time production, repeated use, suitable for installation of different forms of cup posts, and strong promotion.
附图说明Description of drawings
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明及其特征、外形和优点将会变得更加明显。在全部附图中相同的标记指示相同的部分。并未可以按照比例绘制附图,重点在于示出本发明的主旨。The invention and its characteristics, configurations and advantages will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings. Like numbers designate like parts throughout the drawings. The drawings may not be drawn to scale, emphasis instead being placed upon illustrating the gist of the invention.
图1为本发明的安装定位组件的立体结构图;Fig. 1 is the three-dimensional structure diagram of the installation positioning assembly of the present invention;
图2为本发明实施例1的液压千斤顶顶推装置的立体结构图;2 is a three-dimensional structural view of the hydraulic jack pushing device according to
图3为本发明的三角楔的立体结构图;Fig. 3 is the three-dimensional structural diagram of triangular wedge of the present invention;
图4为本发明实施例2的液压千斤顶顶推装置的立体结构图;4 is a three-dimensional structural view of a hydraulic jack pushing device according to
其中,1为三角楔,2为液压千斤顶顶推装置,4为杯口,5为立柱,21为千斤顶,22为支架下板,23为支架水平板,24为支架上板,25为限位板,26为固定卡,27为支撑板,31为钢丝绳,32为手拉葫芦。Among them, 1 is the triangular wedge, 2 is the hydraulic jack pushing device, 4 is the cup mouth, 5 is the column, 21 is the jack, 22 is the lower plate of the bracket, 23 is the horizontal plate of the bracket, 24 is the upper plate of the bracket, and 25 is the limit Plate, 26 is a fixed card, 27 is a support plate, 31 is a wire rope, and 32 is a chain hoist.
具体实施方式Detailed ways
下面结合附图和具体的实施例对本发明中的结构作进一步的说明,但是不作为本发明的限定。The structure of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but it is not intended as a limitation of the present invention.
实施例1Example 1
以炼钢厂房杯口钢柱安装为例,厂房投产后,常年300吨生产行车每日频繁运行。厂房立柱直接影响上部300吨生产行车运行稳定与安全,厂房立柱安装精度要求高。如图1所示,采用一种杯口立柱安装定位组件,包括三角楔1、液压千斤顶顶推装置2和揽风绳手动葫芦张拉装置3;如图2所示,所述液压千斤顶顶推装置2包括液压千斤顶21及其固定支架;所述支架整体呈之字型;支架下板22插入所述杯口4,钩住杯口壁混凝土;所述千斤顶21水平放置在支架水平板23上,后部顶在支架上板24上;支架上板24的千斤顶一侧焊接一圈圆形的千斤顶限位板25;所述揽风绳手动葫芦张拉装置3包括钢丝绳31和手拉葫芦32;所述钢丝绳上段固定在立柱5顶中间的固定点上,下段固定在地面可靠固定点上,中间用手拉葫芦连接张拉;所述立柱5四个侧面方向各设置一套所述揽风绳手动葫芦张拉装置3。Take the installation of the steel column at the mouth of the cup in the steelmaking plant as an example. After the plant is put into production, the 300-ton production vehicle runs frequently every day all year round. The column of the factory building directly affects the stability and safety of the upper 300-ton production crane, and the installation accuracy of the column of the factory building is high. As shown in Figure 1, a cup mouth column is used to install the positioning assembly, including a
本实施例中,所述支架水平板上设置可开启的固定卡26,千斤顶油缸就位后,所述固定卡26卡住油缸本体。所述固定卡26为4mm厚50mm宽钢板制作而成。In this embodiment, an
如图3所示,本实施例中,所述三角楔1呈单面楔形,整体长300mm,宽150mm,楔形上口高50mm,下口高200mm,上下口用钢板封头。所述三角楔1采用12mmQ235-B钢板加工而成。所述千斤顶限位板25为4mm厚30mm宽钢板围成圆形焊接在支架上板上。As shown in Figure 3, in this embodiment, the
采用上述杯口立柱安装定位组件的一种杯口立柱安装方法,包括以下步骤:A method for installing the cup mouth column by using the above cup mouth column to install the positioning component includes the following steps:
S1、立柱吊装入杯口后,杯口插入所述三角楔做初步固定,使柱轴线与基础轴线大致对齐;S1. After the column is hoisted into the mouth of the cup, insert the triangular wedge into the mouth of the cup for preliminary fixation, so that the axis of the column is roughly aligned with the axis of the foundation;
S2、根据轴线偏移情况,在偏斜一侧,放入所述液压千斤顶顶推装置,根据轴线偏差情况,逐步顶推到要求的位置;S2. According to the deviation of the axis, put the hydraulic jack pushing device on the side of the deviation, and gradually push it to the required position according to the deviation of the axis;
S3、把立柱四个侧面上的所述三角楔打入,对立柱进行固定;放松千斤顶油缸,取出顶推装置;S3, drive the triangular wedges on the four sides of the column to fix the column; loosen the jack cylinder, and take out the pushing device;
S4、利用经纬仪进行立柱柱身垂直度校正检查;存在垂直度偏差时,张紧或者松开相应偏差方向的揽风绳手拉葫芦,以此来实现满足柱身垂直度要求;S4. Use the theodolite to check the verticality correction of the column body; when there is a verticality deviation, tighten or loosen the wind rope chain hoist in the corresponding deviation direction, so as to meet the verticality requirements of the column body;
S5、进行柱脚一次灌浆,待混凝土强度满足要求后,拆除三角楔和揽风绳。S5. Carry out one-time grouting at the base of the column, and remove the triangular wedge and the wind rope after the concrete strength meets the requirements.
实施例2Example 2
采用一种杯口立柱安装定位组件,组件组成与实施例1类似。与实施例1不同的是,如图4所示,所述支架上板24整体焊接在水平板上,所述支架上板外侧设有两块三角形支撑板27焊接在水平板上。支撑板27不必采用固定螺栓进行固定,拆除安装方便。所述液压千斤顶顶推装置2在立柱四周设置四套。通过调整四个方向的千斤顶顶进行程,来达到立柱底部中心线与基础轴线对齐的目的,更加高效。在实施杯口立柱的安装时,利用全站仪进行所述立柱柱身垂直度校正检查。A positioning component is installed on a cup mouth column, and the composition of the component is similar to that of
综上,本发明提供了一种杯口立柱快速安全安装定位组件及安装方法,以解决现有技术费时费力、安全性较差且立柱垂直度无法有效调整的问题。所述组件包括三角楔、液压千斤顶顶推装置和揽风绳手动葫芦张拉装置。所述方法实现立柱底部、顶部双重定位调节,底部调整立柱轴线对齐,顶部调整立柱垂直度,实现立柱的高精度快速安装定位。本发明可有效提高安装效率和安装质量;千斤顶油缸底部和本体被双重固定在支架上,立柱侧向调整时不至于带动油缸侧移歪斜,确保使用安全;原材料简单易得,不需要特备配备,成本低;一次制作,重复使用,适用不同形式的杯口立柱安装。To sum up, the present invention provides a positioning assembly and an installation method for quick and safe installation of a cup-mouth column, so as to solve the problems of time-consuming, labor-intensive, poor safety, and inability to effectively adjust the verticality of the column in the prior art. The assembly includes a triangular wedge, a hydraulic jack pushing device and a wind rope manual hoist tensioning device. The method realizes the double positioning adjustment of the bottom and the top of the column, the bottom is adjusted to align the axis of the column, and the top is adjusted to the verticality of the column, so as to realize the high-precision and rapid installation and positioning of the column. The invention can effectively improve the installation efficiency and installation quality; the bottom of the cylinder of the jack and the main body are double-fixed on the bracket, and the vertical column will not drive the cylinder to move sideways and skew when it is adjusted laterally, so as to ensure safe use; the raw materials are simple and easy to obtain, and no special equipment is required , low cost; one-time production, repeated use, suitable for different forms of cup mouth column installation.
本领域技术人员应该理解,本领域技术人员在结合现有技术以及上述实施例可以实现变化例,在此不做赘述。这样的变化例并不影响本发明的实质内容,在此不予赘述。Those skilled in the art should understand that those skilled in the art can implement variations by combining the existing technology and the foregoing embodiments, and details are not described here. Such variations do not affect the essence of the present invention, and will not be repeated here.
以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述的设备和结构应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。The preferred embodiments of the present invention have been described above. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in ordinary ways in the art; any person skilled in the art, without departing from the present invention Within the scope of the technical solution of the invention, many possible changes and modifications can be made to the technical solution of the present invention by using the methods and technical contents disclosed above, or modified into equivalent embodiments with equivalent changes, which does not affect the essence of the present invention. . Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solutions of the present invention still fall within the protection scope of the technical solutions of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210749682.0A CN115234014A (en) | 2022-06-29 | 2022-06-29 | Quick and safe installation positioning assembly and installation method for cup mouth column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210749682.0A CN115234014A (en) | 2022-06-29 | 2022-06-29 | Quick and safe installation positioning assembly and installation method for cup mouth column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115234014A true CN115234014A (en) | 2022-10-25 |
Family
ID=83672367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210749682.0A Pending CN115234014A (en) | 2022-06-29 | 2022-06-29 | Quick and safe installation positioning assembly and installation method for cup mouth column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115234014A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2025011156A1 (en) * | 2023-07-11 | 2025-01-16 | 华能(福建)能源开发有限公司福州分公司 | Novel tube panel pulling-away device |
-
2022
- 2022-06-29 CN CN202210749682.0A patent/CN115234014A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2025011156A1 (en) * | 2023-07-11 | 2025-01-16 | 华能(福建)能源开发有限公司福州分公司 | Novel tube panel pulling-away device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212503601U (en) | Installation die for unit sections of vertical pipes of pipe well | |
CN110526153B (en) | A jack-assisted pile foundation steel cage lifting structure and construction method thereof | |
CN103938653B (en) | Lifting steel pipes method in the construction of hole stake method steel pipe column | |
CN115234014A (en) | Quick and safe installation positioning assembly and installation method for cup mouth column | |
CN116181147A (en) | Construction method of self-lifting hydraulic synchronous jacking chimney | |
CN107097062B (en) | A kind of stacker-reclaimer revolution intersects the replacing options of bearing | |
CN101838986B (en) | Disassembling tool type lattice column and construction method thereof | |
CN217027510U (en) | Accurate adjusting device is used in steel column butt joint | |
CN106150105A (en) | A kind of stiffened column installation method | |
CN113585079B (en) | Method for quickly installing steel structure stand column | |
CN209872184U (en) | An automatic jacking and positioning device for standard sections of tower cranes | |
CN104806001B (en) | The sliding safe operation platform of elevator guide rail and construction method | |
CN1078286A (en) | Concrete barrel novel building method and facility | |
CN217580664U (en) | Construction device with post-pouring section for prefabricated shear wall | |
CN215291319U (en) | Multi-point elevator shaft construction lifting platform | |
CN210087319U (en) | A large-section special-shaped shaft steel strand suspension intelligent hydraulic lifting sliding module | |
CN117661852A (en) | Group holding pole type electric lifting device and installation method of storage tank barrel plate | |
CN114319990A (en) | Inverted cone shell water tower construction process | |
CN210289075U (en) | Adjustable elevator shaft operating platform system that can have enough to meet need | |
CN112502431A (en) | Hydraulic reverse formwork construction method for light aluminum alloy formwork of square chimney | |
CN110820596A (en) | Temporary limiting device for linear adjustment of PC track beam and using method | |
CN216305332U (en) | Guide rail upright post for building construction | |
CN117262979B (en) | Balanced lifting technology of assembled steel-concrete components | |
CN215519871U (en) | Combined elevator shaft operating frame | |
CN220336505U (en) | Temporary fixing structure of arched steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |