CN115142394A - Deformation monitoring and early warning method for high fill and soft foundation engineering - Google Patents
Deformation monitoring and early warning method for high fill and soft foundation engineering Download PDFInfo
- Publication number
- CN115142394A CN115142394A CN202210957815.3A CN202210957815A CN115142394A CN 115142394 A CN115142394 A CN 115142394A CN 202210957815 A CN202210957815 A CN 202210957815A CN 115142394 A CN115142394 A CN 115142394A
- Authority
- CN
- China
- Prior art keywords
- foundation
- fixed box
- detection
- early warning
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000001514 detection method Methods 0.000 claims abstract description 66
- 230000005540 biological transmission Effects 0.000 claims abstract description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims 2
- 230000000694 effects Effects 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/08—Investigation of foundation soil in situ after finishing the foundation structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/10—Miscellaneous comprising sensor means
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Soil Sciences (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
Abstract
本申请公开了用于高填土及软基础工程的变形监测预警方法,属于地基检测技术领域,包括步骤:S1、准备地基沉降监测器,所述地基沉降监测器包括设置于地基基础地面上的固定盒、穿设于所述固定盒上的检测杆、固定于地基桩基侧壁上的转动件以及设置于固定盒内的监测预警组件,所述检测杆远离所述固定盒的一端与所述转动件转动连接,所述监测预警组件用于检测检测杆的转动角度以计算桩基沉降并发出预警;S2、布置固定盒,使得建筑的离地间隙与固定盒至待检测桩基的间距一致;S3、安装转动件,在桩基侧壁开孔,将转动件插接在桩基孔洞内,然后浇筑混凝土,固定转动件;S4、无线监测,通过无线传输技术监测桩基沉降。本申请具有监测地基沉降的效果。
The present application discloses a deformation monitoring and early warning method for high fill and soft foundation engineering, which belongs to the technical field of foundation detection and includes steps: S1. Prepare a foundation settlement monitor, wherein the foundation settlement monitor includes a A fixed box, a detection rod perforated on the fixed box, a rotating member fixed on the side wall of the foundation pile foundation, and a monitoring and early warning assembly arranged in the fixed box, the detection rod is away from the fixed box at one end and the The rotating parts are connected in rotation, and the monitoring and early warning component is used to detect the rotation angle of the detection rod to calculate the settlement of the pile foundation and issue an early warning; S2, arranging the fixed box, so that the ground clearance of the building and the distance between the fixed box and the pile foundation to be detected are Consistent; S3, install the rotating part, open a hole in the side wall of the pile foundation, insert the rotating part in the hole of the pile foundation, and then pour concrete to fix the rotating part; S4, wireless monitoring, monitor the settlement of the pile foundation through wireless transmission technology. The present application has the effect of monitoring foundation settlement.
Description
技术领域technical field
本申请涉及地基监测技术领域,更具体地说,涉及用于高填土及软基础工程的变形监测预警方法。The present application relates to the technical field of foundation monitoring, and more particularly, to a deformation monitoring and early warning method for high fill and soft foundation engineering.
背景技术Background technique
高填土是指堆放在地面上的回填土,大量的高填土堆积,容易造成周围的房屋建筑地基沉降,从而引起地基基础变形。而软地基工程的土地地质较软,在房屋建成长期使用后,也容易出现地基沉降的问题,进而造成地基变形,对建筑的安全性具有一定的隐患。High fill refers to the backfill piled on the ground. The accumulation of a large amount of high fill will easily cause the foundation settlement of the surrounding houses and buildings, thereby causing the deformation of the foundation foundation. However, the land geology of the soft foundation project is relatively soft. After the house is built and used for a long time, the problem of foundation settlement is also prone to occur, which will cause foundation deformation, which has certain hidden dangers to the safety of the building.
为此,亟需一种基础的变形监测预警方法,以检测地基沉降变形,保证建筑的安全性。Therefore, a basic deformation monitoring and early warning method is urgently needed to detect the deformation of the foundation settlement and ensure the safety of the building.
发明内容SUMMARY OF THE INVENTION
为了监测地基沉降,本申请提供用于高填土及软基础工程的变形监测预警方法。In order to monitor foundation settlement, the present application provides a deformation monitoring and early warning method for high fill and soft foundation engineering.
本申请提供的用于高填土及软基础工程的变形监测预警方法采用如下的技术方案:The deformation monitoring and early warning method for high fill and soft foundation engineering provided by this application adopts the following technical solutions:
用于高填土及软基础工程的变形监测预警方法,包括如下步骤:The deformation monitoring and early warning method for high fill and soft foundation engineering includes the following steps:
S1、准备地基沉降监测器,所述地基沉降监测器包括设置于地基基础地面上的固定盒、穿设于所述固定盒上的检测杆、固定于地基桩基侧壁上的转动件以及设置于固定盒内的监测预警组件,所述检测杆远离所述固定盒的一端与所述转动件转动连接,所述监测预警组件用于检测检测杆的转动角度以计算桩基沉降并发出预警;S1. Prepare a foundation settlement monitor. The foundation settlement monitor includes a fixed box arranged on the ground of the foundation foundation, a detection rod passed through the fixed box, a rotating member fixed on the side wall of the foundation pile foundation, and a set of a monitoring and early warning component in the fixed box, the end of the detection rod away from the fixed box is rotatably connected to the rotating member, and the monitoring and early warning component is used to detect the rotation angle of the detection rod to calculate the settlement of the pile foundation and issue an early warning;
S2、布置固定盒,使得建筑的离地间隙与固定盒至待检测桩基的间距一致;S2. Arrange the fixed box so that the ground clearance of the building is consistent with the distance between the fixed box and the pile foundation to be tested;
S3、安装转动件,在桩基侧壁开孔,将转动件插接在桩基孔洞内,然后浇筑混凝土,固定转动件;S3. Install the rotating part, open a hole in the side wall of the pile foundation, insert the rotating part into the hole of the pile foundation, and then pour concrete to fix the rotating part;
S4、无线监测,通过无线传输技术监测桩基沉降。S4, wireless monitoring, monitoring pile foundation settlement through wireless transmission technology.
通过上述技术方案,当地基基础沉降时,桩基相对于地面下沉,此时检测杆随桩基的沉降而相对于固定盒转动,监测预警组件监测检测杆的转动角度,比对计算出桩基的沉降量,从而监测地基基础的沉降,有利于保证建筑的安全性。Through the above technical solution, when the ground foundation settles, the pile foundation sinks relative to the ground. At this time, the detection rod rotates relative to the fixed box with the settlement of the pile foundation. The monitoring and early warning component monitors the rotation angle of the detection rod, and compares and calculates the pile. The settlement of the foundation can be monitored to monitor the settlement of the foundation, which is beneficial to ensure the safety of the building.
进一步的,所述固定盒内底面上固定有竖直设置的固定杆,所述检测杆穿设于固定盒内的端部上开设有第一传动长槽,所述固定杆侧壁固定有穿设于所述第一传动长槽内的滑动圆块,所述第一传动长槽沿所述检测杆的长度方向延伸,且所述滑动圆块与所述第一传动长槽内壁滑移配合;所述固定盒内侧壁开设有沿竖直方向延伸的检测槽,所述检测槽内滑动安装有检测标的块,所述检测杆上还开设有第二传动长槽,所述检测标的块侧壁上固定有穿设于所述第二传动长槽内的传动圆块;所述监测预警组件包括固定于所述检测槽内底面上的距离传感器、固定安装于所述固定盒内侧壁上的控制器以及固定于固定盒内的无线发射模块,所述距离传感器、所述控制器以及所述无线发射模块依次电连接,所述无线发射模块与地面监测中心无线连接;所述距离传感器的检测端朝上,用于检测所述检测标的块的高度位置;所述控制器用于接收距离传感器上传递的检测标的块的高度信号进行比对计算桩基的沉降量,并将高度数据信号通过无线发射模块无线传输至地面监测中心。Further, a vertically arranged fixing rod is fixed on the inner bottom surface of the fixing box, a first transmission long slot is opened on the end of the detection rod passing through the fixing box, and the side wall of the fixing rod is fixed with a piercing hole. A sliding round block arranged in the first transmission long groove, the first transmission long groove extends along the length direction of the detection rod, and the sliding round block is slidingly matched with the inner wall of the first transmission long groove ; The inner side wall of the fixed box is provided with a detection groove extending in the vertical direction, and a detection target block is slidably installed in the detection groove, and a second transmission long groove is also opened on the detection rod. The detection target block side The wall is fixed with a transmission round block that penetrates into the second transmission long groove; the monitoring and early warning component includes a distance sensor fixed on the inner bottom surface of the detection groove, a distance sensor fixed on the inner side wall of the fixed box The controller and the wireless transmitting module fixed in the fixed box, the distance sensor, the controller and the wireless transmitting module are electrically connected in sequence, and the wireless transmitting module is wirelessly connected with the ground monitoring center; the detection of the distance sensor The end is upward, used to detect the height position of the detection target block; the controller is used to receive the height signal of the detection target block transmitted from the distance sensor, compare and calculate the settlement of the pile foundation, and transmit the height data signal through the wireless The transmitter module wirelessly transmits to the ground monitoring center.
通过上述技术方案,当桩基下沉时,转动件带动检测杆转动,使得检测杆带动检测标的块下移,此时,距离传感器检测到检测标的块下移,并发送信号至控制器,控制器通过距离传感器信号比对计算出桩基沉降量并发送信号至无线发射模块,而无线发射模块发送信号至地面监测中心,从而得以让地面监测中心实时检测桩基的沉降量。Through the above technical solution, when the pile foundation sinks, the rotating member drives the detection rod to rotate, so that the detection rod drives the detection target block to move down. At this time, the distance sensor detects that the detection target block moves down, and sends a signal to the controller to control the The sensor calculates the pile foundation settlement by comparing the distance sensor signals and sends the signal to the wireless transmitter module, and the wireless transmitter module sends the signal to the ground monitoring center, so that the ground monitoring center can detect the pile foundation settlement in real time.
进一步的,所述固定盒靠近桩基的侧壁上开设有沿竖直方向延伸的腰型槽,所述检测杆通过所述腰型槽穿设于所述固定盒上,且所述固定盒侧壁与所述固定盒侧壁之间粘接有隔水套,所述腰型槽与所述检测杆均设置于所述隔水套内。Further, a waist-shaped groove extending in the vertical direction is provided on the side wall of the fixing box close to the pile foundation, the detection rod is passed through the waist-shaped groove on the fixing box, and the fixing box is A water-proof jacket is bonded between the side wall and the side wall of the fixing box, and the waist-shaped groove and the detection rod are both arranged in the water-proof jacket.
通过上述技术方案,防止固定盒内受到外界风力影响而造成数据波动。Through the above technical solutions, data fluctuations caused by the influence of external wind in the fixed box are prevented.
综上所述,本申请包括以下至少一个有益技术效果:To sum up, the present application includes at least one of the following beneficial technical effects:
(1)当地基基础沉降时,桩基相对于地面下沉,此时检测杆随桩基的沉降而相对于固定盒转动,监测预警组件监测检测杆的转动角度,比对计算出桩基的沉降量,从而监测地基基础的沉降,有利于保证建筑的安全性;(1) When the foundation settles, the pile foundation sinks relative to the ground. At this time, the detection rod rotates relative to the fixed box with the settlement of the pile foundation. Settlement amount, so as to monitor the settlement of the foundation, which is beneficial to ensure the safety of the building;
(2)当桩基下沉时,转动件带动检测杆转动,使得检测杆带动检测标的块下移,此时,距离传感器检测到检测标的块下移,并发送信号至控制器,控制器通过距离传感器信号比对计算出桩基沉降量并发送信号至无线发射模块,而无线发射模块发送信号至地面监测中心,从而得以让地面监测中心实时检测桩基的沉降量。(2) When the pile foundation sinks, the rotating part drives the detection rod to rotate, so that the detection rod drives the detection target block to move down. At this time, the distance sensor detects the detection target block to move down, and sends a signal to the controller. The distance sensor signal compares and calculates the settlement of the pile foundation and sends the signal to the wireless transmission module, and the wireless transmission module sends the signal to the ground monitoring center, so that the ground monitoring center can detect the settlement of the pile foundation in real time.
附图说明Description of drawings
图1为用于高填土及软基础工程的变形监测预警方法的步骤示意图;Fig. 1 is the step schematic diagram of the deformation monitoring and early warning method used for high fill and soft foundation engineering;
图2为地基沉降监测器的结构示意图;Figure 2 is a schematic structural diagram of a foundation settlement monitor;
图3为固定盒的内部结构示意图。Figure 3 is a schematic diagram of the internal structure of the fixed box.
图中标号说明:Description of the labels in the figure:
1、固定盒;11、固定杆;12、滑动圆块;13、检测槽;14、检测标的块;15、传动圆块;2、检测杆;21、第一传动长槽;22、第二传动长槽;3、转动件;4、监测预警组件;41、距离传感器;42、控制器;43、无线发射模块;5、隔水套。1. Fixed box; 11. Fixed rod; 12. Sliding round block; 13. Detection slot; 14. Detection target block; 15. Transmission round block; 2. Detection rod; 21. First transmission long slot; 22, Second 3. Rotating parts; 4. Monitoring and warning components; 41. Distance sensor; 42. Controller; 43. Wireless transmitting module; 5. Waterproof jacket.
具体实施方式Detailed ways
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例,基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application; obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The embodiments in the present application and all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present application.
在本申请的描述中,需要说明的是,术语“上”、“下”、“内”、“外”、“顶/底端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present application, it should be noted that the orientations or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "top/bottom", etc. are based on the orientations shown in the accompanying drawings Or the positional relationship is only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation on the present application. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed to indicate or imply relative importance.
在本申请的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“套设/接”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation", "provided with", "sleeve/connection", "connection", etc., should be understood in a broad sense, such as " Connection", which can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be an internal connection between two components. of connectivity. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood in specific situations.
以下结合附图1-3对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with accompanying drawings 1-3.
本申请实施例公开用于高填土及软基础工程的变形监测预警方法,请参阅图1,包括如下步骤:The embodiment of the present application discloses a deformation monitoring and early warning method for high fill and soft foundation engineering, please refer to FIG. 1 , including the following steps:
S1、准备地基沉降监测器,结合图2所示,地基沉降监测器包括设置于地基基础地面上的固定盒1、穿设于固定盒1上的检测杆2、固定于地基桩基侧壁上的转动件3以及设置于固定盒1内的监测预警组件4,检测杆2远离固定盒1的一端与转动件3转动连接,监测预警组件4用于检测检测杆2的转动角度以计算桩基沉降并发出预警;S1. Prepare the foundation settlement monitor. As shown in Figure 2, the foundation settlement monitor includes a fixed box 1 arranged on the ground of the foundation foundation, a detection rod 2 passed through the fixed box 1, and fixed on the side wall of the foundation pile foundation. The rotating member 3 and the monitoring and early warning assembly 4 arranged in the fixed box 1, the end of the detection rod 2 away from the fixed box 1 is rotatably connected with the rotating member 3, and the monitoring and early warning assembly 4 is used to detect the rotation angle of the detection rod 2 to calculate the pile foundation. subsidence and issue an early warning;
参照图3,为加强本领域技术人员理解,对上述地基沉降监测器进一步描述。固定盒1内底面上固定有竖直设置的固定杆11,检测杆2穿设于固定盒1内的端部上开设有第一传动长槽21,固定杆11侧壁固定有穿设于第一传动长槽21内的滑动圆块12,第一传动长槽21沿检测杆2的长度方向延伸,且滑动圆块12与第一传动长槽21内壁滑移配合;固定盒1内侧壁开设有沿竖直方向延伸的检测槽13,检测槽13内滑动安装有检测标的块14,检测杆2上还开设有第二传动长槽22,检测标的块14侧壁上固定有穿设于第二传动长槽22内的传动圆块15;监测预警组件4包括固定于检测槽13内底面上的距离传感器41、固定安装于固定盒1内侧壁上的控制器42以及固定于固定盒1内的无线发射模块43,距离传感器41、控制器42以及无线发射模块43依次电连接,无线发射模块43与地面监测中心无线连接;距离传感器41的检测端朝上,用于检测检测标的块14的高度位置;控制器42用于接收距离传感器41上传递的检测标的块14的高度信号进行比对计算桩基的沉降量,并将高度数据信号通过无线发射模块43无线传输至地面监测中心。固定盒1靠近桩基的侧壁上开设有沿竖直方向延伸的腰型槽,检测杆2通过腰型槽穿设于固定盒1上,且固定盒1侧壁与固定盒1侧壁之间粘接有隔水套5,腰型槽与检测杆2均设置于隔水套5内。Referring to FIG. 3 , in order to enhance the understanding of those skilled in the art, the above-mentioned foundation settlement monitor is further described. A vertically arranged fixing
S2、布置固定盒1,使得建筑的离地间隙与固定盒1至待检测桩基的间距一致;S2. Arrange the fixed box 1 so that the ground clearance of the building is consistent with the distance between the fixed box 1 and the pile foundation to be tested;
S3、安装转动件3,在桩基侧壁开孔,将转动件3插接在桩基孔洞内,然后浇筑混凝土,固定转动件3;S3. Install the rotating member 3, open a hole in the side wall of the pile foundation, insert the rotating member 3 in the hole of the pile foundation, and then pour concrete to fix the rotating member 3;
S4、无线监测,通过无线传输技术监测桩基沉降。S4, wireless monitoring, monitoring pile foundation settlement through wireless transmission technology.
本申请实施例用于高填土及软基础工程的变形监测预警方法的实施原理为:当地基基础沉降时,桩基相对于地面下沉,此时检测杆2随桩基的沉降而相对于固定盒1转动,使得检测杆2带动检测标的块14下移,此时,距离传感器41检测到检测标的块14下移,并发送信号至控制器42,控制器42通过距离传感器41信号比对计算出桩基沉降量并发送信号至无线发射模块43,而无线发射模块43发送信号至地面监测中心,从而得以让地面监测中心实时检测桩基的沉降量,有利于保证建筑的安全性。The implementation principle of the deformation monitoring and early warning method for high fill and soft foundation engineering in the embodiment of the present application is as follows: when the ground foundation settles, the pile foundation sinks relative to the ground, and at this time, the detection rod 2 moves relative to the ground along with the settlement of the pile foundation. The fixed box 1 is rotated, so that the detection rod 2 drives the
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210957815.3A CN115142394A (en) | 2022-08-10 | 2022-08-10 | Deformation monitoring and early warning method for high fill and soft foundation engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210957815.3A CN115142394A (en) | 2022-08-10 | 2022-08-10 | Deformation monitoring and early warning method for high fill and soft foundation engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115142394A true CN115142394A (en) | 2022-10-04 |
Family
ID=83416660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210957815.3A Pending CN115142394A (en) | 2022-08-10 | 2022-08-10 | Deformation monitoring and early warning method for high fill and soft foundation engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115142394A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5337613A (en) * | 1991-08-29 | 1994-08-16 | Kalman Kovari | Measuring instrument for determining displacements in soil, rock, foundation soil or construction materials |
JP2000155020A (en) * | 1998-11-20 | 2000-06-06 | Tekken Constr Co Ltd | Displacement gauge, its installation structure and its installation method |
CN110004994A (en) * | 2019-04-26 | 2019-07-12 | 瑞安市职业中等专业教育集团学校 | A kind of bridge pier washes away real-time monitoring device and its application method |
CN210603278U (en) * | 2019-11-06 | 2020-05-22 | 广东省坦途工程技术有限公司 | Device for detecting natural gas pipeline settlement |
CN111236330A (en) * | 2020-03-12 | 2020-06-05 | 四川省兴冶岩土工程检测有限责任公司 | Pile foundation settlement detection device and detection method thereof |
CN112301991A (en) * | 2020-09-17 | 2021-02-02 | 广州地建岩土工程技术有限公司 | Deformation automatic monitoring and early warning method capable of being used for high-fill and soft foundation engineering |
CN214574186U (en) * | 2021-01-25 | 2021-11-02 | 江苏建筑职业技术学院 | Automatic monitoring device for settlement and deformation of foundation pit |
CN214583187U (en) * | 2021-03-02 | 2021-11-02 | 青海天智公路检测有限公司 | High-precision pile foundation settlement detection ruler |
CN114152239A (en) * | 2021-11-04 | 2022-03-08 | 盐城工学院 | A method for measuring surface settlement and its observation device |
CN216243304U (en) * | 2021-12-06 | 2022-04-08 | 上海中侨职业技术大学 | Settlement detection device for constructional engineering |
CN217053499U (en) * | 2022-03-10 | 2022-07-26 | 江西中杰工程质量检测有限公司 | Pile foundation settlement monitoring device |
CN114809124A (en) * | 2022-04-06 | 2022-07-29 | 深圳市盛业建筑科技(集团)有限公司 | Foundation pit deformation measuring device and measuring method thereof |
-
2022
- 2022-08-10 CN CN202210957815.3A patent/CN115142394A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5337613A (en) * | 1991-08-29 | 1994-08-16 | Kalman Kovari | Measuring instrument for determining displacements in soil, rock, foundation soil or construction materials |
JP2000155020A (en) * | 1998-11-20 | 2000-06-06 | Tekken Constr Co Ltd | Displacement gauge, its installation structure and its installation method |
CN110004994A (en) * | 2019-04-26 | 2019-07-12 | 瑞安市职业中等专业教育集团学校 | A kind of bridge pier washes away real-time monitoring device and its application method |
CN210603278U (en) * | 2019-11-06 | 2020-05-22 | 广东省坦途工程技术有限公司 | Device for detecting natural gas pipeline settlement |
CN111236330A (en) * | 2020-03-12 | 2020-06-05 | 四川省兴冶岩土工程检测有限责任公司 | Pile foundation settlement detection device and detection method thereof |
CN112301991A (en) * | 2020-09-17 | 2021-02-02 | 广州地建岩土工程技术有限公司 | Deformation automatic monitoring and early warning method capable of being used for high-fill and soft foundation engineering |
CN214574186U (en) * | 2021-01-25 | 2021-11-02 | 江苏建筑职业技术学院 | Automatic monitoring device for settlement and deformation of foundation pit |
CN214583187U (en) * | 2021-03-02 | 2021-11-02 | 青海天智公路检测有限公司 | High-precision pile foundation settlement detection ruler |
CN114152239A (en) * | 2021-11-04 | 2022-03-08 | 盐城工学院 | A method for measuring surface settlement and its observation device |
CN216243304U (en) * | 2021-12-06 | 2022-04-08 | 上海中侨职业技术大学 | Settlement detection device for constructional engineering |
CN217053499U (en) * | 2022-03-10 | 2022-07-26 | 江西中杰工程质量检测有限公司 | Pile foundation settlement monitoring device |
CN114809124A (en) * | 2022-04-06 | 2022-07-29 | 深圳市盛业建筑科技(集团)有限公司 | Foundation pit deformation measuring device and measuring method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US12055034B2 (en) | Advanced inground operations, system and associated apparatus | |
US20230323769A1 (en) | Near-bit multi-parameter downhole measurement and control system while drilling | |
US10330823B2 (en) | Borehole testing device | |
US10690805B2 (en) | Borehold testing device | |
CA2558107C (en) | Method and system for detecting conditions inside a wellbore | |
CN100513736C (en) | Underground liquid level monitoring system and its method | |
CN110608691B (en) | Real-time monitoring system and method of landslide deep displacement based on sound source localization | |
CN104596405B (en) | Rain dirty pipe deforming contact real-time monitoring device and method on ground | |
CN106908033B (en) | Synchronous measuring device and method for multipoint displacement of top plate of goaf | |
CN101118687A (en) | System and method for real time remote wireless monitoring slope landslide | |
CN108344347A (en) | A kind of landslide depth displacement real-time measurement apparatus and measurement method | |
CN103727911A (en) | Assembled deep displacement monitoring device and system based on MEMS array | |
CN205138480U (en) | Activity inclinometer | |
CN111623747B (en) | A surface subsidence monitoring system and monitoring method thereof | |
CN112922586A (en) | Single-line inertial navigation type dry-wet hole forming quality detection device and method | |
CN116559882A (en) | Auxiliary equipment and method for detecting sonar auxiliary pile foundation under karst geological condition | |
CN115142394A (en) | Deformation monitoring and early warning method for high fill and soft foundation engineering | |
CN105157553A (en) | Building component relative displacement signal sensing generation device and application method thereof | |
CN114018149B (en) | A vertical deformation displacement detection device and detection method thereof | |
CN118275538B (en) | Deep soil body active monitoring device and monitoring method based on shear wave velocity | |
CN115031685A (en) | Underwater penetration monitoring system and operation method thereof | |
CN103161454B (en) | Directional drilling machine is utilized to do the method for horizontal geological survey | |
CN208012490U (en) | Landslide depth displacement real-time measurement apparatus | |
EP2054581B1 (en) | Sensor system | |
CN215339839U (en) | Ground disaster early warning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20221004 |
|
WD01 | Invention patent application deemed withdrawn after publication |