CN115110912B - A construction device and working method for offshore oil well sealing - Google Patents
A construction device and working method for offshore oil well sealing Download PDFInfo
- Publication number
- CN115110912B CN115110912B CN202210915436.8A CN202210915436A CN115110912B CN 115110912 B CN115110912 B CN 115110912B CN 202210915436 A CN202210915436 A CN 202210915436A CN 115110912 B CN115110912 B CN 115110912B
- Authority
- CN
- China
- Prior art keywords
- construction
- air inlet
- bin
- air
- inlet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
- Y02A20/204—Keeping clear the surface of open water from oil spills
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
本发明提供了一种用于海上油井封井的施工装置,包括油管、用于封堵油管的油管封堵器以及球形自封闭施工仓,油管封堵器的顶端固定安装有锁止槽,锁止槽顶端固定安装有单向阀接头,单向阀接头和锁止槽上活动连接有自动连接器,球形自封闭施工仓的上顶部与下底部设计有圆孔,且上下孔周围分别带有上液压膨胀器和下液压膨胀器,球形自封闭施工仓的顶部还设有软管接头,软管接头连接空气加压管、电源线和抽水管,球形自封闭施工仓的内壁上安装有控制仓和工具仓。通过本发明的技术方案,研发出一套设备可对海上油井进行封堵切割,施工工艺简单,耗资少,用人少且时间短,施工时只需要两名蛙人进入内部即可完成封堵和切割油管工作。
The invention provides a construction device for offshore oil well sealing, which includes oil pipes, oil pipe plugging devices for plugging oil pipes, and spherical self-sealing construction warehouses. The top of the oil pipe plugging devices is fixedly equipped with locking grooves, locking A one-way valve joint is fixedly installed on the top of the check groove, and an automatic connector is movably connected to the one-way valve joint and the locking groove. The upper hydraulic expander and the lower hydraulic expander, the top of the spherical self-enclosed construction warehouse is also equipped with a hose joint, the hose joint is connected to the air pressure pipe, power line and water suction pipe, and the inner wall of the spherical self-enclosed construction warehouse is installed with a control bins and tool bins. Through the technical solution of the present invention, a set of equipment has been developed to block and cut offshore oil wells. The construction process is simple, less costly, less labor-intensive and short in time. During construction, only two frogmen are required to enter the interior to complete the plugging and cutting. Cut tubing work.
Description
技术领域technical field
本发明涉及海洋石油油井封井设备技术领域,具体而言,特别涉及一种用于海上油井封井的施工装置及其工作方法。The invention relates to the technical field of sealing equipment for offshore oil wells, in particular to a construction device for sealing offshore oil wells and a working method thereof.
背景技术Background technique
随着海上油井出油量的降低和国家对浅海湿地的封井要求,针对出油量低的油井开始进行封闭关停不再开采,特别是针对海平面以下较深的油井,对于退役的海上平台,在拆除之前必须进行封井作业。在废弃油井封井作业领域中,应做到井内外无地下流体上串的通道,因此需要使用封井装置将井内环境与外部的环境密封隔绝,防止原油意外溢出造成浪费,同时防止原油泄漏到海底面而污染海洋环境的可能性。现有技术中,采用打桩船将支护钢桩顺着出油管向下打入海底并固定,然后将支护钢桩内的海水抽干,再有工人进入支护钢桩内对油管进行切割和焊接及防腐,施工结束后在将支护钢桩起出运走。这些封堵工艺耗时耗力且费用高。With the reduction of oil output from offshore oil wells and the country's requirements for closing wells in shallow sea wetlands, oil wells with low oil output have been closed and shut down and no longer exploited, especially for oil wells deep below sea level. For decommissioned offshore The platform must be shut down before being dismantled. In the field of abandoned oil well sealing operations, there should be no passage of underground fluids inside and outside the well. Therefore, it is necessary to use a sealing device to seal and isolate the environment inside the well from the outside environment to prevent waste caused by accidental spillage of crude oil, and at the same time prevent crude oil from leaking into the Possibility of polluting the marine environment due to seabed surface. In the prior art, a piling ship is used to drive the supporting steel piles down the oil outlet pipe into the seabed and fix them, then the seawater in the supporting steel piles is drained, and workers enter the supporting steel piles to cut the oil pipes And welding and anti-corrosion, after the construction is completed, the supporting steel piles will be lifted out and transported away. These plugging processes are time-consuming, labor-intensive and expensive.
发明内容Contents of the invention
为了弥补现有技术的不足,本发明提供了一种用于海上油井封井的施工装置及其工作方法,本发明专利研发出一套设备可对海上油井进行封堵,施工工艺简单,耗资少,用人少且时间短,施工时只需要两名蛙人进入内部即可完成封堵工作。In order to make up for the deficiencies of the existing technology, the present invention provides a construction device and working method for offshore oil well sealing. The patent of the present invention has developed a set of equipment that can seal offshore oil wells. The construction process is simple and the cost is low. , with less labor and short time, only two frogmen are needed to enter the interior during construction to complete the sealing work.
本发明是通过如下技术方案实现的:一种用于海上油井封井的施工装置,包括油管、用于封堵油管的油管封堵器以及球形自封闭施工仓,油管封堵器的顶端固定安装有锁止槽,锁止槽顶端固定安装有单向阀接头,单向阀接头和锁止槽上活动连接有自动连接器,自动连接器呈圆台形其顶部设置有第一进气管接头,第一进气管接头连接有第一进气管,自动连接器的内壁上有锁止活塞,锁止活塞上设有锁止锁球,锁止活塞的下端设置有弹簧,锁止活塞连接气道的一端,气道的另一端设置有第二进气管接头,第二进气管接头连接有第二进气管,第二进气管管径小于第一进气管且安装在其内部;The present invention is achieved through the following technical solutions: a construction device for offshore oil well sealing, including oil pipes, oil pipe plugging devices for plugging oil pipes, and spherical self-sealing construction bins, the top of the oil pipe plugging devices is fixed and installed There is a locking groove, and a one-way valve joint is fixedly installed on the top of the locking groove, and an automatic connector is movably connected to the one-way valve joint and the locking groove. An air inlet pipe joint is connected with the first air inlet pipe, and there is a locking piston on the inner wall of the automatic connector. The locking piston is provided with a locking ball, and the lower end of the locking piston is provided with a spring, and the locking piston is connected to one end of the air passage. , the other end of the air passage is provided with a second air intake pipe joint, the second air intake pipe joint is connected with a second air intake pipe, the diameter of the second air intake pipe is smaller than that of the first air intake pipe and installed inside it;
球形自封闭施工仓的上顶部与下底部设计有圆孔,且上下孔周围分别带有上液压膨胀器和下液压膨胀器,球形自封闭施工仓内部设置有内支撑架,用于固定油管,上液压膨胀器和下液压膨胀器连接有进气口,球形自封闭施工仓的顶部还设有软管接头,软管接头连接空气加压管、电源线和抽水管,球形自封闭施工仓的内壁上安装有控制仓和工具仓,球形自封闭施工仓的内壁上还设有抽水软管,抽水管与抽水软管相连;球形自封闭施工仓上开设有可供作业时蛙人进入的螺旋杆仓门。The upper top and lower bottom of the spherical self-enclosed construction warehouse are designed with round holes, and the upper and lower holes are respectively equipped with upper hydraulic expanders and lower hydraulic expanders. The spherical self-enclosed construction warehouse is equipped with an inner support frame for fixing oil pipes. The upper hydraulic expander and the lower hydraulic expander are connected with an air inlet, and the top of the spherical self-enclosed construction warehouse is also equipped with a hose joint, which connects the air pressurized pipe, power line and water suction pipe, and the spherical self-enclosed construction warehouse A control chamber and a tool chamber are installed on the inner wall, and a pumping hose is also provided on the inner wall of the spherical self-enclosed construction chamber, which is connected with the pumping hose; the spherical self-enclosed construction chamber is provided with a spiral for the frogman to enter during operation. Rod barn door.
作为优选方案,油管封堵器采用复合橡胶制成,内部为气室,其外壁上设置有一圈加强圈,加压空气膨胀后可密封油管内部。As a preferred solution, the oil pipe plugging device is made of composite rubber, the interior is an air chamber, and a ring of reinforcement ring is arranged on its outer wall, and the inside of the oil pipe can be sealed after the pressurized air expands.
作为优选方案,第二进气管和第一进气管为钢丝软管材料。As a preferred solution, the second air intake pipe and the first air intake pipe are made of steel wire hose material.
作为优选方案,球形自封闭施工仓的上顶部两侧分别固定安装有吊装环。As a preferred solution, hoisting rings are fixedly installed on both sides of the upper top of the spherical self-enclosed construction warehouse.
作为优选方案,控制仓和工具仓分别通过控制仓仓门开关杆和工具仓仓门开关杆打开使用。As a preferred solution, the control bin and the tool bin are respectively opened and used by the control bin door switch lever and the tool bin door switch lever.
进一步地,控制仓内水抽干后可打开使用,打开后内部有施工用的微型电焊机,切割机,空气补偿管口及专用工具,下水时工具仓为全密封状态。Further, after the water in the control chamber is drained, it can be opened for use. After opening, there are micro electric welding machines for construction, cutting machines, air compensation nozzles and special tools inside. The tool chamber is fully sealed when it is launched.
作为优选方案,螺旋杆仓门的一侧通过仓门合页活动连接在球形自封闭施工仓的外壁上,螺旋杆仓门的另一侧设置有螺旋杆,螺旋杆的上端设置有螺旋杆摇柄,转动螺旋杆摇柄驱动螺旋杆轻松开启螺旋杆仓门。As a preferred solution, one side of the screw rod warehouse door is flexibly connected to the outer wall of the spherical self-enclosed construction warehouse through the door hinge, the other side of the screw rod warehouse door is provided with a screw rod, and the upper end of the screw rod is provided with a screw rod rocker. handle, turn the auger rocker to drive the auger to easily open the auger door.
进一步地,控制仓的底部设有进水阀,控制仓的顶部设有旁通口。Furthermore, a water inlet valve is provided at the bottom of the control chamber, and a bypass port is provided at the top of the control chamber.
一种用于海上油井封井的施工装置的工作方法,其特征在于,具体包括以下步骤:A working method for a construction device for shutting in an offshore oil well, characterized in that it specifically includes the following steps:
S1:油管封堵器上部的单向阀接头通过自动连接器连有第二进气管和第一进气管两根压力软管连接,第一进气管与第一进气管接头接口连接后,向油管封堵器内部注入压缩空气,当空气压力达到规定值后,另一根第二进气管与第二进气管接头对接在气道内进行充气加压,加压后驱动弹簧将锁止活塞和锁止锁球弹开,使单向阀接头和锁止槽从自动连接器内脱离,将油管封堵器留在油管内;S1: The one-way valve joint on the upper part of the oil pipe blocker is connected with two pressure hoses, the second air intake pipe and the first air intake pipe, through an automatic connector. Compressed air is injected into the occluder. When the air pressure reaches the specified value, another second air inlet pipe is connected with the second air inlet pipe joint to inflate and pressurize the air passage. After pressurization, the driving spring will lock the piston and lock The lock ball bounces off, so that the one-way valve joint and the locking groove are separated from the automatic connector, and the oil pipe blocker is left in the oil pipe;
S2:将球形自封闭施工仓通过吊装环从油管上方套入。蛙人下入到预定施工位置后,上液压膨胀器和下液压膨胀器可自动膨胀使上下圆孔直径变小与油管紧密吻合,S2: The spherical self-enclosed construction warehouse is inserted from above the oil pipe through the hoisting ring. After the frogman is lowered to the predetermined construction position, the upper hydraulic expander and the lower hydraulic expander can automatically expand to make the diameter of the upper and lower round holes smaller and closely match the oil pipe.
S3:蛙人打开螺旋杆舱门,进入后关闭螺旋杆舱门;开启抽水开关将球形自封闭施工仓内部海水抽出,抽水时球形自封闭施工仓顶部旁通口会向施工仓内部输送空气来平衡大气压;S3: The frogman opens the screw hatch and closes the screw hatch after entering; turns on the pumping switch to pump out the seawater inside the spherical self-enclosed construction chamber, and the bypass port at the top of the spherical self-enclosed construction chamber will deliver air to the interior of the construction chamber when pumping water Equilibrium atmospheric pressure;
S4:施工结束后施工蛙人再打开球形自封闭施工仓底部进水阀,使海水进入球形自封闭施工仓内,仓内空气再经顶部旁通口排除,当内外水压平衡时,转动螺旋杆摇柄驱动螺旋杆轻松开启舱门。S4: After the construction is completed, the construction frogman opens the water inlet valve at the bottom of the spherical self-sealing construction warehouse, so that seawater enters the spherical self-sealing construction warehouse, and the air in the warehouse is discharged through the top bypass port. When the internal and external water pressures are balanced, turn the screw The rod crank drives the screw rod to open the hatch easily.
本发明由于采用了以上技术方案,与现有技术相比使其具有以下有益效果:研发出一套设备可对海上油井进行封堵切割,施工工艺简单,耗资少,用人少且时间短,施工时只需要两名蛙人进入内部即可完成封堵和切割油管工作。Compared with the prior art, the present invention has the following beneficial effects due to the adoption of the above technical scheme: a set of equipment has been developed to block and cut offshore oil wells, the construction process is simple, the cost is less, and the construction time is short and the construction time is short. Only two frogmen are needed to enter the interior to complete the work of plugging and cutting the oil pipe.
本发明的附加方面和优点将在下面的描述部分中变得明显,或通过本发明的实践了解到。Additional aspects and advantages of the invention will become apparent in the description which follows, or may be learned by practice of the invention.
附图说明Description of drawings
本发明的上述和/或附加的方面和优点从结合下面附图对实施例的描述中将变得明显和容易理解,其中:The above and/or additional aspects and advantages of the present invention will become apparent and understandable from the description of the embodiments in conjunction with the following drawings, wherein:
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为油井封堵器的结构示意图;Fig. 2 is the structural representation of oil well plugging device;
图3为控制仓的侧视结构示意图;Fig. 3 is a side view structural schematic diagram of the control cabin;
图4为自动连接器的结构示意图,Figure 4 is a schematic diagram of the structure of the automatic connector,
其中,图1至图4中附图标记与部件之间的对应关系为:Wherein, the corresponding relationship between reference numerals and components in Fig. 1 to Fig. 4 is:
101.第一进气管接头;102.第二进气管接头;103. 单向阀接头; 104.锁止槽;105.油井封堵器; 106.加强圈;107.气室;2.自动连接器;201.第二气道管接口;202.第一气道管接口;203.气道;204.锁止活塞;205.弹簧;206.锁止锁球;3.球形自封闭施工仓;301. 空气加压管; 302. 电源线;303. 抽水管口;304.软管接头;305.吊装环;306.进气口;307. 控制仓仓门开关杆;308. 控制仓;309. 抽水软管; 310.下液压膨胀器;311.上液压膨胀器; 312. 内支撑架;313. 工具仓仓门开关杆;314.工具仓;401.旁通口;402. 螺旋杆仓门;403.仓门合叶;404.螺旋杆摇柄;405. 螺旋杆;406.进水阀;101. First air intake pipe joint; 102. Second air intake pipe joint; 103. One-way valve joint; 104. Locking groove; 105. Oil well plugging device; 106. Reinforcing ring; 107. Air chamber; 2. Automatic connection Device; 201. Second airway tube interface; 202. First airway tube interface; 203. Airway; 204. Locking piston; 205. Spring; 206. Locking lock ball; 3. Spherical self-sealing construction warehouse; 301. Air pressure tube; 302. Power cord; 303. Suction nozzle; 304. Hose connector; 305. Lifting ring; 306. Air inlet; 307. Control compartment door switch lever; 308. Control compartment; .Suction hose; 310. Lower hydraulic expander; 311. Upper hydraulic expander; 312. Inner support frame; 313. Tool compartment door switch lever; 314. Tool compartment; 401. Bypass port; 402. Screw rod compartment Door; 403. door hinge; 404. screw rod rocker; 405. screw rod; 406. water inlet valve;
具体实施方式Detailed ways
为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和具体实施方式对本发明进行进一步的详细描述。需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。In order to understand the above-mentioned purpose, features and advantages of the present invention more clearly, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments can be combined with each other.
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用其他不同于在此描述的方式来实施,因此,本发明的保护范围并不受下面公开的具体实施例的限制。In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention can also be implemented in other ways different from those described here. Therefore, the protection scope of the present invention is not limited by the specific implementation disclosed below. Example limitations.
下面结合图1至图4对本发明的实施例的用于海上油井封井的施工装置及其工作方法进行具体说明。The construction device for offshore oil well closure and its working method according to the embodiment of the present invention will be specifically described below with reference to FIGS. 1 to 4 .
如图1至图4所示,本发明提出了一种用于海上油井封井的施工装置,包括油管、用于封堵油管的油管封堵器105以及球形自封闭施工仓3,油管封堵器105采用复合橡胶制成,内部为气室107,其外壁上设置有一圈加强圈106,加压空气膨胀后可密封油管内部,防止原油溢出。油管封堵器105的顶端固定安装有锁止槽104,锁止槽104顶端固定安装有单向阀接头103,单向阀接头103和锁止槽104上活动连接有自动连接器2,自动连接器2呈圆台形其顶部设置有第一进气管接头201,第一进气管接头201连接有第一进气管102,自动连接器2的内壁上有锁止活塞204,锁止活塞204上设有锁止锁球206,锁止活塞204的下端设置有弹簧205,锁止活塞204连接气道203的一端,气道203的另一端设置有第二进气管接头202,第二进气管接头202连接有第二进气管101,第二进气管101管径小于第一进气管102且安装在其内部;第二进气管101和第一进气管102为钢丝软管材料。As shown in Figures 1 to 4, the present invention proposes a construction device for offshore oil well sealing, including oil pipes, oil
球形自封闭施工仓3的上顶部与下底部设计有圆孔,球形自封闭施工仓3的上顶部两侧分别固定安装有吊装环305,且上下孔周围分别带有上液压膨胀器311和下液压膨胀器310,球形自封闭施工仓3内部设置有内支撑架312,用于固定油管,内支撑架312是在管线切割前将施工仓2内支撑架与管线上部三方向支撑连接,防止管线切割后施工仓在没有下孔膨胀器的支撑而发生摆动,施工完毕后施工仓可随着上部油管一起吊出,在陆地上进行分解回收。上液压膨胀器311和下液压膨胀器310连接有进气口306,上液压膨胀器311和下液压膨胀器310是由特殊材料制成,内部均为中空,在预定位置时,有海上面的压缩泵通过203进气口将空气压缩至膨胀器内,上下口变小与油管吻合防止海水进入的同时还能作为稳定支撑,方便内部施工工作。球形自封闭施工仓3的顶部还设有软管接头304,软管接头304连接空气加压管301、电源线302和抽水管303,球形自封闭施工仓3的内壁上安装有控制仓308和工具仓314,球形自封闭施工仓3的内壁上还设有抽水软管309,抽水管303与抽水软管309相连;控制仓308上开设有可供作业时蛙人进入的螺旋杆仓门402。控制仓308和工具仓314分别通过控制仓仓门开关杆307和工具仓仓门开关杆313打开使用。球形自封闭施工仓3内水抽干后可打开工具仓 314使用,打开后内部有施工用的微型电焊机,切割机,空气补偿管口及专用工具,下水时工具仓314为全密封状态,防止海水进入。螺旋杆仓门402的一侧通过仓门合页403活动连接在球形自封闭施工仓3的外壁上,螺旋杆仓门402的另一侧设置有螺旋杆405,螺旋杆405的上端设置有螺旋杆摇柄404,转动螺旋杆摇柄404驱动螺旋杆405轻松开启螺旋杆仓门402。控制仓的底部设有进水阀406,控制仓308的顶部设有旁通口401。The upper top and the lower bottom of the spherical self-enclosed construction warehouse 3 are designed with round holes, and the two sides of the upper top of the spherical self-closed construction warehouse 3 are respectively fixedly equipped with hoisting
一种用于海上油井封井的施工装置的工作方法,具体包括以下步骤:A working method of a construction device for shutting in offshore oil wells, specifically comprising the following steps:
S1:油管封堵器105上部的单向阀接头103通过自动连接器2连有第二进气管101和第一进气管102两根压力软管连接,第一进气管102与第一进气管接头201接口连接后,向油管封堵器105内部注入压缩空气,当空气压力达到规定值后,另一根第二进气管101与第二进气管接头202对接在气道203内进行充气加压,加压后驱动弹簧205将锁止活塞204和锁止锁球206弹开,使单向阀接头103和锁止槽104从自动连接器2内脱离,将油管封堵器105留在油管内;S1: The one-way valve joint 103 on the upper part of the
S2:将球形自封闭施工仓3通过吊装环305从油管上方套入。蛙人下入到预定施工位置后,上液压膨胀器311和下液压膨胀器310可自动膨胀使上下圆孔直径变小与油管紧密吻合,S2: The spherical self-sealing construction bin 3 is inserted from above the oil pipe through the
S3:蛙人打开螺旋杆仓门402,进入后关闭螺旋杆仓门402;开启抽水开关将球形自封闭施工仓3内部海水抽出,抽水时球形自封闭施工仓3顶部旁通口401会向施工仓内部输送空气来平衡大气压;S3: The frogman opens the
S4:施工结束后施工蛙人再打开球形自封闭施工仓3底部进水阀406,使海水进入球形自封闭施工仓3内,仓内空气再经顶部旁通口401排除,当内外水压平衡时,转动螺旋杆摇柄404驱动螺旋杆405轻松开启舱门。S4: After the construction is completed, the construction frogman opens the
在本发明的描述中,术语“多个”则指两个或两个以上,除非另有明确的限定,术语“上”、“下”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制;术语“连接”、“安装”、“固定”等均应做广义理解,例如,“连接”可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, the term "plurality" refers to two or more than two. Unless otherwise clearly defined, the orientation or positional relationship indicated by the terms "upper", "lower" and so on is based on the orientation shown in the accompanying drawings. Orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, but does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as limiting the present invention; The terms "connection", "installation" and "fixation" should be understood in a broad sense, for example, "connection" can be fixed connection, detachable connection, or integral connection; it can be directly connected or through an intermediate The medium is indirectly connected. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
在本说明书的描述中,术语“一个实施例”、“一些实施例”、“具体实施例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或实例。而且,描述的具体特征、结构、材料或特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions of the terms "one embodiment", "some embodiments", "specific embodiments" and the like mean that specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in the present invention In at least one embodiment or example of . In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
以上仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210915436.8A CN115110912B (en) | 2022-08-01 | 2022-08-01 | A construction device and working method for offshore oil well sealing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210915436.8A CN115110912B (en) | 2022-08-01 | 2022-08-01 | A construction device and working method for offshore oil well sealing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115110912A CN115110912A (en) | 2022-09-27 |
CN115110912B true CN115110912B (en) | 2023-06-06 |
Family
ID=83334182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210915436.8A Active CN115110912B (en) | 2022-08-01 | 2022-08-01 | A construction device and working method for offshore oil well sealing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115110912B (en) |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102041974B (en) * | 2011-01-05 | 2013-07-31 | 深圳市远东石油钻采工程有限公司 | Bypass short-circuit structure of abandoned deep water well cutting device and cementing plug method thereof |
MY181521A (en) * | 2014-07-25 | 2020-12-24 | Helix Energy Solutions Group Inc | Method of subsea containment and system |
US10190379B2 (en) * | 2016-02-15 | 2019-01-29 | Dril-Quip, Inc. | Inner drilling riser tie-back connector seal |
CN107144193A (en) * | 2017-06-29 | 2017-09-08 | 芜湖泰庆电子科技有限公司 | A kind of ring-type blasting type cutter device under water |
CN209687445U (en) * | 2018-12-19 | 2019-11-26 | 贵州高峰石油机械股份有限公司 | A kind of device being completed at the same time seabed Casing-Cutting and capping operation |
CN209838357U (en) * | 2018-12-19 | 2019-12-24 | 贵州高峰石油机械股份有限公司 | Device for simultaneously completing cutting, salvaging and sealing operation of submarine oil well |
CN213391993U (en) * | 2020-10-27 | 2021-06-08 | 中石化石油工程技术服务有限公司 | Cutting device for high-pressure water crushing seabed covering cement layer |
CN214091790U (en) * | 2020-12-30 | 2021-08-31 | 纽威石油设备(苏州)有限公司 | Emergency releasing well sealing equipment for underwater wellhead and connector thereof |
-
2022
- 2022-08-01 CN CN202210915436.8A patent/CN115110912B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN115110912A (en) | 2022-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8220773B2 (en) | Rechargeable subsea force generating device and method | |
US11773557B2 (en) | Suction pile equipment | |
US10081999B2 (en) | Downhole occluder, pressurized sucker rod and operation technique to repair oil pipes | |
GB2469806A (en) | A low pressure slip joint having a high pressure telescopic assembly fitted therein | |
CN204646568U (en) | A kind of hydraulic pressure grouting device | |
CN115110912B (en) | A construction device and working method for offshore oil well sealing | |
CN111535784B (en) | A negative pressure suction and gas lift compound action pump and its operation method | |
US7255162B2 (en) | Methods and apparatus for use in subterranean cementing operations | |
AU2016231638B2 (en) | A type of high pressure resistant borehole sealing device and method | |
CN210768668U (en) | A gas lift reverse circulation drilling system | |
CN107829710A (en) | A kind of ring-type valve plate type downhole safety device | |
CN115012863B (en) | Method for replacing wellhead of high-pressure gas well without killing well | |
CN105781478A (en) | Pressure-limit-free hydraulic expansion type external casing packer assembly | |
CN205532515U (en) | Combustible ice is separated stifled device, is separated stifled system | |
CN110984880B (en) | Well repairing method for treating sand burial of coal-bed gas well | |
KR20150133415A (en) | Plugging Apparatus for Repairing Seawater Outlet-Inlet for Ship | |
CN108252678A (en) | A kind of down-hole plugging device of uncoupling plunger tubing pump snubbing serving | |
CN108517886A (en) | A kind of high hydraulic pressure plugging dewatering well method of high water level | |
CN208152967U (en) | Continuous sand flushing circulating valve | |
CN203685553U (en) | Anti-blocking dropping-fishing draining pump of coal-bed gas well | |
CN214532894U (en) | Well drilling site horizontal well grading hoop opening processing device in advance | |
CN116717203B (en) | Horizontal well sand discharging device and use method | |
CN205477528U (en) | Novel well head coupling blocks up valve | |
CN103629107A (en) | Anti-blocking throw-in type draining pump of coal-bed gas well | |
CN202091270U (en) | Supercharger for well workover and liner patching |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |