[go: up one dir, main page]

CN115110912B - A construction device and working method for offshore oil well sealing - Google Patents

A construction device and working method for offshore oil well sealing Download PDF

Info

Publication number
CN115110912B
CN115110912B CN202210915436.8A CN202210915436A CN115110912B CN 115110912 B CN115110912 B CN 115110912B CN 202210915436 A CN202210915436 A CN 202210915436A CN 115110912 B CN115110912 B CN 115110912B
Authority
CN
China
Prior art keywords
construction
air inlet
bin
air
inlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210915436.8A
Other languages
Chinese (zh)
Other versions
CN115110912A (en
Inventor
岳昕航
郑西来
高增文
郑天元
李福彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ocean University of China
Original Assignee
Ocean University of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ocean University of China filed Critical Ocean University of China
Priority to CN202210915436.8A priority Critical patent/CN115110912B/en
Publication of CN115110912A publication Critical patent/CN115110912A/en
Application granted granted Critical
Publication of CN115110912B publication Critical patent/CN115110912B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/204Keeping clear the surface of open water from oil spills

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

本发明提供了一种用于海上油井封井的施工装置,包括油管、用于封堵油管的油管封堵器以及球形自封闭施工仓,油管封堵器的顶端固定安装有锁止槽,锁止槽顶端固定安装有单向阀接头,单向阀接头和锁止槽上活动连接有自动连接器,球形自封闭施工仓的上顶部与下底部设计有圆孔,且上下孔周围分别带有上液压膨胀器和下液压膨胀器,球形自封闭施工仓的顶部还设有软管接头,软管接头连接空气加压管、电源线和抽水管,球形自封闭施工仓的内壁上安装有控制仓和工具仓。通过本发明的技术方案,研发出一套设备可对海上油井进行封堵切割,施工工艺简单,耗资少,用人少且时间短,施工时只需要两名蛙人进入内部即可完成封堵和切割油管工作。

Figure 202210915436

The invention provides a construction device for offshore oil well sealing, which includes oil pipes, oil pipe plugging devices for plugging oil pipes, and spherical self-sealing construction warehouses. The top of the oil pipe plugging devices is fixedly equipped with locking grooves, locking A one-way valve joint is fixedly installed on the top of the check groove, and an automatic connector is movably connected to the one-way valve joint and the locking groove. The upper hydraulic expander and the lower hydraulic expander, the top of the spherical self-enclosed construction warehouse is also equipped with a hose joint, the hose joint is connected to the air pressure pipe, power line and water suction pipe, and the inner wall of the spherical self-enclosed construction warehouse is installed with a control bins and tool bins. Through the technical solution of the present invention, a set of equipment has been developed to block and cut offshore oil wells. The construction process is simple, less costly, less labor-intensive and short in time. During construction, only two frogmen are required to enter the interior to complete the plugging and cutting. Cut tubing work.

Figure 202210915436

Description

一种用于海上油井封井的施工装置及其工作方法A construction device and working method for offshore oil well sealing

技术领域technical field

本发明涉及海洋石油油井封井设备技术领域,具体而言,特别涉及一种用于海上油井封井的施工装置及其工作方法。The invention relates to the technical field of sealing equipment for offshore oil wells, in particular to a construction device for sealing offshore oil wells and a working method thereof.

背景技术Background technique

随着海上油井出油量的降低和国家对浅海湿地的封井要求,针对出油量低的油井开始进行封闭关停不再开采,特别是针对海平面以下较深的油井,对于退役的海上平台,在拆除之前必须进行封井作业。在废弃油井封井作业领域中,应做到井内外无地下流体上串的通道,因此需要使用封井装置将井内环境与外部的环境密封隔绝,防止原油意外溢出造成浪费,同时防止原油泄漏到海底面而污染海洋环境的可能性。现有技术中,采用打桩船将支护钢桩顺着出油管向下打入海底并固定,然后将支护钢桩内的海水抽干,再有工人进入支护钢桩内对油管进行切割和焊接及防腐,施工结束后在将支护钢桩起出运走。这些封堵工艺耗时耗力且费用高。With the reduction of oil output from offshore oil wells and the country's requirements for closing wells in shallow sea wetlands, oil wells with low oil output have been closed and shut down and no longer exploited, especially for oil wells deep below sea level. For decommissioned offshore The platform must be shut down before being dismantled. In the field of abandoned oil well sealing operations, there should be no passage of underground fluids inside and outside the well. Therefore, it is necessary to use a sealing device to seal and isolate the environment inside the well from the outside environment to prevent waste caused by accidental spillage of crude oil, and at the same time prevent crude oil from leaking into the Possibility of polluting the marine environment due to seabed surface. In the prior art, a piling ship is used to drive the supporting steel piles down the oil outlet pipe into the seabed and fix them, then the seawater in the supporting steel piles is drained, and workers enter the supporting steel piles to cut the oil pipes And welding and anti-corrosion, after the construction is completed, the supporting steel piles will be lifted out and transported away. These plugging processes are time-consuming, labor-intensive and expensive.

发明内容Contents of the invention

为了弥补现有技术的不足,本发明提供了一种用于海上油井封井的施工装置及其工作方法,本发明专利研发出一套设备可对海上油井进行封堵,施工工艺简单,耗资少,用人少且时间短,施工时只需要两名蛙人进入内部即可完成封堵工作。In order to make up for the deficiencies of the existing technology, the present invention provides a construction device and working method for offshore oil well sealing. The patent of the present invention has developed a set of equipment that can seal offshore oil wells. The construction process is simple and the cost is low. , with less labor and short time, only two frogmen are needed to enter the interior during construction to complete the sealing work.

本发明是通过如下技术方案实现的:一种用于海上油井封井的施工装置,包括油管、用于封堵油管的油管封堵器以及球形自封闭施工仓,油管封堵器的顶端固定安装有锁止槽,锁止槽顶端固定安装有单向阀接头,单向阀接头和锁止槽上活动连接有自动连接器,自动连接器呈圆台形其顶部设置有第一进气管接头,第一进气管接头连接有第一进气管,自动连接器的内壁上有锁止活塞,锁止活塞上设有锁止锁球,锁止活塞的下端设置有弹簧,锁止活塞连接气道的一端,气道的另一端设置有第二进气管接头,第二进气管接头连接有第二进气管,第二进气管管径小于第一进气管且安装在其内部;The present invention is achieved through the following technical solutions: a construction device for offshore oil well sealing, including oil pipes, oil pipe plugging devices for plugging oil pipes, and spherical self-sealing construction bins, the top of the oil pipe plugging devices is fixed and installed There is a locking groove, and a one-way valve joint is fixedly installed on the top of the locking groove, and an automatic connector is movably connected to the one-way valve joint and the locking groove. An air inlet pipe joint is connected with the first air inlet pipe, and there is a locking piston on the inner wall of the automatic connector. The locking piston is provided with a locking ball, and the lower end of the locking piston is provided with a spring, and the locking piston is connected to one end of the air passage. , the other end of the air passage is provided with a second air intake pipe joint, the second air intake pipe joint is connected with a second air intake pipe, the diameter of the second air intake pipe is smaller than that of the first air intake pipe and installed inside it;

球形自封闭施工仓的上顶部与下底部设计有圆孔,且上下孔周围分别带有上液压膨胀器和下液压膨胀器,球形自封闭施工仓内部设置有内支撑架,用于固定油管,上液压膨胀器和下液压膨胀器连接有进气口,球形自封闭施工仓的顶部还设有软管接头,软管接头连接空气加压管、电源线和抽水管,球形自封闭施工仓的内壁上安装有控制仓和工具仓,球形自封闭施工仓的内壁上还设有抽水软管,抽水管与抽水软管相连;球形自封闭施工仓上开设有可供作业时蛙人进入的螺旋杆仓门。The upper top and lower bottom of the spherical self-enclosed construction warehouse are designed with round holes, and the upper and lower holes are respectively equipped with upper hydraulic expanders and lower hydraulic expanders. The spherical self-enclosed construction warehouse is equipped with an inner support frame for fixing oil pipes. The upper hydraulic expander and the lower hydraulic expander are connected with an air inlet, and the top of the spherical self-enclosed construction warehouse is also equipped with a hose joint, which connects the air pressurized pipe, power line and water suction pipe, and the spherical self-enclosed construction warehouse A control chamber and a tool chamber are installed on the inner wall, and a pumping hose is also provided on the inner wall of the spherical self-enclosed construction chamber, which is connected with the pumping hose; the spherical self-enclosed construction chamber is provided with a spiral for the frogman to enter during operation. Rod barn door.

作为优选方案,油管封堵器采用复合橡胶制成,内部为气室,其外壁上设置有一圈加强圈,加压空气膨胀后可密封油管内部。As a preferred solution, the oil pipe plugging device is made of composite rubber, the interior is an air chamber, and a ring of reinforcement ring is arranged on its outer wall, and the inside of the oil pipe can be sealed after the pressurized air expands.

作为优选方案,第二进气管和第一进气管为钢丝软管材料。As a preferred solution, the second air intake pipe and the first air intake pipe are made of steel wire hose material.

作为优选方案,球形自封闭施工仓的上顶部两侧分别固定安装有吊装环。As a preferred solution, hoisting rings are fixedly installed on both sides of the upper top of the spherical self-enclosed construction warehouse.

作为优选方案,控制仓和工具仓分别通过控制仓仓门开关杆和工具仓仓门开关杆打开使用。As a preferred solution, the control bin and the tool bin are respectively opened and used by the control bin door switch lever and the tool bin door switch lever.

进一步地,控制仓内水抽干后可打开使用,打开后内部有施工用的微型电焊机,切割机,空气补偿管口及专用工具,下水时工具仓为全密封状态。Further, after the water in the control chamber is drained, it can be opened for use. After opening, there are micro electric welding machines for construction, cutting machines, air compensation nozzles and special tools inside. The tool chamber is fully sealed when it is launched.

作为优选方案,螺旋杆仓门的一侧通过仓门合页活动连接在球形自封闭施工仓的外壁上,螺旋杆仓门的另一侧设置有螺旋杆,螺旋杆的上端设置有螺旋杆摇柄,转动螺旋杆摇柄驱动螺旋杆轻松开启螺旋杆仓门。As a preferred solution, one side of the screw rod warehouse door is flexibly connected to the outer wall of the spherical self-enclosed construction warehouse through the door hinge, the other side of the screw rod warehouse door is provided with a screw rod, and the upper end of the screw rod is provided with a screw rod rocker. handle, turn the auger rocker to drive the auger to easily open the auger door.

进一步地,控制仓的底部设有进水阀,控制仓的顶部设有旁通口。Furthermore, a water inlet valve is provided at the bottom of the control chamber, and a bypass port is provided at the top of the control chamber.

一种用于海上油井封井的施工装置的工作方法,其特征在于,具体包括以下步骤:A working method for a construction device for shutting in an offshore oil well, characterized in that it specifically includes the following steps:

S1:油管封堵器上部的单向阀接头通过自动连接器连有第二进气管和第一进气管两根压力软管连接,第一进气管与第一进气管接头接口连接后,向油管封堵器内部注入压缩空气,当空气压力达到规定值后,另一根第二进气管与第二进气管接头对接在气道内进行充气加压,加压后驱动弹簧将锁止活塞和锁止锁球弹开,使单向阀接头和锁止槽从自动连接器内脱离,将油管封堵器留在油管内;S1: The one-way valve joint on the upper part of the oil pipe blocker is connected with two pressure hoses, the second air intake pipe and the first air intake pipe, through an automatic connector. Compressed air is injected into the occluder. When the air pressure reaches the specified value, another second air inlet pipe is connected with the second air inlet pipe joint to inflate and pressurize the air passage. After pressurization, the driving spring will lock the piston and lock The lock ball bounces off, so that the one-way valve joint and the locking groove are separated from the automatic connector, and the oil pipe blocker is left in the oil pipe;

S2:将球形自封闭施工仓通过吊装环从油管上方套入。蛙人下入到预定施工位置后,上液压膨胀器和下液压膨胀器可自动膨胀使上下圆孔直径变小与油管紧密吻合,S2: The spherical self-enclosed construction warehouse is inserted from above the oil pipe through the hoisting ring. After the frogman is lowered to the predetermined construction position, the upper hydraulic expander and the lower hydraulic expander can automatically expand to make the diameter of the upper and lower round holes smaller and closely match the oil pipe.

S3:蛙人打开螺旋杆舱门,进入后关闭螺旋杆舱门;开启抽水开关将球形自封闭施工仓内部海水抽出,抽水时球形自封闭施工仓顶部旁通口会向施工仓内部输送空气来平衡大气压;S3: The frogman opens the screw hatch and closes the screw hatch after entering; turns on the pumping switch to pump out the seawater inside the spherical self-enclosed construction chamber, and the bypass port at the top of the spherical self-enclosed construction chamber will deliver air to the interior of the construction chamber when pumping water Equilibrium atmospheric pressure;

S4:施工结束后施工蛙人再打开球形自封闭施工仓底部进水阀,使海水进入球形自封闭施工仓内,仓内空气再经顶部旁通口排除,当内外水压平衡时,转动螺旋杆摇柄驱动螺旋杆轻松开启舱门。S4: After the construction is completed, the construction frogman opens the water inlet valve at the bottom of the spherical self-sealing construction warehouse, so that seawater enters the spherical self-sealing construction warehouse, and the air in the warehouse is discharged through the top bypass port. When the internal and external water pressures are balanced, turn the screw The rod crank drives the screw rod to open the hatch easily.

本发明由于采用了以上技术方案,与现有技术相比使其具有以下有益效果:研发出一套设备可对海上油井进行封堵切割,施工工艺简单,耗资少,用人少且时间短,施工时只需要两名蛙人进入内部即可完成封堵和切割油管工作。Compared with the prior art, the present invention has the following beneficial effects due to the adoption of the above technical scheme: a set of equipment has been developed to block and cut offshore oil wells, the construction process is simple, the cost is less, and the construction time is short and the construction time is short. Only two frogmen are needed to enter the interior to complete the work of plugging and cutting the oil pipe.

本发明的附加方面和优点将在下面的描述部分中变得明显,或通过本发明的实践了解到。Additional aspects and advantages of the invention will become apparent in the description which follows, or may be learned by practice of the invention.

附图说明Description of drawings

本发明的上述和/或附加的方面和优点从结合下面附图对实施例的描述中将变得明显和容易理解,其中:The above and/or additional aspects and advantages of the present invention will become apparent and understandable from the description of the embodiments in conjunction with the following drawings, wherein:

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为油井封堵器的结构示意图;Fig. 2 is the structural representation of oil well plugging device;

图3为控制仓的侧视结构示意图;Fig. 3 is a side view structural schematic diagram of the control cabin;

图4为自动连接器的结构示意图,Figure 4 is a schematic diagram of the structure of the automatic connector,

其中,图1至图4中附图标记与部件之间的对应关系为:Wherein, the corresponding relationship between reference numerals and components in Fig. 1 to Fig. 4 is:

101.第一进气管接头;102.第二进气管接头;103. 单向阀接头; 104.锁止槽;105.油井封堵器; 106.加强圈;107.气室;2.自动连接器;201.第二气道管接口;202.第一气道管接口;203.气道;204.锁止活塞;205.弹簧;206.锁止锁球;3.球形自封闭施工仓;301. 空气加压管; 302. 电源线;303. 抽水管口;304.软管接头;305.吊装环;306.进气口;307. 控制仓仓门开关杆;308. 控制仓;309. 抽水软管; 310.下液压膨胀器;311.上液压膨胀器; 312. 内支撑架;313. 工具仓仓门开关杆;314.工具仓;401.旁通口;402. 螺旋杆仓门;403.仓门合叶;404.螺旋杆摇柄;405. 螺旋杆;406.进水阀;101. First air intake pipe joint; 102. Second air intake pipe joint; 103. One-way valve joint; 104. Locking groove; 105. Oil well plugging device; 106. Reinforcing ring; 107. Air chamber; 2. Automatic connection Device; 201. Second airway tube interface; 202. First airway tube interface; 203. Airway; 204. Locking piston; 205. Spring; 206. Locking lock ball; 3. Spherical self-sealing construction warehouse; 301. Air pressure tube; 302. Power cord; 303. Suction nozzle; 304. Hose connector; 305. Lifting ring; 306. Air inlet; 307. Control compartment door switch lever; 308. Control compartment; .Suction hose; 310. Lower hydraulic expander; 311. Upper hydraulic expander; 312. Inner support frame; 313. Tool compartment door switch lever; 314. Tool compartment; 401. Bypass port; 402. Screw rod compartment Door; 403. door hinge; 404. screw rod rocker; 405. screw rod; 406. water inlet valve;

具体实施方式Detailed ways

为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和具体实施方式对本发明进行进一步的详细描述。需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。In order to understand the above-mentioned purpose, features and advantages of the present invention more clearly, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments can be combined with each other.

在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用其他不同于在此描述的方式来实施,因此,本发明的保护范围并不受下面公开的具体实施例的限制。In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention can also be implemented in other ways different from those described here. Therefore, the protection scope of the present invention is not limited by the specific implementation disclosed below. Example limitations.

下面结合图1至图4对本发明的实施例的用于海上油井封井的施工装置及其工作方法进行具体说明。The construction device for offshore oil well closure and its working method according to the embodiment of the present invention will be specifically described below with reference to FIGS. 1 to 4 .

如图1至图4所示,本发明提出了一种用于海上油井封井的施工装置,包括油管、用于封堵油管的油管封堵器105以及球形自封闭施工仓3,油管封堵器105采用复合橡胶制成,内部为气室107,其外壁上设置有一圈加强圈106,加压空气膨胀后可密封油管内部,防止原油溢出。油管封堵器105的顶端固定安装有锁止槽104,锁止槽104顶端固定安装有单向阀接头103,单向阀接头103和锁止槽104上活动连接有自动连接器2,自动连接器2呈圆台形其顶部设置有第一进气管接头201,第一进气管接头201连接有第一进气管102,自动连接器2的内壁上有锁止活塞204,锁止活塞204上设有锁止锁球206,锁止活塞204的下端设置有弹簧205,锁止活塞204连接气道203的一端,气道203的另一端设置有第二进气管接头202,第二进气管接头202连接有第二进气管101,第二进气管101管径小于第一进气管102且安装在其内部;第二进气管101和第一进气管102为钢丝软管材料。As shown in Figures 1 to 4, the present invention proposes a construction device for offshore oil well sealing, including oil pipes, oil pipe plugging devices 105 for sealing oil pipes, and spherical self-sealing construction bins 3, the oil pipe plugging The device 105 is made of composite rubber, the inside is an air chamber 107, and a ring of reinforcement ring 106 is arranged on its outer wall, and the inside of the oil pipe can be sealed after the pressurized air expands to prevent crude oil from overflowing. A locking groove 104 is fixedly installed on the top of the oil pipe plugging device 105, and a one-way valve joint 103 is fixedly installed on the top of the locking groove 104. An automatic connector 2 is movably connected to the one-way valve joint 103 and the locking groove 104 to automatically connect The device 2 is in the shape of a truncated cone, and its top is provided with a first air intake pipe joint 201, which is connected with a first air intake pipe 102. There is a locking piston 204 on the inner wall of the automatic connector 2, and a locking piston 204 is provided with Lock the lock ball 206, the lower end of the locking piston 204 is provided with a spring 205, the locking piston 204 is connected to one end of the air passage 203, and the other end of the air passage 203 is provided with a second air intake pipe joint 202, which is connected to the second air intake pipe joint 202. There is a second air intake pipe 101, and the diameter of the second air intake pipe 101 is smaller than that of the first air intake pipe 102 and installed inside it; the second air intake pipe 101 and the first air intake pipe 102 are steel wire hose materials.

球形自封闭施工仓3的上顶部与下底部设计有圆孔,球形自封闭施工仓3的上顶部两侧分别固定安装有吊装环305,且上下孔周围分别带有上液压膨胀器311和下液压膨胀器310,球形自封闭施工仓3内部设置有内支撑架312,用于固定油管,内支撑架312是在管线切割前将施工仓2内支撑架与管线上部三方向支撑连接,防止管线切割后施工仓在没有下孔膨胀器的支撑而发生摆动,施工完毕后施工仓可随着上部油管一起吊出,在陆地上进行分解回收。上液压膨胀器311和下液压膨胀器310连接有进气口306,上液压膨胀器311和下液压膨胀器310是由特殊材料制成,内部均为中空,在预定位置时,有海上面的压缩泵通过203进气口将空气压缩至膨胀器内,上下口变小与油管吻合防止海水进入的同时还能作为稳定支撑,方便内部施工工作。球形自封闭施工仓3的顶部还设有软管接头304,软管接头304连接空气加压管301、电源线302和抽水管303,球形自封闭施工仓3的内壁上安装有控制仓308和工具仓314,球形自封闭施工仓3的内壁上还设有抽水软管309,抽水管303与抽水软管309相连;控制仓308上开设有可供作业时蛙人进入的螺旋杆仓门402。控制仓308和工具仓314分别通过控制仓仓门开关杆307和工具仓仓门开关杆313打开使用。球形自封闭施工仓3内水抽干后可打开工具仓 314使用,打开后内部有施工用的微型电焊机,切割机,空气补偿管口及专用工具,下水时工具仓314为全密封状态,防止海水进入。螺旋杆仓门402的一侧通过仓门合页403活动连接在球形自封闭施工仓3的外壁上,螺旋杆仓门402的另一侧设置有螺旋杆405,螺旋杆405的上端设置有螺旋杆摇柄404,转动螺旋杆摇柄404驱动螺旋杆405轻松开启螺旋杆仓门402。控制仓的底部设有进水阀406,控制仓308的顶部设有旁通口401。The upper top and the lower bottom of the spherical self-enclosed construction warehouse 3 are designed with round holes, and the two sides of the upper top of the spherical self-closed construction warehouse 3 are respectively fixedly equipped with hoisting rings 305, and the upper and lower holes are respectively equipped with an upper hydraulic expander 311 and a lower hydraulic expander. The hydraulic expander 310, the spherical self-enclosed construction warehouse 3 is provided with an inner support frame 312 for fixing the oil pipe. The inner support frame 312 is used to connect the inner support frame of the construction warehouse 2 with the upper three directions of the pipeline before the pipeline is cut to prevent the pipeline from After cutting, the construction warehouse swings without the support of the lower hole expander. After the construction is completed, the construction warehouse can be hoisted out together with the upper oil pipe for decomposition and recovery on land. The upper hydraulic expander 311 and the lower hydraulic expander 310 are connected with an air inlet 306. The upper hydraulic expander 311 and the lower hydraulic expander 310 are made of special materials, and both are hollow inside. The compression pump compresses the air into the expander through the 203 air inlet, and the upper and lower ports become smaller to coincide with the oil pipe to prevent seawater from entering and also serve as a stable support to facilitate internal construction work. The top of spherical self-enclosed construction warehouse 3 is also provided with hose joint 304, and hose joint 304 connects air pressurized pipe 301, power line 302 and suction pipe 303, and the inwall of spherical self-enclosed construction warehouse 3 is equipped with control warehouse 308 and The tool warehouse 314, the inner wall of the spherical self-enclosed construction warehouse 3 is also provided with a water hose 309, and the water hose 303 is connected with the water hose 309; the control warehouse 308 is provided with a screw bar door 402 for frogman to enter during operation . The control bin 308 and the tool bin 314 are opened and used by the control bin door switch lever 307 and the tool bin door switch lever 313 respectively. After the water in the spherical self-enclosed construction chamber 3 is drained, the tool chamber 314 can be opened for use. After opening, there are miniature electric welding machines for construction, cutting machines, air compensation nozzles and special tools. The tool chamber 314 is in a fully sealed state when it is launched. Prevent seawater from entering. One side of the screw rod door 402 is movably connected on the outer wall of the spherical self-enclosed construction warehouse 3 through the door hinge 403. The other side of the screw rod door 402 is provided with a screw rod 405, and the upper end of the screw rod 405 is provided with a screw rod. Rod rocker 404, rotate the screw rod rocker 404 to drive the screw rod 405 to open the screw rod bin door 402 easily. A water inlet valve 406 is provided at the bottom of the control chamber, and a bypass port 401 is provided at the top of the control chamber 308 .

一种用于海上油井封井的施工装置的工作方法,具体包括以下步骤:A working method of a construction device for shutting in offshore oil wells, specifically comprising the following steps:

S1:油管封堵器105上部的单向阀接头103通过自动连接器2连有第二进气管101和第一进气管102两根压力软管连接,第一进气管102与第一进气管接头201接口连接后,向油管封堵器105内部注入压缩空气,当空气压力达到规定值后,另一根第二进气管101与第二进气管接头202对接在气道203内进行充气加压,加压后驱动弹簧205将锁止活塞204和锁止锁球206弹开,使单向阀接头103和锁止槽104从自动连接器2内脱离,将油管封堵器105留在油管内;S1: The one-way valve joint 103 on the upper part of the oil pipe blocker 105 is connected with two pressure hoses, the second air intake pipe 101 and the first air intake pipe 102 through the automatic connector 2, and the first air intake pipe 102 is connected to the first air intake pipe joint After the 201 interface is connected, inject compressed air into the oil pipe blocker 105, and when the air pressure reaches a specified value, another second air intake pipe 101 is docked with the second air intake pipe joint 202 in the air passage 203 for inflation and pressurization. After pressurization, the driving spring 205 bounces the locking piston 204 and the locking ball 206, so that the one-way valve joint 103 and the locking groove 104 are separated from the automatic connector 2, and the oil pipe blocker 105 is left in the oil pipe;

S2:将球形自封闭施工仓3通过吊装环305从油管上方套入。蛙人下入到预定施工位置后,上液压膨胀器311和下液压膨胀器310可自动膨胀使上下圆孔直径变小与油管紧密吻合,S2: The spherical self-sealing construction bin 3 is inserted from above the oil pipe through the hoisting ring 305 . After the frogman is lowered to the predetermined construction position, the upper hydraulic expander 311 and the lower hydraulic expander 310 can expand automatically so that the diameter of the upper and lower round holes becomes smaller and closely matches the oil pipe.

S3:蛙人打开螺旋杆仓门402,进入后关闭螺旋杆仓门402;开启抽水开关将球形自封闭施工仓3内部海水抽出,抽水时球形自封闭施工仓3顶部旁通口401会向施工仓内部输送空气来平衡大气压;S3: The frogman opens the screw bar door 402, and closes the screw bar door 402 after entering; turns on the pumping switch to pump out the seawater inside the spherical self-sealing construction storehouse 3, and the bypass port 401 at the top of the spherical self-closed construction storehouse 3 will go to the construction during pumping Air is delivered inside the chamber to balance the atmospheric pressure;

S4:施工结束后施工蛙人再打开球形自封闭施工仓3底部进水阀406,使海水进入球形自封闭施工仓3内,仓内空气再经顶部旁通口401排除,当内外水压平衡时,转动螺旋杆摇柄404驱动螺旋杆405轻松开启舱门。S4: After the construction is completed, the construction frogman opens the water inlet valve 406 at the bottom of the spherical self-sealing construction warehouse 3, so that seawater enters the spherical self-sealing construction warehouse 3, and the air in the warehouse is discharged through the top bypass port 401. When the internal and external water pressure is balanced , turn the screw rod rocker 404 to drive the screw rod 405 to open the hatch easily.

在本发明的描述中,术语“多个”则指两个或两个以上,除非另有明确的限定,术语“上”、“下”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制;术语“连接”、“安装”、“固定”等均应做广义理解,例如,“连接”可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, the term "plurality" refers to two or more than two. Unless otherwise clearly defined, the orientation or positional relationship indicated by the terms "upper", "lower" and so on is based on the orientation shown in the accompanying drawings. Orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, but does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as limiting the present invention; The terms "connection", "installation" and "fixation" should be understood in a broad sense, for example, "connection" can be fixed connection, detachable connection, or integral connection; it can be directly connected or through an intermediate The medium is indirectly connected. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

在本说明书的描述中,术语“一个实施例”、“一些实施例”、“具体实施例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或实例。而且,描述的具体特征、结构、材料或特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions of the terms "one embodiment", "some embodiments", "specific embodiments" and the like mean that specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in the present invention In at least one embodiment or example of . In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (9)

1. The construction device for the offshore oil well sealing comprises an oil pipe, an oil pipe plugging device (105) for plugging the oil pipe and a spherical self-sealing construction bin (3), and is characterized in that a locking groove (104) is fixedly arranged at the top end of the oil pipe plugging device (105), a one-way valve connector (103) is fixedly arranged at the top end of the locking groove (104), an automatic connector (2) is movably connected to the one-way valve connector (103) and the locking groove (104), a first air inlet pipe joint (201) is arranged at the top of the automatic connector (2) in a truncated cone shape, the first air inlet pipe joint (201) is connected with a first air inlet pipe (102), a locking piston (204) is arranged on the inner wall of the automatic connector (2), a locking ball (206) is arranged on the locking piston (204), a spring (205) is arranged at the lower end of the locking piston (204), the locking piston (204) is connected with one end of an air channel (203), a second air inlet pipe joint (202) is arranged at the other end of the air channel (203), the second air inlet pipe joint (202) is connected with a second air inlet pipe joint (101), and the second air inlet pipe joint (101) is smaller than the first air inlet pipe (102) and is arranged inside the first air inlet pipe;
round holes are designed on the upper top and the lower bottom of the spherical self-sealing construction bin (3), an upper hydraulic expander (311) and a lower hydraulic expander (310) are respectively arranged around the upper hole and the lower hole, an inner supporting frame (312) is arranged inside the spherical self-sealing construction bin (3) and is used for fixing an oil pipe, the upper hydraulic expander (311) and the lower hydraulic expander (310) are connected with an air inlet (306), a hose connector (304) is further arranged on the top of the spherical self-sealing construction bin (3), the hose connector (304) is connected with an air pressurizing pipe (301), a power wire (302) and a water pumping pipe (303), a control bin (308) and a tool bin (314) are arranged on the inner wall of the spherical self-sealing construction bin (3), and a water pumping hose (309) is further arranged on the inner wall of the spherical self-sealing construction bin (3), and the water pumping pipe (303) is connected with the water pumping hose (309); the control cabin (308) is provided with a screw rod cabin door (402) for frogman to enter during operation.
2. Construction equipment for offshore oil well sealing according to claim 1, characterized in that the tubing sealer (105) is made of composite rubber, the inside is an air chamber (107), a circle of reinforcing rings (106) are arranged on the outer wall of the air chamber, and the inside of the tubing can be sealed after the pressurized air is expanded.
3. Construction equipment for offshore oil well sealing according to claim 1, characterized in that the second air inlet pipe (101) and the first air inlet pipe (102) are of wire hose material.
4. Construction device for offshore oil well sealing according to claim 1, characterized in that hoisting rings (305) are fixedly mounted on two sides of the upper top of the spherical self-sealing construction bin (3) respectively.
5. Construction equipment for offshore oil well sealing according to claim 1, characterized in that the control cabin (308) and the tool cabin (314) are opened for use by controlling the cabin door opening and closing rod (307) and the tool cabin door opening and closing rod (313), respectively.
6. The construction device for offshore oil well sealing according to claim 5, wherein the control cabin (308) can be opened for use after water is pumped out, and the micro electric welder, the cutting machine, the air compensation pipe orifice and the special tool for construction are arranged in the control cabin after the control cabin is opened, and the tool cabin (314) is in a fully sealed state during water drainage.
7. The construction device for offshore oil well sealing according to claim 1, wherein one side of the screw rod bin gate (402) is movably connected to the outer wall of the spherical self-sealing construction bin (3) through a bin gate hinge (403), a screw rod (405) is arranged on the other side of the screw rod bin gate (402), a screw rod rocking handle (404) is arranged at the upper end of the screw rod (405), and the screw rod rocking handle (404) is rotated to drive the screw rod (405) to easily open the screw rod bin gate (402).
8. The construction device for offshore oil well sealing according to claim 7, wherein the bottom of the control cabin (308) is provided with a water inlet valve (406), and the top of the control cabin (308) is provided with a bypass port (401).
9. A working method of a construction device for offshore oil well sealing according to claims 1-8, characterized in that it comprises the following steps:
s1: the check valve joint (103) at the upper part of the oil pipe plugging device (105) is connected with the second air inlet pipe (101) and the first air inlet pipe (102) through an automatic connector (2), compressed air is injected into the oil pipe plugging device (105) after the first air inlet pipe (102) is connected with a first air inlet pipe joint (201) in an interface mode, after the air pressure reaches a specified value, the second air inlet pipe (101) is butted with the second air inlet pipe joint (202) in an air channel (203) for inflation and pressurization, a locking piston (204) and a locking ball (206) are sprung out by a driving spring (205) after pressurization, so that the check valve joint (103) and the locking groove (104) are separated from the automatic connector (2), and the oil pipe plugging device (105) is left in an oil pipe;
s2: sleeving the spherical self-sealing construction bin (3) from the upper part of the oil pipe through a lifting ring (305); after the frogman goes into the preset construction position, the upper hydraulic expander (311) and the lower hydraulic expander (310) automatically expand to enable the diameters of the upper round hole and the lower round hole to be reduced and closely coincide with the oil pipe,
s3: the frogman opens the screw rod bin gate (402), and closes the screw rod bin gate (402) after entering; starting a water pumping switch to pump out seawater in the spherical self-sealing construction bin (3), wherein a bypass port (401) at the top of the spherical self-sealing construction bin (3) can convey air into the construction bin to balance atmospheric pressure during water pumping;
s4: after the construction is finished, the construction frogman opens the water inlet valve (406) at the bottom of the spherical self-sealing construction cabin (3) to enable seawater to enter the spherical self-sealing construction cabin (3), air in the cabin is discharged through the top bypass opening (401), and when the internal water pressure and the external water pressure are balanced, the screw rod rocking handle (404) is rotated to drive the screw rod (405) to easily open the cabin door.
CN202210915436.8A 2022-08-01 2022-08-01 A construction device and working method for offshore oil well sealing Active CN115110912B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210915436.8A CN115110912B (en) 2022-08-01 2022-08-01 A construction device and working method for offshore oil well sealing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210915436.8A CN115110912B (en) 2022-08-01 2022-08-01 A construction device and working method for offshore oil well sealing

Publications (2)

Publication Number Publication Date
CN115110912A CN115110912A (en) 2022-09-27
CN115110912B true CN115110912B (en) 2023-06-06

Family

ID=83334182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210915436.8A Active CN115110912B (en) 2022-08-01 2022-08-01 A construction device and working method for offshore oil well sealing

Country Status (1)

Country Link
CN (1) CN115110912B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041974B (en) * 2011-01-05 2013-07-31 深圳市远东石油钻采工程有限公司 Bypass short-circuit structure of abandoned deep water well cutting device and cementing plug method thereof
MY181521A (en) * 2014-07-25 2020-12-24 Helix Energy Solutions Group Inc Method of subsea containment and system
US10190379B2 (en) * 2016-02-15 2019-01-29 Dril-Quip, Inc. Inner drilling riser tie-back connector seal
CN107144193A (en) * 2017-06-29 2017-09-08 芜湖泰庆电子科技有限公司 A kind of ring-type blasting type cutter device under water
CN209687445U (en) * 2018-12-19 2019-11-26 贵州高峰石油机械股份有限公司 A kind of device being completed at the same time seabed Casing-Cutting and capping operation
CN209838357U (en) * 2018-12-19 2019-12-24 贵州高峰石油机械股份有限公司 Device for simultaneously completing cutting, salvaging and sealing operation of submarine oil well
CN213391993U (en) * 2020-10-27 2021-06-08 中石化石油工程技术服务有限公司 Cutting device for high-pressure water crushing seabed covering cement layer
CN214091790U (en) * 2020-12-30 2021-08-31 纽威石油设备(苏州)有限公司 Emergency releasing well sealing equipment for underwater wellhead and connector thereof

Also Published As

Publication number Publication date
CN115110912A (en) 2022-09-27

Similar Documents

Publication Publication Date Title
US8220773B2 (en) Rechargeable subsea force generating device and method
US11773557B2 (en) Suction pile equipment
US10081999B2 (en) Downhole occluder, pressurized sucker rod and operation technique to repair oil pipes
GB2469806A (en) A low pressure slip joint having a high pressure telescopic assembly fitted therein
CN204646568U (en) A kind of hydraulic pressure grouting device
CN115110912B (en) A construction device and working method for offshore oil well sealing
CN111535784B (en) A negative pressure suction and gas lift compound action pump and its operation method
US7255162B2 (en) Methods and apparatus for use in subterranean cementing operations
AU2016231638B2 (en) A type of high pressure resistant borehole sealing device and method
CN210768668U (en) A gas lift reverse circulation drilling system
CN107829710A (en) A kind of ring-type valve plate type downhole safety device
CN115012863B (en) Method for replacing wellhead of high-pressure gas well without killing well
CN105781478A (en) Pressure-limit-free hydraulic expansion type external casing packer assembly
CN205532515U (en) Combustible ice is separated stifled device, is separated stifled system
CN110984880B (en) Well repairing method for treating sand burial of coal-bed gas well
KR20150133415A (en) Plugging Apparatus for Repairing Seawater Outlet-Inlet for Ship
CN108252678A (en) A kind of down-hole plugging device of uncoupling plunger tubing pump snubbing serving
CN108517886A (en) A kind of high hydraulic pressure plugging dewatering well method of high water level
CN208152967U (en) Continuous sand flushing circulating valve
CN203685553U (en) Anti-blocking dropping-fishing draining pump of coal-bed gas well
CN214532894U (en) Well drilling site horizontal well grading hoop opening processing device in advance
CN116717203B (en) Horizontal well sand discharging device and use method
CN205477528U (en) Novel well head coupling blocks up valve
CN103629107A (en) Anti-blocking throw-in type draining pump of coal-bed gas well
CN202091270U (en) Supercharger for well workover and liner patching

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant