CN115030311A - Installation construction method and construction lifting device for door type steel frame structure - Google Patents

Installation construction method and construction lifting device for door type steel frame structure Download PDF

Info

Publication number
CN115030311A
CN115030311A CN202210724006.8A CN202210724006A CN115030311A CN 115030311 A CN115030311 A CN 115030311A CN 202210724006 A CN202210724006 A CN 202210724006A CN 115030311 A CN115030311 A CN 115030311A
Authority
CN
China
Prior art keywords
platform
construction
lifting
suspension
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210724006.8A
Other languages
Chinese (zh)
Inventor
赵程
孙伟桥
蒋岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202210724006.8A priority Critical patent/CN115030311A/en
Publication of CN115030311A publication Critical patent/CN115030311A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/142Railings extensible or telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/157Extensible platforms, e.g. telescopic platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Jib Cranes (AREA)

Abstract

The invention relates to the technical field of portal steel frame building construction, in particular to a portal steel frame structure installation construction method and a construction lifting device. The foldable suspension platform comprises a lifting frame and a suspension platform, wherein the suspension platform is slidably arranged on the lifting frame through the lifting platform, side suspension platforms are arranged on two sides of the suspension platform, the side suspension platforms are controlled to be folded through hinges, and the suspension platform is arranged in the middle of the lifting platform through the hinges and is controlled to be folded through the hinges. This elevating gear is exclusively used in from building inside to building outside expansion construction platform, solve the high altitude construction of the limited factor in outdoor place in the installation of portal frame structure, but the platform of hanging adopts folding design, can pass and expand behind the truss clearance and carry out the construction, furthest extends the construction platform area, the crane sets up inside the building, construction platform sets up outside the building, both sides are weighed and can be relied on building construction itself to fix and protect when guaranteeing the balance, the security is higher than outdoor construction machinery with the construction platform homonymy setting.

Description

一种门式钢架结构安装施工方法及施工升降装置A kind of portal steel frame structure installation construction method and construction lifting device

技术领域technical field

本发明涉及门式钢架建筑施工的技术领域,尤其是涉及一种门式钢架结构安装施工方法及施工升降装置。The invention relates to the technical field of portal steel frame building construction, in particular to a portal steel frame structure installation and construction method and a construction lifting device.

背景技术Background technique

门式钢架建筑由于其造价成本低、安装效率高和耐用等特点被广泛应用于工厂车间和仓储等领域的场地建筑,大型门式钢架建筑安装过程需要施工人员进行高空作业,通常由于工厂和仓储用地密集度较高,在施工过程中设置大型施工机械受到阻碍,包括在原有建筑基础上进行改建,也会限制大型施工机械的使用。Portal steel frame buildings are widely used in site construction in the fields of factory workshops and warehousing due to their low cost, high installation efficiency and durability. The installation process of large portal steel frame buildings requires construction personnel to perform high-altitude operations. Due to the high density of land for storage and storage, the installation of large-scale construction machinery during the construction process is hindered, including reconstruction on the basis of the original building, which will also limit the use of large-scale construction machinery.

现有高空作业方式主要包括脚手架、吊框和曲臂车,安装脚手架需要耗时耗力,严重拖延施工工期,违背了门式钢架建筑快速施工的要求,吊框需要设置起吊架或者起重机,不仅拖延工期,而且受场地影响设置所占空间受限,无法安装大型起重机,因此只能在门式钢架建筑内部设置高空施工机械,曲臂车控制方式复杂,同时曲臂车不适用于在建筑内部对外部进行安装施工。The existing high-altitude working methods mainly include scaffolding, hanging frames and crank-arm trucks. The installation of scaffolding requires time and effort, which seriously delays the construction period and violates the requirements of rapid construction of portal steel frame buildings. Not only the construction period is delayed, but also due to the limited space occupied by the site, large cranes cannot be installed. Therefore, only high-altitude construction machinery can be installed inside the portal steel structure. The interior of the building is installed to the exterior.

发明内容SUMMARY OF THE INVENTION

为了解决建筑密集区域大型门式钢架建筑对施工机械安装场地限制问题,同时提高高空施工效率,本发明提供一种门式钢架结构安装施工方法及施工升降装置。In order to solve the problem that large-scale portal steel frame buildings limit the installation site of construction machinery in densely built areas, and at the same time improve the efficiency of high-altitude construction, the present invention provides a portal steel frame structure installation and construction method and a construction lifting device.

一方面,本发明提供的一种门式钢架结构安装施工方法,采用如下的技术方案:On the one hand, a kind of portal steel frame structure installation and construction method provided by the present invention adopts the following technical scheme:

一种门式钢架结构安装施工方法,包括以下施工步骤:A construction method for installing a portal steel frame structure, comprising the following construction steps:

利用起重机将门式桁架起吊至预定安装位置并在底部安装固定;Use a crane to lift the portal truss to the predetermined installation position and install and fix it at the bottom;

在安装完成的门式桁架顶部横梁和两侧立柱上安装檩条,安装檩条时利用升降架将施工人员从门式桁架内部移送到施工位置对檩条进行固定安装;Install purlins on the top beam and two side columns of the finished portal truss. When installing the purlins, use the lifting frame to move the construction personnel from the inside of the portal truss to the construction position to fix the purlins;

将墙板悬放置在门式桁架外部侧面位置,在门式桁架内部设置升降架,通过所述升降架将施工人员移送到门式桁架外部施工位置对墙板进行固定安装;Suspend the wall panel on the outer side of the portal truss, set up a lifting frame inside the portal truss, and move the construction personnel to the external construction position of the portal truss through the lifting frame to fix the wall panel;

所述升降架移送施工人员时,施工人员站立在可折叠的悬台上,升降架将施工人员移送至预定高度后悬台展开,施工人员在展开的悬台上进行施工作业;When the lifting frame transfers the construction personnel, the construction personnel stand on the foldable suspension platform, the lifting frame transfers the construction personnel to a predetermined height, and the suspension platform is unfolded, and the construction personnel perform construction operations on the unfolded suspension platform;

所述悬台展开后,将挂梯安装在悬台一侧,所述挂梯通过挂钩悬挂在檩条上进行固定。After the hanging platform is unfolded, the hanging ladder is installed on one side of the hanging platform, and the hanging ladder is hung on the purlin by hooks for fixing.

通过采用上述技术方案,通过悬挑式升降架实现设置在门式桁架内部的施工机械将施工人员移送至门式桁架外部进行施工,减少了负责施工机械的安装,降低了对施工场所受限的施工难度,挂梯用于灵活拓展施工区域,配合升降架使用,保证施工人员安全的同时有效提高施工效率,减少对建筑外部区域的占用。By adopting the above technical solution, the construction machinery arranged inside the portal truss is realized through the cantilever lift frame to transfer the construction personnel to the outside of the portal truss for construction, which reduces the installation of the construction machinery and reduces the limited construction site. Construction difficulty, the hanging ladder is used to flexibly expand the construction area, and used in conjunction with the lifting frame to ensure the safety of the construction personnel, while effectively improving the construction efficiency and reducing the occupation of the external area of the building.

优选的,所述挂梯包括梯框和踏杆,所述梯框由三根钢管呈三棱柱状组成,所述梯框每根钢管与相邻钢管之间间隔水平固定设置有多根踏杆,施工人员在使用所述挂梯时,通过攀爬踏杆进行上下移动,停留时进入挂梯内部,并在踏杆上放置横板用于踩踏或椅坐。Preferably, the hanging ladder includes a ladder frame and a step rod, the ladder frame is composed of three steel pipes in the shape of a triangular prism, and a plurality of step rods are fixed horizontally between each steel pipe of the ladder frame and the adjacent steel pipe, When using the hanging ladder, the construction personnel move up and down by climbing the stepping rod, enter the interior of the hanging ladder when staying, and place a horizontal board on the stepping rod for stepping on or sitting on a chair.

通过采用上述技术方案,三角挂梯方便施工人员从任意一侧面进行攀爬,方便施工人员进行灵活作业,同时挂梯整体能够作为一个防护笼对施工人员进行保护。By adopting the above technical solution, the triangular hanging ladder facilitates the construction personnel to climb from any side, facilitates the construction personnel to perform flexible operations, and at the same time, the hanging ladder as a whole can be used as a protective cage to protect the construction personnel.

另一方面,本发明提供的一种门式钢架结构安装施工升降装置,采用如下的技术方案:On the other hand, a kind of portal steel frame structure installation construction lifting device provided by the present invention adopts the following technical scheme:

一种门式钢架结构安装施工升降装置,包括升降架和悬台,所述悬台通过升降台滑动安装在升降架上,所述悬台两侧设置有侧悬台,所述侧悬台通过铰链控制折叠,所述悬台远离升降架一侧边沿处设置有主护栏,所述侧悬台侧边沿处设置有副护栏,所述悬台通过铰链安装在升降台中部,并通过铰链控制悬台折叠。A gantry steel frame structure installation construction lifting device, including a lifting frame and a suspension platform, the suspension platform is slidably installed on the lifting frame through the lifting platform, and side suspension platforms are arranged on both sides of the suspension platform, and the side suspension platform Folding is controlled by hinges, a main guardrail is arranged at the side edge of the suspension platform away from the lifting frame, and a secondary guardrail is arranged at the side edge of the side suspension platform. The suspension platform is installed in the middle of the lifting platform through a hinge and controlled by the hinge The suspension is folded.

通过采用上述技术方案,本升降装置专用于从建筑内部向建筑外部拓展施工平台,解决门式钢架结构安装过程中的室外场地受限因素的高空施工,悬台采用可折叠设计,可穿过桁架间隙后展开进行施工,最大程度拓展施工平台面积,升降架设置在建筑内部,施工平台设置在建筑外部,两侧称重保证平衡的同时可以依托建筑建构本身进行固定和防护,安全性高于室外与施工平台同侧设置的建筑机械。By adopting the above technical solutions, the lifting device is specially used to expand the construction platform from the inside of the building to the outside of the building, so as to solve the high-altitude construction due to the limitation of the outdoor site during the installation of the portal steel frame structure. The suspension platform adopts a foldable design and can pass through After the truss is cleared, the construction is carried out to maximize the area of the construction platform. The lifting frame is set inside the building, and the construction platform is set outside the building. The two sides are weighed to ensure balance and can be fixed and protected by relying on the building itself. The safety is higher than Construction machinery installed outdoors on the same side as the construction platform.

优选的,所述副护栏靠近主护栏一侧设置有限位板,当所述侧悬台展开时,所述限位板卡在主护栏侧边处。Preferably, a limiting plate is provided on the side of the auxiliary guardrail close to the main guardrail, and when the side suspension platform is unfolded, the limiting plate is clamped at the side of the main guardrail.

通过采用上述技术方案,副护栏展开时仅依靠铰链支撑稳定性比较低,因此限位板有利于提供更加稳固的支撑用于侧悬台的固定。By adopting the above technical solution, when the auxiliary guardrail is unfolded, only relying on the hinge to support the stability is relatively low, so the limit plate is beneficial to provide a more stable support for fixing the side suspension platform.

优选的,所述升降台通过卷扬机拉动钢索控制上升和下降,所述卷扬机设置在升降架顶部,并通过卷扬电机控制转动。Preferably, the lifting platform is controlled to rise and fall by pulling the wire rope through a hoist, the hoist is arranged on the top of the lifting frame, and is controlled to rotate by a hoisting motor.

通过采用上述技术方案,卷扬机能够实现稳定的远程重力传动,使用稳定且方便控制。By adopting the above technical solution, the hoist can realize stable remote gravity transmission, stable use and convenient control.

优选的,所述升降台上设置有动滑轮,所述升降架顶部设置有定滑轮,所述钢索缠绕在动滑轮和定滑轮上,所述钢索一端固定在升降架上,另一端缠绕在卷扬机上。Preferably, the lifting platform is provided with a movable pulley, the top of the lifting frame is provided with a fixed pulley, the wire rope is wound on the movable pulley and the fixed pulley, one end of the wire rope is fixed on the lifting frame, and the other end is wound on the hoist superior.

通过采用上述技术方案,通过动滑轮和定滑轮组合使用降低卷扬机的受力。By adopting the above technical solution, the force of the hoist is reduced by the combined use of the movable pulley and the fixed pulley.

优选的,所述升降台上设置有攀爬齿轮,所述攀爬齿轮与升降架上的攀爬齿条进行啮合。Preferably, a climbing gear is provided on the lifting platform, and the climbing gear is engaged with a climbing rack on the lifting frame.

通过采用上述技术方案,攀爬齿轮与攀爬齿条组合使用,提高升降台上下移动的稳定性,攀爬齿轮与攀爬齿条方便提供锁止来防止升降台的坠落。By adopting the above technical solution, the climbing gear and the climbing rack are used in combination to improve the stability of the lifting platform moving up and down, and the climbing gear and the climbing rack are convenient to provide locking to prevent the lifting platform from falling.

优选的,所述升降台底部设置有支撑轮,所述支撑轮紧贴升降架滚动,所述支撑轮与攀爬齿轮分别设置在升降架两侧。Preferably, the bottom of the lift platform is provided with a support wheel, the support wheel rolls against the lift frame, and the support wheel and the climbing gear are respectively arranged on both sides of the lift frame.

通过采用上述技术方案,支撑轮与攀爬齿轮配合使用减少升降台与升降架之间的滑动摩擦,方便滑动且减少噪音,提高使用寿命。By adopting the above technical solution, the supporting wheel and the climbing gear are used together to reduce the sliding friction between the lifting platform and the lifting frame, facilitate sliding, reduce noise, and improve service life.

优选的,所述升降架底部设置有底盘,所述底盘底部设置有移动轮,所述移动轮为履带式车轮,所述底盘侧面设置有转向轮,所述转向轮为轮胎式车轮。Preferably, the bottom of the lifting frame is provided with a chassis, the bottom of the chassis is provided with moving wheels, the moving wheels are crawler wheels, the side of the chassis is provided with steering wheels, and the steering wheels are tire wheels.

通过采用上述技术方案,履带式的移动轮移动稳定且在非驱动状态下不容易移动,稳定性能可靠,轮胎式的转向轮用于克服履带式的移动轮转向困难。By adopting the above technical solution, the crawler-type moving wheel moves stably and is not easy to move in a non-driving state, and the stability is reliable. The tire-type steering wheel is used to overcome the steering difficulty of the crawler-type moving wheel.

优选的,所述底盘上设置有配重,所述配重由多块钢筋混凝土或钢板堆叠组成,所述升降架与底盘连接处设置有斜撑。Preferably, a counterweight is provided on the chassis, the counterweight is composed of a plurality of reinforced concrete or steel plates stacked, and a diagonal brace is provided at the connection between the lifting frame and the chassis.

通过采用上述技术方案,配重用于平衡整体重量,防止出现倾倒,斜撑提高升降架与底盘之间连接的稳固性。By adopting the above technical solution, the counterweight is used to balance the overall weight to prevent tipping, and the diagonal brace improves the stability of the connection between the lifting frame and the chassis.

综上所述,本发明具有如下的有益技术效果:To sum up, the present invention has the following beneficial technical effects:

1、通过悬挑式升降架实现设置在门式桁架内部的施工机械将施工人员移送至门式桁架外部进行施工,减少了负责施工机械的安装,降低了对施工场所受限的施工难度,挂梯用于灵活拓展施工区域,配合升降架使用,保证施工人员安全的同时有效提高施工效率,减少对建筑外部区域的占用,三角挂梯方便施工人员从任意一侧面进行攀爬,方便施工人员进行灵活作业,同时挂梯整体能够作为一个防护笼对施工人员进行保护。1. The construction machinery set inside the portal truss is realized through the cantilever lifting frame, and the construction personnel are transferred to the outside of the portal truss for construction, which reduces the installation of the responsible construction machinery and reduces the construction difficulty limited to the construction site. The ladder is used to flexibly expand the construction area, and it is used in conjunction with the lifting frame to ensure the safety of the construction personnel while effectively improving the construction efficiency and reducing the occupation of the external area of the building. The triangular hanging ladder is convenient for construction personnel to climb from any side Flexible operation, and the whole hanging ladder can be used as a protective cage to protect the construction personnel.

2、本升降装置专用于从建筑内部向建筑外部拓展施工平台,解决门式钢架结构安装过程中的室外场地受限因素的高空施工,悬台采用可折叠设计,可穿过桁架间隙后展开进行施工,最大程度拓展施工平台面积,升降架设置在建筑内部,施工平台设置在建筑外部,两侧称重保证平衡的同时可以依托建筑建构本身进行固定和防护,安全性高于室外与施工平台同侧设置的建筑机械。2. This lifting device is specially used to expand the construction platform from the inside of the building to the outside of the building to solve the high-altitude construction of the outdoor site during the installation of the portal steel structure. The suspension platform adopts a foldable design and can be unfolded after passing through the truss gap Carry out construction and maximize the area of the construction platform. The lifting frame is set inside the building, and the construction platform is set outside the building. Both sides are weighed to ensure balance and can be fixed and protected by relying on the building itself. The safety is higher than that of outdoor and construction platforms. Construction machinery set on the same side.

3、副护栏展开时仅依靠铰链支撑稳定性比较低,因此限位板有利于提供更加稳固的支撑用于侧悬台的固定,卷扬机能够实现稳定的远程重力传动,使用稳定且方便控制,通过动滑轮和定滑轮组合使用降低卷扬机的受力,攀爬齿轮与攀爬齿条组合使用,提高升降台上下移动的稳定性,攀爬齿轮与攀爬齿条方便提供锁止来防止升降台的坠落,支撑轮与攀爬齿轮配合使用减少升降台与升降架之间的滑动摩擦,方便滑动且减少噪音,提高使用寿命,履带式的移动轮移动稳定且在非驱动状态下不容易移动,稳定性能可靠,轮胎式的转向轮用于克服履带式的移动轮转向困难,配重用于平衡整体重量,防止出现倾倒,斜撑提高升降架与底盘之间连接的稳固性。3. When the auxiliary guardrail is unfolded, the stability is relatively low only by relying on the hinge support, so the limit plate is beneficial to provide a more stable support for fixing the side suspension platform. The hoist can realize stable remote gravity transmission, stable use and convenient control. The combined use of the movable pulley and the fixed pulley reduces the force of the hoist. The combination of the climbing gear and the climbing rack improves the stability of the up and down movement of the lifting platform. The climbing gear and the climbing rack are convenient to provide locking to prevent the lifting platform from falling. , The use of supporting wheels and climbing gears reduces the sliding friction between the lifting platform and the lifting frame, which is convenient for sliding and reduces noise, and improves the service life. Reliable, the tire-type steering wheel is used to overcome the steering difficulty of the crawler-type mobile wheel, the counterweight is used to balance the overall weight and prevent tipping, and the diagonal brace improves the stability of the connection between the lifting frame and the chassis.

附图说明Description of drawings

图1为本发明的施工结构示意图;Fig. 1 is the construction structure schematic diagram of the present invention;

图2为图1另一视角的示意图;Fig. 2 is the schematic diagram of another angle of view of Fig. 1;

图3为本发明升降架结构示意图;Fig. 3 is the structure schematic diagram of the lifting frame of the present invention;

图4为本发明悬台收起状态示意图;4 is a schematic diagram of the suspended state of the present invention;

图5为图3另一视角的示意图;Fig. 5 is the schematic diagram of another angle of view of Fig. 3;

图6为本发明悬台结构示意图;6 is a schematic diagram of the structure of the suspension platform of the present invention;

图7为本发明挂梯结构示意图。FIG. 7 is a schematic diagram of the structure of the hanging ladder of the present invention.

附图标记说明:Description of reference numbers:

100、门式桁架,101、墙板;100, portal truss, 101, wall panel;

1、升降架,10、攀爬齿条,11、升降台,111、动滑轮,112、攀爬齿轮,113、支撑轮,12、卷扬机,121、定滑轮,122、卷扬电机,123、钢索,13、底盘,131、移动轮,132、转向轮,133、配重,134、斜撑;1. Lifting frame, 10, Climbing rack, 11, Lifting platform, 111, Moving pulley, 112, Climbing gear, 113, Support wheel, 12, Hoist, 121, Fixed pulley, 122, Hoist motor, 123, Steel cable, 13, chassis, 131, moving wheel, 132, steering wheel, 133, counterweight, 134, diagonal brace;

2、悬台,20、主护栏,21、侧悬台,211、副护栏,212、限位板;2. Suspension platform, 20, Main guardrail, 21, Side suspension platform, 211, Secondary guardrail, 212, Limit plate;

3、挂梯,31、梯框,311、挂钩,32、踏杆。3. Hanging ladder, 31, ladder frame, 311, hook, 32, tread bar.

具体实施方式Detailed ways

以下结合附图1-7对本发明作进一步详细说明。The present invention will be further described in detail below in conjunction with accompanying drawings 1-7.

实施例1:Example 1:

本发明实施例公开一种门式钢架结构安装施工方法,包括以下施工步骤:The embodiment of the present invention discloses a construction method for installing a portal steel frame structure, comprising the following construction steps:

参照图1和2,利用起重机将门式桁架100起吊至预定安装位置并在底部安装固定;1 and 2, use a crane to lift the portal truss 100 to a predetermined installation position and install and fix it at the bottom;

在安装完成的门式桁架100顶部横梁和两侧立柱上安装檩条,安装檩条时利用升降架1将施工人员从门式桁架100内部移送到施工位置对檩条进行固定安装;Install purlins on the top beam and two side columns of the installed portal truss 100. When installing the purlins, use the lifting frame 1 to move the construction personnel from the interior of the portal truss 100 to the construction position to fix and install the purlins;

将墙板101悬放置在门式桁架100外部侧面位置,在门式桁架100内部设置升降架1,通过所述升降架1将施工人员移送到门式桁架100外部施工位置对墙板101进行固定安装;The wall panel 101 is suspended on the outer side of the portal truss 100 , and a lifting frame 1 is arranged inside the portal truss 100 , and the construction personnel are moved to the external construction position of the portal truss 100 through the lifting frame 1 to fix the wall panel 101 Install;

所述升降架1移送施工人员时,施工人员站立在可折叠的悬台2上,升降架1将施工人员移送至预定高度后悬台2展开,施工人员在展开的悬台2上进行施工作业;When the lifting frame 1 transfers the construction personnel, the construction personnel stand on the foldable suspension platform 2, the lifting frame 1 transfers the construction personnel to a predetermined height and the suspension platform 2 is unfolded, and the construction personnel perform construction work on the unfolded suspension platform 2. ;

所述悬台2展开后,将挂梯3安装在悬台2一侧,所述挂梯3通过挂钩311悬挂在檩条上进行固定。After the hanging platform 2 is unfolded, the hanging ladder 3 is installed on one side of the hanging platform 2 , and the hanging ladder 3 is hung on the purlin by the hook 311 for fixing.

参照图1和7,所述挂梯3包括梯框31和踏杆32,所述梯框31由三根钢管呈三棱柱状组成,所述梯框31每根钢管与相邻钢管之间间隔水平固定设置有多根踏杆32,施工人员在使用所述挂梯3时,通过攀爬踏杆32进行上下移动,停留时进入挂梯3内部,并在踏杆32上放置横板用于踩踏或椅坐。1 and 7, the hanging ladder 3 includes a ladder frame 31 and a tread bar 32, the ladder frame 31 is composed of three steel pipes in the shape of a triangular prism, and the interval between each steel pipe of the ladder frame 31 and the adjacent steel pipe is horizontal A plurality of stepping rods 32 are fixedly arranged. When using the hanging ladder 3, the construction personnel move up and down by climbing the stepping rods 32, enter the interior of the hanging ladder 3 when staying, and place a horizontal board on the stepping rod 32 for stepping on or chair.

实施例2:Example 2:

参照图3-5,一种门式钢架结构安装施工升降装置,包括升降架1和悬台2,所述悬台2通过升降台11滑动安装在升降架1上,所述悬台2两侧设置有侧悬台21,所述侧悬台21通过铰链控制折叠,所述悬台2远离升降架1一侧边沿处设置有主护栏20,所述侧悬台21侧边沿处设置有副护栏211,所述悬台2通过铰链安装在升降台11中部,并通过铰链控制悬台2折叠。3-5, a portal steel structure installation construction lifting device, including a lifting frame 1 and a suspension platform 2, the suspension platform 2 is slidably installed on the lifting frame 1 through the lifting platform 11, the suspension platform 2 is two A side suspension platform 21 is arranged on the side, and the side suspension platform 21 is controlled to be folded by a hinge. A main guardrail 20 is arranged on the side edge of the suspension platform 2 away from the lifting frame 1, and a secondary suspension platform 21 is arranged at the side edge of the side suspension platform 21. The guardrail 211, the suspension platform 2 is installed in the middle of the lifting platform 11 through a hinge, and the suspension platform 2 is controlled to be folded through the hinge.

实施例2的实施方式为:The implementation of embodiment 2 is:

施工人员站立在升降台11上,然后随着驱动将升降台11沿着升降架1上升,上升到预定高度,施工人员将悬台2展开然后将侧悬台21展开,施工人员移步到悬台2和侧悬台21上进行施工作业,结束后,施工人员退回到升降台11上,将悬台2和侧悬台21进行折叠收起。The construction personnel stand on the lifting platform 11, and then along with the drive, the lifting platform 11 is raised along the lifting frame 1 to a predetermined height, the construction personnel unfold the suspension platform 2 and then the side suspension platform 21, and the construction personnel move to the suspension platform. The construction work is carried out on the platform 2 and the side suspension platform 21 . After the completion, the construction personnel return to the lifting platform 11 to fold the suspension platform 2 and the side suspension platform 21 .

实施例3:Example 3:

在实施例2的基础上增加:On the basis of Example 2, increase:

参照图6,所述副护栏211靠近主护栏20一侧设置有限位板212,当所述侧悬台21展开时,所述限位板212卡在主护栏20侧边处。Referring to FIG. 6 , a limiting plate 212 is provided on the side of the secondary guardrail 211 close to the main guardrail 20 . When the side suspension platform 21 is unfolded, the limiting plate 212 is stuck at the side of the main guardrail 20 .

参照图3-5,所述升降台11通过卷扬机12拉动钢索123控制上升和下降,所述卷扬机12设置在升降架1顶部,并通过卷扬电机122控制转动。Referring to FIGS. 3-5 , the lift table 11 is controlled to ascend and descend by pulling the wire rope 123 through the winch 12 , the winch 12 is arranged on the top of the lift frame 1 , and is controlled to rotate by the winch motor 122 .

参照图3-5,所述升降架1底部设置有底盘13,所述底盘13底部设置有移动轮131,所述移动轮131为履带式车轮,所述底盘13侧面设置有转向轮132,所述转向轮132为轮胎式车轮。3-5, the bottom of the lift frame 1 is provided with a chassis 13, the bottom of the chassis 13 is provided with a moving wheel 131, the moving wheel 131 is a crawler wheel, the side of the chassis 13 is provided with a steering wheel 132, so The steering wheel 132 is a tire wheel.

实施例3的实施方式为:The implementation of embodiment 3 is:

在实施例2的实施方式基础上增加:On the basis of the implementation of Example 2, add:

升降架1移动时,包括直线移动和转向,直线运动时移动轮131在驱动下转动实现平移,同时带动转向轮132转动,转向时设置在单侧的转向轮132在驱动下转动实现转向,移动轮131不转动且作为转动支点。When the lifting frame 1 moves, it includes linear movement and steering. During the linear movement, the moving wheel 131 rotates under the drive to realize translation, and at the same time drives the steering wheel 132 to rotate. The wheel 131 does not rotate and serves as a fulcrum of rotation.

实施例4:Example 4:

在实施例3的基础上增加:On the basis of Example 3, increase:

参照图3-5,所述升降台11上设置有动滑轮111,所述升降架1顶部设置有定滑轮121,所述钢索123缠绕在动滑轮111和定滑轮121上,所述钢索123一端固定在升降架1上,另一端缠绕在卷扬机12上。3-5 , a movable pulley 111 is provided on the lifting platform 11 , a fixed pulley 121 is provided on the top of the lifting frame 1 , the wire rope 123 is wound on the movable pulley 111 and the fixed pulley 121 , and one end of the wire rope 123 is It is fixed on the lifting frame 1, and the other end is wound on the hoist 12.

参照图3-5,所述升降台11上设置有攀爬齿轮112,所述攀爬齿轮112与升降架1上的攀爬齿条10进行啮合。3-5 , the lifting platform 11 is provided with a climbing gear 112 , and the climbing gear 112 is engaged with the climbing rack 10 on the lifting frame 1 .

参照图3-5,所述升降台11底部设置有支撑轮113,所述支撑轮113紧贴升降架1滚动,所述支撑轮113与攀爬齿轮112分别设置在升降架1两侧。3-5 , the bottom of the lift platform 11 is provided with support wheels 113 , the support wheels 113 roll against the lift frame 1 , and the support wheels 113 and climbing gears 112 are respectively arranged on both sides of the lift frame 1 .

攀爬齿轮112上设置锁止机构。A locking mechanism is provided on the climbing gear 112 .

参照图3-5,所述底盘13上设置有配重133,所述配重133由多块钢筋混凝土或钢板堆叠组成,所述升降架1与底盘13连接处设置有斜撑134。3-5 , the chassis 13 is provided with a counterweight 133 , the counterweight 133 is composed of a plurality of reinforced concrete or steel plates stacked, and a diagonal brace 134 is provided at the connection between the lift frame 1 and the chassis 13 .

实施例4的实施方式为:The implementation of embodiment 4 is:

实施例3的实施方式基础上增加:On the basis of the implementation of Example 3, increase:

钢索123在动滑轮111和定滑轮121间缠绕2-5圈,降低卷扬机12的负载,当升降台11停止移动时,攀爬齿轮112上设置锁止机构将攀爬齿轮112锁止,防止升降台11坠落。The wire rope 123 is wound between the movable pulley 111 and the fixed pulley 121 for 2-5 turns to reduce the load of the hoist 12. When the lift table 11 stops moving, a locking mechanism is provided on the climbing gear 112 to lock the climbing gear 112 to prevent lifting Table 11 fell.

以上均为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention should be covered within the protection scope of the present invention. Inside.

Claims (10)

1. A method for installing and constructing a door type steel frame structure is characterized by comprising the following steps: the method comprises the following construction steps:
hoisting the portal truss (100) to a preset installation position by using a crane, and installing and fixing the portal truss at the bottom;
purlins are installed on a cross beam at the top of the installed door type truss (100) and upright columns on two sides, and constructors are transferred to a construction position from the inside of the door type truss (100) by utilizing the lifting frame (1) to fixedly install the purlins when the purlins are installed;
the method comprises the following steps that a wallboard (101) is placed at the outer side position of a door type truss (100) in a hanging mode, a lifting frame (1) is arranged inside the door type truss (100), and constructors are moved to the outer construction position of the door type truss (100) through the lifting frame (1) to fixedly install the wallboard (101);
when the lifting frame (1) transfers constructors, the constructors stand on the foldable suspension platform (2), the lifting frame (1) transfers the constructors to a preset height, then the suspension platform (2) is unfolded, and the constructors perform construction operation on the unfolded suspension platform (2);
after the suspension table (2) is unfolded, the hanging ladder (3) is installed on one side of the suspension table (2), and the hanging ladder (3) is hung on the purline through the hook (311) to be fixed.
2. The method of installing and constructing a portal steel frame structure according to claim 1, wherein: the hanging ladder (3) comprises a ladder frame (31) and pedal rods (32), the ladder frame (31) is composed of three steel pipes in a triangular prism shape, and a plurality of pedal rods (32) are horizontally and fixedly arranged between each steel pipe of the ladder frame (31) and the adjacent steel pipe at intervals;
constructors use the hanging ladder (3), move up and down by climbing the pedal rod (32), enter the inside of the hanging ladder (3) when staying, and place a transverse plate on the pedal rod (32) for treading or sitting.
3. The utility model provides a door formula steel frame construction installation elevating gear which characterized in that: the device comprises a lifting frame (1) and a suspension platform (2), wherein the suspension platform (2) is slidably arranged on the lifting frame (1) through a lifting platform (11);
side suspension platforms (21) are arranged on two sides of the suspension platform (2), the side suspension platforms (21) are controlled to be folded through hinges, a main guardrail (20) is arranged at the edge of one side, away from the lifting frame (1), of the suspension platform (2), and an auxiliary guardrail (211) is arranged at the edge of the side suspension platform (21);
the suspension platform (2) is arranged in the middle of the lifting platform (11) through a hinge and is controlled to be folded through the hinge to control the suspension platform (2).
4. The gate steel frame structure erection construction elevating gear of claim 3, characterized by: and a limiting plate (212) is arranged on one side, close to the main guardrail (20), of the auxiliary guardrail (211), and when the side suspension table (21) is unfolded, the limiting plate (212) is clamped at the side edge of the main guardrail (20).
5. The gate steel frame structure erection construction elevating gear of claim 3, characterized by: the lifting platform (11) is controlled to ascend and descend by pulling a steel cable (123) through a winch (12), and the winch (12) is arranged at the top of the lifting frame (1) and is controlled to rotate through a winch motor (122).
6. The gate steel frame structure erection construction elevating gear of claim 5, characterized by: the lifting platform (11) is provided with a movable pulley (111), the top of the lifting frame (1) is provided with a fixed pulley (121), a steel cable (123) is wound on the movable pulley (111) and the fixed pulley (121), one end of the steel cable (123) is fixed on the lifting frame (1), and the other end of the steel cable is wound on the winch (12).
7. The gate type steel frame structure erection construction lifting device of claim 5, wherein: be provided with climbing gear (112) on elevating platform (11), climbing gear (112) mesh with climbing rack (10) on crane (1).
8. The gate steel frame structure erection construction lifting device of claim 7, characterized in that: the lifting platform is characterized in that a supporting wheel (113) is arranged at the bottom of the lifting platform (11), the supporting wheel (113) is tightly attached to the lifting frame (1) to roll, and the supporting wheel (113) and the climbing gear (112) are respectively arranged on two sides of the lifting frame (1).
9. The gate steel frame structure erection construction elevating gear of claim 3, characterized by: the lifting frame is characterized in that a chassis (13) is arranged at the bottom of the lifting frame (1), moving wheels (131) are arranged at the bottom of the chassis (13), the moving wheels (131) are crawler-type wheels, steering wheels (132) are arranged on the side faces of the chassis (13), and the steering wheels (132) are tire-type wheels.
10. The gate steel frame structure erection construction lifting device of claim 9, wherein: the lifting frame is characterized in that a counterweight (133) is arranged on the chassis (13), the counterweight (133) is formed by stacking a plurality of reinforced concrete or steel plates, and an inclined strut (134) is arranged at the joint of the lifting frame (1) and the chassis (13).
CN202210724006.8A 2022-06-24 2022-06-24 Installation construction method and construction lifting device for door type steel frame structure Pending CN115030311A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210724006.8A CN115030311A (en) 2022-06-24 2022-06-24 Installation construction method and construction lifting device for door type steel frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210724006.8A CN115030311A (en) 2022-06-24 2022-06-24 Installation construction method and construction lifting device for door type steel frame structure

Publications (1)

Publication Number Publication Date
CN115030311A true CN115030311A (en) 2022-09-09

Family

ID=83126383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210724006.8A Pending CN115030311A (en) 2022-06-24 2022-06-24 Installation construction method and construction lifting device for door type steel frame structure

Country Status (1)

Country Link
CN (1) CN115030311A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000327265A (en) * 1999-05-20 2000-11-28 Takenaka Komuten Co Ltd Climbing method for climbing crane, and climbing crane
CN105604334A (en) * 2016-01-18 2016-05-25 中铁三局集团有限公司 Rapid-construction method used for overall installation of large-span steel truss
CN105781092A (en) * 2016-03-11 2016-07-20 上海建工集团股份有限公司 Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof
CN207609153U (en) * 2017-10-17 2018-07-13 中建八局第一建设有限公司 A kind of elevator liftable construction operation platform
CN210563479U (en) * 2019-06-24 2020-05-19 中铁十二局集团建筑安装工程有限公司 Assembled material platform that climbs
CN213539660U (en) * 2020-09-12 2021-06-25 云南恒兆科技有限公司 Attached electric construction platform
CN214498342U (en) * 2021-03-05 2021-10-26 段福才 Climbing type building construction operation platform outside building
CN214780110U (en) * 2020-12-14 2021-11-19 陕西中科信息科技咨询有限公司 Intelligent elevating gear for building engineering construction
CN214828828U (en) * 2020-06-29 2021-11-23 南京锦江园林景观有限公司 Landscape construction elevating platform
CN216444850U (en) * 2021-12-23 2022-05-06 徐锋 Energy-saving building construction lifting anti-falling device
CN216664922U (en) * 2021-09-30 2022-06-03 山东宝冶建设有限公司 Steel structure construction device capable of climbing by self-lifting

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000327265A (en) * 1999-05-20 2000-11-28 Takenaka Komuten Co Ltd Climbing method for climbing crane, and climbing crane
CN105604334A (en) * 2016-01-18 2016-05-25 中铁三局集团有限公司 Rapid-construction method used for overall installation of large-span steel truss
CN105781092A (en) * 2016-03-11 2016-07-20 上海建工集团股份有限公司 Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof
CN207609153U (en) * 2017-10-17 2018-07-13 中建八局第一建设有限公司 A kind of elevator liftable construction operation platform
CN210563479U (en) * 2019-06-24 2020-05-19 中铁十二局集团建筑安装工程有限公司 Assembled material platform that climbs
CN214828828U (en) * 2020-06-29 2021-11-23 南京锦江园林景观有限公司 Landscape construction elevating platform
CN213539660U (en) * 2020-09-12 2021-06-25 云南恒兆科技有限公司 Attached electric construction platform
CN214780110U (en) * 2020-12-14 2021-11-19 陕西中科信息科技咨询有限公司 Intelligent elevating gear for building engineering construction
CN214498342U (en) * 2021-03-05 2021-10-26 段福才 Climbing type building construction operation platform outside building
CN216664922U (en) * 2021-09-30 2022-06-03 山东宝冶建设有限公司 Steel structure construction device capable of climbing by self-lifting
CN216444850U (en) * 2021-12-23 2022-05-06 徐锋 Energy-saving building construction lifting anti-falling device

Similar Documents

Publication Publication Date Title
CN110371823B (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method
JP3172719B2 (en) Building construction safety fence
US5327690A (en) Erection workbench for constructing a frame
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN118933321A (en) A self-elevating integrated working platform
CN215828096U (en) Self-lifting hoisting equipment and sliding locking assembly
CN210735910U (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction
CN115030311A (en) Installation construction method and construction lifting device for door type steel frame structure
CN116181041B (en) Building machine of multilayer quick construction
CN111717812A (en) Novel tower crane anti-creep device
CN209040300U (en) Construction equipment and box construction of prefabricated buildings
CN219031629U (en) Lifting equipment for indoor plate installation
CN110005182A (en) An extended elevator shaft construction work protection platform
CN215858953U (en) Device for hydraulically lifting scaffold
KR100301573B1 (en) Safety fence for building construction
JPH11343729A (en) Slide rising type suspended scaffold
JPH092780A (en) Jib-type traveling crane with jack-up
CN113175222A (en) Installation method of embedded prefabricated external wall panel component
JP3617667B2 (en) Steel tower of support or cable crane and construction method thereof
CN115749235B (en) Lift shaft lifting scaffold and assembly method
CN218114742U (en) Carrying pole beam hoisting system and carrying pole beam hoisting system
CN221761329U (en) Lifting device based on tower climbing and support unit for construction platform
CN219569531U (en) A construction platform for adding elevators

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220909

RJ01 Rejection of invention patent application after publication