CN115030311A - Installation construction method and construction lifting device for door type steel frame structure - Google Patents
Installation construction method and construction lifting device for door type steel frame structure Download PDFInfo
- Publication number
- CN115030311A CN115030311A CN202210724006.8A CN202210724006A CN115030311A CN 115030311 A CN115030311 A CN 115030311A CN 202210724006 A CN202210724006 A CN 202210724006A CN 115030311 A CN115030311 A CN 115030311A
- Authority
- CN
- China
- Prior art keywords
- platform
- construction
- lifting
- suspension
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/02—Scaffold feet, e.g. with arrangements for adjustment
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/10—Steps or ladders specially adapted for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/142—Railings extensible or telescopic
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/157—Extensible platforms, e.g. telescopic platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G2005/148—Railings latticed or netted
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本发明涉及门式钢架建筑施工的技术领域,尤其是涉及一种门式钢架结构安装施工方法及施工升降装置。The invention relates to the technical field of portal steel frame building construction, in particular to a portal steel frame structure installation and construction method and a construction lifting device.
背景技术Background technique
门式钢架建筑由于其造价成本低、安装效率高和耐用等特点被广泛应用于工厂车间和仓储等领域的场地建筑,大型门式钢架建筑安装过程需要施工人员进行高空作业,通常由于工厂和仓储用地密集度较高,在施工过程中设置大型施工机械受到阻碍,包括在原有建筑基础上进行改建,也会限制大型施工机械的使用。Portal steel frame buildings are widely used in site construction in the fields of factory workshops and warehousing due to their low cost, high installation efficiency and durability. The installation process of large portal steel frame buildings requires construction personnel to perform high-altitude operations. Due to the high density of land for storage and storage, the installation of large-scale construction machinery during the construction process is hindered, including reconstruction on the basis of the original building, which will also limit the use of large-scale construction machinery.
现有高空作业方式主要包括脚手架、吊框和曲臂车,安装脚手架需要耗时耗力,严重拖延施工工期,违背了门式钢架建筑快速施工的要求,吊框需要设置起吊架或者起重机,不仅拖延工期,而且受场地影响设置所占空间受限,无法安装大型起重机,因此只能在门式钢架建筑内部设置高空施工机械,曲臂车控制方式复杂,同时曲臂车不适用于在建筑内部对外部进行安装施工。The existing high-altitude working methods mainly include scaffolding, hanging frames and crank-arm trucks. The installation of scaffolding requires time and effort, which seriously delays the construction period and violates the requirements of rapid construction of portal steel frame buildings. Not only the construction period is delayed, but also due to the limited space occupied by the site, large cranes cannot be installed. Therefore, only high-altitude construction machinery can be installed inside the portal steel structure. The interior of the building is installed to the exterior.
发明内容SUMMARY OF THE INVENTION
为了解决建筑密集区域大型门式钢架建筑对施工机械安装场地限制问题,同时提高高空施工效率,本发明提供一种门式钢架结构安装施工方法及施工升降装置。In order to solve the problem that large-scale portal steel frame buildings limit the installation site of construction machinery in densely built areas, and at the same time improve the efficiency of high-altitude construction, the present invention provides a portal steel frame structure installation and construction method and a construction lifting device.
一方面,本发明提供的一种门式钢架结构安装施工方法,采用如下的技术方案:On the one hand, a kind of portal steel frame structure installation and construction method provided by the present invention adopts the following technical scheme:
一种门式钢架结构安装施工方法,包括以下施工步骤:A construction method for installing a portal steel frame structure, comprising the following construction steps:
利用起重机将门式桁架起吊至预定安装位置并在底部安装固定;Use a crane to lift the portal truss to the predetermined installation position and install and fix it at the bottom;
在安装完成的门式桁架顶部横梁和两侧立柱上安装檩条,安装檩条时利用升降架将施工人员从门式桁架内部移送到施工位置对檩条进行固定安装;Install purlins on the top beam and two side columns of the finished portal truss. When installing the purlins, use the lifting frame to move the construction personnel from the inside of the portal truss to the construction position to fix the purlins;
将墙板悬放置在门式桁架外部侧面位置,在门式桁架内部设置升降架,通过所述升降架将施工人员移送到门式桁架外部施工位置对墙板进行固定安装;Suspend the wall panel on the outer side of the portal truss, set up a lifting frame inside the portal truss, and move the construction personnel to the external construction position of the portal truss through the lifting frame to fix the wall panel;
所述升降架移送施工人员时,施工人员站立在可折叠的悬台上,升降架将施工人员移送至预定高度后悬台展开,施工人员在展开的悬台上进行施工作业;When the lifting frame transfers the construction personnel, the construction personnel stand on the foldable suspension platform, the lifting frame transfers the construction personnel to a predetermined height, and the suspension platform is unfolded, and the construction personnel perform construction operations on the unfolded suspension platform;
所述悬台展开后,将挂梯安装在悬台一侧,所述挂梯通过挂钩悬挂在檩条上进行固定。After the hanging platform is unfolded, the hanging ladder is installed on one side of the hanging platform, and the hanging ladder is hung on the purlin by hooks for fixing.
通过采用上述技术方案,通过悬挑式升降架实现设置在门式桁架内部的施工机械将施工人员移送至门式桁架外部进行施工,减少了负责施工机械的安装,降低了对施工场所受限的施工难度,挂梯用于灵活拓展施工区域,配合升降架使用,保证施工人员安全的同时有效提高施工效率,减少对建筑外部区域的占用。By adopting the above technical solution, the construction machinery arranged inside the portal truss is realized through the cantilever lift frame to transfer the construction personnel to the outside of the portal truss for construction, which reduces the installation of the construction machinery and reduces the limited construction site. Construction difficulty, the hanging ladder is used to flexibly expand the construction area, and used in conjunction with the lifting frame to ensure the safety of the construction personnel, while effectively improving the construction efficiency and reducing the occupation of the external area of the building.
优选的,所述挂梯包括梯框和踏杆,所述梯框由三根钢管呈三棱柱状组成,所述梯框每根钢管与相邻钢管之间间隔水平固定设置有多根踏杆,施工人员在使用所述挂梯时,通过攀爬踏杆进行上下移动,停留时进入挂梯内部,并在踏杆上放置横板用于踩踏或椅坐。Preferably, the hanging ladder includes a ladder frame and a step rod, the ladder frame is composed of three steel pipes in the shape of a triangular prism, and a plurality of step rods are fixed horizontally between each steel pipe of the ladder frame and the adjacent steel pipe, When using the hanging ladder, the construction personnel move up and down by climbing the stepping rod, enter the interior of the hanging ladder when staying, and place a horizontal board on the stepping rod for stepping on or sitting on a chair.
通过采用上述技术方案,三角挂梯方便施工人员从任意一侧面进行攀爬,方便施工人员进行灵活作业,同时挂梯整体能够作为一个防护笼对施工人员进行保护。By adopting the above technical solution, the triangular hanging ladder facilitates the construction personnel to climb from any side, facilitates the construction personnel to perform flexible operations, and at the same time, the hanging ladder as a whole can be used as a protective cage to protect the construction personnel.
另一方面,本发明提供的一种门式钢架结构安装施工升降装置,采用如下的技术方案:On the other hand, a kind of portal steel frame structure installation construction lifting device provided by the present invention adopts the following technical scheme:
一种门式钢架结构安装施工升降装置,包括升降架和悬台,所述悬台通过升降台滑动安装在升降架上,所述悬台两侧设置有侧悬台,所述侧悬台通过铰链控制折叠,所述悬台远离升降架一侧边沿处设置有主护栏,所述侧悬台侧边沿处设置有副护栏,所述悬台通过铰链安装在升降台中部,并通过铰链控制悬台折叠。A gantry steel frame structure installation construction lifting device, including a lifting frame and a suspension platform, the suspension platform is slidably installed on the lifting frame through the lifting platform, and side suspension platforms are arranged on both sides of the suspension platform, and the side suspension platform Folding is controlled by hinges, a main guardrail is arranged at the side edge of the suspension platform away from the lifting frame, and a secondary guardrail is arranged at the side edge of the side suspension platform. The suspension platform is installed in the middle of the lifting platform through a hinge and controlled by the hinge The suspension is folded.
通过采用上述技术方案,本升降装置专用于从建筑内部向建筑外部拓展施工平台,解决门式钢架结构安装过程中的室外场地受限因素的高空施工,悬台采用可折叠设计,可穿过桁架间隙后展开进行施工,最大程度拓展施工平台面积,升降架设置在建筑内部,施工平台设置在建筑外部,两侧称重保证平衡的同时可以依托建筑建构本身进行固定和防护,安全性高于室外与施工平台同侧设置的建筑机械。By adopting the above technical solutions, the lifting device is specially used to expand the construction platform from the inside of the building to the outside of the building, so as to solve the high-altitude construction due to the limitation of the outdoor site during the installation of the portal steel frame structure. The suspension platform adopts a foldable design and can pass through After the truss is cleared, the construction is carried out to maximize the area of the construction platform. The lifting frame is set inside the building, and the construction platform is set outside the building. The two sides are weighed to ensure balance and can be fixed and protected by relying on the building itself. The safety is higher than Construction machinery installed outdoors on the same side as the construction platform.
优选的,所述副护栏靠近主护栏一侧设置有限位板,当所述侧悬台展开时,所述限位板卡在主护栏侧边处。Preferably, a limiting plate is provided on the side of the auxiliary guardrail close to the main guardrail, and when the side suspension platform is unfolded, the limiting plate is clamped at the side of the main guardrail.
通过采用上述技术方案,副护栏展开时仅依靠铰链支撑稳定性比较低,因此限位板有利于提供更加稳固的支撑用于侧悬台的固定。By adopting the above technical solution, when the auxiliary guardrail is unfolded, only relying on the hinge to support the stability is relatively low, so the limit plate is beneficial to provide a more stable support for fixing the side suspension platform.
优选的,所述升降台通过卷扬机拉动钢索控制上升和下降,所述卷扬机设置在升降架顶部,并通过卷扬电机控制转动。Preferably, the lifting platform is controlled to rise and fall by pulling the wire rope through a hoist, the hoist is arranged on the top of the lifting frame, and is controlled to rotate by a hoisting motor.
通过采用上述技术方案,卷扬机能够实现稳定的远程重力传动,使用稳定且方便控制。By adopting the above technical solution, the hoist can realize stable remote gravity transmission, stable use and convenient control.
优选的,所述升降台上设置有动滑轮,所述升降架顶部设置有定滑轮,所述钢索缠绕在动滑轮和定滑轮上,所述钢索一端固定在升降架上,另一端缠绕在卷扬机上。Preferably, the lifting platform is provided with a movable pulley, the top of the lifting frame is provided with a fixed pulley, the wire rope is wound on the movable pulley and the fixed pulley, one end of the wire rope is fixed on the lifting frame, and the other end is wound on the hoist superior.
通过采用上述技术方案,通过动滑轮和定滑轮组合使用降低卷扬机的受力。By adopting the above technical solution, the force of the hoist is reduced by the combined use of the movable pulley and the fixed pulley.
优选的,所述升降台上设置有攀爬齿轮,所述攀爬齿轮与升降架上的攀爬齿条进行啮合。Preferably, a climbing gear is provided on the lifting platform, and the climbing gear is engaged with a climbing rack on the lifting frame.
通过采用上述技术方案,攀爬齿轮与攀爬齿条组合使用,提高升降台上下移动的稳定性,攀爬齿轮与攀爬齿条方便提供锁止来防止升降台的坠落。By adopting the above technical solution, the climbing gear and the climbing rack are used in combination to improve the stability of the lifting platform moving up and down, and the climbing gear and the climbing rack are convenient to provide locking to prevent the lifting platform from falling.
优选的,所述升降台底部设置有支撑轮,所述支撑轮紧贴升降架滚动,所述支撑轮与攀爬齿轮分别设置在升降架两侧。Preferably, the bottom of the lift platform is provided with a support wheel, the support wheel rolls against the lift frame, and the support wheel and the climbing gear are respectively arranged on both sides of the lift frame.
通过采用上述技术方案,支撑轮与攀爬齿轮配合使用减少升降台与升降架之间的滑动摩擦,方便滑动且减少噪音,提高使用寿命。By adopting the above technical solution, the supporting wheel and the climbing gear are used together to reduce the sliding friction between the lifting platform and the lifting frame, facilitate sliding, reduce noise, and improve service life.
优选的,所述升降架底部设置有底盘,所述底盘底部设置有移动轮,所述移动轮为履带式车轮,所述底盘侧面设置有转向轮,所述转向轮为轮胎式车轮。Preferably, the bottom of the lifting frame is provided with a chassis, the bottom of the chassis is provided with moving wheels, the moving wheels are crawler wheels, the side of the chassis is provided with steering wheels, and the steering wheels are tire wheels.
通过采用上述技术方案,履带式的移动轮移动稳定且在非驱动状态下不容易移动,稳定性能可靠,轮胎式的转向轮用于克服履带式的移动轮转向困难。By adopting the above technical solution, the crawler-type moving wheel moves stably and is not easy to move in a non-driving state, and the stability is reliable. The tire-type steering wheel is used to overcome the steering difficulty of the crawler-type moving wheel.
优选的,所述底盘上设置有配重,所述配重由多块钢筋混凝土或钢板堆叠组成,所述升降架与底盘连接处设置有斜撑。Preferably, a counterweight is provided on the chassis, the counterweight is composed of a plurality of reinforced concrete or steel plates stacked, and a diagonal brace is provided at the connection between the lifting frame and the chassis.
通过采用上述技术方案,配重用于平衡整体重量,防止出现倾倒,斜撑提高升降架与底盘之间连接的稳固性。By adopting the above technical solution, the counterweight is used to balance the overall weight to prevent tipping, and the diagonal brace improves the stability of the connection between the lifting frame and the chassis.
综上所述,本发明具有如下的有益技术效果:To sum up, the present invention has the following beneficial technical effects:
1、通过悬挑式升降架实现设置在门式桁架内部的施工机械将施工人员移送至门式桁架外部进行施工,减少了负责施工机械的安装,降低了对施工场所受限的施工难度,挂梯用于灵活拓展施工区域,配合升降架使用,保证施工人员安全的同时有效提高施工效率,减少对建筑外部区域的占用,三角挂梯方便施工人员从任意一侧面进行攀爬,方便施工人员进行灵活作业,同时挂梯整体能够作为一个防护笼对施工人员进行保护。1. The construction machinery set inside the portal truss is realized through the cantilever lifting frame, and the construction personnel are transferred to the outside of the portal truss for construction, which reduces the installation of the responsible construction machinery and reduces the construction difficulty limited to the construction site. The ladder is used to flexibly expand the construction area, and it is used in conjunction with the lifting frame to ensure the safety of the construction personnel while effectively improving the construction efficiency and reducing the occupation of the external area of the building. The triangular hanging ladder is convenient for construction personnel to climb from any side Flexible operation, and the whole hanging ladder can be used as a protective cage to protect the construction personnel.
2、本升降装置专用于从建筑内部向建筑外部拓展施工平台,解决门式钢架结构安装过程中的室外场地受限因素的高空施工,悬台采用可折叠设计,可穿过桁架间隙后展开进行施工,最大程度拓展施工平台面积,升降架设置在建筑内部,施工平台设置在建筑外部,两侧称重保证平衡的同时可以依托建筑建构本身进行固定和防护,安全性高于室外与施工平台同侧设置的建筑机械。2. This lifting device is specially used to expand the construction platform from the inside of the building to the outside of the building to solve the high-altitude construction of the outdoor site during the installation of the portal steel structure. The suspension platform adopts a foldable design and can be unfolded after passing through the truss gap Carry out construction and maximize the area of the construction platform. The lifting frame is set inside the building, and the construction platform is set outside the building. Both sides are weighed to ensure balance and can be fixed and protected by relying on the building itself. The safety is higher than that of outdoor and construction platforms. Construction machinery set on the same side.
3、副护栏展开时仅依靠铰链支撑稳定性比较低,因此限位板有利于提供更加稳固的支撑用于侧悬台的固定,卷扬机能够实现稳定的远程重力传动,使用稳定且方便控制,通过动滑轮和定滑轮组合使用降低卷扬机的受力,攀爬齿轮与攀爬齿条组合使用,提高升降台上下移动的稳定性,攀爬齿轮与攀爬齿条方便提供锁止来防止升降台的坠落,支撑轮与攀爬齿轮配合使用减少升降台与升降架之间的滑动摩擦,方便滑动且减少噪音,提高使用寿命,履带式的移动轮移动稳定且在非驱动状态下不容易移动,稳定性能可靠,轮胎式的转向轮用于克服履带式的移动轮转向困难,配重用于平衡整体重量,防止出现倾倒,斜撑提高升降架与底盘之间连接的稳固性。3. When the auxiliary guardrail is unfolded, the stability is relatively low only by relying on the hinge support, so the limit plate is beneficial to provide a more stable support for fixing the side suspension platform. The hoist can realize stable remote gravity transmission, stable use and convenient control. The combined use of the movable pulley and the fixed pulley reduces the force of the hoist. The combination of the climbing gear and the climbing rack improves the stability of the up and down movement of the lifting platform. The climbing gear and the climbing rack are convenient to provide locking to prevent the lifting platform from falling. , The use of supporting wheels and climbing gears reduces the sliding friction between the lifting platform and the lifting frame, which is convenient for sliding and reduces noise, and improves the service life. Reliable, the tire-type steering wheel is used to overcome the steering difficulty of the crawler-type mobile wheel, the counterweight is used to balance the overall weight and prevent tipping, and the diagonal brace improves the stability of the connection between the lifting frame and the chassis.
附图说明Description of drawings
图1为本发明的施工结构示意图;Fig. 1 is the construction structure schematic diagram of the present invention;
图2为图1另一视角的示意图;Fig. 2 is the schematic diagram of another angle of view of Fig. 1;
图3为本发明升降架结构示意图;Fig. 3 is the structure schematic diagram of the lifting frame of the present invention;
图4为本发明悬台收起状态示意图;4 is a schematic diagram of the suspended state of the present invention;
图5为图3另一视角的示意图;Fig. 5 is the schematic diagram of another angle of view of Fig. 3;
图6为本发明悬台结构示意图;6 is a schematic diagram of the structure of the suspension platform of the present invention;
图7为本发明挂梯结构示意图。FIG. 7 is a schematic diagram of the structure of the hanging ladder of the present invention.
附图标记说明:Description of reference numbers:
100、门式桁架,101、墙板;100, portal truss, 101, wall panel;
1、升降架,10、攀爬齿条,11、升降台,111、动滑轮,112、攀爬齿轮,113、支撑轮,12、卷扬机,121、定滑轮,122、卷扬电机,123、钢索,13、底盘,131、移动轮,132、转向轮,133、配重,134、斜撑;1. Lifting frame, 10, Climbing rack, 11, Lifting platform, 111, Moving pulley, 112, Climbing gear, 113, Support wheel, 12, Hoist, 121, Fixed pulley, 122, Hoist motor, 123, Steel cable, 13, chassis, 131, moving wheel, 132, steering wheel, 133, counterweight, 134, diagonal brace;
2、悬台,20、主护栏,21、侧悬台,211、副护栏,212、限位板;2. Suspension platform, 20, Main guardrail, 21, Side suspension platform, 211, Secondary guardrail, 212, Limit plate;
3、挂梯,31、梯框,311、挂钩,32、踏杆。3. Hanging ladder, 31, ladder frame, 311, hook, 32, tread bar.
具体实施方式Detailed ways
以下结合附图1-7对本发明作进一步详细说明。The present invention will be further described in detail below in conjunction with accompanying drawings 1-7.
实施例1:Example 1:
本发明实施例公开一种门式钢架结构安装施工方法,包括以下施工步骤:The embodiment of the present invention discloses a construction method for installing a portal steel frame structure, comprising the following construction steps:
参照图1和2,利用起重机将门式桁架100起吊至预定安装位置并在底部安装固定;1 and 2, use a crane to lift the
在安装完成的门式桁架100顶部横梁和两侧立柱上安装檩条,安装檩条时利用升降架1将施工人员从门式桁架100内部移送到施工位置对檩条进行固定安装;Install purlins on the top beam and two side columns of the installed
将墙板101悬放置在门式桁架100外部侧面位置,在门式桁架100内部设置升降架1,通过所述升降架1将施工人员移送到门式桁架100外部施工位置对墙板101进行固定安装;The
所述升降架1移送施工人员时,施工人员站立在可折叠的悬台2上,升降架1将施工人员移送至预定高度后悬台2展开,施工人员在展开的悬台2上进行施工作业;When the lifting frame 1 transfers the construction personnel, the construction personnel stand on the
所述悬台2展开后,将挂梯3安装在悬台2一侧,所述挂梯3通过挂钩311悬挂在檩条上进行固定。After the
参照图1和7,所述挂梯3包括梯框31和踏杆32,所述梯框31由三根钢管呈三棱柱状组成,所述梯框31每根钢管与相邻钢管之间间隔水平固定设置有多根踏杆32,施工人员在使用所述挂梯3时,通过攀爬踏杆32进行上下移动,停留时进入挂梯3内部,并在踏杆32上放置横板用于踩踏或椅坐。1 and 7, the hanging ladder 3 includes a
实施例2:Example 2:
参照图3-5,一种门式钢架结构安装施工升降装置,包括升降架1和悬台2,所述悬台2通过升降台11滑动安装在升降架1上,所述悬台2两侧设置有侧悬台21,所述侧悬台21通过铰链控制折叠,所述悬台2远离升降架1一侧边沿处设置有主护栏20,所述侧悬台21侧边沿处设置有副护栏211,所述悬台2通过铰链安装在升降台11中部,并通过铰链控制悬台2折叠。3-5, a portal steel structure installation construction lifting device, including a lifting frame 1 and a
实施例2的实施方式为:The implementation of
施工人员站立在升降台11上,然后随着驱动将升降台11沿着升降架1上升,上升到预定高度,施工人员将悬台2展开然后将侧悬台21展开,施工人员移步到悬台2和侧悬台21上进行施工作业,结束后,施工人员退回到升降台11上,将悬台2和侧悬台21进行折叠收起。The construction personnel stand on the
实施例3:Example 3:
在实施例2的基础上增加:On the basis of Example 2, increase:
参照图6,所述副护栏211靠近主护栏20一侧设置有限位板212,当所述侧悬台21展开时,所述限位板212卡在主护栏20侧边处。Referring to FIG. 6 , a limiting
参照图3-5,所述升降台11通过卷扬机12拉动钢索123控制上升和下降,所述卷扬机12设置在升降架1顶部,并通过卷扬电机122控制转动。Referring to FIGS. 3-5 , the lift table 11 is controlled to ascend and descend by pulling the
参照图3-5,所述升降架1底部设置有底盘13,所述底盘13底部设置有移动轮131,所述移动轮131为履带式车轮,所述底盘13侧面设置有转向轮132,所述转向轮132为轮胎式车轮。3-5, the bottom of the lift frame 1 is provided with a
实施例3的实施方式为:The implementation of embodiment 3 is:
在实施例2的实施方式基础上增加:On the basis of the implementation of Example 2, add:
升降架1移动时,包括直线移动和转向,直线运动时移动轮131在驱动下转动实现平移,同时带动转向轮132转动,转向时设置在单侧的转向轮132在驱动下转动实现转向,移动轮131不转动且作为转动支点。When the lifting frame 1 moves, it includes linear movement and steering. During the linear movement, the moving
实施例4:Example 4:
在实施例3的基础上增加:On the basis of Example 3, increase:
参照图3-5,所述升降台11上设置有动滑轮111,所述升降架1顶部设置有定滑轮121,所述钢索123缠绕在动滑轮111和定滑轮121上,所述钢索123一端固定在升降架1上,另一端缠绕在卷扬机12上。3-5 , a
参照图3-5,所述升降台11上设置有攀爬齿轮112,所述攀爬齿轮112与升降架1上的攀爬齿条10进行啮合。3-5 , the
参照图3-5,所述升降台11底部设置有支撑轮113,所述支撑轮113紧贴升降架1滚动,所述支撑轮113与攀爬齿轮112分别设置在升降架1两侧。3-5 , the bottom of the
攀爬齿轮112上设置锁止机构。A locking mechanism is provided on the
参照图3-5,所述底盘13上设置有配重133,所述配重133由多块钢筋混凝土或钢板堆叠组成,所述升降架1与底盘13连接处设置有斜撑134。3-5 , the
实施例4的实施方式为:The implementation of embodiment 4 is:
实施例3的实施方式基础上增加:On the basis of the implementation of Example 3, increase:
钢索123在动滑轮111和定滑轮121间缠绕2-5圈,降低卷扬机12的负载,当升降台11停止移动时,攀爬齿轮112上设置锁止机构将攀爬齿轮112锁止,防止升降台11坠落。The
以上均为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention should be covered within the protection scope of the present invention. Inside.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210724006.8A CN115030311A (en) | 2022-06-24 | 2022-06-24 | Installation construction method and construction lifting device for door type steel frame structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210724006.8A CN115030311A (en) | 2022-06-24 | 2022-06-24 | Installation construction method and construction lifting device for door type steel frame structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115030311A true CN115030311A (en) | 2022-09-09 |
Family
ID=83126383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210724006.8A Pending CN115030311A (en) | 2022-06-24 | 2022-06-24 | Installation construction method and construction lifting device for door type steel frame structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115030311A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000327265A (en) * | 1999-05-20 | 2000-11-28 | Takenaka Komuten Co Ltd | Climbing method for climbing crane, and climbing crane |
CN105604334A (en) * | 2016-01-18 | 2016-05-25 | 中铁三局集团有限公司 | Rapid-construction method used for overall installation of large-span steel truss |
CN105781092A (en) * | 2016-03-11 | 2016-07-20 | 上海建工集团股份有限公司 | Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof |
CN207609153U (en) * | 2017-10-17 | 2018-07-13 | 中建八局第一建设有限公司 | A kind of elevator liftable construction operation platform |
CN210563479U (en) * | 2019-06-24 | 2020-05-19 | 中铁十二局集团建筑安装工程有限公司 | Assembled material platform that climbs |
CN213539660U (en) * | 2020-09-12 | 2021-06-25 | 云南恒兆科技有限公司 | Attached electric construction platform |
CN214498342U (en) * | 2021-03-05 | 2021-10-26 | 段福才 | Climbing type building construction operation platform outside building |
CN214780110U (en) * | 2020-12-14 | 2021-11-19 | 陕西中科信息科技咨询有限公司 | Intelligent elevating gear for building engineering construction |
CN214828828U (en) * | 2020-06-29 | 2021-11-23 | 南京锦江园林景观有限公司 | Landscape construction elevating platform |
CN216444850U (en) * | 2021-12-23 | 2022-05-06 | 徐锋 | Energy-saving building construction lifting anti-falling device |
CN216664922U (en) * | 2021-09-30 | 2022-06-03 | 山东宝冶建设有限公司 | Steel structure construction device capable of climbing by self-lifting |
-
2022
- 2022-06-24 CN CN202210724006.8A patent/CN115030311A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000327265A (en) * | 1999-05-20 | 2000-11-28 | Takenaka Komuten Co Ltd | Climbing method for climbing crane, and climbing crane |
CN105604334A (en) * | 2016-01-18 | 2016-05-25 | 中铁三局集团有限公司 | Rapid-construction method used for overall installation of large-span steel truss |
CN105781092A (en) * | 2016-03-11 | 2016-07-20 | 上海建工集团股份有限公司 | Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof |
CN207609153U (en) * | 2017-10-17 | 2018-07-13 | 中建八局第一建设有限公司 | A kind of elevator liftable construction operation platform |
CN210563479U (en) * | 2019-06-24 | 2020-05-19 | 中铁十二局集团建筑安装工程有限公司 | Assembled material platform that climbs |
CN214828828U (en) * | 2020-06-29 | 2021-11-23 | 南京锦江园林景观有限公司 | Landscape construction elevating platform |
CN213539660U (en) * | 2020-09-12 | 2021-06-25 | 云南恒兆科技有限公司 | Attached electric construction platform |
CN214780110U (en) * | 2020-12-14 | 2021-11-19 | 陕西中科信息科技咨询有限公司 | Intelligent elevating gear for building engineering construction |
CN214498342U (en) * | 2021-03-05 | 2021-10-26 | 段福才 | Climbing type building construction operation platform outside building |
CN216664922U (en) * | 2021-09-30 | 2022-06-03 | 山东宝冶建设有限公司 | Steel structure construction device capable of climbing by self-lifting |
CN216444850U (en) * | 2021-12-23 | 2022-05-06 | 徐锋 | Energy-saving building construction lifting anti-falling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110371823B (en) | Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method | |
JP3172719B2 (en) | Building construction safety fence | |
US5327690A (en) | Erection workbench for constructing a frame | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
CN211923476U (en) | Electric hoist lifting system attached to lifting scaffold | |
CN213418443U (en) | Self-climbing type elevator shaft operation platform | |
CN118933321A (en) | A self-elevating integrated working platform | |
CN215828096U (en) | Self-lifting hoisting equipment and sliding locking assembly | |
CN210735910U (en) | Self-lifting hoisting equipment suitable for assembly type additional elevator construction | |
CN115030311A (en) | Installation construction method and construction lifting device for door type steel frame structure | |
CN116181041B (en) | Building machine of multilayer quick construction | |
CN111717812A (en) | Novel tower crane anti-creep device | |
CN209040300U (en) | Construction equipment and box construction of prefabricated buildings | |
CN219031629U (en) | Lifting equipment for indoor plate installation | |
CN110005182A (en) | An extended elevator shaft construction work protection platform | |
CN215858953U (en) | Device for hydraulically lifting scaffold | |
KR100301573B1 (en) | Safety fence for building construction | |
JPH11343729A (en) | Slide rising type suspended scaffold | |
JPH092780A (en) | Jib-type traveling crane with jack-up | |
CN113175222A (en) | Installation method of embedded prefabricated external wall panel component | |
JP3617667B2 (en) | Steel tower of support or cable crane and construction method thereof | |
CN115749235B (en) | Lift shaft lifting scaffold and assembly method | |
CN218114742U (en) | Carrying pole beam hoisting system and carrying pole beam hoisting system | |
CN221761329U (en) | Lifting device based on tower climbing and support unit for construction platform | |
CN219569531U (en) | A construction platform for adding elevators |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220909 |
|
RJ01 | Rejection of invention patent application after publication |