CN114976997A - High-voltage drainage wire clamp and special electrified mounting tool thereof - Google Patents
High-voltage drainage wire clamp and special electrified mounting tool thereof Download PDFInfo
- Publication number
- CN114976997A CN114976997A CN202210597317.2A CN202210597317A CN114976997A CN 114976997 A CN114976997 A CN 114976997A CN 202210597317 A CN202210597317 A CN 202210597317A CN 114976997 A CN114976997 A CN 114976997A
- Authority
- CN
- China
- Prior art keywords
- wire
- tightening
- base
- wrench
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims abstract description 48
- 238000003825 pressing Methods 0.000 claims abstract description 44
- 230000006835 compression Effects 0.000 claims description 9
- 238000007906 compression Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 abstract description 11
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000002788 crimping Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种高压引流线夹及其专用带电安装工具。The invention relates to a high-voltage drain wire clip and a special live installation tool thereof.
背景技术Background technique
10kV配电线路中,在城区的架空线路已基本绝缘化,在设备接入、线路检修等情况下,或对绝缘导线进行剥线裸露内部芯线进行搭接(停电检修挂接地线),或采用直接穿刺方式进行搭接(安装防雷设备等)。In the 10kV distribution line, the overhead line in the urban area has been basically insulated. In the case of equipment access, line maintenance, etc., or strip the insulated wire to expose the inner core wire and connect it (power failure maintenance and hanging ground wire), or Use direct puncture for lap joints (installation of lightning protection equipment, etc.).
请参阅图1、图2和图3,现有技术中,搭接所采用的引流线夹,多采用以竖直方向收紧,通过下端带拉环1'的转动杆2'向上顶紧压紧块3',将导线压入压紧槽4'内进行收紧的方式。Please refer to Fig. 1, Fig. 2 and Fig. 3. In the prior art, most of the drainage wire clips used for lap joints are tightened in the vertical direction, and are pressed upward through the rotating rod 2' with the pull ring 1' at the lower end. Tightening block 3', the method of pressing the wire into the pressing groove 4' for tightening.
引流线夹若对裸导线或绝缘导线剥线部分进行夹紧可有效接触,但对于未剥线绝缘导线,通过下端拉环带动转动杆收紧压紧块,还要进行穿刺插入,显得有些费力且使不上劲,不可靠。If the drain wire clamp clamps the stripped part of the bare wire or the insulated wire, it can be effectively contacted, but for the unstripped insulated wire, the lower end pull ring drives the rotating rod to tighten the compression block, and it also needs to be punctured and inserted, which seems a little laborious. And it's unreliable and unreliable.
而且,现有技术中的各种引流线夹,无专用带电安装工具,转动杆2'的下端带拉环1',虽然通过令克棒勾住底部拉环1'进行旋紧,在实际安装使用中,容易在抬高过程中松脱,在旋紧导线过程中,需向下挂紧导线,不然在勾住拉环旋紧过程中,也容易造成线夹掉落,存在安全隐患。Moreover, the various drainage wire clips in the prior art do not have special live installation tools, and the lower end of the rotating rod 2' is provided with a pull ring 1'. In use, it is easy to loosen during the lifting process. In the process of tightening the wire, it is necessary to hang the wire downward. Otherwise, the wire clip will easily fall off during the tightening process by hooking the pull ring, posing a safety hazard.
发明内容SUMMARY OF THE INVENTION
本发明的目的是克服现有技术的缺陷,提供一种高压引流线夹及其专用带电安装工具,高压引流线夹横向收紧,方便裸导线和绝缘导线可靠夹紧,同时配置专用带电安装工具,安装简便、使用可靠。The purpose of the present invention is to overcome the defects of the prior art, and to provide a high-voltage drain wire clip and a dedicated live installation tool. , Easy to install and reliable to use.
实现上述目的的技术方案是:一种高压引流线夹,包括卡线基座、压紧块、收紧转轴、柱式弹簧、收紧转轴帽、限位锁销和固定螺钉,其中:The technical solution for achieving the above purpose is: a high-voltage drainage wire clamp, comprising a wire clamping base, a pressing block, a tightening shaft, a column spring, a tightening shaft cap, a limit lock pin and a fixing screw, wherein:
所述卡线基座的下部开设有导线卡线槽;所述卡线基座的上部的前后侧分别设置有安装工具衔接块,所述卡线基座的前侧纵向开设有限位锁销孔;所述卡线基座的左侧开设有压紧块槽,所述压紧块槽的内侧槽壁上横向设置有压紧块导向槽;所述卡线基座的右侧的上部开设有横向设置的收紧转轴通孔,所述限位锁销孔与所述收紧转轴通孔连通;所述卡线基座的右侧的下部开设有横向设置的固定螺钉螺纹孔;所述卡线基座的底端开设有竖向设置的引线螺纹孔,所述引线螺纹孔与所述固定螺钉螺纹孔连通;The lower part of the wire clamping base is provided with a wire clamping slot; the front and rear sides of the upper part of the wire clamping base are respectively provided with installation tool connecting blocks, and the front side of the wire clamping base is longitudinally provided with a limit lock pin hole ; The left side of the wire clamping base is provided with a pressing block groove, and the inner groove wall of the pressing block groove is laterally provided with a pressing block guide groove; the upper part of the right side of the wire clamping base is provided with A transversely arranged through hole of the tightening shaft, the limit lock pin hole is communicated with the through hole of the tightening shaft; the lower part of the right side of the wire clamping base is provided with a laterally arranged fixing screw thread hole; The bottom end of the wire base is provided with a vertically arranged lead screw hole, and the lead screw hole is communicated with the fixing screw screw hole;
所述压紧块包括压紧块收紧柱和设置在其底端的压线槽,所述压紧块收紧柱横向设置,所述压紧块收紧柱的外侧壁上横向设置有压紧块导向条,所述压紧块收紧柱的中部横向开设有左右贯通的收紧转轴螺纹孔;所述压紧块设置在所述压紧块槽内,且所述压紧块导向条插在所述压紧块导向槽内,所述收紧转轴螺纹孔与所述收紧转轴通孔连通;The pressing block includes a pressing block tightening column and a wire pressing groove arranged at the bottom end thereof, the pressing block tightening column is arranged laterally, and a pressing force is laterally arranged on the outer side wall of the pressing block tightening column. block guide strip, the middle part of the tightening column of the pressure block is provided with a screw hole for tightening the rotating shaft through the left and right; the pressure block is arranged in the groove of the pressure block, and the guide strip of the pressure block is inserted In the guide groove of the pressing block, the threaded hole of the tightening shaft communicates with the through hole of the tightening shaft;
所述收紧转轴的一端依次穿过所述柱式弹簧、卡线基座的收紧转轴通孔和压紧块的收紧转轴螺纹孔后与所述收紧转轴帽相连;所述收紧转轴的另一端为六角头;One end of the tightening shaft is connected to the tightening shaft cap after passing through the column spring, the tightening shaft through hole of the clamping wire base and the tightening shaft threaded hole of the compression block in sequence; The other end of the shaft is a hexagonal head;
所述柱式弹簧位于所述收紧转轴的六角头和卡线基座的右侧之间,所述柱式弹簧一直呈压缩状态;The column spring is located between the hexagonal head of the tightening shaft and the right side of the wire clamping base, and the column spring is always in a compressed state;
所述限位锁销插入在所述卡线基座的限位锁销孔内,卡位所述收紧转轴,保证所述收紧转轴不受所述柱式弹簧反向弹力脱出,保证所述收紧转轴在安装动作时只旋转,无位移;The limit lock pin is inserted into the limit lock pin hole of the wire clamping base, and the tightening shaft is locked in place to ensure that the tightening shaft is not released by the reverse elastic force of the column spring, ensuring that all The tightening shaft only rotates without displacement during installation;
所述固定螺钉旋入在所述卡线基座的固定螺钉螺纹孔内。The fixing screw is screwed into the fixing screw threaded hole of the wire clamping base.
上述的一种高压引流线夹,其中,所述卡线基座的导线卡线槽的内侧槽壁上开设有穿刺针安装孔,所述穿刺针安装孔上连接有穿刺针。In the above-mentioned high-voltage drainage wire clip, a puncture needle installation hole is opened on the inner groove wall of the wire clamping groove of the wire clamping base, and a puncture needle is connected to the puncture needle installation hole.
上述的一种高压引流线夹,其中,所述卡线基座的引线螺纹孔内螺纹连接有高压引线,且所述高压引线的端部通过所述固定螺钉的末端压紧固定。In the above-mentioned high-voltage drainage wire clip, a high-voltage lead wire is threadedly connected in the lead screw hole of the wire clamping base, and the end of the high-voltage lead wire is pressed and fixed by the end of the fixing screw.
一种上述的高压引流线夹的专用带电安装工具,包括线夹支撑杆、棘轮套筒扳手和扳手操作杆,其中:A special live installation tool for the above-mentioned high-voltage drainage wire clamp, comprising a wire clamp support rod, a ratchet socket wrench and a wrench operating rod, wherein:
所述线夹支撑杆包括F型线夹衔接块、套筒左支撑板、套筒右支撑板、支撑底座和绝缘支撑杆,所述F型线夹衔接块、套筒左支撑板和套筒右支撑板从左至右依次设置在所述支撑底座的顶端,所述支撑底座的底端固定在所述绝缘支撑杆的顶端;所述F型线夹衔接块包括前侧F型板、后侧F型板和右侧U型板,且所述右侧U型板封堵在所述前侧F型板和后侧F型板的右端开口;所述套筒左支撑板和套筒右支撑板上分别开设套筒安装孔;The wire clip support rod includes an F-type wire clip connection block, a sleeve left support plate, a sleeve right support plate, a support base and an insulating support rod. The F-type wire clamp connection block, the sleeve left support plate and the sleeve The right support plate is sequentially arranged on the top of the support base from left to right, and the bottom end of the support base is fixed on the top of the insulating support rod; side F-shaped plate and right U-shaped plate, and the right U-shaped plate is closed at the right end openings of the front side F-shaped plate and the rear side F-shaped plate; the left support plate of the sleeve and the right side of the sleeve are Sleeve mounting holes are respectively provided on the support plate;
所述棘轮套筒扳手包括绝缘手柄、棘轮套筒头和扳手操作圆环,所述绝缘手柄呈中空圆柱型,所述绝缘手柄的一端通过弹性圆柱销与所述棘轮套筒头相连,所述绝缘手柄的另一端通过弹性圆柱销与所述扳手操作圆环相连;The ratchet socket wrench includes an insulating handle, a ratchet socket head and a wrench operating ring. The insulating handle is in the form of a hollow cylinder, and one end of the insulating handle is connected to the ratchet socket head through an elastic cylindrical pin. The other end of the insulating handle is connected with the wrench operating ring through an elastic cylindrical pin;
所述扳手操作杆包括操作底座、绝缘操作杆、U型支架和扳手圆柱销,所述操作底座固定在所述绝缘操作杆的顶端,所述U型支架的底端固定在所述操作底座的顶端,所述扳手圆柱销的两端一一对应地与所述U型支架的两端相连;The wrench operating rod includes an operating base, an insulating operating rod, a U-shaped bracket and a wrench cylindrical pin, the operating base is fixed on the top of the insulating operating rod, and the bottom end of the U-shaped bracket is fixed on the bottom of the operating base. the top, the two ends of the cylindrical pin of the wrench are connected with the two ends of the U-shaped bracket in a one-to-one correspondence;
所述线夹支撑杆和扳手操作杆相对设置,所述棘轮套筒头的两端一一对应地套入在所述套筒左支撑板和套筒右支撑板上的套筒安装孔内;所述扳手操作圆环位于所述U型支架内,且套接在所述扳手圆柱销上。The wire clamp support rod and the wrench operating rod are arranged oppositely, and the two ends of the ratchet sleeve head are sleeved into the sleeve installation holes on the sleeve left support plate and the sleeve right support plate in a one-to-one correspondence; The wrench operating ring is located in the U-shaped bracket and is sleeved on the wrench cylindrical pin.
上述的一种高压引流线夹的专用带电安装工具,其中,所述绝缘支撑杆和绝缘操作杆分别采用长度可调的伸缩杆或可多段拼接的多节杆。In the above-mentioned special live installation tool for a high-voltage drain clamp, the insulating support rod and the insulating operating rod are respectively a telescopic rod with adjustable length or a multi-section rod that can be spliced in multiple sections.
上述的一种高压引流线夹的专用带电安装工具,其中,所述高压引流线夹的卡线基座的前、后侧的安装工具衔接块一一对应地插接在所述F型线夹衔接块的前侧F型板和后侧F型板内,所述高压引流线夹的收紧转轴的六角头穿过所述F型线夹衔接块的右侧U型板后套入所述棘轮套筒头内。The above-mentioned special live installation tool for a high-voltage drainage wire clip, wherein the installation tool connecting blocks on the front and rear sides of the wire clamping base of the high-voltage drainage wire clip are inserted into the F-type wire clip in a one-to-one correspondence. In the front side F-type plate and the rear side F-type plate of the connecting block, the hexagonal head of the tightening shaft of the high-voltage drainage wire clip passes through the right U-shaped plate of the F-type wire clip connecting block and then is sleeved into the inside the ratchet socket head.
本发明的高压引流线夹及其专用带电安装工具,高压引流线夹采用水平方向收紧,匹配专用带电安装工具,具有挂入导线方便,收紧导线不易掉落,和压线穿刺轻松不费力等特点,且使用安装工具确定安装位置精准,在收紧高压引流线夹过程中,不依赖于勾住架空导线的力,对线路影响较小。The high-voltage drainage wire clip and its dedicated live installation tool of the present invention, the high-voltage drainage wire clip is tightened in the horizontal direction, matched with the special live installation tool, and has the advantages of convenient hanging of wires, not easy to drop the tightened wires, and easy and effortless pressure line puncture. and other characteristics, and the installation tool is used to determine the precise installation position. In the process of tightening the high-voltage drainage wire clamp, it does not depend on the force of hooking the overhead wire, and has little impact on the line.
附图说明Description of drawings
图1为现有技术中一种引流线夹的结构示意图;Fig. 1 is the structural representation of a kind of drainage wire clip in the prior art;
图2为现有技术中另一种引流线夹的结构示意图;Fig. 2 is the structural representation of another kind of drainage wire clip in the prior art;
图3为现有技术中第三种引流线夹的结构示意图;Fig. 3 is the structural representation of the third type of drainage wire clip in the prior art;
图4为本发明的高压引流线夹的立体结构图;Fig. 4 is the three-dimensional structure diagram of the high-voltage drainage wire clip of the present invention;
图5为本发明的高压引流线夹的卡线基座的立体结构图(主视方向);Fig. 5 is the three-dimensional structure view (front view direction) of the clamping wire base of the high-voltage drainage wire clip of the present invention;
图6为本发明的高压引流线夹的卡线基座的结构示意图(仰视方向);Fig. 6 is the structural representation (looking up direction) of the clamping wire base of the high-voltage drainage wire clip of the present invention;
图7为本发明的高压引流线夹的压紧块的结构示意图;Fig. 7 is the structural representation of the pressing block of the high-voltage drainage wire clip of the present invention;
图8为本发明的高压引流线夹的专用带电安装工具的结构示意图;Fig. 8 is the structural representation of the special-purpose live installation tool of the high-voltage drain wire clip of the present invention;
图9为本发明的高压引流线夹的专用带电安装工具的线夹支撑杆的结构示意图;Fig. 9 is the structural representation of the wire clip support rod of the special-purpose live installation tool of the high-voltage drainage wire clip of the present invention;
图10为本发明的高压引流线夹的专用带电安装工具的棘轮套筒扳手的结构示意图;10 is a schematic structural diagram of a ratchet socket wrench of a special live installation tool of the high-voltage drain clamp of the present invention;
图11为本发明的高压引流线夹的专用带电安装工具的扳手操作杆的结构示意图;11 is a schematic structural diagram of a wrench operating rod of a dedicated live installation tool for a high-voltage drain clip of the present invention;
图12为本发明的高压引流线夹及其专用带电安装工具的使用状态图。12 is a state diagram of the high-voltage drain wire clip of the present invention and its dedicated live installation tool.
具体实施方式Detailed ways
为了使本技术领域的技术人员能更好地理解本发明的技术方案,下面结合附图对其具体实施方式进行详细地说明:In order to enable those skilled in the art to better understand the technical solutions of the present invention, the specific embodiments thereof will be described in detail below with reference to the accompanying drawings:
请参阅图4、图5、图6和图7,本发明的实施例,一种高压引流线夹,包括卡线基座1、压紧块7、收紧转轴3、柱式弹簧2、收紧转轴帽8、限位锁销4和固定螺钉5。Please refer to Fig. 4, Fig. 5, Fig. 6 and Fig. 7, an embodiment of the present invention, a high-voltage drainage wire clamp, comprising a
卡线基座1的下部开设有导线卡线槽15;卡线基座1的上部的前后侧分别设置有安装工具衔接块11,卡线基座1的前侧纵向开设有限位锁销孔12;卡线基座1的左侧开设有压紧块槽16,压紧块槽16的内侧槽壁上横向设置有压紧块导向槽17;卡线基座1的右侧的上部开设有横向设置的收紧转轴通孔18,限位锁销孔12与收紧转轴通孔18连通;卡线基座1的右侧的下部开设有横向设置的固定螺钉螺纹孔19;卡线基座1的底端开设有竖向设置的引线螺纹孔14,引线螺纹孔14与固定螺钉螺纹孔19连通。The lower part of the
压紧块7包括压紧块收紧柱71和设置在其底端的压线槽74,压紧块收紧柱71横向设置,压紧块收紧柱71的外侧壁上横向设置有压紧块导向条72,压紧块收紧柱71的中部横向开设有左右贯通的收紧转轴螺纹孔73;压紧块71设置在压紧块槽16内,且压紧块导向条72插在压紧块导向槽17内,这样,压紧块71可沿压紧块导向槽17左右移动,收紧转轴螺纹孔73与收紧转轴通孔18连通。The
收紧转轴3的一端依次穿过柱式弹簧2、卡线基座1的收紧转轴通孔18和压紧块7的收紧转轴螺纹孔73后与收紧转轴帽8相连;收紧转轴3的另一端为六角头31。限位锁销4插入在卡线基座1的限位锁销孔12内,柱式弹簧2位于收紧转轴3的六角头31和卡线基座1的右侧之间;柱式弹簧2呈一定压缩状态,由限位锁销4穿入卡线基座1的限位锁销孔12,卡位收紧转轴3,保证收紧转轴3不受柱式弹簧2反向弹力脱出,保证收紧转轴3在安装动作时只旋转,无位移;使得收紧转轴3在旋转过程中,带动压紧块7在卡线基座1的压紧块导向槽17中滑动。One end of the tightening
固定螺钉5旋入在卡线基座1的固定螺钉螺纹孔19内。固定螺钉5用于高压引线的穿入锁紧固定。高压引线通过螺纹旋入卡线基座1的引线螺纹孔14,紧固之后,高压引线的末端再由固定螺钉螺纹孔19内的固定螺钉5旋紧进行压紧固定,The fixing
本发明的高压引流线夹,可以根据需要加装穿刺针6,在卡线基座1的导线卡线槽15的内侧槽壁上开设有两个穿刺针安装孔13,穿刺针6安装于穿刺针安装孔13上,可用于绝缘导线的不剥线接线。若不采用穿刺方式或者是裸导线,可不安装穿刺针6。In the high-voltage drainage wire clip of the present invention, a puncture needle 6 can be added as required, and two puncture needle installation holes 13 are formed on the inner groove wall of the
请参阅图8、图9、图10和图11,本发明的实施例,一种高压引流线夹的专用带电安装工具,包括线夹支撑杆9、棘轮套筒扳手10和扳手操作杆20。Please refer to FIGS. 8 , 9 , 10 and 11 , an embodiment of the present invention, a dedicated live installation tool for a high-voltage drain clamp, includes a clamp support rod 9 , a
线夹支撑杆9包括F型线夹衔接块91、套筒左支撑板92、套筒右支撑板93、支撑底座94和绝缘支撑杆95,F型线夹衔接块92、套筒左支撑板92和套筒右支撑板93从左至右依次设置在支撑底座94的顶端,支撑底座94的底端固定在绝缘支撑杆95的顶端;F型线夹衔接块92包括前侧F型板、后侧F型板和右侧U型板,且右侧U型板封堵在所述前侧F型板和后侧F型板的右端开口;套筒左支撑板92和套筒右支撑板93上分别开设套筒安装孔。The clamp support rod 9 includes an F-type
棘轮套筒扳手10包括绝缘手柄102、棘轮套筒头101和扳手操作圆环103,绝缘手柄102呈中空圆柱型,绝缘手柄102的一端通过弹性圆柱销104与棘轮套筒头101相连,绝缘手柄102的另一端通过弹性圆柱销104与扳手操作圆环103相连。The
扳手操作杆20包括操作底座203、绝缘操作杆204、U型支架202和扳手圆柱销201,操作底座203固定在绝缘操作杆204的顶端,U型支架202的底端固定在操作底座203的顶端,扳手圆柱销201的两端一一对应地与U型支架202的两端相连。The
线夹支撑杆9和扳手操作杆20相对设置,线夹支撑杆9和扳手操作杆20通过棘轮套筒扳手10相连,具体地,棘轮套筒头101的两端一一对应地套入在套筒左支撑板92和套筒右支撑板93上的套筒安装孔内;扳手操作圆环103位于U型支架202内,且套接在扳手圆柱销201上。通过上下拉动绝缘操作杆204,可以带动棘轮套筒头101旋转。The wire clamp support rod 9 and the
高压引流线夹的专用带电安装工具,在实际使用中,为一体式,不可临时拆解,绝缘支撑杆95和绝缘操作杆204分别采用长度可调的伸缩杆或可多段拼接的多节杆,可根据实际使用情况调整长度。The special live installation tool for the high-voltage drain clamp is integrated in actual use and cannot be disassembled temporarily. The insulating
请参阅图12,本发明的高压引流线夹及其专用带电安装工具,在使用时,先将高压引线通过螺纹旋入卡线基座1的引线螺纹孔14,紧固之后再由固定螺钉螺纹孔19内的固定螺钉5旋紧固定;然后将高压引流线夹的卡线基座1的前、后侧的安装工具衔接块11一一对应地插接在F型线夹衔接块91的前侧F型板和后侧F型板内,高压引流线夹1的收紧转轴3的六角头穿过F型线夹衔接块91的右侧U型板后套入棘轮套筒头101内。Please refer to FIG. 12. When using the high-voltage drain wire clip and its dedicated live installation tool of the present invention, firstly screw the high-voltage lead wire into the lead wire threaded
专用带电安装工具,通过以上配合套入后,用绝缘支撑杆95慢慢将高压引流线夹通过导线卡线槽15挂入架空导线,待挂入可靠后,通过上下拉动绝缘操作杆204,带动棘轮套筒头101旋转收紧转轴3。在旋转收紧转轴3过程中,压紧块9会随之收紧,最终将架空导线紧固在卡线基座1的导线卡线槽15和压紧块7的压线槽74内,穿刺针6随之没入绝缘导线绝缘层。The special live installation tool, after being inserted through the above cooperation, use the insulating
待明显感受绝缘操作杆204无法上下拉动时,高压引流线夹收紧到位,水平方向退出带电安装工具即可。When it is obvious that the insulating
综上所述,本发明的高压引流线夹及其专用带电安装工具,改变现用的高压引流线夹多采用底部拉环垂直收紧方式,采用水平方向收紧,匹配专用带电安装工具,具有挂入导线方便,收紧导线不易掉落,和压线穿刺轻松不费力等特点,且使用安装工具确定安装位置精准,在收紧高压引流线夹过程中,不依赖于勾住架空导线的力,对线路影响较小。To sum up, the high-voltage drain wire clip of the present invention and its special live installation tool, which are used to change the current high-voltage drain wire clip, mostly adopt the bottom pulling ring to tighten vertically and tighten in the horizontal direction, and match the special live installation tool. It is convenient to hang the wire, not easy to drop when tightening the wire, and easy and effortless for crimping and puncturing, and the installation tool is used to determine the precise installation position. In the process of tightening the high-voltage drainage clip, it does not depend on the force of hooking the overhead wire. , the impact on the line is small.
本发明为配合新型防雷装置的杆上地电位安装接入系统提供了可靠的产品基础和工具基础,可满足不停电安装防雷装置,减少了电网运行方式调整、设备状态装换操作等工作,可极大地改善重点线路因无法停电而造成的防雷措施较少的现实情况。The invention provides a reliable product basis and tool basis for the installation and access system of the ground potential on the pole of the new lightning protection device, which can meet the requirements of installing the lightning protection device without power failure, and reduce the work of adjusting the operation mode of the power grid and the operation of changing the state of the equipment. , which can greatly improve the reality that there are few lightning protection measures for key lines due to inability to power outages.
本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明,而并非用作为对本发明的限定,只要在本发明的实质精神范围内,对以上所述实施例的变化、变型都将落在本发明的权利要求书范围内。Those skilled in the art should realize that the above embodiments are only used to illustrate the present invention, but not to limit the present invention. Changes and modifications will fall within the scope of the claims of the present invention.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210597317.2A CN114976997A (en) | 2022-05-30 | 2022-05-30 | High-voltage drainage wire clamp and special electrified mounting tool thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210597317.2A CN114976997A (en) | 2022-05-30 | 2022-05-30 | High-voltage drainage wire clamp and special electrified mounting tool thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114976997A true CN114976997A (en) | 2022-08-30 |
Family
ID=82957699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210597317.2A Pending CN114976997A (en) | 2022-05-30 | 2022-05-30 | High-voltage drainage wire clamp and special electrified mounting tool thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114976997A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN119297890A (en) * | 2024-09-14 | 2025-01-10 | 国网青海省电力公司黄化供电公司 | A kind of distribution network operation drainage line fixer and fixing method |
-
2022
- 2022-05-30 CN CN202210597317.2A patent/CN114976997A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN119297890A (en) * | 2024-09-14 | 2025-01-10 | 国网青海省电力公司黄化供电公司 | A kind of distribution network operation drainage line fixer and fixing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101593942B (en) | 10-kilovolt insulated circuit operating rod type bypass working method | |
CN108155602B (en) | Insulating puncture clamp clamping device and quick mounting tool | |
CN103066526B (en) | A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line | |
CN206758672U (en) | One kind ground wire fixture | |
CN114976997A (en) | High-voltage drainage wire clamp and special electrified mounting tool thereof | |
CN204391308U (en) | The electrical lead maintenance grounding wire device of convenient operation | |
CN203732572U (en) | Telescopic high-altitude wire clamp | |
CN114200172B (en) | High-altitude wiring device applied to multi-section equipment wiring | |
CN112736817B (en) | Special-shaped wire clip installer for live work | |
CN203251021U (en) | Pay-off trolley clamping device | |
CN217984278U (en) | High-voltage drainage wire clamp and special electrified mounting tool thereof | |
CN206657864U (en) | A kind of drainage thread quick lap joint instrument for earth potential working | |
CN220732203U (en) | Wire clamping device for power production | |
CN112993604B (en) | Insulating overhead ground wire earth connection wire end chuck | |
CN101841144A (en) | Anti-thunder insulator strain clamp string | |
CN207183580U (en) | Metering connects leading-in device | |
CN104753002A (en) | Semi-fixed-sealed cable terminal inserting and extracting device | |
CN204694810U (en) | A kind of electric wire field compaction test machine | |
CN211208698U (en) | Novel complete set grounding device for 220kV power transmission line | |
CN210273383U (en) | Device for fixing assembly type decoration threading pipe | |
CN210894668U (en) | Ammeter detection mechanism capable of automatically connecting and disconnecting | |
CN208284652U (en) | A kind of electric power first-aid ready-package earthing or grounding means | |
CN209150684U (en) | An insulating fixture for the beginning and end of power transmission | |
CN217984472U (en) | Lightning protection device earth potential installation system | |
CN212085232U (en) | Grounding connection structure of transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |