[go: up one dir, main page]

CN114856229A - Wisdom building site faces limit protection warning device - Google Patents

Wisdom building site faces limit protection warning device Download PDF

Info

Publication number
CN114856229A
CN114856229A CN202210670651.6A CN202210670651A CN114856229A CN 114856229 A CN114856229 A CN 114856229A CN 202210670651 A CN202210670651 A CN 202210670651A CN 114856229 A CN114856229 A CN 114856229A
Authority
CN
China
Prior art keywords
wall
rod
fixing plate
fixedly connected
warning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210670651.6A
Other languages
Chinese (zh)
Inventor
王英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
One Stop Engineering Service Group Co ltd
Original Assignee
One Stop Engineering Service Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by One Stop Engineering Service Group Co ltd filed Critical One Stop Engineering Service Group Co ltd
Priority to CN202210670651.6A priority Critical patent/CN114856229A/en
Publication of CN114856229A publication Critical patent/CN114856229A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/604Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
    • E01F9/615Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings illuminated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/604Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
    • E01F9/619Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings with reflectors; with means for keeping reflectors clean
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1447Details of connections between rails and posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/23Posts therefor lateral supporting elements, e.g. braces, tie downs, or cables
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/04Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means
    • F16F15/06Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means with metal springs
    • F16F15/067Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means with metal springs using only wound springs
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Burglar Alarm Systems (AREA)

Abstract

The invention discloses an intelligent building site edge-facing protection warning device, and relates to the field of edge-facing protection. According to the intelligent building site edge-facing protection warning device, the mounting mechanism can be fixed on the hard ground through the first fixing plate and the first fixing bolt when in use, and can also be deeply buried and fixed on the soil ground through the deeply buried rod, so that the mounting is convenient to fix under various terrains, the applicability is strong, the compression resisting mechanism can be connected with the stable cross rod through the connecting plate when in use, the pressure and the vibration of the vertical main rod and the stable cross rod can be buffered through the pressure spring, the condition of toppling can be avoided, the warning mechanism can scan personnel through the infrared sensor when in use, when the personnel approach, the warning lamp can give out warning and flash, when in use, the warning effect is good, and the use effect is better compared with that of a traditional mode.

Description

一种智慧工地临边防护警示装置A smart construction site edge protection warning device

技术领域technical field

本发明涉及临边防护领域,具体涉及一种智慧工地临边防护警示装置。The invention relates to the field of edge protection, in particular to a edge protection warning device for a smart construction site.

背景技术Background technique

智慧工地是智慧地球理念在工程领域的行业具现,是一种崭新的工程全生命周期管理理念,智慧工地是指运用信息化手段,通过三维设计平台对工程项目进行精确设计和施工模拟,围绕施工过程管理,建立互联协同、智能生产、科学管理的施工项目信息化生态圈,并将此数据在虚拟现实环境下与物联网采集到的工程信息进行数据挖掘分析,提供过程趋势预测及专家预案,实现工程施工可视化智能管理,以提高工程管理信息化水平,从而逐步实现绿色建造和生态建造,在智慧工地的施工过程中,需要搭建临边防护,临边防护指的是尚未安装栏杆的阳台周边、无外架防护的屋面周边、框架工程楼层周边、上下跑道及斜道的两侧边、卸料平台的侧边,对此进行防护,增强安全性。The smart construction site is the industrial realization of the smart earth concept in the engineering field, and it is a brand-new project life cycle management concept. Construction process management, establish a construction project informatization ecosystem of interconnected collaboration, intelligent production and scientific management, and conduct data mining and analysis of this data in the virtual reality environment and the engineering information collected by the Internet of Things, and provide process trend forecasts and expert plans , to realize the visual intelligent management of engineering construction to improve the level of engineering management informatization, so as to gradually realize green construction and ecological construction. In the construction process of smart construction sites, it is necessary to build edge protection, which refers to the balcony that has not yet installed railings. The perimeter, the perimeter of the roof without external frame protection, the perimeter of the frame engineering floor, the sides of the upper and lower runways and ramps, and the side of the unloading platform are protected and enhanced to enhance safety.

但现有的临边防护在使用时存在一定的不便,首先现有的临边防护在使用时通常为固定栓进行固定,但在泥土地面不便于进行固定,固定的稳定性较差,并且在固定安装后,抗压抗震效果较差,容易发生倾倒,在使用时功能单一,警示效果一般,为此,我们提出一种智慧工地临边防护警示装置。However, the existing edge protection has certain inconvenience in use. First of all, the existing edge protection is usually fixed by fixing bolts when in use, but it is not convenient to fix on the soil ground, and the stability of the fixation is poor, and in the After fixed installation, the anti-compression and anti-seismic effect is poor, and it is prone to overturning. In use, the function is single, and the warning effect is general. For this reason, we propose a smart construction site edge protection warning device.

发明内容SUMMARY OF THE INVENTION

本发明的主要目的在于提供一种智慧工地临边防护警示装置,可以有效解决背景技术中的问题。The main purpose of the present invention is to provide a smart construction site edge protection and warning device, which can effectively solve the problems in the background technology.

为实现上述目的,本发明采取的技术方案为:一种智慧工地临边防护警示装置,包括竖立主杆,所述竖立主杆的一端外表面设有安装机构,所述竖立主杆的外壁设有稳定横杆与栏杆,所述稳定横杆位于栏杆的一侧,所述稳定横杆的外壁设有抗压机构,所述栏杆的前端外表面设有反光贴,所述竖立主杆的另一端外表面设有顶置板,所述顶置板的一端外表面设有警示机构,所述竖立主杆与稳定横杆之间设有加强杆,所述安装机构包括第一固定板、第一固定栓、连接头、深埋杆、螺旋片与螺纹接头,所述第一固定栓位于第一固定板的中部,所述连接头位于第一固定板的下端外表面,所述深埋杆位于第一固定板的下方,所述螺旋片位于深埋杆的外壁,所述螺纹接头位于深埋杆的一端外表面,所述抗压机构包括第二固定板、第二固定栓、压力弹簧与连接板,所述第二固定栓位于第二固定板的中部,所述压力弹簧位于第二固定板的上端外表面,所述连接板位于压力弹簧的一端外表面,所述警示机构包括机座、警报灯、电池仓与红外传感器,所述警报灯位于机座的一端外表面,所述电池仓和红外传感器均位于机座的外壁,所述电池仓位于红外传感器的一侧。In order to achieve the above purpose, the technical solution adopted by the present invention is: a smart construction site edge protection warning device, comprising an erecting main rod, an outer surface of one end of the erecting main rod is provided with a mounting mechanism, and an outer wall of the erecting main rod is provided with a mounting mechanism. There are stabilizing bars and railings, the stabilizing bars are located on one side of the balustrades, the outer wall of the stabilizing bars is provided with an anti-compression mechanism, the outer surface of the front end of the balustrades is provided with reflective stickers, and the other side of the erecting main bars is provided. The outer surface of one end is provided with a top plate, the outer surface of one end of the top plate is provided with a warning mechanism, and a reinforcing rod is provided between the main erection rod and the stable cross rod, and the installation mechanism includes a first fixing plate, a second A fixing bolt, a connecting head, a deep-buried rod, a spiral piece and a threaded joint, the first fixing bolt is located in the middle of the first fixing plate, the connecting head is located on the outer surface of the lower end of the first fixing plate, and the deep-buried rod It is located below the first fixing plate, the spiral piece is located on the outer wall of the deep-buried rod, the threaded joint is located on the outer surface of one end of the deep-buried rod, and the compression resistance mechanism includes a second fixing plate, a second fixing bolt, and a pressure spring. and the connecting plate, the second fixing bolt is located in the middle of the second fixing plate, the pressure spring is located on the outer surface of the upper end of the second fixing plate, the connecting plate is located on the outer surface of one end of the pressure spring, and the warning mechanism includes a mechanism. A base, an alarm light, a battery compartment and an infrared sensor, the alarm light is located on the outer surface of one end of the base, the battery compartment and the infrared sensor are both located on the outer wall of the base, and the battery compartment is located on one side of the infrared sensor.

优选的,所述第一固定板的内壁与第一固定栓的外壁可拆卸连接,所述第一固定栓的数量为四组,所述第一固定板的下端外表面与连接头的一端外表面可拆卸连接。Preferably, the inner wall of the first fixing plate is detachably connected to the outer wall of the first fixing bolt, the number of the first fixing bolts is four, and the outer surface of the lower end of the first fixing plate is connected to the outer surface of one end of the connecting head. Surface detachable connection.

优选的,所述深埋杆的一端外表面与螺纹接头的一端外表面固定连接,所述深埋杆的外壁与螺旋片的内壁固定连接,所述深埋杆通过螺纹接头与连接头可拆卸连接。Preferably, the outer surface of one end of the deep-buried rod is fixedly connected to the outer surface of one end of the threaded joint, the outer wall of the deep-buried rod is fixedly connected to the inner wall of the spiral sheet, and the deep-buried rod is detachable through the threaded joint and the connecting head connect.

优选的,所述第二固定板的内壁与第二固定栓的外壁可拆卸连接,所述第二固定板的上端外表面与压力弹簧的另一端外表面固定连接,所述压力弹簧的数量为两组,所述压力弹簧的一端外表面与连接板的下端外表面固定连接。Preferably, the inner wall of the second fixing plate is detachably connected to the outer wall of the second fixing bolt, the outer surface of the upper end of the second fixing plate is fixedly connected to the outer surface of the other end of the pressure spring, and the number of the pressure spring is In two groups, the outer surface of one end of the pressure spring is fixedly connected with the outer surface of the lower end of the connecting plate.

优选的,所述机座的一端外表面与警报灯的一端外表面可拆卸连接,所述机座的外壁与红外传感器的一端外表面可拆卸连接。Preferably, the outer surface of one end of the base is detachably connected to the outer surface of one end of the alarm light, and the outer wall of the base is detachably connected to the outer surface of one end of the infrared sensor.

优选的,所述竖立主杆的外壁与栏杆的后端外表面固定连接,所述栏杆的数量为六组,所述栏杆的前端外表面与反光贴的一端外表面固定连接。Preferably, the outer wall of the upright main pole is fixedly connected with the rear end outer surface of the railing, the number of the railings is six, and the front end outer surface of the railing is fixedly connected with one end outer surface of the reflective sticker.

优选的,所述竖立主杆的外壁与稳定横杆的一端外表面固定连接,所述加强杆的一端外表面与竖立主杆的外壁固定连接,所述加强杆的另一端外表面与稳定横杆的外壁固定连接。Preferably, the outer wall of the main erecting rod is fixedly connected to the outer surface of one end of the stabilizer bar, the outer surface of one end of the reinforcing bar is fixedly connected to the outer wall of the erecting main bar, and the outer surface of the other end of the reinforcing bar is connected to the outer surface of the stable cross bar. The outer wall of the rod is fixedly connected.

与现有技术相比,本发明具有如下有益效果:该一种智慧工地临边防护警示装置,安装机构在使用时可通过第一固定板和第一固定栓在坚硬的地面进行固定,也可通过深埋杆在泥土地面进行深埋固定,便于各种地形下进行固定安装,适用性较强,抗压机构在使用时可通过连接板连接稳定横杆,并且可通过压力弹簧对竖立主杆和稳定横杆所受的压力与震动进行缓冲,可避免发生倾倒的情况,警示机构在使用时可通过红外传感器对人员进行扫描,当有人员靠近时警报灯会发生报警闪烁,在使用时警示效果较好,使用的效果相对于传统方式更好。Compared with the prior art, the present invention has the following beneficial effects: for the smart construction site edge protection warning device, the installation mechanism can be fixed on the hard ground through the first fixing plate and the first fixing bolt when in use, or it can be fixed on the hard ground. The deep burying and fixing on the soil ground is carried out by the deep-buried rod, which is convenient for fixed installation under various terrains, and has strong applicability. It can buffer against the pressure and vibration of the stabilizer bar, which can avoid the situation of tipping. The warning mechanism can scan the personnel through the infrared sensor during use. When a person approaches, the warning light will flash an alarm, and the warning effect will be displayed during use. Better, the effect of using is better than the traditional method.

附图说明Description of drawings

图1为本发明一种智慧工地临边防护警示装置的整体结构示意图;1 is a schematic diagram of the overall structure of a smart construction site edge protection warning device of the present invention;

图2为本发明一种智慧工地临边防护警示装置安装机构2的结构图;FIG. 2 is a structural diagram of a smart construction site edge protection warning device installation mechanism 2 according to the present invention;

图3为本发明一种智慧工地临边防护警示装置抗压机构5的结构图;3 is a structural diagram of a compression mechanism 5 of a smart construction site edge protection warning device according to the present invention;

图4为本发明一种智慧工地临边防护警示装置警示机构8的结构图;4 is a structural diagram of a warning mechanism 8 of a smart construction site edge protection warning device according to the present invention;

图5为本发明一种智慧工地临边防护警示装置安装机构2的拆分结构示意图;FIG. 5 is a schematic view of the disassembled structure of the installation mechanism 2 of a smart construction site edge protection warning device according to the present invention;

图6为本发明一种智慧工地临边防护警示装置图2中A处放大图。FIG. 6 is an enlarged view of part A in FIG. 2 of a smart construction site edge protection warning device according to the present invention.

图中:1、竖立主杆;2、安装机构;201、第一固定板;202、第一固定栓;203、连接头;204、深埋杆;205、螺旋片;206、螺纹接头;3、稳定横杆;4、栏杆;5、抗压机构;501、第二固定板;502、第二固定栓;503、压力弹簧;504、连接板;6、反光贴;7、顶置板;8、警示机构;801、机座;802、警报灯;803、电池仓;804、红外传感器;9、加强杆。In the figure: 1. erecting the main rod; 2. the installation mechanism; 201, the first fixing plate; 202, the first fixing bolt; 203, the connecting head; 204, the deep buried rod; 5. Stabilizing crossbar; 4. Railing; 5. Anti-compression mechanism; 501, Second fixing plate; 502, Second fixing bolt; 503, Pressure spring; 504, Connecting plate; 6. Reflective sticker; 8. Warning mechanism; 801, machine base; 802, warning light; 803, battery compartment; 804, infrared sensor; 9, reinforcing rod.

具体实施方式Detailed ways

为使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本发明。In order to make the technical means, creative features, achievement goals and effects realized by the present invention easy to understand, the present invention will be further described below with reference to the specific embodiments.

实施例一:Example 1:

如图1-6所示,一种智慧工地临边防护警示装置,包括竖立主杆1,竖立主杆1的一端外表面设有安装机构2,竖立主杆1的外壁设有稳定横杆3与栏杆4,稳定横杆3位于栏杆4的一侧,稳定横杆3的外壁设有抗压机构5,栏杆4的前端外表面设有反光贴6,竖立主杆1的另一端外表面设有顶置板7,顶置板7的一端外表面设有警示机构8,竖立主杆1与稳定横杆3之间设有加强杆9,安装机构2包括第一固定板201、第一固定栓202、连接头203、深埋杆204、螺旋片205与螺纹接头206,第一固定栓202位于第一固定板201的中部,连接头203位于第一固定板201的下端外表面,深埋杆204位于第一固定板201的下方,螺旋片205位于深埋杆204的外壁,螺纹接头206位于深埋杆204的一端外表面,抗压机构5包括第二固定板501、第二固定栓502、压力弹簧503与连接板504,第二固定栓502位于第二固定板501的中部,压力弹簧503位于第二固定板501的上端外表面,连接板504位于压力弹簧503的一端外表面,警示机构8包括机座801、警报灯802、电池仓803与红外传感器804,警报灯802位于机座801的一端外表面,电池仓803和红外传感器804均位于机座801的外壁,电池仓803位于红外传感器804的一侧。As shown in Figures 1-6, a smart construction site edge protection warning device includes an erecting main pole 1, an outer surface of one end of the erecting main pole 1 is provided with a mounting mechanism 2, and the outer wall of the erecting main pole 1 is provided with a stabilizing cross bar 3 With the railing 4, the stabilizing rail 3 is located on one side of the railing 4, the outer wall of the stable rail 3 is provided with a compression mechanism 5, the outer surface of the front end of the railing 4 is provided with a reflective sticker 6, and the outer surface of the other end of the erected main pole 1 is provided with a reflective sticker 6. There is a top plate 7, an outer surface of one end of the top plate 7 is provided with a warning mechanism 8, a reinforcing rod 9 is provided between the erecting main rod 1 and the stabilizing cross rod 3, and the installation mechanism 2 includes a first fixing plate 201, a first fixing The bolt 202, the connecting head 203, the deeply buried rod 204, the helical sheet 205 and the threaded joint 206, the first fixing bolt 202 is located in the middle of the first fixing plate 201, and the connecting head 203 is located on the outer surface of the lower end of the first fixing plate 201, which is deeply buried The rod 204 is located below the first fixing plate 201 , the helical sheet 205 is located on the outer wall of the deep-buried rod 204 , the threaded joint 206 is located on the outer surface of one end of the deep-buried rod 204 , and the compression mechanism 5 includes a second fixing plate 501 and a second fixing bolt 502, the pressure spring 503 and the connecting plate 504, the second fixing bolt 502 is located in the middle of the second fixing plate 501, the pressure spring 503 is located on the outer surface of the upper end of the second fixing plate 501, and the connecting plate 504 is located on the outer surface of one end of the pressure spring 503, The warning mechanism 8 includes a base 801, an alarm light 802, a battery compartment 803 and an infrared sensor 804. The alarm light 802 is located on the outer surface of one end of the base 801. The battery compartment 803 and the infrared sensor 804 are located on the outer wall of the base 801. The battery compartment 803 On one side of the infrared sensor 804 .

进一步的,第一固定板201的内壁与第一固定栓202的外壁可拆卸连接,第一固定栓202的数量为四组,第一固定板201的下端外表面与连接头203的一端外表面可拆卸连接,安装机构2在使用时可通过第一固定板201和第一固定栓202在坚硬的地面进行固定,也可通过深埋杆204在泥土地面进行深埋固定,便于各种地形下进行固定安装,适用性较强。Further, the inner wall of the first fixing plate 201 is detachably connected to the outer wall of the first fixing bolt 202 , the number of the first fixing bolts 202 is four groups, the outer surface of the lower end of the first fixing plate 201 and the outer surface of one end of the connecting head 203 Removable connection, the installation mechanism 2 can be fixed on the hard ground through the first fixing plate 201 and the first fixing bolt 202 during use, and can also be deeply buried and fixed on the soil ground through the deep buried rod 204, which is convenient for various terrains. Fixed installation, strong applicability.

进一步的,深埋杆204的一端外表面与螺纹接头206的一端外表面固定连接,深埋杆204的外壁与螺旋片205的内壁固定连接,深埋杆204通过螺纹接头206与连接头203可拆卸连接,深埋杆204在使用时可通过螺旋片205深入到泥土中,并且通过螺旋片205可避免出现松动,稳定性较高。Further, the outer surface of one end of the deep-buried rod 204 is fixedly connected with the outer surface of one end of the threaded joint 206, the outer wall of the deep-buried rod 204 is fixedly connected to the inner wall of the spiral sheet 205, and the deep-buried rod 204 can be connected to the connecting head 203 through the threaded joint 206. When the connection is disassembled, the deep-buried rod 204 can penetrate deep into the soil through the helical sheet 205 during use, and loosening can be avoided through the helical sheet 205, and the stability is high.

进一步的,第二固定板501的内壁与第二固定栓502的外壁可拆卸连接,第二固定板501的上端外表面与压力弹簧503的另一端外表面固定连接,压力弹簧503的数量为两组,压力弹簧503的一端外表面与连接板504的下端外表面固定连接,抗压机构5在使用时可通过连接板504连接稳定横杆3,并且可通过压力弹簧503对竖立主杆1和稳定横杆3所受的压力与震动进行缓冲,可避免发生倾倒的情况。Further, the inner wall of the second fixing plate 501 is detachably connected to the outer wall of the second fixing bolt 502, and the outer surface of the upper end of the second fixing plate 501 is fixedly connected to the outer surface of the other end of the pressure spring 503. The number of the pressure springs 503 is two. Group, the outer surface of one end of the pressure spring 503 is fixedly connected with the outer surface of the lower end of the connecting plate 504, and the anti-compression mechanism 5 can be connected to the stable cross bar 3 through the connecting plate 504 during use, and can pass the pressure spring 503. The pressure and vibration of the stabilizing crossbar 3 are buffered, which can avoid the situation of tipping.

进一步的,机座801的一端外表面与警报灯802的一端外表面可拆卸连接,机座801的外壁与红外传感器804的一端外表面可拆卸连接,警示机构8在使用时可通过红外传感器804对人员进行扫描,当有人员靠近时警报灯802会发生报警闪烁,在使用时警示效果较好。Further, the outer surface of one end of the base 801 is detachably connected to the outer surface of one end of the alarm light 802, the outer wall of the base 801 is detachably connected to the outer surface of one end of the infrared sensor 804, and the warning mechanism 8 can pass the infrared sensor 804 when in use. When people are scanned, the alarm light 802 will flash an alarm when there is a person approaching, and the warning effect is better when in use.

进一步的,竖立主杆1的外壁与栏杆4的后端外表面固定连接,栏杆4的数量为六组,栏杆4的前端外表面与反光贴6的一端外表面固定连接,栏杆4在使用时主要起到阻挡的效果,反光贴6可在夜间起到反光警示的效果。Further, the outer wall of the erected main pole 1 is fixedly connected with the rear end outer surface of the railing 4, the number of the railings 4 is six groups, the front outer surface of the railing 4 is fixedly connected with the outer surface of one end of the reflective sticker 6, and the railing 4 is in use. It mainly plays a blocking effect, and the reflective sticker 6 can play a reflective warning effect at night.

进一步的,竖立主杆1的外壁与稳定横杆3的一端外表面固定连接,加强杆9的一端外表面与竖立主杆1的外壁固定连接,加强杆9的另一端外表面与稳定横杆3的外壁固定连接,加强杆9在使用时可在竖立主杆1和稳定横杆3之间起到支撑的效果,在使用时稳定性较高。Further, the outer wall of the erecting main rod 1 is fixedly connected with the outer surface of one end of the stabilizing crossbar 3, the outer surface of one end of the reinforcing rod 9 is fixedly connected with the outer wall of the erecting main rod 1, and the outer surface of the other end of the reinforcing rod 9 is connected with the stable crossbar. The outer wall of 3 is fixedly connected, and the reinforcing rod 9 can play a supporting effect between the erecting main rod 1 and the stabilizing cross rod 3 during use, and has high stability during use.

需要说明的是,本发明为一种智慧工地临边防护警示装置,在使用时,可根据安装地形的情况对临边防护进行固定安装,当在水泥对面进行固定安装时,可直接通过第一固定板201与第一固定栓202对竖立主杆1进行固定安装,当在泥土地面安装时,可先将深埋杆204通过螺旋片205钻入到泥土中,然后再将深埋杆204通过螺纹接头206与连接头203进行固定连接,从而完成对竖立主杆1的固定,并且通过螺旋片205可避免出现松动,稳定性较高,然后再将第一固定栓202固定在地面上,在使用时连接板504与稳定横杆3的外壁进行固定连接,在安装时可将第二固定板501通过第二固定栓502固定在地面上,当竖立主杆1和稳定横杆3受到压力和震动时,压力弹簧503可对压力与震动进行缓冲,可避免发生倾倒的情况,在使用时红外传感器804可对靠近的人员进行扫描,当有人员靠近时警报灯802会发生报警闪烁,在使用时警示效果较好,较为实用。It should be noted that the present invention is a smart construction site edge protection warning device. When in use, the edge protection can be fixedly installed according to the installation terrain. The fixing plate 201 and the first fixing bolt 202 are used to fix and install the erecting main rod 1. When installing on the soil ground, the deeply buried rod 204 can be drilled into the soil through the screw 205 first, and then the deeply buried rod 204 can be drilled through the soil. The threaded joint 206 is fixedly connected with the connecting head 203, so as to complete the fixing of the erecting main rod 1, and the looseness can be avoided through the spiral piece 205, and the stability is high, and then the first fixing bolt 202 is fixed on the ground. When in use, the connecting plate 504 is fixedly connected with the outer wall of the stabilizer bar 3. During installation, the second fixing plate 501 can be fixed on the ground through the second fixing bolt 502. When the erecting main bar 1 and the stabilizer bar 3 are subjected to pressure and When it vibrates, the pressure spring 503 can buffer the pressure and vibration, which can avoid the situation of overturning. The infrared sensor 804 can scan the approaching person during use. The warning effect is better and more practical.

以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的仅为本发明的优选例,并不用来限制本发明,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。The foregoing has shown and described the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments, and the above-mentioned embodiments and descriptions are only preferred examples of the present invention, and are not intended to limit the present invention, without departing from the spirit and scope of the present invention. Under the premise, the present invention will also have various changes and improvements, and these changes and improvements all fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1.一种智慧工地临边防护警示装置,包括竖立主杆(1),其特征在于:所述竖立主杆(1)的一端外表面设有安装机构(2),所述竖立主杆(1)的外壁设有稳定横杆(3)与栏杆(4),所述稳定横杆(3)位于栏杆(4)的一侧,所述稳定横杆(3)的外壁设有抗压机构(5),所述栏杆(4)的前端外表面设有反光贴(6),所述竖立主杆(1)的另一端外表面设有顶置板(7),所述顶置板(7)的一端外表面设有警示机构(8),所述竖立主杆(1)与稳定横杆(3)之间设有加强杆(9),所述安装机构(2)包括第一固定板(201)、第一固定栓(202)、连接头(203)、深埋杆(204)、螺旋片(205)与螺纹接头(206),所述第一固定栓(202)位于第一固定板(201)的中部,所述连接头(203)位于第一固定板(201)的下端外表面,所述深埋杆(204)位于第一固定板(201)的下方,所述螺旋片(205)位于深埋杆(204)的外壁,所述螺纹接头(206)位于深埋杆(204)的一端外表面,所述抗压机构(5)包括第二固定板(501)、第二固定栓(502)、压力弹簧(503)与连接板(504),所述第二固定栓(502)位于第二固定板(501)的中部,所述压力弹簧(503)位于第二固定板(501)的上端外表面,所述连接板(504)位于压力弹簧(503)的一端外表面,所述警示机构(8)包括机座(801)、警报灯(802)、电池仓(803)与红外传感器(804),所述警报灯(802)位于机座(801)的一端外表面,所述电池仓(803)和红外传感器(804)均位于机座(801)的外壁,所述电池仓(803)位于红外传感器(804)的一侧。1. A smart construction site edge protection warning device, comprising an erecting main pole (1), characterized in that: an outer surface of one end of the erecting main pole (1) is provided with a mounting mechanism (2), and the erecting main pole (1) is provided with a mounting mechanism (2). 1) The outer wall is provided with a stabilizer bar (3) and a railing (4), the stabilizer bar (3) is located on one side of the rail (4), and the outer wall of the stabilizer bar (3) is provided with a compression mechanism (5), the outer surface of the front end of the railing (4) is provided with a reflective sticker (6), and the outer surface of the other end of the vertical main pole (1) is provided with a top plate (7), the top plate ( 7) An outer surface of one end is provided with a warning mechanism (8), a reinforcing rod (9) is provided between the main erecting rod (1) and the stabilizing cross rod (3), and the mounting mechanism (2) includes a first fixing A plate (201), a first fixing bolt (202), a connecting head (203), a deep-buried rod (204), a spiral piece (205) and a threaded joint (206), the first fixing bolt (202) is located in the first In the middle of the fixing plate (201), the connecting head (203) is located on the outer surface of the lower end of the first fixing plate (201), the deep-buried rod (204) is located below the first fixing plate (201), and the screw The sheet (205) is located on the outer wall of the deep-buried rod (204), the threaded joint (206) is located on the outer surface of one end of the deep-buried rod (204), and the compression resistance mechanism (5) includes a second fixing plate (501), The second fixing bolt (502), the pressure spring (503) and the connecting plate (504), the second fixing bolt (502) is located in the middle of the second fixing plate (501), the pressure spring (503) is located in the second fixing plate (501) The outer surface of the upper end of the fixing plate (501), the connecting plate (504) is located on the outer surface of one end of the pressure spring (503), and the warning mechanism (8) includes a base (801), an alarm light (802), a battery compartment (803) and an infrared sensor (804), the warning light (802) is located on the outer surface of one end of the base (801), and both the battery compartment (803) and the infrared sensor (804) are located on the outer wall of the base (801) , the battery compartment (803) is located on one side of the infrared sensor (804). 2.根据权利要求1所述的一种智慧工地临边防护警示装置,其特征在于:所述第一固定板(201)的内壁与第一固定栓(202)的外壁可拆卸连接,所述第一固定栓(202)的数量为四组,所述第一固定板(201)的下端外表面与连接头(203)的一端外表面可拆卸连接。2. A smart construction site edge protection warning device according to claim 1, characterized in that: the inner wall of the first fixing plate (201) is detachably connected to the outer wall of the first fixing bolt (202), and the The number of the first fixing bolts (202) is four groups, and the outer surface of the lower end of the first fixing plate (201) is detachably connected to the outer surface of one end of the connecting head (203). 3.根据权利要求1所述的一种智慧工地临边防护警示装置,其特征在于:所述深埋杆(204)的一端外表面与螺纹接头(206)的一端外表面固定连接,所述深埋杆(204)的外壁与螺旋片(205)的内壁固定连接,所述深埋杆(204)通过螺纹接头(206)与连接头(203)可拆卸连接。3. A smart construction site edge protection warning device according to claim 1, characterized in that: the outer surface of one end of the deep-buried rod (204) is fixedly connected to the outer surface of one end of the threaded joint (206), and the The outer wall of the deep-buried rod (204) is fixedly connected with the inner wall of the spiral sheet (205), and the deep-buried rod (204) is detachably connected to the connecting head (203) through a threaded joint (206). 4.根据权利要求1所述的一种智慧工地临边防护警示装置,其特征在于:所述第二固定板(501)的内壁与第二固定栓(502)的外壁可拆卸连接,所述第二固定板(501)的上端外表面与压力弹簧(503)的另一端外表面固定连接,所述压力弹簧(503)的数量为两组,所述压力弹簧(503)的一端外表面与连接板(504)的下端外表面固定连接。4. A smart construction site edge protection warning device according to claim 1, characterized in that: the inner wall of the second fixing plate (501) is detachably connected to the outer wall of the second fixing bolt (502), and the The outer surface of the upper end of the second fixing plate (501) is fixedly connected to the outer surface of the other end of the pressure spring (503). The number of the pressure springs (503) is two groups. The outer surface of the lower end of the connecting plate (504) is fixedly connected. 5.根据权利要求1所述的一种智慧工地临边防护警示装置,其特征在于:所述机座(801)的一端外表面与警报灯(802)的一端外表面可拆卸连接,所述机座(801)的外壁与红外传感器(804)的一端外表面可拆卸连接。5. A smart construction site edge protection warning device according to claim 1, characterized in that: one end outer surface of the machine base (801) is detachably connected to one end outer surface of the alarm light (802), and the The outer wall of the base (801) is detachably connected to one end outer surface of the infrared sensor (804). 6.根据权利要求1所述的一种智慧工地临边防护警示装置,其特征在于:所述竖立主杆(1)的外壁与栏杆(4)的后端外表面固定连接,所述栏杆(4)的数量为六组,所述栏杆(4)的前端外表面与反光贴(6)的一端外表面固定连接。6. A smart construction site edge protection and warning device according to claim 1, characterized in that: the outer wall of the erected main pole (1) is fixedly connected to the outer surface of the rear end of the railing (4), and the railing ( 4) The number is six groups, and the outer surface of the front end of the railing (4) is fixedly connected with the outer surface of one end of the reflective sticker (6). 7.根据权利要求1所述的一种智慧工地临边防护警示装置,其特征在于:所述竖立主杆(1)的外壁与稳定横杆(3)的一端外表面固定连接,所述加强杆(9)的一端外表面与竖立主杆(1)的外壁固定连接,所述加强杆(9)的另一端外表面与稳定横杆(3)的外壁固定连接。7. A smart construction site edge protection and warning device according to claim 1, characterized in that: the outer wall of the vertical main pole (1) is fixedly connected to the outer surface of one end of the stabilizing crossbar (3), and the reinforcement The outer surface of one end of the rod (9) is fixedly connected to the outer wall of the erecting main rod (1), and the outer surface of the other end of the reinforcing rod (9) is fixedly connected to the outer wall of the stabilizing crossbar (3).
CN202210670651.6A 2022-06-13 2022-06-13 Wisdom building site faces limit protection warning device Pending CN114856229A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210670651.6A CN114856229A (en) 2022-06-13 2022-06-13 Wisdom building site faces limit protection warning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210670651.6A CN114856229A (en) 2022-06-13 2022-06-13 Wisdom building site faces limit protection warning device

Publications (1)

Publication Number Publication Date
CN114856229A true CN114856229A (en) 2022-08-05

Family

ID=82624041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210670651.6A Pending CN114856229A (en) 2022-06-13 2022-06-13 Wisdom building site faces limit protection warning device

Country Status (1)

Country Link
CN (1) CN114856229A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115853300A (en) * 2022-11-28 2023-03-28 中亿丰数字科技集团有限公司 Building site intelligence faces limit defense early warning system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPM856194A0 (en) * 1994-10-05 1994-10-27 Bhp Steel (Jla) Pty Limited Combined fence post and fascia strip
DE202018101013U1 (en) * 2018-02-23 2018-03-28 Benjamin Meyer Fence / railings / gate element
CN209228085U (en) * 2018-10-11 2019-08-09 中建八局第二建设有限公司 A kind of floor edge safety protection device
CN209353346U (en) * 2018-12-14 2019-09-06 舜元建设(集团)有限公司 Assembled deep basal pit faces side sizing protective frame
CN112211485A (en) * 2020-10-23 2021-01-12 江苏大发建设工程有限公司 Warning fence for construction site of constructional engineering
CN213330119U (en) * 2020-07-10 2021-06-01 重庆千变科技有限公司 Wisdom building site faces limit protective structure
CN214062409U (en) * 2020-12-08 2021-08-27 李云升 Face early warning device of frontier defense in construction
CN215212486U (en) * 2021-07-26 2021-12-17 广西建工集团第五建筑工程有限责任公司 Self-locking type punching-free limb entrance to a cave safety device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPM856194A0 (en) * 1994-10-05 1994-10-27 Bhp Steel (Jla) Pty Limited Combined fence post and fascia strip
DE202018101013U1 (en) * 2018-02-23 2018-03-28 Benjamin Meyer Fence / railings / gate element
CN209228085U (en) * 2018-10-11 2019-08-09 中建八局第二建设有限公司 A kind of floor edge safety protection device
CN209353346U (en) * 2018-12-14 2019-09-06 舜元建设(集团)有限公司 Assembled deep basal pit faces side sizing protective frame
CN213330119U (en) * 2020-07-10 2021-06-01 重庆千变科技有限公司 Wisdom building site faces limit protective structure
CN112211485A (en) * 2020-10-23 2021-01-12 江苏大发建设工程有限公司 Warning fence for construction site of constructional engineering
CN214062409U (en) * 2020-12-08 2021-08-27 李云升 Face early warning device of frontier defense in construction
CN215212486U (en) * 2021-07-26 2021-12-17 广西建工集团第五建筑工程有限责任公司 Self-locking type punching-free limb entrance to a cave safety device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115853300A (en) * 2022-11-28 2023-03-28 中亿丰数字科技集团有限公司 Building site intelligence faces limit defense early warning system

Similar Documents

Publication Publication Date Title
CN107217747A (en) A kind of novel fabricated connector for building
KR200441895Y1 (en) Wood railing assembly structure
CN114856229A (en) Wisdom building site faces limit protection warning device
CN211736107U (en) Integration steel stair
CN215858925U (en) Quick-mounting type insulating crossing frame
CN211772762U (en) Use net of throwing of preventing on bridge
CN209723233U (en) High strength steel earthquake-resistant structure connector
CN112554532B (en) Construction method of protective frame system without pulling and connecting with wall surface
CN210947825U (en) Protective bracket for building construction
CN210315249U (en) A bridge welding protection device
CN213508214U (en) Novel assembled safety protective guard of highway
CN2097238U (en) Against shock structure member supported with reinforced concrete sway rod for frame
CN216405208U (en) Possesses built-in fitting and use stable lane ETC portal
CN210636915U (en) Fender is enclosed in construction in room
CN201649003U (en) Active powder concrete column and steel pipe combination rail structure
JP3028231U (en) Seismic strengthening metal fittings for wooden buildings
CN213269047U (en) Building structure design roof beam reinforced structure
CN212837080U (en) Construction guardrail of town road construction
CN217537758U (en) Assembled construction platform
CN216497439U (en) Tower type composite expansion amusement equipment
CN216043025U (en) Rail guard for construction
CN220745192U (en) Tower crane pedestrian passageway
CN118564902B (en) A smart street lamp pole with a display screen
CN215291298U (en) A portable step ladder for construction
CN212027270U (en) Environment-friendly timber structure vestibule

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20220805

WD01 Invention patent application deemed withdrawn after publication