CN114790751B - A "fruit and mud" composite ecological slope protection structure and its construction method - Google Patents
A "fruit and mud" composite ecological slope protection structure and its construction method Download PDFInfo
- Publication number
- CN114790751B CN114790751B CN202210533237.0A CN202210533237A CN114790751B CN 114790751 B CN114790751 B CN 114790751B CN 202210533237 A CN202210533237 A CN 202210533237A CN 114790751 B CN114790751 B CN 114790751B
- Authority
- CN
- China
- Prior art keywords
- cement
- soil
- protective layer
- slope
- fruit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 235000013399 edible fruits Nutrition 0.000 title claims abstract description 104
- 239000002131 composite material Substances 0.000 title claims abstract description 38
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 239000002689 soil Substances 0.000 claims abstract description 319
- 239000004568 cement Substances 0.000 claims abstract description 242
- 239000011241 protective layer Substances 0.000 claims abstract description 207
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 80
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 47
- 239000010959 steel Substances 0.000 claims abstract description 47
- 239000007921 spray Substances 0.000 claims abstract description 43
- 239000003337 fertilizer Substances 0.000 claims abstract description 40
- 239000010410 layer Substances 0.000 claims abstract description 37
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 25
- 239000000758 substrate Substances 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims abstract 3
- 238000005507 spraying Methods 0.000 claims description 36
- 239000000203 mixture Substances 0.000 claims description 29
- 239000007858 starting material Substances 0.000 claims description 27
- 239000004927 clay Substances 0.000 claims description 24
- 239000010902 straw Substances 0.000 claims description 24
- 241000196324 Embryophyta Species 0.000 claims description 23
- 239000004567 concrete Substances 0.000 claims description 22
- 239000000463 material Substances 0.000 claims description 17
- 239000002023 wood Substances 0.000 claims description 16
- 244000052363 Cynodon dactylon Species 0.000 claims description 14
- 239000004745 nonwoven fabric Substances 0.000 claims description 12
- 238000005260 corrosion Methods 0.000 claims description 10
- 230000001580 bacterial effect Effects 0.000 claims description 9
- 239000011398 Portland cement Substances 0.000 claims description 7
- 239000011435 rock Substances 0.000 claims description 7
- 241000894006 Bacteria Species 0.000 claims description 6
- 235000004936 Bromus mango Nutrition 0.000 claims description 6
- 235000014826 Mangifera indica Nutrition 0.000 claims description 6
- 241000220324 Pyrus Species 0.000 claims description 6
- 235000009184 Spondias indica Nutrition 0.000 claims description 6
- 239000000654 additive Substances 0.000 claims description 6
- 230000000996 additive effect Effects 0.000 claims description 6
- 239000010687 lubricating oil Substances 0.000 claims description 6
- 239000003895 organic fertilizer Substances 0.000 claims description 6
- 235000021017 pears Nutrition 0.000 claims description 6
- 241000209082 Lolium Species 0.000 claims description 3
- 241000218378 Magnolia Species 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 claims description 3
- 150000001805 chlorine compounds Chemical group 0.000 claims description 2
- 238000004140 cleaning Methods 0.000 claims 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 3
- 238000005303 weighing Methods 0.000 claims 2
- 241001112695 Clostridiales Species 0.000 claims 1
- 240000007228 Mangifera indica Species 0.000 claims 1
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 claims 1
- 150000001875 compounds Chemical class 0.000 claims 1
- 238000005553 drilling Methods 0.000 claims 1
- 235000010855 food raising agent Nutrition 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 claims 1
- 229910052710 silicon Inorganic materials 0.000 claims 1
- 239000010703 silicon Substances 0.000 claims 1
- 230000008635 plant growth Effects 0.000 abstract description 12
- 239000011148 porous material Substances 0.000 abstract description 8
- 238000000855 fermentation Methods 0.000 abstract description 3
- 230000004151 fermentation Effects 0.000 abstract description 3
- 238000003860 storage Methods 0.000 abstract description 3
- 238000004078 waterproofing Methods 0.000 description 32
- 238000000034 method Methods 0.000 description 12
- 230000012010 growth Effects 0.000 description 7
- 229920001296 polysiloxane Polymers 0.000 description 6
- 206010016807 Fluid retention Diseases 0.000 description 5
- 241001093152 Mangifera Species 0.000 description 5
- 150000003841 chloride salts Chemical group 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 230000003628 erosive effect Effects 0.000 description 5
- 230000007774 longterm Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000007726 management method Methods 0.000 description 4
- 235000015097 nutrients Nutrition 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000007480 spreading Effects 0.000 description 2
- 238000003892 spreading Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000035784 germination Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004162 soil erosion Methods 0.000 description 1
- 238000009331 sowing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 238000011426 transformation method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01C—PLANTING; SOWING; FERTILISING
- A01C21/00—Methods of fertilising, sowing or planting
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G17/00—Cultivation of hops, vines, fruit trees, or like trees
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G22/00—Cultivation of specific crops or plants not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/207—Securing of slopes or inclines with means incorporating sheet piles or piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental Sciences (AREA)
- Botany (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种“果、泥”复合型生态护坡结构及其施工方法,结构包括埋设于边坡内的多根锚杆,沿边坡坡面铺设且与锚杆固定的钢筋网,坡面与钢筋网之间放置有多个垫块用于支撑钢筋网;边坡坡面上依次覆盖有第一水泥土保护层和第二水泥土保护层;第一水泥土保护层喷射的水泥土中掺加生物菌肥发酵剂,即将腐烂的果子在水泥土喷射之后进行喷射,并嵌入第一水泥土保护层中;第二水泥土保护层喷射的水泥土中掺加了种子和生物基材。第一次喷射水泥土之后喷射即将腐烂的果子,利用易腐烂的果子和生物菌肥发酵剂形成嵌合连通孔隙供植物生长和储水,同时第二层水泥土嵌合进果子腐烂形成的孔隙并为第二层水泥土提供一定咬合力。起到加固高陡边坡的作用。
The invention discloses a "fruit and mud" composite ecological slope protection structure and a construction method thereof. The structure includes a plurality of anchor rods buried in the slope, a steel mesh laid along the slope surface and fixed to the anchor rods. A plurality of pads are placed between the steel mesh to support the steel mesh; the slope surface is covered with a first cement-soil protective layer and a second cement-soil protective layer in sequence; the cement-soil sprayed by the first cement-soil protective layer By adding biological fertilizer fermentation agent, the rotten fruit is sprayed after the cement and soil is sprayed, and is embedded in the first cement and soil protective layer; the cement and soil sprayed in the second cement and soil protective layer are mixed with seeds and biological substrates. After the first spray of cement and soil, the fruit that is about to rot is sprayed. The perishable fruit and biofertilizer are used to form connected pores for plant growth and water storage. At the same time, the second layer of cement and soil is embedded into the pores formed by the rot of the fruit. And provide a certain bite force for the second layer of cement and soil. It plays the role of reinforcing high and steep slopes.
Description
技术领域Technical field
本发明属于高陡边坡防护技术领域,具体涉及一种“果、泥”复合型生态护坡结构及其施工方法。The invention belongs to the technical field of high and steep slope protection, and specifically relates to a "fruit and mud" composite ecological slope protection structure and its construction method.
背景技术Background technique
随着我国经济的不断发展,国内能源工程、交通工程、矿山工程以及水利工程的规模也迅速扩大,各大矿山、隧道、大坝在施工过程中都会形成高陡边坡,高陡边坡的坡面斜度一般为45—90度,高陡边坡坡度大、条件差的缺点容易导致水土流失从而不再适合植被的生长,边坡表面无植被覆盖且布满岩石碎屑,在降雨之后容易引发山体滑坡等自然灾害,严重时甚至会影响到人民的生命安全和财产安全。With the continuous development of our country's economy, the scale of domestic energy projects, transportation projects, mining projects, and water conservancy projects has also expanded rapidly. During the construction process of major mines, tunnels, and dams, high and steep slopes will be formed. The slope slope is generally 45-90 degrees. The shortcomings of high and steep slopes, such as large slopes and poor conditions, can easily lead to water and soil erosion and are no longer suitable for the growth of vegetation. The slope surface is not covered by vegetation and is covered with rock debris. After rainfall, It is easy to cause natural disasters such as landslides, and in serious cases may even affect people's lives and property safety.
当前国内外对高陡边坡治理的方法多采用客土喷播、植物生长毯、植被混凝土技术等,但是这些技术自身都存在一些缺点。例如客土喷播虽能形成一定厚度的具有耐雨水、风侵蚀、牢固透气,与自然表土相类似或更优的多孔稳定土壤结,但高陡边坡的坡面斜度一般为45-90度,坡度大,在强降雨下喷播面层会冲刷流失,治理时效短;通过施加植物生长毯为植物生长提供适宜环境从而突破高陡边坡难以实现植物生长的瓶颈(一种边坡植被恢复结构及应用其的高陡劣质边坡改造方法.申请号:202010319529.5),这种条件虽然适合植物的生长,但是施加的植物生长毯和高陡边坡之间的牢固程度很差,坡体强度和耐久性达不到护坡要求,同时也没有考虑到坡体自身的保水性和降雨等因素的影响,在降雨条件下,雨水会对坡体造成冲刷将坡面破坏,同时降雨入渗会引起坡体的软化作用使得土体的强度降低,边坡发生坍塌;将混凝土作为胶结剂虽能提升边坡坡体的牢固性,增强边坡的保水性(高陡边坡植被混凝土护坡绿化系统.申请号:201720386815.7),但混凝土的性质容易造成土壤板结,混凝土的表面也不适宜植物生长,导致混凝土基材之中没有足够的空气和水分等供植物生长所需的必要条件,使得植物种子在混凝土基材中的发芽率和成活率都较低。总体而言,以往的生态护坡治理方法和措施的效果都还有待进一步的提升。At present, the methods used to control high and steep slopes at home and abroad mostly use guest soil spraying, plant growth blanket, vegetation concrete technology, etc. However, these technologies themselves have some shortcomings. For example, although soil spraying can form a certain thickness of porous and stable soil structure that is resistant to rain and wind erosion, is firm and breathable, and is similar to or better than natural topsoil, the slope of high and steep slopes is generally 45-90 degrees. The slope is large, and the sprayed surface layer will be washed away under heavy rainfall, and the treatment time is short; by applying plant growth blankets to provide a suitable environment for plant growth, thereby breaking through the bottleneck of difficult plant growth on high and steep slopes (a kind of slope vegetation) Restoring the structure and applying it to the high, steep and inferior slope transformation method. Application number: 202010319529.5). Although this condition is suitable for the growth of plants, the firmness between the applied plant growth blanket and the high and steep slope is very poor, and the slope body The strength and durability do not meet the slope protection requirements. At the same time, the water retention of the slope itself and the influence of rainfall and other factors are not taken into account. Under rainfall conditions, rainwater will cause erosion on the slope and damage the slope surface. At the same time, rainfall infiltration will cause damage to the slope. The softening effect of the slope reduces the strength of the soil and causes the slope to collapse; using concrete as a cementing agent can improve the firmness of the slope and enhance the water retention of the slope (vegetation concrete slope protection greening system for high and steep slopes .Application number: 201720386815.7), but the nature of concrete can easily cause soil compaction, and the surface of concrete is not suitable for plant growth. As a result, there is not enough air and moisture in the concrete substrate for the necessary conditions for plant growth, causing plant seeds to The germination and survival rates in concrete substrates are low. Overall, the effectiveness of previous ecological slope protection management methods and measures needs to be further improved.
发明内容Contents of the invention
为了解决现有技术中存在的高陡边坡在雨水冲刷下易滑坡,高陡边坡生态治理效果差以及治理时效短的技术问题,本发明的目的在于提供了一种“果、泥”复合型生态护坡结构,通过锚杆、钢筋网、木桩挡土板、易腐烂果子和水泥土防护层形成生态护坡结构,同时结合生命力顽强的狗牙根等植物绿化边坡,增加了高陡边坡上的粘结应力和固土强度,能够起到加固高陡边坡的作用,同时有效改善其生态环境。In order to solve the technical problems in the prior art that high and steep slopes are prone to landslides under rainwater erosion, the ecological management effect of high and steep slopes is poor, and the treatment time is short, the purpose of the present invention is to provide a "fruit and mud" composite The ecological slope protection structure is formed by anchor rods, steel mesh, wooden pile retaining plates, perishable fruits and cement and soil protective layers. At the same time, it is combined with the green slopes of tenacious bermudagrass and other plants to increase the protection of high and steep slopes. The bonding stress and soil-fixing strength on the slope can strengthen the high and steep slopes and effectively improve the ecological environment.
本发明的另一个目的在于提供了一种“果、泥”复合型生态护坡结构施工方法,构造简单,施工方便,同时降低了工程的造价,工序较少,工期较短,施工不需要预制构件,加工时长少,第一层水泥土与第二层水泥土之间的养护间隔也只需七天就能进行,性价比较高。Another object of the present invention is to provide a construction method of a "fruit and mud" composite ecological slope protection structure, which has a simple structure and is convenient for construction. At the same time, it reduces the cost of the project, has fewer processes, a shorter construction period, and does not require prefabricated components for construction. , the processing time is short, and the maintenance interval between the first layer of cement soil and the second layer of cement soil only takes seven days, which is very cost-effective.
为了实现上述目的,本发明采取的技术方案如下:In order to achieve the above objects, the technical solutions adopted by the present invention are as follows:
一种“果、泥”复合型生态护坡结构,包括埋设于边坡内的多根锚杆,沿边坡坡面铺设且与锚杆固定的钢筋网,坡面与钢筋网之间放置有多个垫块用于支撑钢筋网;A "fruit and mud" composite ecological slope protection structure, including multiple anchor rods buried in the slope, a steel mesh laid along the slope surface and fixed to the anchor rods, and multiple anchor rods placed between the slope surface and the steel mesh. Pads are used to support the steel mesh;
边坡坡面上依次覆盖有第一水泥土保护层和第二水泥土保护层,锚杆伸出坡体穿过第二水泥土保护层;其中:The slope surface is covered with a first cement-soil protective layer and a second cement-soil protective layer in sequence, and the anchor rod extends out of the slope and passes through the second cement-soil protective layer; wherein:
第一水泥土保护层喷射的水泥土中掺加生物菌肥发酵剂,即将腐烂的果子在水泥土喷射之后进行喷射,并嵌入第一水泥土保护层中;The cement and soil sprayed by the first cement and soil protective layer are mixed with biofertilizer starter, that is, the rotten fruit is sprayed after the cement and soil is sprayed, and embedded in the first cement and soil protective layer;
第二水泥土保护层喷射的水泥土中掺加了种子和生物基材。The cement and soil sprayed by the second cement and soil protective layer are mixed with seeds and biological substrates.
可选的,钢筋网埋入第一水泥土保护层内,第二水泥土保护层覆盖于第一水泥土保护层前在坡面上竖立木桩挡土板并铺设稻草,木桩挡土板垂直于坡面嵌入第一水泥土保护层内,待第二水泥土保护层养护成型后拆除木桩挡土板,拆除木桩挡土板后形成空洞,向空洞内依次加入第一水泥土保护层、果子、稻草及第二水泥土保护层,以与空洞周围护坡结构相同。Optionally, the steel mesh is buried in the first protective layer of cement and soil, and the second protective layer of cement and soil is covered with the first protective layer of cement and soil. In front of the first protective layer of cement and soil, a wooden pile retaining board is erected on the slope and straw is laid, and the wooden pile retaining board is Embed the first cement-soil protective layer perpendicularly to the slope. After the second cement-soil protective layer is cured and formed, remove the wood pile retaining board. After removing the wood pile retaining board, a cavity will be formed. Add the first cement-soil protection layer sequentially into the cavity. Layer, fruit, straw and second cement-soil protective layer should be the same as the slope protection structure around the cavity.
可选的,第一水泥土保护层所用骨料为:黏土、水泥、生物菌肥发酵剂、水泥早强剂、水泥防水剂组成的混合物,其中,黏土占第一水泥土保护层骨料重量的71%-74%,水泥占第一水泥土保护层骨料重量的20%-23%,生物菌肥发酵剂占第一水泥土保护层骨料重量的2%-4%,水泥早强剂占第一水泥土保护层骨料重量的1%,水泥防水剂占第一水泥土保护层骨料重量的2%;第一水泥土保护层灌浆的水料重量比为1.3:1。Optionally, the aggregate used in the first cement-soil protective layer is: a mixture of clay, cement, biological fertilizer fermentation agent, cement early strength agent, and cement waterproofing agent, wherein clay accounts for the weight of the aggregate of the first cement-soil protective layer. 71%-74% of the aggregate weight of the first cement-soil protective layer, cement accounts for 20%-23% of the aggregate weight of the first cement-soil protective layer, biological fertilizer starter accounts for 2%-4% of the aggregate weight of the first cement-soil protective layer, early strength of cement The agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, and the cement waterproofing agent accounts for 2% of the weight of the aggregate of the first cement-soil protective layer; the water-to-material weight ratio of the first cement-soil protective layer grouting is 1.3:1.
进一步的,所述水泥为普通硅酸盐水泥,如P.O42.5。Further, the cement is ordinary Portland cement, such as P.O42.5.
进一步的,所述生物菌肥发酵剂为优菌康有机肥发酵剂。Further, the biological bacterial fertilizer starter is Youjikang organic fertilizer starter.
进一步的,所述果子为即将腐烂的果子,所述果子可以是即将腐烂的梨、芒果等腐蚀周期长的果子。Furthermore, the fruit is a fruit that is about to rot, and the fruit may be a fruit that has a long corrosion cycle, such as pears, mangoes, etc. that are about to rot.
进一步的,所述水泥早强剂为氯盐类早强剂,所述水泥防水剂为有机硅防水剂。Furthermore, the cement early strength agent is a chloride salt early strength agent, and the cement waterproofing agent is an organic silicone waterproofing agent.
进一步的,所述第一水泥土保护层内嵌入果子为50-60颗/m3,优选为50颗/m3。Further, the number of fruits embedded in the first cement-soil protective layer is 50-60 fruits/m 3 , preferably 50 fruits/m 3 .
可选的,第二水泥土保护层所用骨料为:黏土、水泥、肥料、植物种子、水泥早强剂、水泥防水剂组成的混合物,其中,黏土占第二水泥土保护层骨料重量的92%-94%,水泥占第二水泥土保护层骨料重量的2%-4%,肥料占第二水泥土保护层骨料重量的1%-3%,水泥早强剂占第二水泥土保护层骨料重量的0.5%,水泥防水剂占第二水泥土保护层骨料重量的0.5%,第二水泥土保护层灌浆的水料重量比为1.5:1。Optionally, the aggregate used in the second cement-soil protective layer is: a mixture of clay, cement, fertilizer, plant seeds, cement early strength agent, and cement waterproofing agent, wherein clay accounts for 10% of the weight of the aggregate in the second cement-soil protective layer. 92%-94%, cement accounts for 2%-4% of the weight of the second cement-soil protective layer aggregate, fertilizer accounts for 1%-3% of the second cement-soil protective layer aggregate weight, and cement early strength agent accounts for the second cement The cement waterproofing agent accounts for 0.5% of the aggregate weight of the second cement-soil protective layer, and the water-to-material weight ratio of the second cement-soil protective layer grouting is 1.5:1.
进一步的,所述水泥为普通硅酸盐水泥,如P.O42.5。Further, the cement is ordinary Portland cement, such as P.O42.5.
进一步的,所述肥料为植被混凝土绿化添加剂(A-B菌)。Further, the fertilizer is a vegetation concrete greening additive (A-B bacteria).
进一步的,所述植物种子为狗牙根、多花木兰、黑麦草等,优选为狗牙根。Further, the plant seeds are bermudagrass, magnolia, ryegrass, etc., preferably bermudagrass.
进一步的,所述水泥早强剂为氯盐类早强剂,所述水泥防水剂为有机硅防水剂。Furthermore, the cement early strength agent is a chloride salt early strength agent, and the cement waterproofing agent is an organic silicone waterproofing agent.
进一步的,所述第二水泥土保护层中采用的植物种子为200g/m3(每立方米浆料添加种子200g)。Further, the plant seeds used in the second cement-soil protective layer are 200g/m 3 (200g of seeds are added per cubic meter of slurry).
进一步的,第一水泥土保护层的厚度为4-6cm,第二水泥土保护层的厚度为4-6cm,垫块的高度为2-3cm,锚杆伸出坡体20-25cm,稻草的厚度为2-4cm。Further, the thickness of the first protective layer of cement and soil is 4-6cm, the thickness of the second protective layer of cement and soil is 4-6cm, the height of the pad is 2-3cm, the anchor rod extends out of the slope 20-25cm, and the straw Thickness is 2-4cm.
进一步的,锚杆间距为3m-3.5m,木桩挡土板间距为3m-3.5m。Further, the distance between anchor rods is 3m-3.5m, and the distance between wooden pile retaining plates is 3m-3.5m.
进一步的,所选木桩挡土板外表面涂有润滑油。Further, the outer surface of the selected wooden pile retaining plate is coated with lubricating oil.
进一步的,所用钢筋网涂有防锈蚀材料,网间距为30×30cm。Furthermore, the steel mesh used is coated with anti-corrosion material, and the mesh spacing is 30×30cm.
进一步的,所选水泥土作业方式为湿喷。Furthermore, the selected cement and soil operation method is wet spraying.
由上,果子腐烂的孔隙提供养分和增强边坡保水性,植被和水泥土保护层结合提升了高陡边坡自身强度,也防止了雨水冲刷,因为边坡裸露无植被才会导致滑坡坍塌等事故,植被在保护层中生根发芽蔓延生长,达到生态护坡的目的,解决了高陡边坡生态治理效果差和时效短的问题。From the above, the pores of rotten fruits provide nutrients and enhance the water retention of the slope. The combination of vegetation and cement-soil protective layer improves the strength of high and steep slopes and prevents rainwater erosion. Exposed slopes without vegetation will lead to landslide collapse, etc. In the event of an accident, vegetation takes root, sprouts, spreads and grows in the protective layer, achieving the purpose of ecological slope protection and solving the problems of poor ecological management effect and short timeliness of high and steep slopes.
本发明通过二次喷射水泥含量不同的水泥土,并在第一次水泥土喷播之后加入即将腐烂的果子,与锚杆和钢筋网构成生态护坡结构网。首次喷播高含量的水泥土中掺加生物菌肥发酵剂,高含量水泥土和高陡边坡形成牢固连接,同钢筋网和锚杆一起维持高陡边坡长期的力学稳定,随后喷播即将腐烂的果子,水泥土中果子腐烂后形成相互连通的孔隙,给植被提供生长空间和营养同时储存水分;二次喷播之前在坡面上竖立木桩挡土板并铺设一层稻草,防止二次喷播的水泥土滑坡。二次喷播的水泥含量很低并掺加种子和生物基材,由于第一层高含量水泥土与坡面牢固连接,二次喷播的水泥土含量可进一步降低,有利于植被生长和储水并维持长期的生态稳定。两次喷播结合达到了有效维持高陡边坡力学稳定和植物生长稳定的目的。本发明仅在第一次喷射的水泥土之后喷射果子,形成“果、泥”混合物,果子腐烂后能够形成良好的通道,给上层水泥土中的种子提供良好的生长环境,同时第二层水泥土嵌合进果子腐烂形成的孔隙并为第二层水泥土提供一定咬合力,防止滑坡。The invention sprays cement soil with different cement content twice, and adds rotten fruits after the first cement soil spraying, and forms an ecological slope protection structure network with anchor rods and steel mesh. For the first time, the high-content cement soil is mixed with biological fertilizer starter. The high-content cement soil forms a strong connection with the high and steep slopes, and together with the steel mesh and anchor rods, it maintains the long-term mechanical stability of the high and steep slopes. Subsequent spraying Fruits that are about to rot will form interconnected pores after rotting in the cement soil, providing growth space and nutrients for vegetation while storing water; before the second spraying, erect wooden pile retaining boards and lay a layer of straw on the slope to prevent Secondary spray-seeded cement-soil landslide. The cement content of the secondary spraying is very low and mixed with seeds and biological substrates. Since the first layer of high-content cement and soil is firmly connected to the slope, the cement and soil content of the secondary spraying can be further reduced, which is beneficial to vegetation growth and storage. water and maintain long-term ecological stability. The combination of two sprayings achieved the purpose of effectively maintaining the mechanical stability and plant growth stability of high and steep slopes. The invention only sprays the fruit after the first spray of cement and soil to form a "fruit and mud" mixture. After the fruit rots, it can form a good channel and provide a good growth environment for the seeds in the upper layer of cement and soil. At the same time, the second layer of cement The soil fits into the pores formed by fruit decay and provides a certain bite force for the second layer of cement and soil to prevent landslides.
相应的,本发明还要求保护一种前述的“果、泥”复合型生态护坡结构的施工方法,包括以下步骤:Correspondingly, the present invention also claims a construction method for the aforementioned "fruit and mud" composite ecological slope protection structure, which includes the following steps:
S1:将高陡边坡的障碍物清理干净,清理松散的危岩体;S1: Clear obstacles on high and steep slopes and clear loose and dangerous rock masses;
S2:定位放线并测量边坡坡度,确定锚杆孔位置和水平孔间距,钻孔,安放锚杆,成孔之后安放锚杆体和注浆管并进行防腐处理,注意锚杆要伸出坡体20-25cm,随后清孔注浆,待锚杆稳固后清理坡面;S2: Position and set out the line and measure the slope slope, determine the location of the anchor holes and the spacing between horizontal holes, drill holes, and place the anchor rods. After the holes are formed, install the anchor rod bodies and grouting pipes and perform anti-corrosion treatment. Pay attention to the anchor rods extending out. The slope body is 20-25cm, and then the hole is cleared and grouted. After the anchor rod is stable, the slope surface is cleaned;
S3:在坡面上放置垫块,并从上至下铺设钢筋网,钢筋网通过埋设的多根锚杆固定;S3: Place pads on the slope and lay a steel mesh from top to bottom. The steel mesh is fixed by multiple buried anchor rods;
S4:钢筋网铺设完成后,按配比称取第一水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,待湿喷机准备工作做完后,将搅拌好的水泥土装入湿喷机中,垂直于边坡坡面进行喷射,使水泥土均匀喷射在坡面上,随后用加工定制大口径喷管的砼喷射机(普通的喷管直径小于部分果子的直径,施工采用加工定制的大口径喷管)正对于边坡坡面正上方喷射果子,使果子笔直插入水泥土中,形成第一水泥土保护层;S4: After the laying of the steel mesh is completed, weigh the aggregate used in the first cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. After the preparations for the wet spray machine are completed, mix well The cement and soil are loaded into the wet spraying machine and sprayed perpendicular to the slope surface so that the cement and soil are sprayed evenly on the slope, and then a concrete spraying machine with a customized large-diameter nozzle is used (the diameter of the ordinary nozzle is smaller than that of some fruits) diameter, the construction uses a customized large-diameter nozzle) to spray the fruit directly above the slope surface, so that the fruit can be inserted straight into the cement and soil to form the first cement and soil protective layer;
S5:待第一水泥土保护层养护3-5天且果子80%-90%腐烂后,再从上至下将木桩挡土板垂直于坡面嵌入第一水泥土保护层内,并铺设稻草,按配比称取第二水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土喷射到坡面,形成第二水泥土保护层;S5: After the first cement-soil protective layer has been cured for 3-5 days and 80%-90% of the fruit has rotted, embed the wood pile retaining board perpendicular to the slope from top to bottom into the first cement-soil protective layer and lay it Straw, weigh the aggregate used in the second cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. Use a wet spray machine to spray the cement-soil onto the slope surface to form the second cement-soil protective layer. ;
S6:待第二水泥土保护层养护7-10天后,拆除木桩挡土板,拆除木桩挡土板后形成空洞,向空洞内依次加入第一水泥土保护层、果子、稻草及第二水泥土保护层,以与空洞周围护坡结构相同;S6: After the second protective layer of cement and soil has been cured for 7-10 days, remove the wooden pile retaining board. After removing the wooden pile retaining board, a cavity will be formed. Add the first protective layer of cement and soil, fruits, straw and the second The protective layer of cement and soil should be the same as the slope protection structure around the cavity;
S7:在第二水泥土保护层上覆盖无纺布洒水养护,7-10天后揭开无纺布,即完成生态护坡结构施工。S7: Cover the second cement-soil protective layer with non-woven fabric for sprinkling and curing. After 7-10 days, uncover the non-woven fabric to complete the construction of the ecological slope protection structure.
所选水泥土作业方式为湿喷。The selected cement and soil operation method is wet spraying.
与现有技术相比,本发明至少具有以下优点:Compared with the prior art, the present invention at least has the following advantages:
本发明是一种生态护坡治理结构,本发明通过二次喷射水泥含量不同的水泥土,并在第一次水泥土喷播之后加入即将腐烂的果子,与锚杆和钢筋网构成生态护坡结构网。首次喷播高含量的水泥土中掺加生物菌肥发酵剂,高含量水泥土和高陡边坡形成牢固连接,同钢筋网和锚杆一起维持高陡边坡长期的力学稳定,随后喷播即将腐烂的果子,利用易腐烂的果子和生物菌肥发酵剂形成嵌合连通孔隙提供植物生长空间和营养同时储存水分;二次喷播之前在坡面上竖立木桩挡土板并铺设一层稻草,防止二次喷播的水泥土滑坡。二次喷播的水泥含量很低并掺加种子和生物基材,由于第一层高含量水泥土与坡面牢固连接,二次喷播的水泥土含量可进一步降低,有利于植被生长和储水并维持长期的生态稳定。二次喷射达到了有效维持高陡边坡力学稳定和植物稳定生长的目的。本发明仅在第一次喷射的水泥土之后喷射果子,形成“果、泥”混合物,果子腐烂后能够形成良好的通道,给上层水泥土中的种子提供良好的生长环境,同时第二层水泥土嵌合进果子腐烂形成的孔隙并为第二层水泥土提供一定咬合力,防止滑坡。The invention is an ecological slope protection management structure. In the invention, cement and soil with different cement contents are sprayed twice, and fruits that are about to rot are added after the first cement and soil spraying, and the ecological slope protection structure network is formed together with anchor rods and steel mesh. . For the first time, the high-content cement soil is mixed with biological fertilizer starter. The high-content cement soil forms a strong connection with the high and steep slopes, and together with the steel mesh and anchor rods, it maintains the long-term mechanical stability of the high and steep slopes. Subsequent spraying For fruits that are about to rot, use perishable fruits and biofertilizer starter to form chimeric connected pores to provide plant growth space and nutrients while storing water; before secondary spraying, erect wooden pile retaining boards on the slope and lay a layer of them. Straw to prevent cement and soil landslides caused by secondary spraying. The cement content of the secondary spraying is very low and mixed with seeds and biological substrates. Since the first layer of high-content cement and soil is firmly connected to the slope, the cement and soil content of the secondary spraying can be further reduced, which is beneficial to vegetation growth and storage. water and maintain long-term ecological stability. The secondary injection achieves the purpose of effectively maintaining the mechanical stability of high and steep slopes and the stable growth of plants. The invention only sprays the fruit after the first spray of cement and soil to form a "fruit and mud" mixture. After the fruit rots, it can form a good channel and provide a good growth environment for the seeds in the upper layer of cement and soil. At the same time, the second layer of cement The soil fits into the pores formed by fruit decay and provides a certain bite force for the second layer of cement and soil to prevent landslides.
本发明采用垂直喷射让果子能自由落下垂直斜插入边坡坡面中,一是保证果子在喷播的时候直接嵌入水泥土中不会发生滑移,二是果子腐烂形成孔洞,第二层水泥土能和第一层形成咬合力,防止滑坡。The invention uses vertical spraying to allow the fruit to fall freely and insert it vertically into the slope surface. Firstly, it ensures that the fruit is directly embedded in the cement soil without slipping during spraying. Secondly, the fruit rots to form holes, and the second layer of cement The soil can form a bite force with the first layer to prevent landslides.
本发明仅在第二次喷射的水泥土中加入狗牙根种子等,且植物在此环境中繁殖快、生长良好。其根茎蔓延能力强,在植物顺利生长的同时,也能够保证植物与高陡边坡坡面有良好的粘结力,达到生态护坡应有的效果。In the present invention, bermudagrass seeds and the like are only added to the cement and soil sprayed for the second time, and the plants reproduce quickly and grow well in this environment. Its rhizomes have strong spreading ability. While the plants grow smoothly, they can also ensure good adhesion between the plants and high and steep slopes, achieving the desired effect of ecological slope protection.
本发明选用的狗牙根等具有适应性强、根茎蔓延能力强的特点,可以作为良好的固土植物,能成功的解决土壤疏松易坍塌和易被雨水冲刷的问题。The bermudagrass selected in the present invention has the characteristics of strong adaptability and strong rhizome spreading ability. It can be used as a good soil-fixing plant and can successfully solve the problem of loose soil that is easy to collapse and be easily washed away by rain.
本发明采用湿喷方法进行水泥土施工,该施工工艺成本比较低,极大的提高了施工的安全性(第一层水泥土的强度高,在生态护坡中能够防止滑坡的现象发生),施工比较方便,提高了施工质量和效率,有效地解决了高陡边坡喷播工艺施工难的问题。The present invention uses a wet spraying method to construct cement and soil. The cost of this construction process is relatively low, which greatly improves the safety of construction (the first layer of cement and soil has high strength and can prevent landslides in ecological slope protection). It is more convenient, improves construction quality and efficiency, and effectively solves the problem of difficult construction of spray sowing technology on high and steep slopes.
本发明采用加工定制大口径砼喷射机(即喷射混凝土的天泵和地泵根据施工实际要求改用自制的大口径喷射软管,大口径喷射软管管口用螺栓进行连接加固)进行果子喷射施工,该施工工艺能够解决传统砼喷射机口径小的缺陷,提高了施工效率,同时也能广泛应用于其他同样需求的施工。The present invention uses a customized large-diameter concrete spraying machine (that is, the sky pump and ground pump for spraying concrete are replaced with self-made large-diameter spray hoses according to actual construction requirements, and the large-diameter spray hose pipe mouth is connected and reinforced with bolts) to carry out fruit spraying. Construction, this construction technology can solve the shortcomings of the small diameter of traditional concrete jet machines, improve construction efficiency, and can also be widely used in other constructions with the same needs.
本发明采用木桩挡土板协助施工,该施工工艺能够有效解决二次喷播湿喷的水泥土发生滑坡。The present invention uses wooden pile retaining boards to assist construction, and this construction technology can effectively solve the landslide of cement and soil caused by secondary spraying and wet spraying.
本发明第二次水泥用量低,降低了工程的造价,工序较少,工期较短,性价比较高。The method of the present invention uses less cement for the second time, reduces the cost of the project, has fewer process steps, shorter construction period, and higher cost performance.
附图说明Description of the drawings
图1是本发明所提供的复合型生态护坡结构的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the composite ecological slope protection structure provided by the present invention;
图2是本发明所提供的复合型生态护坡结构的细部结构示意图。Figure 2 is a detailed structural schematic diagram of the composite ecological slope protection structure provided by the present invention.
其中:in:
1-钢筋网;2-第一水泥土保护层;3-腐烂的果子;4-锚杆;5-边坡;6-第二水泥土保护层;7-木桩挡土板;8-垫块;9-稻草。1-Reinforced mesh; 2-First protective layer of cement and soil; 3-Rotten fruit; 4-Anchor; 5-Slope; 6-Second protective layer of cement and soil; 7-Wood pile retaining board; 8-Cushion Block; 9-straw.
具体实施方式Detailed ways
为了使本发明的目的及优点更加清楚明白,以下结合实施例对本发明进行具体说明。应当理解,以下文字仅仅用以描述本发明的一种防水汽侵入的厂房屋顶防水结构或几种具体的实施方式,并不对本发明具体请求的保护范围进行严格限定。In order to make the purpose and advantages of the present invention more clear, the present invention will be described in detail below with reference to examples. It should be understood that the following text is only used to describe a factory roof waterproof structure or several specific embodiments of the present invention to prevent vapor intrusion, and does not strictly limit the scope of protection specifically requested by the present invention.
一种“果、泥”复合型生态护坡结构,如图1、图2所示,包括埋设于边坡内的多根锚杆4,沿边坡5坡面铺设且与锚杆固定的钢筋网1,坡面与钢筋网1之间放置有多个垫块8用于支撑钢筋网1;A "fruit and mud" composite ecological slope protection structure, as shown in Figures 1 and 2, includes multiple anchor rods 4 buried in the slope, and a steel mesh 1 laid along the side slope 5 and fixed to the anchor rods. , multiple pads 8 are placed between the slope surface and the steel mesh 1 to support the steel mesh 1;
边坡5坡面上依次覆盖有第一水泥土保护层2和第二水泥土保护层6,锚杆4伸出坡体穿过第二水泥土保护层6;其中:The slope surface of the side slope 5 is covered with a first cement-soil protective layer 2 and a second cement-soil protective layer 6 in sequence, and the anchor rod 4 extends out of the slope and passes through the second cement-soil protective layer 6; wherein:
第一水泥土保护层2喷射的水泥土中掺加生物菌肥发酵剂,即将腐烂的果子3在水泥土喷射之后进行喷射,并嵌入第一水泥土保护层2中;The cement and soil sprayed by the first cement and soil protective layer 2 are mixed with biological fertilizer starter, that is, the rotten fruit 3 is sprayed after the cement and soil is sprayed, and embedded in the first cement and soil protective layer 2;
第二水泥土保护层6喷射的水泥土中掺加了种子和生物基材。The cement and soil sprayed by the second cement and soil protective layer 6 are mixed with seeds and biological substrates.
可选的,钢筋网1埋入第一水泥土保护层2内,第二水泥土保护层6覆盖于第一水泥土保护层2前在坡面上竖立木桩挡土板7并铺设稻草9,木桩挡土板7垂直于坡面嵌入第一水泥土保护层2内,待第二水泥土保护层6养护成型后拆除木桩挡土板7,拆除木桩挡土板7后形成空洞,向空洞内依次加入第一水泥土保护层2、果子3、稻草9及第二水泥土保护层6,以与空洞周围护坡结构相同。Optionally, the steel mesh 1 is embedded in the first cement-soil protective layer 2, and the second cement-soil protective layer 6 covers the first cement-soil protective layer 2. In front of the first cement-soil protective layer 2, wooden pile retaining boards 7 are erected on the slope and straw 9 is laid. , the wooden pile retaining board 7 is embedded in the first cement-soil protective layer 2 perpendicular to the slope surface. After the second cement-soil protective layer 6 is cured and formed, the wooden pile retaining board 7 is removed. After the wooden pile retaining board 7 is removed, a cavity is formed. , add the first cement-soil protective layer 2, fruit 3, straw 9 and the second cement-soil protective layer 6 into the cavity in order to make it the same as the slope protection structure around the cavity.
本发明中:第一水泥土保护层所用骨料为:黏土、水泥、生物菌肥发酵剂、水泥早强剂、水泥防水剂组成的混合物,其中,粘土占第一水泥土保护层骨料重量的71%-74%,水泥占第一水泥土保护层骨料重量的20%-23%,生物菌肥发酵剂占第一水泥土保护层骨料重量的2%-4%,水泥早强剂占第一水泥土保护层骨料重量的1%,水泥防水剂占第一水泥土保护层骨料重量的2%,第一水泥土保护层灌浆的水料重量比为1.3:1。In the present invention, the aggregate used in the first cement-soil protective layer is: a mixture of clay, cement, biological fertilizer fermentation agent, cement early strength agent, and cement waterproofing agent, wherein clay accounts for the weight of the aggregate of the first cement-soil protective layer. 71%-74% of the aggregate weight of the first cement-soil protective layer, cement accounts for 20%-23% of the aggregate weight of the first cement-soil protective layer, biological fertilizer starter accounts for 2%-4% of the aggregate weight of the first cement-soil protective layer, early strength of cement The agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, the cement waterproofing agent accounts for 2% of the weight of the aggregate of the first cement-soil protective layer, and the water-to-material weight ratio of the first cement-soil protective layer grouting is 1.3:1.
本发明中:第二水泥土保护层所用骨料为:黏土、水泥、肥料、植物种子、水泥早强剂、水泥防水剂组成的混合物,其中,黏土占第二水泥土保护层骨料重量的92%-94%,水泥占第二水泥土保护层骨料重量的2%-4%,肥料占第二水泥土保护层骨料重量的1%-3%,水泥早强剂占第二水泥土保护层骨料重量的0.5%,水泥防水剂占第二水泥土保护层骨料重量的0.5%,第二水泥土保护层灌浆的水料重量比为1.5:1。In the present invention: the aggregate used in the second cement-soil protective layer is: a mixture composed of clay, cement, fertilizer, plant seeds, cement early strength agent, and cement waterproofing agent, wherein clay accounts for 10% of the weight of the aggregate in the second cement-soil protective layer. 92%-94%, cement accounts for 2%-4% of the weight of the second cement-soil protective layer aggregate, fertilizer accounts for 1%-3% of the second cement-soil protective layer aggregate weight, and cement early strength agent accounts for the second cement The cement waterproofing agent accounts for 0.5% of the aggregate weight of the second cement-soil protective layer, and the water-to-material weight ratio of the second cement-soil protective layer grouting is 1.5:1.
其中:水泥为普通硅酸盐水泥,如P.O42.5;Among them: cement is ordinary Portland cement, such as P.O42.5;
生物菌肥发酵剂为优菌康有机肥发酵剂;The biological bacterial fertilizer starter is Youjikang organic fertilizer starter;
果子为即将腐烂的果子,果子可以是即将腐烂的梨、芒果等腐蚀周期长的果子;The fruit is about to rot. The fruit can be about to rot, such as pears, mangoes and other fruits with a long corrosion period;
第一水泥土保护层内嵌入果子为50-60颗/m3,优选为50颗/m3;The number of fruits embedded in the first cement-soil protective layer is 50-60 fruits/m 3 , preferably 50 fruits/m 3 ;
肥料为植被混凝土绿化添加剂(A-B菌);The fertilizer is vegetation concrete greening additive (A-B bacteria);
植物种子为狗牙根、多花木兰、黑麦草等,优选为狗牙根;Plant seeds include bermudagrass, magnolia, ryegrass, etc., preferably bermudagrass;
水泥早强剂为氯盐类早强剂,水泥防水剂为有机硅防水剂;The cement early-strength agent is a chloride-based early-strength agent, and the cement waterproofing agent is a silicone waterproofing agent;
第二水泥土保护层中采用的植物种子200g/m3(每立方米浆料添加种子200g)。The plant seeds used in the second cement-soil protective layer are 200g/m 3 (add 200g seeds per cubic meter of slurry).
本发明中:第一水泥土保护层的厚度为4-6cm,第二水泥土保护层的厚度为4-6cm,垫块的高度为2-3cm,锚杆伸出坡体20-25cm,稻草的厚度为2-4cm。In the present invention: the thickness of the first cement-soil protective layer is 4-6cm, the thickness of the second cement-soil protective layer is 4-6cm, the height of the pad is 2-3cm, the anchor rod extends 20-25cm out of the slope, and the straw The thickness is 2-4cm.
锚杆间距为3m-3.5m,木桩挡土板间距为3m-3.5m。The distance between anchor rods is 3m-3.5m, and the distance between wooden pile retaining plates is 3m-3.5m.
木桩挡土板外表面涂有润滑油;所用钢筋网涂有防锈蚀材料,网间距为30×30cm。The outer surface of the wooden pile retaining board is coated with lubricating oil; the steel mesh used is coated with anti-rust material, and the mesh spacing is 30×30cm.
所选水泥土作业方式为湿喷。The selected cement and soil operation method is wet spraying.
一种前述的“果、泥”复合型生态护坡结构的施工方法,包括以下步骤:A construction method of the aforementioned "fruit and mud" composite ecological slope protection structure includes the following steps:
S1:将高陡边坡5的障碍物清理干净,清理松散的危岩体;S1: Clear the obstacles on the high and steep slope 5 and clean up the loose and dangerous rock masses;
S2:定位放线并测量边坡坡度,确定锚杆孔位置和水平孔间距,钻孔,安放锚杆4,成孔之后安放锚杆体和注浆管并进行防腐处理,注意锚杆4要伸出坡体20-25cm,随后清孔注浆,待锚杆稳固后清理坡面;S2: Position and set out the line and measure the slope slope, determine the location of the anchor holes and the spacing between horizontal holes, drill holes, and place the anchor 4. After the holes are formed, install the anchor body and grouting pipe and perform anti-corrosion treatment. Pay attention to the requirements of the anchor 4. Extend the slope 20-25cm, then clear the hole and grout, and clean the slope after the anchor is stable;
S3:在坡面上放置垫块,并从上至下铺设钢筋网,钢筋网通过埋设的多根锚杆固定;S3: Place pads on the slope and lay a steel mesh from top to bottom. The steel mesh is fixed by multiple buried anchor rods;
S4:钢筋网铺设完成后,按配比称取第一水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,待湿喷机准备工作做完后,将搅拌好的水泥土装入湿喷机中,垂直于边坡坡面进行喷射,使水泥土均匀喷射在坡面上;S4: After the laying of the steel mesh is completed, weigh the aggregate used in the first cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. After the preparations for the wet spray machine are completed, mix well The cement and soil are loaded into the wet spraying machine and sprayed perpendicular to the slope surface so that the cement and soil are sprayed evenly on the slope surface;
随后用加工定制大口径喷管的砼喷射机(普通的喷管直径小于部分果子的直径,施工采用加工定制的大口径喷管)正对于边坡坡面正上方喷射果子,使果子笔直插入水泥土中,形成第一水泥土保护层;Then a concrete jet machine with a custom-made large-diameter nozzle (the diameter of an ordinary nozzle is smaller than the diameter of some fruits, and a custom-made large-diameter nozzle is used for construction) is used to spray the fruit directly above the slope surface, so that the fruit is inserted straight into the cement. In the soil, the first protective layer of cement and soil is formed;
S5:待第一水泥土保护层养护3-5天且果子80%-90%腐烂后,再从上至下将木桩挡土板垂直于坡面嵌入第一水泥土保护层内,并铺设稻草,按配比称取第二水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土喷射到坡面,形成第二水泥土保护层;S5: After the first cement-soil protective layer has been cured for 3-5 days and 80%-90% of the fruit has rotted, embed the wood pile retaining board perpendicular to the slope from top to bottom into the first cement-soil protective layer and lay it Straw, weigh the aggregate used in the second cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. Use a wet spray machine to spray the cement-soil onto the slope surface to form the second cement-soil protective layer. ;
S6:待第二水泥土保护层养护7-10天后,拆除木桩挡土板,拆除木桩挡土板后形成空洞,向空洞内依次加入第一水泥土保护层、果子、稻草及第二水泥土保护层,以与空洞周围护坡结构相同;S6: After the second protective layer of cement and soil has been cured for 7-10 days, remove the wooden pile retaining board. After removing the wooden pile retaining board, a cavity will be formed. Add the first protective layer of cement and soil, fruits, straw and the second The protective layer of cement and soil should be the same as the slope protection structure around the cavity;
S7:在第二水泥土保护层上覆盖无纺布洒水养护,7-10天后揭开无纺布,即完成生态护坡结构施工。S7: Cover the second cement-soil protective layer with non-woven fabric for sprinkling and curing. After 7-10 days, uncover the non-woven fabric to complete the construction of the ecological slope protection structure.
实施例1:Example 1:
某高陡边坡坡度45度,坡面为页岩。拟采用本发明进行生态护坡。A high and steep slope has a slope of 45 degrees, and the slope surface is shale. It is planned to adopt the present invention for ecological slope protection.
锚杆4:锚杆4采用φ16螺纹钢筋,长度为50cm;锚杆4插入边坡长度为30cm,伸出边坡20cm,间距为3.5m。Anchor 4: Anchor 4 is made of φ16 threaded steel bars with a length of 50cm; the length of anchor 4 inserted into the slope is 30cm and extends out of the slope 20cm, with a spacing of 3.5m.
钢筋网1:钢筋网1采用HPB300级钢筋,钢筋网1距离坡面3cm,网间距为30×30cm,表面涂抹防锈蚀材料。Reinforced mesh 1: Reinforced mesh 1 uses HPB300 grade steel bars. The distance between the reinforced mesh 1 and the slope is 3cm. The mesh spacing is 30×30cm. The surface is coated with anti-corrosion material.
垫块8:垫块高度3cm,钢筋网1每平垫3个垫块。Pad 8: The height of the pad is 3cm, and the steel mesh 1 is flat with 3 pads.
如图1-图2所示,一种“果、泥”复合型生态护坡结构,包括埋设于边坡内的多根锚杆4,锚杆4穿过钢筋网1插在钻孔中并通过焊接将钢筋网1与锚杆4牢牢固定,边坡5坡面上覆盖有两层生态保护层,保护层由第一水泥土保护层2和第二水泥土保护层6组成。As shown in Figures 1 and 2, a "fruit and mud" composite ecological slope protection structure includes multiple anchor rods 4 buried in the slope. The anchor rods 4 pass through the steel mesh 1 and are inserted into the borehole and passed through. The steel mesh 1 and the anchor rods 4 are firmly fixed by welding. The side slope 5 is covered with two ecological protective layers. The protective layer consists of the first cement-soil protective layer 2 and the second cement-soil protective layer 6.
第一水泥土保护层2所用骨料为黏土、水泥、生物菌肥发酵剂、水泥早强剂、水泥防水剂的混合物。其中黏土占第一水泥土保护层骨料重量的74%,水泥占第一水泥土保护层骨料重量的20%,生物菌肥发酵剂占第一水泥土保护层骨料重量的3%,水泥早强剂占第一水泥土保护层骨料重量的1%,水泥防水剂占第一水泥土保护层骨料重量的2%,第一水泥土保护层灌浆的水料重量比为1.3:1,果子50颗/m3。The aggregate used in the first cement-soil protective layer 2 is a mixture of clay, cement, biological fertilizer starter, cement early strength agent, and cement waterproofing agent. Among them, clay accounts for 74% of the aggregate weight of the first cement-soil protective layer, cement accounts for 20% of the aggregate weight of the first cement-soil protective layer, and biological fertilizer starter accounts for 3% of the aggregate weight of the first cement-soil protective layer. The cement early strength agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, the cement waterproofing agent accounts for 2% of the weight of the aggregate of the first cement-soil protective layer, and the water-to-material weight ratio of the first cement-soil protective layer grouting is 1.3: 1. 50 fruits/m 3 .
第二水泥土保护层6所用骨料为:黏土、水泥、肥料、植物种子、水泥早强剂、水泥防水剂组成的混合物。其中,黏土占第二水泥土保护层骨料重量的95%,水泥占第二水泥土保护层骨料重量的2%,肥料占第二水泥土层骨料重量的2%,水泥早强剂占第一水泥土保护层骨料重量的0.5%,水泥防水剂占第一水泥土保护层骨料重量的0.5%,第二水泥土保护层灌浆的水料重量比为1.5:1;植物种子200g/m3。The aggregate used in the second cement-soil protective layer 6 is: a mixture composed of clay, cement, fertilizer, plant seeds, cement early strength agent, and cement waterproofing agent. Among them, clay accounts for 95% of the weight of the aggregates of the second cement-soil protective layer, cement accounts for 2% of the weight of the aggregates of the second cement-soil protective layer, fertilizer accounts for 2% of the weight of the aggregates of the second cement-soil layer, and cement early strength agent Accounting for 0.5% of the weight of the aggregate of the first protective layer of cement and soil, the cement waterproofing agent accounts for 0.5% of the weight of the aggregate of the first protective layer of cement and soil. The weight ratio of water to material for the grouting of the second protective layer of cement and soil is 1.5:1; plant seeds 200g/m 3 .
所述水泥为普通硅酸盐水泥P.O42.5;The cement is ordinary Portland cement P.O42.5;
所述肥料为植被混凝土绿化添加剂(A-B菌);The fertilizer is a vegetation concrete greening additive (A-B bacteria);
所述植物种子为狗牙根;The plant seeds are bermudagrass;
所述生物菌肥发酵剂为优菌康有机肥发酵剂;The biological bacterial fertilizer starter is Youjikang organic fertilizer starter;
所述水泥早强剂为氯盐类早强剂;The cement early strength agent is a chloride salt early strength agent;
所述水泥防水剂为有机硅防水剂;The cement waterproofing agent is a silicone waterproofing agent;
所述果子为即将腐烂的梨子、芒果混合物。The fruit is a mixture of pears and mangoes that are about to rot.
一种“果、泥”复合型生态护坡结构的施工方法,包括以下步骤:A construction method of a "fruit and mud" composite ecological slope protection structure, including the following steps:
步骤1:将高陡边坡5的障碍物清理干净,清理松散的危岩体;Step 1: Clear the obstacles on the high and steep slope 5 and clean up the loose and dangerous rock masses;
步骤2:定位放线并测量边坡5坡度,确定锚杆4孔位置和水平孔间距,钻孔,安放锚杆4,待锚杆4稳固后清理坡面;Step 2: Position and set out the line and measure the slope of the side slope 5, determine the position of the anchor 4 holes and the spacing between the horizontal holes, drill holes, place the anchor 4, and clean the slope after the anchor 4 is stable;
步骤3:在坡面上放置垫块8,并从上至下铺设钢筋网1,钢筋网1通过埋设的多根锚杆4固定;Step 3: Place pads 8 on the slope, and lay steel mesh 1 from top to bottom. Steel mesh 1 is fixed by multiple anchor rods 4 buried;
步骤4:按配比称取第一水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土垂直喷射到坡面,随后用大口径喷管的砼喷射机正对于边坡坡面正上方将果子3喷射至水泥土中,形成第一水泥土保护层2;Step 4: Weigh the aggregate used in the first cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. Use a wet spray machine to vertically spray the cement-soil onto the slope surface, and then spray it with a large-diameter spray. The concrete spray machine of the pipe is directly above the slope surface and sprays the fruit 3 into the cement and soil to form the first cement and soil protective layer 2;
步骤5:待第一水泥土保护层2养护3-5天且果子380%-90%腐烂后,再从上至下将木桩挡土板7垂直于坡面嵌入第一水泥土保护层2内,并铺设稻草9,按配比称取第二水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土喷射到坡面,形成第二水泥土保护层6;Step 5: After the first cement-soil protective layer 2 is cured for 3-5 days and the fruit is 380%-90% rotten, embed the wood pile retaining plate 7 perpendicularly to the slope from top to bottom into the first cement-soil protective layer 2 Inside, and lay straw 9, weigh the aggregate used in the second cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil, and use a wet spray machine to spray the cement-soil onto the slope surface to form the third 2. cement-soil protective layer 6;
步骤6:待第二水泥土保护层6养护7-10天后,拆除木桩挡土板7,拆除木桩挡土板7后形成空洞,向空洞内依次加入第一水泥土保护层2、果子3、稻草9及第二水泥土保护层6,以与空洞周围护坡结构相同;Step 6: After the second protective layer of cement and soil 6 has been cured for 7-10 days, remove the wooden pile retaining board 7. After removing the wooden pile retaining board 7, a cavity will be formed. Add the first protective layer of cement and soil 2 and fruits into the cavity in sequence. 3. The straw 9 and the second cement-soil protective layer 6 should be the same as the slope protection structure around the cavity;
步骤7:在第二水泥土保护层6上覆盖无纺布洒水养护,7-10天后揭开无纺布,即完成生态护坡结构施工。Step 7: Cover the second cement-soil protective layer 6 with a non-woven fabric for sprinkling and curing. After 7-10 days, uncover the non-woven fabric to complete the construction of the ecological slope protection structure.
所有步骤在晴天进行施工。All steps are performed on sunny days.
步骤6中使用的木桩挡土板7厚度10cm,间距为3m,伸入水泥土保护层8cm,所述木桩挡土板表面涂抹一层润滑油。The wooden pile retaining board 7 used in step 6 has a thickness of 10cm, a spacing of 3m, and extends 8cm into the cement-soil protective layer. A layer of lubricating oil is applied to the surface of the wooden pile retaining board.
第一水泥土保护层厚度为4cm,第二水泥土保护层厚度为6cm。The thickness of the first cement-soil protective layer is 4cm, and the thickness of the second cement-soil protective layer is 6cm.
实施例2:Example 2:
某高陡边坡坡度60度,坡面为页岩。拟采用本发明进行生态护坡。A high and steep slope has a slope of 60 degrees, and the slope surface is shale. It is planned to adopt the present invention for ecological slope protection.
锚杆4:锚杆4采用φ18螺纹钢筋,长度为55cm;锚杆4插入边坡长度为32cm,伸出边坡23cm,间距为3m。Anchor 4: Anchor 4 uses φ18 threaded steel bars with a length of 55cm; the length of anchor 4 inserted into the slope is 32cm, and the length of the anchor 4 extends out of the slope 23cm, with a spacing of 3m.
钢筋网1:钢筋网1采用HPB300级钢筋,钢筋网1距离坡面3cm,网间距为30×30cm,表面涂抹防锈蚀材料。Reinforced mesh 1: Reinforced mesh 1 uses HPB300 grade steel bars. The distance between the reinforced mesh 1 and the slope is 3cm. The mesh spacing is 30×30cm. The surface is coated with anti-corrosion material.
垫块8:垫块高度3cm,钢筋网1每平垫3个垫块。Pad 8: The height of the pad is 3cm, and the steel mesh 1 is flat with 3 pads.
如图1-图2所示,一种“果、泥”复合型生态护坡结构,包括埋设于边坡内的多根锚杆4,锚杆4穿过钢筋网1插在钻孔中并通过焊接将钢筋网1与锚杆4牢牢固定,边坡5坡面上覆盖有两层生态保护层,保护层由第一水泥土保护层2和第二水泥土保护层6组成。As shown in Figures 1 and 2, a "fruit and mud" composite ecological slope protection structure includes multiple anchor rods 4 buried in the slope. The anchor rods 4 pass through the steel mesh 1 and are inserted into the borehole and passed through. The steel mesh 1 and the anchor rods 4 are firmly fixed by welding. The side slope 5 is covered with two ecological protective layers. The protective layer consists of the first cement-soil protective layer 2 and the second cement-soil protective layer 6.
第一水泥土保护层2所用骨料为黏土、水泥、生物菌肥发酵剂、水泥早强剂、水泥防水剂的混合物。其中黏土占第一水泥土保护层骨料重量的73%,水泥占第一水泥土保护层骨料重量的22%,,生物菌肥发酵剂占第一水泥土保护层骨料重量的3%,水泥早强剂占第一水泥土保护层骨料重量的1%,水泥防水剂占第一水泥土保护层骨料重量的1%,第一水泥土灌浆的水料重量比为1.3:1,果子55颗/m3。The aggregate used in the first cement-soil protective layer 2 is a mixture of clay, cement, biological fertilizer starter, cement early strength agent, and cement waterproofing agent. Among them, clay accounts for 73% of the aggregate weight of the first cement-soil protective layer, cement accounts for 22% of the aggregate weight of the first cement-soil protective layer, and biofertilizer starter accounts for 3% of the aggregate weight of the first cement-soil protective layer. , the cement early strength agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, the cement waterproofing agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, and the water-to-material weight ratio of the first cement-soil grouting is 1.3:1 , 55 fruits/m 3 .
第二水泥土保护层6所用骨料为:黏土、水泥、肥料、植物种子、水泥早强剂、水泥防水剂组成的混合物。其中,黏土占第二水泥土保护层骨料重量的94%,水泥占第二水泥土保护层骨料重量的3%,,肥料占第二水泥土层骨料重量的2%,水泥早强剂占第一水泥土保护层骨料重量的0.5%,水泥防水剂占第一水泥土保护层骨料重量的0.5%,第二水泥土保护层灌浆的水料重量比为1.5:1,植物种子200g/m3。The aggregate used in the second cement-soil protective layer 6 is: a mixture composed of clay, cement, fertilizer, plant seeds, cement early strength agent, and cement waterproofing agent. Among them, clay accounts for 94% of the aggregate weight of the second cement-soil protective layer, cement accounts for 3% of the aggregate weight of the second cement-soil protective layer, fertilizer accounts for 2% of the aggregate weight of the second cement-soil protective layer, and cement early strength The agent accounts for 0.5% of the weight of the aggregate of the first cement-soil protective layer. The cement waterproofing agent accounts for 0.5% of the weight of the aggregate of the first cement-soil protective layer. The water-to-material weight ratio of the second cement-soil protective layer grouting is 1.5:1. Plants Seed 200g/m 3 .
所述水泥为普通硅酸盐水泥P.O42.5;The cement is ordinary Portland cement P.O42.5;
所述肥料为植被混凝土绿化添加剂(A-B菌);The fertilizer is a vegetation concrete greening additive (A-B bacteria);
所述植物种子为狗牙根;The plant seeds are bermudagrass;
所述生物菌肥发酵剂为优菌康有机肥发酵剂;The biological bacterial fertilizer starter is Youjikang organic fertilizer starter;
所述水泥早强剂为氯盐类早强剂;The cement early strength agent is a chloride salt early strength agent;
所述水泥防水剂为有机硅防水剂;The cement waterproofing agent is a silicone waterproofing agent;
所述果子为即将腐烂的梨子、芒果混合物。The fruit is a mixture of pears and mangoes that are about to rot.
一种“果、泥”复合型生态护坡结构的施工方法,该方法包括以下步骤:A construction method of a "fruit and mud" composite ecological slope protection structure. The method includes the following steps:
步骤1:将高陡边坡5的障碍物清理干净,清理松散的危岩体;Step 1: Clear the obstacles on the high and steep slope 5 and clean up the loose and dangerous rock masses;
步骤2:定位放线并测量边坡5坡度,确定锚杆4孔位置和水平孔间距,钻孔,安放锚杆4,待锚杆4稳固后清理坡面;Step 2: Position and set out the line and measure the slope of the side slope 5, determine the position of the anchor 4 holes and the spacing between the horizontal holes, drill holes, place the anchor 4, and clean the slope after the anchor 4 is stable;
步骤3:在坡面上放置垫块8,并从上至下铺设钢筋网1,钢筋网1通过埋设的多根锚杆4固定;Step 3: Place pads 8 on the slope, and lay steel mesh 1 from top to bottom. Steel mesh 1 is fixed by multiple anchor rods 4 buried;
步骤4:按配比称取第一水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土垂直喷射到坡面,随后用大口径喷管的砼喷射机将果子3正对于边坡坡面喷射至水泥土中,形成第一水泥土保护层2;Step 4: Weigh the aggregate used in the first cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. Use a wet spray machine to vertically spray the cement-soil onto the slope surface, and then spray it with a large-diameter spray. The concrete spray machine of the pipe sprays the fruit 3 directly into the cement and soil on the slope surface to form the first cement and soil protective layer 2;
步骤5:待第一水泥土保护层2养护3-5天且果子3 80%-90%腐烂后,将木桩挡土板7垂直于坡面嵌入第一水泥土保护层2内,并铺设稻草9,按配比称取第二水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土喷射到坡面,形成第二水泥土保护层6;Step 5: After the first cement-soil protective layer 2 has been cured for 3-5 days and the fruit 3 is 80%-90% rotten, embed the wood pile retaining board 7 perpendicularly to the slope into the first cement-soil protective layer 2 and lay it Straw 9. Weigh the aggregate used in the second cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. Use a wet spray machine to spray the cement-soil onto the slope surface to form the second cement-soil protection layer. layer 6;
步骤6:待第二水泥土保护层6养护7-10天后,拆除木桩挡土板7,拆除木桩挡土板7后形成空洞,向空洞内依次加入第一水泥土保护层2、果子3、稻草9及第二水泥土保护层6,以与空洞周围护坡结构相同;Step 6: After the second protective layer of cement and soil 6 has been cured for 7-10 days, remove the wooden pile retaining board 7. After removing the wooden pile retaining board 7, a cavity will be formed. Add the first protective layer of cement and soil 2 and fruits into the cavity in sequence. 3. The straw 9 and the second cement-soil protective layer 6 should be the same as the slope protection structure around the cavity;
步骤7:在第二水泥土保护层6上覆盖无纺布洒水养护,7-10天后揭开无纺布,即完成生态护坡结构施工。Step 7: Cover the second cement-soil protective layer 6 with a non-woven fabric for sprinkling and curing. After 7-10 days, uncover the non-woven fabric to complete the construction of the ecological slope protection structure.
所有步骤在晴天进行施工。All steps are performed on sunny days.
步骤6中使用的木桩挡土板7厚度10cm,间距为3.5m,伸入水泥土保护层8cm,所述木桩挡土板表面涂抹一层润滑油。The wooden pile retaining board 7 used in step 6 has a thickness of 10cm, a spacing of 3.5m, and extends 8cm into the cement-soil protective layer. A layer of lubricating oil is applied to the surface of the wooden pile retaining board.
第一水泥土保护层厚度为5cm,第二水泥土保护层厚度为5cm。The thickness of the first cement-soil protective layer is 5cm, and the thickness of the second cement-soil protective layer is 5cm.
实施例3:Example 3:
某高陡边坡坡度70度,坡面为页岩。拟采用本发明进行生态护坡。A high and steep slope has a slope of 70 degrees, and the slope surface is shale. It is planned to adopt the present invention for ecological slope protection.
锚杆4:锚杆4采用φ20螺纹钢筋,长度为60cm;锚杆4插入边坡长度为35cm,伸出边坡25cm,间距为3.5m。Anchor 4: Anchor 4 is made of φ20 threaded steel bars with a length of 60cm; the length of anchor 4 inserted into the slope is 35cm and extends out of the slope 25cm, with a spacing of 3.5m.
钢筋网1:钢筋网1采用HPB300级钢筋,钢筋网1距离坡面3cm,网间距为30×30cm,表面涂抹防锈蚀材料。Reinforced mesh 1: Reinforced mesh 1 uses HPB300 grade steel bars. The distance between the reinforced mesh 1 and the slope is 3cm. The mesh spacing is 30×30cm. The surface is coated with anti-corrosion material.
垫块8:垫块高度3cm,钢筋网1每平垫3个垫块。Pad 8: The height of the pad is 3cm, and the steel mesh 1 is flat with 3 pads.
如图1-图2所示,一种“果、泥”复合型生态护坡结构,包括埋设于边坡内的多根锚杆4,锚杆4穿过钢筋网1插在钻孔中并通过焊接将钢筋网1与锚杆4牢牢固定,边坡5坡面上覆盖有两层生态保护层,保护层由第一水泥土保护层2和第二水泥土保护层6组成。As shown in Figures 1 and 2, a "fruit and mud" composite ecological slope protection structure includes multiple anchor rods 4 buried in the slope. The anchor rods 4 pass through the steel mesh 1 and are inserted into the borehole and passed through. The steel mesh 1 and the anchor rods 4 are firmly fixed by welding. The side slope 5 is covered with two ecological protective layers. The protective layer consists of the first cement-soil protective layer 2 and the second cement-soil protective layer 6.
第一水泥土保护层2所用材料为黏土、水泥、生物菌肥发酵剂、水泥早强剂、水泥防水剂的混合物。其中黏土占第一水泥土保护层骨料重量的72%,水泥占第一水泥土保护层骨料重量的23%,生物菌肥发酵剂占第一水泥土保护层骨料重量的3%,水泥早强剂占第一水泥土保护层骨料重量的1%,水泥防水剂占第一水泥土保护层骨料重量的1%,第一水泥土保护层灌浆的水料重量比为1.3:1,果子60颗/m3。The materials used in the first cement-soil protective layer 2 are a mixture of clay, cement, biological fertilizer starter, cement early strength agent, and cement waterproofing agent. Among them, clay accounts for 72% of the aggregate weight of the first cement-soil protective layer, cement accounts for 23% of the aggregate weight of the first cement-soil protective layer, and biological fertilizer starter accounts for 3% of the aggregate weight of the first cement-soil protective layer. The cement early strength agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, the cement waterproofing agent accounts for 1% of the weight of the aggregate of the first cement-soil protective layer, and the water-to-material weight ratio of the first cement-soil protective layer grouting is 1.3: 1. Fruit 60/m 3 .
第二水泥土保护层6所用骨料为:黏土、水泥、肥料、植物种子、水泥早强剂、水泥防水剂组成的混合物。其中,黏土占第二水泥土保护层骨料重量的93%,水泥占第二水泥土保护层骨料重量的4%,肥料占第二水泥土层骨料重量的2%,水泥早强剂占第一水泥土保护层骨料重量的0.5%,水泥防水剂占第一水泥土保护层骨料重量的0.5%,第二水泥土保护层灌浆的水料重量比为1.5:1;植物种子200g/m3。The aggregate used in the second cement-soil protective layer 6 is: a mixture composed of clay, cement, fertilizer, plant seeds, cement early strength agent, and cement waterproofing agent. Among them, clay accounts for 93% of the weight of the aggregates of the second cement-soil protective layer, cement accounts for 4% of the weight of the aggregates of the second cement-soil protective layer, fertilizer accounts for 2% of the weight of the aggregates of the second cement-soil layer, and cement early strength agent Accounting for 0.5% of the weight of the aggregate of the first protective layer of cement and soil, the cement waterproofing agent accounts for 0.5% of the weight of the aggregate of the first protective layer of cement and soil. The weight ratio of water to material for the grouting of the second protective layer of cement and soil is 1.5:1; plant seeds 200g/m 3 .
所述水泥为普通硅酸盐水泥P.O42.5;The cement is ordinary Portland cement P.O42.5;
所述肥料为植被混凝土绿化添加剂(A-B菌);The fertilizer is a vegetation concrete greening additive (A-B bacteria);
所述植物种子为狗牙根;The plant seeds are bermudagrass;
所述生物菌肥发酵剂为优菌康有机肥发酵剂;The biological bacterial fertilizer starter is Youjikang organic fertilizer starter;
所述水泥早强剂为氯盐类早强剂;The cement early strength agent is a chloride salt early strength agent;
所述水泥防水剂为有机硅防水剂;The cement waterproofing agent is a silicone waterproofing agent;
所述果子为即将腐烂的梨子、芒果混合物。The fruit is a mixture of pears and mangoes that are about to rot.
一种“果、泥”复合型生态护坡结构的施工方法,该方法包括以下步骤:A construction method of a "fruit and mud" composite ecological slope protection structure. The method includes the following steps:
步骤1:将高陡边坡5的障碍物清理干净,清理松散的危岩体;Step 1: Clear the obstacles on the high and steep slope 5 and clean up the loose and dangerous rock masses;
步骤2:定位放线并测量边坡5坡度,确定锚杆4孔位置和水平孔间距,钻孔,安放锚杆4,待锚杆4稳固后清理坡面;Step 2: Position and set out the line and measure the slope of the side slope 5, determine the position of the anchor 4 holes and the spacing between the horizontal holes, drill holes, place the anchor 4, and clean the slope after the anchor 4 is stable;
步骤3:在坡面上放置垫块8,并从上至下铺设钢筋网1,钢筋网1通过埋设的多根锚杆4固定;Step 3: Place pads 8 on the slope, and lay steel mesh 1 from top to bottom. Steel mesh 1 is fixed by multiple anchor rods 4 buried;
步骤4:按配比称取第一水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土垂直喷射到坡面,随后用大口径喷管的砼喷射机正对于边坡坡面正上方将果子3喷射至水泥土中,形成第一水泥土保护层2;Step 4: Weigh the aggregate used in the first cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil. Use a wet spray machine to vertically spray the cement-soil onto the slope surface, and then spray it with a large-diameter spray. The concrete spray machine of the pipe is directly above the slope surface and sprays the fruit 3 into the cement and soil to form the first cement and soil protective layer 2;
步骤5:待第一水泥土保护层2养护3-5天且果子3 80%-90%腐烂后,再从上至下将木桩挡土板7垂直于坡面嵌入第一水泥土保护层2内,并铺设稻草9,按配比称取第二水泥土保护层所用骨料,并与水按比例拌合均匀,形成泥浆状水泥土,采用湿喷机将水泥土喷射到坡面,形成第二水泥土保护层6;Step 5: After the first cement-soil protective layer 2 has been cured for 3-5 days and the fruit 3 is 80%-90% rotten, embed the wooden pile retaining board 7 perpendicularly to the slope from top to bottom into the first cement-soil protective layer. 2, and lay straw 9, weigh the aggregate used in the second cement-soil protective layer according to the proportion, and mix it evenly with water in proportion to form a muddy cement-soil, and use a wet spray machine to spray the cement-soil onto the slope surface to form second cement-soil protective layer 6;
步骤6:待第二水泥土保护层6养护7-10天后,拆除木桩挡土板7,拆除木桩挡土板7后形成空洞,向空洞内依次加入第一水泥土保护层2、果子3、稻草9及第二水泥土保护层6,以与空洞周围护坡结构相同;Step 6: After the second protective layer of cement and soil 6 has been cured for 7-10 days, remove the wooden pile retaining board 7. After removing the wooden pile retaining board 7, a cavity will be formed. Add the first protective layer of cement and soil 2 and fruits into the cavity in sequence. 3. The straw 9 and the second cement-soil protective layer 6 should be the same as the slope protection structure around the cavity;
步骤7:在第二水泥土保护层6上覆盖无纺布洒水养护,7-10天后揭开无纺布,即完成生态护坡结构施工。Step 7: Cover the second cement-soil protective layer 6 with a non-woven fabric for sprinkling and curing. After 7-10 days, uncover the non-woven fabric to complete the construction of the ecological slope protection structure.
所有步骤在晴天进行施工。All steps are performed on sunny days.
步骤6中使用的木桩挡土板7厚度15cm,间距为3.5m,伸入水泥土保护层8cm,所述木桩挡土板表面涂抹一层润滑油。The wooden pile retaining board 7 used in step 6 has a thickness of 15cm, a spacing of 3.5m, and extends 8cm into the cement-soil protective layer. A layer of lubricating oil is applied to the surface of the wooden pile retaining board.
第一水泥土保护层厚度为6cm,第二水泥土保护层厚度为4cm。The thickness of the first cement-soil protective layer is 6cm, and the thickness of the second cement-soil protective layer is 4cm.
本发明通过二次喷射水泥含量不同的水泥土,并在第一次水泥土喷播之后加入即将腐烂的果子,与锚杆和钢筋网构成生态护坡结构网。两层均添加了水泥土增加了坡体自身的强度,同时第二层水泥土中掺加了狗牙根种子,狗牙根扎根于腐烂的果子(果子腐烂提供营养并且具有保水性)孔隙中,在第二层水泥土中根系链接生长,再结合狗牙根自身的特性,结合植被和掺加水泥土的高陡边坡来提升高陡边坡自身强度,增强边坡保水性,也防止了雨水冲刷,边坡维持长期稳定,时效性耐久性更强。The invention sprays cement soil with different cement content twice, and adds rotten fruits after the first cement soil spraying, and forms an ecological slope protection structure network with anchor rods and steel mesh. Cement soil was added to both layers to increase the strength of the slope itself. At the same time, bermudagrass seeds were added to the second layer of cement soil. Bermudagrass roots are rooted in the pores of rotten fruits (fruit rot provides nutrients and has water retention properties). The growth of root systems in the second layer of cement and soil, combined with the characteristics of bermudagrass, vegetation and high and steep slopes mixed with cement and soil, improves the strength of high and steep slopes, enhances the water retention of the slope, and prevents rainwater erosion. The slope maintains long-term stability and is more time-effective and durable.
以上所述仅是为了便于本领域的技术人员理解本发明的技术方案,并不用以限制本发明。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above description is only to facilitate those skilled in the art to understand the technical solutions of the present invention, and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210533237.0A CN114790751B (en) | 2022-05-12 | 2022-05-12 | A "fruit and mud" composite ecological slope protection structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210533237.0A CN114790751B (en) | 2022-05-12 | 2022-05-12 | A "fruit and mud" composite ecological slope protection structure and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114790751A CN114790751A (en) | 2022-07-26 |
CN114790751B true CN114790751B (en) | 2023-11-28 |
Family
ID=82463201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210533237.0A Active CN114790751B (en) | 2022-05-12 | 2022-05-12 | A "fruit and mud" composite ecological slope protection structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114790751B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115288164B (en) * | 2022-07-29 | 2024-03-08 | 湖北工业大学 | Ecological restoration construction method and device for high-steep side slope |
CN116326309B (en) * | 2023-04-07 | 2025-07-15 | 浙江广川工程咨询有限公司 | Coastline planting method and concrete spraying equipment thereof |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005155159A (en) * | 2003-11-26 | 2005-06-16 | Makino Green:Kk | Vegetation base on flooded slope and greening method of flooded slope |
KR20060009068A (en) * | 2004-07-20 | 2006-01-27 | 주식회사 선엔지니어링 | Roadside slope protection method |
JP2006299537A (en) * | 2005-04-15 | 2006-11-02 | Iwase Ryokka Sangyo Kk | Double-layered slope greening method |
CN105409695A (en) * | 2015-12-10 | 2016-03-23 | 天津泰达盐碱地绿化研究中心有限公司 | Method for improving water penetration rate of soil in urban greenland |
CN105484275A (en) * | 2016-01-12 | 2016-04-13 | 中国电建集团贵阳勘测设计研究院有限公司 | Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area |
KR20180055121A (en) * | 2016-11-16 | 2018-05-25 | 에덴녹화산업 주식회사 | Vegetation base artificial soil and method for growing vegetation on sloped surface using the same |
CN109162286A (en) * | 2018-09-13 | 2019-01-08 | 宝钢集团新疆八钢铁有限公司 | A kind of pair of opencut carries out the construction method of slope ecological protection |
CN109853592A (en) * | 2019-02-01 | 2019-06-07 | 湖北工业大学 | The dry ecological safeguard structure and method for spraying work sash beam and substrate of fractured rock side slope |
CN110521503A (en) * | 2019-08-07 | 2019-12-03 | 叶建军 | Wet shot plant cover concrete ecological vestige |
CN112195940A (en) * | 2020-09-11 | 2021-01-08 | 湖北工业大学 | Ecological protection structure and construction method suitable for potholes and uneven rock slopes |
CN113235623A (en) * | 2021-05-12 | 2021-08-10 | 中交四航工程研究院有限公司 | Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof |
WO2021175263A1 (en) * | 2020-03-03 | 2021-09-10 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Fully-ecological slope spray-seeding structure and construction method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110637668B (en) * | 2019-11-13 | 2024-05-28 | 江西省环境保护科学研究院 | Structure and method for three-dimensional restoration of slope soil in ionic rare earth abandoned mining area |
-
2022
- 2022-05-12 CN CN202210533237.0A patent/CN114790751B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005155159A (en) * | 2003-11-26 | 2005-06-16 | Makino Green:Kk | Vegetation base on flooded slope and greening method of flooded slope |
KR20060009068A (en) * | 2004-07-20 | 2006-01-27 | 주식회사 선엔지니어링 | Roadside slope protection method |
JP2006299537A (en) * | 2005-04-15 | 2006-11-02 | Iwase Ryokka Sangyo Kk | Double-layered slope greening method |
CN105409695A (en) * | 2015-12-10 | 2016-03-23 | 天津泰达盐碱地绿化研究中心有限公司 | Method for improving water penetration rate of soil in urban greenland |
CN105484275A (en) * | 2016-01-12 | 2016-04-13 | 中国电建集团贵阳勘测设计研究院有限公司 | Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area |
KR20180055121A (en) * | 2016-11-16 | 2018-05-25 | 에덴녹화산업 주식회사 | Vegetation base artificial soil and method for growing vegetation on sloped surface using the same |
CN109162286A (en) * | 2018-09-13 | 2019-01-08 | 宝钢集团新疆八钢铁有限公司 | A kind of pair of opencut carries out the construction method of slope ecological protection |
CN109853592A (en) * | 2019-02-01 | 2019-06-07 | 湖北工业大学 | The dry ecological safeguard structure and method for spraying work sash beam and substrate of fractured rock side slope |
CN110521503A (en) * | 2019-08-07 | 2019-12-03 | 叶建军 | Wet shot plant cover concrete ecological vestige |
WO2021175263A1 (en) * | 2020-03-03 | 2021-09-10 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Fully-ecological slope spray-seeding structure and construction method |
CN112195940A (en) * | 2020-09-11 | 2021-01-08 | 湖北工业大学 | Ecological protection structure and construction method suitable for potholes and uneven rock slopes |
CN113235623A (en) * | 2021-05-12 | 2021-08-10 | 中交四航工程研究院有限公司 | Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof |
Non-Patent Citations (2)
Title |
---|
公路边坡生态防护喷播基质的应用;刘亚平等;公路交通科技(应用技术版);第2012年卷(第10期);75-78 * |
岩石边坡护坡绿化技术应用研究;许文年, 王铁桥, 叶建军;水利水电技术(07);35-36+40 * |
Also Published As
Publication number | Publication date |
---|---|
CN114790751A (en) | 2022-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109723068B (en) | Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation | |
CN103774679B (en) | A kind of method of rock slope linked network | |
CN102926391B (en) | Loess slope ecological protection method | |
CN114790751B (en) | A "fruit and mud" composite ecological slope protection structure and its construction method | |
CN109763504B (en) | Slope ecological reinforcement and greening method | |
CN106638630B (en) | Flexible ceramsite board slope ecological afforestation equipment and its greening method | |
CN102444134A (en) | A slope protection method based on a slope whose upper part is a soil layer and the lower part is a rock layer | |
CN111472371A (en) | Comprehensive ecological prevention and control structure and method for easily weathered soft rock high and steep slope | |
CN102652480A (en) | Vegetation recovery method for acid metal mine solid waste stock dump | |
CN100393948C (en) | Ecological slope protection method for anti-scouring substrate | |
CN108625381A (en) | High-steep slope protection administering method and safeguard structure | |
CN107460884B (en) | Grass cage reinforcement spray layer ecological slope protection structure and construction method thereof | |
CN109503052A (en) | Raw celluar concrete of a plant and preparation method and application | |
CN108049423B (en) | Ecological landscape retaining wall | |
CN110219310A (en) | Drainage pipe combines the frame grid type vegetation soil cement bank protecting method and facility of the multi-functional reinforced bands that draw water | |
CN113235623A (en) | Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof | |
CN210151758U (en) | A kind of slope ecological protection structure with water storage and water supply system | |
CN109626898A (en) | A kind of ecology is sowed grass seeds by duster concrete and its method of preparation and use | |
CN209816870U (en) | Conducive to slope vegetation growth steep concrete frame beam slope protection system | |
CN201473957U (en) | A non-slip planting trough applied to the ecological management of bare slopes | |
CN114319395A (en) | Ecological bag modified expansive soil flexible ecological slope protection structure and construction method | |
CN211621621U (en) | Plant biological bag protection device for high and steep rocky slope | |
CN112012234A (en) | Construction method of anchor spraying protective structure | |
CN114753387B (en) | Water-retaining high-steep slope ecological slope protection structure and construction method | |
CN219508604U (en) | Ecological concrete protection system in rock steep slope lattice protection frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |