[go: up one dir, main page]

CN114673787A - A large-sized hydraulic breaker piston and its manufacturing method - Google Patents

A large-sized hydraulic breaker piston and its manufacturing method Download PDF

Info

Publication number
CN114673787A
CN114673787A CN202210333102.XA CN202210333102A CN114673787A CN 114673787 A CN114673787 A CN 114673787A CN 202210333102 A CN202210333102 A CN 202210333102A CN 114673787 A CN114673787 A CN 114673787A
Authority
CN
China
Prior art keywords
piston
tempering
hydraulic breaker
temperature
sized hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210333102.XA
Other languages
Chinese (zh)
Other versions
CN114673787B (en
Inventor
张宝燕
李永胜
陈茹
王磊
王昕�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ocean University of China
Shandong Tianrui Heavy Industry Co Ltd
Original Assignee
Ocean University of China
Shandong Tianrui Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ocean University of China, Shandong Tianrui Heavy Industry Co Ltd filed Critical Ocean University of China
Priority to CN202210333102.XA priority Critical patent/CN114673787B/en
Publication of CN114673787A publication Critical patent/CN114673787A/en
Application granted granted Critical
Publication of CN114673787B publication Critical patent/CN114673787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J1/00Pistons; Trunk pistons; Plungers
    • F16J1/01Pistons; Trunk pistons; Plungers characterised by the use of particular materials
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • C21D1/25Hardening, combined with annealing between 300 degrees Celsius and 600 degrees Celsius, i.e. heat refining ("Vergüten")
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/34Methods of heating
    • C21D1/44Methods of heating in heat-treatment baths
    • C21D1/46Salt baths
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/24Ferrous alloys, e.g. steel alloys containing chromium with vanadium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J1/00Pistons; Trunk pistons; Plungers
    • F16J1/001One-piece pistons

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Heat Treatment Of Articles (AREA)
  • Pistons, Piston Rings, And Cylinders (AREA)

Abstract

本发明公开了一种大尺寸液压破碎锤活塞及其制造方法,其中大尺寸液压破碎锤活塞包括采用高碳合金钢9CrV制成的活塞基体,活塞基体经过调质处理制成;活塞基体的一端面上开设有圆形沉孔,本发明通过配合与之相适应的加工与热处理工艺,能够使得大尺寸液压破碎锤活塞的整断面强韧性达到均衡,显著提升大尺寸液压破碎锤活塞的综合强韧性。

Figure 202210333102

The invention discloses a large-sized hydraulic breaker piston and a manufacturing method thereof, wherein the large-sized hydraulic breaker piston comprises a piston base body made of high-carbon alloy steel 9CrV, and the piston base body is made by quenching and tempering treatment; The end face is provided with a circular countersunk hole. By cooperating with the corresponding processing and heat treatment process, the invention can balance the strength and toughness of the entire section of the large-sized hydraulic breaker piston, and significantly improve the comprehensive strength of the large-sized hydraulic breaker piston. toughness.

Figure 202210333102

Description

一种大尺寸液压破碎锤活塞及其制造方法A large-sized hydraulic breaker piston and its manufacturing method

技术领域technical field

本发明属于重型机械制造技术领域,具体的说,涉及一种大尺寸液压破碎锤活塞及其制造方法。The invention belongs to the technical field of heavy machinery manufacturing, and in particular relates to a large-sized hydraulic breaker piston and a manufacturing method thereof.

背景技术Background technique

液压破碎锤作为一种新型的液压工程设备,被广泛应用于矿山岩石的破碎及各种大型工程建设等;而液压破碎锤冲击系统中的活塞是直接做功的关键部件,也是液压破碎锤的最关键的工作部件。As a new type of hydraulic engineering equipment, hydraulic breaker is widely used in the crushing of rock in mines and various large-scale construction projects; and the piston in the impact system of hydraulic breaker is the key component that directly performs work, and it is also the most important part of hydraulic breaker. critical working parts.

长期以来诸如阿特拉斯等国际凿岩机械知名企业占据了市场主体,现有技术中液压破碎锤中的活塞均采用低碳合金钢调质处理后进行表面强化处理(包括渗碳等)制造而成的,其寿命高的同时制造成本亦昂贵。For a long time, well-known international rock drilling machinery companies such as Atlas have dominated the market. In the prior art, the pistons in the hydraulic breakers are all made of low-carbon alloy steel after quenching and tempering treatment and then surface strengthening treatment (including carburizing, etc.) It has a long life and is expensive to manufacture.

近年国内开始采用诸如GCr15等高碳合金钢制造液压破碎锤的活塞,并取得了一定的市场应用。In recent years, high carbon alloy steel such as GCr15 has been used in China to manufacture the piston of hydraulic breaker, and it has achieved certain market applications.

然而,伴随液压破碎机械型号的升级,活塞尺寸逐步增大。However, with the upgrading of hydraulic crusher models, the piston size has gradually increased.

在现场应用过程中,高碳合金钢制造的活塞在工作中其打击端面容易发生崩块开裂,从而缩短了液压破碎锤的使用寿命。In the field application process, the impact end face of the piston made of high carbon alloy steel is prone to chipping and cracking, thus shortening the service life of the hydraulic breaker.

发生上述问题的根本原因在于高碳合金钢淬火硬化层与内部强韧性不平衡所致。The root cause of the above problems is that the quench hardened layer of high carbon alloy steel is unbalanced with the internal strength and toughness.

为此,本发明通过分析活塞用钢开裂失效的原因,针对大尺寸液压破碎锤活塞特殊的工作环境,设计大尺寸液压破碎锤活塞的特殊结构与相应的制造方法;使得大尺寸液压破碎锤活塞的整体断面强韧性达到均衡,有效地缓解了由于尺寸效应引起的硬度、韧性突变现象,显著提升大尺寸液压破碎锤活塞的综合强韧性。For this reason, the present invention designs the special structure and corresponding manufacturing method of the large-sized hydraulic breaker piston by analyzing the reasons for the cracking failure of the steel used for the piston, aiming at the special working environment of the large-sized hydraulic breaker piston; The strength and toughness of the overall cross-section are balanced, which effectively alleviates the sudden change in hardness and toughness caused by the size effect, and significantly improves the comprehensive strength and toughness of the large-sized hydraulic breaker piston.

发明内容SUMMARY OF THE INVENTION

本发明要解决的主要技术问题是提供一种大尺寸液压破碎锤活塞及其制造方法,该活塞结构具有整体断面强韧性均衡、无性能急剧变化的特点。The main technical problem to be solved by the present invention is to provide a large-sized hydraulic breaker piston and a manufacturing method thereof.

为解决上述技术问题,本发明提供如下技术方案:In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions:

一种大尺寸液压破碎锤活塞,该活塞包括采用高碳合金钢9CrV制成的活塞基体,活塞基体经过调质处理制成;活塞基体的一端面上开设有圆形沉孔。The utility model relates to a large-sized hydraulic breaker piston. The piston includes a piston base body made of high carbon alloy steel 9CrV, and the piston base body is made by quenching and tempering treatment; one end face of the piston base body is provided with a circular countersunk hole.

以下是本发明对上述技术方案的进一步优化:The following is the further optimization of the present invention to the above-mentioned technical scheme:

该活塞的表面硬度为:57-63HRC;超声波探伤≤2级。The surface hardness of the piston is: 57-63HRC; ultrasonic flaw detection ≤ grade 2.

进一步优化:所述活塞基体的外表面上靠近具有圆形沉孔一端面的位置处布设有依次一体连接的第一过度段、第二过度段和第三过度段。Further optimization: a first transition section, a second transition section and a third transition section that are integrally connected in sequence are arranged on the outer surface of the piston base near the position with one end surface of the circular counterbore.

本发明还提供一种用于制备上述大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:The present invention also provides a manufacturing method for preparing the above-mentioned large-size hydraulic breaker piston, the manufacturing method comprising the machining steps:

S1、下料:选取符合制造大尺寸液压破碎锤活塞的高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验;S1. Blanking: Select high-carbon alloy steel 9CrV that is suitable for manufacturing large-sized hydraulic breaker pistons for production. 9CrV steel needs to be inspected before entering the factory;

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,最终获得毛坯产品。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker, and finally a blank product is obtained.

以下是本发明对上述技术方案的进一步优化:The following is the further optimization of the present invention to the above-mentioned technical scheme:

该制造方法还包括调质步骤:The manufacturing method also includes a tempering step:

T1、加热:将毛坯产品装入加热炉内,进行加热时以5-10℃/min的升温速度升温至820-850℃,加热炉内维持碳势保护气氛为0.8-1.1%,而后保温5小时;T1. Heating: Put the blank product into the heating furnace, and heat it up to 820-850 °C at a heating rate of 5-10 °C/min. The carbon potential protective atmosphere in the heating furnace is maintained at 0.8-1.1%, and then kept for 5 Hour;

T2、淬火:将加热保温完成的毛坯产品放在空气中进行预冷1min,预冷完成后放入淬火介质中进行淬火,淬火时间为2.5-4min,淬火完成后,毛坯产品的温度为200-290℃;T2. Quenching: Put the finished product in the air for pre-cooling for 1min. After the pre-cooling is completed, put it into the quenching medium for quenching. The quenching time is 2.5-4min. 290℃;

T3、硝盐浴:将淬火完成的毛坯产品进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时;T3. Nitrate bath: the quenched blank product is subjected to a nitrate bath, wherein the nitrate bath temperature is 230°C; the nitrate bath holding time is 4 hours;

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品进行第一次低温回火,回火温度为230-300℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温;T4. The first low-temperature tempering: the first low-temperature tempering is performed on the blank product after the nitrate bath treatment, the tempering temperature is 230-300 ° C, the tempering holding time is 4 hours, and the first tempering treatment is completed After cooling to room temperature;

T5、第二次低温回火:将第一次低温回火完成的毛坯产品进行第二次低温回火,其中回火温度为230-350℃,回火保温时间为4小时,冷却至室温,最终获得大尺寸液压破碎锤活塞。T5. The second low temperature tempering: the first low temperature tempering completed blank product is subjected to the second low temperature tempering, wherein the tempering temperature is 230-350 ° C, the tempering holding time is 4 hours, and the temperature is cooled to room temperature. Finally, a large size hydraulic breaker piston is obtained.

进一步优化:步骤22中,毛坯产品生产完成后,毛坯产品的加工标准为直径尺寸公差为-0.085~-0.075mm;表面光洁度为Ra0.2,外径圆度为0.003;圆柱度为0.003,同心度为φ0.005。Further optimization: in step 22, after the production of the blank product is completed, the processing standard of the blank product is that the diameter dimensional tolerance is -0.085~-0.075mm; the surface finish is Ra0.2, the outer diameter roundness is 0.003; the cylindricity is 0.003, and the concentricity is The degree is φ0.005.

进一步优化:所述步骤T1中,加热炉采用的是井式炉,其中装炉方式为:吊盘吊装;装炉数量为4-5支/炉。Further optimization: in the step T1, the heating furnace is a pit furnace, and the furnace loading method is: hanging plate hoisting; the number of furnaces is 4-5 per furnace.

进一步优化:步骤T1中,进行保温时,保温温度波动为:±5℃。Further optimization: in step T1, when heat preservation is performed, the fluctuation of the heat preservation temperature is ±5°C.

进一步优化:步骤T2中,淬火介质的初始温度为20-50℃,淬火介质的出水温度为200-240℃。Further optimization: in step T2, the initial temperature of the quenching medium is 20-50°C, and the outlet temperature of the quenching medium is 200-240°C.

进一步优化:步骤T2中,淬火介质为盐水,且盐水的浓度为3%。Further optimization: in step T2, the quenching medium is brine, and the concentration of the brine is 3%.

本发明采用上述技术方案,构思巧妙,结构合理,解决了采用高碳钢制造大尺寸液压破碎锤活塞的内外强韧性难以匹配的问题;更重要的是通过配合与之相适应的加工与热处理工艺,能够使得大尺寸液压破碎锤活塞的整断面强韧性达到均衡,有效地缓解了由于尺寸效应引起的硬度、韧性突变的现象,显著提升大尺寸液压破碎锤活塞的综合强韧性。The present invention adopts the above-mentioned technical scheme, has ingenious conception and reasonable structure, and solves the problem that the internal and external strength and toughness of large-sized hydraulic breaker pistons are difficult to match by using high carbon steel; , which can balance the strength and toughness of the whole section of the large-sized hydraulic breaker piston, effectively alleviate the phenomenon of sudden changes in hardness and toughness caused by the size effect, and significantly improve the comprehensive strength and toughness of the large-sized hydraulic breaker piston.

下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

附图说明Description of drawings

图1为本发明实施例的总体结构示意图;1 is a schematic diagram of the overall structure of an embodiment of the present invention;

图2为本发明实施例中活塞基体的剖视图;2 is a cross-sectional view of a piston base in an embodiment of the present invention;

图3为本发明实施例中活塞基体上具有圆形沉孔端面处的侧视图;3 is a side view of the end face of the piston base with a circular counterbore in the embodiment of the present invention;

图4为本发明对照例1-3的拉伸性能示意图;4 is a schematic diagram of the tensile properties of Comparative Examples 1-3 of the present invention;

图5为本发明实施例1-3的拉伸性能示意图;Figure 5 is a schematic diagram of the tensile properties of Examples 1-3 of the present invention;

图6为本发明对照例1-3与实施例1-3的硬度对比图;Fig. 6 is the hardness comparison diagram of comparative example 1-3 of the present invention and embodiment 1-3;

图7为本发明对照例1-3与实施例1-3的冲击吸收功对比图;Fig. 7 is the comparison diagram of impact absorption energy of Comparative Example 1-3 of the present invention and Example 1-3;

图8为本发明对照例1-3的残余应力图Fig. 8 is the residual stress diagram of the comparative examples 1-3 of the present invention

图9为本发明实施例1-3的残余应力图。FIG. 9 is a residual stress diagram of Examples 1-3 of the present invention.

图中:1-活塞基体;2-圆形沉孔;3-第一过度段;4-第二过度段;5-第三过度段。In the figure: 1-piston base; 2-circular counterbore; 3-first transition segment; 4-second transition segment; 5-third transition segment.

具体实施方式Detailed ways

实施例1:请参阅图1-3,一种大尺寸液压破碎锤活塞,包括活塞基体1,所述活塞基体1的整体结构呈圆柱体形,所述活塞基体1的一端面上开设有圆形沉孔2。Embodiment 1: Please refer to Figures 1-3, a large-sized hydraulic breaker piston, including a piston base 1, the overall structure of the piston base 1 is cylindrical, and one end surface of the piston base 1 is provided with a circular shape. Counterbore 2.

所述活塞基体1采用用高碳合金钢制成,所述高碳合金钢的具体型号为9CrV钢。The piston base 1 is made of high carbon alloy steel, and the specific model of the high carbon alloy steel is 9CrV steel.

将采用高碳合金钢9CrV制成的活塞基体1经过调质处理后,使活塞基体1的整体断面强韧性均衡、无性能急剧变化。After the piston base body 1 made of high carbon alloy steel 9CrV is quenched and tempered, the overall section strength and toughness of the piston base body 1 is balanced, and there is no sudden change in performance.

所述调质处理包括加热、淬火、硝盐浴和回火工艺。The quenching and tempering treatment includes heating, quenching, nitrate bath and tempering process.

制得完成的液压破碎锤活塞,其整体参数为:表面硬度:55-65HRC;心部硬度:35-45HRC,超声波探伤≤2级。The finished hydraulic breaker piston has the overall parameters: surface hardness: 55-65HRC; core hardness: 35-45HRC, ultrasonic flaw detection ≤ grade 2.

所述活塞基体1的整体直径Φ1为180-260mm,所述活塞基体1的整体高度为L1为410mm,所述圆形沉孔2的整体直径Φ2为25-45mm;所述圆形沉孔2的深度L2为75-100mm。The overall diameter Φ1 of the piston base 1 is 180-260 mm, the overall height of the piston base 1 is 410 mm, and the overall diameter Φ2 of the circular counterbore 2 is 25-45 mm; the circular counterbore 2 The depth L2 is 75-100mm.

所述活塞基体1的外表面上靠近具有圆形沉孔2一端面的位置处布设有多段过度段。A plurality of transition sections are arranged on the outer surface of the base body 1 of the piston at a position close to one end surface of the counterbore 2 having a circular shape.

在本实施例中,所述过度段的数量为三个,且三个过度段分别为第一过度段3、第二过度段4和第三过度段5,所述第一过度段3、第二过度段4和第三过度段5依次一体连接。In this embodiment, the number of the transition sections is three, and the three transition sections are respectively a first transition section 3, a second transition section 4 and a third transition section 5. The first transition section 3, the third transition section The second transition section 4 and the third transition section 5 are integrally connected in sequence.

所述第一过度段3的外表面形状为圆锥面,所述第二过度段4的外表面形状为圆柱面,所述第三过度段5的外表面形状为圆锥面。The outer surface shape of the first transition section 3 is a conical surface, the outer surface shape of the second transition section 4 is a cylindrical surface, and the outer surface shape of the third transition section 5 is a conical surface.

所述第二过度段4的外表面直径Φ4为180mm。The outer surface diameter Φ4 of the second transition section 4 is 180 mm.

所述活塞基体1具有圆形沉孔2一端面的外表面直径Φ3为150mm。The piston base 1 has an outer surface diameter Φ3 of one end face of a circular counterbore 2 of 150 mm.

在本实施中,以整体直径Φ1为190mm的活塞基体1为例,其中活塞基体1的整体高度L1为410mm;圆形沉孔2的整体直径Φ2为30mm;圆形沉孔2的深度L2为100mm;第二过度段4的外表面直径Φ4为180mm;活塞基体1具有圆形沉孔2一端面的外表面直径Φ3为150mm。In this implementation, take the piston base body 1 with the overall diameter Φ1 of 190mm as an example, wherein the overall height L1 of the piston base body 1 is 410mm; the overall diameter Φ2 of the circular counterbore 2 is 30mm; the depth L2 of the circular counterbore 2 is 100mm; the diameter Φ4 of the outer surface of the second transition section 4 is 180mm; the diameter Φ3 of the outer surface of the piston base 1 with one end face of the circular counterbore 2 is 150mm.

本发明采用上述技术方案,该活塞基体1采用用9CrV高碳合金钢制成,并且活塞经调质处理后,使活塞基体1的整体断面强韧性均衡、有效地缓解了由于尺寸效应引起的硬度、韧性突变现象,显著提升大尺寸液压破碎锤活塞的综合强韧性,并且活塞的疲劳强度和抗腐蚀性优异。The present invention adopts the above technical scheme, the piston base body 1 is made of 9CrV high carbon alloy steel, and after the piston is quenched and tempered, the overall section strength and toughness of the piston base body 1 is balanced, and the hardness caused by the size effect is effectively relieved The phenomenon of sudden change in toughness significantly improves the comprehensive strength and toughness of the large-sized hydraulic breaker piston, and the piston has excellent fatigue strength and corrosion resistance.

本实施例1还公开了一种大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:This embodiment 1 also discloses a method for manufacturing a large-sized hydraulic breaker piston, and the manufacturing method includes the steps of machining:

S1、下料:选取符合制造大尺寸液压破碎锤活塞的高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验。S1. Blanking: Select high-carbon alloy steel 9CrV that is suitable for manufacturing large-sized hydraulic breaker pistons for production. 9CrV steel needs to be inspected for raw materials before entering the factory.

所述步骤S1中,9CrV钢原材料的检验按如下步骤进行:In the step S1, the inspection of the 9CrV steel raw material is carried out according to the following steps:

1、供货状态:9CrV钢原材料的制备工艺包括:模铸、锻造、球化退火。1. Supply status: The preparation process of 9CrV steel raw materials includes: die casting, forging, spheroidizing annealing.

2、化学成分:在9CrV钢原材料的端面且距表面0.5R(R表示9CrV钢原材料的半径)处进行取样检测,取样数量为1支/炉次;2. Chemical composition: Sampling and testing is carried out at the end face of the 9CrV steel raw material and 0.5R from the surface (R represents the radius of the 9CrV steel raw material), and the sampling quantity is 1 piece/heat;

经检测9CrV钢中各元素的百分比含量如下表所示:The percentage content of each element in the tested 9CrV steel is shown in the following table:

Figure 8184DEST_PATH_IMAGE001
Figure 8184DEST_PATH_IMAGE001

3、低倍组织:取样部位:9CrV钢原材料的端部;取样数量:1件/炉次;3. Low magnification structure: sampling location: the end of 9CrV steel raw material; sampling quantity: 1 piece/heat;

要求:参照GB/T18254-2016,横向酸浸试样上不应有残余缩孔、裂纹、皮下气泡、过烧、白点等有害缺陷。Requirements: Referring to GB/T18254-2016, there should be no harmful defects such as residual shrinkage cavities, cracks, subcutaneous bubbles, over-burning, and white spots on the transverse acid leaching samples.

Figure 216442DEST_PATH_IMAGE002
Figure 216442DEST_PATH_IMAGE002

4、供货硬度:球化退火硬度不大于HBW179-229.4. Supply hardness: spheroidizing annealing hardness is not greater than HBW179-229.

5、脱碳层:取样部位:9CrV钢原材料的端部;取样数量:1件/炉次;要求:每边总脱碳层深度,不大于公称直径的1%。5. Decarburization layer: Sampling location: the end of the 9CrV steel raw material; Sampling quantity: 1 piece/heat; Requirements: The total decarburization layer depth on each side is not greater than 1% of the nominal diameter.

6、非金属夹杂物:6. Non-metallic inclusions:

Figure 93131DEST_PATH_IMAGE003
Figure 93131DEST_PATH_IMAGE003

7、显微组织7. Microstructure

Figure 650015DEST_PATH_IMAGE004
Figure 650015DEST_PATH_IMAGE004

8、超声波无损探伤:取样数量:逐支;要求:参照GB/T 4612,单个的不连续平底孔直径≤2.0级。8. Ultrasonic non-destructive testing: sampling quantity: one by one; requirements: refer to GB/T 4612, the diameter of a single discontinuous flat-bottom hole is less than or equal to 2.0.

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,首先采用车床进行粗车获得粗车毛坯,而后将粗车毛坯采用车床进行精车获得精车毛坯,将精车毛坯采用铣床进行铣削最终获得毛坯产品。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker. First, the lathe is used for rough turning to obtain a rough turning blank, and then the rough turning blank is subjected to a lathe for finishing turning to obtain a finishing turning blank, and the finishing turning blank is milled with a milling machine. Finally, a rough product is obtained.

所述毛坯产品生产完成后,毛坯产品的加工标准为直径尺寸公差为-0.085~-0.075mm;表面光洁度为Ra0.2,外径圆度为0.003;圆柱度为0.003,同心度为φ0.005。After the production of the blank product is completed, the processing standard of the blank product is that the diameter dimensional tolerance is -0.085~-0.075mm; the surface finish is Ra0.2, the outer diameter roundness is 0.003; the cylindricity is 0.003, and the concentricity is φ0.005 .

所述该制造方法还包括调质步骤:Said manufacturing method also comprises a tempering step:

T1、加热:将毛坯产品装入加热炉内,进行加热时以5-10℃/min的升温速度升温至850℃,加热炉内维持碳势保护气氛为0.8-1.1%,而后保温5小时。T1. Heating: Put the blank product into the heating furnace, and heat it up to 850 °C at a heating rate of 5-10 °C/min. The carbon potential protective atmosphere in the heating furnace is maintained at 0.8-1.1%, and then kept for 5 hours.

所述步骤T1中,加热炉采用的是井式炉,其中装炉方式为:吊盘吊装;装炉数量为4支/炉。In the step T1, the heating furnace is a well-type furnace, and the furnace loading method is: hanging plate hoisting; the number of furnaces to be loaded is 4 pieces/furnace.

所述步骤T1中,进行保温时,保温温度波动为:±5℃。In the step T1, when the heat preservation is performed, the fluctuation of the heat preservation temperature is ±5°C.

T2、淬火:将加热保温完成的毛坯产品放在空气中进行预冷,预冷时间为1min,预冷完成后放入淬火介质中进行淬火,其中淬火介质的初始温度为20-50℃,淬火时间为2.5min,淬火介质的出水温度为200-240℃,淬火完成后,毛坯产品的温度为200℃。T2, quenching: put the finished product of heating and heat preservation in the air for pre-cooling, the pre-cooling time is 1min, after the pre-cooling is completed, put it into the quenching medium for quenching, wherein the initial temperature of the quenching medium is 20-50 ℃, quenching The time is 2.5min, the outlet temperature of the quenching medium is 200-240°C, and after the quenching is completed, the temperature of the blank product is 200°C.

所述步骤T2 中,淬火介质为盐水,且盐水的浓度为3%。In the step T2, the quenching medium is brine, and the concentration of the brine is 3%.

所述步骤T2中,预冷的目的是缓解活塞的应力,避免应力集中。In the step T2, the purpose of pre-cooling is to relieve the stress of the piston and avoid stress concentration.

步骤T2中,采用盐水作为淬火介质进行淬火时,容易得到较高的硬度和光洁的表面,不容易产生淬不硬的软点,并且在淬火前将毛坯产品进行预冷,能够缓解活塞的应力,避免应力集中,进而防止工件变形严重,造成开裂的问题。In step T2, when brine is used as the quenching medium for quenching, it is easy to obtain a higher hardness and a smooth surface, and it is not easy to produce soft spots that are not hardened, and pre-cooling the blank product before quenching can relieve the stress of the piston. , to avoid stress concentration, thereby preventing serious deformation of the workpiece, resulting in cracking problems.

并且通过该淬火工序,能够提高活塞的硬度,强度和耐磨性,为后道热处理作好组织准备。And through the quenching process, the hardness, strength and wear resistance of the piston can be improved to prepare the structure for the subsequent heat treatment.

T3、硝盐浴:将淬火完成的毛坯产品装入硝盐炉内进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时。T3. Nitrate bath: the quenched blank product is loaded into a nitrate furnace for nitrate bath, wherein the temperature of the nitrate bath is 230°C; the holding time of the nitrate bath is 4 hours.

步骤T3中,通过硝盐浴处理,能够使活塞获得优良的淬火组织,并且能够降低淬火变形,减小活塞开裂的趋势,进而提高活塞的使用寿命。In step T3, through the nitrate bath treatment, the piston can obtain an excellent quenched structure, and can reduce the quenching deformation, reduce the tendency of the piston to crack, and further improve the service life of the piston.

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品装入低温回火炉中进行第一次低温回火,其中回火温度为230℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温。T4. The first low-temperature tempering: put the blank product treated in the nitrate bath into the low-temperature tempering furnace for the first low-temperature tempering, wherein the tempering temperature is 230°C, and the tempering holding time is 4 hours. After the secondary tempering treatment was completed, it was cooled to room temperature.

T5、第二次低温回火:将第一次低温回火完成的毛坯产品装入低温回火炉中进行第二次低温回火,其中回火温度为230℃,回火保温时间为4小时,第二次回火处理完成后冷却至室温,最终获得大尺寸液压破碎锤活塞。T5, the second low temperature tempering: put the blank product completed by the first low temperature tempering into the low temperature tempering furnace for the second low temperature tempering, wherein the tempering temperature is 230 ℃, and the tempering holding time is 4 hours. After the second tempering treatment is completed, it is cooled to room temperature, and finally a large-sized hydraulic breaker piston is obtained.

这样设计,采用两次低温回火,能够充分消除活塞淬火时产生的残留应力,防止变形和开裂;并且能够调整活塞的硬度、强度、塑性和韧性,达到使用性能要求;并且还能够稳定组织与尺寸,保证精度。In this way, the use of two low temperature tempering can fully eliminate the residual stress generated when the piston is quenched, prevent deformation and cracking; and can adjust the hardness, strength, plasticity and toughness of the piston to meet the performance requirements; and can also stabilize the structure and size to ensure accuracy.

实施例2:在本实施例中,所述大尺寸液压破碎锤活塞的整体结构与上述实施例1中的整体结构相同。Embodiment 2: In this embodiment, the overall structure of the large-sized hydraulic breaker piston is the same as that in the above-mentioned Embodiment 1.

本实施例2中还公开了一种大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:This embodiment 2 also discloses a manufacturing method of a large-sized hydraulic breaker piston, and the manufacturing method includes the machining steps:

S1、下料:选取符合制造大尺寸液压破碎锤活塞的高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验。S1. Blanking: Select high-carbon alloy steel 9CrV that is suitable for manufacturing large-sized hydraulic breaker pistons for production. 9CrV steel needs to be inspected before entering the factory.

所述原材料的检验步骤与上述实施例1中的检验步骤相同。The inspection steps of the raw materials are the same as those in the above-mentioned Example 1.

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,首先采用车床进行粗车获得粗车毛坯,而后将粗车毛坯采用车床进行精车获得精车毛坯,将精车毛坯采用铣床进行铣削最终获得毛坯产品,毛坯产品的加工标准为直径尺寸公差为-0.085~-0.075mm;表面光洁度为Ra0.2,外径圆度为0.003;圆柱度为0.003,同心度为φ0.005。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker. First, the lathe is used for rough turning to obtain a rough turning blank, and then the rough turning blank is subjected to a lathe for finishing turning to obtain a finishing turning blank, and the finishing turning blank is milled with a milling machine. Finally, a blank product is obtained. The processing standard of the blank product is that the diameter dimensional tolerance is -0.085~-0.075mm; the surface finish is Ra0.2, the outer diameter roundness is 0.003; the cylindricity is 0.003, and the concentricity is φ0.005.

所述该制造方法还包括调质步骤:Said manufacturing method also comprises a tempering step:

T1、加热:将毛坯产品装入井式炉内,其中装炉方式为:吊盘吊装;装炉数量为4支/炉,进行加热时以7℃/min的升温速度升温至820℃,加热炉内维持碳势保护气氛为1%,而后保温5小时,进行保温时,保温温度波动为:±5℃。T1. Heating: Put the blank product into the pit furnace, and the loading method is: hanging plate hoisting; the number of furnaces is 4 pieces/furnace. The carbon potential protective atmosphere in the furnace was maintained at 1%, and then the temperature was kept for 5 hours. During the insulation, the temperature fluctuation of the insulation was: ±5°C.

T2、淬火:将加热保温完成的毛坯产品放在空气中进行预冷,预冷时间为1min,预冷完成后放入浓度为3%的盐水中进行淬火,其中盐水的初始温度为35℃,淬火时间为4min,淬火介质的出水温度为220℃,淬火完成后,毛坯产品的温度为245℃。T2, quenching: put the finished product of heating and heat preservation in the air for pre-cooling, the pre-cooling time is 1min, after the pre-cooling is completed, put it into the brine with a concentration of 3% for quenching, wherein the initial temperature of the brine is 35 ℃, The quenching time is 4 minutes, the outlet temperature of the quenching medium is 220°C, and after the quenching is completed, the temperature of the blank product is 245°C.

T3、硝盐浴:将淬火完成的毛坯产品装入硝盐炉内进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时。T3. Nitrate bath: the quenched blank product is loaded into the nitrate furnace for nitrate bath, wherein the temperature of the nitrate bath is 230°C; the holding time of the nitrate bath is 4 hours.

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品装入低温回火炉中进行第一次低温回火,其中回火温度为230℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温。T4. The first low-temperature tempering: put the blank product treated in the nitrate bath into the low-temperature tempering furnace for the first low-temperature tempering, wherein the tempering temperature is 230°C, and the tempering holding time is 4 hours. After the secondary tempering treatment was completed, it was cooled to room temperature.

T5、第二次低温回火:将第一次低温回火完成的毛坯产品装入低温回火炉中进行第二次低温回火,其中回火温度为350℃,回火保温时间为4小时,第二次回火处理完成后冷却至室温,最终获得大尺寸液压破碎锤活塞。T5, the second low temperature tempering: put the blank product completed by the first low temperature tempering into the low temperature tempering furnace for the second low temperature tempering, wherein the tempering temperature is 350 ℃, and the tempering holding time is 4 hours. After the second tempering treatment is completed, it is cooled to room temperature, and finally a large-sized hydraulic breaker piston is obtained.

这样设计,采用两次低温回火,能够充分消除活塞淬火时产生的残留应力,防止变形和开裂;并且能够调整活塞的硬度、强度、塑性和韧性,达到使用性能要求;并且还能够稳定组织与尺寸,保证精度,并且最后一次采取350℃整体回火,能够让整个活塞在贝氏体中温回火区进行回火。In this way, the use of two low temperature tempering can fully eliminate the residual stress generated when the piston is quenched, prevent deformation and cracking; and can adjust the hardness, strength, plasticity and toughness of the piston to meet the performance requirements; and can also stabilize the structure and The size is guaranteed to ensure accuracy, and the final overall tempering at 350 ° C can allow the entire piston to be tempered in the bainite medium temperature tempering zone.

实施例3:在本实施例中,所述大尺寸液压破碎锤活塞的整体结构与上述实施例1中的整体结构相同。Embodiment 3: In this embodiment, the overall structure of the large-sized hydraulic breaker piston is the same as that in the above-mentioned Embodiment 1.

本实施例3中还公开了一种大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:This embodiment 3 also discloses a method for manufacturing a large-sized hydraulic breaker piston, and the manufacturing method includes the machining steps:

S1、下料:选取符合制造大尺寸液压破碎锤活塞的高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验。S1. Blanking: Select high-carbon alloy steel 9CrV that is suitable for manufacturing large-sized hydraulic breaker pistons for production. 9CrV steel needs to be inspected before entering the factory.

所述原材料的检验步骤与上述实施例1中的检验步骤相同。The inspection steps of the raw materials are the same as those in the above-mentioned Example 1.

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,首先采用车床进行粗车获得粗车毛坯,而后将粗车毛坯采用车床进行精车获得精车毛坯,将精车毛坯采用铣床进行铣削最终获得毛坯产品,毛坯产品的加工标准为直径尺寸公差为-0.085~-0.075mm;表面光洁度为Ra0.2,外径圆度为0.003;圆柱度为0.003,同心度为φ0.005。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker. First, the lathe is used for rough turning to obtain a rough turning blank, and then the rough turning blank is subjected to a lathe for finishing turning to obtain a finishing turning blank, and the finishing turning blank is milled with a milling machine. Finally, a blank product is obtained. The processing standard of the blank product is that the diameter dimensional tolerance is -0.085~-0.075mm; the surface finish is Ra0.2, the outer diameter roundness is 0.003; the cylindricity is 0.003, and the concentricity is φ0.005.

所述该制造方法还包括调质步骤:Said manufacturing method also comprises a tempering step:

T1、加热:将毛坯产品装入井式炉内,其中装炉方式为:吊盘吊装;装炉数量为4支/炉,进行加热时以10℃/min的升温速度升温至850℃,加热炉内维持碳势保护气氛为1.1%,而后保温5小时,进行保温时,保温温度波动为:±5℃。T1. Heating: put the blank product into the pit furnace, and the loading method is: hanging plate hoisting; the number of furnaces is 4 pieces/furnace. The carbon potential protective atmosphere in the furnace is maintained at 1.1%, and then the temperature is kept for 5 hours. When the insulation is performed, the temperature fluctuation of the insulation is: ±5°C.

T2、淬火:将加热保温完成的毛坯产品放在空气中进行预冷,预冷时间为1min,预冷完成后放入浓度为3%的盐水中进行淬火,其中盐水的初始温度为50℃,淬火时间为4min,淬火介质的出水温度为240℃,淬火完成后,毛坯产品的温度为290℃。T2, quenching: put the finished product of heating and heat preservation in the air for pre-cooling, the pre-cooling time is 1min, and after the pre-cooling is completed, put it in brine with a concentration of 3% for quenching, wherein the initial temperature of the brine is 50 ℃, The quenching time is 4min, the outlet temperature of the quenching medium is 240°C, and after the quenching is completed, the temperature of the blank product is 290°C.

T3、硝盐浴:将淬火完成的毛坯产品装入硝盐炉内进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时。T3. Nitrate bath: the quenched blank product is loaded into the nitrate furnace for nitrate bath, wherein the temperature of the nitrate bath is 230°C; the holding time of the nitrate bath is 4 hours.

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品装入低温回火炉中进行第一次低温回火,其中回火温度为300℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温。T4. The first low-temperature tempering: put the blank product after the nitrate bath treatment into the low-temperature tempering furnace for the first low-temperature tempering, wherein the tempering temperature is 300 ° C, and the tempering holding time is 4 hours. After the secondary tempering treatment was completed, it was cooled to room temperature.

T5、第二次低温回火:将第一次低温回火完成的毛坯产品装入低温回火炉中进行第二次低温回火,其中回火温度为350℃,回火保温时间为4小时,第二次回火处理完成后冷却至室温,最终获得大尺寸液压破碎锤活塞。T5, the second low temperature tempering: put the blank product completed by the first low temperature tempering into the low temperature tempering furnace for the second low temperature tempering, wherein the tempering temperature is 350 ℃, and the tempering holding time is 4 hours. After the second tempering treatment is completed, it is cooled to room temperature, and finally a large-sized hydraulic breaker piston is obtained.

这样设计,采用两次低温回火,能够充分消除活塞淬火时产生的残留应力,防止变形和开裂;并且能够调整活塞的硬度、强度、塑性和韧性,达到使用性能要求;并且还能够稳定组织与尺寸,保证精度,并且最后一次采取350℃整体回火,能够让整个活塞在贝氏体中温回火区进行回火。In this way, the use of two low temperature tempering can fully eliminate the residual stress generated when the piston is quenched, prevent deformation and cracking; and can adjust the hardness, strength, plasticity and toughness of the piston to meet the performance requirements; and can also stabilize the structure and The size is guaranteed to ensure accuracy, and the final overall tempering at 350 ° C can allow the entire piston to be tempered in the bainite medium temperature tempering zone.

对照例1:Comparative Example 1:

一种大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:A method of manufacturing a large-sized hydraulic breaker piston, the manufacturing method comprising the steps of machining:

S1、下料:选取高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验,检验步骤与上述实施例1中的检验步骤相同。S1, blanking: select high carbon alloy steel 9CrV for production, 9CrV steel needs to be inspected for raw materials before entering the factory, and the inspection steps are the same as those in the above-mentioned embodiment 1.

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,经粗车、精车、铣削最终获得毛坯产品。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker, and the rough product is finally obtained through rough turning, finishing turning and milling.

所述该制造方法还包括调质步骤:Said manufacturing method also comprises a tempering step:

T1、加热:将毛坯产品装入井式炉内,装炉数量为4支/炉,进行加热时以10℃/min的升温速度升温至850℃,加热炉内维持碳势保护气氛为0.8%,而后保温5小时。T1. Heating: put the blank product into the pit furnace, the number of furnaces is 4 pieces/furnace, and the temperature is raised to 850 °C at a heating rate of 10 °C/min during heating, and the carbon potential protective atmosphere in the heating furnace is maintained at 0.8% , and then incubated for 5 hours.

T2、淬火:将加热保温完成的毛坯产品在空气中预冷1min,预冷完成后放入浓度为3%的盐水中进行淬火,其中盐水的初始温度为20℃,淬火时间为2.5min,淬火介质的出水温度为200℃。T2. Quenching: Pre-cool the finished product after heating and heat preservation in air for 1 min. After the pre-cooling is completed, put it into brine with a concentration of 3% for quenching. The initial temperature of the brine is 20 °C, and the quenching time is 2.5 min. The outlet temperature of the medium is 200°C.

T3、硝盐浴:将淬火完成的毛坯产品装入硝盐炉内进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时。T3. Nitrate bath: the quenched blank product is loaded into the nitrate furnace for nitrate bath, wherein the temperature of the nitrate bath is 230°C; the holding time of the nitrate bath is 4 hours.

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品装入低温回火炉中进行第一次低温回火,其中回火温度为230℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温,最终获得大尺寸液压破碎锤活塞。T4. The first low-temperature tempering: put the blank product treated in the nitrate bath into the low-temperature tempering furnace for the first low-temperature tempering, wherein the tempering temperature is 230°C, and the tempering holding time is 4 hours. After the secondary tempering treatment is completed, it is cooled to room temperature, and finally a large-sized hydraulic breaker piston is obtained.

对照例2:Comparative Example 2:

一种大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:A method of manufacturing a large-sized hydraulic breaker piston, the manufacturing method comprising the steps of machining:

S1、下料:选取高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验,检验步骤与上述实施例1中的检验步骤相同。S1, blanking: select high carbon alloy steel 9CrV for production, 9CrV steel needs to be inspected for raw materials before entering the factory, and the inspection steps are the same as those in the above-mentioned embodiment 1.

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,经粗车、精车、铣削最终获得毛坯产品。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker, and the rough product is finally obtained through rough turning, finishing turning and milling.

所述该制造方法还包括调质步骤:Said manufacturing method also comprises a tempering step:

T1、加热:将毛坯产品装入井式炉内,装炉数量为4支/炉,进行加热时以7℃/min的升温速度升温至800℃,加热炉内维持碳势保护气氛为1%,而后保温5小时。T1. Heating: put the blank product into the pit furnace, the number of furnaces is 4 pieces/furnace, and the temperature is raised to 800 ℃ at a heating rate of 7 ℃/min during heating, and the carbon potential protective atmosphere in the heating furnace is maintained at 1% , and then incubated for 5 hours.

T2、淬火:将加热保温完成的毛坯产品在空气中预冷1min,预冷完成后放入浓度为3%的盐水中进行淬火,其中盐水的初始温度为35℃,淬火时间为4min,淬火介质的出水温度为220℃。T2. Quenching: Pre-cool the finished product after heating and heat preservation in air for 1 min. After the pre-cooling is completed, put it into brine with a concentration of 3% for quenching. The initial temperature of the brine is 35°C, the quenching time is 4min, and the quenching medium The outlet water temperature is 220℃.

T3、硝盐浴:将淬火完成的毛坯产品装入硝盐炉内进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时。T3. Nitrate bath: the quenched blank product is loaded into a nitrate furnace for nitrate bath, wherein the temperature of the nitrate bath is 230°C; the holding time of the nitrate bath is 4 hours.

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品装入低温回火炉中进行第一次低温回火,其中回火温度为400℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温。T4. The first low-temperature tempering: put the blank product after the nitrate bath treatment into the low-temperature tempering furnace for the first low-temperature tempering, wherein the tempering temperature is 400°C, and the tempering holding time is 4 hours. After the secondary tempering treatment was completed, it was cooled to room temperature.

T5、第二次低温回火:将第一次低温回火完成的毛坯产品装入低温回火炉中进行第二次低温回火,其中回火温度为400℃,回火保温时间为4小时,第二次回火处理完成后冷却至室温,最终获得大尺寸液压破碎锤活塞。T5, the second low temperature tempering: put the blank product completed by the first low temperature tempering into the low temperature tempering furnace for the second low temperature tempering, wherein the tempering temperature is 400 ℃, and the tempering holding time is 4 hours. After the second tempering treatment is completed, it is cooled to room temperature, and finally a large-sized hydraulic breaker piston is obtained.

对照例3:Comparative Example 3:

一种大尺寸液压破碎锤活塞的制造方法,该制造方法包括机加工步骤:A method for manufacturing a large-sized hydraulic breaker piston, the manufacturing method comprising the steps of machining:

S1、下料:选取高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验,检验步骤与上述实施例1中的检验步骤相同。S1, blanking: select high carbon alloy steel 9CrV for production, 9CrV steel needs to be inspected for raw materials before entering the factory, and the inspection steps are the same as those in the above-mentioned embodiment 1.

S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,经粗车、精车、铣削最终获得毛坯产品。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker, and the rough product is finally obtained through rough turning, finishing turning and milling.

所述该制造方法还包括调质步骤:Said manufacturing method also comprises a tempering step:

T1、加热:将毛坯产品装入井式炉内,装炉数量为4支/炉,进行加热时以10℃/min的升温速度升温至800℃,加热炉内维持碳势保护气氛为1.1%,而后保温5小时。T1. Heating: put the blank product into the pit furnace, the number of furnaces is 4 pieces/furnace, and the temperature is raised to 800°C at a heating rate of 10°C/min during heating, and the carbon potential protective atmosphere in the heating furnace is maintained at 1.1% , and then incubated for 5 hours.

T2、淬火:将加热保温完成的毛坯产品在空气中预冷1min,预冷完成后放入浓度为3%的盐水中进行淬火,其中盐水的初始温度为50℃,淬火时间为4min,淬火介质的出水温度为240℃。T2. Quenching: Pre-cool the finished product after heating and heat preservation in air for 1 min. After the pre-cooling is completed, put it into brine with a concentration of 3% for quenching. The initial temperature of the brine is 50°C, the quenching time is 4min, and the quenching medium The outlet water temperature is 240℃.

T3、硝盐浴:将淬火完成的毛坯产品装入硝盐炉内进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时。T3. Nitrate bath: the quenched blank product is loaded into a nitrate furnace for nitrate bath, wherein the temperature of the nitrate bath is 230°C; the holding time of the nitrate bath is 4 hours.

T4、第一次低温回火:将硝盐浴处理完成的毛坯产品装入低温回火炉中进行第一次低温回火,其中回火温度为230℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温。T4. The first low-temperature tempering: put the blank product treated in the nitrate bath into the low-temperature tempering furnace for the first low-temperature tempering, wherein the tempering temperature is 230°C, and the tempering holding time is 4 hours. After the secondary tempering treatment was completed, it was cooled to room temperature.

T5、第二次低温回火:将第一次低温回火完成的毛坯产品装入低温回火炉中进行第二次低温回火,其中回火温度为400℃,回火保温时间为4小时,第二次回火处理完成后冷却至室温,最终获得大尺寸液压破碎锤活塞。T5, the second low temperature tempering: put the blank product completed by the first low temperature tempering into the low temperature tempering furnace for the second low temperature tempering, wherein the tempering temperature is 400 ℃, and the tempering holding time is 4 hours. After the second tempering treatment is completed, it is cooled to room temperature, and finally a large-sized hydraulic breaker piston is obtained.

将上述实施例1-3和对照例1-3制备的大尺寸液压破碎锤活塞进行如下性能测试:The large-sized hydraulic breaker pistons prepared in the above-mentioned Examples 1-3 and Comparative Examples 1-3 were subjected to the following performance tests:

1、对实施例1-3和对照例1-3制备的大尺寸液压破碎锤活塞横截面径向不同位置处的拉伸性能进行检测,检测结构如图4-5所示。1. The tensile properties of the large-sized hydraulic breaker pistons prepared in Example 1-3 and Comparative Example 1-3 at different radial positions of the piston cross-section were tested, and the testing structure is shown in Figure 4-5.

2、对实施例1-3和对照例1-3制备的大尺寸液压破碎锤活塞横截面径向不同位置处的硬度进行检测,检测结构如图6所示。2. Detect the hardness at different positions in the radial direction of the piston cross section of the large-size hydraulic breaker prepared in Example 1-3 and Comparative Example 1-3, and the detection structure is shown in Figure 6 .

3、对实施例1-3和对照例1-3制备的大尺寸液压破碎锤活塞横截面径向不同位置处的冲击吸收功进行检测,检测结构如图7所示。3. The impact absorption energy at different positions in the radial direction of the piston cross section of the large-size hydraulic breaker prepared in Example 1-3 and Comparative Example 1-3 was detected, and the detection structure is shown in Figure 7.

4、对实施例1-3和对照例1-3制备的大尺寸液压破碎锤活塞横截面径向不同位置处的残余应力进行检测,检测结构如图8-9所示。4. Detect the residual stress at different radial positions of the piston cross section of the large-size hydraulic breaker prepared in Example 1-3 and Comparative Example 1-3, and the detection structure is shown in Figure 8-9.

经上述检测:采用本发明工艺生产的活塞,其拉伸性能、硬度、冲击吸收功均优于现有技术制造的活塞,进而能够提高活塞的整体结构强度,提高使用寿命和使用效果。After the above detection, the tensile properties, hardness and impact absorption energy of the piston produced by the process of the present invention are better than those of the piston manufactured by the prior art, and then the overall structural strength of the piston can be improved, and the service life and use effect can be improved.

对于本领域的普通技术人员而言,根据本发明的教导,在不脱离本发明的原理与精神的情况下,对实施方式所进行的改变、修改、替换和变型仍落入本发明的保护范围之内。For those of ordinary skill in the art, according to the teachings of the present invention, without departing from the principle and spirit of the present invention, changes, modifications, substitutions and alterations to the embodiments still fall within the protection scope of the present invention within.

Claims (10)

1.一种大尺寸液压破碎锤活塞,其特征在于:该活塞包括采用高碳合金钢9CrV制成的活塞基体(1),活塞基体(1)经过调质处理制成;活塞基体(1)的一端面上开设有圆形沉孔(2)。1. A large-sized hydraulic breaker piston, characterized in that: the piston comprises a piston base (1) made of high-carbon alloy steel 9CrV, and the piston base (1) is made by quenching and tempering; the piston base (1) A circular counterbore (2) is opened on one end face of the . 2.根据权利要求1所述的一种大尺寸液压破碎锤活塞,其特征在于:该活塞的表面硬度为:57-63HRC;超声波探伤≤2级。2. A large-sized hydraulic breaker piston according to claim 1, characterized in that: the surface hardness of the piston is: 57-63HRC; ultrasonic flaw detection≤grade 2. 3.根据权利要求2所述的一种大尺寸液压破碎锤活塞,其特征在于:所述活塞基体(1)的外表面上靠近具有圆形沉孔(2)一端面的位置处布设有依次一体连接的第一过度段(3)、第二过度段(4)和第三过度段(5)。3. A large-sized hydraulic breaker piston according to claim 2, characterized in that: on the outer surface of the piston base (1), a position close to one end face of the circular counterbore (2) is arranged in sequence. The first transition section (3), the second transition section (4) and the third transition section (5) are integrally connected. 4.如权利要求1-3任一项所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:该制造方法包括机加工步骤:4. The manufacturing method of a large-sized hydraulic breaker piston according to any one of claims 1-3, wherein the manufacturing method comprises the machining steps: S1、下料:选取符合制造大尺寸液压破碎锤活塞的高碳合金钢9CrV进行生产,9CrV钢入厂前需对原材料进行检验;S1. Blanking: Select high-carbon alloy steel 9CrV that is suitable for manufacturing large-sized hydraulic breaker pistons for production. 9CrV steel needs to be inspected before entering the factory; S2、按照大尺寸液压破碎锤活塞的整体尺寸进行机加工,最终获得毛坯产品。S2. Machining is carried out according to the overall size of the piston of the large-sized hydraulic breaker, and finally a blank product is obtained. 5.根据权利要求4所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:该制造方法还包括调质步骤:5. The manufacturing method of a large-sized hydraulic breaker piston according to claim 4, characterized in that: the manufacturing method further comprises a conditioning step: T1、加热:将毛坯产品装入加热炉内,进行加热时以5-10℃/min的升温速度升温至820-850℃,加热炉内维持碳势保护气氛为0.8-1.1%,而后保温5小时;T1. Heating: Put the blank product into the heating furnace, and heat it up to 820-850 °C at a heating rate of 5-10 °C/min. The carbon potential protective atmosphere in the heating furnace is maintained at 0.8-1.1%, and then kept for 5 Hour; T2、淬火:将加热保温完成的毛坯产品放在空气中进行预冷1min,预冷完成后放入淬火介质中进行淬火,淬火时间为2.5-4min,淬火完成后,毛坯产品的温度为200-290℃;T2. Quenching: Put the finished product in the air for pre-cooling for 1min. After the pre-cooling is completed, put it into the quenching medium for quenching. The quenching time is 2.5-4min. 290℃; T3、硝盐浴:将淬火完成的毛坯产品进行硝盐浴,其中硝盐浴温度为230℃;硝盐浴保温时间为4小时;T3. Nitrate bath: the quenched blank product is subjected to a nitrate bath, wherein the nitrate bath temperature is 230°C; the nitrate bath holding time is 4 hours; T4、第一次低温回火:将硝盐浴处理完成的毛坯产品进行第一次低温回火,回火温度为230-300℃,回火保温时间为4小时,第一次回火处理完成后冷却至室温;T4. The first low-temperature tempering: the first low-temperature tempering is performed on the blank product after the nitrate bath treatment, the tempering temperature is 230-300 ° C, the tempering holding time is 4 hours, and the first tempering treatment is completed After cooling to room temperature; T5、第二次低温回火:将第一次低温回火完成的毛坯产品进行第二次低温回火,其中回火温度为230-350℃,回火保温时间为4小时,冷却至室温,最终获得大尺寸液压破碎锤活塞。T5. The second low temperature tempering: the first low temperature tempering completed blank product is subjected to the second low temperature tempering, wherein the tempering temperature is 230-350 ° C, the tempering holding time is 4 hours, and the temperature is cooled to room temperature. Finally, a large size hydraulic breaker piston is obtained. 6.根据权利要求5所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:步骤22中,毛坯产品生产完成后,毛坯产品的加工标准为直径尺寸公差为-0.085~-0.075mm;表面光洁度为Ra0.2,外径圆度为0.003;圆柱度为0.003,同心度为φ0.005。6. The method for manufacturing a large-sized hydraulic breaker piston according to claim 5, wherein in step 22, after the production of the blank product is completed, the processing standard of the blank product is that the diameter dimensional tolerance is -0.085~-0.075 mm; the surface finish is Ra0.2, the outer diameter roundness is 0.003; the cylindricity is 0.003, and the concentricity is φ0.005. 7.根据权利要求6所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:步骤T1中,加热炉采用的是井式炉,其中装炉方式为:吊盘吊装;装炉数量为4-6支/炉。7. The method for manufacturing a large-sized hydraulic breaker piston according to claim 6, characterized in that: in step T1, the heating furnace adopts a well-type furnace, and the furnace loading method is: hoisting on a hanging plate; loading furnace The quantity is 4-6 pieces/furnace. 8.根据权利要求7所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:步骤T1中,进行保温时,保温温度波动为:±5℃。8 . The method for manufacturing a large-sized hydraulic breaker piston according to claim 7 , wherein in step T1 , when heat preservation is performed, the fluctuation of the heat preservation temperature is ±5° C. 9 . 9.根据权利要求8所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:步骤T2中,淬火介质的初始温度为20-50℃,淬火介质的出水温度为200-240℃。9 . The method for manufacturing a large-sized hydraulic breaker piston according to claim 8 , wherein in step T2 , the initial temperature of the quenching medium is 20-50° C., and the outlet temperature of the quenching medium is 200-240° C. 10 . . 10.根据权利要求9所述的一种大尺寸液压破碎锤活塞的制造方法,其特征在于:步骤T2中,淬火介质为盐水,且盐水的浓度为3%。10 . The method for manufacturing a large-sized hydraulic breaker piston according to claim 9 , wherein in step T2 , the quenching medium is brine, and the concentration of the brine is 3%. 11 .
CN202210333102.XA 2022-03-31 2022-03-31 A large-size hydraulic breaker piston and its manufacturing method Active CN114673787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210333102.XA CN114673787B (en) 2022-03-31 2022-03-31 A large-size hydraulic breaker piston and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210333102.XA CN114673787B (en) 2022-03-31 2022-03-31 A large-size hydraulic breaker piston and its manufacturing method

Publications (2)

Publication Number Publication Date
CN114673787A true CN114673787A (en) 2022-06-28
CN114673787B CN114673787B (en) 2025-03-14

Family

ID=82075735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210333102.XA Active CN114673787B (en) 2022-03-31 2022-03-31 A large-size hydraulic breaker piston and its manufacturing method

Country Status (1)

Country Link
CN (1) CN114673787B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117802446A (en) * 2024-03-01 2024-04-02 山东天瑞重工有限公司 Heat treatment process method of low-carbon high-alloy structural steel and hydraulic breaking hammer piston

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695429U (en) * 2010-04-19 2011-01-05 合肥滨海工程机械有限公司 Novel hydraulic-nitrogen joint action breaking hammer
CN102796964A (en) * 2011-10-10 2012-11-28 江苏力博士机械股份有限公司 Novel material of piston of breaking hammer and manufacturing process of piston
CN102818018A (en) * 2012-08-03 2012-12-12 烟台艾迪精密机械股份有限公司 Impact piston and hydraulic breaking hammer with same
CN107989107A (en) * 2017-10-31 2018-05-04 山东天瑞重工有限公司 Hydraulic shock quartering hammer with fluid pressure support piston function
CN111120651A (en) * 2019-12-30 2020-05-08 台州贝力特机械有限公司 Piston for breaking hammer and manufacturing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695429U (en) * 2010-04-19 2011-01-05 合肥滨海工程机械有限公司 Novel hydraulic-nitrogen joint action breaking hammer
CN102796964A (en) * 2011-10-10 2012-11-28 江苏力博士机械股份有限公司 Novel material of piston of breaking hammer and manufacturing process of piston
CN102818018A (en) * 2012-08-03 2012-12-12 烟台艾迪精密机械股份有限公司 Impact piston and hydraulic breaking hammer with same
CN107989107A (en) * 2017-10-31 2018-05-04 山东天瑞重工有限公司 Hydraulic shock quartering hammer with fluid pressure support piston function
CN111120651A (en) * 2019-12-30 2020-05-08 台州贝力特机械有限公司 Piston for breaking hammer and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117802446A (en) * 2024-03-01 2024-04-02 山东天瑞重工有限公司 Heat treatment process method of low-carbon high-alloy structural steel and hydraulic breaking hammer piston

Also Published As

Publication number Publication date
CN114673787B (en) 2025-03-14

Similar Documents

Publication Publication Date Title
KR102516710B1 (en) A type of steel for wind turbine main shaft bearing and manufacturing method
CN108517461B (en) High-performance martensitic stainless steel flange and manufacturing method thereof
CN102766751B (en) Process method for quenching rotary support gear
CN114134400B (en) Steel for large-size high-strength high-toughness oil well drill bit and preparation method thereof
CN109706449B (en) Coating material for repairing main bearing of shield tunneling machine and process method
CN103223577A (en) Anti-fatigue manufacturing method of spiral bevel gear
CN106811580A (en) A kind of annealing process of H13 hot die steels
CN105252230A (en) Machining process for inclined tee
CN105543451A (en) Heat treatment method for inlaid backup roll sleeve
CN101966645A (en) Production method for high-precision rolling ball screw
CN112536406B (en) Forging drawing method for avoiding surface cracking
CN102010973A (en) Simple method for deformation control during carburizing and quenching of large-diameter heavy-duty gears
CN114673787A (en) A large-sized hydraulic breaker piston and its manufacturing method
CN110791619A (en) Large-diameter forged grinding ball for mine and preparation process thereof
CN105506647A (en) Heat treatment production process of super-tough low-carbon steel screws
CN109439861B (en) Heat treatment method of martensite precipitation hardening stainless steel part
CN110923547A (en) Chromium-nickel-molybdenum austenitic stainless steel flange for fast reactor nuclear power station and manufacturing method thereof
CN110940545B (en) A sampling method for quality inspection of penetrating piece heads
CN112496216B (en) Forging production process of 30Cr15MoN high-nitrogen martensitic stainless steel bar
CN110227914B (en) High-precision machining method for gear shaft of high-speed wire finishing mill
CN111589874B (en) Combined roller manufactured in environment-friendly mode and manufacturing method thereof
CN112941410A (en) Method for controlling alpha phase content in austenitic stainless steel
CN103103920B (en) Manufacturing method for tempering cable clip applied to suspension bridge
CN109182896B (en) 175MPa movable elbow material and heat treatment process
CN111842533A (en) A kind of production method of high-strength and high-toughness precision steel pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant