CN114575605A - Building engineering pours device with mud of building a wall - Google Patents
Building engineering pours device with mud of building a wall Download PDFInfo
- Publication number
- CN114575605A CN114575605A CN202210214613.XA CN202210214613A CN114575605A CN 114575605 A CN114575605 A CN 114575605A CN 202210214613 A CN202210214613 A CN 202210214613A CN 114575605 A CN114575605 A CN 114575605A
- Authority
- CN
- China
- Prior art keywords
- slurry
- mud
- pouring device
- fixedly connected
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/20—Tools or apparatus for applying mortar
- E04G21/204—Mortar sledges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明专利涉及一种建筑工程用砌墙泥浆浇筑装置,属于建筑技术领域。The patent of the present invention relates to a mortar pouring device for masonry walls used in construction projects, which belongs to the technical field of construction.
背景技术Background technique
在砖体建筑砌墙过程中,需要在每一层抹上泥浆,用来填充砖体之间的空隙以及连接顶部的砖体,只有将砖体间的缝隙充分填充,墙体才能牢固稳定。In the process of building brick walls, it is necessary to apply mud on each layer to fill the gaps between the bricks and connect the bricks at the top. Only when the gaps between the bricks are fully filled can the wall be firm and stable.
目前的砌墙方式依旧采用较为传统的手工方式,这种方式费时费力,在高强度作业下容易使施工人员疲惫,影响工作效率。The current method of laying walls still adopts the more traditional manual method, which is time-consuming and labor-intensive, and it is easy to make construction workers tired under high-intensity operations and affect work efficiency.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种建筑工程用砌墙泥浆浇筑装置,以解决上述技术问题。The purpose of the present invention is to provide a wall-laying mud pouring device for building engineering, so as to solve the above-mentioned technical problems.
为实现上述目的本发明采用以下技术方案:For achieving the above object, the present invention adopts the following technical solutions:
一种建筑工程用砌墙泥浆浇筑装置,包括移动浇筑装置、泥浆限位工具、泥浆倒入槽、防溢板、墙体卡接板、调整螺栓、浇筑装置移动槽,所述移动浇筑装置左侧安装有泥浆限位工具,所述泥浆倒入槽开设在泥浆限位工具内侧,所述防溢板固定连接在泥浆限位工具左侧,两个墙体卡接板通过两个调整螺栓分别安装在泥浆限位工具前端两侧,所述浇筑装置移动槽开设在泥浆限位工具右侧。A masonry wall mud pouring device for construction engineering, comprising a mobile pouring device, a mud limiting tool, a mud pouring groove, an overflow prevention plate, a wall clamping plate, an adjustment bolt, and a pouring device moving groove, the mobile pouring device is left. A mud limiting tool is installed on the side, the mud pouring groove is opened on the inner side of the mud limiting tool, the overflow prevention plate is fixedly connected to the left side of the mud limiting tool, and the two wall clamping plates are respectively connected by two adjusting bolts. It is installed on both sides of the front end of the mud limiting tool, and the moving groove of the pouring device is opened on the right side of the mud limiting tool.
在上述技术方案基础上,所述移动浇筑装置包括移动支撑平台、移动轮、升降底座、垂直升降杆、工作平台,所述移动支撑平台两侧分别安装有四个移动轮,四个所述升降底座等距固定连接在移动支撑平台顶部,所述垂直升降杆安装在升降底座内部,所述工作平台固定连接在四条垂直升降杆顶部。On the basis of the above technical solution, the mobile pouring device includes a mobile support platform, a mobile wheel, a lifting base, a vertical lifting rod, and a working platform. Four mobile wheels are respectively installed on both sides of the mobile support platform. The base is equidistantly connected to the top of the mobile support platform, the vertical lifting rods are installed inside the lifting base, and the working platform is fixedly connected to the tops of the four vertical lifting rods.
在上述技术方案基础上,所述工作平台包括安装平台、升降控制器、移动推杆、动力供能管、蓄电池、供能管导线、轮轴、倒浆移动轮、抹平板固定支架、支架螺丝、抹平板、倒浆装置支撑架、倒浆装置,所述安装平台右侧后方安装有升降控制器,所述移动推杆固定连接在升降控制器后方,所述动力供能管固定连接在安装平台前端正面,所述蓄电池固定连接在安装平台顶部前端,所述供能管导线安装在动力供能管和蓄电池之间,两个所述轮轴等距安装在安装平台左侧,所述倒浆移动轮安装在轮轴左侧,两个所述抹平板固定支架固定连接在安装平台顶部前端左侧,所述抹平板通过四个支架螺丝螺栓连接在两个抹平板固定支架之间,所述倒浆装置支架固定连接在安装平台顶部后方,所述倒浆装置固定连接在倒浆装置支架顶部。On the basis of the above technical solutions, the working platform includes an installation platform, a lift controller, a moving push rod, a power supply tube, a battery, an energy supply tube wire, an axle, a slurry pouring moving wheel, a troweling plate fixing bracket, bracket screws, and a troweling plate. , the support frame of the pulping device, the pulping device, the lifting controller is installed behind the right side of the installation platform, the moving push rod is fixedly connected to the rear of the lifting controller, and the power supply pipe is fixedly connected to the front of the installation platform. The battery is fixedly connected to the top front end of the installation platform, the energy supply pipe wire is installed between the power supply pipe and the battery, the two wheel axles are installed at the left side of the installation platform at an equal distance, and the slurry pouring moving wheel is installed on the left side of the wheel axle. side, the two trowel fixing brackets are fixedly connected to the left side of the top front end of the installation platform, the troweling plate is connected between the two troweling plate fixing brackets through four bracket screws and bolts, and the slurry pouring device bracket is fixedly connected to Behind the top of the installation platform, the slurry pouring device is fixedly connected to the top of the slurry pouring device bracket.
在上述技术方案基础上,所述倒浆装置包括出浆筒、存浆罐、进浆口、阀门控制板、控制板导线、出浆阀门、信号接收器、信号导线、出浆口,所述出浆筒后方固定连接有存浆罐,所述进浆口开设在存浆罐顶部,所述阀门控制板固定连接在存浆罐左侧,所述控制板导线安装在阀门控制板底部,所述出浆阀门开设在出浆筒中心前端,所述信号接收器安装在出浆阀门左侧中心处,所述信号导线安装在阀门控制板与信号接收器之间,所述出浆口开设在出浆筒前端。On the basis of the above technical solutions, the slurry pouring device includes a slurry outlet, a slurry storage tank, a slurry inlet, a valve control board, a control board lead, a slurry valve, a signal receiver, a signal lead, and a slurry outlet. A slurry storage tank is fixedly connected to the back of the slurry outlet, the slurry inlet is opened on the top of the slurry storage tank, the valve control board is fixedly connected to the left side of the slurry storage tank, and the control board wire is installed at the bottom of the valve control board, so The slurry valve is opened at the front end of the center of the slurry cylinder, the signal receiver is installed at the center of the left side of the slurry valve, the signal wire is installed between the valve control board and the signal receiver, and the slurry outlet is opened at the The front end of the pulp drum.
与现有技术相比,本发明具有以下优点:本发明针对砌墙作业的工序,设计了装置工作结构,使泥浆浇筑抹平工作由机械完成,替代了传统的人工抹平工作,减轻了工人的作业难度,提高了泥浆浇筑效率。Compared with the prior art, the present invention has the following advantages: the present invention designs a device working structure for the process of laying walls, so that the mud pouring and leveling work is completed by machinery, which replaces the traditional manual leveling work and reduces the labor costs of workers. The operation difficulty is improved, and the mud pouring efficiency is improved.
附图说明Description of drawings
图1为本发明外观结构示意图。Figure 1 is a schematic diagram of the appearance structure of the present invention.
图2为本发明移动浇筑装置结构示意图。FIG. 2 is a schematic structural diagram of the mobile pouring device of the present invention.
图3为本发明工作平台结构示意图。FIG. 3 is a schematic structural diagram of the working platform of the present invention.
图4为本发明倒浆装置结构示意图。FIG. 4 is a schematic structural diagram of the slurry pouring device of the present invention.
图中:1.移动浇筑装置,2.泥浆限位工具,3.泥浆倒入槽,4.防溢板,5.墙体卡接板,6.调整螺栓,7.浇筑装置移动槽,8.移动支撑平台,9.移动轮,10.升降底座,11.垂直升降杆,12.工作平台,13.安装平台,14.升降控制器,15.移动推杆,16.动力供能管,17.蓄电池,18.供能管导线,19.轮轴,20.倒浆移动轮,21.抹平板固定支架,22.支架螺丝,23.抹平板,24.倒浆装置支撑架,25.倒浆装置,26.出浆筒,27.存浆罐,28.进浆口,29.阀门控制板,30.控制板导线,31.出浆阀门,32.信号接收器,33.信号导线,34.出浆口。In the picture: 1. Mobile pouring device, 2. Mud limit tool, 3. Mud pouring groove, 4. Anti-overflow plate, 5. Wall clipping plate, 6. Adjusting bolt, 7. Moving groove of pouring device, 8 .Mobile supporting platform, 9.Moving wheel, 10.Lifting base, 11.Vertical lifting rod, 12.Working platform, 13.Installing platform, 14.Lifting controller, 15.Moving push rod, 16.Power supply tube, 17 .battery, 18. power supply tube wire, 19. wheel axle, 20. slurry pouring moving wheel, 21. trowel fixing bracket, 22. bracket screw, 23. troweling plate, 24. slurry pouring device support frame, 25. slurry pouring device , 26. Slurry drum, 27. Slurry tank, 28. Slurry inlet, 29. Valve control board, 30. Control board wire, 31. Slurry valve, 32. Signal receiver, 33. Signal wire, 34. Pulp outlet.
具体实施方式Detailed ways
下面结合附图和具体实施例对本发明作进一步详细阐述。The present invention will be further elaborated below in conjunction with the accompanying drawings and specific embodiments.
如图1-4所示,一种建筑工程用砌墙泥浆浇筑装置,包括移动浇筑装置1、泥浆限位工具2、泥浆倒入槽3、防溢板4、墙体卡接板5、调整螺栓6、浇筑装置移动槽7,所述移动浇筑装置1左侧安装有泥浆限位工具2,所述泥浆倒入槽3开设在泥浆限位工具2内侧,所述防溢板4固定连接在泥浆限位工具2左侧,两个墙体卡接板5通过两个调整螺栓6分别安装在泥浆限位工具2前端两侧,所述浇筑装置移动槽7开设在泥浆限位工具2右侧。As shown in Figures 1-4, a wall-laying mud pouring device for construction engineering includes a mobile pouring device 1, a
所述移动浇筑装置1包括移动支撑平台8、移动轮9、升降底座10、垂直升降杆11、工作平台12,所述移动支撑平台8两侧分别安装有四个移动轮9,四个所述升降底座10等距固定连接在移动支撑平台8顶部,所述垂直升降杆11安装在升降底座10内部,所述工作平台12固定连接在四条垂直升降杆11顶部。The mobile pouring device 1 includes a mobile supporting
所述工作平台12包括安装平台13、升降控制器14、移动推杆15、动力供能管16、蓄电池17、供能管导线18、轮轴19、倒浆移动轮20、抹平板固定支架21、支架螺丝22、抹平板23、倒浆装置支撑架24、倒浆装置25,所述安装平台13右侧后方安装有升降控制器14,所述移动推杆15固定连接在升降控制器14后方,所述动力供能管16固定连接在安装平台13前端正面,所述蓄电池17固定连接在安装平台13顶部前端,所述供能管导线18安装在动力供能管16和蓄电池17之间,两个所述轮轴19等距安装在安装平台13左侧,所述倒浆移动轮20安装在轮轴19左侧,两个所述抹平板固定支架21固定连接在安装平台13顶部前端左侧,所述抹平板23通过四个支架螺丝22螺栓连接在两个抹平板固定支架21之间,所述倒浆装置支架24固定连接在安装平台13顶部后方,所述倒浆装置25固定连接在倒浆装置支架24顶部。The
所述倒浆装置25包括出浆筒26、存浆罐27、进浆口28、阀门控制板29、控制板导线30、出浆阀门31、信号接收器32、信号导线33、出浆口34,所述出浆筒26后方固定连接有存浆罐27,所述进浆口28开设在存浆罐27顶部,所述阀门控制板29固定连接在存浆罐27左侧,所述控制板导线30安装在阀门控制板29底部,所述出浆阀门31开设在出浆筒26中心前端,所述信号接收器32安装在出浆阀门31左侧中心处,所述信号导线33安装在阀门控制板29与信号接收器32之间,所述出浆口34开设在出浆筒26前端。The
本发明的工作原理:本发明在使用时将泥浆通过进浆口倒入到存浆罐内,根据需要利用升降杆调整工作平台高度,将泥浆限位工具通过卡接板固定在砖体上方,使泥浆倒入槽位于砖体上方,通过控制出浆阀门对泥浆倒入槽进行泥浆浇筑,并移动工作平台,利用抹平板对泥浆进行抹平作业,反复上述步骤,以达到泥浆浇筑、抹平目的。The working principle of the present invention: when the present invention is in use, the mud is poured into the mud storage tank through the mud inlet, the height of the working platform is adjusted by the lifting rod according to the needs, and the mud limiting tool is fixed above the brick body through the clamping plate, Make the mud pouring groove located above the brick body, control the mud pouring valve to pour the mud into the mud pouring groove, move the working platform, use the trowel to smooth the mud, and repeat the above steps to achieve the mud pouring and smoothing. Purpose.
以上所述为本发明较佳实施例,对于本领域的普通技术人员而言,根据本发明的教导,在不脱离本发明的原理与精神的情况下,对实施方式所进行的改变、修改、替换和变型仍落入本发明的保护范围之内。The above are preferred embodiments of the present invention. For those of ordinary skill in the art, according to the teachings of the present invention, without departing from the principles and spirit of the present invention, changes, modifications, Substitutions and modifications still fall within the scope of the present invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210214613.XA CN114575605A (en) | 2022-03-07 | 2022-03-07 | Building engineering pours device with mud of building a wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210214613.XA CN114575605A (en) | 2022-03-07 | 2022-03-07 | Building engineering pours device with mud of building a wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114575605A true CN114575605A (en) | 2022-06-03 |
Family
ID=81779032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210214613.XA Withdrawn CN114575605A (en) | 2022-03-07 | 2022-03-07 | Building engineering pours device with mud of building a wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114575605A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118441891A (en) * | 2024-04-30 | 2024-08-06 | 青岛飞宇昌兴智能化工程有限公司 | Intelligent control-based steel-concrete structure building rapid pouring system |
-
2022
- 2022-03-07 CN CN202210214613.XA patent/CN114575605A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118441891A (en) * | 2024-04-30 | 2024-08-06 | 青岛飞宇昌兴智能化工程有限公司 | Intelligent control-based steel-concrete structure building rapid pouring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN213055281U (en) | Mould for building prefabricated member | |
CN108505645B (en) | CL composite concrete shear wall cast-in-place construction method | |
CN201202281Y (en) | Vibrating formwork walling machine | |
CN114575605A (en) | Building engineering pours device with mud of building a wall | |
CN113417455B (en) | Self-reinforcing supporting rod for slip form construction | |
CN204589767U (en) | A kind of automatic leveling system for pitch core wall paver | |
CN110385778A (en) | A kind of PC assembled architecture pours device with building block | |
CN101265704B (en) | Underground cast-in-place concrete structure outer wall neck construction method | |
CN106522569A (en) | Aggregated building prefabricated construction floor combined leveling device and leveling method thereof | |
CN213449568U (en) | Cement paste trowelling machine for masonry | |
CN210887980U (en) | Embedded leveling support and leveling construction tool for ground concrete | |
CN213710355U (en) | Construction pouring plate structure | |
CN211227982U (en) | Rear concrete sliding die | |
CN209854513U (en) | Town road curb mounting structure and construction equipment | |
CN107351233A (en) | A kind of wallboard production mould and wallboard process units | |
CN218398124U (en) | A water slope maintenance manipulator | |
CN207189932U (en) | A kind of wallboard production mould and wallboard process units | |
CN218149883U (en) | Concrete floating device for building construction | |
CN206245766U (en) | Glomeration builds prefabricated construction flooring combined type leveling unit | |
CN219993192U (en) | Wall building auxiliary device | |
CN2646279Y (en) | Hydraulic vibration type mechanical float | |
CN221878678U (en) | Automatic plastering and leveling device for vertical wall panels | |
CN2818651Y (en) | Lime slice | |
CN221912487U (en) | A prefabricated column grouting and sealing steel mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20220603 |
|
WW01 | Invention patent application withdrawn after publication |