CN114571589A - Autoclaved aerated concrete plate and building block production line - Google Patents

Autoclaved aerated concrete plate and building block production line Download PDF

Info

Publication number
CN114571589A
CN114571589A CN202011365702.1A CN202011365702A CN114571589A CN 114571589 A CN114571589 A CN 114571589A CN 202011365702 A CN202011365702 A CN 202011365702A CN 114571589 A CN114571589 A CN 114571589A
Authority
CN
China
Prior art keywords
piece
section
machine
floor
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011365702.1A
Other languages
Chinese (zh)
Inventor
刘洪斌
林忠材
李稳
林明星
张�林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tianyi Machinery Co ltd
Original Assignee
Shandong Tianyi Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tianyi Machinery Co ltd filed Critical Shandong Tianyi Machinery Co ltd
Priority to CN202011365702.1A priority Critical patent/CN114571589A/en
Publication of CN114571589A publication Critical patent/CN114571589A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

一种蒸压加气混凝土板材与砌块生产线,包含原材料处理工段,布置在原材料堆场旁边,包括三仓料斗、皮带输送机等设备;钢筋网笼制作工段,布置在静停室的二楼楼面,包含钢筋校直切断机、自动网片焊机等设备;配料浇注工段,包含浇注摆渡车、浇注搅拌机等设备;静停养护工段,布置在一楼静停室内,包括定位装置、模具车等设备;切割工段包括翻转吊机、切割小车等设备;编组蒸养工段,布置在一楼,包括蒸养车回程牵引机、进釜摆渡车等设备;成品处理工段,布置在釜后区域,包括出釜摆渡车、成品分垛吊机等设备。该种蒸压加气混凝土板材与砌块生产线的工艺布置具有占地面积小,节约土地资源,自动化程度高等特点,切实提高投资者的回报率。

Figure 202011365702

An autoclaved aerated concrete plate and block production line, including a raw material processing section, arranged next to the raw material storage yard, including equipment such as a three-silo hopper, a belt conveyor, etc.; a steel mesh cage production section, arranged on the second floor of a static stop room Floor, including steel bar straightening and cutting machine, automatic mesh welding machine and other equipment; batching and pouring section, including pouring shuttle car, pouring mixer and other equipment; static stop maintenance section, arranged in the static stop room on the first floor, including positioning device, mold The cutting section includes equipment such as turning cranes, cutting trolleys, etc.; the steaming and curing section is arranged on the first floor, including the return tractor of the steaming and curing car, the ferry car into the kettle and other equipment; the finished product processing section is arranged in the area behind the kettle. Including the kettle ferry, finished product stacking crane and other equipment. The process layout of the autoclaved aerated concrete plate and block production line has the characteristics of small footprint, land resource saving and high degree of automation, which effectively improves the return rate of investors.

Figure 202011365702

Description

一种蒸压加气混凝土板材与砌块生产线An autoclaved aerated concrete slab and block production line

技术领域technical field

本发明涉及建材生产技术领域,更具体地说,涉及一种蒸压加气混凝土板材与砌块的工艺布置方式,特别是一种蒸压加气混凝土板材与砌块生产线。The invention relates to the technical field of building materials production, more particularly, to a process arrangement of autoclaved aerated concrete plates and blocks, in particular to a production line of autoclaved aerated concrete plates and blocks.

背景技术Background technique

目前蒸压加气混凝土板材与砌块在建材领域的应用越来越广泛,随着国家装配式建筑政策的落地,越来越多的生产线建成投产,原有的生产线普遍存在产能低,自动化程度不高,人工成本高等现象,无法满足市场需求,故研发大产能、自动化水平高的生产线满足该市场需求。At present, autoclaved aerated concrete panels and blocks are more and more widely used in the field of building materials. With the implementation of the national prefabricated building policy, more and more production lines have been completed and put into operation. The original production lines generally have low production capacity and a degree of automation. It is not high, and the labor cost is high, which cannot meet the market demand. Therefore, the production line with large capacity and high automation level is developed to meet the market demand.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于已有技术存在的问题提供一种蒸压加气混凝土板材与砌块生产线,解决现有生产线无法满足市场大产能、自动化水平高的需求问题。The purpose of the present invention is to provide an autoclaved aerated concrete plate and block production line based on the problems existing in the prior art, so as to solve the problem that the existing production line cannot meet the needs of large production capacity and high automation level in the market.

本发明通过以下技术方案来达到上述目的:The present invention achieves the above object through the following technical solutions:

为达到上述目的,本发明提供的技术方案为:For achieving the above object, the technical scheme provided by the invention is:

一种蒸压加气混凝土板材与砌块生产线,包含七部分组成:101、原料处理工段、102、钢筋网笼制作工段、103、配料浇注工段、104、静停养护工段、105、切割工段、106、编组蒸养工段、107、成品处理工段。An autoclaved aerated concrete plate and block production line, comprising seven parts: 101, a raw material processing section, 102, a steel mesh cage manufacturing section, 103, a batching pouring section, 104, a static stop and curing section, 105, a cutting section, 106. Group steaming and curing section, 107. Finished product processing section.

该种蒸压加气混凝土板材与砌块生产线整体布局方案中设备放置方式主要为:101、原材料处理工段:布置在原材料堆场旁边,其中包括件1三仓料斗、件2皮带输送机、件3湿式球磨机、件4地坑搅拌装置、件5磨头搅拌罐、件6颚式破碎机、件7石灰块库、件8皮带机、件9干式球磨机、件10石灰粉仓、件11水泥仓;102、钢筋网笼制作工段:布置在静停室的二楼楼面,可以尽最大可能的减少用地面积,件44钢筋校直切断机、件45自动网片焊机、件46鞍架摆渡车、件47鞍架输送机、件48鞍架座、件49鞍架、件50防腐吊机、件51防腐浸渍槽、件52烘干箱、件53插钎机、件54拔钎机、件55浸蜡吊机、件56浸蜡槽;103、配料浇注工段:件12浇注摆渡车放置在一楼,件13浇注搅拌机放置在配料楼二楼,利用势能将料浆注入件16模具车内,件14气泡整理机放置在件16模具车的第二条轨道上;104、静停养护工段:布置在一楼静停室内,其中包括件15定位装置、件16模具车、件17静养摆渡车、件18地面摩擦轮;105、切割工段:其中包括件19翻转吊机、件20切割小车、件22侧面切割机、件23水平切割机、件24垂直切割机、件25切割坑废浆搅拌、件26侧板清理机、件27半成品翻转台、件28半成品堆垛吊机;106、编组蒸养工段:布置在一楼,其中包括件29蒸养车回程牵引机、件30进釜摆渡车、件31入釜牵引机、件32蒸压釜、件33釜前过桥;107、成品处理工段:布置在釜后区域,其中包括件34出釜摆渡车、件35成品分垛吊机、件36固定掰板机、件37掰板输送机、件38单模夹坯机、件39移动并坯机、件40板材输送机、件41托盘发放机、件42旋转夹坯机、件43砌块输送机。In the overall layout plan of the autoclaved aerated concrete plate and block production line, the equipment placement methods are mainly: 101. Raw material processing section: arranged next to the raw material storage yard, including part 1, three silo hoppers, part 2 belt conveyor, part 2 3. Wet ball mill, 4. Pit mixing device, 5. Grinding head mixing tank, 6. Jaw crusher, 7. Lime block storage, 8. Belt conveyor, 9. Dry ball mill, 10. Lime powder silo, 11. Cement silo; 102. Reinforcement mesh cage production section: It is arranged on the second floor of the static parking room, which can reduce the land area as much as possible. Part 44 steel bar straightening and cutting machine, part 45 automatic mesh welding machine, part 46 saddle Ferry car, 47 saddle conveyor, 48 saddle seat, 49 saddle, 50 anti-corrosion crane, 51 anti-corrosion dipping tank, 52 drying box, 53 inserting machine, 54 unplugging Machine, part 55 wax dipping crane, part 56 wax dipping tank; 103. Batching and pouring section: part 12 pouring ferry car is placed on the first floor, part 13 pouring mixer is placed on the second floor of the batching building, using potential energy to inject slurry into part 16 In the mold car, the piece 14 bubble finishing machine is placed on the second track of the piece 16 mold car; 104. Static stop and maintenance section: arranged in the static parking room on the first floor, including the piece 15 positioning device, the piece 16 mold car, the piece 17 Resting ferry car, part 18 Ground friction wheel; 105. Cutting section: including part 19 turning crane, part 20 cutting trolley, part 22 side cutting machine, part 23 horizontal cutting machine, part 24 vertical cutting machine, part 25 cutting Pit waste slurry mixing, piece 26 side plate cleaning machine, piece 27 semi-finished product turning table, piece 28 semi-finished product stacking crane; 106. Group steaming and curing section: arranged on the first floor, including piece 29 steaming and curing vehicle return tractor, piece 30 107. Finished product processing section: arranged in the area behind the autoclave, including 34 out of the autoclave ferry car, 35 finished product points Stacker crane, Piece 36 fixed board breaking machine, Piece 37 board breaking conveyor, Piece 38 Single mold blank clamping machine, Piece 39 Mobile and blank machine, Piece 40 Plate conveyor, Piece 41 Pallet dispenser, Piece 42 Rotary blank clamping Machine, piece 43 block conveyor.

采用本发明提供的技术方案,与已有的公知技术相比,具有如下有益效果:Adopting the technical scheme provided by the present invention, compared with the existing known technology, has the following beneficial effects:

1、该种蒸压加气混凝土板材与砌块生产线占地面积小,节约土地资源;1. This autoclaved aerated concrete plate and block production line occupies a small area and saves land resources;

2、该种蒸压加气混凝土板材与砌块生产线年产量大(40万方砌块或者25万方板材),切实提高投资者的回报率;2. The annual output of this autoclaved aerated concrete plate and block production line is large (400,000 square blocks or 250,000 square plates), which can effectively improve the return rate of investors;

3、该种蒸压加气混凝土板材与砌块生产线自动化程度高,整线操作人员3至5人。3. This kind of autoclaved aerated concrete slab and block production line has a high degree of automation, and the entire line has 3 to 5 operators.

附图说明Description of drawings

图1 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的工艺总布置图;Fig. 1 is a process general layout diagram of an autoclaved aerated concrete plate and block production line according to the present invention;

图2 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的原料处理工段布置图;Fig. 2 is the layout diagram of the raw material processing section of an autoclaved aerated concrete plate and block production line according to the present invention;

图3 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的钢筋网笼制作工段布置图;Fig. 3 is the layout diagram of the steel mesh cage manufacturing section of the autoclaved aerated concrete plate and block production line according to the present invention;

图4 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的配料浇注工段布置图;Fig. 4 is the layout diagram of the batching and pouring section of an autoclaved aerated concrete plate and block production line according to the present invention;

图5 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的静停养护工段布置图;Fig. 5 is the layout diagram of the static stop and curing section of the autoclaved aerated concrete plate and block production line according to the present invention;

图6 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的切割工段布置图;Fig. 6 is a cutting section layout diagram of an autoclaved aerated concrete plate and block production line according to the present invention;

图7 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的编组蒸养工段布置图;Fig. 7 is the arrangement diagram of the marshalling steam curing section of the autoclaved aerated concrete plate and block production line according to the present invention;

图8 为本发明所述的一种蒸压加气混凝土板材与砌块生产线的成品处理工段布置图。FIG. 8 is a layout diagram of a finished product processing section of an autoclaved aerated concrete slab and block production line according to the present invention.

具体实施方式Detailed ways

以下通过附图和实施例对本发明的技术方案作进一步说明。The technical solutions of the present invention will be further described below through the accompanying drawings and embodiments.

如图1、图2所示,原料堆放区存放有砂、石膏、切割废料等硅质材料,装载机将以上原料装载进件1三仓料斗,然后经件2皮带输送机计量后输送到件3湿式球磨机中,同时件5搅拌罐将适量的废浆注入到件3湿式球磨机中,通过件3湿式球磨机制成混合砂浆并通过渣浆泵输送到件5料浆储罐,在件5料浆储罐中储存后,流入件4地坑搅拌装置过渡池并经渣浆泵输送到配料楼二楼的料浆计量称等待注入件13浇注搅拌机内(以前的方案基本上都是从料浆罐输送到配料楼三楼的料浆过渡罐,这样就可以省掉一个过渡搅拌罐),石灰堆放区存放有石灰块,装载机将石灰块载入件6颚式破碎机,破碎后的石灰粒经斗提机送入件7石灰块库,件7石灰块库里的石灰粒经件8皮带机输送到件9干式球磨机,经过球磨以后的石灰粉经斗提机输送到件10石灰粉仓,然后经螺旋输送机输送到石灰粉料计量称等待注入件13浇注搅拌机内,水泥罐车将散装水泥泵送到件11水泥仓内,然后经螺旋输送机输送到水泥粉料计量称等待注入件13浇注搅拌机内。As shown in Figure 1 and Figure 2, the raw material stacking area stores siliceous materials such as sand, gypsum, and cutting waste. The loader loads the above raw materials into the hopper of Part 1 and the third bin, and then conveys them to the parts after being measured by the belt conveyor of Part 2. In the wet ball mill 3, at the same time, the mixing tank of part 5 injects an appropriate amount of waste slurry into the wet ball mill of part 3, and the mixed mortar is produced by the wet ball mill of part 3 and transported to the slurry storage tank of part 5 through the slurry pump. After the slurry is stored in the storage tank, it flows into the transition tank of the pit mixing device in Part 4 and is transported to the slurry metering scale on the second floor of the batching building by the slurry pump, waiting for the injection part 13 to be poured into the mixer (the previous scheme basically started from the slurry. The tank is transported to the slurry transition tank on the third floor of the batching building, so that a transition mixing tank can be saved), lime blocks are stored in the lime stacking area, and the loader loads the lime blocks into the 6 jaw crusher, and the crushed lime The granules are sent to the lime block storage of piece 7 through the bucket elevator, and the lime particles in the lime block warehouse of piece 7 are transported to the dry ball mill of piece 9 through the belt conveyor of piece 8, and the lime powder after ball milling is conveyed to the lime of piece 10 by the bucket elevator. The powder silo is then transported to the lime powder weighing scale by the screw conveyor and waits for injection into the pouring mixer of part 13. The cement tanker pumps the bulk cement to the cement silo in part 11, and then conveys it to the cement powder weighing scale through the screw conveyor and waits. The injection piece 13 is poured into the mixer.

如图4所示,料浆计量称计量好的料浆,石灰、水泥粉料称计量好的石灰和水泥,按顺序加入到件13浇注搅拌机内进行充分搅拌,同时件16模具车由件18地面摩擦轮传动输送到在件13浇注搅拌机下方的件12浇注摆渡车上,待件13浇注搅拌机充分搅拌后,通过其自带的升降式浇注头将料浆注入到件16模具车内,然后件12浇注摆渡车带着件16模具车移动到静养轨道工位,件12浇注摆渡车上的摩擦轮将件16模具车推送到静养轨道工位,此时件14气泡整理机的振动棒下降,对件16模具车内的料浆进行震动,使内部气孔更加均匀,震动完成后,件14气泡整理机的振动棒上升脱离件16模具车,通过件18地面摩擦轮推送到插钎工位。As shown in Figure 4, the slurry is weighed into the metered slurry, and the lime and cement powder are weighed into the metered lime and cement, and are added to the pouring mixer of piece 13 in order for full mixing. The ground friction wheel is driven and conveyed to the part 12 pouring ferry car under the part 13 pouring mixer. After the part 13 pouring mixer is fully stirred, the slurry is injected into the part 16 mold car through its own lifting pouring head, and then The part 12 pouring ferry car and the part 16 mould car are moved to the stationary track station, the friction wheel on the part 12 pouring ferry car pushes the part 16 mold car to the resting track station, and the vibrating bar of the part 14 bubble finishing machine is lowered. , vibrate the slurry in the mold car of part 16 to make the internal pores more uniform. After the vibration is completed, the vibrating rod of the bubble finishing machine of part 14 rises and leaves the mold car of part 16, and is pushed to the inserting station through the ground friction wheel of part 18. .

如图3所示,钢筋通过件44钢筋校直切断机调直切断后,再经过件45钢筋自动网片焊机,将冷拉盘圆后的钢筋焊接成网片,制作好的网片通过件49鞍架和件57钢钎用塑料卡对其进行组装,形成网笼,组装好的件49鞍架、件57钢钎带网笼安放在件48鞍架座上,并通过件47鞍架输送机,输送到件46鞍架摆渡车上,并通过件46鞍架摆渡车运送到件50防腐吊机工位,通过件50防腐吊机将件48鞍架座、件49鞍架、件57钢钎带网笼吊运至件51烘干箱中对网笼进行烘干,烘干完成的网笼被输送至件53插钎机工位,由件53插钎机将件48鞍架座、件49鞍架、件57钢钎带网笼吊运至指定的插钎位置,待静养完成后进入指定的拔钎工位,由件54拔钎机将件48鞍架座、件49鞍架、件57钢钎拔出件16模具车,并将其放在件46鞍架摆渡车上输送到件55浸蜡吊机工位,并通过件55浸蜡吊机件其吊运至件56浸蜡槽内,对件57钢钎进行涂蜡处理,处理完成后由件55浸蜡吊机将其吊运至件47鞍架输送机上然后经件46鞍架摆渡车转运至另一个件47鞍架输送机上进行重新组网笼。As shown in Figure 3, after the steel bars are straightened and cut by the 44 steel bar straightening and cutting machine, and then passed through the 45 steel bar automatic mesh welding machine, the cold drawn and rounded steel bars are welded into mesh pieces, and the prepared mesh pieces pass through The piece 49 saddle and piece 57 steel brazing are assembled with plastic clips to form a mesh cage. The assembled piece 49 saddle and piece 57 steel brazing belt mesh cage are placed on the piece 48 saddle seat, and pass through the piece 47 saddle. The rack conveyor is transported to the piece 46 saddle frame ferry car, and is transported to the piece 50 anti-corrosion crane station through the piece 46 saddle frame ferry car, and the piece 48 saddle frame, the piece 49 saddle frame, the piece 49 saddle frame, Piece 57 steel brazing belt mesh cage is hoisted to piece 51 drying box to dry the mesh cage, and the dried mesh cage is transported to piece 53 inserting machine station, and piece 48 is saddled by piece 53 inserting machine. The frame seat, the piece 49 saddle frame, and the piece 57 steel brazing belt mesh cage are hoisted to the designated brazing position. After the resting is completed, it enters the designated brazing station. 49 saddle frame, piece 57 steel drill pull out the piece 16 mold car, put it on the piece 46 saddle frame ferry car and transport it to the piece 55 wax dipping crane station, and lift it through the piece 55 wax dipping crane. Put the piece 56 in the wax dip tank, and apply wax to the piece 57 steel brazing. After the treatment is completed, the piece 55 wax dipping crane will lift it to the piece 47 saddle conveyor and then transfer it to the other by the piece 46 saddle ferry. A piece of 47 saddle conveyor was used to re-mesh the cage.

如图5所示,件16模具车移动到制定插钎位置,件15定位装置对件16模具车进行定位,此时件53插钎机将件48鞍架座、件49鞍架、件57钢钎带网笼从二楼吊运下降至件16模具车上(此时,件48鞍架座放在件16模具车上,件57钢钎带网笼在件16模具车内),插钎完成后由件18地面摩擦轮将件16模具车推送到件17静养摆渡车上,由其将件16模具车运送至静停室内左右的轨道上,进行静养,待静养完成后,再由件17静养摆渡车将件16模具车运出静养室,进入拔钎工位由件15定位装置对件16模具车进行定位,并等待件54拔钎机进行拔钎处理。As shown in Figure 5, the part 16 mold car moves to the designated inserting position, and the part 15 positioning device positions the part 16 mold car. At this time, the part 53 inserting machine moves the part 48 saddle seat, part 49 saddle, and part 57 The steel brazing belt mesh cage is hoisted and lowered from the second floor to the piece 16 mold car (at this time, the piece 48 saddle is seated on the piece 16 mold car, and the piece 57 steel brazing belt mesh cage is in the piece 16 mold car). After the drilling is completed, the piece 16 mold car is pushed to the piece 17 resting ferry by the piece 18 ground friction wheel, and the piece 16 mold car is transported to the left and right tracks in the static parking room for resting. The piece 17 resting ferry car transports the piece 16 mold car out of the resting room, and enters the pulling and brazing station.

如图6所示,完成拔钎的件16模具车,由件18地面摩擦轮推送至件19翻转吊机工位,由件19翻转吊机将件16模具车吊运并翻转90°放至切割道上件20切割小车上,并完成脱模动作,将件58蒸养底板带坯体留在件20切割小车上(同时将空模箱吊运至件21侧板回程轨道工位与件58蒸养底板进行合模,并将完成合模的件16模具车吊运至空模具回程轨道。由件18地面摩擦轮推送至浇注工位,途径涂油机对件16模具车腔内进行涂油,防止坯体与件16模具车内表面粘连),由其移动经过件22侧面切割机对坯体进行两侧面切割,并对两侧进行切槽处理,继续移动经过件23水平切割机,对坯体进行水平切割以确定制品的高度,再继续移动至件24垂直切割机工位,由其将件58蒸养底板带坯体提升,实现边提升边切割,提高了此工位的切割效率,同时件20切割小车返回件19翻转吊机工位等待下一模坯体,另一辆件20切割小车移动到件24垂直切割机工位,等待坯体切割完成,带着件58蒸养底板及坯体移动到件28半成品堆垛吊机工位,(双切割小车在垂直切割机工位置换,大大提高了切割机组的工作周期)由其将件58蒸养底板带坯体吊运至件27半成品翻转台工位,由其将件58蒸养底板带坯体翻转90°,完成对坯体底皮的去除,然后再翻回90°,由件28半成品堆垛吊机将件58蒸养底板带坯体吊运至件59蒸养车上(一个蒸养车上放置三块蒸养底板),并从件59蒸养车上吊一块件58蒸养底板至件21侧板回程轨道上,由其输送至件19翻转吊机工位,途中经过件26侧板清理机,对件58蒸养底板的表面进行清理,在整个切割过程中产生的废料将全部吊入切割坑内,然后由两侧冲水送入件25切割坑废浆搅拌池内,由渣浆泵将废浆输送至件5料浆罐内待用。As shown in Figure 6, the piece 16 mold car that has completed the brazing is pushed by the piece 18 ground friction wheel to the piece 19 overturning crane station, and the piece 16 mold car is lifted and turned 90° by the piece 19 overturning crane. On the cutting road, the piece 20 is placed on the cutting trolley, and the demoulding action is completed, and the piece 58 is steamed and cured on the cutting trolley of the piece 20. The bottom plate is steamed to close the mold, and the mold car of Part 16 that has been closed is hoisted to the return track of the empty mold. The ground friction wheel of Part 18 is pushed to the pouring station, and the oiler is used to coat the cavity of the mold of Part 16. oil, to prevent the blank from sticking to the inner surface of the mold car of part 16), it moves through the side cutting machine of part 22 to cut both sides of the blank, and carries out grooving treatment on both sides, and continues to move through the horizontal cutting machine of part 23, The blank is horizontally cut to determine the height of the product, and then continues to move to the vertical cutting machine station of the piece 24, which lifts the piece 58 steam-cured bottom plate with the blank to realize cutting while lifting, which improves the cutting of this station. Efficiency, at the same time, the piece 20 cutting trolley returns to the piece 19 and turns over the crane station to wait for the next mold blank, and another piece 20 cutting trolley moves to the piece 24 vertical cutting machine station, waiting for the blank cutting to be completed, with the piece 58 steamed. The curing bottom plate and the blank are moved to the semi-finished product stacking crane station of Piece 28, (the double cutting trolley is changed at the vertical cutting machine position, which greatly improves the working cycle of the cutting unit), and the piece 58 steaming and curing bottom plate with the blank is lifted by it. It is transported to the semi-finished product turning table station of Piece 27, which will turn the steam curing bottom plate of Piece 58 over 90° to complete the removal of the bottom skin of the blank, and then turn it back to 90°, and the semi-finished product stacking crane of Piece 28 will turn it over. Piece 58 steam curing base plate with blank body is hoisted to piece 59 steam curing car (three steam curing base plates are placed on one steam curing car), and one piece 58 steam curing base plate is lifted from piece 59 steam curing car to piece 21 side plate return track , it is transported to the turning crane station of part 19. On the way, it passes through the side plate cleaning machine of part 26 to clean the surface of the steam curing bottom plate of part 58. The waste generated during the whole cutting process will be all hoisted into the cutting pit, and then by The flushing water on both sides is sent into the waste slurry mixing tank of the cutting pit of the piece 25, and the waste slurry is transported to the slurry tank of the piece 5 by the slurry pump for use.

如图7所示,件28半成品堆垛吊机将三块件58蒸养底板带坯体放置在件59蒸养小车上,由件29蒸养车回程牵引机将其牵引至件30进釜摆渡车上,件30进釜摆渡车再将一车三模坯体运送至釜前轨道进行编组,直到釜前轨道排满,然后由件31入釜牵引机将其牵引通过件33釜前过桥进入件32蒸压釜内蒸养。As shown in Fig. 7, the stacking crane of the semi-finished product 28 places the three pieces of 58 steam curing floor with blanks on the steam curing trolley of the piece 59, and the return tractor of the piece 29 steaming and curing car pulls it to the piece 30 into the kettle for ferry. On the car, piece 30 enters the kettle ferry car, and then transports a car of three-mould blanks to the track in front of the kettle for marshalling until the track in front of the kettle is full, and then the tractor pulls the piece 31 into the kettle to pass through the bridge in front of the kettle 33. Enter the 32 autoclave for steam curing.

如图8所示,蒸养完成的整釜一车三模坯体,由件34出釜摆渡车上的子车将其全部拖出至釜后轨道(整体拖出蒸压釜,可以节省釜前入釜时间,提高蒸压釜周转效率),然后由件34出釜摆渡车逐一运送至蒸养车回程轨道,由件29蒸养车回程牵引机将其牵引至件35成品分垛吊机工位,由件35成品分垛吊机逐一将件59蒸养车上的三块件58蒸养底板带坯体吊运至件37掰板输送机工位,由件37掰板输送机的1号车将一块件58蒸养底板带坯体运送至件36固定掰板机工位,由36固定掰板机对坯体进行掰分处理,在掰分的过程中,件37掰板输送机将空的件58蒸养底板运送会件35成品分垛吊机工位,再将其吊运至件59蒸养车上(待三模坯体全换成空蒸养底板后,由蒸养车回程牵引机牵引至件2828半成品堆垛吊机工位),此时件37掰板输送机的2号车将掰分完的坯体接着并运送至件38单模夹坯机工位,如果是板材,件38单模夹坯机就将整模板材吊运至件40板材输送机上,然后直接打包,被叉车转走,如果是砌块,件38单模夹坯机就将整模砌块放在件39移动并坯机上的其中一个固定平台上,待件38单模夹坯机将下一模砌块放在其中一个移动平台上,随后件39移动并坯机通过气缸将移动平台与固定平台并拢,实现两模坯体并紧,然后件39移动并坯机通过传动链条移动到件42旋转夹坯机抓取工位(1.2x1.2m坯体夹取工位),此时件41托盘发放机将一件托盘放置在件43砌块输送机上,由件43砌块输2送机将空托盘输送到件42旋转夹坯机放坯工位(1.2x1.2m坯体放置工位),同时件42旋转夹坯机将1.2x1.2m坯体吊运至空托盘上,由件43砌块输送机将托盘带坯体输送到打包工位,打包完成后由叉车转运走。As shown in Figure 8, the whole autoclave, one car and three mold blanks that have been steamed and cured, are all pulled out to the track behind the autoclave by the sub-car on the autoclave ferry car (piece 34 is pulled out of the autoclave as a whole, which can save the autoclave time before entering the autoclave to improve the turnover efficiency of the autoclave), and then transported by the piece 34 out of the autoclave to the return track of the steaming and curing car one by one, and pulled by the piece 29 steaming and curing car return tractor to the piece 35 finished product stacking crane station , the three pieces 58 steam curing floor belt blanks on the piece 59 steaming and curing car are lifted one by one by the piece 35 finished product stacking crane to the piece 37 breaking board conveyor station, and the No. 1 car of the piece 37 breaking board conveyor A piece of 58 steam curing bottom plate with blank is transported to the piece 36 fixed board breaking machine station, and the blank is broken and divided by the 36 fixed board breaking machine. During the breaking process, the piece 37 board breaking conveyor will be empty. Part 58 of the steam curing base plate will be transported to the finished product stacking crane station of Part 35, and then hoisted to the steam curing car of Part 59 (after the three-mould blanks are all replaced with empty steam curing base plates, the steam curing car will return to the tractor Pulled to the piece 2828 semi-finished product stacking crane station), at this time, the No. 2 car of the piece 37 plate breaking conveyor will then transport the broken blank to the piece 38 single mold blank clamping machine station, if it is a plate, Piece 38 single-mode blank clamping machine lifts the whole template to the piece 40 plate conveyor, and then packs it directly, and is transferred away by forklift. Piece 39 moves and is placed on one of the fixed platforms on the blanking machine, waiting for piece 38 to place the next module block on one of the moving platforms, and then the piece 39 moves and the blanking machine connects the moving platform with the fixed platform through the cylinder Close together to realize the two-die blanks and tighten, and then the piece 39 moves and the blank machine moves through the transmission chain to the piece 42 rotating blank clamping machine grabbing station (1.2x1.2m blank clamping station). The dispenser places a pallet on the piece 43 block conveyor, and the piece 43 block conveyor 2 conveys the empty pallet to the piece 42 rotary blank clamping machine blank placement station (1.2x1.2m blank placement station) At the same time, the piece 42 rotary blank clamping machine lifts the 1.2x1.2m blank to the empty pallet, and the piece 43 block conveyor transports the pallet with the blank to the packing station. After the packing is completed, it is transported away by a forklift.

以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的布置并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该布置方案相似的结构方式及实施例,均应属于本发明的保护范围。The present invention and its embodiments are described above schematically, and the description is not restrictive. What is shown in the accompanying drawings is only one of the embodiments of the present invention, and the actual arrangement is not limited thereto. Therefore, if those of ordinary skill in the art are inspired by it, and without departing from the purpose of the present invention, any structure and embodiment similar to this arrangement scheme are designed without creativity, which shall belong to the protection scope of the present invention. .

Claims (1)

1. The production line for autoclaved aerated concrete plates and building blocks comprises a raw material processing working section, a steel bar mesh cage manufacturing working section, a batching pouring working section, a static curing working section, a cutting working section, a grouping steam curing working section and a finished product processing working section, and is characterized in that:
the raw material treatment section comprises: the device is arranged beside a raw material storage yard and comprises a three-bin hopper, a belt conveyor, a wet ball mill, a pit stirring device, a grinding head stirring tank, a jaw crusher, a lime block warehouse, a belt conveyor, a dry ball mill, a lime powder bin and a cement bin; a steel bar mesh cage manufacturing section: the device is arranged on the second floor of a static parking room and comprises a steel bar straightening and cutting machine, an automatic mesh welding machine, a saddle ferry vehicle, a saddle conveyor, a saddle seat, a saddle, an anticorrosive crane, an anticorrosive dipping tank, a drying box, a drill inserting machine, a drill pulling machine, a wax dipping crane and a wax dipping tank; a material mixing and pouring section: the pouring ferry vehicle is placed on the first floor, the pouring stirrer is placed on the second floor of the batching floor, the slurry is injected into the mold vehicle by utilizing potential energy, and the bubble collator is placed on a second track of the mold vehicle; a static maintenance section: the device is arranged in a first-floor static parking room and comprises a positioning device, a mould vehicle, a static maintenance ferry vehicle and a ground friction wheel; a cutting section: comprises a turnover crane, a cutting trolley, a side face cutting machine, a horizontal cutting machine, a vertical cutting machine, a cutting pit waste slurry stirring machine, a side plate cleaning machine, a semi-finished product turnover table and a semi-finished product stacking crane; grouping and steam-curing section: the system is arranged at the first floor and comprises a return tractor of a steam curing vehicle, a kettle entering ferry vehicle, a kettle entering tractor, a still kettle and a kettle front gap bridge; and (3) a finished product treatment section: the device is arranged in the rear area of the kettle and comprises a kettle discharging ferry vehicle, a finished product stacking crane, a fixed plate severing machine, a plate severing conveyor, a single-mold blank clamping machine, a moving blank combining machine, a plate severing conveyor, a tray dispenser, a rotary blank clamping machine and a block conveyor.
CN202011365702.1A 2020-11-28 2020-11-28 Autoclaved aerated concrete plate and building block production line Pending CN114571589A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011365702.1A CN114571589A (en) 2020-11-28 2020-11-28 Autoclaved aerated concrete plate and building block production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011365702.1A CN114571589A (en) 2020-11-28 2020-11-28 Autoclaved aerated concrete plate and building block production line

Publications (1)

Publication Number Publication Date
CN114571589A true CN114571589A (en) 2022-06-03

Family

ID=81767357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011365702.1A Pending CN114571589A (en) 2020-11-28 2020-11-28 Autoclaved aerated concrete plate and building block production line

Country Status (1)

Country Link
CN (1) CN114571589A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115464770A (en) * 2022-09-15 2022-12-13 深圳市特区建工科工集团绿色建材有限公司 Production process of aerated concrete plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2602234A1 (en) * 2011-12-07 2013-06-12 Vilnius Gediminas Technical University Method for manufacturing of products from autoclaved aerated concrete and composition of autoclaved aerated concrete
CN106542135A (en) * 2017-01-12 2017-03-29 山东阳光众泰机械工程有限公司 A kind of air entrained concrete mixing packaging system
CN107283615A (en) * 2017-08-23 2017-10-24 山东阳光众泰机械工程有限公司 A kind of air entrained concrete plugs process streamline with drill rod
CN111300628A (en) * 2020-05-12 2020-06-19 湖南三一快而居住宅工业有限公司 Autoclaved aerated concrete production line
CN211164465U (en) * 2019-09-19 2020-08-04 浙江杭加泽通建筑节能新材料有限公司 Evaporate and press aerated concrete building material production system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2602234A1 (en) * 2011-12-07 2013-06-12 Vilnius Gediminas Technical University Method for manufacturing of products from autoclaved aerated concrete and composition of autoclaved aerated concrete
CN106542135A (en) * 2017-01-12 2017-03-29 山东阳光众泰机械工程有限公司 A kind of air entrained concrete mixing packaging system
CN107283615A (en) * 2017-08-23 2017-10-24 山东阳光众泰机械工程有限公司 A kind of air entrained concrete plugs process streamline with drill rod
CN211164465U (en) * 2019-09-19 2020-08-04 浙江杭加泽通建筑节能新材料有限公司 Evaporate and press aerated concrete building material production system
CN111300628A (en) * 2020-05-12 2020-06-19 湖南三一快而居住宅工业有限公司 Autoclaved aerated concrete production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈立军等: "《混凝土及其制品工艺学》", 31 August 2012, 中国建材工业出版社, pages: 232 - 239 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115464770A (en) * 2022-09-15 2022-12-13 深圳市特区建工科工集团绿色建材有限公司 Production process of aerated concrete plate

Similar Documents

Publication Publication Date Title
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN107650258A (en) A kind of bidirectional circulating structure prefabricated components production line and control method
CN208068545U (en) A kind of three-dimensional production system of prefabricated component
CN211492145U (en) Automatic production line for Reactive Powder Concrete (RPC) prefabricated parts
CN105603917B (en) A kind of construction method that makes moulding bed and guardrail of guardrail reinforcing bar
CN108748644A (en) A kind of embedded concrete small size prefabricated components automatic manufacturing device of grid-type
CN111203972A (en) Automatic production line for pile plate type structural bridge deck
CN105600335B (en) Rebar cage storage and conveying device for pipe pile production line
CN107186872B (en) Self preservation temperature building block brick apparatus for producing
CN218659724U (en) Wet breaking system with pre-curing function for concrete plates or building blocks
CN114571589A (en) Autoclaved aerated concrete plate and building block production line
CN201913703U (en) Novel tile production line
CN108189211A (en) A kind of light cellular partition board automated production equipment
CN102220439B (en) Production method of slag ladle partition plate for processing casting residue steel
US20100136156A1 (en) Plant for production of concrete
CN202029210U (en) Double combined type quadruple aerated concrete brick device
CN206982970U (en) A kind of load bearing wall wall board forming equipment
CN110815534A (en) PC component production line
CN115959876A (en) Autoclaved aerated concrete slab and production process thereof
CN107460827A (en) A kind of method of cast-in-situ box girder form bracing system precompressed
CN204487794U (en) Foam slurry fills out the automatic production line of core building block
CN108481543A (en) Precast stair production line
CN202685079U (en) Production equipment for sand autoclaved aerated concrete blocks
CN102601859B (en) Conveyer who uses in haydite board production facility
CN102295469A (en) Process for producing aerated concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination