CN114454326A - Concrete member production line - Google Patents

Concrete member production line Download PDF

Info

Publication number
CN114454326A
CN114454326A CN202210187212.XA CN202210187212A CN114454326A CN 114454326 A CN114454326 A CN 114454326A CN 202210187212 A CN202210187212 A CN 202210187212A CN 114454326 A CN114454326 A CN 114454326A
Authority
CN
China
Prior art keywords
track
station
rail
trolley
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210187212.XA
Other languages
Chinese (zh)
Inventor
谢炜煜
张宝利
戴一飞
孟凡增
陈守昭
严璞龄
陈勇
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Wuxi Engineering Technology Development Co ltd
Original Assignee
China Railway Construction Wuxi Engineering Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Wuxi Engineering Technology Development Co ltd filed Critical China Railway Construction Wuxi Engineering Technology Development Co ltd
Priority to CN202210187212.XA priority Critical patent/CN114454326A/en
Publication of CN114454326A publication Critical patent/CN114454326A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/026Feeding the moulding material in measured quantities from a container or silo by using a movable hopper transferring the moulding material to the moulding cavities
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明提供一种混凝土构件生产线,包括第一轨道,所述第一轨道上设有多组轨道小车,所述轨道小车上设有一个或多个底模,所述第一轨道上设有浇筑振捣工位和若干混凝土构件加工工位,所述浇筑振捣工位内设有至少两个可以沿第一轨道长度方向移动的布料机。本发明提供的一种混凝土构件生产线,采用轨道小车上设置一个长的底模或多个短的底模,轨道小车为生产线部分,更换底模时不需要更换轨道小车,降低成本;当轨道小车上设置两个或两个以上底模时,一次可以加工两个或两个以上的混凝土构件,虽然在一个工位停留加工的时间变长,但是单个混凝土构件的加工工时缩短,日产能提高,且因为在一个工位停留的时间变长,加工出来的混凝土构件质量也更好。

Figure 202210187212

The present invention provides a concrete component production line, comprising a first track, a plurality of groups of track trolleys are arranged on the first track, one or more bottom molds are arranged on the track trolleys, and a pouring mould is arranged on the first track A vibrating station and a number of concrete component processing stations are provided, and at least two placing machines that can move along the length direction of the first track are arranged in the pouring and vibrating station. The present invention provides a concrete component production line, which adopts a rail trolley to set a long bottom mold or a plurality of short bottom molds. The rail trolley is a part of the production line, and the rail trolley does not need to be replaced when replacing the bottom mold, thereby reducing costs; when the rail trolley is used When two or more bottom molds are set on the top, two or more concrete members can be processed at a time. Although the processing time in one station is longer, the processing time of a single concrete member is shortened and the daily production capacity is increased. And because the time spent in one station is longer, the quality of the processed concrete components is also better.

Figure 202210187212

Description

一种混凝土构件生产线A production line for concrete components

技术领域technical field

本发明涉及混凝土构件技术领域,特别是涉及一种混凝土构件生产线。The invention relates to the technical field of concrete components, in particular to a concrete component production line.

背景技术Background technique

管片、墙板、叠合板等预制式混凝土构件在工厂预制加工,大大减少了现场的浇注作业,提高了施工效率,满足节能环保的需求。混凝土构件由于体积比较大,浇注时单个产品的工时较长,生产商通常通过设置多个生产线来提高产能,但是这样一来前期投入成本过高,场地占用面积大,需要的工人也比较多,是本领域技术人员迫切需要解决的问题。Prefabricated concrete components such as segments, wall panels, and laminated panels are prefabricated in the factory, which greatly reduces on-site pouring operations, improves construction efficiency, and meets the needs of energy conservation and environmental protection. Due to the relatively large volume of concrete components, the man-hours for a single product during pouring are long. Manufacturers usually set up multiple production lines to increase production capacity. However, the initial investment cost is too high, the site occupies a large area, and more workers are needed. It is a problem that those skilled in the art urgently need to solve.

发明内容SUMMARY OF THE INVENTION

本发明所要解决的技术问题是:为了克服现有技术中的不足,本发明提供一种混凝土构件生产线。The technical problem to be solved by the present invention is: in order to overcome the deficiencies in the prior art, the present invention provides a concrete member production line.

本发明解决其技术问题所要采用的技术方案是:一种混凝土构件生产线,包括第一轨道,所述第一轨道上设有多组轨道小车,所述轨道小车上设有一个或多个底模,所述第一轨道上设有浇筑振捣工位和若干混凝土构件加工工位,所述浇筑振捣工位内设有至少两个可以沿第一轨道长度方向移动的布料机。The technical solution adopted by the present invention to solve the technical problem is as follows: a concrete member production line, comprising a first track, a plurality of groups of track trolleys are arranged on the first track, and one or more bottom molds are arranged on the track trolleys The first track is provided with a pouring and vibrating station and a number of concrete component processing stations, and at least two placing machines that can move along the length of the first track are arranged in the pouring and vibrating station.

将一个长的底模或多个短的底模设置在轨道小车上,轨道小车为生产线部分,更换底模时不需要更换轨道小车,降低成本;当轨道小车上设置两个或两个以上底模时,一次可以加工两个或两个以上的混凝土构件,虽然在一个工位停留加工的时间变长,但是单个混凝土构件的加工工时缩短,日产能提高,且因为在一个工位停留的时间变长,加工出来的混凝土构件质量也更好。Set one long bottom mold or multiple short bottom molds on the rail trolley. The rail trolley is part of the production line. It is not necessary to replace the rail trolley when replacing the bottom mold, which reduces the cost; when two or more bottom molds are set on the rail trolley When moulding, two or more concrete components can be processed at a time. Although the processing time in one station is longer, the processing time of a single concrete component is shortened, the daily production capacity is increased, and because of the time spent in one station The longer the length, the better the quality of the processed concrete components.

进一步,所述第一轨道一侧设有第二轨道,所述第一轨道和第二轨道两端设有换向输送机构,所述第二轨道上沿轨道小车移动方向依次设有静养工位、蒸养升温工位、蒸养恒温工位和蒸养降温工位,所述静养工位、蒸养升温工位、蒸养恒温工位和蒸养降温工位设于地下。Further, a second rail is provided on one side of the first rail, a reversing conveying mechanism is provided at both ends of the first rail and the second rail, and a static maintenance station is sequentially arranged on the second rail along the moving direction of the rail trolley. , steam curing heating station, steam curing constant temperature station and steam curing cooling station, the static curing station, steam curing heating station, steam curing constant temperature station and steam curing cooling station are located underground.

从第一轨道上加工完成的各混凝土构件,通过换向输送机构将轨道小车转运至第二轨道上,设置在第二轨道上的包括静养工位、蒸养升温工位、蒸养恒温工位和蒸养降温工位在内的养护工位因为设于地下,所以减少了因空气流通导致的热量散失,从而降低了能耗。Each concrete component processed from the first track is transferred to the second track by the reversing conveying mechanism. The second track includes a static curing station, a steam curing temperature rise station, and a steam curing constant temperature station. The maintenance stations, including the steam curing and cooling station, are located underground, so the heat loss caused by air circulation is reduced, thereby reducing energy consumption.

进一步,为了将轨道小车从第一轨道上输送至第二轨道上,所述换向输送机构包括升降平台,所述升降平台下方设有升降机,所述升降平台上端设有多条平行设置的第三轨道,所述第三轨道与轨道小车底部滑动配合,所述第三轨道与第一轨道垂直,所述第一轨道和第二轨道的两端均设有推拉油缸,推拉油缸输出端上设有与轨道小车配合的卡勾。Further, in order to transport the track trolley from the first track to the second track, the reversing conveying mechanism includes a lifting platform, a lifter is arranged below the lifting platform, and a plurality of parallelly arranged first rails are arranged on the upper end of the lifting platform. Three rails, the third rail is in sliding fit with the bottom of the rail trolley, the third rail is perpendicular to the first rail, both ends of the first rail and the second rail are provided with push-pull cylinders, and the output end of the push-pull cylinder is provided with a push-pull cylinder. There are hooks for matching with the track trolley.

第一轨道末端的推拉油缸将轨道小车推入升降平台的第三轨道上,升降平台带着轨道小车下沉到地下,第二轨道始端的推拉油缸将轨道小车拉出升降平台,轨道小车沿着第二轨道进入各工位进行养护;因为轨道小车总体长度较长,所以需要设置多条第三轨道对轨道小车进行支撑,防止轨道小车弯曲变形;混凝土构件经养护成形后,轨道小车移动至第二轨道尾端,第二轨道尾端处的推拉油缸用于将轨道小车送入第二轨道末端处的升降平台上,升降平台带着轨道小车上升至地面,第一轨道始端的推拉油缸将轨道小车拉入开模工位,进行后续的开模和转运工序。The push-pull cylinder at the end of the first track pushes the rail trolley into the third rail of the lift platform, the lift platform sinks to the ground with the rail trolley, and the push-pull cylinder at the beginning of the second track pulls the rail trolley out of the lift platform, and the rail trolley follows the The second track enters each station for maintenance; because the overall length of the track trolley is long, it is necessary to set up multiple third tracks to support the track trolley to prevent the track trolley from bending and deforming; after the concrete components are cured and formed, the track trolley moves to the first At the end of the second track, the push-pull cylinder at the end of the second track is used to send the track trolley to the lifting platform at the end of the second track. The trolley is pulled into the mold-opening station for subsequent mold-opening and transfer processes.

进一步,所述轨道小车上设有用于与底模连接的连接板,所述轨道小车与连接板之间设有若干支撑弹簧,所述连接板上设有若干用于调节底模位置的调节孔。支撑弹簧主要起避震作用,布料机向底模内注入混凝土时需要振捣,支撑弹簧可以防止底模的振动影响到轨道小车,延长轨道小车的使用寿命。Further, the rail trolley is provided with a connecting plate for connecting with the bottom mold, a number of support springs are arranged between the rail trolley and the connecting plate, and the connecting plate is provided with a number of adjustment holes for adjusting the position of the bottom mold . The support spring mainly plays the role of shock absorption. When the placing machine injects concrete into the bottom mold, it needs to be vibrated. The support spring can prevent the vibration of the bottom mold from affecting the rail car and prolong the service life of the rail car.

进一步,所述布料机出料端可拆卸连接有导流管,所述导流管设有一个进料口和多个出料口,所述导流管为软管,每个所述出料口上均设有用于打开或关闭出料口的阀门。当轨道小车上设置有三个或三个以上的底模时,需要在布料机出料端设置导流管,向各个底模内注入混凝土,当相应底模内注满时,阀门将相应出料口关闭,停止向底模内注入混凝土。Further, the discharge end of the distributor is detachably connected with a guide pipe, the guide pipe is provided with a feed port and a plurality of discharge ports, the guide pipe is a hose, and each discharge port is There are valves on the ports for opening or closing the discharge ports. When there are three or more bottom molds on the track trolley, it is necessary to set a guide pipe at the discharge end of the placing machine to inject concrete into each bottom mold. When the corresponding bottom mold is filled, the valve will discharge the material accordingly. The mouth is closed, and the injection of concrete into the bottom mold is stopped.

进一步,所述第一轨道上方平行设置有架空的行车轨道,所述行车轨道上设有至少两组吊机。混凝土构件成型后通过吊机进行转运,设置至少两组吊机,一方面,在轨道小车上设置多个短的底模时,可以将各个混凝土构件同时进行转运,提高转运效率,另一方面,在轨道小车上设置一个长的底模时,两组或两组以上的吊机吊运长的混凝土构件会更加稳定。Further, an overhead traveling track is arranged in parallel above the first track, and at least two sets of cranes are arranged on the traveling track. After the concrete components are formed, they are transported by cranes, and at least two sets of cranes are installed. On the one hand, when multiple short bottom molds are set on the rail trolley, each concrete component can be transported at the same time to improve the transport efficiency. On the other hand, When a long bottom form is set on the track trolley, two or more sets of cranes will hoist long concrete members more stably.

本发明的有益效果是:本发明提供的一种混凝土构件生产线,采用轨道小车上设置两个或两个以上底模,一次可以加工两个或两个以上的混凝土构件,虽然在一个工位停留加工的时间变长,但是单个混凝土构件的加工工时缩短,日产能提高,且因为在一个工位停留的时间变长,加工出来的混凝土构件质量也更好。The beneficial effects of the present invention are as follows: the concrete member production line provided by the present invention adopts two or more bottom molds set on the rail trolley, and can process two or more concrete members at a time, although it stays in one station The processing time is longer, but the processing time of a single concrete component is shortened, the daily production capacity is increased, and the quality of the processed concrete component is also better because the time spent in one station is longer.

附图说明Description of drawings

下面结合附图和实施例对本发明作进一步说明。The present invention will be further described below with reference to the accompanying drawings and embodiments.

图1是本发明最佳实施例的结构示意图;Fig. 1 is the structural representation of the preferred embodiment of the present invention;

图2是轨道小车与底模的结构示意图;Fig. 2 is the structural representation of the rail car and the bottom mold;

图3是布料机与底模的结构示意图。Figure 3 is a schematic diagram of the structure of the cloth machine and the bottom mold.

图中:1、第一轨道,2、轨道小车,3、底模,4、浇筑振捣工位,41、布料机,411、导流管,5、第二轨道,6、静养工位,7、蒸养升温工位,8、蒸养恒温工位,9、蒸养降温工位,10、升降平台,11、第三轨道,12、连接板,13、支撑弹簧,14、吊机,15、开模工位,16、清模工位,17、合模工位,18、钢筋入模工位,19、抹平工位。In the picture: 1. The first track, 2. The track trolley, 3. The bottom mold, 4. The pouring and vibrating station, 41. The placing machine, 411. The guide pipe, 5. The second track, 6. The resting station, 7. Steaming and curing heating station, 8. Steaming and curing constant temperature station, 9. Steaming and curing cooling station, 10. Lifting platform, 11. Third rail, 12. Connecting plate, 13. Supporting spring, 14. Crane, 15. Mould-opening station, 16. Mould-clearing station, 17. Mould-closing station, 18. Reinforcement moulding station, 19. Smoothing station.

具体实施方式Detailed ways

现在结合附图对本发明作详细的说明。此图为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。The present invention will now be described in detail with reference to the accompanying drawings. This figure is a simplified schematic diagram, and only illustrates the basic structure of the present invention in a schematic manner, so it only shows the structure related to the present invention.

如图1-3所示,本发明的一种混凝土构件生产线,包括第一轨道1,所述第一轨道1上设有轨道小车2,所述轨道小车2上设有两个底模3,所述第一轨道1上沿轨道小车2移动方向依次设有开模工位15、清模工位16、合模工位17、钢筋入模工位18、浇筑振捣工位4和抹平工位19,所述浇筑振捣工位4内设有两个可以沿第一轨道1长度方向移动的布料机41。As shown in Figures 1-3, a concrete member production line of the present invention includes a first rail 1, on which a rail trolley 2 is provided, and two bottom molds 3 are provided on the rail trolley 2, The first track 1 is sequentially provided with a mold opening station 15, a mold cleaning station 16, a mold clamping station 17, a steel bar entering station 18, a pouring and vibrating station 4 and a smoothing station along the moving direction of the track trolley 2. In the station 19, the pouring and vibrating station 4 is provided with two placing machines 41 that can move along the length of the first track 1.

所述第一轨道1一侧设有第二轨道5,所述第一轨道1和第二轨道5两端设有换向输送机构,所述第二轨道5上沿轨道小车2移动方向依次设有静养工位6、蒸养升温工位7、蒸养恒温工位8和蒸养降温工位,所述静养工位6、蒸养升温工位7、蒸养恒温工位8和蒸养降温工位设于地下。One side of the first track 1 is provided with a second track 5 , both ends of the first track 1 and the second track 5 are provided with a reversing conveying mechanism, and the second track 5 is arranged in sequence along the moving direction of the track trolley 2 . There are 6 resting stations, 7 steaming and heating stations, 8 steaming and curing constant temperature stations, and 8 steaming and cooling stations. Workstations are located underground.

所述换向输送机构包括升降平台10,所述升降平台10下方设有升降机,所述升降平台10上端设有多条平行设置的第三轨道11,所述第三轨道11与轨道小车2底部滑动配合,所述第三轨道11与第一轨道1垂直,所述第一轨道1和第二轨道5的两端均设有推拉油缸,推拉油缸输出端上设有与轨道小车2配合的卡勾。The reversing conveying mechanism includes a lift platform 10 , a lift is arranged below the lift platform 10 , and a plurality of third rails 11 arranged in parallel are arranged on the upper end of the lift platform 10 , and the third rails 11 are connected to the bottom of the rail car 2 . Sliding fit, the third rail 11 is perpendicular to the first rail 1, both ends of the first rail 1 and the second rail 5 are provided with push-pull cylinders, and the output end of the push-pull cylinders is provided with a card that cooperates with the rail trolley 2 hook.

所述轨道小车2上设有用于与底模3连接的连接板12,所述轨道小车2与连接板12之间设有若干支撑弹簧13,所述连接板12上设有若干用于调节底模3位置的调节孔。The rail trolley 2 is provided with a connecting plate 12 for connecting with the bottom mold 3, a plurality of support springs 13 are arranged between the rail trolley 2 and the connecting plate 12, and a plurality of supporting springs 13 are arranged on the connecting plate 12 for adjusting the bottom. Adjustment hole at position 3 of the die.

所述布料机41出料端可拆卸连接有导流管411,所述导流管411设有一个进料口和多个出料口,所述导流管411为软管,每个所述出料口上均设有用于打开或关闭出料口的阀门。The discharge end of the distributor 41 is detachably connected with a guide pipe 411, the guide pipe 411 is provided with a feeding port and a plurality of discharge ports, the guide pipe 411 is a hose, each of the The discharge port is equipped with a valve for opening or closing the discharge port.

所述第一轨道1上方平行设置有架空的行车轨道,所述行车轨道上设有两组吊机14。吊机14用于将开模工位15处成形的混凝土构件进行转运。Above the first track 1 is an overhead traveling track arranged in parallel, and two sets of cranes 14 are arranged on the traveling track. The crane 14 is used to transport the concrete members formed at the mould opening station 15 .

工作过程:work process:

自开模工位15开始,工作人员将底模3拆开露出成形的混凝土构件,吊机14将混凝土构件进行转运,然后轨道小车2带动两个底模3前进,进入清模工位16,工作人员对底模3进行清洁,清洁后将底模3重新组装成形,进入钢筋入模工位18后吊机14向两个底模3内装入钢筋笼,随后轨道小车2带着两个底模3进入两个布料机41下方,布料机41向底模3内注入混凝土,同时底模3上的振捣机构开始工作,注料完成后轨道小车2进入抹平工位19,工作人员将混凝土表面进行抹平,保证混凝土构件的质量。Starting from the mold opening station 15, the staff disassembles the bottom mold 3 to expose the formed concrete components, the crane 14 transfers the concrete components, and then the rail trolley 2 drives the two bottom molds 3 forward, and enters the mold cleaning station 16. The staff cleans the bottom mold 3. After cleaning, the bottom mold 3 is reassembled and formed. After entering the steel bar into the mold station 18, the crane 14 loads the steel cage into the two bottom molds 3, and then the rail trolley 2 carries the two bottom molds. The mold 3 enters under the two placing machines 41, the placing machine 41 injects concrete into the bottom mold 3, and at the same time, the vibrating mechanism on the bottom mold 3 starts to work. The concrete surface is smoothed to ensure the quality of the concrete components.

随后推拉油缸将轨道小车2推至升降平台10上的第三轨道11,升降平台10下降带着轨道小车2下沉到地下,轨道小车2来到第二轨道5始端,通过第二轨道5依次进入静养工位6、蒸养升温工位7、蒸养恒温工位8和蒸养降温工位内进行养护,混凝土构件经养护成形后,轨道小车2移动至第二轨道5尾端,第二轨道5尾端处的推拉油缸用于将轨道小车2送入第二轨道5末端处的升降平台10上,升降平台10带着轨道小车2上升至地面,第一轨道1始端的推拉油缸将轨道小车2拉入开模工位15,进行后续的开模和转运工序。Then the push-pull cylinder pushes the rail trolley 2 to the third track 11 on the lifting platform 10, the lifting platform 10 descends and the rail trolley 2 sinks to the ground, the rail trolley 2 comes to the beginning of the second track 5, and passes through the second track 5 in sequence. Enter the static curing station 6, the steam curing heating station 7, the steam curing constant temperature station 8 and the steam curing cooling station for curing. After the concrete components are cured and formed, the rail car 2 moves to the end of the second track 5, and the second The push-pull cylinder at the end of the track 5 is used to send the rail trolley 2 to the lift platform 10 at the end of the second track 5. The lift platform 10 lifts the track trolley 2 to the ground, and the push-pull cylinder at the beginning of the first track 1 lifts the track. The trolley 2 is pulled into the mold opening station 15 for subsequent mold opening and transfer processes.

产线一次加工两个底模3内的混凝土构件,虽然在一个工位停留加工的时间变长,但是单个混凝土构件的加工工时缩短,日产能提高,且因为在一个工位停留的时间变长,工作人员在各工位加工的时间变长,工作更加全面和细致,加工出来的混凝土构件质量也更好。The production line processes two concrete components in the bottom mold 3 at a time. Although the processing time in one station is longer, the processing time of a single concrete component is shortened, the daily production capacity is increased, and the time spent in one station is longer. , the processing time of the staff in each station is longer, the work is more comprehensive and detailed, and the quality of the processed concrete components is also better.

本发明中方向和参照(例如,上、下、左、右、等等)可以仅用于帮助对附图中的特征的描述。因此,并非在限制性意义上采用以下具体实施方式,并且仅仅由所附权利要求及其等同形式来限定所请求保护的主题的范围。Directions and references (eg, up, down, left, right, etc.) in the present disclosure may only be used to aid in the description of features in the figures. Therefore, the following detailed description is not to be taken in a limiting sense, and the scope of the claimed subject matter is defined solely by the appended claims and their equivalents.

以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关的工作人员完全可以在不偏离本发明的范围内,进行多样的变更以及修改。本项发明的技术范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。Taking the above ideal embodiments according to the present invention as inspiration, and through the above description, relevant personnel can make various changes and modifications without departing from the scope of the present invention. The technical scope of the present invention is not limited to the content of the specification, and the technical scope must be determined according to the scope of the claims.

Claims (6)

1.一种混凝土构件生产线,其特征在于:包括第一轨道(1),所述第一轨道(1)上设有多组轨道小车(2),所述轨道小车(2)上设有一个或多个底模(3),所述第一轨道(1)上设有浇筑振捣工位(4)和若干混凝土构件加工工位,所述浇筑振捣工位(4)内设有至少两个可以沿第一轨道(1)长度方向移动的布料机(41)。1. A concrete member production line, characterized in that: it comprises a first track (1), the first track (1) is provided with multiple groups of track trolleys (2), and the track trolley (2) is provided with a or a plurality of bottom molds (3), the first rail (1) is provided with a pouring and vibrating station (4) and a number of concrete member processing stations, and the pouring and vibrating station (4) is provided with at least Two distributors (41) that can move along the length of the first track (1). 2.如权利要求1所述的一种混凝土构件生产线,其特征在于:所述第一轨道(1)一侧设有第二轨道(5),所述第一轨道(1)和第二轨道(5)两端设有换向输送机构,所述第二轨道(5)上沿轨道小车(2)移动方向依次设有静养工位(6)、蒸养升温工位(7)、蒸养恒温工位(8)和蒸养降温工位,所述静养工位(6)、蒸养升温工位(7)、蒸养恒温工位(8)和蒸养降温工位设于地下。2. A concrete member production line according to claim 1, characterized in that: a second rail (5) is provided on one side of the first rail (1), the first rail (1) and the second rail (5) A reversing conveying mechanism is provided at both ends, and the second rail (5) is sequentially provided with a static curing station (6), a steam curing temperature rise station (7), a steam curing station (7), and a steam curing station along the moving direction of the track trolley (2). A constant temperature station (8) and a steam curing and cooling station, the static curing station (6), the steam curing heating station (7), the steam curing constant temperature station (8) and the steam curing cooling station are arranged underground. 3.如权利要求2所述的一种混凝土构件生产线,其特征在于:所述换向输送机构包括升降平台(10),所述升降平台(10)下方设有升降机,所述升降平台(10)上端设有多条平行设置的第三轨道(11),所述第三轨道(11)与轨道小车(2)底部滑动配合,所述第三轨道(11)与第一轨道(1)垂直,所述第一轨道(1)和第二轨道(5)的两端均设有推拉油缸,推拉油缸输出端上设有与轨道小车(2)配合的卡勾。3. A concrete component production line according to claim 2, characterized in that: the reversing conveying mechanism comprises a lifting platform (10), a lifter is provided below the lifting platform (10), and the lifting platform (10) ) is provided with a plurality of third rails (11) arranged in parallel at the upper end, the third rails (11) are slidingly matched with the bottom of the rail trolley (2), and the third rails (11) are perpendicular to the first rail (1) Both ends of the first rail (1) and the second rail (5) are provided with push-pull oil cylinders, and the output ends of the push-pull oil cylinders are provided with hooks matched with the rail trolley (2). 4.如权利要求1所述的一种混凝土构件生产线,其特征在于:所述轨道小车(2)上设有用于与底模(3)连接的连接板(12),所述轨道小车(2)与连接板(12)之间设有若干支撑弹簧(13),所述连接板(12)上设有若干用于调节底模(3)位置的调节孔。4. A concrete member production line according to claim 1, characterized in that: the rail trolley (2) is provided with a connecting plate (12) for connecting with the bottom form (3), the rail trolley (2) ) and the connecting plate (12) are provided with a plurality of supporting springs (13), and the connecting plate (12) is provided with a plurality of adjusting holes for adjusting the position of the bottom mold (3). 5.如权利要求1所述的一种混凝土构件生产线,其特征在于:所述布料机(41)出料端可拆卸连接有导流管(411),所述导流管(411)设有一个进料口和多个出料口,所述导流管(411)为软管,每个所述出料口上均设有用于打开或关闭出料口的阀门。5 . The production line for concrete components according to claim 1 , wherein the discharge end of the placing machine ( 41 ) is detachably connected with a guide pipe ( 411 ), and the guide pipe ( 411 ) is provided with 5 . One feed port and multiple discharge ports, the guide pipe (411) is a hose, and each of the discharge ports is provided with a valve for opening or closing the discharge ports. 6.如权利要求1所述的一种混凝土构件生产线,其特征在于:所述第一轨道(1)上方平行设置有架空的行车轨道,所述行车轨道上设有至少两组吊机(14)。6. A concrete member production line as claimed in claim 1, characterized in that: above the first track (1), an overhead traveling track is arranged in parallel, and at least two sets of cranes (14) are arranged on the traveling track. ).
CN202210187212.XA 2022-02-28 2022-02-28 Concrete member production line Pending CN114454326A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210187212.XA CN114454326A (en) 2022-02-28 2022-02-28 Concrete member production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210187212.XA CN114454326A (en) 2022-02-28 2022-02-28 Concrete member production line

Publications (1)

Publication Number Publication Date
CN114454326A true CN114454326A (en) 2022-05-10

Family

ID=81415410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210187212.XA Pending CN114454326A (en) 2022-02-28 2022-02-28 Concrete member production line

Country Status (1)

Country Link
CN (1) CN114454326A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB572390A (en) * 1943-06-20 1945-10-05 Dowsett Engineering Constructi Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams
CN104647577A (en) * 2013-11-19 2015-05-27 任丘市永基建筑安装工程有限公司 Automatic production lien for assembling type housing prefabricated panels
EP2878415A2 (en) * 2013-11-15 2015-06-03 Elematic Oy Ab Method and manufacturing facility for casting concrete products
CN106584654A (en) * 2016-11-16 2017-04-26 中铁工程装备集团机电工程有限公司 Production process for prefabricated reinforced concrete duct pieces
CN107953446A (en) * 2016-10-17 2018-04-24 福建泉州永昌建材机械有限公司 A kind of foam concrete block production line and method
CN109333791A (en) * 2018-09-07 2019-02-15 贵州大成恒通建设工程有限公司 Small members movable type construction trolley
CN109624055A (en) * 2019-01-03 2019-04-16 重庆单轨交通工程有限责任公司 A kind of automatic production line of subway segment
CN210082050U (en) * 2019-01-26 2020-02-18 中交一航局第四工程有限公司 Efficient precast concrete shield constructs section of jurisdiction and evaporates curing cellar for storing things
CN211054030U (en) * 2019-10-22 2020-07-21 杭州铁牛机械有限公司 Segment production line maintenance kiln
CN211868159U (en) * 2019-12-31 2020-11-06 河南蓝科绿色建材科技有限公司 Steam maintenance ferry vehicle
CN113752357A (en) * 2021-09-30 2021-12-07 河南水建集团有限公司 A examination mould bracket that is used for section of jurisdiction streamlined production to take a sample
CN215893255U (en) * 2021-08-27 2022-02-22 山东鑫瑞祥新材料有限公司 Traction equipment for tunnel type composite drying device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB572390A (en) * 1943-06-20 1945-10-05 Dowsett Engineering Constructi Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams
EP2878415A2 (en) * 2013-11-15 2015-06-03 Elematic Oy Ab Method and manufacturing facility for casting concrete products
CN104647577A (en) * 2013-11-19 2015-05-27 任丘市永基建筑安装工程有限公司 Automatic production lien for assembling type housing prefabricated panels
CN107953446A (en) * 2016-10-17 2018-04-24 福建泉州永昌建材机械有限公司 A kind of foam concrete block production line and method
CN106584654A (en) * 2016-11-16 2017-04-26 中铁工程装备集团机电工程有限公司 Production process for prefabricated reinforced concrete duct pieces
CN109333791A (en) * 2018-09-07 2019-02-15 贵州大成恒通建设工程有限公司 Small members movable type construction trolley
CN109624055A (en) * 2019-01-03 2019-04-16 重庆单轨交通工程有限责任公司 A kind of automatic production line of subway segment
CN210082050U (en) * 2019-01-26 2020-02-18 中交一航局第四工程有限公司 Efficient precast concrete shield constructs section of jurisdiction and evaporates curing cellar for storing things
CN211054030U (en) * 2019-10-22 2020-07-21 杭州铁牛机械有限公司 Segment production line maintenance kiln
CN211868159U (en) * 2019-12-31 2020-11-06 河南蓝科绿色建材科技有限公司 Steam maintenance ferry vehicle
CN215893255U (en) * 2021-08-27 2022-02-22 山东鑫瑞祥新材料有限公司 Traction equipment for tunnel type composite drying device
CN113752357A (en) * 2021-09-30 2021-12-07 河南水建集团有限公司 A examination mould bracket that is used for section of jurisdiction streamlined production to take a sample

Similar Documents

Publication Publication Date Title
WO2020232744A1 (en) Prefabricated component production line having temporary storage function
CN113232144B (en) Production process of high-speed railway prefabricated box girder production line
CN106142325B (en) A kind of sanitary ceramics injection forming production system and its production method
CN107901208A (en) Prefabricated reinforced concrete section of jurisdiction automatic production line
CN101244581A (en) Lightweight Composite Wallboard Forming Machine and Production Line
CN111975974A (en) A double-circulation production line for prefabricated building components and its production process
CN110076897A (en) A kind of prefabricated components production line with platform mould temporary storage location
CN102861880A (en) Sand-coating molding device and method for large metal mold
CN208118097U (en) A new type of flexible production line for prefabricated concrete lining segment fixed kiln
CN201179548Y (en) Sand-covered molding machine adapted to automatic production line
CN207711039U (en) A kind of pre-stress rail plate tinuous production
CN211492145U (en) Automatic production line for Reactive Powder Concrete (RPC) prefabricated parts
CN111151739A (en) Casting forming production line
WO2021088711A1 (en) Sand casting production line
CN201353831Y (en) Transfer device for transferring segment mould and segment mould production system
CN116604694B (en) Composite production line for prefabricated sleeper and small component and production method thereof
CN110355866B (en) Parallel PC component production system
CN114454326A (en) Concrete member production line
CN104669430B (en) PC wallboard production systems
CN212221511U (en) Automatic walking, collecting and placing system for molds
CN102248126B (en) Lost foam automatic line
CN108789809B (en) Centrifugal concrete pile production line
CN209319993U (en) Centrifugal concrete pile production line
CN111151738A (en) Casting production line
CN216803909U (en) Prefabricated component production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220510

RJ01 Rejection of invention patent application after publication