CN114438875A - Novel partially-prefabricated concrete pier column structure and construction method - Google Patents
Novel partially-prefabricated concrete pier column structure and construction method Download PDFInfo
- Publication number
- CN114438875A CN114438875A CN202210160944.XA CN202210160944A CN114438875A CN 114438875 A CN114438875 A CN 114438875A CN 202210160944 A CN202210160944 A CN 202210160944A CN 114438875 A CN114438875 A CN 114438875A
- Authority
- CN
- China
- Prior art keywords
- frame
- prefabricated
- fixedly connected
- matching
- limiting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本发明涉及混凝土墩柱设备技术领域,具体为一种新型部分预制混凝土墩柱结构及施工方法。The invention relates to the technical field of concrete pier column equipment, in particular to a novel partially prefabricated concrete pier column structure and a construction method.
背景技术Background technique
预制混凝土墩柱生产工艺的控制主要分为个环节,首先应当合理的选择模板,其次应当保证脱模剂的均匀度,自后应当完善混凝土的浇筑与振捣工作,模板施工技术是桥梁施工技术中常见的一种力式,主要由前期设计、中期立模与支撑工作流程与后期引人钢筋绑定工作组成,模板施工技术的得失将直接影响桥梁墩柱的结构的稳定性,同时,还对墩柱外观的光洁有一定的影响,因此做好模板技术的施工应用是桥梁墩柱施工技术的关键环节,由于我国的桥梁墩柱结构有南力与北力的差异,因此在进行模板技术之前需要进行实地,深人研究桥梁工程的环境因素,从地形地貌,到水文地质都是相关工作人员的考察对象,做好勘探工作,才能保证模板技术的施工万无一失,从而保证桥梁墩柱外观的质量问题。The control of the production process of precast concrete piers is mainly divided into two parts. First, the formwork should be reasonably selected, and secondly, the uniformity of the release agent should be ensured. After that, the concrete pouring and vibrating work should be improved. The formwork construction technology is the bridge construction technology. A common type of force in China, mainly consists of preliminary design, mid-term vertical formwork and support workflow, and later introduction of steel bar binding work. The gain or loss of formwork construction technology will directly affect the structural stability of bridge piers and columns. It has a certain influence on the appearance of the pier and column, so the construction application of the formwork technology is the key link of the bridge pier column construction technology. Before, it was necessary to conduct on-the-spot research on the environmental factors of bridge engineering. From topography and geology to hydrogeology, all relevant personnel were inspected. Only by doing a good job of exploration work can the construction of formwork technology be foolproof, so as to ensure the appearance of bridge piers and columns. Quality issues.
根据中国专利号CN201310116355.2,本发明涉及大跨度桥梁、(超)高层建筑以及地铁地下结构等领域的一种体外预应力外加钢罩加固钢筋混凝土墩柱的方法,该方法主要包括:根据混凝土墩柱的抗剪、抗弯强度以及延性要求,计算混凝土墩柱是否需要加固;确定由预应力绞线和连接锚具组成的预应力绞线环箍在沿混凝土墩柱高度方向上的位置和间距;将预应力绞线环箍缠绕在混凝土墩柱外面,并根据沿混凝土墩柱加固需求的大小,对预应力绞线施加拉应力;最后根据混凝土墩柱竖向承载力和变形性能要求,以及对体外预应力绞线和锚具的保护要求,确定外层钢板的厚度以及钢板焊接成钢罩后直径大小,并在原混凝土墩柱和钢罩间注入水泥砂浆填充,形成体外预应力外加钢罩加固混凝土墩柱,但是该专利存在不方便进行导向连接的功能,需要进行改进。According to Chinese Patent No. CN201310116355.2, the present invention relates to a method for reinforcing reinforced concrete piers with external prestressing and a steel cover in the fields of large-span bridges, (super) high-rise buildings and subway underground structures. The method mainly includes: according to concrete Shear, flexural strength and ductility requirements of the pier column, calculate whether the concrete pier column needs to be reinforced; determine the position and location of the prestressed stranded wire hoop composed of the prestressed stranded wire and the connecting anchor along the height direction of the concrete pier column. Spacing; wrap the prestressed strand hoop around the outside of the concrete pier column, and apply tensile stress to the prestressed strand according to the reinforcement requirements along the concrete pier column; finally, according to the vertical bearing capacity and deformation performance requirements of the concrete pier column, As well as the protection requirements for the external prestressed strands and anchors, determine the thickness of the outer steel plate and the diameter of the steel plate after welding into the steel cover, and inject cement mortar between the original concrete pier and the steel cover to form the external prestressed steel. The cover reinforces the concrete pier column, but the patent has the function of inconvenient for guiding connection and needs to be improved.
根据中国专利号CN201610424250.7,本发明涉及桥梁施工,提供一种钢箱梁与混凝土墩柱同步施工方法,根据钢箱梁安装方案设置临时支撑,进行钢箱梁的吊装施工,同步施工钢箱梁下部的各混凝土墩柱,且在钢箱梁拼装完成以及混凝土墩柱施工至所需强度,将钢箱梁落至各混凝土墩柱上。本发明的施工方法中,钢箱梁与混凝土墩柱同步施工,对此桥梁工程的上部分结构与下部分结构同时施工,从而可以大大缩短桥梁工程的工期,而且操作简单易行,可以满足城市道路改造中高架桥建设,减小施工过程对城市交通的影响,但是该专利不方便进行相互的快速限位的功能,需要进行改进。According to Chinese Patent No. CN201610424250.7, the present invention relates to bridge construction, and provides a synchronous construction method of steel box girder and concrete pier column, setting temporary support according to the steel box girder installation plan, carrying out the hoisting construction of the steel box girder, and synchronously constructing the steel box Each concrete pier at the lower part of the beam, and after the steel box girder is assembled and the concrete pier is constructed to the required strength, drop the steel box beam onto each concrete pier. In the construction method of the present invention, the steel box girder and the concrete pier are constructed synchronously, and the upper part of the structure and the lower part of the bridge project are constructed at the same time, so that the construction period of the bridge project can be greatly shortened, and the operation is simple and easy to operate, which can meet the needs of urban The construction of viaducts in the road renovation reduces the impact of the construction process on urban traffic, but the patent is inconvenient for the function of mutual fast limit and needs to be improved.
根据中国专利号CN201920388823.4,本实用新型涉及桥梁施工技术领域,具体涉及一种预制混凝土墩柱与承台的连接结构,包括:承台,具有用于承载预制混凝土墩柱的腔体,且腔体的侧壁上预埋有多根第一钢筋,第一钢筋一端延伸至腔体的内部;预制混凝土墩柱,一端设于腔体中,且位于腔体中的预制混凝土墩柱的侧壁上预埋有多根第二钢筋,第二钢筋一端延伸至腔体的内部;连接组件,设于承台和预制混凝土墩柱之间的腔体空间中,包括相互交叉设置的多根第一钢筋、多根第二钢筋,以及填充在第一钢筋和第二钢筋的空隙中的混凝土层。本实用新型提供了一种施工简单,且施工精度要求较低的预制混凝土墩柱与承台的连接结构,但是该专利存在不利于后期的浇筑配合工作,需要进行改进。According to Chinese Patent No. CN201920388823.4, the utility model relates to the technical field of bridge construction, in particular to a connection structure of a prefabricated concrete pier column and a bearing platform, comprising: a bearing platform having a cavity for bearing the prefabricated concrete pier column, and A plurality of first steel bars are pre-embedded on the side wall of the cavity, and one end of the first steel bars extends to the inside of the cavity; one end of the prefabricated concrete pier is set in the cavity, and is located on the side of the prefabricated concrete pier in the cavity. A plurality of second steel bars are pre-embedded on the wall, and one end of the second steel bars extends to the inside of the cavity; the connecting component is arranged in the cavity space between the bearing platform and the precast concrete pier column, and includes a plurality of first steel bars arranged in a crossed manner. A steel bar, a plurality of second steel bars, and a concrete layer filled in the gap between the first steel bar and the second steel bar. The utility model provides a connection structure of a prefabricated concrete pier column and a cap which is simple in construction and requires low construction accuracy, but the patent is not conducive to the later pouring and coordination work and needs to be improved.
现有的预制混凝土墩柱结构存在不方便进行导向安装连接的功能,同时还存在不方便进行相互的快速限位的功能,不利于后期的浇筑配合工作,影响到正常的使用,需要进行改进。The existing precast concrete pier-column structure has the function of inconvenient for guiding installation and connection, and also has the function of inconvenient for mutual quick limit, which is not conducive to the later pouring coordination work, affects the normal use, and needs to be improved.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种新型部分预制混凝土墩柱结构及施工方法,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a novel partially precast concrete pier structure and construction method to solve the problems raised in the above background technology.
为实现上述目的,本发明提供如下技术方案:一种新型部分预制混凝土墩柱结构,包括基础、现浇底座、部分预制节段和预制盖梁,所述基础的上端位置固定连接有现浇底座,所述现浇底座的上端位置固定连接有部分预制节段,所述部分预制节段的上端位置固定连接有预制盖梁;In order to achieve the above purpose, the present invention provides the following technical solutions: a novel partially prefabricated concrete pier structure, comprising a foundation, a cast-in-place base, a part of prefabricated segments and a prefabricated cover beam, and the upper end of the foundation is fixedly connected with a cast-in-place base , the upper end of the cast-in-place base is fixedly connected with a part of the prefabricated segment, and the upper end of the part of the prefabricated segment is fixedly connected with a prefabricated cover beam;
所述部分预制节段包括第一预制块、第一配合座架、限位紧固结构、第二预制块和第二配合座架;The partial prefabricated segment includes a first prefabricated block, a first matching seat frame, a limit fastening structure, a second prefabricated block and a second matching seat frame;
所述第二预制块设在部分预制节段的内端底部位置,所述第二预制块的侧端位置固定连接有第二配合座架,所述第二配合座架的上端位置与第一配合座架相固定连接,所述第一配合座架的中心位置与第一预制块相固定连接,所述第一预制块、第二预制块的中心位置处固定连接有限位紧固结构;The second prefabricated block is arranged at the bottom position of the inner end of some prefabricated segments, the side end position of the second prefabricated block is fixedly connected with a second matching seat frame, and the upper end position of the second matching seat frame is the same as that of the first matching seat frame. The matching seat frame is fixedly connected, the center position of the first matching seat frame is fixedly connected with the first prefabricated block, and the center positions of the first prefabricated block and the second prefabricated block are fixedly connected with a limited-position fastening structure;
所述限位紧固结构包括中心连杆架、支撑导架、支撑柱架和限位连导块;The limit fastening structure includes a central link frame, a support guide frame, a support column frame and a limit connecting guide block;
所述中心连杆架设在限位紧固结构的内端底部位置,所述中心连杆架的上端固定连接有支撑导架,所述支撑导架的中心固定连接有支撑柱架,所述支撑柱架的中心位置固定连接有限位连导块;The central link is erected at the bottom position of the inner end of the limiting fastening structure, the upper end of the central link frame is fixedly connected with a support guide frame, the center of the support guide frame is fixedly connected with a support column frame, and the support The central position of the column frame is fixedly connected to the limit and guide block;
所述限位紧固结构还包括顶盘架、配合桁架、安装限制架、紧固推轴、销轴、配合轴柱、活动架和插接立杆;The limit fastening structure further includes a top plate frame, a matching truss, an installation limit frame, a tightening push shaft, a pin shaft, a matching shaft column, a movable frame and a plug-in vertical rod;
所述顶盘架的下端位置固定连接有配合轴柱,所述配合轴柱的下端位置固定连接有紧固推轴,所述紧固推轴的下端位置固定连接有安装限制架,所述紧固推轴贯通连接有配合桁架,所述配合桁架的侧端位置与活动架相固定连接,所述活动架的下端与销轴相插接设置,所述活动架的顶部位置铰接有插接立杆;The lower end of the top plate frame is fixedly connected with a matching shaft column, the lower end of the matching shaft column is fixedly connected with a tightening push shaft, and the lower end of the tightening push shaft is fixedly connected with an installation limit frame, the tightening The fixed push shaft is connected with a matching truss, the side end position of the matching truss is fixedly connected with the movable frame, the lower end of the movable frame is connected with the pin shaft, and the top position of the movable frame is hinged with a plug-in stand. rod;
所述预制盖梁包括盖梁板和安装结构;The prefabricated cover beam includes a cover beam plate and an installation structure;
所述盖梁板设在预制盖梁的内端顶部,所述盖梁板的下端固定连接有安装结构;The cover beam plate is arranged on the top of the inner end of the prefabricated cover beam, and the lower end of the cover beam plate is fixedly connected with an installation structure;
所述安装结构包括顶撑架、稳固台架、支柱架、内置钢架、配合槽架、限制圆杆、钢筋架和平顶架;The installation structure includes a top support frame, a stable platform, a pillar frame, a built-in steel frame, a matching groove frame, a limiting round rod, a steel bar frame and a flat top frame;
所述平顶架的侧端位置固定连接有钢筋架,所述平顶架的后端位置与限制圆杆相固定连接,所述限制圆杆的中心与顶撑架相固定连接,所述顶撑架的侧端位置与稳固台架相固定连接,所述稳固台架的侧端位置与支柱架相固定连接,所述支柱架的侧端位置与内置钢架相固定连接,所述内置钢架的侧端位置与配合槽架相固定连接。The side end position of the flat-top frame is fixedly connected with a reinforcing bar frame, the rear end position of the flat-top frame is fixedly connected with the restricting round rod, the center of the restricting round rod is fixedly connected with the top support frame, and the top The side end position of the support frame is fixedly connected to the stable platform, the side end position of the stable platform is fixedly connected to the pillar frame, the side end position of the support frame is fixedly connected to the built-in steel frame, and the built-in steel frame is fixedly connected. The side end position of the frame is fixedly connected with the matching groove frame.
优选的,所述安装结构通过顶撑架与盖梁板相固定连接,且顶撑架与盖梁板适配设置。Preferably, the installation structure is fixedly connected to the cover beam plate through a top support frame, and the top support frame and the cover beam plate are adapted to be arranged.
优选的,所述配合槽架的中心位置开设有槽体,且配合槽架与部分预制节段的顶部位置相插接限位设置。Preferably, a groove body is provided at the center of the matching slot frame, and the matching slot frame is inserted and limited to the top position of some prefabricated segments.
优选的,所述安装限制架与限位连导块相适配卡接设置,且顶盘架通过销轴与第一预制块相连接。Preferably, the installation limiting frame and the limiting connecting guide block are adapted to be snap-connected, and the top plate frame is connected to the first prefabricated block through a pin shaft.
优选的,所述限位连导块的侧端位置处设有弹簧柱,所述限位连导块通过弹簧柱与安装限制架相连接。Preferably, a spring column is provided at the side end position of the limit connecting guide block, and the limit connecting guide block is connected with the installation limit frame through the spring column.
优选的,所述支撑导架通过中心连杆架与第二预制块相固定连接。Preferably, the support guide frame is fixedly connected to the second prefabricated block through a central link frame.
优选的,所述活动架通过销轴与第一预制块相限位连接。Preferably, the movable frame is limitedly connected to the first prefabricated block through a pin shaft.
优选的,所述第一配合座架、第二配合座架相配合设置,且第一配合座架、第二配合座架设有四个,均围绕第一预制块、第二预制块对称设置。Preferably, the first matching seat frame and the second matching seat frame are matched and arranged, and there are four first matching seat frames and second matching seat frames, which are symmetrically arranged around the first prefabricated block and the second prefabricated block.
优选的,所述部分预制节段的侧端位置处设有第一防护筋和第二防护筋,所述第一防护筋、第二防护筋前后对称分布。Preferably, a first protective rib and a second protective rib are arranged at the side end positions of the partial prefabricated segments, and the first protective rib and the second protective rib are symmetrically distributed in the front and rear.
一种新型部分预制混凝土墩柱结构的施工方法,包括:A new construction method for a partially precast concrete pier-column structure, comprising:
S1、将基础进行预先安装设置,实现浇筑连接工作,实现基础与地基的连接固定;S1. Pre-install the foundation, realize the pouring connection work, and realize the connection and fixation of the foundation and the foundation;
S2、将部分预制节段进行预制生产,通过运输、吊装,实现与基础的连接安装,通过限位紧固结构实现固定连接,底部的第二预制块通过限位紧固结构与基础进行固定,且第一预制块、第二预制块之间也通过限位紧固结构进行固定设置;S2. Prefabricate some prefabricated segments, realize the connection and installation with the foundation through transportation and hoisting, and realize the fixed connection through the limit fastening structure. The second prefabricated block at the bottom is fixed with the foundation through the limit fastening structure. And the first prefabricated block and the second prefabricated block are also fixedly arranged through the limit fastening structure;
S3、将预制盖梁与部分预制节段进行安装固定,实现整体的组合设置,预制盖梁通过安装结构实现与部分预制节段的安装插接,实现整体的固定,之后通过混凝土的浇筑,实现整体的配合,方便进行组合浇筑工作。S3. Install and fix the prefabricated cover beams and some prefabricated segments to realize the overall combined setting. The prefabricated cover beams can be installed and connected with some prefabricated segments through the installation structure to realize the overall fixation, and then the concrete is poured to achieve The overall cooperation is convenient for combined pouring work.
与现有技术相比,本发明的有益效果如下:Compared with the prior art, the beneficial effects of the present invention are as follows:
一、与全预制桥墩结构相比,部分截面预制,减轻预制构件的自重,方便运输和吊装,同时,纵筋上下贯通,节段预制桥墩的四周空腔浇筑混凝土,节段预制的四周空腔,增强了节段之间的抗剪能力,增强了结构的整体性和抗震性,结构的耗能能力得到较大的提升,与现浇混凝土结构相比,现浇底座作为耗能段耗散地震作用能量,节段预制墩柱对耗能能力贡献较小,整体结构的耗能能力基本等同于现浇混凝土结构。预制腔体外壳作为现浇混凝土的模板,减少了现场支模的工作量,加快了施工进度,大大缩短施工周期,在墩柱的截面中心布置后张预应力筋,预应力筋与周围的混凝土并未粘结,加强各节段的连接的整体性,增强各节段的抗剪性,同时利用预应力筋的弹性恢复力,使墩柱结构在地震作用下具有较强的自复位的能力,减小结构的残余变形,增强结构的可修复性。1. Compared with the fully prefabricated pier structure, the partial prefabrication of the section reduces the weight of the prefabricated components and facilitates transportation and hoisting. At the same time, the longitudinal bars are connected up and down, and the surrounding cavities of the segmental prefabricated piers are poured with concrete, and the surrounding cavities of the segmental prefabricated piers are poured , the shear resistance between segments is enhanced, the integrity and earthquake resistance of the structure are enhanced, and the energy dissipation capacity of the structure is greatly improved. The seismic action energy and the segmental prefabricated piers contribute little to the energy dissipation capacity, and the energy dissipation capacity of the overall structure is basically equivalent to that of the cast-in-place concrete structure. The prefabricated cavity shell is used as the formwork of the cast-in-place concrete, which reduces the workload of on-site formwork support, speeds up the construction progress, and greatly shortens the construction period. It is not bonded, strengthens the integrity of the connection of each segment, enhances the shear resistance of each segment, and at the same time utilizes the elastic restoring force of the prestressed tendons, so that the pier-column structure has a strong self-resetting ability under the action of earthquakes , reduce the residual deformation of the structure and enhance the repairability of the structure.
二、通过安装部分预制节段,部分预制节段通过第一预制块、第一配合座架、限位紧固结构、第二预制块和第二配合座架组合连接,实现整体的构建安装工作,且第一预制块、第二预制块采用预制生产工作,通过限位紧固结构可方便进行第一预制块、第二预制块的组合安装工作,实现相互的配合,侧部位置的第一配合座架、第二配合座架可实现紧固,方便进行各段之间连接,通过第一预制块、第二预制块中心的灌浆,实现整体的紧固,方便进行整体的固化处理,有助于进行快速的安装连接工作,实现整体的装配生产工作。2. By installing some prefabricated segments, some prefabricated segments are connected by the first prefabricated block, the first matching seat frame, the limit fastening structure, the second prefabricated block and the second matching seat frame to realize the overall construction and installation work , and the first prefabricated block and the second prefabricated block are produced by prefabrication, and the combined installation of the first prefabricated block and the second prefabricated block can be facilitated through the limit fastening structure to achieve mutual cooperation. The mating seat frame and the second mating seat frame can be fastened to facilitate the connection between each section. The grouting in the center of the first prefabricated block and the second prefabricated block realizes the overall fastening and facilitates the overall curing treatment. It is helpful for quick installation and connection work, and realizes the overall assembly production work.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.
图1为本发明的主体结构示意图;Fig. 1 is the main structure schematic diagram of the present invention;
图2为本发明的主体部分结构示意图;Fig. 2 is the main structure schematic diagram of the present invention;
图3为本发明的主体的立体图;Fig. 3 is the perspective view of the main body of the present invention;
图4为本发明的部分预制节段的结构示意图;4 is a schematic structural diagram of a part of a prefabricated segment of the present invention;
图5为本发明限位紧固结构的结构示意图;Fig. 5 is the structural schematic diagram of the limit fastening structure of the present invention;
图6为本发明限位紧固结构的侧视图;FIG. 6 is a side view of the limiting fastening structure of the present invention;
图7为本发明预制盖梁的结构示意图;Fig. 7 is the structural schematic diagram of the prefabricated cover beam of the present invention;
图8为本发明预制盖梁的侧视图;Fig. 8 is the side view of the prefabricated cover beam of the present invention;
图9为本发明安装结构的结构示意图;Fig. 9 is the structural schematic diagram of the installation structure of the present invention;
图10为本发明的主体插头的第二实施例侧视图。10 is a side view of the second embodiment of the main body plug of the present invention.
图中:1-基础、2-现浇底座、3-部分预制节段、4-预制盖梁、5-第一预制块、6-第一配合座架、7-限位紧固结构、8-第二预制块、9-第二配合座架、10-中心连杆架、11-支撑导架、12-支撑柱架、13-限位连导块、14-顶盘架、15-配合桁架、16-安装限制架、17-紧固推轴、18-销轴、19-配合轴柱、20-活动架、21-插接立杆、22-盖梁板、23-安装结构、24-顶撑架、25-稳固台架、26-支柱架、27-内置钢架、28-配合槽架、29-限制圆杆、30-钢筋架、31-平顶架、32-第一防护筋、33-第二防护筋。In the figure: 1- Foundation, 2- Cast-in-place base, 3- Part of prefabricated segment, 4- Prefabricated cover beam, 5- First prefabricated block, 6- First matching seat frame, 7- Limiting fastening structure, 8- -Second prefabricated block, 9-Second matching seat frame, 10-Central link frame, 11-Supporting guide frame, 12-Supporting column frame, 13-Limiting connecting guide block, 14-Top plate frame, 15-Matching Truss, 16-installation limit frame, 17-fastening push shaft, 18-pin shaft, 19-cooperating shaft column, 20-movable frame, 21-plug-in pole, 22-cover beam plate, 23-installation structure, 24 -Top support frame, 25-Stable platform, 26-Pillar frame, 27-Built-in steel frame, 28-Matching groove frame, 29-Limited round rod, 30-Rebar frame, 31-Flat top frame, 32-First protection Ribs, 33 - the second protective ribs.
具体实施方式Detailed ways
为了使本技术领域的人员更好地理解本申请方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分的实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。In order to make those skilled in the art better understand the solutions of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only The embodiments are part of the present application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the scope of protection of the present application.
需要说明的是,本申请的说明书和权利要求书及上述附图中的术语″第一″、″第二″等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本申请的实施例。此外,术语″包括″和″具有″以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first", "second" and the like in the description and claims of the present application and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific sequence or sequence. It is to be understood that the data so used are interchangeable under appropriate circumstances for the embodiments of the application described herein. Furthermore, the terms "comprising" and "having" and any variations thereof, are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those expressly listed Rather, those steps or units may include other steps or units not expressly listed or inherent to these processes, methods, products or devices.
下面结合附图对本发明进一步说明。The present invention will be further described below with reference to the accompanying drawings.
实施例1Example 1
请参阅图1、图2、图3,本发明提供的一种实施例:一种新型部分预制混凝土墩柱结构,包括基础1、现浇底座2、部分预制节段3和预制盖梁4,基础1的上端位置固定连接有现浇底座2,现浇底座2的上端位置固定连接有部分预制节段3,部分预制节段3的上端位置固定连接有预制盖梁4,通过基础1、现浇底座2、部分预制节段3和预制盖梁4的连接组合,方便进行整体的构建安装工作;Please refer to Figure 1, Figure 2, Figure 3, an embodiment provided by the present invention: a novel partially precast concrete pier structure, comprising a
请参阅图4,部分预制节段3包括第一预制块5、第一配合座架6、限位紧固结构7、第二预制块8和第二配合座架9;Referring to FIG. 4 , a part of the
第二预制块8设在部分预制节段3的内端底部位置,第二预制块8的侧端位置固定连接有第二配合座架9,第二配合座架9的上端位置与第一配合座架6相固定连接,第一配合座架6的中心位置与第一预制块5相固定连接,第一预制块5、第二预制块8的中心位置处固定连接有限位紧固结构7,通过第一预制块5、第一配合座架6、限位紧固结构7、第二预制块8和第二配合座架9的组合设置,方便进行整体的安装配合,有助于提高连接的稳定性;The second
请参阅图5,限位紧固结构7包括中心连杆架10、支撑导架11、支撑柱架12和限位连导块13;Please refer to FIG. 5 , the
中心连杆架10设在限位紧固结构7的内端底部位置,中心连杆架10的上端固定连接有支撑导架11,支撑导架11的中心固定连接有支撑柱架12,支撑柱架12的中心位置固定连接有限位连导块13,通过中心连杆架10、支撑导架11、支撑柱架12和限位连导块13的安装组合,方便进行配合连接工作,实现支撑连接的目的;The
请参阅图6,限位紧固结构7还包括顶盘架14、配合桁架15、安装限制架16、紧固推轴17、销轴18、配合轴柱19、活动架20和插接立杆21;Please refer to FIG. 6 , the
顶盘架14的下端位置固定连接有配合轴柱19,配合轴柱19的下端位置固定连接有紧固推轴17紧固推轴17的下端位置固定连接有安装限制架16,紧固推轴17贯通连接有配合桁架15,配合桁架15的侧端位置与活动架20相固定连接,活动架20的下端与销轴18相插接设置,活动架20的顶部位置铰接有插接立杆21,通过顶盘架14、配合桁架15、安装限制架16、紧固推轴17、销轴18、配合轴柱19、活动架20和插接立杆21的组合设置,方便进行预制连接工作,方便进行配合生产目的;The lower end position of the
请参阅图7、图8,预制盖梁4包括盖梁板22和安装结构23;Please refer to FIG. 7 and FIG. 8 , the
盖梁板22设在预制盖梁4的内端顶部,盖梁板22的下端固定连接有安装结构23,通过盖梁板22和安装结构23的组合连接,方便进行组合安装;The
请参阅图9,安装结构23包括顶撑架24、稳固台架25、支柱架26、内置钢架27、配合槽架28、限制圆杆29、钢筋架30和平顶架31;Please refer to FIG. 9 , the
平顶架31的侧端位置固定连接有钢筋架30,平顶架31的后端位置与限制圆杆29相固定连接,限制圆杆29的中心与顶撑架24相固定连接,顶撑架24的侧端位置与稳固台架25相固定连接,稳固台架25的侧端位置与支柱架26相固定连接,支柱架26的侧端位置与内置钢架27相固定连接,内置钢架27的侧端位置与配合槽架28相固定连接,通过顶撑架24、稳固台架25、支柱架26、内置钢架27、配合槽架28、限制圆杆29、钢筋架30和平顶架31的安装组合,可方便进行立体式的固定安装工作。The side end position of the flat
请参阅图1、图2、图3、图4、图5、图6、图7、图8、图9,安装结构23通过顶撑架24与盖梁板22相固定连接,且顶撑架24与盖梁板22适配设置,配合槽架28的中心位置开设有槽体,且配合槽架28与部分预制节段3的顶部位置相插接限位设置,安装限制架16与限位连导块13相适配卡接设置,且顶盘架14通过销轴18与第一预制块5相连接,限位连导块13的侧端位置处设有弹簧柱,限位连导块13通过弹簧柱与安装限制架16相连接,支撑导架11通过中心连杆架10与第二预制块8相固定连接,活动架20通过销轴18与第一预制块5相限位连接,第一配合座架6、第二配合座架9相配合设置,且第一配合座架6、第二配合座架9设有四个,均围绕第一预制块5、第二预制块8对称设置,通过结构的安装组合,可方便进行整体的构建组合工作,方便进行配合组装生产工作。Please refer to FIG. 1 , FIG. 2 , FIG. 3 , FIG. 4 , FIG. 5 , FIG. 6 , FIG. 7 , FIG. 8 , and FIG. 9 , the mounting
本实施例在实施时,将基础1、现浇底座2、部分预制节段3、预制盖梁4进行安装连接,实现整体的构建,帮助进行承载连接工作,方便进行施工生产工作,部分预制节段3通过第一预制块5、第一配合座架6、限位紧固结构7、第二预制块8和第二配合座架9进行安装连接,通过限位紧固结构7实现第一预制块5、第二预制块8之间的固定工作,限位紧固结构7的底部通过中心连杆架10、支撑导架11、支撑柱架12、限位连导块13组合设置,通过中心连杆架10、支撑导架11、支撑柱架12、限位连导块13的连接,实现底部的支撑,有助于上下端的配合固定工作,方便进行组装连接目的,限位紧固结构7的上部通过顶盘架14、配合桁架15、安装限制架16、紧固推轴17、销轴18、配合轴柱19、活动架20和插接立杆21组合连接,顶部的顶盘架14、配合轴柱19可通过外力,进行下压连接,实现安装限制架16与限位连导块13的配合连接工作,侧端位置的活动架20、插接立杆21的设置,方便进行伴随运动,实现下压处理工作,方便进行高效的组合,通过二次的浇筑,更好的进行承载连接,实现钢结构与混凝土结构的混合生产工作,提高整体的承载刚度,预制盖梁4通过盖梁板22、安装结构23连接设置,通过安装结构23可方便与部分预制节段3的固定连接,安装结构23通过顶撑架24、稳固台架25、支柱架26、内置钢架27、配合槽架28、限制圆杆29、钢筋架30和平顶架31组合设置,钢筋架30、平顶架31可方便进行内部的连接,有助于进行预埋工作,提高连接的接触面积,通过配合槽架28可方便进行与部分预制节段3的安装限位工作,稳固台架25、支柱架26、内置钢架27的设置,可实现承载支撑,帮助提高连接的稳定性能。In the implementation of this embodiment, the
实施例2Example 2
在实施例1的基础上,如图10所示,部分预制节段3的侧端位置处设有第一防护筋32和第二防护筋33,第一防护筋32、第二防护筋33前后对称分布。On the basis of
本实施例在实施时,将第一防护筋32、第二防护筋33与部分预制节段3进行安装连接,实现整体的架设构建工作,实现整体的连接处理工作,通过第一防护筋32、第二防护筋33的设置,实现侧边位置的防护,同时可进行二次的浇筑工作,更好的实现一体化的构建生产工作,提高整体的承载能力。In the implementation of this embodiment, the first
一种新型部分预制混凝土墩柱结构的施工方法,包括:A new construction method for a partially precast concrete pier-column structure, comprising:
S1、将基础1进行预先安装设置,实现浇筑连接工作,实现基础1与地基的连接固定;S1. Pre-install and set the
S2、将部分预制节段3进行预制生产,通过运输、吊装,实现与基础1的连接安装,通过限位紧固结构7实现固定连接,底部的第二预制块8通过限位紧固结构7与基础1进行固定,且第一预制块5、第二预制块8之间也通过限位紧固结构7进行固定设置;S2. Prefabricate part of the
S3、将预制盖梁4与部分预制节段3进行安装固定,实现整体的组合设置,预制盖梁4通过安装结构23实现与部分预制节段3的安装插接,实现整体的固定,之后通过混凝土的浇筑,实现整体的配合,方便进行组合浇筑工作。S3. Install and fix the
工作原理:使用者将基础1进行安装连接,实现底部的支撑固定,通过现浇底座2、部分预制节段3可与基础1进行安装组合,实现连接,部分预制节段3通过第一预制块5、第二预制块8进行预制生产工作,通过限位紧固结构7可进行固定连接,实现现场的装配生产,完成安装后,通过混凝土的二次浇灌,实现整体的组合,限位紧固结构7的底部通过中心连杆架10、支撑导架11、支撑柱架12和限位连导块13的设置,可实现底部的承载,且限位连导块13的侧端设有弹簧架,有利于组合连接工作,限位紧固结构7的上端可与下端进行配合,且配合轴柱19可通过外界的安装,实现传导,带动紧固推轴17、安装限制架16与限位连导块13进行连接工作顶盘架14的侧端通过活动架20、插接立杆21进行连接,可实现向下的按压支撑工作,侧端位置的销轴18方便进行与第一预制块5的组合连接工作,方便进行固定安装,实现组合生产的目的,预制盖梁4内通过盖梁板22、安装结构23进行连接工作,安装结构23方便进行部分预制节段3、预制盖梁4的固定连接,安装结构23通过顶撑架24进行顶部的支撑,稳固台架25、支柱架26、内置钢架27可实现配合槽架28的承载安装,且配合槽架28可与部分预制节段3进行配合,实现紧固连接的目的,侧端位置的钢筋架30、平顶架31方便进行预埋生产工作,提高连接的稳定性,完成工作。Working principle: The user installs and connects the
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210160944.XA CN114438875A (en) | 2022-02-22 | 2022-02-22 | Novel partially-prefabricated concrete pier column structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210160944.XA CN114438875A (en) | 2022-02-22 | 2022-02-22 | Novel partially-prefabricated concrete pier column structure and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114438875A true CN114438875A (en) | 2022-05-06 |
Family
ID=81373284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210160944.XA Withdrawn CN114438875A (en) | 2022-02-22 | 2022-02-22 | Novel partially-prefabricated concrete pier column structure and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114438875A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118456610A (en) * | 2024-07-12 | 2024-08-09 | 河北东风世景轨道有限公司 | Precast pier column template of concrete |
-
2022
- 2022-02-22 CN CN202210160944.XA patent/CN114438875A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118456610A (en) * | 2024-07-12 | 2024-08-09 | 河北东风世景轨道有限公司 | Precast pier column template of concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100667921B1 (en) | Pylon construction method of cable bridge using precast concrete crossbeam | |
CN202108115U (en) | Bamboo truss string structure | |
CN107882328B (en) | Construction method of large-span steel truss suspension structure | |
CN110965474A (en) | Construction method of cable tower cross beam | |
CN104481031A (en) | Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure | |
CN108179808A (en) | A prefabricated beam-column crimp joint reinforced stirrup structure and its construction method | |
CN103741854B (en) | A prestressed composite grid frame and its construction method | |
CN112523517A (en) | Pre-bent laminated wood-concrete composite beam construction method based on crossbow method | |
CN114438875A (en) | Novel partially-prefabricated concrete pier column structure and construction method | |
CN110318342B (en) | Construction equipment is assembled to prefabricated bent cap cantilever of festival section | |
CN111058381A (en) | Construction method for side-span cast-in-place section of continuous rigid frame bridge | |
CN212656384U (en) | High-strength concrete connecting piece, high-strength concrete post-cast assembled frame system and support frame | |
JP2003213623A6 (en) | Bridge superstructure | |
JP3877995B2 (en) | How to build a string string bridge | |
CN110185179B (en) | Self-resetting building structure and construction method of prefabricated suspended floor | |
CN112012105A (en) | Anchoring structure of a cable-stayed bridge with a tooth block and tie rod combination cable tower | |
CN219604164U (en) | Variable cross-section special-shaped steel tower crown mounting device | |
CN106351128A (en) | Construction method of side span main girder of cable-stayed bridge | |
CN115162697B (en) | Special-shaped column construction work I-shaped steel cantilever platform and construction method | |
JP3466136B2 (en) | Method and apparatus for overhanging PC bridge | |
CN116065476A (en) | A template-free ultra-large-scale UHPC-CSW-NC composite cover beam and its construction method | |
CN210685165U (en) | Structure of encorbelmenting | |
CN107142830A (en) | Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method | |
CN210803119U (en) | A large-tonnage cantilever self-balancing test loading system | |
CN115387234A (en) | A formwork system and construction method for the lower beam of a super-high diamond-shaped tower pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20220506 |
|
WW01 | Invention patent application withdrawn after publication |