[go: up one dir, main page]

CN114427304B - An assembled edge protection device for cast-in-place concrete stairs - Google Patents

An assembled edge protection device for cast-in-place concrete stairs Download PDF

Info

Publication number
CN114427304B
CN114427304B CN202210033300.4A CN202210033300A CN114427304B CN 114427304 B CN114427304 B CN 114427304B CN 202210033300 A CN202210033300 A CN 202210033300A CN 114427304 B CN114427304 B CN 114427304B
Authority
CN
China
Prior art keywords
railing
rod
stairs
cast
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210033300.4A
Other languages
Chinese (zh)
Other versions
CN114427304A (en
Inventor
张世江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhongsheng Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210033300.4A priority Critical patent/CN114427304B/en
Publication of CN114427304A publication Critical patent/CN114427304A/en
Application granted granted Critical
Publication of CN114427304B publication Critical patent/CN114427304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本发明公开了一种用于现浇混凝土楼梯的组装式临边防护装置,包括分别设置在上、下平台板上的立柱,以及设置在楼梯休息平台上的转接立柱,在立柱与转接立柱之间沿楼梯的踏步板延伸方向分别设置有防护栏组件,所述防护栏组件分别与立柱及转接立柱连接,所述上栏杆、下栏杆与立柱及转接立柱的连接处分别设置第一组装连接机构,立杆与上栏杆、下栏杆的连接处分别设置第二组装连接机构。本发明结构简单、拆装快速、连接稳固、重复使用、运输方便,具有很好的实用性,可满足不同建筑施工现场楼梯临边的防护需要,且可以重复使用,具有很大的利用价值,是现浇混凝土楼梯临边防护领域的一个技术革新。

The invention discloses an assembled edge protection device for cast-in-situ concrete stairs, which comprises upright columns respectively arranged on the upper and lower platform slabs, and transfer uprights arranged on the rest platform of the stairs. Guardrail components are respectively arranged between the uprights along the extending direction of the step boards of the stairs. The guardrail components are respectively connected with the uprights and the transfer uprights. Assembling the connecting mechanism, a second assembling and connecting mechanism is arranged at the joints of the upright bar, the upper railing and the lower railing respectively. The invention has the advantages of simple structure, fast disassembly and assembly, stable connection, repeated use, convenient transportation, good practicability, and can meet the protection needs of stairs in different construction sites, and can be reused, and has great utilization value. It is a technical innovation in the field of edge protection of cast-in-situ concrete stairs.

Description

一种用于现浇混凝土楼梯的组装式临边防护装置An assembled edge protection device for cast-in-place concrete stairs

技术领域technical field

本发明涉及建筑设施领域,尤其涉及一种用于现浇混凝土楼梯的组装式临边防护装置。The invention relates to the field of building facilities, in particular to an assembled edge protection device for cast-in-situ concrete stairs.

背景技术Background technique

随着国家市场经济的快速发展、城市化进展的加快,城市的住宅、商场、办公楼、酒店等大楼建设必不可少。众所周知,楼梯作为大楼建设施工中必不可少的结构,也是建筑施工现场最容易出现安全问题的薄弱部位,如今建筑工程施工的安全问题已经成为建筑领域的重点审查项目。为了保证施工现场人员的人身安全,在主体施工过程的后期阶段施工中,现浇混凝土楼梯浇筑成型后,需要在楼梯上安装临边防护栏,一般临边防护栏结构主要包括立杆和横杆,在防护栏搭建过程中,立杆和横杆采用焊接式固定或扣件连接而成,为了实现可拆卸目的,降低成本,常用的临边防护栏大多是采用钢管加扣件的结构。With the rapid development of the country's market economy and the acceleration of urbanization, the construction of residential buildings, shopping malls, office buildings, hotels and other buildings in the city is indispensable. As we all know, as an indispensable structure in building construction, stairs are also the weakest part of the construction site where safety problems are most likely to occur. Nowadays, the safety of construction projects has become a key review item in the construction field. In order to ensure the personal safety of the personnel on the construction site, in the later stage of the main construction process, after the cast-in-place concrete stairs are poured, it is necessary to install the edge guardrail on the stairs. Generally, the edge guardrail structure mainly includes vertical bars and horizontal bars. During the construction of the guardrail, the vertical poles and crossbars are fixed by welding or connected by fasteners. In order to achieve the purpose of detachment and reduce costs, most of the commonly used border guardrails are steel pipes and fasteners.

CN212984409U公开了一种可拆卸式临边防护栏,包括立杆和横杆,横杆拦挡于楼梯边沿,立杆间隔地与横杆连接并将横杆支撑于楼梯上,所述立杆底端设有连接座,连接座包括底板和一端固定连接于底板上的连接管,立杆底端插接于连接管的另一端,连接管为直管或弯管接头,所接连接管为直管的底板螺钉连接于楼梯底部或顶部的楼梯平台上,所接连接管为弯管接头的底板螺钉连接于楼梯侧边或楼梯转角处的楼梯平台侧边上;所述立杆和横杆的连接点设有连接套件,连接套件分为第一连接套件、第二连接套件和第三连接套件。CN212984409U discloses a detachable edge guardrail, comprising uprights and crossbars, the crossbars block the edge of the stairs, the uprights are connected to the crossbars at intervals and the crossbars are supported on the stairs, and the bottom ends of the uprights are provided with There is a connecting seat, the connecting seat includes a bottom plate and a connecting pipe fixedly connected to the bottom plate at one end, the bottom end of the vertical pole is inserted into the other end of the connecting pipe, the connecting pipe is a straight pipe or an elbow joint, and the connecting pipe is a straight pipe bottom plate The screw is connected to the stair platform at the bottom or top of the stair, and the connecting pipe is connected to the bottom plate screw of the elbow joint to be connected to the side of the stair or the stair platform at the corner of the stair; The connection kit is divided into a first connection kit, a second connection kit and a third connection kit.

CN211143811U公开了一种伸缩式楼梯临边防护栏杆,具体涉及防护栏杆领域,包括栏杆和安装座,所述栏杆下表面设置有凹槽,所述凹槽内部设置有第一滑筒,所述栏杆外侧对应第一滑筒的位置设置有第一蝶形螺栓,所述第一蝶形螺栓贯穿栏杆并与所述第一滑筒螺纹连接,所述第一滑筒远离第一蝶形螺栓的另一侧通过销轴与栏杆连接。本发明通过设有第一滑筒和滑杆,第一滑筒内部的第二滑筒在自身重力的作用下会向下滑动,从而延伸其长度,第二滑筒内部的滑杆在重力的作用下会向下滑动并进一步加长其长度,使其可适应大部分不同高度的楼梯临边围护的使用,连接件会与固定筒螺纹连接,从而将滑杆牢牢固定在固定筒上,提高其稳定性。CN211143811U discloses a telescopic stair edge protective railing, specifically related to the field of protective railings, including a railing and a mounting seat, the lower surface of the railing is provided with a groove, the inside of the groove is provided with a first sliding cylinder, and the railing The position corresponding to the first sliding cylinder on the outside is provided with a first butterfly bolt. The first butterfly bolt passes through the railing and is threadedly connected with the first sliding cylinder. The first sliding cylinder is far away from the other side of the first butterfly bolt. One side is connected with the railing by a pin. In the present invention, the first sliding tube and the sliding rod are provided, and the second sliding tube inside the first sliding tube will slide downward under the action of its own gravity, thereby extending its length. Under the action, it will slide down and further lengthen its length, making it suitable for the use of most of the stair edge enclosures of different heights. The connecting piece will be threaded with the fixing tube, so that the sliding rod is firmly fixed on the fixing tube. improve its stability.

CN208347336U公开了一种可拆卸式楼梯临边防护栏杆,包括楼梯,所述楼梯上还包括第一立杆、连接横杆、第二立杆、第三立杆、第四立杆和水平杆,所述楼梯与第一立杆、连接横杆、第二立杆、第三立杆、第四立杆和水平杆配合连接;所述第一立杆上设有螺栓孔槽和固定底盘,所述固定底盘上设有第一螺栓,所述第一立杆设置在楼梯上端左侧处,且通过固定底盘、第一螺栓和楼梯可拆卸连接;所述连接横杆上设有第二螺栓,所述水平杆上设有套筒。CN208347336U discloses a detachable stair edge protection railing, including stairs, and the stairs also include first uprights, connecting cross bars, second uprights, third uprights, fourth uprights and horizontal bars, The stairs are connected with the first vertical rod, the connecting cross rod, the second vertical rod, the third vertical rod, the fourth vertical rod and the horizontal rod; the first vertical rod is provided with a bolt hole groove and a fixed chassis, so that The fixed chassis is provided with a first bolt, the first vertical rod is arranged on the left side of the upper end of the stairs, and is detachably connected by the fixed chassis, the first bolt and the stairs; the connecting cross bar is provided with a second bolt, A sleeve is arranged on the horizontal bar.

CN210659342U公开了一种可拆卸式楼梯临边防护栏杆,第一立杆、第二立杆、多个转接部件和横杆;所述第一立杆和所述第二立杆分别设置在相邻两个楼梯平台的边侧上;所述转接部件分别设置在所述第一立杆、所述第二立杆上;所述横杆设置于所述第一立杆和所述第二立杆之间,且所述横杆的两端与所述转接部件连接。CN210659342U discloses a detachable stair edge protection railing, the first vertical rod, the second vertical rod, a plurality of transfer parts and cross bars; the first vertical rod and the second vertical rod are respectively arranged on the corresponding On the sides adjacent to two stair platforms; the transfer parts are respectively arranged on the first upright rod and the second upright rod; the cross bar is arranged on the first upright rod and the second upright rod between the upright bars, and the two ends of the cross bars are connected with the transition parts.

上述楼梯临边防护栏结构有效保证了施工人员的人身安全,也是目前较为主流的、常用的一些临边防护结构,但仍然存在一些缺陷,例如采用横杆、立杆、扣件或套筒结构的临边防护,虽然安全性较高,且能够实现可拆卸的重复使用的目的,但横杆、立杆、扣件或套筒数量庞大,在安装时一个人无法完成,安装过程较为麻烦,安装施工时间较长,而且横杆、立杆跟扣件运输不方便而且容易丢失,只采用横杆进行防护的结构,虽然减少了立杆的数量降低了扣件或套筒的使用量,安装过程相对容易,并且也不需要在踏步板上打孔安装立杆,但防护效果并不好,容易出现安全隐患。采用伸缩式的结构,最大程度减少了横杆、立杆、扣件等部件的数量,但重量较大,安装需要两人配合,安装过程仍然比较麻烦,而且需要在踏步板上打孔。综上所述,目前的临边防护结构仍然存在部件连接结构较多、安装过程麻烦,需要在踏步板上打孔且防护效果欠佳的问题。那么如何能够降低临边防护栏的生产成本、在不破坏踏步板的前提下,安装、拆卸更加方便、降低工人工作量且确保较高的安全防护效果,成为了建筑安全防护设备领域技术人员一个亟待解决的问题。The above-mentioned stair border guardrail structure effectively guarantees the personal safety of construction personnel, and is currently the mainstream and commonly used border guard structure, but there are still some defects, such as the use of horizontal bars, vertical bars, fasteners or sleeve structures. Although the edge protection has high safety and can be detachable and reused, the number of horizontal bars, vertical bars, fasteners or sleeves is huge, and one person cannot complete the installation, and the installation process is more troublesome. The construction time is long, and the transportation of the crossbars, vertical poles and fasteners is inconvenient and easy to be lost. Only the crossbars are used for the protection structure. Although the number of vertical poles is reduced and the amount of fasteners or sleeves is reduced, the installation process It is relatively easy, and there is no need to drill holes on the step board to install the pole, but the protective effect is not good, and it is prone to safety hazards. The telescopic structure minimizes the number of crossbars, vertical poles, fasteners and other components, but it is heavy and requires the cooperation of two people for installation. The installation process is still cumbersome, and holes need to be drilled on the step board. To sum up, the current border protection structure still has the problems of many component connection structures, troublesome installation process, the need to drill holes on the step plate and poor protection effect. So how to reduce the production cost of the border guardrail, make the installation and disassembly more convenient, reduce the workload of workers and ensure a high safety protection effect without damaging the step board, has become an urgent need for technical personnel in the field of construction safety protection equipment solved problem.

发明内容Contents of the invention

针对现有技术存在的不足,本发明所要解决的技术问题是,提供一种降低临边防护栏的生产成本、在不破坏踏步板的前提下,安装、拆卸更加方便、降低工人工作量且确保较高的安全防护效果的用于现浇混凝土楼梯的组装式临边防护装置。Aiming at the deficiencies of the existing technology, the technical problem to be solved by the present invention is to provide a method to reduce the production cost of the border guardrail, to provide a more convenient installation and disassembly without damaging the step board, to reduce the workload of the workers and to ensure a higher Modular edge protection for cast-in-situ concrete stairs with high safety protection effect.

为解决上述技术问题,本发明所采取的技术方案是:一种用于现浇混凝土楼梯的组装式临边防护装置,包括分别设置在上、下平台板上的立柱,以及设置在楼梯休息平台上的转接立柱,在立柱与转接立柱之间沿楼梯的踏步板延伸方向分别设置有防护栏组件,所述防护栏组件分别与立柱及转接立柱连接,所述防护栏组件包括分别依次上下设于踏步板两侧的上栏杆及下栏杆,以及沿上、下栏杆的长度方向依次设置的多个分别与上栏杆及下栏杆连接的立杆,所述上栏杆及下栏杆包括一杆体,在杆体的两端部均设置有用于与立柱及转接立柱相连的球形连接部件,在杆体近两端部处分别开设有用于与所述立杆连接的插孔,沿杆体的轴线方向在杆体上连续开设有与两插孔相连的导向限位槽,在立杆的底部沿楼梯的踏步板延伸方向设置有踢脚板,相邻的踢脚板之间形成一连续的用于防护踏步板两侧的防护板组件,所述上栏杆、下栏杆与立柱及转接立柱的连接处分别设置第一组装连接机构,立杆与上栏杆、下栏杆的连接处分别设置第二组装连接机构。In order to solve the above-mentioned technical problems, the technical solution adopted by the present invention is: an assembled edge protection device for cast-in-place concrete stairs, including upright columns respectively arranged on the upper and lower platform slabs, and columns arranged on the rest platform of the stairs The transfer column on the upper column is provided with a guardrail assembly between the column and the transfer column along the extension direction of the stair tread. The guardrail assembly is connected with the column and the transfer column respectively. The guardrail assembly includes respectively The upper railing and the lower railing arranged on both sides of the step plate up and down, and a plurality of upright rails connected with the upper railing and the lower railing respectively arranged in sequence along the length direction of the upper railing and the lower railing. The upper railing and the lower railing include a rod body , both ends of the rod body are provided with spherical connecting parts for connecting with the upright column and the transfer column, and the near two ends of the rod body are respectively provided with sockets for connecting with the upright rod, along the axis direction of the rod body. The rod body is continuously provided with a guide limit groove connected with the two sockets, and a skirting board is arranged at the bottom of the vertical rod along the extending direction of the step board of the stairs, and a continuous skirting board is formed between adjacent skirting boards to protect both sides of the step board. As for the protective plate assembly, the joints of the upper railing, the lower railing and the upright post and the transfer post are respectively provided with a first assembly connection mechanism, and the joints of the upright rail, the upper railing, and the lower railing are respectively provided with a second assembly connection mechanism.

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述立柱包括与上、下平台板固定连接的第一底座,以及设于第一底座上的立柱本体。In the aforementioned assembled edge protection device for cast-in-situ concrete stairs, the column includes a first base fixedly connected with the upper and lower platform plates, and a column body arranged on the first base.

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述转接立柱包括与楼梯休息平台固定连接的第二底座,以及设于第二底座上的分别与上、下栏杆相连的左、右立柱。In the above-mentioned assembled edge protection device for cast-in-place concrete stairs, the transfer column includes a second base fixedly connected to the rest platform of the stairs, and a left base set on the second base connected to the upper and lower railings respectively. , Right column.

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述第一组装连接机构包括在立柱本体上开设的与球形连接部件相连的第一插孔结构,以及在左、右立柱上分别开设的与球形连接部件连接的第二插孔结构,所述第一、二插孔结构均包括与上栏杆的球形连接部件插接的插槽,以及与下栏杆的球形连接部件插接的第一插孔,在立柱本体及左、右立柱上分别开设有与第一插孔相连的第一导向限位槽,所述第一导向限位槽的宽度小于球形连接部件的直径。In the above-mentioned assembled edge protection device for cast-in-situ concrete stairs, the first assembled connection mechanism includes a first socket structure connected to the spherical connecting part opened on the column body, and the left and right columns respectively The second socket structure connected with the spherical connection part is opened, and the first and second socket structures both include a slot plugged with the spherical connection part of the upper railing, and a second socket plugged with the spherical connection part of the lower railing. An insertion hole, the column body and the left and right columns are respectively provided with a first guiding and limiting groove connected to the first insertion hole, the width of the first guiding and limiting groove is smaller than the diameter of the spherical connecting part.

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述立杆包括立杆本体,垂直于立杆本体分别向外延伸设置两连接杆,在两连接杆的端部设置有分别与上、下栏杆的插孔及导向限位槽配合的第二球形连接部件,所述踢脚板设于立杆本体的底部。In the above-mentioned assembled edge protection device for cast-in-place concrete stairs, the upright rod includes a upright rod body, and two connecting rods are respectively extended outwardly perpendicular to the upright rod body, and the ends of the two connecting rods are respectively provided with The jacks of the upper and lower railings and the second spherical connecting part matched with the guide and limit grooves, and the skirting board is arranged at the bottom of the pole body.

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述第二组装连接机构包括分别设于连接杆上的用于将立杆本体与上栏杆及下栏杆固定的压紧机构,所述压紧机构与连接杆活动连接,在压紧机构上设置有锁紧螺钉。In the above-mentioned assembled edge protection device for cast-in-situ concrete stairs, the second assembled connection mechanism includes pressing mechanisms respectively arranged on the connecting rods for fixing the main body of the vertical rod with the upper railing and the lower railing. The pressing mechanism is movably connected with the connecting rod, and a locking screw is arranged on the pressing mechanism.

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述压紧机构包括一压紧块,在压紧块上开设有一与连接杆活动连接的通孔,所述压紧块的内侧壁设置有一与上栏杆或下栏杆的外壁仿形配合的内凹部,在内凹部的表面覆盖有橡胶防滑层,所述锁紧螺钉分别设于压紧块的顶部及底部并向内凹部延伸设置。In the above-mentioned assembled edge protection device for cast-in-situ concrete stairs, the pressing mechanism includes a pressing block, and a through hole movably connected with the connecting rod is provided on the pressing block, and the inner side of the pressing block The wall is provided with an inner concave part that conforms to the outer wall of the upper railing or the lower railing, and the surface of the inner concave part is covered with a rubber anti-skid layer. The locking screws are respectively arranged on the top and bottom of the pressing block and extended to the inner concave part. .

上述的用于现浇混凝土楼梯的组装式临边防护装置,所述踢脚板包括一板体,在板体上连接有一与所述立杆本体转动连接的调节杆,所述立杆本体上开设有与调节杆连接的销孔,立杆本体与调节杆通过销轴转动连接。In the above-mentioned assembled edge protection device for cast-in-place concrete stairs, the skirting board includes a board body, and an adjusting rod connected to the body of the vertical rod is connected to the board body, and the body of the vertical rod is provided with a The pin hole connected with the adjusting rod, the vertical rod body and the adjusting rod are rotatably connected through the pin shaft.

本发明用于现浇混凝土楼梯的组装式临边防护装置的优点是:本发明颠覆了过去传统的建筑物临边防护栏结构需要在楼梯踏步板上打孔安装立柱、立杆导致楼梯踏步板被破坏的弊端。与上、下栏杆采用悬挂式连接方式的立杆,与传统大量螺栓、螺钉螺纹连接固定的繁琐方式相比,结构更加简单、安装更加方便,且踢脚板也能够起到辅助支撑立杆的作用,避免了上、下栏杆变形的问题。立柱、转接立柱及立杆均采用插接式的连接结构,第一组装连接机构能够使得连接部分成为活动式的自锁定结构,拆装更加方便,结构更加稳固。压紧机构的设置确保了立杆与上、下栏杆安装连接的稳定性。本发明结构简单、拆装快速、连接稳固、重复使用、运输方便,具有很好的实用性,可满足不同建筑施工现场楼梯临边的防护需要,且可以重复使用,具有很大的利用价值,是现浇混凝土楼梯临边防护领域的一个技术革新!The advantages of the present invention's assembled edge protection device for cast-in-situ concrete stairs are: the present invention subverts the traditional structure of the building's edge protection fence in the past and needs to punch holes on the stair treads to install columns and poles, causing the stair treads to be damaged. Disadvantages of destruction. Compared with the upper and lower railings that adopt the hanging connection method, compared with the traditional cumbersome way of connecting and fixing a large number of bolts and screws, the structure is simpler and the installation is more convenient, and the skirting board can also play the role of auxiliary support for the vertical rod. The problem of deformation of the upper and lower railings is avoided. The column, the transfer column and the column all adopt a plug-in connection structure. The first assembly connection mechanism can make the connection part a movable self-locking structure, which is more convenient for disassembly and assembly, and the structure is more stable. The setting of the pressing mechanism ensures the stability of the installation and connection between the upright bar and the upper and lower railings. The invention has the advantages of simple structure, fast disassembly and assembly, stable connection, repeated use, convenient transportation, good practicability, and can meet the protection needs of stairs in different construction sites, and can be reused, and has great utilization value. It is a technological innovation in the field of cast-in-place concrete staircase edge protection!

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为上栏杆、下栏杆的结构放大图;Fig. 2 is the structural enlarged view of upper railing and lower railing;

图3为立杆与第二组装连接机构的结构示意图;Fig. 3 is a schematic structural view of the vertical rod and the second assembly connection mechanism;

图4为立柱的结构示意图;Fig. 4 is the structural representation of column;

图5为转接立柱的结构示意图;Figure 5 is a schematic structural view of the transfer column;

图6为图3中A部分的局部放大图;Fig. 6 is a partially enlarged view of part A in Fig. 3;

图7为第二组装连接机构与上栏杆的局部连接结构示意图;Fig. 7 is a schematic diagram of a partial connection structure between the second assembly connection mechanism and the upper railing;

图8为压紧机构的结构放大图;Figure 8 is an enlarged view of the structure of the pressing mechanism;

图9为踢脚板的结构示意图。Fig. 9 is a structural schematic diagram of the skirting board.

具体实施方式Detailed ways

下面结合附图及具体实施例对本发明做进一步详细说明;Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail;

如图1所示,一种用于现浇混凝土楼梯的组装式临边防护装置,包括分别设置在上平台板1、下平台板2上的立柱3,以及设置在楼梯休息平台4上的转接立柱5,在立柱3与转接立柱5之间沿楼梯6的踏步板延伸方向分别设置有防护栏组件7,防护栏组件7分别与立柱3及转接立柱5连接。As shown in Fig. 1, an assembled type edge protection device for cast-in-place concrete stairs includes columns 3 respectively arranged on the upper platform slab 1 and the lower platform slab 2, and a turntable arranged on the stair rest platform 4. Connect the column 5, between the column 3 and the transfer column 5, guardrail components 7 are respectively arranged along the step plate extension direction of the stairs 6, and the guardrail components 7 are connected with the column 3 and the transfer column 5 respectively.

如图2、3所示,防护栏组件7包括分别依次上下设于踏步板两侧的上栏杆8及下栏杆9,以及沿上栏杆8及下栏杆9的长度方向依次设置的多个分别与上栏杆8及下栏杆9连接的立杆10。其中,上栏杆8及下栏杆9结构相同,均包括一杆体11,在杆体11的两端部均设置有用于与立柱3及转接立柱5相连的球形连接部件12。在杆体11上,近两端部处分别开设有用于与立杆10连接的插孔13,沿杆体11的轴线方向在杆体11上连续开设有与两插孔13相连的导向限位槽14。本实施例中,为确保杆体11与立柱3及转接立柱5拆装及连接的牢固性,球形连接部件12与杆体11的连接处采用直径较小的连接杆连接,连接杆能够相对容易的与立柱3及转接立柱5进行卡接。为降低制作成本,杆体11可以采用钢管进行制作。立杆10包括立杆本体15,垂直于立杆本体15分别向外延伸设置两连接杆16,在两连接杆16的端部设置有分别与上栏杆8及下栏杆9的插孔13及导向限位槽14配合的第二球形连接部件17。立杆本体15与连接杆16可以采用焊接或者螺栓连接的方式固定,材料可以选择钢管或钢筋等结构进行制作。连接杆16的长度可根据实际楼梯防护要求进行调整。As shown in Figures 2 and 3, the guardrail assembly 7 includes an upper railing 8 and a lower railing 9 which are successively arranged on both sides of the tread plate, and a plurality of rails which are arranged successively along the length direction of the upper railing 8 and the lower railing 9 respectively and The upright bar 10 that upper railing 8 and lower railing 9 are connected. Wherein, the upper railing 8 and the lower railing 9 have the same structure, and both include a rod body 11, and the two ends of the rod body 11 are provided with spherical connecting parts 12 for connecting with the column 3 and the transfer column 5. On the rod body 11, sockets 13 for connecting with the upright rod 10 are provided at the near two ends respectively, and guiding and limiting grooves 14 connected with the two sockets 13 are continuously provided on the rod body 11 along the axis direction of the rod body 11. In this embodiment, in order to ensure the firmness of disassembly and connection between the rod body 11 and the column 3 and the transfer column 5, the connection between the spherical connecting part 12 and the rod body 11 is connected by a connecting rod with a smaller diameter, and the connecting rod can be relatively easily connected. Carry out card connection with the column 3 and the transfer column 5. In order to reduce the manufacturing cost, the rod body 11 can be made of steel pipe. The pole 10 comprises a pole body 15, and two connecting rods 16 are respectively extended outwardly perpendicular to the pole body 15, and the ends of the two connecting rods 16 are provided with jacks 13 and guide holes respectively connected to the upper railing 8 and the lower railing 9. The second spherical connection part 17 matched with the limiting groove 14 . The pole body 15 and the connecting rod 16 can be fixed by welding or bolting, and the material can be made of steel pipe or steel bar. The length of connecting rod 16 can be adjusted according to actual stair protection requirements.

如图4、5所示,立柱3包括与上平台板1或下平台板2固定连接的第一底座17,以及设于第一底座17上的立柱本体18。转接立柱5包括与楼梯休息平台4固定连接的第二底座19,以及设于第二底座19上的分别与上栏杆8及下栏杆9相连的左立柱20、右立柱21。在第一底座17、第二底座19上分别安装有便于与地面进行固定的地脚螺栓22。立柱3与转接立柱5可采用目前传统的立柱结构,立柱本体18可采用钢管结构制作,本申请的左立柱20、右立柱21的结构与立柱本体18相同,为了连接上下两个楼梯的上栏杆8及下栏杆9。As shown in FIGS. 4 and 5 , the column 3 includes a first base 17 fixedly connected with the upper platform 1 or the lower platform 2 , and a column body 18 arranged on the first base 17 . The transfer column 5 includes a second base 19 fixedly connected to the stair rest platform 4 , and a left column 20 and a right column 21 arranged on the second base 19 and connected to the upper railing 8 and the lower railing 9 respectively. Anchor bolts 22 are installed on the first base 17 and the second base 19 to facilitate fixing to the ground. Column 3 and transfer column 5 can adopt present traditional column structure, and column body 18 can adopt steel pipe structure to make, and the structure of left column 20 of the present application, right column 21 is identical with column body 18, in order to connect the up and down two stairs Railing 8 and lower railing 9.

如图1、3、4、5、7、8所示,在上栏杆8及下栏杆9与立柱3及转接立柱5的连接处分别设置第一组装连接机构23。第一组装连接机构23包括在立柱本体18上开设的与球形连接部件12相连的第一插孔结构24,以及在左立柱20、右立柱21上分别开设的与球形连接部件12连接的第二插孔结构25。第一插孔结构24、第二插孔结构25均包括与上栏杆8的球形连接部件12插接的插槽26,以及与下栏杆9的球形连接部件12插接的第一插孔27,在立柱本体18及左立柱20、右立柱21上分别开设有与第一插孔27相连的第一导向限位槽28,第一导向限位槽28的宽度小于球形连接部件12的直径。本实施例中,立柱本体18、左立柱20及右立柱21采用钢管制作,插槽26制作后可与钢管的内腔连通,球形连接部件12从钢管的顶部安装,球形连接部件12进入内腔中,杆体11上的连接杆能够直接卡在插槽26内,实现了沿杆体11方向的自由度限位。为拆装方便,插槽26的尺寸可略大于连接杆的直径。第一插孔27及第一导向限位槽28的结构设置及安装原理与插槽26相同。As shown in FIGS. 1 , 3 , 4 , 5 , 7 and 8 , a first assembly connection mechanism 23 is respectively provided at the joints of the upper railing 8 and the lower railing 9 with the column 3 and the transfer column 5 . The first assembly connection mechanism 23 comprises the first socket structure 24 connected with the spherical connection part 12 that is opened on the column body 18, and the second socket structure 24 that is connected with the spherical connection part 12 and is respectively opened on the left column 20 and the right column 21. jack structure25. Both the first socket structure 24 and the second socket structure 25 include a slot 26 plugged with the ball-shaped connecting part 12 of the upper railing 8, and a first socket 27 plugged with the ball-shaped connecting part 12 of the lower railing 9, The column body 18 , the left column 20 , and the right column 21 are respectively provided with a first guide limiting groove 28 connected to the first insertion hole 27 . In this embodiment, the column body 18, the left column 20 and the right column 21 are made of steel pipes, the slots 26 can communicate with the inner cavity of the steel pipe after being made, the spherical connecting part 12 is installed from the top of the steel pipe, and the spherical connecting part 12 enters the inner cavity Among them, the connecting rod on the rod body 11 can be directly clamped in the slot 26, realizing the limitation of the degree of freedom along the direction of the rod body 11. For the convenience of dismounting, the size of the slot 26 can be slightly larger than the diameter of the connecting rod. The structural setting and installation principle of the first insertion hole 27 and the first guiding and limiting groove 28 are the same as those of the slot 26 .

如图3、7、8所示,在立杆10与上栏杆8及下栏杆9的连接处分别设置第二组装连接机构29。第二组装连接机构29包括分别设于连接杆16上的用于将立杆本体15与上栏杆8及下栏杆9固定的压紧机构30,压紧机构30与连接杆16活动连接。压紧机构30包括一压紧块31,在压紧块31上开设有一与连接杆16活动连接的通孔32,压紧块31的内侧壁33设置有一与上栏杆8或下栏杆9的外壁仿形配合的内凹部34,在内凹部34的表面覆盖有橡胶防滑层35。在压紧块31上设置有锁紧螺钉36,锁紧螺钉36分别设于压紧块31的顶部及底部并向内凹部34延伸设置。由于上栏杆8、下栏杆9、立杆10及压紧块31均为金属材质,为有效提高立杆10与上栏杆8及下栏杆9连接的牢固度,橡胶防滑层35以及锁紧螺钉36的设置能够使得压紧块31与上栏杆8、下栏杆9牢牢固定,不会发生滑移。立杆10的安装数量可以根据具体楼梯6浇注的长度来搭配,立杆10可沿上栏杆8、下栏杆9的长度方向任意滑动调整,实现了相邻立杆10之间的距离可以任意调节的目的,安全防护效果可以得到人为有效控制。As shown in FIGS. 3 , 7 , and 8 , second assembling and connecting mechanisms 29 are respectively provided at the connections between the upright bar 10 and the upper railing 8 and the lower railing 9 . The second assembly connection mechanism 29 includes pressing mechanisms 30 respectively provided on the connecting rods 16 for fixing the upright body 15 with the upper railing 8 and the lower railing 9 , and the pressing mechanisms 30 are movably connected with the connecting rods 16 . Compression mechanism 30 comprises a compression block 31, offers a through hole 32 that is movably connected with connecting rod 16 on compression block 31, and the inner side wall 33 of compression block 31 is provided with an outer wall with upper railing 8 or lower railing 9 The inner concave portion 34 is conformally fitted, and the surface of the inner concave portion 34 is covered with a rubber anti-skid layer 35 . Locking screws 36 are arranged on the pressing block 31 , and the locking screws 36 are respectively arranged on the top and the bottom of the pressing block 31 and extend toward the inner recess 34 . Since the upper railing 8, the lower railing 9, the vertical rod 10 and the pressing block 31 are all made of metal, in order to effectively improve the firmness of the connection between the vertical rod 10 and the upper railing 8 and the lower railing 9, the rubber anti-skid layer 35 and the locking screw 36 The setting can make the pressing block 31 firmly fixed with the upper railing 8 and the lower railing 9 without slipping. The installation quantity of uprights 10 can be matched according to the length of concrete stairs 6 pouring. The uprights 10 can be slid and adjusted arbitrarily along the length direction of the upper railing 8 and the lower railing 9, so that the distance between adjacent uprights 10 can be adjusted arbitrarily. The purpose of safety protection can be effectively controlled artificially.

如图1、3、6、9所示,为提高防护效果,避免楼梯坠物砸伤施工人员,在立杆10的底部沿楼梯6的踏步板延伸方向设置有踢脚板37,踢脚板37设于立杆本体15的底部。相邻的踢脚板37之间形成一连续的用于防护踏步板两侧的防护板组件38。踢脚板37包括一板体39,在板体39上连接有一与立杆本体15转动连接的调节杆40,在立杆本体15上开设有与调节杆40连接的销孔,立杆本体15与调节杆40通过销轴41转动连接。As shown in Figures 1, 3, 6, and 9, in order to improve the protective effect and prevent the construction workers from being injured by falling objects on the stairs, a skirting board 37 is arranged at the bottom of the vertical rod 10 along the extending direction of the step board of the staircase 6, and the skirting board 37 is located on the vertical The bottom of the rod body 15. A continuous protective plate assembly 38 for protecting both sides of the step plate is formed between adjacent skirting plates 37 . Skirting board 37 comprises a plate body 39, is connected with an adjusting rod 40 that is rotatably connected with the vertical rod body 15 on the plate body 39, offers the pin hole that is connected with the adjusting rod 40 on the vertical rod body 15, the vertical rod body 15 is connected with the adjustment rod body 15. The rod 40 is rotatably connected by a pin shaft 41 .

当然,上述说明并非是对本发明的限制,本发明也并不限于上述举例,本技术领域的普通技术人员,在本发明的实质范围内,作出的变化、改型、添加或替换,都应属于本发明的保护范围。Of course, the above description is not a limitation to the present invention, and the present invention is not limited to the above-mentioned examples. Any changes, modifications, additions or substitutions made by those skilled in the art within the scope of the present invention shall belong to protection scope of the present invention.

Claims (5)

1.一种用于现浇混凝土楼梯的组装式临边防护装置,包括分别设置在上、下平台板上的立柱,以及设置在楼梯休息平台上的转接立柱,在立柱与转接立柱之间沿楼梯的踏步板延伸方向分别设置有防护栏组件,所述防护栏组件分别与立柱及转接立柱连接,其特征在于:所述防护栏组件包括分别依次上下设于踏步板两侧的上栏杆及下栏杆,以及沿上、下栏杆的长度方向依次设置的多个分别与上栏杆及下栏杆连接的立杆,所述上栏杆及下栏杆包括一杆体,在杆体的两端部均设置有用于与立柱及转接立柱相连的球形连接部件,在杆体近两端部处分别开设有用于与所述立杆连接的插孔,沿杆体的轴线方向在杆体上连续开设有与两插孔相连的导向限位槽,在立杆的底部沿楼梯的踏步板延伸方向设置有踢脚板,相邻的踢脚板之间形成一连续的用于防护踏步板两侧的防护板组件,所述上栏杆、下栏杆与立柱及转接立柱的连接处分别设置第一组装连接机构,立杆与上栏杆、下栏杆的连接处分别设置第二组装连接机构;所述立杆包括立杆本体,垂直于立杆本体分别向外延伸设置两连接杆,在两连接杆的端部设置有分别与上、下栏杆的插孔及导向限位槽配合的第二球形连接部件,所述踢脚板设于立杆本体的底部;所述第二组装连接机构包括分别设于连接杆上的用于将立杆本体与上栏杆及下栏杆固定的压紧机构,所述压紧机构与连接杆活动连接,在压紧机构上设置有锁紧螺钉;所述压紧机构包括一压紧块,在压紧块上开设有一与连接杆活动连接的通孔,所述压紧块的内侧壁设置有一与上栏杆或下栏杆的外壁仿形配合的内凹部,在内凹部的表面覆盖有橡胶防滑层,所述锁紧螺钉分别设于压紧块的顶部及底部并向内凹部延伸设置。1. An assembled edge protection device for cast-in-situ concrete stairs, comprising uprights respectively arranged on the upper and lower platform slabs, and a transfer upright arranged on the stair rest platform, between the upright post and the transfer upright Guardrail assemblies are respectively arranged along the extending direction of the step boards of the stairs, and the guardrail assemblies are respectively connected with the columns and the transfer columns. Railings and lower railings, and a plurality of uprights respectively connected to the upper railings and lower railings arranged in sequence along the length direction of the upper and lower railings, the upper railings and lower railings include a rod body, and both ends of the rod body are arranged There are spherical connecting parts used to connect with the upright post and the transfer upright post. There are sockets for connecting with the upright rods at the near two ends of the rod body, and two sockets are continuously opened on the rod body along the axial direction of the rod body. The connected guide limit grooves are provided with skirting boards along the extending direction of the step boards at the bottom of the vertical rods, and a continuous protective board assembly for protecting both sides of the tread boards is formed between adjacent skirting boards. The upper railing, The joints between the lower railing and the upright and the transfer post are respectively provided with a first assembly connection mechanism, and the joints between the upright rail and the upper railing and the lower rail are respectively provided with a second assembly connection mechanism; Two connecting rods are respectively extended outwardly from the rod body, and second spherical connecting parts are arranged at the ends of the two connecting rods to cooperate with the jacks of the upper and lower railings and the guide limit groove respectively. the bottom of the bottom; the second assembly connection mechanism includes a compression mechanism respectively arranged on the connecting rod for fixing the vertical rod body with the upper railing and the lower railing, and the compression mechanism is movably connected with the connecting rod. Locking screws are arranged on the mechanism; the pressing mechanism includes a pressing block, and a through hole for movably connecting with the connecting rod is provided on the pressing block, and the inner side wall of the pressing block is provided with a The outer wall of the balustrade is fitted with an inner recess, and the surface of the inner recess is covered with a rubber anti-skid layer. The locking screws are respectively arranged on the top and bottom of the pressing block and extend toward the inner recess. 2.根据权利要求1所述的用于现浇混凝土楼梯的组装式临边防护装置,其特征是:所述立柱包括与上、下平台板固定连接的第一底座,以及设于第一底座上的立柱本体。2. The assembled edge protection device for cast-in-situ concrete stairs according to claim 1, characterized in that: the column includes a first base fixedly connected with the upper and lower platform plates, and is located on the first base The upper body of the column. 3.根据权利要求2所述的用于现浇混凝土楼梯的组装式临边防护装置,其特征是:所述转接立柱包括与楼梯休息平台固定连接的第二底座,以及设于第二底座上的分别与上、下栏杆相连的左、右立柱。3. The assembled edge protection device for cast-in-situ concrete stairs according to claim 2, characterized in that: the transfer column includes a second base fixedly connected with the rest platform of the stairs, and is arranged on the second base The upper left and right uprights are respectively connected with the upper and lower railings. 4.根据权利要求3所述的用于现浇混凝土楼梯的组装式临边防护装置,其特征是:所述第一组装连接机构包括在立柱本体上开设的与球形连接部件相连的第一插孔结构,以及在左、右立柱上分别开设的与球形连接部件连接的第二插孔结构,所述第一、二插孔结构均包括与上栏杆的球形连接部件插接的插槽,以及与下栏杆的球形连接部件插接的第一插孔,在立柱本体及左、右立柱上分别开设有与第一插孔相连的第一导向限位槽,所述第一导向限位槽的宽度小于球形连接部件的直径。4. The assembled edge protection device for cast-in-situ concrete stairs according to claim 3, characterized in that: the first assembled connection mechanism includes a first plug connected to the spherical connection part provided on the column body. The hole structure, and the second socket structure connected with the spherical connecting part respectively opened on the left and right uprights, the first and second socket structures both include slots inserted with the spherical connecting part of the upper railing, and The first socket that is inserted into the spherical connecting part of the lower railing is respectively provided with a first guide limiting groove connected to the first socket on the column body and the left and right columns. The width is less than the diameter of the ball joint. 5.根据权利要求1所述的用于现浇混凝土楼梯的组装式临边防护装置,其特征是:所述踢脚板包括一板体,在板体上连接有一与所述立杆本体转动连接的调节杆,所述立杆本体上开设有与调节杆连接的销孔,立杆本体与调节杆通过销轴转动连接。5. The assembled edge protection device for cast-in-situ concrete stairs according to claim 1, characterized in that: the skirting board includes a board body, and a board body is connected to a board body that is rotatably connected with the pole body. An adjustment rod, the body of the vertical rod is provided with a pin hole connected with the adjustment rod, and the body of the vertical rod and the adjustment rod are rotatably connected through a pin shaft.
CN202210033300.4A 2022-01-12 2022-01-12 An assembled edge protection device for cast-in-place concrete stairs Active CN114427304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210033300.4A CN114427304B (en) 2022-01-12 2022-01-12 An assembled edge protection device for cast-in-place concrete stairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210033300.4A CN114427304B (en) 2022-01-12 2022-01-12 An assembled edge protection device for cast-in-place concrete stairs

Publications (2)

Publication Number Publication Date
CN114427304A CN114427304A (en) 2022-05-03
CN114427304B true CN114427304B (en) 2023-08-22

Family

ID=81310907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210033300.4A Active CN114427304B (en) 2022-01-12 2022-01-12 An assembled edge protection device for cast-in-place concrete stairs

Country Status (1)

Country Link
CN (1) CN114427304B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809685A (en) * 2022-05-09 2022-07-29 山西三建集团有限公司 Method for installing and dismounting edge-facing guard rail of externally-mounted clamping assembly type concrete pouring stair

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2296743A1 (en) * 1974-12-30 1976-07-30 Froment Ets Post for guard rail - consists of upright fixed to horizontal stone and right-angled locking-arm
KR20120132157A (en) * 2011-05-27 2012-12-05 대지금속 주식회사 Assembly stairs railing having angle control function
JP6220471B1 (en) * 2017-03-30 2017-10-25 株式会社小坂工務店 Fall prevention prop
WO2021184540A1 (en) * 2020-03-18 2021-09-23 常州工程职业技术学院 Fully prefabricated staircase system and assembly method therefor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205421982U (en) * 2016-04-05 2016-08-03 赵忠亮 Interim rail guard of design stair
CN211775959U (en) * 2019-11-29 2020-10-27 中建八局第一建设有限公司 Can have enough to meet need interim protector in vertical entrance to a cave of adjustable size
CN212154228U (en) * 2020-04-26 2020-12-15 张秋玲 Building safety device
CN212660816U (en) * 2020-05-26 2021-03-09 刘澎伟 Livestock breeding fence convenient to disassemble and assemble

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2296743A1 (en) * 1974-12-30 1976-07-30 Froment Ets Post for guard rail - consists of upright fixed to horizontal stone and right-angled locking-arm
KR20120132157A (en) * 2011-05-27 2012-12-05 대지금속 주식회사 Assembly stairs railing having angle control function
JP6220471B1 (en) * 2017-03-30 2017-10-25 株式会社小坂工務店 Fall prevention prop
WO2021184540A1 (en) * 2020-03-18 2021-09-23 常州工程职业技术学院 Fully prefabricated staircase system and assembly method therefor

Also Published As

Publication number Publication date
CN114427304A (en) 2022-05-03

Similar Documents

Publication Publication Date Title
CN114427304B (en) An assembled edge protection device for cast-in-place concrete stairs
CN105019657A (en) Building construction system
CN204876578U (en) Building construction system
CN113216587B (en) High-rise building outer wall construction operation platform fixing structure and construction method thereof
CN211114971U (en) A interim protection cat ladder for prefabricating staircase
CN216893370U (en) High and good novel scaffold frame is used in building construction of flexibility of security
CN204876575U (en) Building construction system
CN204876579U (en) Building construction system
CN212405788U (en) Novel beam type stair are assembled in prefabrication of board structure of marking time
CN212836814U (en) Lateral bending upright post railing
CN114809614A (en) A four-run staircase formwork support system and construction method
CN215760608U (en) Stair guard rail
CN219973855U (en) Climbing frame jump layer lifting device
CN113309256A (en) Construction device and construction method for prefabricated shear wall with post-pouring section
CN220225999U (en) High-strength building railing
CN221972941U (en) Adjustable mobile scaffolding for building construction
CN211143811U (en) Telescopic stair face limit guard rail
CN218934302U (en) Climbing device for building engineering
CN219993211U (en) Steel pipe fastener type edge opening protection railing
CN218758848U (en) Thick advanced control device of cast-in-place concrete floor slab
CN218493201U (en) Standardized construction stair of light weight type
CN219011866U (en) Tool type cantilever frame
CN223119598U (en) A simple safety protection device for stairs used in construction
CN211776075U (en) Steel construction building stair
CN222576211U (en) Prefabricated building ladder way protection platform and construction structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250708

Address after: 510000 Guangdong Province Guangzhou City Zengcheng District Zhongxin Town Datian Village Zhongfu North Road No. 23 (Office Building B1)

Patentee after: Guangdong Zhongsheng Construction Co.,Ltd.

Country or region after: China

Address before: 256101 Shandong Province Qingdao City Laoshan District Haier Road 25

Patentee before: Zhang Shijiang

Country or region before: China