[go: up one dir, main page]

CN114346396A - A kind of double-layer flap wall plate superplastic forming diffusion connection die and method - Google Patents

A kind of double-layer flap wall plate superplastic forming diffusion connection die and method Download PDF

Info

Publication number
CN114346396A
CN114346396A CN202111630091.3A CN202111630091A CN114346396A CN 114346396 A CN114346396 A CN 114346396A CN 202111630091 A CN202111630091 A CN 202111630091A CN 114346396 A CN114346396 A CN 114346396A
Authority
CN
China
Prior art keywords
double
layer
superplastic forming
mold
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111630091.3A
Other languages
Chinese (zh)
Inventor
刘伟
李保永
姚为
韩维群
丁科迪
何慧敏
刘吉琛
侯超
李宏伟
韩冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology Shenzhen
Beijing Hangxing Machinery Manufacturing Co Ltd
Original Assignee
Harbin Institute of Technology Shenzhen
Beijing Hangxing Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology Shenzhen, Beijing Hangxing Machinery Manufacturing Co Ltd filed Critical Harbin Institute of Technology Shenzhen
Priority to CN202111630091.3A priority Critical patent/CN114346396A/en
Publication of CN114346396A publication Critical patent/CN114346396A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

The invention provides a superplastic forming diffusion bonding die and a superplastic forming diffusion bonding method for a double-layer flap wall plate, which aim to realize the superplastic forming/diffusion bonding process of the double-layer flap wall plate at one time through a set of tooling. Compared with the existing processing technology, a set of tooling can be saved, and the processing cost is greatly reduced; in addition, the superplastic forming/diffusion bonding process can be completed by heating the part once, so that the mechanical property of the material can be improved; finally, one set of die is adopted for one-step forming, so that the product processing period can be obviously shortened, and the production efficiency is improved.

Description

一种双层口盖壁板超塑成形扩散连接模具和方法A kind of double-layer flap wall plate superplastic forming diffusion connection die and method

技术领域technical field

本发明属于精密塑性加工领域,涉及到一种双层口盖壁板超塑成形/扩散连接模具和方法。The invention belongs to the field of precision plastic processing, and relates to a superplastic forming/diffusion connection mold and method for a double-layered flap wall plate.

背景技术Background technique

近年来,随着航空航天飞行器性能的不断提升,整体化和轻量化已成为航空航天零部件的发展趋势。钛合金多层结构内部中空,可最大限度满足飞行器的轻量化。对于钛合金多层结构,常规的加工方法难以实现成形,钛合金超塑成形/扩散连接技术可实现多层结构的整体近净成形。针对钛合金双层口盖壁板,由于成形时通气和密封条件限制,通常情况下需要将扩散连接和超塑成形过程分开进行。即首先利用扩散连接模具并单独进行双层板的扩散连接,在此之前需要将板坯非扩散连接的帽筋部位喷涂阻焊剂;然后将扩散完成后的板坯放于帽筋超塑成形模具中进行帽筋的超塑成形。该方法可以实现钛合金双层口盖壁板的成形,但将超塑成形和扩散连接分开进行就需要设计制作两套工装,使成本升高。此外,分两次成形还会增加加工周期,降低生产效率。尤其,钛合金经过两次热循环会显著降低材料的力学性能。In recent years, with the continuous improvement of the performance of aerospace vehicles, integration and lightweight have become the development trend of aerospace parts. The titanium alloy multi-layer structure is hollow inside, which can maximize the lightweight of the aircraft. For the multi-layer structure of titanium alloy, it is difficult to achieve forming by conventional processing methods, and the superplastic forming/diffusion bonding technology of titanium alloy can realize the overall near-net shape of the multi-layer structure. For titanium alloy double-layer flap wall panels, due to the limitation of ventilation and sealing conditions during forming, it is usually necessary to separate diffusion joining and superplastic forming processes. That is to say, firstly use the diffusion connection mold and carry out the diffusion connection of the double-layer board separately. Before that, it is necessary to spray the solder resist on the cap rib of the non-diffusion connection of the slab; then place the diffused slab in the cap rib superplastic forming mold Superplastic forming of cap ribs. This method can realize the forming of the titanium alloy double-layer port wall plate, but separate superplastic forming and diffusion joining need to design and manufacture two sets of tooling, which increases the cost. In addition, forming in two times will increase the processing cycle and reduce production efficiency. In particular, the mechanical properties of titanium alloys can be significantly degraded after two thermal cycles.

发明内容SUMMARY OF THE INVENTION

本发明所要解决的技术问题:本发明提供一种双层口盖壁板超塑成形扩散连接模具和方法,拟通过一套工装即可一次实现双层口盖壁板的超塑成形/扩散连接过程。与现有加工工艺相比,可节省一套工装,大大降低加工成本;另外,零件只需进行一次加热即可完成超塑成形/扩散连接过程,可提高材料的力学性能;最后,采用一套模具一次成形可显著缩短产品加工周期,提高生产效率。The technical problem to be solved by the present invention: the present invention provides a superplastic forming diffusion connection die and method for a double-layer flap wall plate, which can realize the superplastic forming/diffusion connection of the double-layer flap wall plate at one time through a set of tooling process. Compared with the existing processing technology, it can save a set of tooling and greatly reduce the processing cost; in addition, the parts only need to be heated once to complete the superplastic forming/diffusion joining process, which can improve the mechanical properties of the material; finally, a set of One-time forming of the mold can significantly shorten the product processing cycle and improve production efficiency.

本发明所采用的技术方案是:一种双层口盖壁板超塑成形扩散连接模具,包括上模,充气管,充气孔,密封梗,型腔,下模,压块;The technical scheme adopted in the present invention is: a superplastic forming diffusion connection mold for a double-layer mouth cover wall plate, comprising an upper mold, an inflatable tube, an inflatable hole, a sealing stem, a cavity, a lower mold, and a pressing block;

其中,型腔位于上模的下表面,每个型腔的末端设置有充气孔,且所有充气孔与所述模具外部的充气管相通,用于双层口盖壁板成形时向型腔内通入高压惰性气体(2~3Mpa);在上模下表面的型腔周围设置有密封梗,当模具压下时,密封梗、双层板坯与上模的型腔构成密闭腔体,待充气管通入高压惰性气体后通过保压实现双层板坯的扩散连接;Among them, the cavity is located on the lower surface of the upper mold, and the end of each cavity is provided with an inflatable hole, and all the inflatable holes are communicated with the inflatable pipe outside the mold, which is used for the injection of the double-layer mouth cover wall into the cavity when forming. Introduce high-pressure inert gas (2-3Mpa); a sealing stem is arranged around the cavity on the lower surface of the upper mold. When the mold is pressed down, the sealing stem, the double-layer slab and the cavity of the upper mold form a closed cavity. After the high-pressure inert gas is introduced into the inflation pipe, the diffusion connection of the double-layer slab is realized by maintaining the pressure;

下模上设置凹槽,双层板坯安装在下模上时,双层板坯的通气块及通气管对应放置于下模的凹槽内并用压块压实。A groove is arranged on the lower die, and when the double-layer slab is installed on the lower die, the ventilation block and the ventilation pipe of the double-layered slab are placed in the groove of the lower die correspondingly and compacted with a compact.

使用所述的模具进行双层口盖壁板超塑成形扩散连接的方法,包括步骤如下:The method for superplastic forming diffusion connection of double-layer flap wall plates using the described mould comprises the following steps:

步骤一、制作双层板阻焊剂图样;Step 1. Make a double-layer board solder resist pattern;

步骤二、封边焊接双层板,焊接通气块及通气管;Step 2: Weld the double-layer board by sealing the edge, and weld the ventilation block and the ventilation pipe;

步骤三、将焊后的双层板坯安装在下模上,通气块及通气管对应放置于下模的凹槽内,用压块压实通气管;最后合上上模;将模具升温至钛合金的超塑成形扩散连接温度;Step 3. Install the welded double-layer slab on the lower mold, place the ventilation block and the ventilation pipe in the groove of the lower mold, and compress the ventilation pipe with a compact; finally close the upper mold; heat the mold to titanium The superplastic forming diffusion bonding temperature of the alloy;

步骤四、待模具到达钛合金的超塑成形扩散连接温度后,给上模施加机械压力,以使密封梗、双层板坯与上模型腔构成密闭腔体;同时向充气管内通入高压惰性气体,在设定的时间段内保压,以实现双层板非帽筋区域的扩散连接;Step 4. After the mold reaches the superplastic forming diffusion bonding temperature of the titanium alloy, mechanical pressure is applied to the upper mold, so that the sealing stem, the double-layer slab and the upper mold cavity form a closed cavity; Gas, maintain pressure within a set period of time to achieve diffusion connection in the non-cap rib area of the double-layer plate;

步骤五、帽筋层的超塑成形:卸载充气管内的气压,同时向下模通气管内通入高压惰性气体,在设定的时间段内保压,以实现帽筋层的超塑成形;待帽筋完全贴模后,卸载通气管内的气压并降温,以实现双层口盖壁板的超塑成形扩散连接。Step 5. Superplastic forming of the cap rib layer: unloading the air pressure in the inflation pipe, at the same time injecting high-pressure inert gas into the vent pipe of the lower die, and maintaining the pressure within a set period of time, so as to realize the superplastic forming of the cap rib layer; After the cap rib is completely molded, the air pressure in the vent pipe is unloaded and the temperature is lowered to realize the superplastic forming diffusion connection of the double-layer mouth cover wall plate.

所述步骤一的具体方法为:激光切割钛合金双层板料,其中下层板料对应帽筋层的部位切割出与通气块对应的小孔;待双层板酸洗完毕后,取上层板制作帽筋层的阻焊剂图样,其中帽筋层对应的部位喷涂阻焊剂,其余部位不要喷涂阻焊剂。The specific method of the first step is as follows: laser cutting the titanium alloy double-layer sheet, wherein the lower sheet corresponds to the cap rib layer to cut holes corresponding to the ventilation blocks; after the double-layer sheet is pickled, take the upper sheet Make the solder resist pattern of the cap rib layer, in which the parts corresponding to the cap rib layer are sprayed with solder resist, and the rest of the parts should not be sprayed with solder resist.

步骤二的具体方法为:The specific method of step 2 is:

将双层板对齐并采用手工氩弧焊的方式进行封边焊接;将通气块与通气管采用手工氩弧焊的方式焊到帽筋层背面预留的小孔位置;焊接完成后检查通气块,通气管以及双层板坯的气密性。Align the double-layer boards and weld the edges by manual argon arc welding; weld the ventilation block and the ventilation pipe to the position of the small hole reserved on the back of the cap rib layer by manual argon arc welding; check the ventilation block after the welding is completed , snorkel and air tightness of double slab.

步骤三中,钛合金的超塑成形扩散连接温度为920~930℃。In step 3, the superplastic forming diffusion bonding temperature of the titanium alloy is 920-930°C.

步骤四中保压2小时。In step 4, the pressure is maintained for 2 hours.

步骤五中保压2小时;卸载通气管内的气压并降温300摄氏度以下。In step 5, the pressure is maintained for 2 hours; the air pressure in the snorkel is unloaded and the temperature is lowered below 300 degrees Celsius.

本发明与现有技术相比的有益效果是:The beneficial effects of the present invention compared with the prior art are:

本发明与现有加工工艺相比,通过一套工装即可一次实现双层口盖壁板的超塑成形/扩散连接过程,节省一套工装,大大降低加工成本。Compared with the existing processing technology, the invention can realize the superplastic forming/diffusion joining process of the double-layered flap wall plate at one time with one set of tooling, saves a set of tooling and greatly reduces the processing cost.

本发明只需进行一次加热即可完成双层口盖壁板的超塑成形/扩散连接过程,可提高材料的力学性能。According to the invention, the superplastic forming/diffusion joining process of the double-layer flap wall plate can be completed by only one heating, and the mechanical properties of the material can be improved.

本发明采用一套模具一次成形的方法可显著缩短产品加工周期,提高生产效率。The present invention adopts the one-time forming method of a set of molds, which can significantly shorten the product processing cycle and improve the production efficiency.

附图说明Description of drawings

图1为双层口盖壁板的超塑成形/扩散连接模具图;Fig. 1 is the superplastic forming/diffusion connection mould diagram of the double-layer mouth cover wall plate;

图2为双层口盖壁板的超塑成形/扩散连接下模及装配图;Fig. 2 is the superplastic forming/diffusion connection lower die and assembly drawing of the double-layer mouth cover wall plate;

图3为双层口盖壁板结构图;Figure 3 is a structural diagram of a double-layer mouth cover wall plate;

图4为上层板对应帽筋层的阻焊剂图样示意图。FIG. 4 is a schematic diagram of the solder resist pattern corresponding to the cap rib layer of the upper board.

具体实施方式Detailed ways

为降低钛合金双层口盖壁板的成本,提高加工效率和材料性能,本发明提出了一种双层口盖壁板超塑成形/扩散连接方法,该方法通过一套工装即可一次实现双层口盖壁板的超塑成形/扩散连接过程。In order to reduce the cost of the titanium alloy double-layer port wall panel and improve the processing efficiency and material performance, the present invention proposes a superplastic forming/diffusion connection method for the double-layer port panel panel, which can be realized at one time by a set of tooling. Superplastic forming/diffusion joining process of double-layer flap panels.

本发明针对双层口盖壁板的超塑成形/扩连接过程,提出了一套模具一次成形的方法。Aiming at the superplastic forming/expansion connection process of the double-layered flap wall plate, the present invention proposes a set of mold forming method at one time.

一种双层口盖壁板超塑成形扩散连接模具包括上模1,充气管2,充气孔3,密封梗4,型腔5,下模6,压块7,如图1所示。其中,型腔5位于上模1,每个型腔5的末端设置有充气孔3,且所有充气孔3与模具外部的充气管2相通,用于双层口盖壁板成形时向型腔5内通入高压惰性气体(压力取值范围为2~3Mpa)以实现双层板间的扩散连接;将充气孔3设置在每个型腔5的末端还可在超塑成形时用于气体的排出。在上模1设置有密封梗4,当模具压下时,密封梗4、板坯与上模的型腔5构成密闭腔体,待充气管2通入高压惰性气体后可通过保压实现双层板坯的扩散连接。A superplastic forming diffusion connection mold for a double-layer flap wall plate includes an upper mold 1, an inflatable tube 2, an inflatable hole 3, a sealing stem 4, a cavity 5, a lower mold 6, and a pressing block 7, as shown in Figure 1. Among them, the cavity 5 is located in the upper mold 1, and the end of each cavity 5 is provided with an inflatable hole 3, and all the inflatable holes 3 are communicated with the inflatable tube 2 outside the mold, which is used for the cavity when the double-layer mouth cover wall is formed. High-pressure inert gas (the pressure range is 2-3Mpa) is introduced into 5 to realize the diffusion connection between the double-layer plates; the inflatable hole 3 is arranged at the end of each cavity 5 and can also be used for gas during superplastic forming. of discharge. The upper mold 1 is provided with a sealing stem 4. When the mold is pressed down, the sealing stem 4, the slab and the cavity 5 of the upper mold form a closed cavity. Diffusion bonding of layer slabs.

由于上模1需要形成密闭腔体,以满足扩散连接要求,所以本方法将超塑成形的通气装置设置在下模6上。本发明的方法双层板坯采用于帽筋层8的背面进气的方式,且背面进气结构采用通气块9与通气管10相结合的形式,如图2所示。模具下模6设置有压块7,当双层板坯封焊完成后将双层板坯的通气块9及通气管10放于下模6的凹槽内并用压块7压实。Since the upper mold 1 needs to form a closed cavity to meet the requirements of diffusion connection, in this method, the superplastic forming ventilation device is arranged on the lower mold 6 . In the method of the present invention, the double-layer slab is used for air intake on the back of the cap rib layer 8, and the back air intake structure adopts the combination of ventilation block 9 and ventilation pipe 10, as shown in FIG. 2 . The lower mold 6 of the mold is provided with a pressing block 7 . After the double-layer slab is sealed and welded, the ventilation block 9 and the ventilation pipe 10 of the double-layered slab are placed in the groove of the lower mold 6 and compacted with the pressing block 7 .

本发明当双层口盖壁板进行超塑成形/扩散连接时,将双层板坯喷涂阻焊剂图样并封焊完成后,在对应帽筋层8的背面小孔处焊接通气块9及通气管10,并保证腔体内部及通气块9及通气管10的气密性。焊接完成后将双层板坯安装在下模6上,此时通气块9及通气管10应对应放置于下模6的凹槽内,用压块7压实通气管10;最后合上上模1。In the present invention, when the double-layer mouth cover wall plate is subjected to superplastic forming/diffusion connection, after the double-layer slab is sprayed with a solder resist pattern and sealed and welded, the ventilation block 9 and the through hole are welded at the back small holes of the corresponding cap rib layer 8. trachea 10, and ensure the air tightness of the interior of the cavity, the ventilation block 9 and the ventilation tube 10. After the welding is completed, install the double-layer slab on the lower mold 6. At this time, the ventilation block 9 and the ventilation pipe 10 should be placed in the groove of the lower mold 6, and the ventilation pipe 10 should be compacted with the pressing block 7; finally, the upper mold is closed. 1.

待模具升温至钛合金超塑成形/扩散连接温度时,给上模1施加机械压力,以使密封梗4、板坯与上模型腔5构成密闭腔体;同时向充气管2内通入高压惰性气体,保压以实现双层板非帽筋区域的扩散连接。When the mold is heated to the temperature of superplastic forming/diffusion bonding of titanium alloy, mechanical pressure is applied to the upper mold 1, so that the sealing stem 4, the slab and the upper mold cavity 5 form a closed cavity; Inert gas, pressurized to achieve diffusion bonding in the non-cap rib area of the double-layer plate.

扩散连接完成后,卸载充气管2内的气压,同时向下模6通气管10内通入高压惰性气体,保压以实现帽筋层8的超塑成形。After the diffusion connection is completed, the air pressure in the inflation pipe 2 is unloaded, and at the same time, a high-pressure inert gas is introduced into the ventilation pipe 10 of the lower mold 6 to maintain the pressure to realize the superplastic forming of the cap rib layer 8 .

待帽筋完全贴模后卸载通气管10内的气压并降温以实现双层口盖壁板的超塑成形/扩散连接。After the cap rib is completely molded, the air pressure in the vent pipe 10 is unloaded and the temperature is lowered to realize the superplastic forming/diffusion connection of the double-layer flap wall plate.

本实例提供了一种双层口盖壁板超塑成形/扩散连接方法;零件为中空帽筋结构,采用双层板超塑成形/扩散连接方法加工,且非帽筋部位为双层板的扩散连接,帽筋部位为超塑成形。如图3所示结构图。This example provides a superplastic forming/diffusion joining method for a double-layer mouth cover wall; the part is a hollow cap rib structure, which is processed by the double-layer superplastic forming/diffusion joining method, and the non-cap rib part is a double-layer plate. Diffusion connection, the cap rib part is superplastic formed. The structure diagram is shown in Figure 3.

实施例:Example:

本实例例的具体方法步骤如下:The specific method steps of this example are as follows:

下料,制作双层板阻焊剂图样。激光切割钛合金双层板料,其中下层板料对应帽筋层8的部位切割出与通气块9对应的小孔。待双层板酸洗完毕后,取上层板制作帽筋层8的阻焊剂图样,其中帽筋层8对应的部位喷涂阻焊剂,其余部位不要喷涂阻焊剂。如图4所示。Cut the material to make a double-layer board solder resist pattern. The titanium alloy double-layer sheet is laser cut, and the lower sheet corresponding to the cap rib layer 8 is cut with small holes corresponding to the ventilation block 9 . After the double-layer board is pickled, take the upper board to make the solder resist pattern of the cap rib layer 8, in which the parts corresponding to the cap rib layer 8 are sprayed with solder resist, and the rest of the parts should not be sprayed with solder resist. As shown in Figure 4.

封边焊接双层板,焊接通气块9及通气管10:帽筋阻焊剂图样制备完成后将双层板对齐并采用手工氩弧焊的方式进行封边焊接;之后将通气块9与通气管10采用手工氩弧焊的方式焊到背面预留的小孔位置。焊接完成后检查通气块,通气管10以及双层板坯的气密性。Edge-sealing and welding the double-layer board, welding the ventilation block 9 and the ventilation pipe 10: after the preparation of the solder resist pattern of the cap rib, align the double-layer board and perform edge sealing welding by manual argon arc welding; then connect the ventilation block 9 to the ventilation pipe. 10 Use manual argon arc welding to weld to the small hole reserved on the back. After the welding is completed, check the air tightness of the ventilation block, the ventilation pipe 10 and the double slab.

装模升温。将焊后的双层板坯安装在下模6上,此时通气块9及通气管10应对应放置于下模6的凹槽内,用压块7压实通气管10;最后合上上模1;将模具升温至钛合金的超塑成形/扩散连接温度920~930℃。Mold heating. Install the welded double-layer slab on the lower mold 6. At this time, the ventilation block 9 and the ventilation pipe 10 should be placed in the groove of the lower mold 6, and the ventilation pipe 10 should be compacted with the pressing block 7; finally, the upper mold is closed. 1; Raise the temperature of the mold to the superplastic forming/diffusion bonding temperature of the titanium alloy at 920-930°C.

双层板的扩散连接:待模具到温后,给上模1施加机械压力4MPa,以使密封梗4、板坯与上模型腔5构成密闭腔体;同时向充气管2内通入2MPa高压氩气,保压2小时以实现双层板非帽筋区域的扩散连接。Diffusion connection of double-layer plates: After the mold reaches temperature, apply a mechanical pressure of 4MPa to the upper mold 1, so that the sealing stem 4, the slab and the upper mold cavity 5 form a closed cavity; Argon, maintained for 2 hours to achieve diffusion bonding in the non-cap rib area of the double-layer plate.

帽筋层的超塑成形。扩散连接完成后,卸载充气管2内的气压,同时向下模6通气管10内通入2MPa高压氩气,保压2小时以实现帽筋层8的超塑成形。待帽筋完全贴模后卸载通气管10内的气压并降温至300℃以下,以实现双层口盖壁板的超塑成形/扩散连接。Superplastic forming of cap rib layers. After the diffusion connection is completed, the air pressure in the inflation pipe 2 is unloaded, and 2MPa high-pressure argon gas is introduced into the ventilation pipe 10 of the lower mold 6 at the same time, and the pressure is maintained for 2 hours to realize the superplastic forming of the cap rib layer 8 . After the cap rib is completely molded, the air pressure in the vent pipe 10 is unloaded and the temperature is lowered to below 300°C, so as to realize the superplastic forming/diffusion connection of the double-layer mouth cover wall plate.

本发明未详细说明部分属于本领域技术人员公知技术。The parts of the present invention that are not described in detail belong to the well-known technology of those skilled in the art.

Claims (7)

1.一种双层口盖壁板超塑成形扩散连接模具,其特征在于,包括上模(1),充气管(2),充气孔(3),密封梗(4),型腔(5),下模(6),压块(7);1. a double-layer mouth cover wall plate superplastic forming diffusion connection mould, is characterized in that, comprises upper mould (1), inflatable tube (2), inflatable hole (3), sealing stem (4), cavity (5) ), lower die (6), pressing block (7); 其中,型腔(5)位于上模(1)的下表面,每个型腔(5)的末端设置有充气孔(3),且所有充气孔(3)与所述模具外部的充气管(2)相通,用于双层口盖壁板成形时向型腔(5)内通入高压惰性气体;在上模(1)下表面的型腔(5)周围设置有密封梗(4),当模具压下时,密封梗(4)、双层板坯与上模的型腔(5)构成密闭腔体,待充气管(2)通入高压惰性气体后通过保压实现双层板坯的扩散连接;Wherein, the cavity (5) is located on the lower surface of the upper mold (1), the end of each cavity (5) is provided with an inflatable hole (3), and all the inflatable holes (3) are connected to the inflatable pipes ( 2) Connected, used for feeding high-pressure inert gas into the cavity (5) when forming the double-layer mouth cover wall plate; sealing stems (4) are arranged around the cavity (5) on the lower surface of the upper mold (1), When the mold is pressed down, the sealing stem (4), the double-layer slab and the cavity (5) of the upper mold form a closed cavity, and the double-layer slab is realized by maintaining the pressure after the high-pressure inert gas is introduced into the inflation tube (2). diffusion junction; 下模(6)上设置凹槽,双层板坯安装在下模(6)上时,双层板坯的通气块(9)及通气管(10)对应放置于下模(6)的凹槽内并用压块(7)压实。A groove is provided on the lower die (6), and when the double-layer slab is installed on the lower die (6), the ventilation block (9) and the ventilation pipe (10) of the double-layered slab are correspondingly placed in the groove of the lower die (6). The inside is compacted with the pressing block (7). 2.使用如权利要求1所述的模具进行双层口盖壁板超塑成形扩散连接的方法,其特征在于,包括步骤如下:2. use the mould as claimed in claim 1 to carry out the method for double-layer flap wall plate superplastic forming diffusion connection, is characterized in that, comprises the steps as follows: 步骤一、制作双层板阻焊剂图样;Step 1. Make a double-layer board solder resist pattern; 步骤二、封边焊接双层板,焊接通气块(9)及通气管(10);Step 2: Welding the double-layer board by sealing the edge, and welding the ventilation block (9) and the ventilation pipe (10); 步骤三、将焊后的双层板坯安装在下模(6)上,通气块(9)及通气管(10)对应放置于下模(6)的凹槽内,用压块(7)压实通气管(10);最后合上上模(1);将模具升温至钛合金的超塑成形扩散连接温度;Step 3: Install the welded double-layer slab on the lower mold (6), place the ventilation block (9) and the ventilation pipe (10) in the groove of the lower mold (6) correspondingly, and press with the pressing block (7). solid air pipe (10); finally closing the upper mold (1); heating the mold to the superplastic forming diffusion bonding temperature of titanium alloy; 步骤四、待模具到达钛合金的超塑成形扩散连接温度后,给上模(1)施加机械压力,以使密封梗(4)、双层板坯与上模型腔(5)构成密闭腔体;同时向充气管(2)内通入高压惰性气体,在设定的时间段内保压,以实现双层板非帽筋区域的扩散连接;Step 4. After the mold reaches the superplastic forming diffusion bonding temperature of the titanium alloy, mechanical pressure is applied to the upper mold (1), so that the sealing stem (4), the double-layer slab and the upper mold cavity (5) form a closed cavity At the same time, high-pressure inert gas is introduced into the inflation pipe (2), and the pressure is maintained within a set time period, so as to realize the diffusion connection of the non-cap rib area of the double-layer plate; 步骤五、帽筋层(8)的超塑成形:卸载充气管(2)内的气压,同时向下模(6)通气管(10)内通入高压惰性气体,在设定的时间段内保压,以实现帽筋层(8)的超塑成形;待帽筋完全贴模后,卸载通气管(10)内的气压并降温,以实现双层口盖壁板的超塑成形扩散连接。Step 5. Superplastic forming of the cap rib layer (8): unloading the air pressure in the inflation tube (2), and at the same time feeding high-pressure inert gas into the vent tube (10) of the lower die (6), within a set time period maintaining pressure to realize superplastic forming of the cap rib layer (8); after the cap rib is completely attached to the mold, unload the air pressure in the vent pipe (10) and cool down, so as to realize the superplastic forming diffusion connection of the double-layer mouth cover wall plate . 3.根据权利要求2所述的双层口盖壁板超塑成形扩散连接的方法,其特征在于,所述步骤一的具体方法为:激光切割钛合金双层板料,其中下层板料对应帽筋层(8)的部位切割出与通气块(9)对应的小孔;待双层板酸洗完毕后,取上层板制作帽筋层(8)的阻焊剂图样,其中帽筋层(8)对应的部位喷涂阻焊剂,其余部位不要喷涂阻焊剂。3. The method for superplastic forming diffusion connection of double-layer mouth cover wall plate according to claim 2, it is characterized in that, the concrete method of described step 1 is: laser cutting titanium alloy double-layer sheet, wherein the lower sheet corresponds to Cut out the holes corresponding to the ventilation block (9) at the part of the cap rib layer (8); after the double-layer board is pickled, take the upper board to make the solder resist pattern of the cap rib layer (8), wherein the cap rib layer ( 8) The corresponding parts should be sprayed with solder resist, and the rest of the parts should not be sprayed with solder resist. 4.根据权利要求3所述的双层口盖壁板超塑成形扩散连接的方法,其特征在于,步骤二的具体方法为:4. the method for superplastic forming diffusion connection of double-layer mouth cover wall plate according to claim 3, is characterized in that, the concrete method of step 2 is: 将双层板对齐并采用手工氩弧焊的方式进行封边焊接;将通气块(9)与通气管(10)采用手工氩弧焊的方式焊到帽筋层(8)背面预留的小孔位置;焊接完成后检查通气块(9),通气管(10)以及双层板坯的气密性。Align the double-layer boards and perform edge-sealing welding by manual argon arc welding; weld the ventilation block (9) and the ventilation pipe (10) to the small space reserved on the back of the cap rib layer (8) by manual argon arc welding. Hole location; check the air tightness of the ventilation block (9), the ventilation pipe (10) and the double-layer slab after the welding is completed. 5.根据权利要求4所述的双层口盖壁板超塑成形扩散连接的方法,其特征在于,步骤三中,钛合金的超塑成形扩散连接温度为920~930℃。5 . The method for superplastic forming diffusion joining of double-layered flap wall plates according to claim 4 , wherein in step 3, the temperature of superplastic forming diffusion joining of titanium alloy is 920-930° C. 6 . 6.根据权利要求5所述的双层口盖壁板超塑成形扩散连接的方法,其特征在于,步骤四中保压2小时。6 . The method for superplastic forming diffusion connection of double-layer flap wall panels according to claim 5 , wherein the pressure is maintained for 2 hours in step 4. 7 . 7.根据权利要求6所述的双层口盖壁板超塑成形扩散连接的方法,其特征在于,步骤五中保压2小时;卸载通气管(10)内的气压并降温300摄氏度以下。7. The method for superplastic forming diffusion connection of double-layer port cover wall plates according to claim 6, characterized in that, in step 5, the pressure is maintained for 2 hours;
CN202111630091.3A 2021-12-28 2021-12-28 A kind of double-layer flap wall plate superplastic forming diffusion connection die and method Pending CN114346396A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111630091.3A CN114346396A (en) 2021-12-28 2021-12-28 A kind of double-layer flap wall plate superplastic forming diffusion connection die and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111630091.3A CN114346396A (en) 2021-12-28 2021-12-28 A kind of double-layer flap wall plate superplastic forming diffusion connection die and method

Publications (1)

Publication Number Publication Date
CN114346396A true CN114346396A (en) 2022-04-15

Family

ID=81102824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111630091.3A Pending CN114346396A (en) 2021-12-28 2021-12-28 A kind of double-layer flap wall plate superplastic forming diffusion connection die and method

Country Status (1)

Country Link
CN (1) CN114346396A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116586524A (en) * 2023-05-29 2023-08-15 哈尔滨工业大学 A superplastic diffusion bonding method capable of self-locking molds

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9217415D0 (en) * 1992-08-15 1992-09-30 Rolly Royce Plc A method of manufacturing an article by diffusion bonding
GB201009299D0 (en) * 2010-06-03 2010-07-21 Rolls Royce Plc A method of manufacturing an article by diffusion bonding and superplastic forming
CN105149874A (en) * 2015-08-24 2015-12-16 北京星航机电装备有限公司 Integral forming method for titanium alloy skin with reinforcing rib structure
CN106271439A (en) * 2016-08-30 2017-01-04 北京普惠三航科技有限公司 The superplastic forming of the heat-resisting eyelid covering of titanium alloy/diffusion joint forming method
CN106270095A (en) * 2016-08-16 2017-01-04 北京航星机器制造有限公司 A kind of band reinforcement part superplastic forming & diffusion bonding integral forming mould and method
CN107096890A (en) * 2017-06-19 2017-08-29 沈阳飞机工业(集团)有限公司 The superplastic forming of the thicker face split casting such as a kind of/diffusion joint forming mould and preparation method thereof
CN110340557A (en) * 2019-07-22 2019-10-18 北京航星机器制造有限公司 Diffusion bonding mold and diffusion bonding method
CN112620914A (en) * 2020-11-30 2021-04-09 哈尔滨工业大学 Aluminum alloy synchronous superplastic forming diffusion bonding method
CN113333935A (en) * 2021-04-30 2021-09-03 成都飞机工业(集团)有限责任公司 Curved web surface titanium alloy superplastic forming-diffusion bonding blank preparation method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9217415D0 (en) * 1992-08-15 1992-09-30 Rolly Royce Plc A method of manufacturing an article by diffusion bonding
GB201009299D0 (en) * 2010-06-03 2010-07-21 Rolls Royce Plc A method of manufacturing an article by diffusion bonding and superplastic forming
GB2481000A (en) * 2010-06-03 2011-12-14 Rolls Royce Plc A method of manufacturing an article by diffusion bonding and superplastic forming
CN105149874A (en) * 2015-08-24 2015-12-16 北京星航机电装备有限公司 Integral forming method for titanium alloy skin with reinforcing rib structure
CN106270095A (en) * 2016-08-16 2017-01-04 北京航星机器制造有限公司 A kind of band reinforcement part superplastic forming & diffusion bonding integral forming mould and method
CN106271439A (en) * 2016-08-30 2017-01-04 北京普惠三航科技有限公司 The superplastic forming of the heat-resisting eyelid covering of titanium alloy/diffusion joint forming method
CN107096890A (en) * 2017-06-19 2017-08-29 沈阳飞机工业(集团)有限公司 The superplastic forming of the thicker face split casting such as a kind of/diffusion joint forming mould and preparation method thereof
CN110340557A (en) * 2019-07-22 2019-10-18 北京航星机器制造有限公司 Diffusion bonding mold and diffusion bonding method
CN112620914A (en) * 2020-11-30 2021-04-09 哈尔滨工业大学 Aluminum alloy synchronous superplastic forming diffusion bonding method
CN113333935A (en) * 2021-04-30 2021-09-03 成都飞机工业(集团)有限责任公司 Curved web surface titanium alloy superplastic forming-diffusion bonding blank preparation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨钦鑫: "TA15双层板超塑成形/扩散连接试验研究", 《工程科技Ⅱ辑》 *
杨钦鑫: "TA15双层板超塑成形/扩散连接试验研究", 《工程科技Ⅱ辑》, 31 December 2018 (2018-12-31), pages 031 - 373 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116586524A (en) * 2023-05-29 2023-08-15 哈尔滨工业大学 A superplastic diffusion bonding method capable of self-locking molds
CN116586524B (en) * 2023-05-29 2024-06-04 哈尔滨工业大学 Superplastic diffusion connection method capable of realizing self-locking of mold

Similar Documents

Publication Publication Date Title
CN103029307B (en) Manufacture method of box-shaped structural main beam made from composite material
CN112372130B (en) Preparation method of titanium alloy hollow structure
CN110666457A (en) Preparation method of titanium alloy thin-wall lightweight flap part
CN109605625B (en) Method for forming heat insulation layer of solid rocket engine combustion chamber shell
CN207808547U (en) A kind of combination pressurizing mould and the pressing shaping device comprising this mold
CN111744983B (en) A kind of topological structure wall panel additive hot-pressing air-expansion composite forming method
CN113996711B (en) High-temperature titanium alloy skin hot drawing and flatulence composite forming method
CN110125229B (en) Synchronous high-pressure air-bulking forming method for large-size titanium alloy curved bus double-layer conical barrel component
CN110340557B (en) Diffusion bonding die and diffusion bonding method
CN114346396A (en) A kind of double-layer flap wall plate superplastic forming diffusion connection die and method
CN115971628A (en) Control method of rounded corners of diffusion joint triangular area in superplastic forming of titanium alloy four-layer structure
CN109127886B (en) A air pressure-molding composite forming method for rectangular cross-section hollow parts of hard-to-deform materials with rounded corners R≤2t
CN107716689A (en) A kind of positive drawing under sheet material inflation back pressure effect is backwards to the compound superplastic forming device of bulging and its method
CN114179392B (en) Forming method of large-size seal head heat insulation layer
CN116140450A (en) Superplastic air-expanding forming die capable of feeding and method
CN116000195A (en) Composite manufacturing method of blade leading edge titanium alloy reinforced edge thermal creep and diffusion bonding
CN112606380A (en) Method for forming thermal protection layer of spray pipe
CN217551162U (en) Powder vacuum warm-pressing mold
CN102886460B (en) Overall composite mechanical push rod type bulging process for car drive axle
CN112893849B (en) Powder-solid coupling forming device and method for multiple layers of ribs in thin-wall part
CN114918306B (en) Injection-press forming method and apparatus for metal resin laminated structure
KR102409575B1 (en) Vacuum module device for improving casting quality
CN114309912A (en) A kind of vacuum high pressure diffusion connection superplastic forming gas circuit system and control method
CN118372025A (en) Air pressure loading hollow complex structure bending, expanding and welding integrated forming die and method
CN113751976B (en) Manufacturing method of titanium alloy reinforcing edge of front edge of composite fan blade of aircraft engine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220415