一种用于热电厂精准分区的发电机及厂用电接地保护方法 Download PDFInfo
- Publication number
- CN114336542B CN114336542B CN202111459419.XA CN202111459419A CN114336542B CN 114336542 B CN114336542 B CN 114336542B CN 202111459419 A CN202111459419 A CN 202111459419A CN 114336542 B CN114336542 B CN 114336542B
- Authority
- CN
- China
- Prior art keywords
- generator
- plant
- grounding
- protection
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Control Of Eletrric Generators (AREA)
- Protection Of Generators And Motors (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111459419.XA CN114336542B (zh) | 2021-12-01 | 2021-12-01 | 一种用于热电厂精准分区的发电机及厂用电接地保护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111459419.XA CN114336542B (zh) | 2021-12-01 | 2021-12-01 | 一种用于热电厂精准分区的发电机及厂用电接地保护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114336542A CN114336542A (zh) | 2022-04-12 |
CN114336542B true CN114336542B (zh) | 2024-12-20 |
Family
ID=81048094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111459419.XA Active CN114336542B (zh) | 2021-12-01 | 2021-12-01 | 一种用于热电厂精准分区的发电机及厂用电接地保护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114336542B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115764837B (zh) * | 2022-10-21 | 2023-12-26 | 国网四川省电力公司电力科学研究院 | 一种基于子网分割的故障选线分析方法及装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103414159A (zh) * | 2013-08-28 | 2013-11-27 | 国家电网公司 | 解决发电机定子接地保护滞后切除故障的方法 |
CN104362735A (zh) * | 2014-11-06 | 2015-02-18 | 山东中实易通集团有限公司 | 一种缩小电厂停电范围的方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1890369B1 (en) * | 2006-08-18 | 2013-10-02 | ABB Research Ltd | Ground fault detection |
CN105071347B (zh) * | 2015-07-17 | 2018-01-19 | 国网山东省电力公司电力科学研究院 | 防止传递电压导致发电机定子接地保护误动的闭锁方法 |
CN105655976B (zh) * | 2016-03-23 | 2018-05-22 | 南京南瑞继保电气有限公司 | 一种发电机定子接地保护方法 |
-
2021
- 2021-12-01 CN CN202111459419.XA patent/CN114336542B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103414159A (zh) * | 2013-08-28 | 2013-11-27 | 国家电网公司 | 解决发电机定子接地保护滞后切除故障的方法 |
CN104362735A (zh) * | 2014-11-06 | 2015-02-18 | 山东中实易通集团有限公司 | 一种缩小电厂停电范围的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN114336542A (zh) | 2022-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208571394U (zh) | 一种基于智能控制器的光伏发电用箱式变电站 | |
CN106410766B (zh) | 基于dg并网电力系统高容纳性保护方法 | |
CN114336542B (zh) | 一种用于热电厂精准分区的发电机及厂用电接地保护方法 | |
Patel et al. | A comprehensive review: AC & DC microgrid protection | |
CN105162086B (zh) | 针对dg并网变压器接地系统的保护方法 | |
CN109861188B (zh) | 基于集中式新能源并网方式的接地保护方法及系统 | |
CN117526236A (zh) | 基于并联环流的主变串接限流电抗器故障监测保护方法 | |
Camm et al. | Wind power plant grounding, overvoltage protection, and insulation coordination: IEEE PES wind plant collector system design working group | |
CN210957781U (zh) | 一种基于感应型超导限流器的110kV变电站双母线系统 | |
Pérez et al. | Technical Methods for the Prevention and Correction of Voltage Sags and Short Interruptions Inside the Industrial Plants and in the Distribution Networks. | |
Liu et al. | Missing Information Protection Considering Inrush Current and CT Saturation | |
Yan et al. | Process and protection action of commissioning fault of offshore wind farm grid-connected transmission lines | |
Zhu et al. | Steady-state Operation Tests of Magneto-biased Superconducting Fault Current Limiter (MBSFCL) on a 66kV Power Substation in China | |
Zhang et al. | Research on Protection Scheme of Offshore Wind Power Transmission Configured with Offshore High-Voltage Reactor Station | |
CN118399506B (zh) | 一种用于变频器的电压暂降治理控制方法及系统 | |
CN206331053U (zh) | 一种多功能电压跌落发生装置 | |
CN114646816B (zh) | 一种核电厂辅助变压器断相监测方法 | |
Luo et al. | Relay Protection Configuration of High-voltage Plant Power System for Solar Thermal Power Plant | |
CN209217702U (zh) | 电弧光保护装置中的断路器失灵保护模块 | |
CN115249966B (zh) | 一种燃机电厂外围母线电源联锁保护配置系统 | |
Prasher et al. | HVDC east-south interconnector II in India: 2000 MW,+/-500 kV | |
Shawel et al. | Design Procedure of a Hybrid YBCO-Superconductor Fault Current Limiter (SFCL) for a High Voltage Substation | |
CN1141765C (zh) | 一种低压配电系统接地保护方法及其装置 | |
CN110137919A (zh) | 海上风电继电保护系统、方法及计算机可读存储介质 | |
CN214900167U (zh) | 一种基于dcs系统的低压厂用变压器高联低保护系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Hailiang Inventor after: Weng Haifeng Inventor after: Pan Xiaoye Inventor after: Sun Ruodi Inventor after: Liang Wenjun Inventor after: Gao Ya Inventor after: Yin Jiawei Inventor before: Chen Hailiang Inventor before: Sun Ruodi Inventor before: Gao Ya Inventor before: Pan Xiaoye Inventor before: Yin Jiawei Inventor before: Weng Haifeng Inventor before: Liang Wenjun |
|
CB03 | Change of inventor or designer information |