CN114040513B - Link establishment method, device, terminal equipment and computer readable storage medium - Google Patents
Link establishment method, device, terminal equipment and computer readable storage medium Download PDFInfo
- Publication number
- CN114040513B CN114040513B CN202111521317.6A CN202111521317A CN114040513B CN 114040513 B CN114040513 B CN 114040513B CN 202111521317 A CN202111521317 A CN 202111521317A CN 114040513 B CN114040513 B CN 114040513B
- Authority
- CN
- China
- Prior art keywords
- link
- module
- resource
- resource module
- terminal device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 66
- 230000008569 process Effects 0.000 claims abstract description 20
- 238000004590 computer program Methods 0.000 claims description 16
- 230000002776 aggregation Effects 0.000 claims description 8
- 238000004220 aggregation Methods 0.000 claims description 8
- 230000003993 interaction Effects 0.000 abstract description 7
- 230000011664 signaling Effects 0.000 abstract description 6
- 230000010354 integration Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 14
- 238000012545 processing Methods 0.000 description 14
- 230000005540 biological transmission Effects 0.000 description 10
- 238000004891 communication Methods 0.000 description 9
- 230000001360 synchronised effect Effects 0.000 description 7
- 230000006870 function Effects 0.000 description 5
- 230000009977 dual effect Effects 0.000 description 4
- 230000003068 static effect Effects 0.000 description 3
- 241000135164 Timea Species 0.000 description 2
- 230000003190 augmentative effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/11—Allocation or use of connection identifiers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B1/00—Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
- H04B1/38—Transceivers, i.e. devices in which transmitter and receiver form a structural unit and in which at least one part is used for functions of transmitting and receiving
- H04B1/40—Circuits
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/0231—Traffic management, e.g. flow control or congestion control based on communication conditions
- H04W28/0236—Traffic management, e.g. flow control or congestion control based on communication conditions radio quality, e.g. interference, losses or delay
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/02—Terminal devices
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
本申请涉及一种链路建立方法、装置、终端设备和计算机可读存储介质,终端设备中的基带处理器接收网络设备发送的指示信息;基于上述指示信息,基带处理器对链路资源模块进行参数配置,建立第一链路;其中,上述链路资源模块为终端设备中与建立第一链路相关的模块。采用上述方法可以避免链路建立过程中数字基带系统与其它链路资源模块所在系统之间的信令交互,降低了第一链路的建立时延;进一步地,终端设备中通过基带处理器完成其他链路资源模块的参数配置,使得射频模块等链路资源模块可以简化至纯硬件电路,降低电路结构复杂度以及减小其他链路资源模块的尺寸,提高系统集成度。
The present application relates to a link establishment method, device, terminal equipment and computer-readable storage medium. The baseband processor in the terminal equipment receives the instruction information sent by the network equipment; based on the above instruction information, the baseband processor performs link resource module Parameter configuration, establishing the first link; wherein, the link resource module is a module related to establishing the first link in the terminal device. Using the above method can avoid the signaling interaction between the digital baseband system and the system where the other link resource modules are located during the link establishment process, reducing the establishment delay of the first link; further, the terminal device completes the process through the baseband processor The parameter configuration of other link resource modules enables link resource modules such as radio frequency modules to be simplified to pure hardware circuits, reduces the complexity of the circuit structure and the size of other link resource modules, and improves system integration.
Description
技术领域technical field
本申请涉及通信技术领域,特别是涉及一种链路建立方法、装置、终端设备和计算机可读存储介质。The present application relates to the technical field of communications, and in particular to a link establishment method, device, terminal equipment and computer-readable storage medium.
背景技术Background technique
5G系统中,为了提高上行吞吐量和降低时延,终端设备可以在不同场景下进行上行链路切换。例如,终端设备在其中一种场景下的上行链路可以包括N3频段的上行链路以及N78频段的上行链路,当需要切换至另一种场景下时,终端设备的上行链路可以包括两路N78频段的上行链路。N78频段带宽较宽,可以带来更高的上行吞吐率。In a 5G system, in order to improve uplink throughput and reduce latency, terminal devices can perform uplink switching in different scenarios. For example, the uplink of the terminal device in one of the scenarios may include the uplink of the N3 frequency band and the uplink of the N78 frequency band. When switching to another scenario, the uplink of the terminal device may include two The uplink of the N78 frequency band. The bandwidth of the N78 frequency band is wider, which can bring higher uplink throughput.
终端设备在不同场景下进行上行链路切换时,需要重新分配或重置所有发射通路,上述发射通路中包括射频单元,基带单元还有天线前端单元等。上述链路切换过程涉及到多个系统单元之间的交互,导致链路切换时延较长,影响系统性能。When a terminal device performs uplink switching in different scenarios, it needs to reassign or reset all transmission paths, which include radio frequency units, baseband units, and antenna front-end units. The above-mentioned link switching process involves the interaction between multiple system units, resulting in a long link switching delay and affecting system performance.
发明内容Contents of the invention
本申请实施例提供了一种链路建立方法、装置、终端设备和计算机可读存储介质,可以降低链路建立时延。Embodiments of the present application provide a link establishment method, device, terminal equipment, and computer-readable storage medium, which can reduce link establishment delay.
第一方面,一种链路建立方法,应用于终端设备中的基带处理器,包括:In the first aspect, a method for establishing a link is applied to a baseband processor in a terminal device, including:
基带处理器接收网络设备发送的指示信息;指示信息用于指示终端设备建立第一链路;The baseband processor receives instruction information sent by the network device; the instruction information is used to instruct the terminal device to establish the first link;
基带处理器对链路资源模块进行参数配置,以建立第一链路;链路资源模块为终端设备中与建立第一链路相关的模块。The baseband processor configures the parameters of the link resource module to establish the first link; the link resource module is a module related to the establishment of the first link in the terminal device.
第二方面,一种链路建立装置,应用于终端设备中的基带处理器,包括:In the second aspect, a link establishment device is applied to a baseband processor in a terminal device, including:
接收模块,用于接收网络设备发送的指示信息;指示信息用于指示终端设备建立第一链路;A receiving module, configured to receive instruction information sent by the network device; the instruction information is used to instruct the terminal device to establish the first link;
配置模块,用于对链路资源模块进行参数配置,以建立第一链路;链路资源模块为终端设备中与建立第一链路相关的模块。The configuration module is configured to configure parameters of the link resource module to establish the first link; the link resource module is a module related to the establishment of the first link in the terminal device.
第三方面,一种终端设备,包括存储器及处理器,存储器中储存有计算机程序,计算机程序被处理器执行时,使得处理器执行第一方面中的方法的步骤。In a third aspect, a terminal device includes a memory and a processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the processor is made to execute the steps of the method in the first aspect.
第四方面,一种计算机可读存储介质,其上存储有计算机程序,其特征在于,计算机程序被处理器执行时实现如第一方面中的方法的步骤。In a fourth aspect, a computer-readable storage medium stores a computer program thereon, wherein the computer program implements the steps of the method in the first aspect when executed by a processor.
上述链路建立方法、装置、终端设备和计算机可读存储介质,终端设备中的基带处理器接收网络设备发送的指示信息;基于上述指示信息,基带处理器对链路资源模块进行参数配置,建立第一链路;其中,上述链路资源模块为终端设备中与建立第一链路相关的模块。由于终端设备中接收网络设备发送建立第一链路的指示信息、对链路资源模块进行参数配置等步骤都是在基带处理器中完成的,因此本申请中第一链路的建立过程可以避免数字基带系统与其它链路资源模块所在系统之间的信令交互,降低了第一链路的建立时延;进一步地,终端设备中通过基带处理器完成其他链路资源模块的参数配置,使得射频模块等链路资源模块可以简化至纯硬件电路,降低电路结构复杂度以及减小其他链路资源模块的尺寸,提高系统集成度。The above-mentioned link establishment method, device, terminal equipment and computer-readable storage medium, the baseband processor in the terminal equipment receives the indication information sent by the network equipment; based on the above indication information, the baseband processor configures the parameters of the link resource module, and establishes The first link; wherein, the aforementioned link resource module is a module related to establishing the first link in the terminal device. Since the receiving network device in the terminal device sends the instruction information for establishing the first link, and the steps such as configuring the parameters of the link resource module are all completed in the baseband processor, the establishment process of the first link in this application can be avoided. The signaling interaction between the digital baseband system and the system where other link resource modules are located reduces the establishment delay of the first link; further, the terminal device completes the parameter configuration of other link resource modules through the baseband processor, so that Link resource modules such as radio frequency modules can be simplified to pure hardware circuits, reducing circuit structure complexity and reducing the size of other link resource modules, improving system integration.
附图说明Description of drawings
为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present application. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本申请一个实施例中链路建立方法的应用环境图;FIG. 1 is an application environment diagram of a link establishment method in an embodiment of the present application;
图2为本申请一个实施例中链路建立方法的流程图;FIG. 2 is a flowchart of a link establishment method in an embodiment of the present application;
图3为本申请一个实施例中硬件链路架构示意图;FIG. 3 is a schematic diagram of a hardware link architecture in an embodiment of the present application;
图4为本申请一个实施例中链路建立方法的流程图;FIG. 4 is a flowchart of a link establishment method in an embodiment of the present application;
图5为本申请一个实施例中指示信息接收示意图;FIG. 5 is a schematic diagram of receiving indication information in an embodiment of the present application;
图6为本申请一个实施例中链路切换的示意图;FIG. 6 is a schematic diagram of link switching in an embodiment of the present application;
图7为本申请一个实施例中链路建立方法的流程图;FIG. 7 is a flowchart of a link establishment method in an embodiment of the present application;
图8为本申请一个实施例中链路建立方法的流程图;FIG. 8 is a flowchart of a link establishment method in an embodiment of the present application;
图9为本申请一个实施例中链路建立方法的流程图;FIG. 9 is a flowchart of a link establishment method in an embodiment of the present application;
图10为本申请一个实施例中链路建立装置的结构框图;FIG. 10 is a structural block diagram of a link establishment device in an embodiment of the present application;
图11为本申请一个实施例中链路建立装置的结构框图;FIG. 11 is a structural block diagram of a link establishment device in an embodiment of the present application;
图12为本申请一个实施例中链路建立装置的结构框图;FIG. 12 is a structural block diagram of a link establishment device in an embodiment of the present application;
图13为本申请一个实施例中终端设备的结构示意图。Fig. 13 is a schematic structural diagram of a terminal device in an embodiment of the present application.
具体实施方式Detailed ways
为了使本申请的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本申请进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, and are not intended to limit the present application.
可以理解,本申请所使用的术语“第一”、“第二”等可在本文中用于描述各种元件,但这些元件不受这些术语限制。这些术语仅用于将第一个元件与另一个元件区分。举例来说,在不脱离本申请的范围的情况下,可以将第一资源模块称为第二资源模块,且类似地,可将第二资源模块称为第一资源模块。第一资源模块和第二资源模块两者都是资源模块,但其不是同一资源模块。It can be understood that the terms "first", "second" and the like used in this application may be used to describe various elements herein, but these elements are not limited by these terms. These terms are only used to distinguish one element from another element. For example, a first resource module could be termed a second resource module, and, similarly, a second resource module could be termed a first resource module, without departing from the scope of the present application. Both the first resource module and the second resource module are resource modules, but they are not the same resource module.
图1为一个实施例中链路建立方法的应用环境示意图。如图1所示,该应用环境包括通信连接的终端设备102和网络设备104。上述网络设备104可以是任意一种具有无线收发功能的设备,包括但不限于:基站NodeB、演进型基站eNodeB、第五代(the fifthgeneration,5G)通信系统中的基站、未来通信系统中的基站或网络设备、WiFi系统中的接入节点、无线中继节点、无线回传节点等。网络设备还可以是云无线接入网络(cloud radioaccess network,CRAN)场景下的无线控制器。网络设备还可以是小站,传输节点(transmission reference point,TRP),路侧单元(road side unit,RSU)等。本申请的实施例对上述网络设备所采用的具体技术和具体设备形态不做限定。上述终端设备102可以是一种具有无线收发功能的设备,可以但不限于是手持、穿戴或车载的设备等。终端设备可以是手机、平板电脑、带无线收发功能的电脑、虚拟现实(virtual reality,VR)终端设备、增强现实(augmented reality,AR)终端设备、工业控制(industrial control)中的无线终端、无人驾驶(self-driving)中的无线终端、远程医疗(remote medical)中的无线终端、智能电网(smart grid)中的无线终端、运输安全(transportation safety)中的无线终端、智慧城市(smart city)中的无线终端、智慧家庭(smarthome)中的无线终端等。本申请的实施例对应用场景不做限定。Fig. 1 is a schematic diagram of an application environment of a link establishment method in an embodiment. As shown in FIG. 1 , the application environment includes a communication-connected terminal device 102 and a network device 104 . The above-mentioned network device 104 may be any device with wireless transceiver function, including but not limited to: base station NodeB, evolved base station eNodeB, base station in the fifth generation (the fifth generation, 5G) communication system, and base station in the future communication system Or network devices, access nodes in WiFi systems, wireless relay nodes, wireless backhaul nodes, etc. The network device may also be a wireless controller in a cloud radio access network (cloud radio access network, CRAN) scenario. The network device may also be a small station, a transmission reference point (transmission reference point, TRP), a road side unit (road side unit, RSU), and the like. The embodiments of the present application do not limit the specific technology and specific device form adopted by the foregoing network devices. The above-mentioned terminal device 102 may be a device with a wireless transceiver function, and may be, but not limited to, a handheld, wearable, or vehicle-mounted device. The terminal device can be a mobile phone, a tablet computer, a computer with a wireless transceiver function, a virtual reality (virtual reality, VR) terminal device, an augmented reality (augmented reality, AR) terminal device, a wireless terminal in industrial control (industrial control), wireless Wireless terminals in self-driving, wireless terminals in remote medical, wireless terminals in smart grid, wireless terminals in transportation safety, smart city ), a wireless terminal in a smart home (smarthome), and the like. The embodiments of the present application do not limit the application scenarios.
图2为一个实施例中链路建立方法的流程图。本实施例中的链路建立方法,以运行于图1中的终端设备上为例进行描述。如图2所示,上述方法包:Fig. 2 is a flowchart of a link establishment method in an embodiment. The method for establishing a link in this embodiment is described by taking the terminal device running on the terminal device in FIG. 1 as an example. As shown in Figure 2, the above method package:
S101、基带处理器接收基站发送的指示信息;指示信息用于指示终端设备建立第一链路。S101. The baseband processor receives indication information sent by a base station; the indication information is used to instruct a terminal device to establish a first link.
上述基带处理器可以为数字基带系统中的处理器。上述数字基带系统可以为终端设备中执行信号调制解调功能的系统。上述数字基带系统中可以包括多个基带模块,上述基带模块可以是上行数字通道,也可以是下行数字通道;上述上行数字通道可以向射频模块发送数字基带信号,通过射频模块对数字基带信号进行处理后,由天线发送至网络设备。上述下行数字通道可以接收射频模块发送的下行数据,并对下行数据进行解调处理。The aforementioned baseband processor may be a processor in a digital baseband system. The above-mentioned digital baseband system may be a system that performs signal modulation and demodulation functions in terminal equipment. The above-mentioned digital baseband system may include a plurality of baseband modules, and the above-mentioned baseband module may be an uplink digital channel or a downlink digital channel; the above-mentioned uplink digital channel may send a digital baseband signal to the radio frequency module, and process the digital baseband signal through the radio frequency module After that, it is sent to the network device by the antenna. The above-mentioned downlink digital channel can receive the downlink data sent by the radio frequency module, and demodulate the downlink data.
上述基带处理器可以对网络设备发送的下行数据进行解调,获得网络设备发送的指示信息。上述指示信息可以通过下行控制信令(Downlink Control Information,简称DCI)发送。The above-mentioned baseband processor can demodulate the downlink data sent by the network device, and obtain the indication information sent by the network device. The above indication information may be sent through downlink control signaling (Downlink Control Information, DCI for short).
上述指示信息可以用于指示终端设备建立第一链路。其中,上述第一链路可以是上行链路,也可以是下行链路,在此不做限定。上述第一链路中可以包括一个链路通道,也可以包括多个链路通道,在此不做限定。上述第一链路可以支持4G/5G双连接(EUTRA-NRDual Connectivity,简称ENDC),也可以支持5G/5G双连接(NR-NR Dual Connectivity,简称NNDC),还可以支持补充上行(Supplementary Uplink,简称SUL)组合下通信连接;对于上述第一链路所支持的通信场景在此不做限定。可选地,上述第一链路可以用于实现载波聚合(Carrier Aggregation,简称CA)。The foregoing indication information may be used to instruct the terminal device to establish the first link. Wherein, the above-mentioned first link may be an uplink or a downlink, which is not limited here. The foregoing first link may include one link channel, or may include multiple link channels, which is not limited here. The above-mentioned first link can support 4G/5G dual connectivity (EUTRA-NRDual Connectivity, referred to as ENDC), can also support 5G/5G dual connectivity (NR-NR Dual Connectivity, referred to as NNDC), and can also support supplementary uplink (Supplementary Uplink, SUL for short) combined communication connections; the communication scenarios supported by the above-mentioned first link are not limited here. Optionally, the foregoing first link may be used to implement carrier aggregation (Carrier Aggregation, CA for short).
终端设备可以在注册网络之后,接收网络设备发送的指示信息,以新建第一链路;或者,上述终端设备可以在与网络设备已建立链路连接的情况下,接收到上述指示信息,以将当前链路切换至第一链路。也就是说,上述指示信息可以用于指示终端设备新建第一链路,或者,用于指示终端设备将当前链路切换至第一链路。网络设备可以根据终端设备的业务需求,确定是否发送指示信息,以指示终端设备进行链路切换。After registering with the network, the terminal device may receive the instruction information sent by the network device to establish the first link; or, the above terminal device may receive the above instruction information when the link connection with the network device has been established, so as to establish the first link. The current link is switched to the first link. That is to say, the above indication information may be used to instruct the terminal device to create a first link, or to instruct the terminal device to switch the current link to the first link. The network device may determine whether to send indication information according to the service requirements of the terminal device, so as to instruct the terminal device to perform link switching.
上述指示信息中可以包括待建立的第一链路的载波信息,也可以包括第一链路的链路标识,还可以包括第一链路对应的通信场景标识,还可以包括第一链路对应的通信频段标识,对于上述指示信息中的内容在此不做限定。上述第一链路的载波信息可以包括第一链路对应的中心频点、链路带宽、子载波间隔等。以用于NR系统中上行载波聚合的第一链路为例,上述载波聚合可以支持多种场景,如下表所示:The above indication information may include the carrier information of the first link to be established, the link identifier of the first link, the communication scene identifier corresponding to the first link, and the corresponding The communication frequency band identifier of , and the content in the above indication information is not limited here. The above-mentioned carrier information of the first link may include a center frequency point corresponding to the first link, link bandwidth, subcarrier spacing, and the like. Taking the first link used for uplink carrier aggregation in the NR system as an example, the above carrier aggregation can support multiple scenarios, as shown in the following table:
其中,上述N78为频段3.3GHz-3.8GHz,上述N3为频段1710MHz-1785MHz。N78具有较大频率带宽,可以满足高吞吐量要求;上述N3支持FDD载波,可以满足低时延要求。上述场景A和场景C对应的上行链路中,可以包括1个链路通道;上述场景B和场景D对应的上行链路中,可以包括2个链路通道。以建立场景B下的上行链路为例,上述指示信息可以包括通信场景标识,也就是场景B,也可以包括通信频段标识,例如N78。Among them, the above-mentioned N78 is a frequency band of 3.3GHz-3.8GHz, and the above-mentioned N3 is a frequency band of 1710MHz-1785MHz. N78 has a large frequency bandwidth and can meet high throughput requirements; the above-mentioned N3 supports FDD carriers and can meet low latency requirements. The uplinks corresponding to the foregoing scenario A and scenario C may include one link channel; the uplinks corresponding to the foregoing scenario B and scenario D may include two link channels. Taking establishing an uplink in scenario B as an example, the above indication information may include a communication scenario identifier, that is, scenario B, and may also include a communication frequency band identifier, such as N78.
S102、基带处理器对链路资源模块进行参数配置,以建立第一链路;链路资源模块为终端设备中与建立第一链路相关的模块。S102. The baseband processor configures parameters for the link resource module to establish the first link; the link resource module is a module related to establishing the first link in the terminal device.
终端设备中的基带处理器接收到上述指示信息之后,可以基于指示信息,对链路资源模块进行参数配置。上述链路资源模块可以包括基带模块、射频模块、本振模块、功放模块、天线开关模块以及天线模块。After the baseband processor in the terminal device receives the above indication information, it can configure the parameters of the link resource module based on the indication information. The above-mentioned link resource module may include a baseband module, a radio frequency module, a local oscillator module, a power amplifier module, an antenna switch module, and an antenna module.
上述第一链路完成上行数据或下行数据传输时,需要使用的模块可以包括基带模块、射频模块、本振模块、功放模块、天线开关模块以及天线模块。其中,上述射频模块可以完成信号变频,上述本振模块可以向射频模块提供本振信号,上述功放模块可以对信号进行放大,上述天线开关模块可以通过开关控制射频模块与天线的连接,上述天线模块用于接收信号或者将功放输出的信号发送至网络设备。终端设备中的模块可以具备支持多个链路通路的能力。以图3所示的上行硬件架构图为例,终端设备中的数字基带系统可以包括3个上行数字通道,对应3个基带模块;终端设备中的射频模拟系统中包括3个射频模块以及2个本振模块;上述上行硬件架构中的前端天线系统中包括3个功放模块、2个天线开关模块以及2个天线模块。When the above-mentioned first link completes uplink data or downlink data transmission, the modules to be used may include a baseband module, a radio frequency module, a local oscillator module, a power amplifier module, an antenna switch module, and an antenna module. Wherein, the radio frequency module can complete signal frequency conversion, the local oscillator module can provide a local oscillator signal to the radio frequency module, the power amplifier module can amplify the signal, the antenna switch module can control the connection between the radio frequency module and the antenna through a switch, the antenna module Used to receive signals or send signals output by the power amplifier to network devices. Modules in terminal equipment may have the capability to support multiple link paths. Taking the uplink hardware architecture diagram shown in Figure 3 as an example, the digital baseband system in the terminal device may include 3 uplink digital channels, corresponding to 3 baseband modules; the RF analog system in the terminal device includes 3 RF modules and 2 The local oscillator module; the front-end antenna system in the above-mentioned uplink hardware architecture includes 3 power amplifier modules, 2 antenna switch modules and 2 antenna modules.
上述链路资源模块可以是终端设备中与建立第一链路相关的模块。与建立第一链路相关的模块,可以包括建立第一链路需要使用的模块,也可以包括建立第一链路之后需要进行资源释放的模块。以图3中的上行链硬件架构图为例,若指示信息用于新建第一链路,上述第一链路为N78单流链路情况下,上述链路资源模块可以包括一个基带模块、N78匹配的射频模块、N78匹配的功放模块、一个本振模块以及一个天线开关模块和一个天线模块。若指示信息用于将当前链路切换至第一链路,以当前链路为N3单流链路,第一链路为N78单流链路为例,上述链路资源模块可以包括2个基带模块、N78对应的一个射频模块以及N3对应的1个射频模块、N78对应的功放模块以及与N3对应的功放模块、2个本振模块以及2个天线开关模块和2个天线模块。The aforementioned link resource module may be a module related to establishing the first link in the terminal device. The modules related to establishing the first link may include modules required to establish the first link, and may also include modules required to release resources after the first link is established. Taking the uplink hardware architecture diagram in Figure 3 as an example, if the indication information is used to create a first link, and the first link is an N78 single-stream link, the link resource module may include a baseband module, an N78 A matching radio frequency module, an N78 matching power amplifier module, a local oscillator module, an antenna switch module and an antenna module. If the indication information is used to switch the current link to the first link, taking the current link as an N3 single-stream link and the first link as an N78 single-stream link as an example, the above-mentioned link resource module may include 2 basebands module, a radio frequency module corresponding to N78 and 1 radio frequency module corresponding to N3, a power amplifier module corresponding to N78 and a power amplifier module corresponding to N3, 2 local oscillator modules, 2 antenna switch modules and 2 antenna modules.
基带处理器可以对上述链路资源模块进行参数配置。基带处理器可以对各个链路资源模块分别进行控制。不同类型的链路资源模块对应的配置参数可以不同。例如,上述基带模块的配置参数可以包括基带模块输出的信号频率、载波带宽、载波间隔等;上述射频模块的配置参数可以包括中频频率、链路衰减等,上述本振模块的配置参数可以包括本振频率等,上述功放模块的配置参数可以包括衰减量、静态参数、温补系数等。另外,上述链路资源模块的配置参数还可以包括各个模块之间的连接关系,例如第一链路使用的基带模块与哪一个射频模块连接,第一链路使用的射频模块与哪一个本振模块连接,上述天线开关模块的导通方向,也就是天线开关模块将哪一个功放模块与天线模块导通。The baseband processor can perform parameter configuration on the above-mentioned link resource module. The baseband processor can control each link resource module separately. The configuration parameters corresponding to different types of link resource modules may be different. For example, the configuration parameters of the above-mentioned baseband module may include the signal frequency output by the baseband module, carrier bandwidth, carrier spacing, etc.; the configuration parameters of the above-mentioned radio frequency module may include intermediate frequency frequency, link attenuation, etc. Vibration frequency, etc., the configuration parameters of the power amplifier module may include attenuation, static parameters, temperature compensation coefficient, etc. In addition, the configuration parameters of the above-mentioned link resource modules may also include the connection relationship between each module, for example, which radio frequency module is connected to the baseband module used in the first link, and which local oscillator is connected to the radio frequency module used in the first link. Module connection, the conduction direction of the above-mentioned antenna switch module, that is, which power amplifier module is connected to the antenna module by the antenna switch module.
终端设备中的基带处理器对上述链路资源模块进行参数配置之后,使得第一链路可以在对应的工作频段完成数据传输。After the baseband processor in the terminal device configures the parameters of the link resource module, the first link can complete data transmission in the corresponding working frequency band.
基带处理器中可以包括一个处理单元,也可以包括多个处理单元。上述基带处理器中包括一个处理单元的情况下,上述链路建立过程中,接收指示信息、完成参数配置等步骤均可以通过该处理单元完成。可选地,上述基带处理器中可以包括3个处理单元,分别为统筹单元(Central Link Control Unit,简称CLCU)、资源管理单元(Central LinkResource Unit,简称CLRU)以及驱动配置单元(Central Link Driver Unit,简称CLDU)。其中,上述CLCU主要用于收集对链路资源模块的申请,包括接收网络设备发送的指示信息,根据指示信息对CLDU以及CLRU进行调度。上述CLDU可以用于对各个链路资源模块进行参数配置。上述CLRU用于对链路资源模块以及链路资源模块对应的配置参数进行管理。The baseband processor may include one processing unit, or may include multiple processing units. In the case where the above-mentioned baseband processor includes a processing unit, in the above-mentioned link establishment process, steps such as receiving indication information and completing parameter configuration can be completed by the processing unit. Optionally, the above-mentioned baseband processor may include three processing units, namely a central link control unit (Central Link Control Unit, CLCU for short), a resource management unit (Central LinkResource Unit, CLRU for short), and a drive configuration unit (Central Link Driver Unit). , referred to as CLDU). Wherein, the above-mentioned CLCU is mainly used for collecting applications for link resource modules, including receiving indication information sent by network equipment, and scheduling CLDUs and CLRUs according to the indication information. The above CLDU can be used to configure parameters of each link resource module. The above-mentioned CLRU is used to manage the link resource module and the configuration parameters corresponding to the link resource module.
上述链路建立方法,终端设备中的基带处理器接收网络设备发送的指示信息;基于上述指示信息,基带处理器对链路资源模块进行参数配置,建立第一链路;其中,上述链路资源模块为终端设备中与建立第一链路相关的模块。由于终端设备中接收网络设备发送建立第一链路的指示信息、对链路资源模块进行参数配置等步骤都是由基带处理器完成的,因此本申请中第一链路的建立过程可以避免数字基带系统与其它链路资源模块所在系统之间的信令交互,降低了第一链路的建立时延;进一步地,终端设备中通过基带模块完成其他链路资源模块的参数配置,使得射频模块等链路资源模块可以简化至纯硬件电路,降低电路结构复杂度以及减小其他链路资源模块的尺寸,提高系统集成度。In the above link establishment method, the baseband processor in the terminal device receives the instruction information sent by the network device; based on the above instruction information, the baseband processor performs parameter configuration on the link resource module to establish the first link; wherein, the above link resource The module is a module related to establishing the first link in the terminal device. Since the receiving network device in the terminal device sends the instruction information for establishing the first link, and the steps such as configuring the parameters of the link resource module are all completed by the baseband processor, the establishment process of the first link in this application can avoid digital The signaling interaction between the baseband system and the system where other link resource modules are located reduces the establishment delay of the first link; further, the terminal device completes the parameter configuration of other link resource modules through the baseband module, so that the radio frequency module The other link resource modules can be simplified to pure hardware circuits, reducing the complexity of the circuit structure and the size of other link resource modules, and improving the system integration.
图4为一个实施例中链路建立方法的流程示意图,本实施例涉及终端设备从当前链路切换至第一链路的过程,在上述实施例的基础上,如图4所示,上述S102包括:Fig. 4 is a schematic flowchart of a link establishment method in an embodiment. This embodiment involves the process of switching a terminal device from the current link to the first link. On the basis of the above embodiment, as shown in Fig. 4, the above S102 include:
S201、基带处理器获取第一链路相关的资源配置参数。S201. The baseband processor acquires resource configuration parameters related to the first link.
上述指示信息用于指示终端设备从当前链路切换至第一链路。以NR系统为例,为了提高上行吞吐量以及降低系统时延,终端设备可以在能力范围内进行上行链路切换。终端设备设备可以接收到网络设备发送的DCI消息,通过解析DCI消息获取上述指示信息。上述指示信息中还可以包括链路切换的时间要求,例如网络设备可以要求终端设备在时间周期T内完成链路切换。以图5中的切换示意图为例,终端设备的当前链路可以是N3单流链路加N78双流链路;终端设备可以在slot1接收到DCI消息,并解析获得指示信息,指示终端设备从当前链路切换至N78双流链路;图中阴影部分可以为链路切换的时间周期T,终端设备可以在slot3开始进行链路切换,在slot4可以开始通过N78双流链路进行上行传输。The above indication information is used to instruct the terminal device to switch from the current link to the first link. Taking the NR system as an example, in order to improve the uplink throughput and reduce the system delay, the terminal device can perform uplink switching within the capability range. The terminal device may receive the DCI message sent by the network device, and obtain the above indication information by parsing the DCI message. The above indication information may also include a time requirement for link switching, for example, the network device may require the terminal device to complete the link switching within a time period T. Taking the handover schematic diagram in Figure 5 as an example, the current link of the terminal device can be an N3 single-stream link plus an N78 dual-stream link; the terminal device can receive a DCI message in slot1, and analyze and obtain the instruction information, instructing the terminal device to switch from the current The link is switched to the N78 dual-stream link; the shaded part in the figure can be the time period T of the link switch. The terminal device can start link switching at slot3, and can start uplink transmission through the N78 dual-stream link at slot4.
上述链路切换的时间周期可以是35微秒,也可以是140微秒。在该时间周期T内终端设备发送的上行数据为无效数据。上述时间周期T可以是终端设备根据自身系统能力向基站上报的参数,上述时间周期T越短,对应的上行链路对切换时延越短。The above link switching time period may be 35 microseconds or 140 microseconds. The uplink data sent by the terminal device within the time period T is invalid data. The above-mentioned time period T may be a parameter reported by the terminal device to the base station according to its own system capability, and the shorter the above-mentioned time period T, the shorter the corresponding uplink pair switching delay.
上述资源配置参数,是指第一链路使用的第一资源模块在第一链路下对应的配置参数。上述基带处理器在接收到指示信息之后,计算哪些资源模块是切换至第一链路的过程中相关的链路资源模块,进而确定上述链路资源模块对应的配置参数。可选地,基带处理器可以在接收到指示信息之后,在预设的资源配置关系中查询第一资源模块的标识;然后,在预设的配置参数列表中查询与标识匹配的参数,获得资源配置参数。The foregoing resource configuration parameters refer to configuration parameters corresponding to the first resource module used by the first link under the first link. After receiving the indication information, the baseband processor calculates which resource modules are related link resource modules in the process of switching to the first link, and then determines configuration parameters corresponding to the link resource modules. Optionally, after receiving the indication information, the baseband processor can query the identifier of the first resource module in the preset resource configuration relationship; then, query the parameter matching the identifier in the preset configuration parameter list to obtain the resource configuration parameters.
或者,上述基带处理器也可以获取预配置参数,上述预配置参数可以是在接收到指示信息之前,提前确定的与第一链路相关的链路资源模块,以及上述链路资源模块的配置参数。可选地,基带处理器可以在接收到指示信息之前,在预设的资源配置关系中查询第一资源模块的标识;然后在预设的配置参数列表中查询与第一资源模块的标识匹配的参数,生成预配置参数。终端设备可以在预设的存储区域中调用上述预配置参数,将其确定为资源配置参数。对于上述资源配置参数的获取方式在此不做限定。Alternatively, the above-mentioned baseband processor may also obtain pre-configured parameters, and the above-mentioned pre-configured parameters may be link resource modules related to the first link determined in advance before receiving the indication information, and configuration parameters of the above-mentioned link resource modules . Optionally, before receiving the indication information, the baseband processor may query the identifier of the first resource module in the preset resource configuration relationship; and then query the preset configuration parameter list that matches the identifier of the first resource module. Parameters, generate pre-configured parameters. The terminal device may call the above-mentioned preconfigured parameters in a preset storage area, and determine them as resource configuration parameters. The manner of obtaining the above resource configuration parameters is not limited here.
在一种实现方式中,基带处理器可以根据终端设备能力确定当前链路是否支持链路切换;若是,则执行生成预配置参数的步骤。若终端设备的当前链路不支持链路切换,那么则不执行生成预配置参数的步骤。In an implementation manner, the baseband processor may determine whether the current link supports link switching according to the capability of the terminal device; if so, execute the step of generating preconfigured parameters. If the current link of the terminal device does not support link switching, then the step of generating preconfigured parameters is not performed.
上述资源配置关系中可以包括不同链路所需要的模块标识。以上表中所示的各个载波聚合场景对应的链路为例,上述资源配置关系可以如下表:The above resource configuration relationship may include module identifiers required by different links. The link corresponding to each carrier aggregation scenario shown in the above table is taken as an example. The above resource configuration relationship can be shown in the following table:
以终端设备从场景D的上行链路切换至场景B的上行链路为例,终端设备进行链路切换时涉及到的链路资源模块可以包括基带模块0-2、射频模块0~2、本振模块0~1、功放模块0~2、天线开关模块0~1以及天线模块0~1。上述第一链路使用的第一资源模块可以包括基带模块1-2、射频模块1~2、本振模块1、功放模块1~2、天线开关模块0~1以及天线模块0~1。Taking the terminal device switching from the uplink of scenario D to the uplink of scenario B as an example, the link resource modules involved in the link switching of the terminal device may include baseband modules 0-2, radio frequency modules 0-2, local vibration modules 0~1, power amplifier modules 0~2, antenna switch modules 0~1, and antenna modules 0~1. The first resource modules used by the first link may include a baseband module 1-2, a radio frequency module 1-2, a local oscillator module 1, a power amplifier module 1-2, an antenna switch module 0-1, and an antenna module 0-1.
终端设备可以通过基带模块中的CLRU可以根据CLCU的控制指令,计算哪些模块为第一资源模块,进一步地根据预设的配置参数列表确定各个第一资源模块的配置参数。上述配置参数列表中包括各个资源模块在不同链路下对应的参数。The terminal device can use the CLRU in the baseband module to calculate which modules are the first resource modules according to the control instructions of the CLCU, and further determine the configuration parameters of each first resource module according to the preset configuration parameter list. The above configuration parameter list includes parameters corresponding to each resource module under different links.
需要说明的是,当前链路可以具备切换至不同链路的能力,也就是说当前链路可能被切换至不同的链路。例如,当前链路为场景D对应的链路,上述当前链路可以切换至场景D对应的链路,也可以切换至场景C对应的链路。It should be noted that the current link may be capable of being switched to a different link, that is to say, the current link may be switched to a different link. For example, the current link is a link corresponding to scene D, and the above-mentioned current link may be switched to a link corresponding to scene D, or may be switched to a link corresponding to scene C.
基带处理器在确定预配置参数时,可以确定当前链路切换至不同链路时对应的预配置参数。CLRU可以在存储于非易失性随机访问存储器(Non-Volatile Random-AccessMemory,简称NVRAM)中的资源配置关系中,查询各个备选切换链路使用的资源模块,并查询各个备选链路对应的预配置参数,对该备选切换链路进行标记后,对各个预配置参数以半静态方式存储。例如,当前链路为N3单流链路加N78单流链路,当前链路中N3频段对应的资源模块可能被切换至N78频段;基带处理器可以在当前链路下,基于资源配置关系查询N78对应的资源配置,以下表方式存储:When determining the preconfiguration parameters, the baseband processor may determine the corresponding preconfiguration parameters when the current link is switched to a different link. The CLRU can query the resource modules used by each candidate switching link in the resource configuration relationship stored in the non-volatile random-access memory (Non-Volatile Random-Access Memory, referred to as NVRAM), and query the corresponding After marking the candidate handover link, each preconfigured parameter is stored in a semi-static manner. For example, if the current link is an N3 single-stream link plus an N78 single-stream link, the resource module corresponding to the N3 frequency band in the current link may be switched to the N78 frequency band; the baseband processor can query based on the resource configuration relationship under the current link The resource configuration corresponding to N78 is stored in the following table:
基带处理器中的CLCU接收到指示信息之后,可以根据上述指示信息中对应的第一链路,向CLRU发送调度指令,使得CLRU可以将第一链路对应的预配置参数发送至CLDU;CLDU可以将第一链路对应的预配置参数以寄存器形态写入DRAM中,待接收到CLCU的调度指令之后,采用上述预配置参数对第一资源模块进行参数配置。After the CLCU in the baseband processor receives the instruction information, it can send a scheduling instruction to the CLRU according to the first link corresponding to the above instruction information, so that the CLRU can send the preconfigured parameters corresponding to the first link to the CLDU; the CLDU can Write the preconfigured parameters corresponding to the first link into the DRAM in the form of registers, and use the above preconfigured parameters to perform parameter configuration on the first resource module after receiving the scheduling instruction from the CLCU.
S202、基带处理器采用资源配置参数,对第一资源模块进行参数设置;第一资源模块为第一链路中使用的模块。S202. The baseband processor uses resource configuration parameters to set parameters for the first resource module; the first resource module is a module used in the first link.
基带处理器可以采用上述资源配置参数,对各第一资源模块进行参数设置,使得设置后的第一资源模块可以在第一链路下进行数据传输。The baseband processor can use the above resource configuration parameters to set parameters for each first resource module, so that the set first resource modules can perform data transmission under the first link.
基带处理器可按照随机顺序,对各个第一资源模块进行参数设置;也可以按照上述各个第一资源模块的预设顺序对其进行参数设置,在此不做限定。The baseband processor may set parameters for each first resource module in a random order; it may also set parameters for each first resource module in a preset order, which is not limited here.
S203、基带处理器对第二资源模块进行资源释放;其中,第二资源模块为当前链路使用的,且第一链路中不使用的模块。S203. The baseband processor performs resource release on the second resource module; wherein, the second resource module is used by the current link and not used by the first link.
在完成第一资源模块的参数设置之后,基带处理器可以对当前链路使用的,且第一链路中不使用的第二资源模块,进行资源释放。After the parameter setting of the first resource module is completed, the baseband processor may perform resource release on the second resource module used by the current link and not used in the first link.
上述链路建立方法,基带处理器通过对第一资源模块进行参数配置,以及对第二资源模块进行资源释放,从而完成第一链路的建立;进一步地,上述基带处理器通过预配置参数对第一资源模块进行参数配置的情况下,可以在终端设备接收到指示信息之前,完成切换过程中的第一资源模块的计算以及完成第一资源模块的参数获取,使得基带处理器在接收到指示信息之后,可以直接采用预配置参数对第一资源模块进行参数配置,进一步降低了链路切换时延;进一步地,基带处理器中通过资源配置关系以及配置参数列表对各个资源模块进行统一管理,不仅可以减少链路建立过程中的信令交互,还可以提升链路建立的可扩展性,当终端设备支持其他场景下的链路时,只需要优化资源配置关系即可。In the above link establishment method, the baseband processor completes the establishment of the first link by configuring the parameters of the first resource module and releasing the resources of the second resource module; In the case of parameter configuration of the first resource module, before the terminal device receives the instruction information, the calculation of the first resource module in the handover process and the parameter acquisition of the first resource module can be completed, so that the baseband processor receives the instruction After information, the first resource module can be configured with pre-configured parameters directly, which further reduces the link switching delay; further, the baseband processor performs unified management of each resource module through the resource configuration relationship and configuration parameter list, Not only can it reduce the signaling interaction during link establishment, but it can also improve the scalability of link establishment. When the terminal device supports links in other scenarios, it only needs to optimize the resource configuration relationship.
在一个实施例中,上述资源配置参数中包括共享资源模块的第一参数,以及非共享资源模块的第二参数;其中,共享资源模块为第一链路以及当前链路均使用的模块;非共享资源模块为第一链路使用,且当前链路未使用的模块。In one embodiment, the above-mentioned resource configuration parameters include a first parameter of a shared resource module and a second parameter of a non-shared resource module; wherein, the shared resource module is a module used by both the first link and the current link; The shared resource module is used by the first link and not used by the current link.
基带处理器可以在预设的资源配置关系中查询第一链路使用的第一资源模块的标识,以及在预设的资源配置关系中查询当前链路使用的链路资源模块的标识;进一步地,通过将当前链路使用的链路资源模块的标识与第一资源模块的标识进行对比,确定所述第一资源模块中的共享资源模块和非共享资源模块。The baseband processor can query the identifier of the first resource module used by the first link in the preset resource configuration relationship, and query the identifier of the link resource module used by the current link in the preset resource configuration relationship; further , determining the shared resource module and the non-shared resource module in the first resource module by comparing the identifier of the link resource module used by the current link with the identifier of the first resource module.
以当前链路包括第一频段(例如N3)的单流链路,以及第二频段(例如N78)的单流链路;第一链路包括第二频段(例如N78)的双流链路为例,参照图3中的上行硬件架构,上述链路切换过程可以如图6所示。图6中,各个模块通过实线连接,构成当前链路;各个模块通过虚线连接,构成切换后的第一链路。由图6可知,当前链路与第一链路的共享资源模块可以包括数字基带模块2、射频模块2、功放模块2、天线开关模块0、天线开关模块1、天线模块1和天线模块0。非共享资源模块可以包括数字基带模块1、射频模块1以及功放模块1。Take the current link including a single-stream link of the first frequency band (such as N3) and a single-stream link of the second frequency band (such as N78); the first link includes a dual-stream link of the second frequency band (such as N78) as an example , referring to the uplink hardware architecture in FIG. 3 , the above link switching process may be shown in FIG. 6 . In FIG. 6 , each module is connected by a solid line to form a current link; each module is connected by a dotted line to form a switched first link. It can be seen from FIG. 6 that the shared resource modules of the current link and the first link may include a digital baseband module 2 , a radio frequency module 2 , a power amplifier module 2 , an antenna switch module 0 , an antenna switch module 1 , an antenna module 1 and an antenna module 0 . The non-shared resource modules may include a digital baseband module 1 , a radio frequency module 1 and a power amplifier module 1 .
基带处理器可以根据预设的配置参数列表,确定共享模块使用的第一参数,以及非共享模块使用的第二参数。进一步地,基带模块可以将非共享资源模块的参数配置为第二参数;然后,将共享资源模块的当前参数修改为第一参数。The baseband processor can determine the first parameter used by the shared module and the second parameter used by the non-shared module according to the preset configuration parameter list. Further, the baseband module may configure the parameter of the non-shared resource module as the second parameter; then, modify the current parameter of the shared resource module to the first parameter.
图7为一个实施例中链路建立方法的流程示意图,本实施例涉及终端设备新建第一链路的过程,在上述实施例的基础上,如图7所示,上述S102包括:FIG. 7 is a schematic flowchart of a method for establishing a link in an embodiment. This embodiment involves the process of creating a first link for a terminal device. On the basis of the above embodiment, as shown in FIG. 7, the above S102 includes:
S301、基带处理器在预设的资源配置关系中,查询第一链路使用的第一资源模块的标识。S301. The baseband processor queries an identifier of a first resource module used by a first link in a preset resource configuration relationship.
S302、在预设的配置参数列表中查询与第一资源模块的标识匹配的参数,获得资源配置参数。S302. Query parameters matching the identifier of the first resource module in the preset configuration parameter list, and obtain resource configuration parameters.
S303、采用资源配置参数对第一链路资源模块进行配置。S303. Configure the first link resource module by using resource configuration parameters.
上述新建第一链路的过程,与从当前链路切换至第一链路的过程不同在于,终端设备中的基带处理器中在接收到指示信息之后,通过资源配置关系以及配置参数列表,直接获取第一链路对应的资源配置参数,而不是通过预配置参数获取。另外,针对新建第一链路的情况,第一链路关联的链路资源模块即为第一链路使用的第一资源模块,而不包括第一链路未使用的模块;因此,基带处理器不需要对第一链路未使用的模块进行资源释放。The above process of creating the first link is different from the process of switching from the current link to the first link in that, after receiving the indication information, the baseband processor in the terminal device directly uses the resource configuration relationship and the configuration parameter list to The resource configuration parameters corresponding to the first link are obtained instead of pre-configured parameters. In addition, for the case of creating a new first link, the link resource module associated with the first link is the first resource module used by the first link, excluding modules not used by the first link; therefore, the baseband processing The controller does not need to release resources for unused modules of the first link.
上述链路建立方法,终端设备在新建第一链路的过程中,由基带处理器完成对第一资源模块的参数配置,避免数字基带系统与其它链路资源模块所在系统之间的信令交互,降低了第一链路的建立时延。In the above link establishment method, in the process of establishing the first link of the terminal device, the baseband processor completes the parameter configuration of the first resource module, so as to avoid the signaling interaction between the digital baseband system and the system where other link resource modules are located , reducing the establishment delay of the first link.
在一个实施例中,如图8所示,上述链路建立方法包括:In one embodiment, as shown in FIG. 8, the link establishment method includes:
S401、网络设备向终端设备发送建立第一频段单流链路的指示信息。S401. The network device sends instruction information for establishing a first frequency band single-stream link to the terminal device.
S402、终端设备中的基带处理器在预设的资源配置关系中,查询第一频段单流链路使用的第一资源模块的标识。S402. The baseband processor in the terminal device queries the identifier of the first resource module used by the first frequency band single-stream link in the preset resource configuration relationship.
S403、终端设备中的基带处理器在预设的配置参数列表中查询与第一频段单流链路使用的第一资源模块的标识匹配的参数,获得第一频段单流链路对应的资源配置参数。S403. The baseband processor in the terminal device searches the preset configuration parameter list for parameters that match the identifier of the first resource module used by the first frequency band single-stream link, and obtains the resource configuration corresponding to the first frequency band single-stream link parameter.
S404、终端设备中的基带处理器采用第一频段单流链路对应的资源配置参数,对第一频段单流链路使用的第一链路资源模块进行配置。S404. The baseband processor in the terminal device configures the first link resource module used by the first frequency band single stream link by using the resource configuration parameters corresponding to the first frequency band single stream link.
以NR系统为例,终端设备接入N3小区的情况下,网络设备可以通过DCI消息,通知终端设备建立N3单流链路,且要求在TimeA之后完成链路建立。Taking the NR system as an example, when a terminal device accesses an N3 cell, the network device can notify the terminal device to establish an N3 single-flow link through a DCI message, and requires the link establishment to be completed after TimeA.
基带处理其中的CLCU可以根据网络设备配置的N3中心频点、带宽、子载波间隔等载波信息,调度CLRU查询链路资源。CLRU会依据载波信息从NVRAM存放的资源配置关系中找到N3单载波链路资源信息,然后存放于系统已分配的内存空间内。CLRU会将N3链路使用的第一资源模块用链路编号标记,如下表所示,并将链路编号返回至CLCU。The CLCU in the baseband processing can schedule the CLRU to query link resources according to the carrier information such as the N3 center frequency point, bandwidth, and subcarrier spacing configured by the network equipment. CLRU will find the N3 single-carrier link resource information from the resource configuration relationship stored in NVRAM according to the carrier information, and then store it in the memory space allocated by the system. The CLRU will mark the first resource module used by the N3 link with a link number, as shown in the table below, and return the link number to the CLCU.
进一步地,CLRU可以向CLDU发送参数查询指令,以指示CLDU查询N3链路使用的资源模块的配置参数。CLDU按照各模块的编号,在配置参数列表中查询与第一频段单流链路使用的第一资源模块的标识匹配的参数,然后对各配置参数进行格式化处理,以寄存器形态存放于DRAM中。CLCU可以根据网络设备指示的TimeA以及N3链路的链路编号,向CLDU发送参数配置指示。CLDU可以将已经存储于DRAM中的配置参数,配置给各个资源模块。CLDU可以在Time A-D0-TD之前,完成参数配置。其中,上述TD是数字接口传输时延,D0大于链路切换周期T。上述N3链路的建立过程中,基带处理器中各个处理单元之间的交互,可以参见图9。Further, the CLRU may send a parameter query instruction to the CLDU to instruct the CLDU to query the configuration parameters of the resource modules used by the N3 link. According to the number of each module, CLDU searches the configuration parameter list for parameters that match the identifier of the first resource module used by the first frequency band single-stream link, then formats each configuration parameter and stores it in DRAM in the form of a register . The CLCU may send a parameter configuration instruction to the CLDU according to the TimeA indicated by the network device and the link number of the N3 link. CLDU can configure configuration parameters already stored in DRAM to each resource module. CLDU can complete parameter configuration before Time A-D0-TD. Wherein, the above TD is the digital interface transmission delay, and D0 is greater than the link switching period T. During the establishment process of the above-mentioned N3 link, the interaction between various processing units in the baseband processor can be referred to in FIG. 9 .
S405、网络设备向终端设备发送建立第二频段单流链路的指示信息。S405. The network device sends instruction information for establishing a single-stream link in the second frequency band to the terminal device.
S406、终端设备中的基带处理器在预设的资源配置关系中,查询第二频段单流链路使用的第一资源模块的标识。S406. The baseband processor in the terminal device queries the identifier of the first resource module used by the single-stream link in the second frequency band in the preset resource configuration relationship.
S407、终端设备中的基带处理器在预设的配置参数列表中查询与第二频段单流链路使用的第一资源模块的标识匹配的参数,获得第二频段单流链路对应的资源配置参数。S407. The baseband processor in the terminal device searches the preset configuration parameter list for parameters that match the identifier of the first resource module used by the second frequency band single-stream link, and obtains the resource configuration corresponding to the second frequency band single-stream link parameter.
S408、终端设备中的基带处理器采用第二频段单流链路对应的资源配置参数,对第二频段单流链路使用的第一链路资源模块进行配置。S408. The baseband processor in the terminal device configures the first link resource module used by the single-stream link in the second frequency band by using the resource configuration parameters corresponding to the single-stream link in the second frequency band.
继续以上述NR系统为例,终端设备接入N78小区的情况下,终端设备可以通过DCI消息,通知终端设备建立N78单流链路,与N3单流链路组成上行载波聚合。网络设备可以通知终端设备在TimeB之后完成链路建立。Continuing to take the above-mentioned NR system as an example, when a terminal device accesses an N78 cell, the terminal device can notify the terminal device to establish an N78 single-flow link through a DCI message, and form uplink carrier aggregation with the N3 single-flow link. The network device may notify the terminal device to complete link establishment after TimeB.
上述N78单流链路的建立过程,与上述N3单流链路的建立过程类似,如图9所示,CLDU可以在Time B-D1-TD之前完成N78单流链路的参数配置。The establishment process of the above N78 single-stream link is similar to the establishment process of the above-mentioned N3 single-stream link. As shown in Figure 9, the CLDU can complete the parameter configuration of the N78 single-stream link before Time B-D1-TD.
S405之后,还包括:After S405, it also includes:
S409、终端设备中的基带处理器在预设的资源配置关系中查询第二频段双流链路使用的第一资源模块的标识。S409. The baseband processor in the terminal device queries the identifier of the first resource module used by the dual-stream link in the second frequency band in the preset resource configuration relationship.
S410、终端设备中的基带处理器在预设的配置参数列表中查询与所述第一资源模块的标识匹配的参数,生成预配置参数。S410. The baseband processor in the terminal device searches a preset configuration parameter list for parameters matching the identifier of the first resource module, and generates pre-configured parameters.
继续以NR系统为例,CLCU接收到建立N78单流链路的指示信息之后,可以判断N3单流链路和N78单流链路的组合是否支持链路切换。如果不支持,则基带处理器可以按照上述步骤完成N78单流链路的建立;如果支持,表示切换后的N78双流链路可能使用N3单流链路使用的资源模块。CLRU需要在资源配置关系中查询N78双流链路需要使用的第一资源模块的标识,并对N78双流链路进行链路标号之后,发送至CLDU。CLDU可以基于上述链路标识确定当前链路与切换后的N78双流链路的共享资源模块,将共享资源模块在N78双流链路中的配置参数以寄存器形态存放于DRAM中,形成预配置参数。Continuing to take the NR system as an example, the CLCU can determine whether the combination of the N3 single-stream link and the N78 single-stream link supports link switching after receiving the instruction information for establishing the N78 single-stream link. If not supported, the baseband processor can complete the establishment of the N78 single-stream link according to the above steps; if supported, it means that the switched N78 dual-stream link may use the resource module used by the N3 single-stream link. The CLRU needs to query the identifier of the first resource module to be used by the N78 dual-stream link in the resource configuration relationship, and after labeling the N78 dual-stream link, send it to the CLDU. The CLDU can determine the shared resource modules of the current link and the switched N78 dual-stream link based on the above-mentioned link identifier, and store the configuration parameters of the shared resource module in the N78 dual-stream link in the DRAM in the form of registers to form pre-configured parameters.
S411、网络设备向终端设备发送切换至第二频段的双流链路的指示信息。S411. The network device sends instruction information to switch to the dual-stream link in the second frequency band to the terminal device.
S412、终端设备的基带处理器获取预配置参数;预配置参数中包括非共享资源模块对应的第二参数,以及共享资源模块对应的第一参数。S412. The baseband processor of the terminal device acquires preconfigured parameters; the preconfigured parameters include a second parameter corresponding to a non-shared resource module and a first parameter corresponding to a shared resource module.
S413、终端设备的基带处理器将非共享资源模块的参数配置为第二参数。S413. The baseband processor of the terminal device configures the parameter of the non-shared resource module as a second parameter.
S414、终端设备的基带处理器将共享资源模块的当前参数修改为所述第一参数。S414. The baseband processor of the terminal device modifies the current parameter of the shared resource module to the first parameter.
S415、终端设备的基带处理器对第二资源模块进行资源释放。S415. The baseband processor of the terminal device releases resources for the second resource module.
继续以上述NR系统为例,终端设备中的基带处理器接收到DCI之后,通过解析获得切换至N78双流链路的指示信息,上述指示信息中要求终端设备从Time C开始切换到N78双流链路进行数据传输。Continuing to take the above-mentioned NR system as an example, after the baseband processor in the terminal device receives the DCI, it obtains the instruction information to switch to the N78 dual-stream link through analysis. The above instruction information requires the terminal device to switch to the N78 dual-stream link from Time C for data transfer.
终端设备中的基带处理器在提前获取预配置参数的情况下,CLCU只需要调度CLDU进行参数配置,CLDU可以基于DRAM中存储的预配置参数,依次完成N78双流链路使用的非共享资源模块的参数配置、N78双流链路使用的共享资源模块的参数配置以及N3使用的第二资源模块的资源释放。如图9所示,CLDU可以在TimeC-D1-TD之前完成N78双流链路的参数配置。CLDU可以在Time C-T-TD(T为终端上报支持的最小链路切换周期)之前完成N78双流链路中非共享资源模块的参数配置,这样不会影响N3单流链路的数据传输。然后在Time C-D2-TD(D2<T)前完成N78双流链路的共享资源模块的参数配置,以及对N3单流链路使用的第二资源模块进行资源释放;在此基础上,N78双流链路可以在Time C之后进行数据传输,并停止在N3单流链路上传输数据。When the baseband processor in the terminal device obtains the pre-configured parameters in advance, the CLCU only needs to schedule the CLDU for parameter configuration, and the CLDU can sequentially complete the configuration of the non-shared resource modules used by the N78 dual-stream link based on the pre-configured parameters stored in the DRAM. Parameter configuration, parameter configuration of the shared resource module used by the N78 dual-stream link, and resource release of the second resource module used by the N3. As shown in Figure 9, the CLDU can complete the parameter configuration of the N78 dual-stream link before TimeC-D1-TD. CLDU can complete the parameter configuration of the non-shared resource module in the N78 dual-stream link before Time C-T-TD (T is the minimum link switching period reported by the terminal), so that the data transmission of the N3 single-stream link will not be affected. Then complete the parameter configuration of the shared resource module of the N78 dual-stream link before Time C-D2-TD (D2<T), and release the resources of the second resource module used by the N3 single-stream link; on this basis, the N78 The dual-stream link can transmit data after Time C, and stop transmitting data on the N3 single-stream link.
上述链路建立方法,对终端设备的链路切换周期的时间要求交底,可以预留更多的时间进行数据传输,提高终端设备的吞吐率。例如,传统方法中需要140微秒将N3单流链路加N78双流链路切换至N78双流链路,而采用本实施例中的方法,可以将链路切换时间压缩至35微秒,链路切换周期缩短75%。另外,基带处理器中通过多个处理单元共同完成链路建立,可以对链路建立任务进行并行处理,进一步提高链路切换效率,降低链路切换时延。The link establishment method above requires disclosure of the link switching cycle time of the terminal equipment, which can reserve more time for data transmission and improve the throughput of the terminal equipment. For example, it takes 140 microseconds to switch an N3 single-stream link plus an N78 dual-stream link to an N78 dual-stream link in the traditional method, but using the method in this embodiment, the link switching time can be compressed to 35 microseconds, and the link The switching period is shortened by 75%. In addition, multiple processing units in the baseband processor jointly complete link establishment, and can perform parallel processing on link establishment tasks, further improving link switching efficiency and reducing link switching delay.
应该理解的是,虽然图2-9的流程图中的各个步骤按照箭头的指示依次显示,但是这些步骤并不是必然按照箭头指示的顺序依次执行。除非本文中有明确的说明,这些步骤的执行并没有严格的顺序限制,这些步骤可以以其它的顺序执行。而且,图2-9中的至少一部分步骤可以包括多个子步骤或者多个阶段,这些子步骤或者阶段并不必然是在同一时刻执行完成,而是可以在不同的时刻执行,这些子步骤或者阶段的执行顺序也不必然是依次进行,而是可以与其它步骤或者其它步骤的子步骤或者阶段的至少一部分轮流或者交替地执行。It should be understood that although the various steps in the flow charts in FIGS. 2-9 are shown sequentially as indicated by the arrows, these steps are not necessarily executed sequentially in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and these steps can be executed in other orders. Moreover, at least some of the steps in Figures 2-9 may include a plurality of sub-steps or stages, these sub-steps or stages are not necessarily performed at the same time, but may be performed at different times, these sub-steps or stages The order of execution is not necessarily performed sequentially, but may be performed alternately or alternately with at least a part of other steps or sub-steps or stages of other steps.
图10为一个实施例的链路建立装置的结构框图。如图10所示,上述装置包括:Fig. 10 is a structural block diagram of an apparatus for establishing a link according to an embodiment. As shown in Figure 10, the above-mentioned devices include:
接收模块10,用于接收网络设备发送的指示信息;所述指示信息用于指示终端设备建立第一链路;The receiving module 10 is configured to receive instruction information sent by the network device; the instruction information is used to instruct the terminal device to establish the first link;
配置模块20,用于对链路资源模块进行参数配置,以建立所述第一链路;所述链路资源模块为终端设备中与建立所述第一链路相关的模块。The configuration module 20 is configured to configure parameters of the link resource module to establish the first link; the link resource module is a module related to the establishment of the first link in the terminal device.
在一个实施例中,在上述实施例的基础上,指示信息用于指示终端设备新建所述第一链路,或者,用于指示所述终端设备将当前链路切换至所述第一链路。In one embodiment, on the basis of the above embodiments, the instruction information is used to instruct the terminal device to create the first link, or to instruct the terminal device to switch the current link to the first link .
在一个实施例中,在上述实施例的基础上,如图11所示,所述指示信息用于指示终端设备将当前链路切换至第一链路的情况下,配置模块20包括:In one embodiment, on the basis of the foregoing embodiments, as shown in FIG. 11 , when the indication information is used to instruct the terminal device to switch the current link to the first link, the configuration module 20 includes:
获取单元201,用于获取所述第一链路相关的资源配置参数;An obtaining unit 201, configured to obtain resource configuration parameters related to the first link;
设置单元202,用于采用所述资源配置参数,对第一资源模块进行参数设置;所述第一资源模块为所述第一链路中使用的模块;A setting unit 202, configured to use the resource configuration parameters to set parameters for the first resource module; the first resource module is a module used in the first link;
释放单元203,用于对第二资源模块进行资源释放;其中,所述第二资源模块为所述当前链路使用的,且所述第一链路中不使用的模块。The release unit 203 is configured to perform resource release on the second resource module; wherein, the second resource module is used by the current link and not used by the first link.
在一个实施例中,在上述实施例的基础上,如图12所示,上述装置还包括生成模块30,用于:在接收到所述指示信息之前,在预设的资源配置关系中查询所述第一资源模块的标识;在预设的配置参数列表中查询与所述第一资源模块的标识匹配的参数,生成预配置参数;相应地,上述获取单元201用于将所述预配置参数确定为所述资源配置参数。In one embodiment, on the basis of the above embodiment, as shown in FIG. 12 , the above device further includes a generation module 30, configured to: before receiving the indication information, query all The identifier of the first resource module; query the parameters matching the identifier of the first resource module in the preset configuration parameter list to generate pre-configured parameters; correspondingly, the above-mentioned acquisition unit 201 is used for Determine the configuration parameters for the resource.
在一个实施例中,在上述实施例的基础上,上述获取单元201具体用于:在预设的资源配置关系中查询所述第一资源模块的标识;在预设的配置参数列表中查询与所述标识匹配的参数,获得所述资源配置参数。In one embodiment, on the basis of the above-mentioned embodiments, the above-mentioned acquisition unit 201 is specifically configured to: query the identifier of the first resource module in the preset resource configuration relationship; query the identity of the first resource module in the preset configuration parameter list The parameter matching the identifier is used to obtain the resource configuration parameter.
在一个实施例中,在上述实施例的基础上,所述资源配置参数中包括共享资源模块的第一参数,以及非共享资源模块的第二参数;其中,所述共享资源模块为所述第一链路以及所述当前链路均使用的模块;所述非共享资源模块为所述第一链路使用,且所述当前链路未使用的模块。In one embodiment, on the basis of the above embodiments, the resource configuration parameters include the first parameter of the shared resource module and the second parameter of the non-shared resource module; wherein, the shared resource module is the first parameter A module used by both a link and the current link; the non-shared resource module used by the first link and not used by the current link.
在一个实施例中,在上述实施例的基础上,上述生成模块30还用于:在预设的资源配置关系中查询所述当前链路使用的链路资源模块的标识;将所述当前链路使用的链路资源模块的标识与所述第一资源模块的标识进行对比,确定所述第一资源模块中的共享资源模块和非共享资源模块。In one embodiment, on the basis of the above embodiment, the generating module 30 is further configured to: query the identifier of the link resource module used by the current link in the preset resource configuration relationship; The identification of the link resource module used by the road is compared with the identification of the first resource module, and the shared resource module and the non-shared resource module in the first resource module are determined.
在一个实施例中,在上述实施例的基础上,上述设置单元202具体用于:将所述非共享资源模块的参数配置为所述第二参数;将所述共享资源模块的当前参数修改为所述第一参数。In one embodiment, on the basis of the above embodiment, the above setting unit 202 is specifically configured to: configure the parameter of the non-shared resource module as the second parameter; modify the current parameter of the shared resource module as the first parameter.
在一个实施例中,在上述实施例的基础上,上述生成模块30还用于:根据终端设备能力确定所述当前链路是否支持链路切换;若是,则执行生成预配置参数的步骤。In one embodiment, on the basis of the above embodiments, the generating module 30 is further configured to: determine whether the current link supports link switching according to the capability of the terminal device; if so, execute the step of generating preconfigured parameters.
在一个实施例中,在上述实施例的基础上,所述当前链路包括第一频段的单流链路,以及第二频段的单流链路;所述第一链路包括所述第二频段的双流链路。In one embodiment, on the basis of the above embodiments, the current link includes a single-stream link in the first frequency band and a single-stream link in the second frequency band; the first link includes the second Band dual-stream link.
在一个实施例中,在上述实施例的基础上,配置模块20具体用于:在预设的资源配置关系中,查询所述第一链路使用的第一资源模块的标识;在预设的配置参数列表中查询与所述第一资源模块的标识匹配的参数,获得所述资源配置参数;采用所述资源配置参数对所述第一链路资源模块进行配置。In one embodiment, on the basis of the above embodiments, the configuration module 20 is specifically configured to: in the preset resource configuration relationship, query the identifier of the first resource module used by the first link; Querying the parameters matching the identifier of the first resource module in the configuration parameter list to obtain the resource configuration parameters; using the resource configuration parameters to configure the first link resource module.
在一个实施例中,在上述实施例的基础上,所述第一链路用于实现载波聚合。In an embodiment, based on the foregoing embodiments, the first link is used to implement carrier aggregation.
在一个实施例中,在上述实施例的基础上,所述链路资源模块包括基带模块、射频模块、本振模块、功放模块、天线开关模块以及天线模块。In one embodiment, on the basis of the foregoing embodiments, the link resource module includes a baseband module, a radio frequency module, a local oscillator module, a power amplifier module, an antenna switch module, and an antenna module.
上述链路建立装置,其实现原理和技术效果参见上述方法实施例,在此不做赘述。For the above-mentioned link establishment device, its implementation principle and technical effect refer to the above-mentioned method embodiment, and details are not described here.
上述链路建立装置中各个模块的划分仅仅用于举例说明,在其他实施例中,可将链路建立装置按照需要划分为不同的模块,以完成上述链路建立装置的全部或部分功能。The division of each module in the above link establishment device is only for illustration. In other embodiments, the link establishment device can be divided into different modules according to needs, so as to complete all or part of the functions of the above link establishment device.
关于链路建立装置的具体限定可以参见上文中对于链路建立方法的限定,在此不再赘述。上述链路建立装置中的各个模块可全部或部分通过软件、硬件及其组合来实现。上述各模块可以硬件形式内嵌于或独立于计算机设备中的处理器中,也可以以软件形式存储于计算机设备中的存储器中,以便于处理器调用执行以上各个模块对应的操作。For specific limitations on the link establishment device, refer to the above limitation on the link establishment method, which will not be repeated here. Each module in the above-mentioned link establishment device can be fully or partially realized by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, and can also be stored in the memory of the computer device in the form of software, so that the processor can invoke and execute the corresponding operations of the above-mentioned modules.
图13为一个实施例中终端设备的内部结构示意图。该终端设备可以是手机、平板电脑、笔记本电脑、台式电脑、PDA(Personal Digital Assistant,个人数字助理)、POS(Point of Sales,销售终端)、车载电脑、穿戴式设备等任意终端设备。该终端设备包括通过系统总线连接的处理器和存储器。其中,该处理器可以包括一个或多个处理单元。处理器可为CPU(Central Processing Unit,中央处理单元)或DSP(Digital Signal Processing,数字信号处理器)等。存储器可包括非易失性存储介质及内存储器。非易失性存储介质存储有操作系统和计算机程序。该计算机程序可被处理器所执行,以用于实现以下各个实施例所提供的一种链路建立方法。内存储器为非易失性存储介质中的操作系统计算机程序提供高速缓存的运行环境。Fig. 13 is a schematic diagram of the internal structure of a terminal device in an embodiment. The terminal device may be any terminal device such as a mobile phone, a tablet computer, a notebook computer, a desktop computer, a PDA (Personal Digital Assistant, personal digital assistant), a POS (Point of Sales, sales terminal), a vehicle-mounted computer, or a wearable device. The terminal device includes a processor and a memory connected by a system bus. Wherein, the processor may include one or more processing units. The processor may be a CPU (Central Processing Unit, central processing unit) or a DSP (Digital Signal Processing, digital signal processor), etc. The memory may include non-volatile storage media and internal memory. Nonvolatile storage media store operating systems and computer programs. The computer program can be executed by a processor, so as to implement a method for establishing a link provided in each of the following embodiments. The internal memory provides a high-speed running environment for the operating system computer program in the non-volatile storage medium.
本申请实施例中提供的链路建立装置中的各个模块的实现可为计算机程序的形式。该计算机程序可在终端或服务器上运行。该计算机程序构成的程序模块可存储在终端设备的存储器上。该计算机程序被处理器执行时,实现本申请实施例中所描述方法的步骤。The implementation of each module in the link establishing apparatus provided in the embodiment of the present application may be in the form of a computer program. The computer program can run on a terminal or a server. The program modules constituted by the computer program can be stored on the memory of the terminal device. When the computer program is executed by the processor, the steps of the methods described in the embodiments of the present application are realized.
本申请实施例还提供了一种计算机可读存储介质。一个或多个包含计算机可执行指令的非易失性计算机可读存储介质,当所述计算机可执行指令被一个或多个处理器执行时,使得所述处理器执行链路建立方法的步骤。The embodiment of the present application also provides a computer-readable storage medium. One or more non-transitory computer-readable storage media containing computer-executable instructions that, when executed by one or more processors, cause the processors to perform the steps of the link establishment method.
本申请实施例还提供了一种包含指令的计算机程序产品,当其在计算机上运行时,使得计算机执行链路建立方法。The embodiment of the present application also provides a computer program product including instructions, which, when running on a computer, causes the computer to execute the link establishment method.
本申请所使用的对存储器、存储、数据库或其它介质的任何引用可包括非易失性和/或易失性存储器。非易失性存储器可包括ROM(Read-Only Memory,只读存储器)、PROM(Programmable Read-only Memory,可编程只读存储器)、EPROM(Erasable ProgrammableRead-Only Memory,可擦除可编程只读存储器)、EEPROM(Electrically ErasableProgrammable Read-only Memory,电可擦除可编程只读存储器)或闪存。易失性存储器可包括RAM(Random Access Memory,随机存取存储器),它用作外部高速缓冲存储器。作为说明而非局限,RAM以多种形式可得,诸如SRAM(Static Random Access Memory,静态随机存取存储器)、DRAM(Dynamic Random Access Memory,动态随机存取存储器)、SDRAM(Synchronous Dynamic Random Access Memory,同步动态随机存取存储器)、双数据率DDRSDRAM(Double Data Rate Synchronous Dynamic Random Access memory,双数据率同步动态随机存取存储器)、ESDRAM(Enhanced Synchronous Dynamic Random Access memory,增强型同步动态随机存取存储器)、SLDRAM(Sync Link Dynamic Random Access Memory,同步链路动态随机存取存储器)、RDRAM(Rambus Dynamic Random Access Memory,总线式动态随机存储器)、DRDRAM(Direct Rambus Dynamic Random Access Memory,接口动态随机存储器)。Any reference to memory, storage, database, or other medium as used herein may include non-volatile and/or volatile memory. Non-volatile memory can include ROM (Read-Only Memory, read-only memory), PROM (Programmable Read-only Memory, programmable read-only memory), EPROM (Erasable Programmable Read-Only Memory, erasable programmable read-only memory ), EEPROM (Electrically Erasable Programmable Read-only Memory, Electrically Erasable Programmable Read-Only Memory) or flash memory. The volatile memory may include RAM (Random Access Memory), which is used as an external cache memory. By way of illustration and not limitation, RAM is available in various forms, such as SRAM (Static Random Access Memory, Static Random Access Memory), DRAM (Dynamic Random Access Memory, Dynamic Random Access Memory), SDRAM (Synchronous Dynamic Random Access Memory , synchronous dynamic random access memory), double data rate DDRSDRAM (Double Data Rate Synchronous Dynamic Random Access memory, double data rate synchronous dynamic random access memory), ESDRAM (Enhanced Synchronous Dynamic Random Access memory, enhanced synchronous dynamic random access memory), SLDRAM (Sync Link Dynamic Random Access Memory, synchronous link dynamic random access memory), RDRAM (Rambus Dynamic Random Access Memory, bus dynamic random access memory), DRDRAM (Direct Rambus Dynamic Random Access Memory, interface dynamic random access memory ).
以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the present application, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the scope of protection of the patent application should be based on the appended claims.
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111521317.6A CN114040513B (en) | 2021-12-13 | 2021-12-13 | Link establishment method, device, terminal equipment and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111521317.6A CN114040513B (en) | 2021-12-13 | 2021-12-13 | Link establishment method, device, terminal equipment and computer readable storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114040513A CN114040513A (en) | 2022-02-11 |
CN114040513B true CN114040513B (en) | 2023-08-11 |
Family
ID=80140621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111521317.6A Active CN114040513B (en) | 2021-12-13 | 2021-12-13 | Link establishment method, device, terminal equipment and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114040513B (en) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1526736A1 (en) * | 2003-10-20 | 2005-04-27 | Broadcom Corporation | Wireless device having a distinct hardware video accelerator to support video compression and decompression |
WO2011141931A2 (en) * | 2010-05-10 | 2011-11-17 | Global Rural Netco Ltd. | A method and system to attain multi-band, multi-carrier, multi-user through access point base station - a femtocell. |
WO2019028276A1 (en) * | 2017-08-02 | 2019-02-07 | Intel IP Corporation | Apparatus, system and method to implement reserved resources for forward compatibility in new radio (nr) networks |
CN109565837A (en) * | 2018-11-01 | 2019-04-02 | 北京小米移动软件有限公司 | Transmit method, apparatus, base station and the terminal of information |
CN110622593A (en) * | 2017-09-15 | 2019-12-27 | Oppo广东移动通信有限公司 | Resource configuration method, terminal equipment and network equipment |
WO2020062102A1 (en) * | 2018-09-28 | 2020-04-02 | 华为技术有限公司 | Data transmission method, device and system, and storage medium |
CN111148236A (en) * | 2018-11-02 | 2020-05-12 | 华为技术有限公司 | Data transmission method and device |
CN111314881A (en) * | 2020-02-11 | 2020-06-19 | 展讯通信(上海)有限公司 | Method for establishing direct connection link and related equipment |
WO2020133539A1 (en) * | 2018-12-29 | 2020-07-02 | 华为技术有限公司 | Data scheduling method and device |
CN111669805A (en) * | 2019-03-09 | 2020-09-15 | 华为技术有限公司 | Network connection processing method, related equipment and computer storage medium |
WO2020192714A1 (en) * | 2019-03-28 | 2020-10-01 | 华为技术有限公司 | Device control page display method, related apparatus and system |
WO2021017804A1 (en) * | 2019-07-29 | 2021-02-04 | 华为技术有限公司 | Link measurement method and device |
WO2021027752A1 (en) * | 2019-08-15 | 2021-02-18 | 华为技术有限公司 | Communication method, apparatus and device based on dual connectivity configuration, and storage medium |
CN112655256A (en) * | 2018-10-25 | 2021-04-13 | Oppo广东移动通信有限公司 | Resource pool switching method, terminal equipment and communication equipment |
CN113454939A (en) * | 2019-04-30 | 2021-09-28 | 华为技术有限公司 | Method and related device for sending sounding reference signal |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7480489B2 (en) * | 2004-11-22 | 2009-01-20 | Broadcom Corporation | Wireless device having a distinct hardware accelerator to support data compression protocols dedicated to GSM (V.42) |
-
2021
- 2021-12-13 CN CN202111521317.6A patent/CN114040513B/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1526736A1 (en) * | 2003-10-20 | 2005-04-27 | Broadcom Corporation | Wireless device having a distinct hardware video accelerator to support video compression and decompression |
WO2011141931A2 (en) * | 2010-05-10 | 2011-11-17 | Global Rural Netco Ltd. | A method and system to attain multi-band, multi-carrier, multi-user through access point base station - a femtocell. |
WO2019028276A1 (en) * | 2017-08-02 | 2019-02-07 | Intel IP Corporation | Apparatus, system and method to implement reserved resources for forward compatibility in new radio (nr) networks |
CN110622593A (en) * | 2017-09-15 | 2019-12-27 | Oppo广东移动通信有限公司 | Resource configuration method, terminal equipment and network equipment |
WO2020062102A1 (en) * | 2018-09-28 | 2020-04-02 | 华为技术有限公司 | Data transmission method, device and system, and storage medium |
CN112655256A (en) * | 2018-10-25 | 2021-04-13 | Oppo广东移动通信有限公司 | Resource pool switching method, terminal equipment and communication equipment |
CN109565837A (en) * | 2018-11-01 | 2019-04-02 | 北京小米移动软件有限公司 | Transmit method, apparatus, base station and the terminal of information |
CN111148236A (en) * | 2018-11-02 | 2020-05-12 | 华为技术有限公司 | Data transmission method and device |
WO2020133539A1 (en) * | 2018-12-29 | 2020-07-02 | 华为技术有限公司 | Data scheduling method and device |
CN111669805A (en) * | 2019-03-09 | 2020-09-15 | 华为技术有限公司 | Network connection processing method, related equipment and computer storage medium |
WO2020192714A1 (en) * | 2019-03-28 | 2020-10-01 | 华为技术有限公司 | Device control page display method, related apparatus and system |
CN113454939A (en) * | 2019-04-30 | 2021-09-28 | 华为技术有限公司 | Method and related device for sending sounding reference signal |
WO2021017804A1 (en) * | 2019-07-29 | 2021-02-04 | 华为技术有限公司 | Link measurement method and device |
WO2021027752A1 (en) * | 2019-08-15 | 2021-02-18 | 华为技术有限公司 | Communication method, apparatus and device based on dual connectivity configuration, and storage medium |
CN111314881A (en) * | 2020-02-11 | 2020-06-19 | 展讯通信(上海)有限公司 | Method for establishing direct connection link and related equipment |
Non-Patent Citations (1)
Title |
---|
The Flexible Microwave Payload-2: A SDR-Based GNSS-Reflectometer and L-Band Radiometer for CubeSats;J. F. Munoz-Martin, et al.;IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN114040513A (en) | 2022-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7193620B2 (en) | Data transmission method, radio access network device and terminal device | |
EP3624486A1 (en) | Resource configuration method, terminal device and network device | |
WO2021196249A1 (en) | Rrc state configuration method and apparatus, communication device, and storage medium | |
EP4192082A1 (en) | Communication method, apparatus and system | |
WO2019051811A1 (en) | Method for configuring frequency priority, terminal device, base station, and core network device | |
WO2022165721A1 (en) | Model sharing method and apparatus in ran domain | |
US12022541B2 (en) | Communication method and communications apparatus | |
CN109429217B (en) | Information interaction method, first base station, second base station and mobile communication terminal | |
JP2019522388A (en) | Communication method and communication device | |
JP2025502822A (en) | Downlink transmission method and apparatus | |
CN114040513B (en) | Link establishment method, device, terminal equipment and computer readable storage medium | |
CN113039832B (en) | Inter-system switching method and device | |
WO2021114193A1 (en) | Communication method and communication apparatus | |
US20230209422A1 (en) | Communication method, apparatus, and system | |
US20220394710A1 (en) | Resource indication method, resource determining method, and related apparatus | |
EP3537650B1 (en) | Method for channel sounding between terminals, network side device, and terminal | |
JP2023500342A (en) | Communication method and device | |
US11228960B2 (en) | Efficient signaling in multi-connectivity scenarios | |
WO2020063521A1 (en) | Capability reporting method and apparatus | |
US12207308B2 (en) | Random access method and apparatus | |
JP7597918B2 (en) | Communication methods and devices | |
WO2022068416A1 (en) | Feedback information transmission method and communication device | |
CN113382425B (en) | Communication method and device | |
WO2024104057A1 (en) | Resource allocation method and apparatus | |
WO2023065334A1 (en) | Wireless communication method, terminal device, and network device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20241106 Address after: 6th Floor, No.1 Chongqing Road, Banqiao District, Xinbei City, Taiwan, China, China Patentee after: Weiguang Co.,Ltd. Country or region after: Samoa Address before: Room 1501, 15 / F, building 2, courtyard 10, Chaoyang Park South Road, Chaoyang District, Beijing 100020 Patentee before: Zheku Technology (Beijing) Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |