CN113655272B CN202110977781.XA CN202110977781A CN113655272B CN 113655272 B CN113655272 B CN 113655272B CN 202110977781 A CN202110977781 A CN 202110977781A CN 113655272 B CN113655272 B CN 113655272B
Authority
CN
China
Prior art keywords
electric quantity
quantity value
value
electric
correction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110977781.XA
Other languages
Chinese (zh)
Other versions
CN113655272A (en
Inventor
李斌
吴天桂
夏红峰
余克克
杜可可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huaxiao Technology Co ltd
Original Assignee
Zhejiang Huaxiao Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huaxiao Technology Co ltd filed Critical Zhejiang Huaxiao Technology Co ltd
Priority to CN202110977781.XA priority Critical patent/CN113655272B/en
Publication of CN113655272A publication Critical patent/CN113655272A/en
Application granted granted Critical
Publication of CN113655272B publication Critical patent/CN113655272B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/17Compensating for errors; Adjusting or regulating means therefor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a method and a device for correcting an electric quantity value, a storage medium and electronic equipment. The method comprises the following steps: acquiring a first electric quantity value measured by a first electric meter in a first time period, wherein the first electric meter is arranged on the power-out side of an air switch, and the air switch is used for controlling a circuit path of an electric system; obtaining a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power-out side of a standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of a power utilization system after the standby power supply is used, and the standby power supply is arranged in the power utilization system; and correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value of the power grid for actually supplying power to the power utilization system in a first time period. The invention solves the technical problem of low efficiency of the existing power consumption monitoring method.

Description

Correction method and device for electric quantity value, storage medium and electronic equipment
Technical Field
The present invention relates to the field of electrical control, and in particular, to a method and apparatus for correcting an electric quantity value, a storage medium, and an electronic device.
Background
In the past, because the electricity consumption monitoring infrastructure is imperfect and lacks the service theory, the actual electricity consumption demand of user is not purposefully satisfied, leads to supply and demand relation unbalance, and electric power system's stability and reliability are relatively poor. At present, the application of the power system is changed over the sky and over the earth compared with the prior art, and the application of various technologies such as sensing measurement technology, computer technology, communication technology, control technology, power electronics and the like enables the power system to develop towards more intelligentization. On the other hand, the promotion of the electric power marketing process enables users to change the colors from the original passive electricity utilization to the active electricity supply, the electricity utilization form becomes more flexible, and higher requirements are provided for the reliability, the safety and the quality of electric energy. Therefore, intelligent power systems with various electrical parameter monitoring functions are developed and are beginning to be applied to daily life.
At present, the electricity generation amount metering of emergency power supplies by most of electric power systems is lacking, because most of the electric power systems are only provided with unidirectional electric meters, and only the electricity consumption of users can be recorded; when the utility network fails, the user generates electricity through the self-used emergency power supply (standby power supply) and transmits part of electric energy to the utility network, the existing ammeter cannot measure the generated energy of the part generated by the emergency power supply, so that the charging electric quantity of the user can be caused to exceed the use quantity of the actual utility network electric quantity of the user. If two unidirectional ammeter are adopted, the generated energy and the used electricity are respectively measured, thus greatly increasing the use cost, increasing the wiring difficulty and complicating the use or maintenance in the future. That is, the prior art has a technical problem of low efficiency in monitoring the power consumption.
In view of the above problems, no effective solution has been proposed at present.
Disclosure of Invention
The embodiment of the invention provides a method and a device for correcting an electricity value, a storage medium and electronic equipment, which are used for at least solving the technical problem of low efficiency of the existing electricity consumption monitoring method.
According to an aspect of the embodiment of the present invention, there is provided a method for correcting an electric quantity value, including: acquiring a first electric quantity value measured by a first electric meter in a first time period, wherein the first electric meter is arranged on the power-out side of an air switch, and the air switch is used for controlling a circuit path of an electric system; obtaining a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power-out side of a standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of a power utilization system after the standby power supply is used, and the standby power supply is arranged in the power utilization system; and correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value of the power grid for actually supplying power to the power utilization system in a first time period.
According to another aspect of the embodiment of the present invention, there is also provided a correction device for an electric quantity value, including: the first acquisition unit is used for acquiring a first electric quantity value measured by the first electric meter in a first time period, wherein the first electric meter is arranged on the power-out side of the air switch, and the air switch is used for controlling a circuit path of the power utilization system; the second acquisition unit is used for acquiring a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power outlet side of the standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of the power utilization system after the standby power supply is used, and the standby power supply is arranged in the power utilization system; and the correction unit is used for correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value for actually supplying power to the power utilization system in a first time period by the power grid.
According to a further aspect of embodiments of the present invention, there is also provided a computer-readable storage medium having a computer program stored therein, wherein the computer program is arranged to perform the above-described method of correcting an electrical quantity value when run.
According to still another aspect of the embodiments of the present invention, there is also provided an electronic device including a memory in which a computer program is stored, and a processor configured to execute the method of correcting an electric power value by the computer program.
In the embodiment of the invention, the method of acquiring the actual electric quantity value by acquiring the first electric quantity value obtained by measuring the first electric meter in the first time period and simultaneously acquiring the second electric quantity value obtained by measuring the second electric meter in the second time period is adopted, and finally, the first electric quantity value is corrected according to the first electric quantity value and the second electric quantity value, and the electric quantity value truly input by the electric network to the electric system and the electric quantity output by the standby power supply are simultaneously monitored to acquire the electric quantity value truly input by the electric network to the electric system, so that the technical problem that the electric quantity value output by the electric system to the electric network cannot be measured by the existing electric meter, and the error exists in monitoring the actual electric quantity of the electric system is solved, and the technical problem of low efficiency existing in the existing electric quantity monitoring method is solved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this specification, illustrate embodiments of the application and together with the description serve to explain the application and do not constitute a limitation on the application. In the drawings:
FIG. 1 is a schematic diagram of a network environment of an alternative method of modifying an electrical quantity value in accordance with an embodiment of the present invention;
FIG. 2 is a schematic illustration of an alternative method of modifying an electrical quantity value in accordance with an embodiment of the present invention;
FIG. 3 is a schematic illustration of another alternative method of modifying an electrical quantity value according to an embodiment of the present invention;
FIG. 4 is a schematic illustration of yet another alternative method of modifying an electrical quantity value in accordance with an embodiment of the present invention;
FIG. 5 is a schematic diagram of an alternative power value correction device according to an embodiment of the present invention;
FIG. 6 is a schematic diagram of another alternative power value correction device according to an embodiment of the present invention;
FIG. 7 is a schematic diagram of a configuration of an alternative power value correction device according to an embodiment of the present invention;
fig. 8 is a schematic diagram of an alternative correction device for an electrical quantity value according to an embodiment of the present invention.
Detailed Description
In order that those skilled in the art will better understand the present invention, a technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in which it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present invention without making any inventive effort, shall fall within the scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and the claims of the present invention and the above figures are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged where appropriate such that the embodiments of the invention described herein may be implemented in sequences other than those illustrated or otherwise described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
According to an aspect of the embodiment of the present invention, there is provided a method for correcting an electrical quantity value, optionally, as an optional implementation manner, the method for correcting an electrical quantity value may be, but is not limited to, applied to a system for correcting an electrical quantity value in a network environment as shown in fig. 1, where the system for correcting an electrical quantity value includes a device 102, a network 110, and a server 112. The apparatus 102 includes a first acquisition unit 103, a second acquisition unit 104, and a correction unit 105. The first obtaining unit 103 is configured to obtain a first electric quantity value measured by the first electric meter in a first period of time, where the first electric meter is installed on an electricity outlet side of an air switch, and the air switch is used to control a circuit path of the electricity consumption system; the second obtaining unit 104 is configured to obtain a second electric quantity value measured by the second electric meter in a second time period, where the second electric meter is installed on an electricity outlet side of the standby air switch, the second time period is located in the first time period, the standby air switch is used to control a circuit path of the electricity utilization system after the standby power supply is used, and the standby power supply is installed inside the electricity utilization system; and the correction unit 105 is configured to correct the first electric quantity value according to the first electric quantity value and the second electric quantity value, so as to obtain an actual electric quantity value, where the actual electric quantity value is an electric quantity value that the power grid actually supplies power to the power utilization system in the first time period. Specifically, please refer to step S101 to step S108:
S101, sending an electric quantity value correction request: the server 112 sends a request for correction of the power value of the power consumption system to the network 110;
S102, sending an electric quantity value correction request: network 110 sends a request for correction of the power value of the powered system to device 102;
S103, the device 102 obtains a first electric quantity value measured by a first electric meter in a first time period, wherein the first electric meter is arranged on the electricity outlet side of an air switch, and the air switch is used for controlling a circuit path of an electricity utilization system;
S104, the equipment 102 obtains a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power outlet side of the standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of the power utilization system after the standby power supply is used, and the standby power supply is arranged in the power utilization system;
S105, the device 102 corrects the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value for actually supplying power to the power utilization system in a first time period by the power grid;
s106, the device 102 sends the correction result of the power value to the network 110;
S107, the network 110 transmits the correction result of the power value to the server 112;
S110, the server 112 receives the correction result of the electric quantity value and corrects the actual electric quantity according to the correction result.
In the embodiment of the invention, the method of acquiring the actual electric quantity value by acquiring the first electric quantity value obtained by measuring the first electric meter in the first time period and simultaneously acquiring the second electric quantity value obtained by measuring the second electric meter in the second time period is adopted, and finally, the first electric quantity value is corrected according to the first electric quantity value and the second electric quantity value, and the electric quantity value truly input by the electric network to the electric system and the electric quantity output by the standby power supply are simultaneously monitored to acquire the electric quantity value truly input by the electric network to the electric system, so that the technical problem that the electric quantity value output by the electric system to the electric network cannot be measured by the existing electric meter, and the error exists in monitoring the actual electric quantity of the electric system is solved, and the technical problem of low efficiency existing in the existing electric quantity monitoring method is solved.
Optionally, in this embodiment, the user device may be, but is not limited to, a computer device supporting running an application client, such as a mobile phone, a tablet computer, a notebook computer, and a PC. The server and the user device may implement data interaction through a network, which may include, but is not limited to, a wireless network or a wired network. Wherein the wireless network comprises: bluetooth, WIFI, and other networks that enable wireless communications. The wired network may include, but is not limited to: wide area network, metropolitan area network, local area network. The above is merely an example, and is not limited in any way in the present embodiment.
Referring to fig. 2, according to an aspect of the embodiment of the present invention, there is provided a correction method of an electric quantity value, including:
S202, acquiring a first electric quantity value measured by a first ammeter in a first time period, wherein the first ammeter is arranged on an electricity outlet side of an air switch, and the air switch is used for controlling a circuit path of an electricity utilization system;
s204, obtaining a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power outlet side of a standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of a power utilization system after the standby power supply is used, and the standby power supply is arranged in the power utilization system;
S206, correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value for actually supplying power to the power utilization system in a first time period by the power grid.
Referring to fig. 3, according to still another aspect of the embodiment of the present invention, the provided power value correction method may be applied to an electrical system in the manner shown in fig. 3.
Alternatively, the first electric meter of the present application may be applied to the electric quantity value correction system in the form of a general electric meter.
Optionally, the first electric meter of the present application may be applied to an electric quantity value correction system in a manner of an intelligent electricity consumption module, and is installed on an electricity outlet side of a total air switch of the electricity consumption system. The intelligent electricity utilization module mainly comprises 1P, 2P, 3P and 4P modules, and respectively corresponds to 1-4P air switches, the intelligent electricity utilization module is arranged on the idle electricity utilization side, a cable can penetrate through a wiring hole of the intelligent electricity utilization module and then is connected with the air switches, and the cable can be detected to internal voltage and current signals by an internal transformer after penetrating through the wiring hole of the intelligent electricity utilization module. Meanwhile, the second electric meter can be an intelligent electricity utilization module arranged on the electricity outlet side of the standby air switch, and the intelligent electricity utilization module can use devices with the same model as the intelligent electricity utilization module representing the first electric meter. Meanwhile, the intelligent electricity utilization host is arranged in the power distribution cabinet through an electric guide rail and is mainly used for processing collected electric signal data and reporting the collected electric signal data to the electricity utilization management platform; the intelligent power grid is installed in the power distribution cabinet through an electric guide rail and is mainly used for collecting data of the intelligent power utilization module.
Optionally, the above-mentioned intelligent electricity consumption module detection principle can be through the voltage and the current signal of electricity consumption module detection air switch output, and wherein voltage signal is through electrical contact pin and sky open binding post direct contact collection voltage signal, and the current signal is through cup jointing the mutual-inductor on live wire or zero line, gathers current signal based on electromagnetic induction principle.
In the embodiment of the invention, the method of acquiring the actual electric quantity value by acquiring the first electric quantity value obtained by measuring the first electric meter in the first time period and simultaneously acquiring the second electric quantity value obtained by measuring the second electric meter in the second time period is adopted, and finally, the first electric quantity value is corrected according to the first electric quantity value and the second electric quantity value, and the electric quantity value truly input by the electric network to the electric system and the electric quantity output by the standby power supply are simultaneously monitored to acquire the electric quantity value truly input by the electric network to the electric system, so that the technical problem that the electric quantity value output by the electric system to the electric network cannot be measured by the existing electric meter, and the error exists in monitoring the actual electric quantity of the electric system is solved, and the technical problem of low efficiency existing in the existing electric quantity monitoring method is solved.
In an alternative embodiment of the present invention, the step S206, correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, may include the following steps:
s1, determining an electric quantity correction parameter according to a device type parameter of a first electric meter, wherein the electric quantity correction parameter is used for indicating a correction proportion for performing deviation correction on a first electric quantity value;
s2, determining an actual electric quantity value according to the electric quantity correction parameter, the first electric quantity value and the second electric quantity value.
Optionally, the method for determining the actual electric quantity value according to the electric quantity correction parameter, the first electric quantity value and the second electric quantity value may be:
S1, determining the electric quantity correction parameter value as a first proportion value under the condition that the equipment type parameter indicates that the first electric meter is a mechanical electric meter;
S2, obtaining the product of the first proportional value and the second electric quantity value to serve as a first correction electric quantity value;
S3, determining the difference value between the first electric quantity value and the first correction electric quantity value as the actual electric quantity value.
Optionally, the method for determining the actual electric quantity value according to the electric quantity correction parameter, the first electric quantity value and the second electric quantity value may further be:
S1, determining the electric quantity correction parameter value as a second proportion value under the condition that the equipment type parameter indicates that the first electric meter is an electronic electric meter;
s2, obtaining the product of the second proportional value and the second electric quantity value to serve as a second correction electric quantity value;
s3, determining the difference value of the first electric quantity value and the second correction electric quantity value as the actual electric quantity value.
According to an alternative embodiment of the present invention, in the case where the first electric meter is a mechanical electric meter, as shown in fig. 4, after the emergency power supply or the backup power supply is started in the case of a fault or a power failure of the electric power system, due to the structural limitation, the electric meter is still forward when power is reversely supplied, so that the metering of the power supply state of the backup power supply needs to be corrected, and the counting principle in two power supply states is shown in fig. 5; when power is supplied in the forward direction, the current I1 passes through the voltage coil and generates magnetic flux phi 2 in the iron core to pass through the disc, the current coil passes through the current I2 and generates magnetic fluxes phi 1 and phi 3 in the iron core to pass through the disc, the magnetic fluxes phi 1 and phi 3 respectively induce eddy currents I3 and I4 on the disc, and based on the left hand law, the eddy currents I3 and I4 generate a rotating moment F1 under the action of the magnetic flux phi 2 to enable the disc to rotate, and the rotating direction is clockwise to drive the counter to count; when the reverse power is supplied, the current I5 passes through the voltage coil and generates magnetic flux phi 5 in the iron core to pass through the disc, the current coil passes through the current I6 and generates magnetic fluxes phi 4 and phi 6 in the iron core to pass through the disc, the magnetic fluxes phi 4 and phi 6 respectively induce eddy currents I7 and I8 on the disc, and based on the left hand law, the eddy currents I7 and I8 generate a rotating moment F2 under the action of the magnetic flux phi 5 to enable the disc to rotate, so that the rotating direction is still clockwise. The power system still counts forward in the standby power supply state, and the actual power consumption needs to be subtracted by 2 times of the standby power consumption (i.e. the second power value) from the electricity consumption (i.e. the first power value) displayed by the electricity meter.
According to an alternative embodiment of the present invention, in the case where the first electric meter is an electronic electric meter, the first electric meter uses a voltage dividing resistor or a voltage transformer to collect a voltage signal, uses a current divider or a current transformer to collect a current signal, and uses an electric energy measurement chip to accumulate electric energy, so that after the emergency power supply or the standby power supply is started when the electric power system fails or fails, the electric meter is powered reversely, but the electric meter performs self-locking to prevent the electric power consumption from counting reversely, so that the actual electric power consumption needs to be subtracted by 1 time from the electric power consumption of the standby power supply (i.e., the second electric power value) displayed by the electric meter (i.e., the first electric power value).
In the embodiment of the invention, the electric quantity correction parameters are determined according to the first electric meters with different types, so that the actual electric quantity can be corrected more accurately, and the technical effect of accurately correcting the actual electric quantity of the electric consumption system is realized.
Optionally, in step S204, the obtaining the second electric quantity value measured by the second electric meter further includes:
S1, acquiring a plurality of instantaneous current values i n and a plurality of instantaneous voltage values u n, which are obtained by data acquisition of the second ammeter in the second time period, wherein n is a positive integer;
s2, obtaining a product value of the instant current value and the instant voltage value acquired at the nth moment to obtain an nth instant electric power value i nun;
And S3, carrying out integral calculation on the instantaneous electric power value i nun acquired in the second time period to obtain the second electric power value.
According to an aspect of the embodiment of the present invention, the above-mentioned obtaining method may be a specific method, in the application environment of electric quantity value correction shown in fig. 3, a first electric meter is installed on an output side of a conventional air switch in the form of an intelligent electric consumption module, and the electric consumption of the electric consumption system is calculated by collecting the voltage and current values passing through the air switch; when the power utilization system works in a normal power utilization state, the intelligent power utilization module acquires a voltage value u 1、u2...un and a current value i 1、i2...in which are opened conventionally, and then the instant power i 1·u1,i2·u2 of each channel is calculated; when the power system starts a standby power supply due to a fault or power failure, the intelligent power utilization module acquires a voltage value u ' 1、u'2...u'n and a current value i ' 1、i'2...i'n which are opened conventionally, and then the instant power i ' 1·u'1,i'2·u'2 of each path is achieved; the intelligent electricity utilization module acquires a voltage value u ' k and a current value i ' k which are opened by standby, and then the instant power i ' k·u'k of the channel is obtained; because after standby power starts, in order to guarantee whether the standby power is on or can play the role of protecting the load in the circuit, the standby power is generally connected between the rear of the ammeter and the on-air, and the connection between the ammeter and the mains supply passage is difficult to break, so that the ammeter monitors the power supply state of the standby state, the ammeter cannot monitor the power supply monitoring of the standby power to the external circuit through the circuit passage, but can still normally walk when in reverse power supply, and at the moment, the power consumption under the standby state can be corrected through the power consumption monitored by the intelligent power consumption module. Display electricity consumption in standby state:
actual electricity consumption in standby state: /(I) Therefore, the corrected actual power consumption can be obtained through the intelligent power consumption monitoring module:
P wherein a and b represent the electricity meter type coefficients, and the specific value is determined by the electricity meter type. More specifically, in the case where the conventional electricity meter is a mechanical electricity meter, the coefficient a is 1 and the coefficient b is 2; in the case where the conventional electricity meter is an electronic electricity meter, the coefficient a is 0 and the coefficient b is 1.
According to an alternative embodiment of the present invention, the intelligent electricity host applied in the electricity consumption monitoring system shown in fig. 3 may be in the form shown in fig. 5, and is configured to be installed in a power distribution cabinet through an electrical rail, and is mainly used for processing collected electrical signal data and reporting the collected electrical signal data to an electricity management platform; the intelligent power grid gateway can be installed in the power distribution cabinet in the form of fig. 6 and is used for collecting data of the intelligent power utilization module; the first electric meter and the second electric meter can be applied to the power utilization system in the form of fig. 7 for detecting electric signals.
According to the power correction method based on the intelligent power utilization module, the intelligent power utilization module is added in the power utilization system, so that the power utilization error of the standby power supply or the emergency power supply after the standby power supply or the emergency power supply is started can be corrected; meanwhile, different correction algorithms can be set and switched according to the type of the ammeter, so that correction accuracy is ensured. Meanwhile, the intelligent power utilization module does not need to change the layout of the original devices when the intelligent power utilization system is modified, and only needs to be added when the intelligent power utilization module is opened, so that the construction is convenient and time-saving.
In another optional embodiment of the present invention, the step S206, after correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, may further include the following steps:
S1, sending a correction instruction carrying the actual electric quantity value to a server, wherein the correction instruction is used for indicating the server to use the actual electric quantity value as an actual statistical value, and the actual statistical value indicates the electric quantity value of the power grid for actually supplying power to the power utilization system in the first time period.
According to an optional embodiment of the invention, in the intelligent electricity utilization system, data communication between the intelligent electricity utilization gateway and the intelligent electricity utilization module and between the intelligent electricity utilization module and the intelligent electricity utilization module can be realized through a wired mode and a wireless mode, wherein the wired mode mainly comprises a 485 communication mode, and the wireless communication mode mainly comprises Bluetooth communication; the intelligent gateway and the intelligent host are in wired communication mainly through 485 mode.
According to another alternative embodiment of the present invention, the method of sending the correction command to the server and uploading the actual electricity consumption to the electricity management platform, so that the electricity consumption is charged by the electric company and checked by the user, and the communication mode may be a wireless communication mode or a wired communication mode.
According to the embodiment of the invention, the technical effect of correcting the monitored electric quantity at the system side can be realized by sending the correction command to the server after the corrected electric quantity is obtained, so that the electric power company charges and the user checks the electric quantity.
It should be noted that, for simplicity of description, the foregoing method embodiments are all described as a series of acts, but it should be understood by those skilled in the art that the present invention is not limited by the order of acts described, as some steps may be performed in other orders or concurrently in accordance with the present invention. Further, those skilled in the art will also appreciate that the embodiments described in the specification are all preferred embodiments, and that the acts and modules referred to are not necessarily required for the present invention.
According to another aspect of the embodiment of the present invention, there is also provided a control device for implementing the above-mentioned electric quantity value correction method. As shown in fig. 8, the apparatus includes:
a first obtaining unit 801, configured to obtain a first electric quantity value measured by a first electric meter in a first period of time, where the first electric meter is installed on an electricity outlet side of an air switch, and the air switch is used to control a circuit path of an electricity consumption system;
A second obtaining unit 802, configured to obtain a second electric quantity value measured by a second electric meter in a second time period, where the second electric meter is installed on an electricity outlet side of a standby air switch, and the second time period is located in the first time period, where the standby air switch is used to control a circuit path of an electricity utilization system after the standby power supply is used, and the standby power supply is installed inside the electricity utilization system;
and the correction unit 503 is configured to correct the first electric quantity value according to the first electric quantity value and the second electric quantity value, so as to obtain an actual electric quantity value, where the actual electric quantity value is an electric quantity value that the power grid actually supplies power to the power utilization system in the first time period.
In the embodiment of the invention, the method of acquiring the actual electric quantity value by acquiring the first electric quantity value obtained by measuring the first electric meter in the first time period and simultaneously acquiring the second electric quantity value obtained by measuring the second electric meter in the second time period is adopted, and finally, the first electric quantity value is corrected according to the first electric quantity value and the second electric quantity value, and the electric quantity value truly input by the electric network to the electric system and the electric quantity output by the standby power supply are simultaneously monitored to acquire the electric quantity value truly input by the electric network to the electric system, so that the technical problem that the electric quantity value output by the electric system to the electric network cannot be measured by the existing electric meter, and the error exists in monitoring the actual electric quantity of the electric system is solved, and the technical problem of low efficiency existing in the existing electric quantity monitoring method is solved.
Alternatively, according to another aspect of the embodiment of the present invention, the above-mentioned correction unit 803 may further include:
the parameter module is used for determining an electric quantity correction parameter according to the equipment type parameter of the first electric meter, wherein the electric quantity correction parameter is used for indicating a correction proportion for performing deviation correction on the first electric quantity value;
And the determining module is used for determining an actual electric quantity value according to the electric quantity correction parameter, the first electric quantity value and the second electric quantity value.
Optionally, according to another aspect of the embodiment of the present invention, the determining module may be further configured to:
Determining that the electric quantity correction parameter value is a first proportion value under the condition that the equipment type parameter indicates that the first electric meter is a mechanical electric meter;
obtaining the product of the first proportional value and the second electric quantity value as a first correction electric quantity value;
The difference between the first electrical quantity value and the first correction electrical quantity value is determined as an actual electrical quantity value.
Optionally, according to another aspect of the embodiment of the present invention, the determining module may be further configured to:
Under the condition that the equipment type parameter indicates that the first ammeter is an electronic ammeter, determining that the electric quantity correction parameter value is a second proportion value;
obtaining the product of the second proportional value and the second electric quantity value as a second correction electric quantity value;
And determining the difference value between the first electric quantity value and the second correction electric quantity value as an actual electric quantity value.
Optionally, according to another aspect of the embodiment of the present invention, the second obtaining unit 802 further includes:
the first acquisition module is used for acquiring a plurality of instantaneous current values i n and a plurality of instantaneous voltage values u n, which are obtained by data acquisition of the second ammeter in a second time period, wherein n is a positive integer;
The second acquisition module is used for acquiring a product value of the instant current value and the instant voltage value acquired at the nth moment to obtain an nth instant electric power value i nun;
And the calculation module is used for carrying out integral calculation on the instantaneous electric power value i nun acquired in the second time period to obtain a second electric power value.
Alternatively, according to another aspect of the embodiment of the present invention, the above-mentioned correction unit 803 may be further configured to:
And sending a correction instruction carrying the actual electric quantity value to the server, wherein the correction instruction is used for indicating the server to use the actual electric quantity value as an actual statistical value, and the actual statistical value indicates the electric quantity value of the power grid for actually supplying power to the power utilization system in a first time period.
Alternatively, in this embodiment, it will be understood by those skilled in the art that all or part of the steps in the methods of the above embodiments may be performed by a program for instructing a terminal device to execute the steps, where the program may be stored in a computer readable storage medium, and the storage medium may include: flash disk, read-Only Memory (ROM), random-access Memory (Random Access Memory, RAM), magnetic disk or optical disk, etc.
According to a further aspect of the embodiments of the present invention there is also provided an electronic device for implementing the above-described method of modifying an electrical quantity value, the electronic device comprising a memory and a processor, the memory having stored therein a computer program, the processor being arranged to perform the steps of any of the method embodiments described above by means of the computer program.
Alternatively, in this embodiment, the electronic apparatus may be located in at least one network device of a plurality of network devices of the computer network.
Alternatively, in the present embodiment, the above-described processor may be configured to execute the following steps by a computer program:
s1, acquiring a first electric quantity value measured by a first ammeter in a first time period, wherein the first ammeter is arranged on an electricity outlet side of an air switch, and the air switch is used for controlling a circuit path of an electricity utilization system;
S2, obtaining a second electric quantity value obtained by measuring a second electric meter in a second time period, wherein the second electric meter is arranged on the power-out side of a standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of a power utilization system after the standby power supply is used, and the standby power supply is arranged in the power utilization system;
S3, correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value for actually supplying power to the power utilization system in a first time period by the power grid.
The integrated units in the above embodiments may be stored in the above-described computer-readable storage medium if implemented in the form of software functional units and sold or used as separate products. Based on such understanding, the technical solution of the present invention may be embodied in essence or a part contributing to the prior art or all or part of the technical solution in the form of a software product stored in a storage medium, comprising several instructions for causing one or more computer devices (which may be personal computers, servers or network devices, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention.
In the foregoing embodiments of the present invention, the descriptions of the embodiments are emphasized, and for a portion of this disclosure that is not described in detail in this embodiment, reference is made to the related descriptions of other embodiments.
The integrated units in the above embodiments may be stored in the above-described computer-readable storage medium if implemented in the form of software functional units and sold or used as separate products. Based on such understanding, the technical solution of the present invention may be embodied in essence or a part contributing to the prior art or all or part of the technical solution in the form of a software product stored in a storage medium, comprising several instructions for causing one or more computer devices (which may be personal computers, servers or network devices, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention.
In the foregoing embodiments of the present invention, the descriptions of the embodiments are emphasized, and for a portion of this disclosure that is not described in detail in this embodiment, reference is made to the related descriptions of other embodiments.
In several embodiments provided by the present application, it should be understood that the disclosed client may be implemented in other manners. The above-described embodiments of the apparatus are merely exemplary, and the division of units is merely a logic function division, and there may be other manners of dividing actually implementing, for example, multiple units or components may be combined or integrated into another system, or some features may be omitted or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed with each other may be through some interfaces, units or modules, or may be in electrical or other forms.
The units illustrated as separate units may or may not be physically separate, and units shown as units may or may not be physical units, may be located in one place, or may be distributed over a plurality of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in the embodiments of the present invention may be integrated in one processing unit, or each unit may exist alone physically, or two or more units may be integrated in one unit. The integrated units may be implemented in hardware or in software functional units.
The foregoing is merely a preferred embodiment of the present invention and it should be noted that modifications and adaptations to those skilled in the art may be made without departing from the principles of the present invention, which are intended to be comprehended within the scope of the present invention.

Claims (12)

1. A method for correcting an electrical quantity value, applied to an electrical system, comprising:
Acquiring a first electric quantity value measured by a first electric meter in a first time period, wherein the first electric meter is arranged on an electricity outlet side of an air switch, and the air switch is used for controlling a circuit path of the electricity utilization system;
obtaining a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power-out side of a standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of an electricity utilization system after a standby power supply is used, and the standby power supply is arranged in the electricity utilization system;
correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the method comprises the following steps of: determining an electric quantity correction parameter according to the equipment type parameter of the first electric meter, wherein the electric quantity correction parameter is used for indicating a correction proportion for performing deviation correction on the first electric quantity value; and determining the actual electric quantity value according to the electric quantity correction parameter, the first electric quantity value and the second electric quantity value, wherein the actual electric quantity value is an electric quantity value of the power grid for actually supplying power to the power utilization system in the first time period.
2. The method of claim 1, wherein the determining the actual charge value from the charge correction parameter, the first charge value, and the second charge value comprises:
determining the electric quantity correction parameter as a first proportional value under the condition that the equipment type parameter indicates that the first electric meter is a mechanical electric meter;
Obtaining the product of the first proportion value and the second electric quantity value as a first correction electric quantity value;
And determining a difference value between the first electric quantity value and the first correction electric quantity value as the actual electric quantity value.
3. The method of claim 1, wherein the determining the actual charge from the charge correction parameter, the first charge value, and the second charge value comprises:
Determining that the electric quantity correction parameter is a second proportion value under the condition that the equipment type parameter indicates that the first electric meter is an electronic electric meter;
obtaining the product of the second proportion value and the second electric quantity value as a second correction electric quantity value;
And determining a difference value between the first electric quantity value and the second correction electric quantity value as the actual electric quantity value.
4. The method of claim 1, wherein obtaining a second electrical quantity value measured by a second meter further comprises:
acquiring a plurality of instantaneous current values obtained by data acquisition of the second ammeter in the second time period And a plurality of instantaneous voltage values/>Wherein n is a positive integer;
Acquiring the product value of the instantaneous current value and the instantaneous voltage value acquired at the nth moment to obtain the nth instantaneous electric power value
For the instantaneous electric power value obtained in the second time periodAnd performing integral calculation to obtain the second electric quantity value.
5. The method of claim 1, wherein after correcting the first electrical quantity value based on the first electrical quantity value and the second electrical quantity value, further comprising:
And sending a correction instruction carrying the actual electric quantity value to a server, wherein the correction instruction is used for indicating the server to use the actual electric quantity value as an actual statistical value, and the actual statistical value indicates the electric quantity value of the power grid for actually supplying power to the power utilization system in the first time period.
6. A correction device for an electric quantity value, applied to an electric system, comprising:
The first acquisition unit is used for acquiring a first electric quantity value measured by a first electric meter in a first time period, wherein the first electric meter is arranged on the electricity outlet side of an air switch, and the air switch is used for controlling a circuit path of the electricity utilization system;
The second acquisition unit is used for acquiring a second electric quantity value measured by a second electric meter in a second time period, wherein the second electric meter is arranged on the power outlet side of a standby air switch, the second time period is positioned in the first time period, the standby air switch is used for controlling a circuit path of a power utilization system after a standby power supply is used, and the standby power supply is arranged in the power utilization system;
The correction unit is used for correcting the first electric quantity value according to the first electric quantity value and the second electric quantity value to obtain an actual electric quantity value, wherein the actual electric quantity value is an electric quantity value of the power grid for actually supplying power to the power utilization system in the first time period;
The parameter module is used for determining an electric quantity correction parameter according to the equipment type parameter of the first electric meter, wherein the electric quantity correction parameter is used for indicating a correction proportion for performing deviation correction on the first electric quantity value;
and the determining module is used for determining the actual electric quantity value according to the electric quantity correction parameter, the first electric quantity value and the second electric quantity value.
7. The apparatus of claim 6, wherein the means for determining is configured to:
determining the electric quantity correction parameter as a first proportional value under the condition that the equipment type parameter indicates that the first electric meter is a mechanical electric meter;
Obtaining the product of the first proportion value and the second electric quantity value as a first correction electric quantity value;
And determining a difference value between the first electric quantity value and the first correction electric quantity value as the actual electric quantity value.
8. The apparatus of claim 6, wherein the means for determining is further for:
Determining that the electric quantity correction parameter is a second proportion value under the condition that the equipment type parameter indicates that the first electric meter is an electronic electric meter;
obtaining the product of the second proportion value and the second electric quantity value as a second correction electric quantity value;
And determining a difference value between the first electric quantity value and the second correction electric quantity value as the actual electric quantity value.
9. The apparatus of claim 6, wherein the second acquisition unit further comprises:
A first obtaining module, configured to obtain a plurality of instantaneous current values obtained by data acquisition of the second electric meter in the second time period And a plurality of instantaneous voltage values/>Wherein n is a positive integer;
a second acquisition module for acquiring the product value of the instantaneous current value and the instantaneous voltage value acquired at the nth moment to obtain the nth instantaneous electric power value
A calculation module for calculating the instantaneous electric power value obtained in the second time periodAnd performing integral calculation to obtain the second electric quantity value.
10. The apparatus of claim 6, wherein the correction unit is further configured to:
And sending a correction instruction carrying the actual electric quantity value to a server, wherein the correction instruction is used for indicating the server to use the actual electric quantity value as an actual statistical value, and the actual statistical value indicates the electric quantity value of the power grid for actually supplying power to the power utilization system in the first time period.
11. A computer-readable storage medium, characterized in that the computer-readable storage medium comprises a stored program, wherein the program, when run, performs the method of correcting an electrical quantity value as claimed in any one of claims 1 to 5.
12. An electronic device comprising a memory and a processor, characterized in that the memory has stored therein a computer program, the processor being arranged to execute the method of correcting an electrical quantity value according to any of claims 1 to 5 by means of the computer program.
CN202110977781.XA 2021-08-24 2021-08-24 Correction method and device for electric quantity value, storage medium and electronic equipment Active CN113655272B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110977781.XA CN113655272B (en) 2021-08-24 2021-08-24 Correction method and device for electric quantity value, storage medium and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110977781.XA CN113655272B (en) 2021-08-24 2021-08-24 Correction method and device for electric quantity value, storage medium and electronic equipment

Publications (2)

Publication Number Publication Date
CN113655272A CN113655272A (en) 2021-11-16
CN113655272B true CN113655272B (en) 2024-05-24

Family

ID=78481860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110977781.XA Active CN113655272B (en) 2021-08-24 2021-08-24 Correction method and device for electric quantity value, storage medium and electronic equipment

Country Status (1)

Country Link
CN (1) CN113655272B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114721326B (en) * 2022-05-31 2022-09-09 国网浙江省电力有限公司 Marketing audit information processing method and device based on deep learning algorithm

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1142264A (en) * 1994-01-12 1997-02-05 电力能源研究中心 Measuring process for measuring chargeable electrical consumption from an electrical network and electronic electricity meter
WO2012005420A1 (en) * 2010-07-07 2012-01-12 옴니시스템 주식회사 Bi-directional digital power meter
CN103454491A (en) * 2013-08-15 2013-12-18 江苏科技大学 Intelligent electric meter and power quality detection method
JP2015078937A (en) * 2013-10-18 2015-04-23 ゼネラル・エレクトリック・カンパニイ Correcting accumulated power in utility meters
CN104751260A (en) * 2013-12-30 2015-07-01 通用电气公司 System and method for identifying abnormal reading of meter
CN106451766A (en) * 2016-09-09 2017-02-22 国家电网公司 Smart power supply management method and smart meter
JP2017212861A (en) * 2016-05-27 2017-11-30 日本電気株式会社 Power adjustment system, information processing device, information processing method, and program
WO2018133230A1 (en) * 2017-01-17 2018-07-26 珠海格力电器股份有限公司 Control method and apparatus for micro-grid system
CN109412263A (en) * 2018-10-10 2019-03-01 深圳市国网迈腾电力科技股份有限公司 Alterating and direct current is resource integrated and intelligence control system
CN111596125A (en) * 2020-04-03 2020-08-28 远景智能国际私人投资有限公司 Method, device and equipment for determining power generation capacity and storage medium
CN113009406A (en) * 2021-02-26 2021-06-22 珠海格力电器股份有限公司 Electric quantity measurement correction method and device and air conditioning system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1142264A (en) * 1994-01-12 1997-02-05 电力能源研究中心 Measuring process for measuring chargeable electrical consumption from an electrical network and electronic electricity meter
WO2012005420A1 (en) * 2010-07-07 2012-01-12 옴니시스템 주식회사 Bi-directional digital power meter
CN103454491A (en) * 2013-08-15 2013-12-18 江苏科技大学 Intelligent electric meter and power quality detection method
JP2015078937A (en) * 2013-10-18 2015-04-23 ゼネラル・エレクトリック・カンパニイ Correcting accumulated power in utility meters
CN104751260A (en) * 2013-12-30 2015-07-01 通用电气公司 System and method for identifying abnormal reading of meter
JP2017212861A (en) * 2016-05-27 2017-11-30 日本電気株式会社 Power adjustment system, information processing device, information processing method, and program
CN106451766A (en) * 2016-09-09 2017-02-22 国家电网公司 Smart power supply management method and smart meter
WO2018133230A1 (en) * 2017-01-17 2018-07-26 珠海格力电器股份有限公司 Control method and apparatus for micro-grid system
CN109412263A (en) * 2018-10-10 2019-03-01 深圳市国网迈腾电力科技股份有限公司 Alterating and direct current is resource integrated and intelligence control system
CN111596125A (en) * 2020-04-03 2020-08-28 远景智能国际私人投资有限公司 Method, device and equipment for determining power generation capacity and storage medium
CN113009406A (en) * 2021-02-26 2021-06-22 珠海格力电器股份有限公司 Electric quantity measurement correction method and device and air conditioning system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能双向计量与监控终端设计;高雄;史哲;彭勇刚;韦巍;;机电工程;20160331;第33卷(第3期);第326-330、382页 *

Also Published As

Publication number Publication date
CN113655272A (en) 2021-11-16

Similar Documents

Publication Publication Date Title
US6671654B1 (en) Apparatus and method for measuring and reporting the reliability of a power distribution system
US6611773B2 (en) Apparatus and method for measuring and reporting the reliability of a power distribution system with improved accuracy
US8558508B2 (en) Battery system and management method
US8558712B2 (en) Battery system and management method
CN103852744A (en) Distributed online monitoring system and method for electric energy metering device
EP3223022A1 (en) Method for inferring downtime from power quality data
US20070046261A1 (en) Method and apparatus for temperature, conductance and/or impedance testing in remote application of battery monitoring systems
CN102116857B (en) Method for checking electric quantity at power grid gate
CN104682556A (en) Remote intelligent maintenance system for direct current power supply of transformer substation and application of remote intelligent maintenance system
CN105223517A (en) The online balanced monitoring method of a kind of battery pack
CN112534286B (en) System and method for power meter power-off time detection
US20170271915A1 (en) Energy Demand Monitoring System and Smart micro-Grid Controller
CN113189437A (en) Detection method for power-off and power-on fault areas of transformer area
AU2021300164B2 (en) Providing rapid threshold amount of power to customer load during transfer between primary and secondary power supplies
CN113092855B (en) Temperature monitoring method and device, double-core intelligent ammeter and storage medium
CN104569578B (en) A kind of nuclear power station electric energy monitoring system
CN113655272B (en) Correction method and device for electric quantity value, storage medium and electronic equipment
Uvais Controller based power theft location detection system
CN104656050B (en) Manpower-saving remote monitoring and diagnosing method for electric energy metering device
CN111521966A (en) Method and device for monitoring time out-of-tolerance of district electric meter, monitoring terminal and storage medium
CN104614699A (en) Higher-efficiency remote monitoring and diagnosis method of electric energy metering device
KR20200103932A (en) Apparatus for detecting wrong of electronic watt-hour meter in advanced metering infrastructure system and method thereof
CN109655681A (en) A kind of substation and switchyard double measurement circuit method for detecting abnormality and system
CN104656052A (en) Remote monitoring and diagnosing method for loss-reducing and efficiency-improving electric energy metering device
CN107656116A (en) The important active and standby metering method of Electricity customers kilowatt-hour meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant