- Publication number
- CN113585296B CN113585296B CN202110895303.4A CN202110895303A CN113585296B CN 113585296 B CN113585296 B CN 113585296B CN 202110895303 A CN202110895303 A CN 202110895303A CN 113585296 B CN113585296 B CN 113585296B
- Authority
- CN
- China
- Prior art keywords
- gabion
- slope
- frame
- soil
- gabion frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/027—Pots connected in horizontal rows
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/205—Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/02—Arrangement of sewer pipe-lines or pipe-line systems
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
- E03F3/046—Open sewage channels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0085—Geotextiles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Environmental Sciences (AREA)
- Revetment (AREA)
Abstract
Description
技术领域technical field
本发明属于边坡处治技术领域,涉及一种人工边坡装配式柔性支护生态综合处治结构及其施工方法。The invention belongs to the technical field of slope treatment, and relates to an artificial slope assembly-type flexible support ecological comprehensive treatment structure and a construction method thereof.
背景技术Background technique
在高速公路建设中,原始地形条件难以达到平、纵断面线性要求,工程建设过程中的深挖高填路基不可避免。开挖后的人工边坡在湿热环境长期作用下岩土体抗剪强度不断降低,极易出现风化剥落、落石、崩塌、滑塌等边坡浅层失稳破坏现象。边坡浅层失稳破坏一般出现在边坡坡面下6m范围内,且量大面广,已成为人工边坡治理面临的重大技术难题。In the construction of expressways, the original terrain conditions are difficult to meet the linear requirements of the flat and vertical sections, and deep excavation and high filling of subgrades are inevitable during the construction process. After the excavation, the shear strength of the rock and soil mass has been continuously reduced under the long-term action of the hot and humid environment, and it is very easy to have shallow slope instability and damage phenomena such as weathering, spalling, rockfall, collapse, and slump. Shallow slope instability and failure generally occur within 6m below the slope surface, and the large amount and wide area have become a major technical problem for artificial slope management.
裸露人工边坡不利于生态环境保护,一方面裸露人工边坡表面土壤、水分和有机质缺乏,植物无法正常生长,自然条件下植被难以恢复;另一方面裸露人工边坡长期受到湿热作用容易造成和加剧表面的水土流失,植被恢复更加困难。目前,常用的护坡方法有:重力式挡墙、扶壁式挡墙、悬臂式挡墙支护、排桩式锚杆挡墙支护、喷锚支护等。虽然上述方法均能有效提高边坡稳定性,但是支护后的边坡与周边自然景观协调性差,难以满足生态环境保护要求;除了在生态环境保护方面存在一定缺陷之外,上述护坡方法在边坡排、补水方面也存在较大不足。边坡表面长期积水将软化岩土体,极易出现边坡浅层失稳破坏现象,对边坡的稳定性造成隐患。使用普通钢筋网+石笼护坡时,块石间空隙大且互相连接,虽然可有效排出积水,但是石笼间的关联性较弱、协同受力能力差,一旦坡边坡局部出现滑动,钢筋网+石笼护坡结构极易出现破坏,对边坡局部变形的防护能力极为有限。The exposed artificial slope is not conducive to the protection of the ecological environment. On the one hand, the surface of the exposed artificial slope lacks soil, water and organic matter, and the plants cannot grow normally, and the vegetation is difficult to recover under natural conditions; Exacerbating soil erosion on the surface and making vegetation restoration more difficult. At present, the commonly used slope protection methods are: gravity retaining wall, buttress retaining wall, cantilever retaining wall support, row pile anchor retaining wall support, spray anchor support, etc. Although the above methods can effectively improve the stability of the slope, the coordination between the supported slope and the surrounding natural landscape is poor, and it is difficult to meet the requirements of ecological environment protection. There are also major deficiencies in slope drainage and water replenishment. Long-term accumulation of water on the surface of the slope will soften the rock and soil mass, and it is very easy to cause shallow slope instability and damage, which will cause hidden dangers to the stability of the slope. When ordinary steel mesh + gabion slope protection is used, the gaps between the stones are large and connected to each other. Although the water can be effectively discharged, the correlation between the gabions is weak and the cooperative force capacity is poor. Once the slope partially slides, The reinforced mesh + gabion slope protection structure is extremely prone to damage, and its protection against local deformation of the slope is extremely limited.
公开号CN206928301U的专利公开了一种钢筋石笼边坡支护结构,该专利涉及用于改善软土边坡的排水和加固效果,但是难以兼顾绿化、蓄水。公开号CN107439356A的专利公开了一种实现石笼稳定和绿化的方法及石笼绿化系统,有效解决石笼脱落及无绿化功能的问题,将锚杆、石笼以及种植筒做了有机结合,可防止由流体静力造成的损害,有利于山坡和岸滩的稳定,同时增加了绿化效果,但是整体性不佳,加固效果差。The patent of publication number CN206928301U discloses a kind of reinforced gabion slope support structure, and this patent relates to be used for improving the drainage and reinforcement effect of soft soil slope, but it is difficult to give consideration to greening and water storage. The patent with publication number CN107439356A discloses a method for realizing gabion stabilization and greening and a gabion greening system, which effectively solves the problems of gabion falling off and no greening function, and organically combines anchor rods, gabion and planting tubes, which can Preventing damage caused by hydrostatic force is conducive to the stability of hillsides and beaches, and at the same time increases the greening effect, but the integrity is not good and the reinforcement effect is poor.
在实现本发明的过程中,发明人发现现有技术中至少存在以下问题:In the process of realizing the present invention, the inventor finds that there are at least the following problems in the prior art:
1.防渗能力差。现有边坡加固技术没有很好地解决坡体防渗问题,在工程建设中不能一步到位,需附加防渗结构,大大减缓了工程进度,提高了处治成本。一旦边坡排水不及,雨水将深入边坡内部软化岩土体,即使对边坡进行了加固也极大影响了边坡稳定性;1. Poor anti-seepage ability. The existing slope reinforcement technology does not solve the problem of slope anti-seepage well. It cannot be completed in one step during the construction of the project, and an additional anti-seepage structure is required, which greatly slows down the progress of the project and increases the cost of treatment. Once the slope is not well drained, the rainwater will go deep into the slope to soften the rock and soil mass, even if the slope is reinforced, it will greatly affect the stability of the slope;
2.绿化效果差。传统边坡处治技术在边坡加固的同时很难兼顾绿化,容易出现视觉灰色污染,影响生态环境景观。对岩石坡体进行处治时,薄而浅的植生土壤导致植被生长困难,持续干旱季节里土壤保水能力差更加影响了植物生长;2. Poor greening effect. The traditional slope treatment technology is difficult to take into account the greening while strengthening the slope, which is prone to visual gray pollution and affects the ecological environment and landscape. When treating rocky slopes, the thin and shallow vegetative soil makes it difficult for vegetation to grow, and the poor water retention capacity of the soil in the continuous dry season further affects the growth of plants;
3.工程造价高,利用率低。现有边坡处治技术没有充分利用边坡自身变形能力大量采用刚性结构,不仅提高了工程造价而且降低了利用率;3. The project cost is high and the utilization rate is low. The existing slope treatment technology does not make full use of the slope's own deformation capacity and adopts a large number of rigid structures, which not only increases the project cost but also reduces the utilization rate;
4.没有重视预防边坡浅层失稳破坏。大量工程实践表明,受到水热循环影响的边坡常在其表面出现失稳破坏现象。传统边坡处治技术很少针对边坡浅层失稳破坏采取预防措施,导致表面失稳破坏现象频发,不仅影响了表面绿化也降低了结构的加固能力。4. No attention was paid to the prevention of shallow slope instability and damage. A large number of engineering practices have shown that slopes affected by hydrothermal cycles often experience instability and failure on their surfaces. Traditional slope treatment technologies seldom take preventive measures against shallow slope instability and damage, resulting in frequent occurrence of surface instability and damage, which not only affects surface greening but also reduces the reinforcement capacity of the structure.
发明内容Contents of the invention
为了解决上述问题,本发明提供一种人工边坡装配式柔性支护生态综合处治结构,兼顾加固防渗、排补水、绿化功能,造价低,充分利用边坡自身变形实现协同受力,预防边坡浅层失稳破坏,解决了现有技术中存在的问题。In order to solve the above problems, the present invention provides an artificial slope assembly-type flexible support ecological comprehensive treatment structure, which takes into account the functions of reinforcement and anti-seepage, drainage and replenishment, and greening, and has low cost. The shallow layer instability and destruction of the slope solves the problems existing in the prior art.
本发明的另一目的是,提供一种人工边坡装配式柔性支护生态综合处治结构的施工方法。Another object of the present invention is to provide a construction method for an artificial slope assembly type flexible support ecological comprehensive treatment structure.
本发明所采用的技术方案是,一种人工边坡装配式柔性支护生态综合处治结构,包括石笼系统、固定连接系统、排水系统;The technical solution adopted in the present invention is an artificial slope assembly type flexible support ecological comprehensive treatment structure, including a gabion system, a fixed connection system, and a drainage system;
所述石笼系统,包括设于台阶状边坡上的多个石笼单元,每个石笼单元包括上、下、左、右错位分布的四个结构相同的石笼框,即下石笼框设于第一层台阶,左石笼框和右石笼框设于第二层台阶,上石笼框设于第三层台阶,四个石笼框围成的中间区域设有间隙,每个石笼框的底部设有灌浆管;The gabion system includes a plurality of gabion units arranged on the stepped slope, and each gabion unit includes four gabion frames with the same structure distributed up, down, left, and right, that is, the lower gabion The frame is set on the first step, the left gabion frame and the right gabion frame are set on the second step, the upper gabion frame is set on the third step, and there is a gap in the middle area surrounded by four gabion frames. A grouting pipe is provided at the bottom of each gabion frame;
所述固定连接系统,包括连接件,连接件安装于间隙内,连接件上下左右四个方向延伸的部分分别与对应的上石笼框、下石笼框、左石笼框、右石笼框互相接触,边坡与连接件的中心通过土钉连接,将四个石笼框连接形成整体。The fixed connection system includes connectors, the connectors are installed in the gap, and the parts extending in the four directions of the connectors are respectively connected with the corresponding upper gabion frame, lower gabion frame, left gabion frame, and right gabion frame. In contact with each other, the center of the slope and the connector is connected by soil nails, and the four gabion frames are connected to form a whole.
进一步的,所述连接件顶部设有L型切口,上石笼框的底部与L型切口相互接触,连接件底部与下石笼框顶部互相接触,下石笼框顶部设有纵截面为Z型的挡板,挡板紧贴连接件的前壁面、下石笼框顶部和下石笼框的前壁面,挡板的左右两侧向外延伸,限制左石笼框、右石笼框向远离坡面方向的位移。Further, the top of the connector is provided with an L-shaped incision, the bottom of the upper gabion frame is in contact with the L-shaped incision, the bottom of the connector is in contact with the top of the lower gabion frame, and the top of the lower gabion frame is provided with a longitudinal section of Z. Type baffle, the baffle is close to the front wall of the connector, the top of the lower gabion frame and the front wall of the lower gabion frame, the left and right sides of the baffle extend outwards, limiting the direction of the left and right gabion frames Displacement away from the slope direction.
进一步的,所述挡板紧贴连接件的前壁面与下石笼框顶部之间设有纵截面为三角形的肋板。Further, a rib with a triangular longitudinal section is provided between the front wall surface of the baffle close to the connecting piece and the top of the lower gabion frame.
进一步的,所述排水系统,包括设于坡侧与坡脚的排水沟、坡顶的截水沟、土工布、侧面土工布和排水板;Further, the drainage system includes drainage ditches arranged at the side and foot of the slope, intercepting ditches at the top of the slope, geotextiles, side geotextiles and drainage boards;
所述土工布覆盖于台阶状边坡的水平部、竖直部,且覆盖于上下两层台阶的土工布在竖直部处重叠,重叠的两个土工布之间设有排水板,排水板紧靠竖直部;水平部具有弧形下陷部,弧形下陷部上铺有碎石,使得水平部的表面平整;The geotextile covers the horizontal part and the vertical part of the stepped slope, and the geotextiles covering the upper and lower steps overlap at the vertical part, and a drainage board is arranged between the two overlapping geotextiles, and the drainage board Close to the vertical part; the horizontal part has an arc-shaped sunken part, and gravel is laid on the arc-shaped sunken part, so that the surface of the horizontal part is smooth;
所述侧面土工布包裹于所述石笼框的临空侧。The side geotextile is wrapped on the free side of the gabion frame.
进一步的,每个所述石笼框内均放置有块石,植生土分布于块石间空隙中,植物种植于植生土中。Further, block stones are placed in each of the gabion frames, the vegetation soil is distributed in the space between the blocks, and the plants are planted in the vegetation soil.
进一步的,所述灌浆管为L型,灌浆管的水平部分与对应石笼框的框底平行,灌浆管的竖直部分伸出石笼框,灌浆管伸出石笼框的端部设有注浆口;灌浆管的水平部分均匀布设有多个小孔,孔径0.005-0.01m。Further, the grouting pipe is L-shaped, the horizontal part of the grouting pipe is parallel to the frame bottom of the corresponding gabion frame, the vertical part of the grouting pipe extends out of the gabion frame, and the end of the grouting pipe extending out of the gabion frame is provided with a grouting mouth; the horizontal part of the grouting pipe is evenly distributed with a number of small holes with a diameter of 0.005-0.01m.
进一步的,所述石笼框均由长方体状的钢筋框和石笼网组成,石笼框内部设有钢筋隔网。Further, the gabion frames are all composed of rectangular parallelepiped steel bar frames and gabion nets, and the gabion frames are provided with steel bar spacers.
进一步的,所述连接件的中上部预留有直径为0.05m的孔洞,孔洞入口安装有中空圆柱体状的金属垫片,连接件对应的间隙下方的土体内设有土钉孔,土钉穿过孔洞伸入土钉孔内,注浆后将土钉与金属垫片焊接牢固。Further, a hole with a diameter of 0.05m is reserved in the middle and upper part of the connecting piece, and a hollow cylinder-shaped metal gasket is installed at the entrance of the hole, and a soil nail hole is provided in the soil below the gap corresponding to the connecting piece. The nail goes through the hole and extends into the soil nail hole, and the soil nail and the metal gasket are welded firmly after grouting.
进一步的,所述土钉深入边坡土体内部的深度为6-8m。Further, the depth of the soil nails penetrating into the slope soil is 6-8m.
一种上述人工边坡装配式柔性支护生态综合处治结构的施工方法,具体按照以下步骤进行:A construction method for the above-mentioned artificial slope assembly type flexible support ecological comprehensive treatment structure, specifically according to the following steps:
S1:处理边坡表面杂物,在坡顶、坡侧、坡脚修筑排水结构;S1: Deal with debris on the slope surface, and build drainage structures at the top, side, and foot of the slope;
S2:从坡顶向下进行坡面的分级开挖,形成台阶状边坡,横向坡度为1:40;S2: Gradual excavation of the slope surface is carried out from the top of the slope downward to form a stepped slope with a transverse slope of 1:40;
S3:平整台阶状边坡表面;S3: Flat stepped slope surface;
S4:规划每个石笼框的位置,每个石笼单元的左石笼框或右石笼框为相邻石笼单元的上石笼框或下石笼框,每个石笼单元的左石笼框和右石笼框间隔距离与连接件嵌入石笼单元部分的宽度相适应;在石笼框底部预埋有灌浆管,将石块先放入上级石笼框靠近坡体一侧内,待下级石笼框靠近坡体一侧充填完成后,再将块石放入上级石笼框远离坡体一侧内,石笼框的临空侧包裹有侧面土工布;S4: Plan the position of each gabion frame, the left or right gabion frame of each gabion unit is the upper or lower gabion frame of the adjacent gabion unit, the left gabion frame of each gabion unit The distance between the gabion frame and the right gabion frame is adapted to the width of the connecting piece embedded in the gabion unit; a grouting pipe is pre-buried at the bottom of the gabion frame, and the stones are first put into the side of the upper gabion frame close to the slope , after the filling of the side of the lower gabion frame close to the slope is completed, then put the block stones into the side of the upper gabion frame away from the slope body, and the free side of the gabion frame is wrapped with side geotextile;
S5:预制的连接件运输到施工现场后,安放在间隙内,边坡与连接件的中心通过土钉注浆连接,将对应的四个石笼框连接形成整体;S5: After the prefabricated connecting parts are transported to the construction site, they are placed in the gap, and the center of the slope and the connecting parts is connected by soil nailing grouting, and the corresponding four gabion frames are connected to form a whole;
S6:将附带植物种子的液状植生土通过预设的灌浆管灌入对应的石笼框中,充满块石间的空隙,待植生土溢出块石上表面3~5cm后停止灌注。S6: Pour the liquid plant soil with plant seeds into the corresponding gabion frame through the preset grouting pipe to fill the gaps between the stones, and stop pouring after the plant soil overflows the upper surface of the stone by 3~5cm.
本发明的有益效果是:The beneficial effects of the present invention are:
1.排水防渗能力强。“防渗先于排水”是本发明灵活使用土工布的显著优势,土工布的合理使用不仅能提高石笼结构的防渗能力,还能有效排出坡面以下岩土体渗水。渗水在上层台阶土工布以下的坡面汇集,再由排水板引导至下层台阶土工布之上随水平台阶的坡度方向流入坡侧的排水沟,能有效排出坡面以下岩土体渗水。坡顶的大部分雨水汇集于截水沟排出,小部分渗水在各水平台阶土工布下方汇集,一部分随水平台阶的坡度方向流入坡侧的排水沟,另一部分沿竖向排水板的孔隙流向下一级台阶土工布上方,最终流入排水沟。减少雨水下渗能够有效预防水热循环作用下边坡病害的出现。现有边坡处治技术排水大部分为沿坡度下降方向,过长的排水路径极易造成边坡表面的水土流失和雨水下渗,影响到绿化效果和边坡稳定性。本发明中,水平台阶弧形设计提高了集水能力为绿植补水,同时小坡度倾斜设计改变了排水路径,显著缩短了雨水在边坡的滞留时间;1. Strong drainage and anti-seepage ability. "Seepage control prior to drainage" is a significant advantage of the flexible use of geotextiles in the present invention. Reasonable use of geotextiles can not only improve the seepage prevention capability of the gabion structure, but also effectively drain water seepage from rock and soil below the slope. The seepage water collects on the slope below the upper step geotextile, and then is guided by the drainage board to the lower step geotextile and flows into the drainage ditch on the side of the slope with the slope direction of the horizontal platform step, which can effectively discharge the rock and soil seepage below the slope. Most of the rainwater at the top of the slope is collected in the intercepting ditch and discharged, a small part of the seepage water is collected under the geotextile of each horizontal platform step, part of it flows into the drainage ditch on the side of the slope along the slope direction of the horizontal platform step, and the other part flows down along the pores of the vertical drainage plate One step above the geotextile, which eventually flows into the drainage ditch. Reducing rainwater infiltration can effectively prevent the occurrence of slope diseases under the action of hydrothermal cycle. Most of the existing slope treatment technologies drain water along the direction of slope decline. Too long drainage paths can easily cause soil erosion and rainwater infiltration on the slope surface, affecting the greening effect and slope stability. In the present invention, the arc-shaped design of the horizontal platform improves the water collection capacity to replenish water for green plants, and at the same time, the small slope design changes the drainage path, which significantly shortens the residence time of rainwater on the slope;
2.绿化效果好。普通石笼加固边坡很难兼顾绿化,裸露的石笼网+块石与周围自然生态景观不协调。本发明同时兼顾加固和绿化,块石与植生土的组合结构具有足够厚度,可储存水分和植物生长所需养料,为边坡植被提供良好的生长环境,保证了绿化效果。种植绿色植物后,植物根部可深入植生土,使植生土与块石间的连接更加牢固,也能有效减少植生土流失;2. Good greening effect. It is difficult to take into account the greening of the slope reinforced by ordinary gabions, and the exposed gabion mesh + block stones are not in harmony with the surrounding natural ecological landscape. The invention takes both reinforcement and greening into account, and the combined structure of rocks and planting soil has sufficient thickness to store water and nutrients required for plant growth, provide a good growth environment for slope vegetation, and ensure greening effects. After planting green plants, the roots of the plants can go deep into the planting soil, which makes the connection between the planting soil and the rocks stronger, and can effectively reduce the loss of the planting soil;
3.整体性好。本发明能在兼顾绿化、排补水的同时大大提高石笼结构的整体性,既能保留柔性结构适应平台面不平整,适应边坡较大变形的优势,又能增加石笼间协同受力的作用。本发明使用到的预制连接件将四周的石笼牢牢连接,预制连接件与土钉的结合将结构应力传递至深层岩土体,能够有效防止浅层失稳。这种柔性支护方式能有效地发挥边坡自承能力,允许坡体有一定变形而不被破坏,当边坡局部变形时柔性的石笼结构可随之产生一定变形,并通过挡板传递到其他石笼和土钉,一起协同变形、协同受力,有利于整体分担局部石笼受力过大而产生的变形与破坏;3. Good integrity. The invention can greatly improve the integrity of the gabion structure while taking into account the greening, water drainage and replenishment, and can not only retain the advantages of the flexible structure to adapt to the unevenness of the platform surface and the larger deformation of the slope, but also increase the collaborative force between the gabions. effect. The prefabricated connecting piece used in the present invention firmly connects the surrounding gabions, and the combination of the prefabricated connecting piece and the soil nail transmits the structural stress to the deep rock and soil mass, which can effectively prevent the instability of the shallow layer. This flexible support method can effectively exert the self-supporting capacity of the slope, allowing the slope to have a certain deformation without being damaged. When the slope is partially deformed, the flexible gabion structure can produce a certain deformation and transmit it through the baffle. To other gabions and soil nails, they are deformed and stressed together, which is beneficial to the overall sharing of deformation and damage caused by excessive force on local gabions;
4.工程造价低,施工工艺简便。本发明采用装配式施工方法,石笼框、预制连接件、土工布、灌浆管、液化植生土等原件原料都预先在工厂中制作成型然后运送至施工场地进行组装,质量有保证,施工工艺十分简便。从上至下的施工顺序适应了坡面开挖,不仅可以缩短施工工期而且能够省去边坡支护的成本。同时,以上所有原材料价格都十分低廉,施工场地附近的块石即可放入石笼网内,整体结构的工程造价低,适宜多点大面积使用。4. The project cost is low and the construction process is simple. The present invention adopts the assembled construction method. Original raw materials such as gabion frames, prefabricated connectors, geotextiles, grouting pipes, and liquefied planting soil are pre-made in the factory and then transported to the construction site for assembly. The quality is guaranteed and the construction process is very accurate. easy. The construction sequence from top to bottom is suitable for slope excavation, which can not only shorten the construction period but also save the cost of slope support. At the same time, the price of all the above raw materials is very low, and the stones near the construction site can be put into the gabion net. The engineering cost of the overall structure is low, and it is suitable for multi-point and large-area use.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1是本发明实施例的侧视图。Fig. 1 is a side view of an embodiment of the present invention.
图2是本发明实施例的正视图。Fig. 2 is a front view of an embodiment of the present invention.
图3是本发明实施例的边坡开挖施工侧视图。Fig. 3 is a side view of the side slope excavation construction according to the embodiment of the present invention.
图4是本发明实施例的竖向排水板侧视图。Fig. 4 is a side view of the vertical drainage board according to the embodiment of the present invention.
图5是本发明实施例中石笼结构正视图。Fig. 5 is a front view of the gabion structure in the embodiment of the present invention.
图6是本发明实施例的装石示意图。Fig. 6 is a schematic diagram of stone loading according to an embodiment of the present invention.
图7是本发明实施例的灌浆管结构示意图。Fig. 7 is a schematic structural diagram of a grouting pipe according to an embodiment of the present invention.
图8是本发明实施例的石笼框三视图。Fig. 8 is three views of the gabion frame of the embodiment of the present invention.
图9是本发明实施例的侧视放大图。Fig. 9 is an enlarged side view of an embodiment of the present invention.
图10是本发明实施例的连接件三视图。Fig. 10 is a three-view view of the connector of the embodiment of the present invention.
图中,1.截水沟,2.排水沟,3.水平部,4.竖直部,5.弧形下陷部,6.土工布,6-1.第一级土工布,6-2.下一级土工布,7.挡板,8.排水板,9.碎石,10.左石笼框,11.右石笼框,12.上石笼框,13.下石笼框,14.侧面土工布,15.框底,16.灌浆管,17.注浆口,18.石笼内侧,19.钢筋隔网,20.石笼外侧,21.连接件,22.间隙,23.孔洞,24.土钉孔,25.金属垫片,26.土钉。In the figure, 1. Interception ditch, 2. Drainage ditch, 3. Horizontal part, 4. Vertical part, 5. Arc-shaped sunken part, 6. Geotextile, 6-1. First-level geotextile, 6-2 .The next level of geotextile, 7. Baffle, 8. Drainage board, 9. Gravel, 10. Left gabion frame, 11. Right gabion frame, 12. Upper gabion frame, 13. Lower gabion frame, 14. Side geotextile, 15. Frame bottom, 16. Grouting pipe, 17. Grouting port, 18. Inside the gabion, 19. Reinforcement mesh, 20. Outside the gabion, 21. Connector, 22. Gap, 23 . Holes, 24. Soil nail holes, 25. Metal spacers, 26. Soil nails.
具体实施方式Detailed ways
下面将结合本发明实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
实施例1,Example 1,
一种人工边坡装配式柔性支护生态综合处治结构,包括石笼系统、固定连接系统、排水系统;An artificial slope assembled flexible support ecological comprehensive treatment structure, including a gabion system, a fixed connection system, and a drainage system;
如图1-2、图5-7所示,石笼系统,包括设于台阶状边坡上的多个石笼单元,每个石笼单元包括上、下、左、右错位分布的四个结构相同的石笼框,即下石笼框13构成第一层台阶,左石笼框10和右石笼框11构成第二层台阶,上石笼框12构成第三层台阶,四个石笼框围成的中间区域设有间隙22,每个石笼框的底部设有L型的灌浆管16,每个石笼框内均放置有块石,植生土分布于块石间空隙中,植物种植于植生土中,植生土由当地细颗粒土掺加有机质、肥料、水等成分拌合而成。As shown in Figure 1-2 and Figure 5-7, the gabion system includes multiple gabion units arranged on a stepped slope, and each gabion unit includes four Gabion frames with the same structure, that is, the
固定连接系统,包括连接件21,连接件21为预制的混凝土结构,连接件21安装于间隙22内,连接件21上下左右四个方向延伸的部分分别与对应的上石笼框12、下石笼框13、左石笼框10、右石笼框11互相接触,边坡与连接件21的中心通过土钉26连接,将四个石笼框连接形成整体。The fixed connection system includes
排水系统,包括设于坡侧坡脚的排水沟2和坡顶的截水沟1;还包括土工布6、侧面土工布14和排水板8。The drainage system includes a
如图3-4、图6所示,台阶状边坡的水平部3、竖直部4均覆盖有土工布6,且覆盖于上下两层台阶的土工布6在竖直部4处重叠,重叠的两个土工布6之间设有排水板8,排水板8紧靠竖直部4;水平部3具有弧形下陷部5,弧形下陷部5上铺有单一级配的碎石9,使得水平部3的表面平整,石笼框的临空侧包裹有侧面土工布14。As shown in Figure 3-4 and Figure 6, both the horizontal part 3 and the vertical part 4 of the stepped slope are covered with
如图7所示,灌浆管16的水平部分与对应石笼框的框底15平行,灌浆管16的竖直部分伸出石笼框,灌浆管16伸出石笼框的端部设有注浆口17;灌浆管16的水平部分均匀布设有多个小孔,孔径0.005-0.01m,植生土颗粒粒径小于孔径。灌浆管16的管径0.04m,灌浆管16的竖直部长0.6m,灌浆管16的水平部分长3.8m。As shown in Figure 7, the horizontal part of the
如图8所示,石笼框均由长方体状的钢筋框和石笼网组成,规格长为4m、宽0.6m、高0.5m;石笼框内部设有钢筋隔网19,将石笼框分为靠近临空面一侧(石笼外侧20)和靠近坡体一侧(石笼内侧18),石笼内侧18与石笼外侧20的宽度比为2:1,方便施工,避免石笼框临空部分破坏、块石掉落。石笼框在工厂预制过程中,能利用模具批量生产连接件,质量、经济性和生产效率能够保证。石笼网为高抗腐蚀、高强度、具有延展性的低碳钢丝或者包覆PVC的钢丝使用机械编织而成。As shown in Figure 8, the gabion frames are all made up of rectangular parallelepiped steel bars and gabion nets, with specifications of 4m in length, 0.6m in width, and 0.5m in height; It is divided into one side close to the air surface (20 outside the gabion) and one side close to the slope (18 inside the gabion). The width ratio of the inside 18 of the gabion to the outside 20 of the gabion is 2:1, which is convenient for construction and avoids gabion The empty part of the frame was destroyed, and the stone fell. During the prefabrication process of the gabion frame in the factory, the connecting parts can be mass-produced by using the mold, and the quality, economy and production efficiency can be guaranteed. Gabion net is made of low carbon steel wire with high corrosion resistance, high strength and ductility or steel wire covered with PVC by mechanical weaving.
如图9-10所示,连接件21的主体部分嵌入间隙22,连接件21顶部设有L型切口,上石笼框12的底部与L型切口相互接触,连接件21底部与下石笼框13顶部互相接触,下石笼框13顶部设有纵截面为Z型的挡板,挡板紧贴连接件21的前壁面、下石笼框13顶部和下石笼框13的前壁面,挡板的左右两侧向外延伸,约束左石笼框10、右石笼框11向远离坡面方向的位移,便于安装,而且连接件21能够对石笼产生足够的约束力。As shown in Figure 9-10, the main part of the
挡板紧贴连接件21的前壁面与下石笼框13顶部之间设有纵截面为三角形的肋板,所起作用是缓解应力集中现象,增加连接件21的刚度。Baffle plate close to the front wall surface of
如图10所示,连接件21板长0.6m,板宽0.2m,板高0.5m,向上延伸0.2m,向下延伸0.2m,纵截面为Z型的挡板左右对称延伸0.3m,其中板长、板高与边坡台阶宽、高相适应,台阶状边坡的水平部3宽0.5m,竖直部4高0.5m;板宽考虑了土钉孔径长和配筋的混凝土最小保护层厚度;板向四周的延伸长度考虑了实用性和经济性。As shown in Figure 10, the board length of the
连接件21的中上部预留有直径为0.05m的孔洞23,孔洞23入口安装有中空圆柱体状的金属垫片25,连接件21对应的间隙22下方的土体内设有土钉孔24,土钉26穿过孔洞23伸入土钉孔24内。金属垫片25高为0.02m,外径为0.1m,内径为0.05m;土钉26采用直径为0.016~0.032m、长6~8m的钢筋,注浆后将钢筋与金属垫片25焊接牢固;连接件21配筋直径为0.016m,间距长0.1m×宽0.1m。A
土钉26与石笼单元结合有效地发挥岩土体自承能力,允许岩土体有一定变形而不破坏,甚至同被加固的岩体作整体运动时仍能保证相当大支护抗力的支护措施。土钉26深入边坡浅层破坏临界面以下2m左右,即可发挥足够的加固效果,一般软岩、土质边坡的边坡浅层破坏临界面深度为4-6m,故土钉26深入边坡土体内部的深度为6-8m,土钉26过短会降低边坡的稳定性,增加土钉26长度可有效提高边坡稳定性,但土钉26过长时,对提升边坡稳定性的效果不明显,而且会提高工程造价及施工难度。The combination of the
实施例2,Example 2,
一种人工边坡装配式柔性支护生态综合处治结构的施工方法,具体按照以下步骤进行:A construction method for an artificial slope assembly-type flexible support ecological comprehensive treatment structure, specifically in accordance with the following steps:
S1:处理边坡表面杂物,先在坡顶修筑截水沟1,再于坡侧坡脚修筑排水沟2。S1: To deal with debris on the surface of the slope, first build the intercepting
S2:机械从坡顶向下进行坡面的分级开挖,形成台阶状边坡,台阶状边坡的水平部3宽0.5m,竖直部4高0.5m,水平部3中间下陷0.05m呈弧形,横向坡度为1:40;以便集排水;S2: The machine excavates the slope in stages from the top of the slope downwards to form a stepped slope. The horizontal part 3 of the stepped slope is 0.5m wide, the vertical part 4 is 0.5m high, and the middle of the horizontal part 3 sinks 0.05m. Arc-shaped, with a transverse slope of 1:40; for drainage;
S3:在台阶状边坡表面覆盖土工布6,保证台阶状边坡表面平整;第一级土工布6-1贴紧土体覆盖住台阶状边坡的水平部3并留出0.3m的长度贴紧相邻下方的竖直部4的土体,下一级土工布6-2覆盖下层台阶水平部3的土体,同时下一级土工布6-2的上端与第一级土工布6-1在台阶的竖直部4处重叠0.1m,下一级土工布6-2的下端留出0.3m的长度贴紧相邻下方的竖直部4的土体,如此重复直至覆盖完所有坡面;重叠的第一级土工布6-1和下一级土工布6-2之间设有排水板8,排水板8紧靠竖直部4,排水板8的高0.5m。在水平部3的弧形下陷处铺垫单一级配的碎石9,至水平部3的表面水平。S3: Cover the surface of the stepped slope with
S4:规划每个石笼框的位置,每个石笼单元的左石笼框10或右石笼框11为相邻石笼单元的上石笼框12或下石笼框13,使得上级下级石笼框错位排列;每个石笼单元的左石笼框10和右石笼框11间隔距离与连接件21嵌入石笼单元部分的宽度相适应,本实施例中,连接件21嵌入石笼单元部分的宽度为0.2m,每个石笼单元的左石笼框10和右石笼框11间隔距离比连接件21嵌入石笼单元部分的宽度大0.01m。石笼框在工厂制作好以后运输到施工现场,低重量的石笼框由人工或机械搬运至指定位置,在石笼框底部预埋有灌浆管16,管口标高大于石笼框0.1~0.2m;就地取材采集坡体附近的块石,将石块先放入上级石笼框靠近坡体一侧内,待下级石笼框靠近坡体一侧充填完成后,再将块石放入上级石笼框远离坡体一侧内,以避免石笼框临空部分破坏、块石掉落;石笼框的临空侧包裹有侧面土工布14。开挖和布置石笼顺序均为从上至下,多级台阶成形过程应与边坡开挖过程同步,避免了开挖后无支护时间段内边坡发生破坏,同时节省施工时间,有利于缩短工期。S4: Plan the position of each gabion frame, the left gabion frame 10 or the
S5:连接件21采用工程预制,降低了复杂性、减少成本、控制质量;预制的连接件21运输到施工现场后,安放在间隙22内,边坡与连接件21的中心通过土钉26注浆连接,将对应的四个石笼框连接形成整体;具体的,土钉26穿过孔洞23伸入土钉孔24内,土钉26预留0.05-0.1m在连接件21外,采用底部注浆法将水泥砂浆灌入土钉孔24中,注浆管应插入距孔底0.25~0.5m处,随浆液的注入缓慢匀速拔出,保证水泥砂浆灌满土钉孔24以及孔洞23,注浆完毕后将土钉26与孔洞23处的金属垫片25焊接牢固。S5: The
S6:将附带植物种子的液状植生土通过预设的灌浆管16灌入对应的石笼框中,附带植物种子的液状植生土灌入石笼时具有一定流动性,符合泵送要求,灌注前检查石笼框临空侧面的土工布与框体间的密闭性,匀速灌入石笼框底部后充满块石间的空隙,待植生土溢出块石上表面3~5cm后停止灌注。S6: Pour the liquid plant soil with plant seeds into the corresponding gabion frame through the
重复上述步骤完成坡面所有石笼单元的施工,监测边坡和石笼结构的变形和植物的生长情况。如果边坡和石笼结构的变形发生,迅速进行维修处理,确保受力结构不破坏;当坡体开始滑塌,可紧急堆积石块至坡角处,防止滑坡。Repeat the above steps to complete the construction of all gabion units on the slope, and monitor the deformation of the slope and gabion structures and the growth of plants. If the deformation of the slope and the gabion structure occurs, repairs should be carried out quickly to ensure that the stressed structure is not damaged; when the slope body begins to slide, stones can be piled up at the corner of the slope in an emergency to prevent landslides.
本发明实施例提出的边坡处治结构同时兼顾加固和绿化和排水;利用土工布和横向排水路径,实现快速排出边坡表面积水、减少坡体内部渗水的目的;石笼+块石+植生土的组合结构可储存水分和植物生长所需养料,为边坡植被提供良好的生长环境,保证了绿化效果,实现绿化边坡、协调自然景观的目的;土钉26与石笼组合的柔性结构能够有效加固边坡,防止边坡的失稳破坏,对坡体提供足够支撑力的前提下,追求绿色生态。柔性支护方式能有效地发挥边坡自承能力,当边坡局部变形时柔性的石笼结构可随之产生一定变形,并通过连接件21传递到其他石笼和土钉26,一起协同变形、协同受力,最终土钉26将外力传递到坡体深处。土钉26与石笼的有机结合既提高了石笼的整体性,也大大提高结构加固边坡的能力。此外,土钉26施工时需要的机械设备少,技术要求相对较低,与锚杆相比,显著减少了施工成本。克服了现有边坡支护技术防渗能力差,绿化效果不好,成本高,整体性不好,结构不能协同受力的技术问题。The slope treatment structure proposed by the embodiment of the present invention takes into account reinforcement, greening and drainage at the same time; uses geotextiles and horizontal drainage paths to achieve the purpose of quickly draining the surface water of the slope and reducing water seepage inside the slope; gabion + block stone + plant soil The combined structure can store water and nutrients needed for plant growth, provide a good growth environment for slope vegetation, ensure the greening effect, realize the purpose of greening the slope and coordinating the natural landscape; the flexible structure combined with
以上所述仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内所作的任何修改、等同替换、改进等,均包含在本发明的保护范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention are included in the protection scope of the present invention.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110895303.4A CN113585296B (en) | 2021-08-05 | 2021-08-05 | Artificial slope prefabricated flexible support ecological comprehensive treatment structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110895303.4A CN113585296B (en) | 2021-08-05 | 2021-08-05 | Artificial slope prefabricated flexible support ecological comprehensive treatment structure and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113585296A CN113585296A (en) | 2021-11-02 |
CN113585296B true CN113585296B (en) | 2022-11-08 |
Family
ID=78255301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110895303.4A Active CN113585296B (en) | 2021-08-05 | 2021-08-05 | Artificial slope prefabricated flexible support ecological comprehensive treatment structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113585296B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20200173756A1 (en) * | 2018-10-19 | 2020-06-04 | Lizhong JIANG | Implement and facility for capturing grounding missiles and penetrating missiles in a fixed point and collecting guiding rockets and aircrafts and manufacture method thereof |
CN114097469B (en) * | 2021-12-24 | 2023-01-06 | 苏州仁和园林股份有限公司 | Construction method of flower and shrub cultivation system |
CN118292469B (en) * | 2024-06-04 | 2024-08-13 | 西南石油大学 | An ecological restoration device for steep slope soil consolidation |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724402A (en) * | 2017-11-08 | 2018-02-23 | 广西南宁胜祺安科技开发有限公司 | A kind of spoil ground regulation method |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005325661A (en) * | 2004-05-12 | 2005-11-24 | Landscape Tamaki:Kk | Slope weed prevention device and slope revegetation method |
JP6205207B2 (en) * | 2013-08-27 | 2017-09-27 | 共和ハーモテック株式会社 | Slope protection structure and method for forming the same |
CN105874959B (en) * | 2016-04-13 | 2018-12-18 | 北京林业大学 | Side slope vegetation ecological recovery method and system |
CN110747871A (en) * | 2019-11-20 | 2020-02-04 | 厦门海石生态环境股份有限公司 | Ecological friendly side slope structure and construction method thereof |
CN213836677U (en) * | 2020-09-14 | 2021-07-30 | 河海大学 | Ecological slope protection structure of continuous multistage gabion barricade of mountain area highway |
CN112359849A (en) * | 2020-09-17 | 2021-02-12 | 安徽林海园林绿化股份有限公司 | Ecological restoration method for mine side slope |
CN213836692U (en) * | 2020-11-27 | 2021-07-30 | 海南省设计研究院有限公司 | Novel assembled side slope protection view wall |
CN112431213B (en) * | 2020-11-30 | 2022-02-15 | 长沙理工大学 | Semi-rigid support ecological comprehensive treatment structure of artificial slope and its construction method |
-
2021
- 2021-08-05 CN CN202110895303.4A patent/CN113585296B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724402A (en) * | 2017-11-08 | 2018-02-23 | 广西南宁胜祺安科技开发有限公司 | A kind of spoil ground regulation method |
Also Published As
Publication number | Publication date |
---|---|
CN113585296A (en) | 2021-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113585296B (en) | Artificial slope prefabricated flexible support ecological comprehensive treatment structure and its construction method | |
CN100493339C (en) | Farmland discharging-irrigating series facilities | |
CN110241849A (en) | An assembled concrete box retaining wall and its construction method | |
CN108049423B (en) | Ecological landscape retaining wall | |
CN113250240A (en) | Combined side slope protection structure and process of layered net type gabion and concrete | |
CN117926849A (en) | Construction method and application of high-strength gravity retaining wall | |
CN109555153A (en) | A kind of pin-connected panel ecology gravity retaining wall | |
CN111676989A (en) | A kind of expansive soil road cutting side slope reinforcement structure and construction method | |
CN105821902B (en) | Construction method of vertical lattice light reinforced concrete ecological retaining wall | |
CN105064273B (en) | A kind of grass planting gabion ecology terraced fields ridge | |
CN111622234B (en) | Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process | |
CN206189447U (en) | Partly strut formula retaining wall | |
IT9047689A1 (en) | STRUCTURE FOR THE CONTAINMENT OF NATURAL AND / OR ARTIFICIAL GROUNDS | |
CN210216318U (en) | Ecological river course side slope protective structure | |
CN108222030A (en) | The lattice safeguard structure and construction method of a kind of not equidistant dregs side slope of transverse direction | |
CN108867668B (en) | Ecological retaining plate structure | |
CN214783977U (en) | Compound foundation pit supporting structure of full miscellaneous filled earth stratum | |
CN114703875B (en) | High-steep artificial side slope wavy reinforced soil retaining structure and construction method thereof | |
CN116220075A (en) | A slope protection structure and its construction method | |
CN206418460U (en) | Ecological slope protection structure | |
CN209693554U (en) | A kind of pin-connected panel ecology gravity retaining wall | |
CN222227362U (en) | A high fill composite structure retaining wall | |
CN214783652U (en) | Ecological gabion revetment structure | |
CN114481953B (en) | Ecological slope protection without damaging integrity of hard slope protection of established embankment and construction method thereof | |
CN219219057U (en) | Ecological protection structure suitable for loess area high and large side slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Qiu Xiang Inventor after: Xiao Zelin Inventor after: Fan Siqi Inventor after: Tan Gui Inventor after: Jiang Huangbin Inventor after: Fu Hongyuan Inventor after: Chen Changrui Inventor after: Liu Zhongwei Inventor after: Luo Zhenyu Inventor after: Hu Hongbo Inventor before: Qiu Xiang Inventor before: Tan Gui Inventor before: Jiang Huangbin Inventor before: Fu Hongyuan Inventor before: Chen Changrui Inventor before: Liu Zhongwei Inventor before: Luo Zhenyu Inventor before: Hu Hongbo Inventor before: Xiao Zelin |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |