[go: up one dir, main page]

CN113543288B - A power control method and a power control device - Google Patents

A power control method and a power control device Download PDF

Info

Publication number
CN113543288B
CN113543288B CN202010316153.2A CN202010316153A CN113543288B CN 113543288 B CN113543288 B CN 113543288B CN 202010316153 A CN202010316153 A CN 202010316153A CN 113543288 B CN113543288 B CN 113543288B
Authority
CN
China
Prior art keywords
target
power
frequency band
sub
communication unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010316153.2A
Other languages
Chinese (zh)
Other versions
CN113543288A (en
Inventor
彭俊
杨俊�
郑晓军
郭江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN202010316153.2A priority Critical patent/CN113543288B/en
Priority to PCT/CN2021/087177 priority patent/WO2021213226A1/en
Publication of CN113543288A publication Critical patent/CN113543288A/en
Application granted granted Critical
Publication of CN113543288B publication Critical patent/CN113543288B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. Transmission Power Control [TPC] or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/30Monitoring; Testing of propagation channels
    • H04B17/309Measuring or estimating channel quality parameters
    • H04B17/318Received signal strength
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/06Testing, supervising or monitoring using simulated traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. Transmission Power Control [TPC] or power classes
    • H04W52/02Power saving arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A power control method comprising: acquiring a first electric field intensity value, wherein the first electric field intensity value is obtained by measuring a site at a measuring point when a plurality of communication units of the site are configured with preset data transmission power; when the first electric field intensity value is larger than or equal to the preset electric field intensity, carrying out power reduction simulation on the data transmission power of the plurality of communication units in the target period, and calculating a second electric field intensity value according to the reduced data transmission power; outputting a command when the second electric field intensity value is smaller than the preset electric field intensity; the power-down operation is performed within a target period according to the command. The method can automatically adjust the power of each communication unit in the station, thereby effectively utilizing the power of the communication unit. The application also provides a power control device capable of realizing the power control method.

Description

一种功率控制方法以及功率控制装置A power control method and a power control device

技术领域Technical Field

本申请涉及通信技术领域,尤其涉及一种功率控制方法以及功率控制装置。The present application relates to the field of communication technology, and in particular to a power control method and a power control device.

背景技术Background Art

随着无线通信技术的发展,一个站点可以部署多个不同通信制式的通信设备,以提供多种无线网络服务。这样一个站点产生的电磁辐射强度存在超过电磁辐射标准的风险。随着5G设备的部署,如何将站点的电磁辐射控制在电磁辐射标准以内成为人们关注的问题。With the development of wireless communication technology, a site can deploy multiple communication devices of different communication standards to provide a variety of wireless network services. The electromagnetic radiation intensity generated by such a site has the risk of exceeding the electromagnetic radiation standard. With the deployment of 5G equipment, how to control the electromagnetic radiation of the site within the electromagnetic radiation standard has become a concern.

目前有一种控制电磁辐射强度的方法大致如下:根据一个站点的非5G设备的工作功率计算出站点的当前电磁辐射强度,根据电磁辐射标准与当前电磁辐射强度的差值计算出5G设备的允许工作功率,按照该允许工作功率对5G设备进行功率控制。Currently, there is a method for controlling the intensity of electromagnetic radiation, which is roughly as follows: calculate the current electromagnetic radiation intensity of a site based on the working power of non-5G equipment at a site, calculate the allowable working power of the 5G device based on the difference between the electromagnetic radiation standard and the current electromagnetic radiation intensity, and control the power of the 5G device according to the allowable working power.

随着非5G设备上的业务迁移到5G设备,非5G设备的工作功率会降低,这样会造成分配给非5G设备的工作功率过高且分配给5G设备的工作功率过低,即功率分配不合理的问题,因此上述控制电磁辐射强度的方法难以适用于5G应用场景。As the services on non-5G devices migrate to 5G devices, the working power of non-5G devices will decrease. This will cause the working power allocated to non-5G devices to be too high and the working power allocated to 5G devices to be too low, that is, the problem of unreasonable power allocation. Therefore, the above method of controlling the intensity of electromagnetic radiation is difficult to apply to 5G application scenarios.

发明内容Summary of the invention

有鉴于此,本申请提供一种功率控制方法以及功率控制装置,能够自动调节站点内各通信单元的功率,从而更加有效地利用通信单元的功率。In view of this, the present application provides a power control method and a power control device, which can automatically adjust the power of each communication unit in a site, so as to more effectively utilize the power of the communication unit.

第一方面提供一种功率控制方法,在该方法中,获取第一电场强度值;当第一电场强度值大于或等于预设电场强度时,将多个通信单元在目标时段的数据传输功率进行降功率仿真,根据降低后的数据传输功率计算第二电场强度值;当第二电场强度值小于预设电场强度时输出命令;根据命令在目标时段内执行降功率操作。A first aspect provides a power control method, in which a first electric field strength value is obtained; when the first electric field strength value is greater than or equal to a preset electric field strength, a power reduction simulation is performed on the data transmission power of multiple communication units in a target time period, and a second electric field strength value is calculated based on the reduced data transmission power; when the second electric field strength value is less than the preset electric field strength, a command is output; and a power reduction operation is performed within the target time period according to the command.

其中,多个通信单元包括不同通信制式的通信单元。每个通信单元配置有独立的预设数据传输功率。数据传输功率是指一个时段内传输业务数据的平均功率,该时段的时长可以根据实际情况进行设置,本申请不作限定。电场强度也称为电磁辐射强度。第一电场强度值是当站点的多个通信单元配置预设数据传输功率时,在测量点对站点测量得到的电场强度值。第二电场强度值是当站点的多个通信单元按照降低后的数据传输功率配置时,在测量点对站点测量得到的电场强度值。Among them, the multiple communication units include communication units of different communication formats. Each communication unit is configured with an independent preset data transmission power. Data transmission power refers to the average power of transmitting business data in a time period. The duration of the time period can be set according to actual conditions, and this application does not limit it. Electric field strength is also called electromagnetic radiation intensity. The first electric field strength value is the electric field strength value measured at the measurement point for the site when the multiple communication units of the site are configured with a preset data transmission power. The second electric field strength value is the electric field strength value measured at the measurement point for the site when the multiple communication units of the site are configured according to the reduced data transmission power.

依此实施,在站点的数据传输功率过大的情况下,将多个通信单元在目标时段的数据传输功率进行降功率仿真,站点的数据传输功率可以是全部通信单元的数据传输功率的算数和或者加权和。如果在仿真条件下站点的电场强度不超过预设电场强度,那么按照降低后的数据传输功率进行配置后,能够使得通信单元在目标时段内按照降低后的数据传输功率进行数据传输。这样能够自动调节各通信单元的功率且使得站点的电场强度不超过预设电场强度,从而保证其电磁辐射强度在安全范围以内。According to this implementation, when the data transmission power of the site is too large, the data transmission power of multiple communication units in the target time period is reduced for simulation, and the data transmission power of the site can be the arithmetic sum or weighted sum of the data transmission power of all communication units. If the electric field strength of the site does not exceed the preset electric field strength under the simulation condition, then after configuration according to the reduced data transmission power, the communication unit can perform data transmission according to the reduced data transmission power during the target time period. In this way, the power of each communication unit can be automatically adjusted and the electric field strength of the site does not exceed the preset electric field strength, thereby ensuring that its electromagnetic radiation intensity is within a safe range.

在另一种可能的实现方式中,根据通信单元的历史负载量对每个通信单元在目标时段的负载量进行预测;根据预测结果确定每个通信单元的优先级,每个通信单元在目标时段的预测结果与通信单元的优先级负相关;按照从高到低的优先级顺序,将每个通信单元在目标时段的数据传输功率进行降功率仿真。具体的,可以将目标时段之前的时间划分为多个时段,每个时段的时长与目标时段的时长相等,目标时段的单位可以是但不限于分钟或小时,具体可以根据实际情况进行设置,本申请不作限定。然后根据各时段的历史负载量训练预测模型,使用该预测模型来预测目标时段的负载量。训练方法可以是但不限于梯度下降算法,神经网络算法。根据各通信单元的负载量确定每个通信单元的优先级,即负载量越低的通信单元优先级越高,负载量越高的通信单元优先级越低。优先对负载量低的通信单元进行降功率仿真,这样负载量高的通信单元可以使用更多功率,就实现了根据负载量来分配通信单元的功率,从而充分利用各通信单元的功率。并且,该方法对站点的业务传输的影响很小甚至没有影响,从而对用户体验不产生明显影响甚至不影响用户体验。需要说明的是,对于多个通信单元进行降功率仿真的顺序不限于从高到低,也可以是从低到高的次序,随机次序或者其他方式的次序,本申请不作限定。In another possible implementation, the load of each communication unit in the target period is predicted according to the historical load of the communication unit; the priority of each communication unit is determined according to the prediction result, and the prediction result of each communication unit in the target period is negatively correlated with the priority of the communication unit; and the data transmission power of each communication unit in the target period is simulated by power reduction according to the priority order from high to low. Specifically, the time before the target period can be divided into multiple periods, and the duration of each period is equal to the duration of the target period. The unit of the target period can be but not limited to minutes or hours, which can be set according to actual conditions, and the present application is not limited thereto. Then, a prediction model is trained according to the historical load of each period, and the prediction model is used to predict the load of the target period. The training method can be but not limited to a gradient descent algorithm or a neural network algorithm. The priority of each communication unit is determined according to the load of each communication unit, that is, the lower the load, the higher the priority of the communication unit, and the higher the load, the lower the priority of the communication unit. Prioritize the power reduction simulation for the communication unit with low load, so that the communication unit with high load can use more power, so that the power of the communication unit is allocated according to the load, thereby making full use of the power of each communication unit. Moreover, the method has little or no impact on the service transmission of the site, so that the user experience is not significantly affected or even does not affect the user experience. It should be noted that the order of power reduction simulation for multiple communication units is not limited to from high to low, but can also be from low to high, random order or other order, which is not limited in this application.

在另一种可能的实现方式中,将每个通信单元在目标时段的数据传输功率进行降功率仿真包括:在通信单元配置有多个工作频段且每个工作频段包括多个子频段的条件下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段,目标子频段和其他子频段属于同一个工作频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断。In another possible implementation, the data transmission power of each communication unit in the target time period is simulated to be reduced in power, including: under the condition that the communication unit is configured with multiple working frequency bands and each working frequency band includes multiple sub-frequency bands, one working frequency band is selected from the multiple working frequency bands in turn as the target working frequency band, and the load of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load of the sub-frequency band; the sub-frequency band with the smallest predicted load is used as the target sub-frequency band; all business loads of the target sub-frequency band in the target time period are transferred to other sub-frequency bands, and the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; when the target sub-frequency band meets the shutdown condition, the target sub-frequency band is simulated to be shut down during the target time period.

其中,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量可以基于预测模型。预测模型的训练方法可以是但不限于梯度下降算法,神经网络算法。依此实施,能够将最小负载的目标子频段的负载迁移到其他子频段上传输,然后将目标子频段进行关断,从而实现降功率仿真。这样能够对通信单元的业务传输的影响很小甚至没有影响。需要说明的是,除了关断最小负载量的子频段之外,还可以选择负载量较小的一个或多个其他子频段进行关断。Among them, predicting the load of each sub-band in the target working frequency band within the target time period according to the historical load of the sub-band can be based on a prediction model. The training method of the prediction model can be but is not limited to a gradient descent algorithm and a neural network algorithm. According to this implementation, the load of the target sub-band with the minimum load can be migrated to other sub-bands for transmission, and then the target sub-band is turned off, thereby realizing power reduction simulation. This can have little or no impact on the service transmission of the communication unit. It should be noted that in addition to turning off the sub-band with the minimum load, one or more other sub-bands with smaller loads can also be selected to be turned off.

在另一种可能的实现方式中,在目标时段将目标子频段进行仿真载波关断之前,该功率控制方法还包括:在目标时段将目标子频段进行仿真载波关断;获取目标工作频段的服务质量指标;当目标工作频段的服务质量指标满足预设服务质量要求时,确定目标子频段满足关断条件;当目标工作频段的服务质量指标不满足预设服务质量要求时,确定目标子频段不满足关断条件。这样通过仿真能够识别出各通信单元中能够关断的子频段和不能关断的子频段,由此能够在降功率时保障业务服务质量。In another possible implementation, before the target sub-frequency band is simulated and the carrier is turned off during the target period, the power control method also includes: the target sub-frequency band is simulated and the carrier is turned off during the target period; the service quality index of the target working frequency band is obtained; when the service quality index of the target working frequency band meets the preset service quality requirement, it is determined that the target sub-frequency band meets the turn-off condition; when the service quality index of the target working frequency band does not meet the preset service quality requirement, it is determined that the target sub-frequency band does not meet the turn-off condition. In this way, the sub-frequency bands that can be turned off and the sub-frequency bands that cannot be turned off in each communication unit can be identified through simulation, thereby ensuring the service quality of the business when reducing power.

在另一种可能的实现方式中,将每个通信单元在目标时段的数据传输功率进行降功率仿真包括:在通信单元配置有多个用于数据传输的波束的情况下,从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置。其中,波束的功率控制可以是相互独立的。这样能够降低一个或多个波束的功率,并且能够保障业务服务质量。In another possible implementation, the power reduction simulation of the data transmission power of each communication unit in the target time period includes: when the communication unit is configured with multiple beams for data transmission, selecting one beam from the multiple beams in turn as the target beam, and reducing the data transmission power of the target beam in the target time period from a preset first power to a second power; obtaining the service quality index of the target beam; when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time period according to the second power. The power control of the beams can be independent of each other. This can reduce the power of one or more beams and ensure the quality of business service.

在另一种可能的实现方式中,将每个通信单元在目标时段的数据传输功率进行降功率仿真包括:将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。这样能够降低通信单元的功率放大器的功率,并且能够保障业务服务质量。In another possible implementation, the power reduction simulation of the data transmission power of each communication unit in the target time period includes: reducing the average power of the power amplifier of the communication unit in the target time period from the preset third power to the fourth power; obtaining the service quality index of all working frequency bands of the communication unit; when the service quality index of all working frequency bands of the communication unit meets the preset service quality requirements, configuring the power of the power amplifier of the communication unit in the target time period according to the fourth power. In this way, the power of the power amplifier of the communication unit can be reduced, and the service quality of the business can be guaranteed.

在另一种可能的实现方式中,将每个通信单元在目标时段的数据传输功率进行降功率仿真包括:在通信单元配置有多个工作频段,每个工作频段包括多个子频段且通信单元配置有多个波束的情况下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段,目标子频段和其他子频段属于同一个工作频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断;从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置;将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。依此实施,载波关断仿真对服务质量影响最小,降低波束功率对服务质量影响次之,将通信单元的功率放大器进行降功率仿真对服务质量影响最大。按照以上顺序实施,能够将降功率过程对服务质量影响降至最低。In another possible implementation, the power reduction simulation of the data transmission power of each communication unit in the target time period includes: when the communication unit is configured with multiple working frequency bands, each working frequency band includes multiple sub-frequency bands and the communication unit is configured with multiple beams, one working frequency band is selected from the multiple working frequency bands in turn as the target working frequency band, and the load of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load of the sub-frequency band; the sub-frequency band with the smallest predicted load is used as the target sub-frequency band; all business loads of the target sub-frequency band in the target time period are transferred to other sub-frequency bands, and the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; when the target sub-frequency band meets the shutdown condition, the target sub-frequency band is shut down in the target time period. Simulate carrier shutdown; select one beam from multiple beams in turn as the target beam, and reduce the data transmission power of the target beam in the target time period from the preset first power to the second power; obtain the service quality index of the target beam; when the service quality index of the target beam meets the preset service quality requirements, configure the data transmission power of the target beam in the target time period according to the second power; reduce the average power of the power amplifier of the communication unit in the target time period from the preset third power to the fourth power; obtain the service quality index of all working frequency bands of the communication unit; when the service quality index of all working frequency bands of the communication unit meets the preset service quality requirements, configure the power of the power amplifier of the communication unit in the target time period according to the fourth power. According to this implementation, the carrier shutdown simulation has the least impact on the service quality, the reduction of beam power has the second greatest impact on the service quality, and the power reduction simulation of the power amplifier of the communication unit has the greatest impact on the service quality. According to the above order of implementation, the impact of the power reduction process on the service quality can be minimized.

第二方面提供一种功率控制装置,包括:A second aspect provides a power control device, including:

处理单元,用于获取第一电场强度值,第一电场强度值是当站点的多个通信单元配置预设数据传输功率时在测量点对站点测量得到的电场强度值;A processing unit, configured to obtain a first electric field strength value, where the first electric field strength value is an electric field strength value measured at a measuring point for a site when multiple communication units of the site are configured with a preset data transmission power;

处理单元,用于当第二电场强度值大于或等于预设电场强度时,将多个通信单元在目标时段的数据传输功率进行降功率仿真,多个通信单元包括不同通信制式的通信单元;根据降低后的数据传输功率计算测量点的第二电场强度值;当第二电场强度值小于预设电场强度时输出命令;A processing unit, configured to, when the second electric field strength value is greater than or equal to a preset electric field strength, simulate power reduction of data transmission power of multiple communication units in a target period, wherein the multiple communication units include communication units of different communication formats; calculate the second electric field strength value of the measurement point according to the reduced data transmission power; and output a command when the second electric field strength value is less than the preset electric field strength;

通信单元,用于根据命令在目标时段内执行降功率操作。The communication unit is used to perform a power reduction operation within a target period according to a command.

在一种可能的实现方式中,处理单元具体用于根据通信单元的历史负载量对每个通信单元在目标时段的负载量进行预测;根据预测结果确定每个通信单元的优先级,每个通信单元在目标时段的预测结果与通信单元的优先级负相关;按照从高到低的优先级顺序,将每个通信单元在目标时段的数据传输功率进行降功率仿真。In one possible implementation, the processing unit is specifically used to predict the load of each communication unit in a target time period based on the historical load of the communication unit; determine the priority of each communication unit based on the prediction result, and the prediction result of each communication unit in the target time period is negatively correlated with the priority of the communication unit; and perform power reduction simulation on the data transmission power of each communication unit in the target time period in order of priority from high to low.

在另一种可能的实现方式中,处理单元具体用于在通信单元配置有多个工作频段,每个工作频段包括多个子频段的情况下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断。目标子频段和其他子频段属于同一个工作频段。In another possible implementation, the processing unit is specifically used to select one working frequency band from the multiple working frequency bands as the target working frequency band in turn when the communication unit is configured with multiple working frequency bands, each working frequency band including multiple sub-frequency bands, and predict the load of each sub-frequency band in the target working frequency band during the target period according to the historical load of the sub-frequency band; use the sub-frequency band with the smallest predicted load as the target sub-frequency band; transfer all business loads of the target sub-frequency band during the target period to other sub-frequency bands; when the target sub-frequency band meets the shutdown condition, simulate the carrier shutdown of the target sub-frequency band during the target period. The target sub-frequency band and other sub-frequency bands belong to the same working frequency band.

在另一种可能的实现方式中,处理单元还用于在目标时段将目标子频段进行仿真载波关断之前,在目标时段将目标子频段进行仿真载波关断;获取目标工作频段的服务质量指标;当目标工作频段的服务质量指标满足预设服务质量要求时,确定目标子频段满足关断条件;当目标工作频段的服务质量指标不满足预设服务质量要求时,确定目标子频段不满足关断条件。In another possible implementation, the processing unit is also used to shut down the target sub-frequency band for simulated carrier switching in the target time period before shutting down the target sub-frequency band for simulated carrier switching in the target time period; obtain the service quality indicator of the target working frequency band; when the service quality indicator of the target working frequency band meets the preset service quality requirement, determine that the target sub-frequency band meets the shutdown condition; when the service quality indicator of the target working frequency band does not meet the preset service quality requirement, determine that the target sub-frequency band does not meet the shutdown condition.

在另一种可能的实现方式中,处理单元具体用于在通信单元配置有多个用于数据传输的波束的情况下,从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置。In another possible implementation, the processing unit is specifically used to, when the communication unit is configured with multiple beams for data transmission, select one beam from the multiple beams in turn as the target beam, reduce the data transmission power of the target beam in a target time period from a preset first power to a second power; obtain a service quality indicator of the target beam; when the service quality indicator of the target beam meets the preset service quality requirement, configure the data transmission power of the target beam in the target time period according to the second power.

在另一种可能的实现方式中,处理单元具体用于将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。In another possible implementation, the processing unit is specifically used to reduce the average power of the power amplifier of the communication unit during the target time period from a preset third power to a fourth power; obtain the service quality indicators of all working frequency bands of the communication unit; when the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirements, configure the power of the power amplifier of the communication unit during the target time period according to the fourth power.

在另一种可能的实现方式中,处理单元具体用于在通信单元配置有多个工作频段,每个工作频段包括多个子频段且通信单元配置有多个波束的情况下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段,目标子频段和其他子频段属于同一个工作频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断;从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置;将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。In another possible implementation, the processing unit is specifically used to select one working frequency band from the multiple working frequency bands in turn as the target working frequency band when the communication unit is configured with multiple working frequency bands, each working frequency band includes multiple sub-frequency bands and the communication unit is configured with multiple beams, and predict the load of each sub-frequency band in the target working frequency band during the target time period according to the historical load of the sub-frequency band; use the sub-frequency band with the smallest predicted load as the target sub-frequency band; transfer all business loads of the target sub-frequency band during the target time period to other sub-frequency bands, and the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; when the target sub-frequency band meets the shutdown condition, simulate the carrier shutdown of the target sub-frequency band during the target time period; and select the target sub-frequency band from multiple beams. A beam is selected from the beams in turn as a target beam, and the data transmission power of the target beam in a target time period is reduced from a preset first power to a second power; a service quality indicator of the target beam is obtained; when the service quality indicator of the target beam meets the preset service quality requirement, the data transmission power of the target beam in the target time period is configured according to the second power; the average power of the power amplifier of the communication unit in the target time period is reduced from a preset third power to a fourth power; the service quality indicators of all working frequency bands of the communication unit are obtained; when the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirement, the power of the power amplifier of the communication unit in the target time period is configured according to the fourth power.

对于本申请第二方面提供的装置的组成模块执行第二方面以及第二方面的各种可能实现方式的具体实现步骤,以及每种实现方式所带来的有益效果,均可以参考第一方面以及第一方面中各种可能的实现方式中的描述,此处不再一一赘述。For the specific implementation steps of the second aspect and various possible implementation methods of the second aspect executed by the constituent modules of the device provided in the second aspect of this application, as well as the beneficial effects brought about by each implementation method, reference can be made to the description in the first aspect and various possible implementation methods in the first aspect, and no further details will be given here.

第三方面提供一种计算机可读存储介质,所述计算机可读存储介质中存储有计算机程序,其特征在于,当其在计算机上运行时,使得计算机执行第一方面或第一方面任意一种可能的实现方式中的功率控制方法。The third aspect provides a computer-readable storage medium, in which a computer program is stored, characterized in that when the computer-readable storage medium is run on a computer, the computer is enabled to execute the power control method in the first aspect or any possible implementation of the first aspect.

第四方面提供一种计算机程序,当其在计算机上运行时,使得计算机执行第一方面或第一方面任意一种可能的实现方式中的功率控制方法。A fourth aspect provides a computer program, which, when executed on a computer, enables the computer to execute the power control method in the first aspect or any possible implementation manner of the first aspect.

第五方面提供一种芯片系统,该芯片系统包括处理器,用于支持站点实现上述方面中涉及的功能,例如,发送或处理上述功率控制方法中涉及的数据和/或信息。在一种可能的设计中,所述芯片系统还包括存储器,所述存储器用于保存站点必要的程序指令和数据。该芯片系统,可以由芯片构成,也可以包括芯片和其他分立器件。A fifth aspect provides a chip system, which includes a processor for supporting a site to implement the functions involved in the above aspects, for example, sending or processing data and/or information involved in the above power control method. In a possible design, the chip system also includes a memory, which is used to store program instructions and data necessary for the site. The chip system can be composed of a chip, or it can include a chip and other discrete devices.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本申请中站点的一个示意图;FIG1 is a schematic diagram of a site in this application;

图2为本申请中功率控制方法的一个流程图;FIG2 is a flow chart of a power control method in the present application;

图3为本申请中功率控制装置的一个结构示意图。FIG3 is a schematic diagram of the structure of a power control device in the present application.

具体实施方式DETAILED DESCRIPTION

本申请的功率控制方法可以应用于无线通信系统的站点。站点可以包括处理单元和通信单元。处理单元和通信单元通过有线或无线连接。当站点包括多个通信单元时,多个通信单元可以包括不同通信制式的通信单元,例如2G网络的射频拉远单元(remote radiounit,RRU)、3G网络的RRU、4G网络的RRU或5G网络的有源天线处理单元(active antennaunit,AAU)。处理单元的数量可以是一个或多个,每种通信制式的通信单元的数量可以是一个或多个。可以理解的是,每个通信单元还可以包括天线单元,天线单元可以包括一个或多个天线。The power control method of the present application can be applied to a site of a wireless communication system. The site may include a processing unit and a communication unit. The processing unit and the communication unit are connected by wire or wirelessly. When the site includes multiple communication units, the multiple communication units may include communication units of different communication formats, such as a remote radio unit (RRU) of a 2G network, an RRU of a 3G network, an RRU of a 4G network, or an active antenna unit (AAU) of a 5G network. The number of processing units may be one or more, and the number of communication units of each communication format may be one or more. It is understandable that each communication unit may also include an antenna unit, and the antenna unit may include one or more antennas.

参阅图1,一种站点可以包括处理单元10、通信单元20和通信单元30。处理单元10可以是计算设备或计算设备内的处理器。通信单元20可以为4G网络的RRU,通信单元30可以为5G网络的AAU。Referring to Fig. 1, a site may include a processing unit 10, a communication unit 20, and a communication unit 30. The processing unit 10 may be a computing device or a processor in a computing device. The communication unit 20 may be an RRU of a 4G network, and the communication unit 30 may be an AAU of a 5G network.

以下将通信单元20的数据传输功率记为P1,通信单元30的数据传输功率记为P2,数据传输功率可以是天线发射功率。Hereinafter, the data transmission power of the communication unit 20 is recorded as P 1 , and the data transmission power of the communication unit 30 is recorded as P 2 . The data transmission power may be the antenna transmission power.

可选的,根据第一公式计算通信单元20的功率密度S1Optionally, the power density S 1 of the communication unit 20 is calculated according to the first formula.

第一公式为:S1=P1×G1/4πR1 2The first formula is: S 1 =P 1 ×G 1 /4πR 1 2 ;

其中,G1为通信单元20的功率增益,单位为dBi。R1为测量点到通信单元20的天线的距离。Wherein, G1 is the power gain of the communication unit 20, in dBi. R1 is the distance from the measurement point to the antenna of the communication unit 20.

可选的,根据第二公式计算通信单元30的功率密度S2Optionally, the power density S 2 of the communication unit 30 is calculated according to the second formula.

第二公式为:S2=P2×G2/4πR2 2 The second formula is: S 2 =P 2 ×G 2 /4πR 2 2

其中,G2为通信单元30的功率增益,单位为dBi。R2为测量点到通信单元30的天线的距离。通信单元20的天线和通信单元30的天线可以部署在一个天线塔,或者部署在相近位置,此时R1与R2相似或相等。Wherein, G2 is the power gain of the communication unit 30, in dBi. R2 is the distance from the measurement point to the antenna of the communication unit 30. The antenna of the communication unit 20 and the antenna of the communication unit 30 can be deployed on the same antenna tower or at a close location, in which case R1 is similar to or equal to R2 .

可选的,根据第三公式计算站点的功率密度S′。Optionally, the power density S′ of the site is calculated according to the third formula.

第三公式为:S′=S1+S2The third formula is: S′=S 1 +S 2 .

可选的,功率密度S与电场强度E满足第四公式:Optionally, the power density S and the electric field strength E satisfy the fourth formula:

第四公式为:S=E2/377。The fourth formula is: S=E 2 /377.

按照以上公式,获取测量点到天线的距离、功率增益、天线发射功率之后就可以计算得到各通信单元的电场强度值。按照以上公式和电磁辐射标准也可以计算出站点的最大允许功率,在此基础上对各通信单元的功率进行分配。According to the above formula, after obtaining the distance from the measurement point to the antenna, the power gain, and the antenna transmission power, the electric field strength value of each communication unit can be calculated. According to the above formula and the electromagnetic radiation standard, the maximum allowable power of the site can also be calculated, and the power of each communication unit can be allocated on this basis.

对于目前的功率分配方法存在功率分配不合理,难以充分利用各通信设备的功率的问题。本申请公开了一种功率控制方法,能够自动调节站点内各通信单元的功率,从而更加有效地利用通信单元的功率。下面进行详细介绍,参阅图2,本申请中功率控制方法的一个实施例包括:The current power allocation method has the problem of unreasonable power allocation and difficulty in fully utilizing the power of each communication device. The present application discloses a power control method, which can automatically adjust the power of each communication unit in a site, so as to more effectively utilize the power of the communication unit. The following is a detailed description. Referring to FIG. 2, an embodiment of the power control method in the present application includes:

步骤201、获取第一电场强度值。Step 201: Obtain a first electric field strength value.

本实施例中,第一电场强度值是当站点的多个通信单元配置预设数据传输功率时,在测量点对站点测量得到的电场强度值。多个通信单元包括不同通信制式的通信单元。例如,站点可以包括一个或多个2G网络的RRU、一个或多个3G网络的RRU、一个或多个4G网络的RRU以及一个或多个5G网络的AAU,还可以包括5G以后的通信单元。In this embodiment, the first electric field strength value is the electric field strength value measured at the site at the measurement point when the multiple communication units of the site are configured with a preset data transmission power. The multiple communication units include communication units of different communication standards. For example, the site may include one or more RRUs of a 2G network, one or more RRUs of a 3G network, one or more RRUs of a 4G network, and one or more AAUs of a 5G network, and may also include communication units after 5G.

每个通信单元配置有独立的预设数据传输功率。例如,4G网络的RRU的预设数据传输功率与5G网络的AAU的预设数据传输功率不同。数据传输功率是指一个时段内传输业务数据的平均功率,该时段的时长可以根据实际情况进行设置,本申请不作限定。Each communication unit is configured with an independent preset data transmission power. For example, the preset data transmission power of the RRU of the 4G network is different from the preset data transmission power of the AAU of the 5G network. The data transmission power refers to the average power of transmitting service data in a period of time. The duration of the period can be set according to actual conditions and is not limited in this application.

步骤202、当第一电场强度值大于或等于预设电场强度时,将多个通信单元在目标时段的数据传输功率进行降功率仿真。Step 202: When the first electric field strength value is greater than or equal to the preset electric field strength, a power reduction simulation is performed on the data transmission power of the plurality of communication units in the target time period.

当第一电场强度值大于或等于预设电场强度时,表明站点的电场强度值大于电磁场辐射标准,也表明站点的数据传输功率过大,需要降低通信单元的数据传输功率。当第一电场强度值小于预设电场强度时,表明站点的电场强度值小于电磁场辐射标准。When the first electric field strength value is greater than or equal to the preset electric field strength, it indicates that the electric field strength value of the site is greater than the electromagnetic field radiation standard, and also indicates that the data transmission power of the site is too large, and the data transmission power of the communication unit needs to be reduced. When the first electric field strength value is less than the preset electric field strength, it indicates that the electric field strength value of the site is less than the electromagnetic field radiation standard.

站点的数据传输功率可以是全部通信单元的数据传输功率的算数和,或者站点的数据传输功率可以是全部通信单元的数据传输功率的加权和。每个通信单元的数据传输功率的权值可以根据实际情况进行设置,本申请不作限定。The data transmission power of the site may be the arithmetic sum of the data transmission powers of all communication units, or the data transmission power of the site may be the weighted sum of the data transmission powers of all communication units. The weight of the data transmission power of each communication unit may be set according to actual conditions, and this application does not limit this.

步骤203、根据降低后的数据传输功率计算第二电场强度值。Step 203: Calculate a second electric field strength value according to the reduced data transmission power.

第二电场强度值是当站点的多个通信单元按照降低后的数据传输功率配置时,在测量点对站点测量得到的电场强度值。The second electric field strength value is an electric field strength value measured at the site at the measurement point when multiple communication units of the site are configured according to the reduced data transmission power.

可选的,将多个通信单元的数据传输功率降低后,根据每个通信单元降低后的数据传输功率计算每个通信单元的电场强度值,再根据每个通信单元的电场强度值计算第二电场强度值。另一可选的,将多个通信单元的数据传输功率降低后,根据每个通信单元降低后的数据传输功率计算站点的数据传输功率,再根据该站点的数据传输功率计算第二电场强度值。Optionally, after the data transmission power of multiple communication units is reduced, the electric field strength value of each communication unit is calculated according to the reduced data transmission power of each communication unit, and then the second electric field strength value is calculated according to the electric field strength value of each communication unit. Alternatively, after the data transmission power of multiple communication units is reduced, the data transmission power of the site is calculated according to the reduced data transmission power of each communication unit, and then the second electric field strength value is calculated according to the data transmission power of the site.

步骤204、当第二电场强度值小于或等于预设电场强度时输出命令。Step 204: Output a command when the second electric field strength value is less than or equal to the preset electric field strength.

命令可以是人机语言(man-machine language,MML)命令。当第二电场强度值大于预设电场强度时,表明站点电场强度过大,不能按照当前数据传输功率进行降功率仿真。具体可以进一步降低数据传输功率,直至根据降低后的数据传输功率计算得到的电场强度值小于或等于预设电场强度时,输出命令。The command may be a man-machine language (MML) command. When the second electric field strength value is greater than the preset electric field strength, it indicates that the electric field strength of the site is too large and the power reduction simulation cannot be performed according to the current data transmission power. Specifically, the data transmission power may be further reduced until the electric field strength value calculated according to the reduced data transmission power is less than or equal to the preset electric field strength, and then the command is output.

步骤205、根据命令在目标时段内执行降功率操作。Step 205: Perform a power reduction operation within the target time period according to the command.

通信单元根据命令在目标时段内执行降功率操作,以及按照降低后的数据传输功率进行数据传输。该命令用于使得降功率操作与降功率仿真过程一致。The communication unit performs a power reduction operation within the target period according to the command, and performs data transmission according to the reduced data transmission power. The command is used to make the power reduction operation consistent with the power reduction simulation process.

本实施例中,在站点的数据传输功率过大的情况下,将多个通信单元在目标时段的数据传输功率进行降功率仿真。如果在仿真条件下站点的电场强度不超过预设电场强度,那么按照降低后的数据传输功率进行配置后,能够保证在目标时段内按照降低后的数据传输功率进行数据传输。这样能够自动调节各通信单元的功率且使得站点的电场强度不超过预设电场强度,从而保证其电磁辐射强度在安全范围以内。In this embodiment, when the data transmission power of a site is too large, the data transmission power of multiple communication units in the target time period is reduced for simulation. If the electric field strength of the site does not exceed the preset electric field strength under the simulation condition, then after configuration according to the reduced data transmission power, data transmission can be ensured according to the reduced data transmission power during the target time period. In this way, the power of each communication unit can be automatically adjusted and the electric field strength of the site does not exceed the preset electric field strength, thereby ensuring that its electromagnetic radiation intensity is within a safe range.

在一个可选实施例中,将多个通信单元在目标时段的数据传输功率进行降功率仿真包括:In an optional embodiment, performing power reduction simulation on the data transmission power of the plurality of communication units in the target time period includes:

根据通信单元的历史负载量对每个通信单元在目标时段的负载量进行预测;根据预测结果确定每个通信单元的优先级;按照从高到低的优先级顺序,将每个通信单元在目标时段的数据传输功率进行降功率仿真。The load of each communication unit in the target period is predicted according to the historical load of the communication unit; the priority of each communication unit is determined according to the prediction result; and the data transmission power of each communication unit in the target period is reduced for simulation in descending order of priority.

本实施例中,可以将目标时段之前的时间划分为多个时段,然后根据各时段的历史负载量训练预测模型,使用该预测模型来预测目标时段的负载量。每个时段的时长与目标时段的时长相等,目标时段的单位可以是分钟,小时,具体可以根据实际情况进行设置,本申请不作限定。训练方法可以是梯度下降算法,神经网络算法等。In this embodiment, the time before the target period can be divided into multiple periods, and then the prediction model is trained according to the historical load of each period, and the prediction model is used to predict the load of the target period. The duration of each period is equal to the duration of the target period, and the unit of the target period can be minutes or hours, which can be set according to actual conditions and is not limited in this application. The training method can be a gradient descent algorithm, a neural network algorithm, etc.

每个通信单元在目标时段的预测结果与通信单元的优先级负相关,即负载量越低的通信单元优先级越高,负载量越高的通信单元优先级越低。优先对负载量低的通信单元进行降功率仿真,这样负载量高的通信单元可以使用更多功率,就实现了根据负载量来分配通信单元的功率,从而充分利用各通信单元的功率。并且,该方法对站点的业务传输的影响很小甚至没有影响,因此对用户体验不产生明显影响甚至不影响用户体验。The prediction result of each communication unit in the target time period is negatively correlated with the priority of the communication unit, that is, the lower the load, the higher the priority of the communication unit, and the higher the load, the lower the priority of the communication unit. Prioritize the power reduction simulation for the communication unit with low load, so that the communication unit with high load can use more power, so as to realize the power allocation of the communication unit according to the load, so as to make full use of the power of each communication unit. In addition, this method has little or no impact on the service transmission of the site, so it has no obvious impact on the user experience or even no impact on the user experience.

需要说明的是,对于多个通信单元进行降功率仿真的顺序不限于从高到低,也可以是从低到高或者随机次序,本申请不作限定。It should be noted that the order of performing power reduction simulation on multiple communication units is not limited to from high to low, and can also be from low to high or in a random order, and this application does not limit this.

在本申请的实施例中,将每个通信单元在目标时段的数据传输功率进行降功率仿真可以通过多种方法实现:In the embodiment of the present application, the power reduction simulation of the data transmission power of each communication unit in the target period can be implemented by various methods:

第一种方法为载波关断,具体可参阅以下实施例:The first method is to shut down the carrier, which can be specifically referred to in the following embodiments:

在一个可选实施例中,在通信单元配置有多个工作频段且每个工作频段包括多个子频段的条件下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断。In an optional embodiment, under the condition that the communication unit is configured with multiple working frequency bands and each working frequency band includes multiple sub-frequency bands, one working frequency band is selected from the multiple working frequency bands in turn as the target working frequency band, and the load of each sub-frequency band in the target working frequency band within the target time period is predicted according to the historical load of the sub-frequency band; the sub-frequency band with the smallest predicted load is used as the target sub-frequency band; all business loads of the target sub-frequency band in the target time period are transferred to other sub-frequency bands; when the target sub-frequency band meets the shutdown condition, the target sub-frequency band is subjected to simulated carrier shutdown during the target time period.

其中,子频段也称为子载波。目标子频段和其他子频段属于同一个工作频段。将目标子频段的业务负载迁移的过程中,可以为每个子频段设置一个负载阈值,当子频段的负载低于该负载阈值时,可以向该子频段迁移业务负载。当子频段的负载达到或超过该负载阈值时,停止向该子频段迁移业务负载。The sub-band is also called a subcarrier. The target sub-band and other sub-bands belong to the same working band. In the process of migrating the service load of the target sub-band, a load threshold can be set for each sub-band. When the load of the sub-band is lower than the load threshold, the service load can be migrated to the sub-band. When the load of the sub-band reaches or exceeds the load threshold, the migration of the service load to the sub-band is stopped.

可选的,迁移子频段可以是按照负载量从低到高的次序进行设置,迁移子频段是将业务负载迁移到达的子频段。例如,一个工作频段包括5个子频段,5个子频段分别为f1,f2,f3,f4,f5。子频段的负载量分别为D1,D2,D3,D4,D5,且D1<D2<D3<D4<D5。按照本实施例的方法可以确定f1为目标子频段,将f1的业务负载迁移到其他子频段,迁移次序为f2,f3,f4,f5。在将业务迁移到下一个子频段之前,需要使得前一个子频段的业务负载达到或超过负载阈值。如果将全部业务负载迁移到f2且f2的负载量不超过负载阈值,那么f1就不将业务负载迁移到f3,f4,f5。如果需要将业务负载迁移到f3,那么要先将业务负载迁移至f2,使得f2的负载量达到或超过负载阈值。Optionally, the migration sub-band can be set in order from low to high load, and the migration sub-band is the sub-band to which the service load is migrated. For example, a working frequency band includes 5 sub-bands, and the 5 sub-bands are f1, f2, f3, f4, and f5. The load amounts of the sub-bands are D1, D2, D3, D4, and D5, and D1<D2<D3<D4<D5. According to the method of this embodiment, f1 can be determined as the target sub-band, and the service load of f1 can be migrated to other sub-bands, and the migration order is f2, f3, f4, and f5. Before migrating the service to the next sub-band, it is necessary to make the service load of the previous sub-band reach or exceed the load threshold. If all service loads are migrated to f2 and the load amount of f2 does not exceed the load threshold, then f1 will not migrate the service load to f3, f4, and f5. If the service load needs to be migrated to f3, the service load must first be migrated to f2 so that the load of f2 reaches or exceeds the load threshold.

这样,对于每个工作频段通过业务负载迁移和子频段关断可以降低通信单元的数据传输功率,由此能够对通信单元的业务传输影响很小甚至没有影响。In this way, for each working frequency band, the data transmission power of the communication unit can be reduced by migrating the service load and shutting down the sub-frequency band, thereby having little or no impact on the service transmission of the communication unit.

在另一个可选实施例中,在目标时段将目标子频段进行仿真载波关断之前,该功率控制方法还包括:在目标时段将目标子频段进行仿真载波关断;获取目标工作频段的服务质量指标;当目标工作频段的服务质量指标满足预设服务质量要求时,确定目标子频段满足关断条件;当目标工作频段的服务质量指标不满足预设服务质量要求时,确定目标子频段不满足关断条件。In another optional embodiment, before the target sub-frequency band is shut down for simulated carrier during the target time period, the power control method also includes: shutting down the target sub-frequency band for simulated carrier during the target time period; obtaining a service quality indicator of the target working frequency band; when the service quality indicator of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets the shutdown condition; when the service quality indicator of the target working frequency band does not meet the preset service quality requirement, determining that the target sub-frequency band does not meet the shutdown condition.

服务质量指标可以包括吞吐量、传输时延和丢包率中的一项或多项。当服务质量指标包括吞吐量、传输时延和丢包率时,需要同时满足吞吐量大于或等于预设吞吐量,传输时延小于或等于预设时延或者丢包率小于或等于预设丢包率等多个条件,才表明目标工作频段的服务质量指标满足预设服务质量要求,否则目标工作频段的服务质量指标不满足预设服务质量要求。The service quality indicator may include one or more of throughput, transmission delay and packet loss rate. When the service quality indicator includes throughput, transmission delay and packet loss rate, it is necessary to simultaneously meet multiple conditions such as throughput greater than or equal to the preset throughput, transmission delay less than or equal to the preset delay or packet loss rate less than or equal to the preset packet loss rate, to indicate that the service quality indicator of the target working frequency band meets the preset service quality requirement, otherwise the service quality indicator of the target working frequency band does not meet the preset service quality requirement.

本实施例中,通过仿真能够识别出各通信单元中能够关断的子频段和不能关断的子频段,由此能够在降功率时保障业务服务质量。In this embodiment, the sub-frequency bands that can be turned off and the sub-frequency bands that cannot be turned off in each communication unit can be identified through simulation, thereby ensuring the service quality when reducing power.

第二种方法为波束功率控制,具体可参阅以下实施例:The second method is beam power control, which can be specifically referred to in the following embodiments:

在另一个可选实施例中,在通信单元配置有多个用于数据传输的波束的情况下,从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置。In another optional embodiment, when the communication unit is configured with multiple beams for data transmission, one beam is selected from the multiple beams in turn as the target beam, and the data transmission power of the target beam in the target time period is reduced from a preset first power to a second power; the service quality indicator of the target beam is obtained; when the service quality indicator of the target beam meets the preset service quality requirement, the data transmission power of the target beam in the target time period is configured according to the second power.

其中,第二功率小于第一功率。第一功率和第二功率的具体取值可以根据实际情况进行设置,本申请不作限定。The second power is less than the first power. The specific values of the first power and the second power can be set according to actual conditions, and this application does not limit them.

本实施例中,可以单独降低一个波束的数据传输功率,从而实现细粒度的功率控制。通过降低一个或多个波束的功率,能够使得站点的电场强度符合安全标准并且保障业务服务质量。In this embodiment, the data transmission power of a beam can be reduced individually, thereby achieving fine-grained power control. By reducing the power of one or more beams, the electric field strength of the site can meet safety standards and ensure the quality of service.

第三种方法为降低功率放大器的功率,具体可参阅以下实施例:The third method is to reduce the power of the power amplifier, which can be specifically referred to in the following embodiments:

在另一个可选实施例中,将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。In another optional embodiment, the average power of the power amplifier of the communication unit during the target time period is reduced from a preset third power to a fourth power; the service quality indicators of all working frequency bands of the communication unit are obtained; when the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirements, the power of the power amplifier of the communication unit during the target time period is configured according to the fourth power.

其中,第四功率小于第三功率。第三功率和第四功率的具体取值可以根据实际情况进行设置,本申请不作限定。The fourth power is less than the third power. The specific values of the third power and the fourth power can be set according to actual conditions, and this application does not limit them.

本实施例中,可以降低通信单元的功率放大器的功率,从而实现粗粒度的功率控制,这样能够使得站点的电场强度符合安全标准并且能够保障业务服务质量。In this embodiment, the power of the power amplifier of the communication unit can be reduced, thereby achieving coarse-grained power control, which can make the electric field strength of the site meet the safety standards and ensure the service quality of the business.

另外,将每个通信单元在目标时段的数据传输功率进行降功率仿真还可以按照先后顺序执行以上降功率仿真方法的两种或三种。例如,对于3G通信单元,可以先执行第一种方法再执行第三种方法;或者,先执行第三种方法再执行第一种方法。对于4G通信单元或5G通信单元,可以先执行第一种方法,再执行第二种方法;或者,先执行第一种方法再执行第三种方法;或者,先执行第一种方法,再执行第二种方法,然后执行第三种方法。In addition, the data transmission power of each communication unit in the target time period can be reduced by simulating the power reduction, and two or three of the above power reduction simulation methods can be performed in sequence. For example, for a 3G communication unit, the first method can be performed first and then the third method; or, the third method can be performed first and then the first method. For a 4G communication unit or a 5G communication unit, the first method can be performed first and then the second method; or, the first method can be performed first and then the third method; or, the first method can be performed first, then the second method, and then the third method.

需要说明的是,对于多个降功率仿真方法的执行顺序不限于以上举例,还可以按照其他顺序执行,本申请不作限定。It should be noted that the execution order of the multiple power reduction simulation methods is not limited to the above examples, and can also be executed in other orders, which is not limited in this application.

对于按照第一种方法,第二种方法,第三种方法的先后顺序进行降功率仿真的过程,下面以一个实施例进行详细说明:The process of performing power reduction simulation in the order of the first method, the second method, and the third method is described in detail below with an embodiment:

在一个可选实施例中,将每个通信单元在目标时段的数据传输功率进行降功率仿真包括:In an optional embodiment, performing power reduction simulation on the data transmission power of each communication unit in the target time period includes:

在通信单元配置有多个工作频段,每个工作频段包括多个子频段且通信单元配置有多个波束的情况下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段,目标子频段和其他子频段属于同一个工作频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断;In the case where the communication unit is configured with multiple working frequency bands, each working frequency band includes multiple sub-frequency bands and the communication unit is configured with multiple beams, one working frequency band is selected from the multiple working frequency bands in turn as the target working frequency band, and the load of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load of the sub-frequency band; the sub-frequency band with the smallest predicted load is used as the target sub-frequency band; all business loads of the target sub-frequency band in the target time period are transferred to other sub-frequency bands, and the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; when the target sub-frequency band meets the shutdown condition, the target sub-frequency band is subjected to simulated carrier shutdown in the target time period;

从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置;Selecting one beam from the multiple beams in turn as a target beam, reducing the data transmission power of the target beam in a target time period from a preset first power to a second power; obtaining a service quality indicator of the target beam; when the service quality indicator of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target time period according to the second power;

将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。Reduce the average power of the power amplifier of the communication unit during the target time period from a preset third power to a fourth power; obtain the service quality indicators of all working frequency bands of the communication unit; when the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirements, configure the power of the power amplifier of the communication unit during the target time period according to the fourth power.

本实施例中,对于每个工作频段,将其中负载量最低的子频段的业务负载迁移到其他子频段后,然后将负载量最低的子频段进行载波关断仿真。将部分或全部工作频段中负载量最低的子频段进行关断后,将部分或全部波束的数据传输功率进行降功率仿真,然后将通信单元的功率放大器进行降功率仿真。这样能够在降低功率的同时保障通信设备传输业务的服务质量。In this embodiment, for each working frequency band, after the service load of the sub-frequency band with the lowest load is migrated to other sub-frequency bands, the sub-frequency band with the lowest load is then subjected to carrier shutdown simulation. After the sub-frequency band with the lowest load in some or all working frequency bands is shut down, the data transmission power of some or all beams is simulated to be reduced, and then the power amplifier of the communication unit is simulated to be reduced. In this way, the service quality of the communication equipment transmission service can be guaranteed while reducing the power.

需要说明的是,虽然通信单元的全部工作频段的服务质量指标满足预设服务质量要求,但是在降低功率的过程中对业务的服务质量可能有影响。其中,载波关断仿真对服务质量影响最小,降低波束功率对服务质量影响次之,将通信单元的功率放大器进行降功率仿真对服务质量影响最大。按照以上顺序实施,能够将降功率过程对服务质量影响降至最低。It should be noted that although the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirements, the service quality of the business may be affected during the power reduction process. Among them, the carrier shutdown simulation has the least impact on the service quality, the beam power reduction has the second greatest impact on the service quality, and the power reduction simulation of the power amplifier of the communication unit has the greatest impact on the service quality. Implementing in the above order can minimize the impact of the power reduction process on the service quality.

本申请提供一种功率控制装置,能够实现图2所示实施例或可选实施例中的功率控制方法。参阅图3,一种功率控制装置300包括:The present application provides a power control device, which can implement the power control method in the embodiment or optional embodiment shown in FIG2. Referring to FIG3, a power control device 300 includes:

处理单元301,用于获取第一电场强度值,第一电场强度值是当站点的多个通信单元配置预设数据传输功率时在测量点对站点测量得到的电场强度值;The processing unit 301 is used to obtain a first electric field strength value, where the first electric field strength value is an electric field strength value measured at a measuring point for a site when multiple communication units of the site are configured with a preset data transmission power;

处理单元301,还用于当第二电场强度值大于或等于预设电场强度时,将多个通信单元在目标时段的数据传输功率进行降功率仿真,多个通信单元包括不同通信制式的通信单元;根据降低后的数据传输功率计算第二电场强度值;当第二电场强度值小于预设电场强度时输出命令;The processing unit 301 is further configured to, when the second electric field strength value is greater than or equal to the preset electric field strength, simulate power reduction of the data transmission power of the multiple communication units in the target period, wherein the multiple communication units include communication units of different communication formats; calculate the second electric field strength value according to the reduced data transmission power; and output a command when the second electric field strength value is less than the preset electric field strength;

通信单元302,用于根据命令在目标时段内执行降功率操作。The communication unit 302 is used to perform a power reduction operation within a target period according to a command.

在一个可选实施例中,处理单元301具体用于根据通信单元的历史负载量对每个通信单元在目标时段的负载量进行预测;根据预测结果确定每个通信单元的优先级,每个通信单元在目标时段的预测结果与通信单元的优先级负相关;按照从高到低的优先级顺序,将每个通信单元在目标时段的数据传输功率进行降功率仿真。In an optional embodiment, the processing unit 301 is specifically used to predict the load of each communication unit in a target time period based on the historical load of the communication unit; determine the priority of each communication unit based on the prediction result, and the prediction result of each communication unit in the target time period is negatively correlated with the priority of the communication unit; and perform power reduction simulation on the data transmission power of each communication unit in the target time period in order of priority from high to low.

在另一个可选实施例中,处理单元301具体用于在通信单元配置有多个工作频段,每个工作频段包括多个子频段的情况下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段,目标子频段和其他子频段属于同一个工作频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断。In another optional embodiment, the processing unit 301 is specifically used to, when the communication unit is configured with multiple working frequency bands, each working frequency band includes multiple sub-frequency bands, select one working frequency band from the multiple working frequency bands in turn as the target working frequency band, predict the load of each sub-frequency band in the target working frequency band during the target time period according to the historical load of the sub-frequency band; use the sub-frequency band with the smallest predicted load as the target sub-frequency band; transfer all business loads of the target sub-frequency band during the target time period to other sub-frequency bands, and the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; when the target sub-frequency band meets the shutdown condition, simulate the carrier shutdown of the target sub-frequency band during the target time period.

在另一个可选实施例中,处理单元301还用于在目标时段将目标子频段进行仿真载波关断之前,在目标时段将目标子频段进行仿真载波关断;获取目标工作频段的服务质量指标;当目标工作频段的服务质量指标满足预设服务质量要求时,确定目标子频段满足关断条件;当目标工作频段的服务质量指标不满足预设服务质量要求时,确定目标子频段不满足关断条件。In another optional embodiment, the processing unit 301 is also used to simulate the carrier shutoff of the target sub-frequency band in the target time period before shutting down the simulated carrier of the target sub-frequency band in the target time period; obtain the service quality indicator of the target working frequency band; when the service quality indicator of the target working frequency band meets the preset service quality requirement, determine that the target sub-frequency band meets the shutdown condition; when the service quality indicator of the target working frequency band does not meet the preset service quality requirement, determine that the target sub-frequency band does not meet the shutdown condition.

在另一个可选实施例中,处理单元301具体用于在通信单元配置有多个用于数据传输的波束的情况下,从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置。In another optional embodiment, the processing unit 301 is specifically used to, when the communication unit is configured with multiple beams for data transmission, select one beam from the multiple beams in turn as the target beam, reduce the data transmission power of the target beam in a target time period from a preset first power to a second power; obtain a service quality indicator of the target beam; when the service quality indicator of the target beam meets the preset service quality requirement, configure the data transmission power of the target beam in the target time period according to the second power.

在另一个可选实施例中,处理单元301具体用于将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。In another optional embodiment, the processing unit 301 is specifically used to reduce the average power of the power amplifier of the communication unit during the target time period from a preset third power to a fourth power; obtain the service quality indicators of all working frequency bands of the communication unit; when the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirements, configure the power of the power amplifier of the communication unit during the target time period according to the fourth power.

在另一个可选实施例中,处理单元301具体用于在通信单元配置有多个工作频段,每个工作频段包括多个子频段且通信单元配置有多个波束的情况下,从多个工作频段中依次选取一个工作频段作为目标工作频段,根据子频段的历史负载量预测目标工作频段中每个子频段在目标时段内的负载量;将预测的负载量最小的子频段作为目标子频段;将目标子频段在目标时段的全部业务负载转移到其他子频段,目标子频段和其他子频段属于同一个工作频段;当目标子频段满足关断条件时,在目标时段将目标子频段进行仿真载波关断;从多个波束中依次选取一个波束作为目标波束,将目标波束在目标时段的数据传输功率从预设的第一功率降低为第二功率;获取目标波束的服务质量指标;当目标波束的服务质量指标满足预设服务质量要求时,将目标波束在目标时段内的数据传输功率按照第二功率进行配置;将通信单元的功率放大器在目标时段的平均功率从预设的第三功率降低为第四功率;获取通信单元的全部工作频段的服务质量指标;当通信单元的全部工作频段的服务质量指标满足预设服务质量要求时,将通信单元的功率放大器在目标时段的功率按照第四功率进行配置。In another optional embodiment, the processing unit 301 is specifically used to select one working frequency band from the multiple working frequency bands in turn as the target working frequency band when the communication unit is configured with multiple working frequency bands, each working frequency band includes multiple sub-frequency bands and the communication unit is configured with multiple beams, and predict the load of each sub-frequency band in the target working frequency band during the target time period according to the historical load of the sub-frequency band; use the sub-frequency band with the smallest predicted load as the target sub-frequency band; transfer all business loads of the target sub-frequency band during the target time period to other sub-frequency bands, and the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; when the target sub-frequency band meets the shutdown condition, simulate the carrier shutdown of the target sub-frequency band during the target time period; and select from multiple Select one beam from the beams in turn as the target beam, reduce the data transmission power of the target beam in the target time period from a preset first power to a second power; obtain the service quality indicator of the target beam; when the service quality indicator of the target beam meets the preset service quality requirement, configure the data transmission power of the target beam in the target time period according to the second power; reduce the average power of the power amplifier of the communication unit in the target time period from a preset third power to a fourth power; obtain the service quality indicators of all working frequency bands of the communication unit; when the service quality indicators of all working frequency bands of the communication unit meet the preset service quality requirement, configure the power of the power amplifier of the communication unit in the target time period according to the fourth power.

需要说明的是,上述装置各模块/单元之间的信息交互、执行过程等内容,由于与本申请方法实施例基于同一构思,其带来的技术效果与本申请方法实施例相同,具体内容可参见本申请前述所示的方法实施例中的叙述,此处不再赘述。It should be noted that the information interaction, execution process, etc. between the modules/units of the above-mentioned device are based on the same concept as the method embodiment of the present application, and the technical effects they bring are the same as those of the method embodiment of the present application. For specific contents, please refer to the description in the method embodiment shown above in the present application, and will not be repeated here.

本申请提供一种计算机可读存储介质,所述计算机可读存储介质中存储有计算机程序,其特征在于,当其在计算机上运行时,使得计算机执行图2所示实施例或可选实施例中的功率控制方法。The present application provides a computer-readable storage medium, in which a computer program is stored. The computer-readable storage medium is characterized in that when the computer-readable storage medium is run on a computer, the computer is enabled to execute the power control method in the embodiment shown in FIG. 2 or in an optional embodiment.

本申请还提供一种包括计算机程序产品,当其在计算机上运行时,使得计算机执行如前述图2所示实施例或可选实施例中的功率控制方法。The present application also provides a computer program product, which, when executed on a computer, enables the computer to execute the power control method in the embodiment or optional embodiment as shown in FIG. 2 .

本申请中的功率控制装置具体可以为站点中的芯片,芯片包括:处理单元和存储单元。处理单元可以是处理器。该处理单元可执行存储单元存储的计算机执行指令,以使站点执行图2所示实施例中的功率控制方法。可选地,所述存储单元为所述芯片内的存储单元,如寄存器、缓存等,所述存储单元还可以是所述站点内的位于所述芯片外部的存储单元,如只读存储器(read-only memory,ROM)或可存储静态信息和指令的其他类型的静态存储设备,随机存取存储器(random access memory,RAM)等。上述任一处提到的处理器,可以是一个通用中央处理器,微处理器,专用集成电路(application specific integratedcircuit,ASIC)或一个或多个用于控制上述第一方面方法的程序执行的集成电路。The power control device in the present application may specifically be a chip in a site, and the chip includes: a processing unit and a storage unit. The processing unit may be a processor. The processing unit may execute computer-executable instructions stored in the storage unit so that the site executes the power control method in the embodiment shown in FIG. 2 . Optionally, the storage unit is a storage unit in the chip, such as a register, a cache, etc., and the storage unit may also be a storage unit located outside the chip in the site, such as a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM), etc. The processor mentioned in any of the above may be a general-purpose central processing unit, a microprocessor, an application specific integrated circuit (ASIC), or one or more integrated circuits for controlling the execution of the program of the method of the first aspect described above.

另外需说明的是,以上所描述的装置实施例只是示意性的,其中所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或者全部模块来实现本实施例方案的目的。另外,本申请提供的装置实施例附图中,模块之间的连接关系表示它们之间具有通信连接,具体可以实现为一条或多条通信总线或信号线。It should also be noted that the device embodiments described above are only schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the drawings of the device embodiments provided by the present application, the connection relationship between the modules indicates that there is a communication connection between them, which can be specifically implemented as one or more communication buses or signal lines.

通过以上的实施方式的描述,所属领域的技术人员可以清楚地了解到本申请可借助软件加必需的通用硬件的方式来实现,当然也可以通过专用硬件包括专用集成电路、专用CPU、专用存储器、专用元器件等来实现。一般情况下,凡由计算机程序完成的功能都可以很容易地用相应的硬件来实现,而且,用来实现同一功能的具体硬件结构也可以是多种多样的,例如模拟电路、数字电路或专用电路等。但是,对本申请而言更多情况下软件程序实现是更佳的实施方式。基于这样的理解,本申请的技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品存储在可读取的存储介质中,如计算机的软盘、U盘、移动硬盘、ROM、RAM、磁碟或者光盘等,包括若干指令用以使得一台计算机设备(可以是个人计算机,服务器,或者网络设备等)执行本申请各个实施例所述的方法。Through the description of the above implementation mode, the technicians in the field can clearly understand that the present application can be implemented by means of software plus necessary general hardware, and of course, it can also be implemented by special hardware including application-specific integrated circuits, special CPUs, special memories, special components, etc. In general, all functions completed by computer programs can be easily implemented with corresponding hardware, and the specific hardware structure used to implement the same function can also be various, such as analog circuits, digital circuits or special circuits. However, for the present application, software program implementation is a better implementation mode in more cases. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a readable storage medium, such as a computer floppy disk, a U disk, a mobile hard disk, a ROM, a RAM, a disk or an optical disk, etc., including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

在上述实施例中,可以全部或部分地通过软件、硬件、固件或者其任意组合来实现。当使用软件实现时,可以全部或部分地以计算机程序产品的形式实现。In the above embodiments, all or part of the embodiments may be implemented by software, hardware, firmware or any combination thereof. When implemented by software, all or part of the embodiments may be implemented in the form of a computer program product.

所述计算机程序产品包括一个或多个计算机指令。在计算机上加载和执行所述计算机程序指令时,全部或部分地产生按照本申请实施例所述的流程或功能。所述计算机可以是通用计算机、专用计算机、计算机网络、或者其他可编程装置。所述计算机指令可以存储在计算机可读存储介质中,或者从一个计算机可读存储介质向另一计算机可读存储介质传输,例如,所述计算机指令可以从一个网站站点、计算机、服务器或数据中心通过有线(例如同轴电缆、光纤、数字用户线(digital subscriber line,DSL)或无线(例如红外、无线、微波等)方式向另一个网站站点、计算机、服务器或数据中心进行传输。所述计算机可读存储介质可以是计算机能够存储的任何可用介质或者是包含一个或多个可用介质集成的服务器、数据中心等数据存储设备。所述可用介质可以是磁性介质,(例如软盘、硬盘、磁带)、光介质(例如DVD)、或者半导体介质(例如固态硬盘(solid state disk,SSD))等。The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website site, a computer, a server, or a data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server, or data center. The computer-readable storage medium may be any available medium that a computer can store or a data storage device such as a server or a data center that includes one or more available media integrated. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid state disk (SSD)), etc.

以上实施例仅用以说明本申请的技术方案,而非对其限制;尽管参照前述实施例对本申请进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本申请各实施例的技术方案的范围。The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims (15)

1. A method of power control, comprising:
Acquiring a first electric field intensity value, wherein the first electric field intensity value is obtained by measuring a site at a measuring point when a plurality of communication units of the site are configured with preset data transmission power;
When the first electric field intensity value is larger than or equal to the preset electric field intensity, carrying out power reduction simulation on the data transmission power of the plurality of communication units in the target period, wherein the plurality of communication units comprise communication units with different communication systems;
calculating a second electric field strength value according to the reduced data transmission power;
outputting a command when the second electric field intensity value is smaller than a preset electric field intensity;
Performing a power down operation within the target period according to the command, the command for causing the power down operation to coincide with the power down simulation, the power down operation for causing the electric field strength of the station to be within a safe range.
2. The method of claim 1, wherein the power-down simulating the data transmission power of the plurality of communication units for the target period comprises:
Predicting the load capacity of each communication unit in the target period according to the historical load capacity of the communication unit; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target period is inversely related to the priority of the communication unit;
and carrying out power reduction simulation on the data transmission power of each communication unit in the target period according to the order of priority from high to low.
3. The method of claim 2, wherein said power-down simulating the data transmission power of each of the communication units during the target period comprises:
under the condition that the communication unit is configured with a plurality of working frequency bands and each working frequency band comprises a plurality of sub-frequency bands, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load capacity of the sub-frequency band;
Taking the sub-frequency band with the smallest predicted load as a target sub-frequency band;
Transferring all the service loads of the target sub-frequency band in the target period to other sub-frequency bands, wherein the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band;
And when the target sub-frequency band meets a turn-off condition, performing simulation carrier turn-off on the target sub-frequency band in the target period.
4. The method of claim 3, wherein prior to the target time period emulating carrier off for the target sub-band, the method further comprises:
the simulation carrier is turned off for the target sub-frequency band in the target period;
Acquiring a service quality index of the target working frequency band;
when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets a turn-off condition;
and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target sub-frequency band does not meet the turn-off condition.
5. The method of claim 2, wherein said power-down simulating the data transmission power of each of the communication units during the target period comprises:
When the communication unit is configured with a plurality of beams for data transmission, sequentially selecting one beam from the plurality of beams as a target beam, and reducing the data transmission power of the target beam in the target period from a preset first power to a second power;
acquiring a service quality index of the target beam;
and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target period according to the second power.
6. The method of claim 2, wherein said power-down simulating the data transmission power of each of the communication units during the target period comprises:
Reducing the average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power;
Acquiring service quality indexes of all working frequency bands of the communication unit;
And when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target period according to the fourth power.
7. The method of claim 2, wherein said power-down simulating the data transmission power of each of the communication units during the target period comprises:
Under the condition that the communication unit is configured with a plurality of working frequency bands, each working frequency band comprises a plurality of sub-frequency bands and the communication unit is configured with a plurality of beams, one working frequency band is sequentially selected from the plurality of working frequency bands to serve as a target working frequency band, and the load capacity of each sub-frequency band in the target working frequency band in the target time period is predicted according to the historical load capacity of the sub-frequency band;
Taking the sub-frequency band with the smallest predicted load as a target sub-frequency band;
Transferring all the service loads of the target sub-frequency band in the target period to other sub-frequency bands, wherein the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band;
when the target sub-frequency band meets a turn-off condition, performing simulation carrier turn-off on the target sub-frequency band in the target period;
sequentially selecting one beam from a plurality of beams as a target beam, and reducing the data transmission power of the target beam in the target period from a preset first power to a second power;
acquiring a service quality index of the target beam;
when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target period according to the second power;
Reducing the average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power;
Acquiring service quality indexes of all working frequency bands of the communication unit;
And when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target period according to the fourth power.
8. A power control apparatus, comprising:
the processing unit is used for acquiring a first electric field intensity value, wherein the first electric field intensity value is obtained by measuring a site at a measuring point when a plurality of communication units of the site are configured with preset data transmission power;
The processing unit is further configured to perform power reduction simulation on the data transmission power of the plurality of communication units in the target period when the first electric field strength value is greater than or equal to a preset electric field strength, where the plurality of communication units include communication units with different communication systems; calculating a second electric field strength value according to the reduced data transmission power; outputting a command when the second electric field intensity value is smaller than a preset electric field intensity;
a communication unit for performing a power-down operation within the target period according to the command for making the power-down operation coincide with the power-down simulation, the power-down operation for making the electric field intensity of the station within a safe range.
9. The apparatus of claim 8, wherein the device comprises a plurality of sensors,
The processing unit is specifically configured to predict, according to the historical load amounts of the communication units, the load amounts of each communication unit in the target period; determining the priority of each communication unit according to the prediction result, wherein the prediction result of each communication unit in the target period is inversely related to the priority of the communication unit; and carrying out power reduction simulation on the data transmission power of each communication unit in the target period according to the order of priority from high to low.
10. The apparatus of claim 9, wherein the device comprises a plurality of sensors,
The processing unit is specifically configured to select, when the communication unit is configured with a plurality of working frequency bands and each working frequency band includes a plurality of sub-frequency bands, one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict, according to a historical load amount of the sub-frequency bands, a load amount of each sub-frequency band in the target working frequency band in the target period; taking the sub-frequency band with the smallest predicted load as a target sub-frequency band; transferring all the service loads of a target sub-frequency band in the target period to other sub-frequency bands, wherein the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band; and when the target sub-frequency band meets a turn-off condition, performing simulation carrier turn-off on the target sub-frequency band in the target period.
11. The apparatus of claim 10, wherein the device comprises a plurality of sensors,
The processing unit is further configured to perform, before the target period of time turns off the simulation carrier for the target sub-band, turn off the simulation carrier for the target sub-band in the target period of time; acquiring a service quality index of the target working frequency band; when the service quality index of the target working frequency band meets the preset service quality requirement, determining that the target sub-frequency band meets a turn-off condition; and when the service quality index of the target working frequency band does not meet the preset service quality requirement, determining that the target sub-frequency band does not meet the turn-off condition.
12. The apparatus of claim 9, wherein the device comprises a plurality of sensors,
The processing unit is specifically configured to, when the communication unit is configured with a plurality of beams for data transmission, select one beam from the plurality of beams as a target beam, and reduce data transmission power of the target beam in the target period from a preset first power to a second power; acquiring a service quality index of the target beam; and when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target period according to the second power.
13. The apparatus of claim 9, wherein the device comprises a plurality of sensors,
The processing unit is specifically configured to reduce the average power of the power amplifier of the communication unit in the target period from a preset third power to a fourth power; acquiring service quality indexes of all working frequency bands of the communication unit; and when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target period according to the fourth power.
14. The apparatus of claim 9, wherein the device comprises a plurality of sensors,
The processing unit is specifically configured to, when the communication unit is configured with a plurality of working frequency bands, and each working frequency band includes a plurality of sub-frequency bands and the communication unit is configured with a plurality of beams, sequentially select one working frequency band from the plurality of working frequency bands as a target working frequency band, and predict the load capacity of each sub-frequency band in the target working frequency band in the target period according to the historical load capacity of the sub-frequency band;
Taking the sub-frequency band with the smallest predicted load as a target sub-frequency band;
Transferring all the service loads of the target sub-frequency band in the target period to other sub-frequency bands, wherein the target sub-frequency band and the other sub-frequency bands belong to the same working frequency band;
when the target sub-frequency band meets a turn-off condition, performing simulation carrier turn-off on the target sub-frequency band in the target period;
sequentially selecting one beam from a plurality of beams as a target beam, and reducing the data transmission power of the target beam in the target period from a preset first power to a second power;
acquiring a service quality index of the target beam;
when the service quality index of the target beam meets the preset service quality requirement, configuring the data transmission power of the target beam in the target period according to the second power;
Reducing the average power of a power amplifier of the communication unit in the target period from a preset third power to a fourth power;
Acquiring service quality indexes of all working frequency bands of the communication unit;
And when the service quality indexes of all the working frequency bands of the communication unit meet the preset service quality requirement, configuring the power of the power amplifier of the communication unit in the target period according to the fourth power.
15. A computer readable storage medium having stored therein a computer program, characterized in that when run on a computer, causes the computer to perform the power control method of any one of claims 1 to 7.
CN202010316153.2A 2020-04-21 2020-04-21 A power control method and a power control device Active CN113543288B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202010316153.2A CN113543288B (en) 2020-04-21 2020-04-21 A power control method and a power control device
PCT/CN2021/087177 WO2021213226A1 (en) 2020-04-21 2021-04-14 Power control method and power control apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010316153.2A CN113543288B (en) 2020-04-21 2020-04-21 A power control method and a power control device

Publications (2)

Publication Number Publication Date
CN113543288A CN113543288A (en) 2021-10-22
CN113543288B true CN113543288B (en) 2024-10-11

Family

ID=78123795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010316153.2A Active CN113543288B (en) 2020-04-21 2020-04-21 A power control method and a power control device

Country Status (2)

Country Link
CN (1) CN113543288B (en)
WO (1) WO2021213226A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119254351B (en) * 2024-12-03 2025-03-14 深圳市多酷科技有限公司 Yield testing method, device and system for reducing testing times

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103354643A (en) * 2013-06-26 2013-10-16 上海华为技术有限公司 Method and apparatus for realizing dual-mode network energy-efficiency joint simulation

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7813753B2 (en) * 2006-02-27 2010-10-12 Qualcomm Incorporated Power control in communication systems
CN101998601B (en) * 2010-12-15 2013-11-20 迈普通信技术股份有限公司 Dynamic power control method capable of reducing wireless local area network (WLAN) interference and system thereof
CN102196542B (en) * 2011-05-27 2014-06-25 上海华为技术有限公司 Power control method, equipment and system
KR101941510B1 (en) * 2012-06-13 2019-01-23 삼성전자주식회사 Method for saving power consumption and an electronic device thereof
CN105493545B (en) * 2013-04-26 2019-08-27 华为技术有限公司 Network Energy Efficiency Simulation and Evaluation Method and Device
CN103841568B (en) * 2013-12-10 2017-05-17 大唐移动通信设备有限公司 Wireless network planning method and device
CN109728828B (en) * 2017-10-31 2021-08-20 华为技术有限公司 Signal separation method and signal processing device
CN110493826B (en) * 2019-08-28 2022-04-12 重庆邮电大学 Heterogeneous cloud wireless access network resource allocation method based on deep reinforcement learning

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103354643A (en) * 2013-06-26 2013-10-16 上海华为技术有限公司 Method and apparatus for realizing dual-mode network energy-efficiency joint simulation

Also Published As

Publication number Publication date
WO2021213226A1 (en) 2021-10-28
CN113543288A (en) 2021-10-22

Similar Documents

Publication Publication Date Title
US20220043067A1 (en) Charging method and device, charging system, electronic equipment and storage medium
US20190268894A1 (en) Resource allocation method and apparatus for wireless backhaul network based on reinforcement learning
CN111108721B (en) Method, apparatus, and computer-readable storage medium for allocating resources in a network slice
US9763138B2 (en) Load balancing apparatus and method for wireless communications system, and base station
CN109660994B (en) Apparatus for operation in a spectrum-reclaimable leased system
CN104735786A (en) Resource scheduling method and device
US20200137678A1 (en) Slice management device and slice management method
CN113543288B (en) A power control method and a power control device
CN113490226A (en) Method and system for optimizing coexistence of 5G new air interface and WiFi network in unauthorized frequency band
CN111385796B (en) Internet of Things business indicator early warning methods, devices, electronic equipment and storage media
CN113489580B (en) Configuration method and device for carrier aggregation secondary cell
CN116232923A (en) Model training method and device, network traffic prediction method and device
CN102076004A (en) Measuring method and device
CN112804694B (en) Method, system, computing device and storage medium for configuring communication network bandwidth
CN103249118A (en) Wireless access point selection method and electronic terminals
US10893485B2 (en) Carrier power control method and apparatus, storage medium, and computer program product
CN109151810A (en) A kind of method, user equipment and base station that user capability is reported and handled
CN106101211A (en) A kind of carrier wave emigration method rewriting probabilistic forecasting based on page
JP2021517436A (en) Communication method and equipment
CN113642638A (en) Capacity adjustment method, model training method, device, equipment and storage medium
CN103298007B (en) A kind of problem cells screening technique and device
US10356713B2 (en) Resource control device, system, method and recording medium
CN114389952A (en) Multi-layer network-oriented mobile communication network capacity configuration method and device
CN112398172A (en) Source-grid-load coordinated operation control method and related device
JP6735322B2 (en) Communication device, control device, communication method, and communication program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant