CN113529955B CN202110764136.XA CN202110764136A CN113529955B CN 113529955 B CN113529955 B CN 113529955B CN 202110764136 A CN202110764136 A CN 202110764136A CN 113529955 B CN113529955 B CN 113529955B
Authority
CN
China
Prior art keywords
zipper
plate
installation
type wall
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110764136.XA
Other languages
Chinese (zh)
Other versions
CN113529955A (en
Inventor
姚井祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to PCT/CN2021/106175 priority Critical patent/WO2022012566A1/en
Publication of CN113529955A publication Critical patent/CN113529955A/en
Application granted granted Critical
Publication of CN113529955B publication Critical patent/CN113529955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明提供了一种拉锁式墙体部品的安装方法,该安装方法包括:前续准备步骤、首块板安装步骤、后N块板安装步骤、墙体平整步骤,任选还包括:锁定卡件安装工序,其设置在首块板安装步骤和后N块板安装步骤中;和/或插固装饰条工序,其设置在首块板安装步骤、后N块板安装步骤和/或墙体平整步骤中。本发明提供的安装方法:通过设置锁定卡件安装工序,实现墙体部品与其他建筑构造体卡固连接与粘接剂连接有效结合,提高连接稳固性和抗震性,通过设置插固装饰条工序,避免出现细小裂纹、裂缝,并增强装饰性功能。

Figure 202110764136

The invention provides an installation method for a zipper-type wall part. The installation method includes: a previous preparation step, a first board installation step, a rear N board installation step, a wall flattening step, and optionally further comprising: a locking card Part installation process, which is set in the first board installation step and the next N board installation steps; and/or the inserting and fixing decorative strip process, which is set in the first board installation step, the last N board installation steps and/or the wall in the leveling step. The installation method provided by the invention: by setting the locking clip installation process, the effective combination of the wall parts and other building structures is realized by the clamping connection and the adhesive connection, and the connection stability and shock resistance are improved. , to avoid small cracks, cracks, and enhance decorative functions.

Figure 202110764136

Description

拉锁式墙体部品的安装方法How to install zipper wall parts

技术领域technical field

本发明涉及拉锁式墙体部品的安装方法,属于一种建筑墙体施工方法,特别涉及一种连接端设置拉锁槽的拉锁式墙体部品建筑材料的安装方法。The invention relates to a method for installing zipper-type wall parts, which belongs to a building wall construction method, in particular to a method for installing a zipper-type wall part building material with a zipper groove at the connection end.

背景技术Background technique

随着装配式建筑在国内的建筑市场的愈来愈受到青睐,带来了建筑墙体部品材料进一步的技术革新,但上述革新也仅在建筑墙体部品的材料工艺和其外观连接结构这两个方面,拉锁式墙体部品是这个时期的代表作之一。但无论是其他建筑隔墙板或拉锁式墙体部品其在整个安装流程各安装方式上并没有改变,其自连接或与建筑其他结构连接均采用建筑胶凝材料粘接工艺。As prefabricated buildings are becoming more and more popular in the domestic construction market, further technological innovations have been brought about in the materials of building wall parts. In this respect, the zipper wall part is one of the masterpieces of this period. However, whether it is other building partition panels or zipper wall parts, the installation methods of the entire installation process have not changed, and their self-connection or connection with other structures of the building adopts the bonding process of building cementitious materials.

原有的建筑墙体材料的建筑胶凝材料粘接工艺在具体装配式建筑的施工中时常出现如下弊端(以拉锁式墙体部品为例):The building cementitious material bonding process of the original building wall materials often has the following disadvantages in the construction of specific prefabricated buildings (taking zipper wall parts as an example):

(一)虽然拉锁式墙体部品的特殊结构很好的解决了部品与部品之间的连接开裂问题,但墙体部品与建筑结构的材质不一致的属性,在其二者的连接中时常出现开裂的问题,这点在墙体部品与钢结构建筑构件连接柱问题最为突出。(1) Although the special structure of the zipper wall parts solves the cracking problem of the connection between parts, the material of the wall parts and the building structure are inconsistent, and cracks often occur in the connection between the two parts. This problem is most prominent in the connection column between wall parts and steel structure building components.

(二)虽然部品与部品之间的连接开裂问题得到解决,但由于任何材料都具有热胀冷缩或湿涨干缩这个物理特性,连接再坚固的部品与部品连接缝隙之间随着气候环境的变化也会出现细小的裂纹,这一点在墙面涂饰后显得尤为突出。(2) Although the problem of cracking of the connection between parts has been solved, since any material has the physical characteristics of thermal expansion and contraction or wet expansion and contraction, the connection gap between the connected parts and the parts will change with the climate environment. Small cracks will also appear in the change of the wall, which is especially prominent after the wall is painted.

(三)在原有的墙体部品安装施工中,紧固墙体部品与建筑结构之间均采用木质楔子楔紧固定,由于木质楔遇潮湿环境会出现腐烂后在墙体部品与建筑结构之间会出现较多脱离现象,从而影响其二者的连接紧固强度。(3) During the installation and construction of the original wall parts, wooden wedges are used to fasten the fastening wall parts and the building structure. Because the wooden wedges will rot in a humid environment, they will be between the wall parts and the building structure. There will be more detachment, which will affect the fastening strength of the connection between the two.

(四)由于装配式或混凝土框架结构建筑内部举架高空间大,单一大面积大宽幅墙体部品其整体抗冲击力会大幅下降,影响整个装配式建筑的抗震性能。(4) Due to the large internal lifting space of the prefabricated or concrete frame structure building, the overall impact resistance of a single large-area and large-width wall part will be greatly reduced, which will affect the seismic performance of the entire prefabricated building.

因此,亟待研发一种稳固性、抗震性较高,同时能够避免出现裂纹、裂缝和楔子腐烂情况的拉锁式部品的安装方法。Therefore, there is an urgent need to develop a method for installing zipper parts that has high stability and shock resistance and can avoid cracks, cracks and wedge rot.

发明内容Contents of the invention

为解决上述问题,本发明提供了一种新的拉锁式墙体部品的安装方法,本发明通过设置锁定卡件安装工序,实现墙体部品与其他建筑构造体卡固连接与粘接剂连接有效结合,提高连接稳固性和抗震性,通过设置插固装饰条工序,将装饰条的安装与墙体部品之间的注入粘接剂工艺有效结合,避免出现细小裂纹,并增强装饰性功能,从而完成本发明。In order to solve the above problems, the present invention provides a new installation method of zipper type wall parts. The present invention realizes efficient clamping connection and adhesive connection between wall parts and other building structures by setting the installation process of locking clips. Combining to improve connection stability and shock resistance. By setting the process of inserting decorative strips, the installation of decorative strips and the process of injecting adhesive between wall parts can be effectively combined to avoid small cracks and enhance decorative functions. Complete the present invention.

本发明拉锁式墙体部品的安装方法包括前续准备步骤、首块板安装步骤、后N块板安装步骤、墙体平整步骤,其还包括:The installation method of the zipper type wall parts of the present invention includes the preceding preparation steps, the first board installation step, the rear N board installation steps, and the wall leveling step, which also includes:

锁定卡件安装工序,其优选设置在首块板安装步骤和后N块板安装步骤中;和/或The locking clip installation process is preferably arranged in the first board installation step and the last N board installation steps; and/or

插固装饰条工序,其优选设置在首块板安装步骤和后N块板安装步骤、和/或设置在墙体平整步骤中。The process of inserting and fixing the decorative strips is preferably arranged in the installation step of the first board and the installation step of the next N boards, and/or in the step of leveling the wall.

本发明提供的拉锁式墙体部品的安装方法以及按此方法安装制作的拉锁式墙体部品能够取得的有益效果可汇总如下:The installation method of the zipper type wall parts provided by the present invention and the beneficial effects that can be obtained by the zipper type wall parts installed and manufactured according to this method can be summarized as follows:

(1)在拉锁式墙体部品的安装方法创新性的设置了锁定卡件安装工序,拉锁式墙体部品通过其特有的拉锁槽结合各锁定卡件可实现墙体部品与建筑构造柱/墙体、建筑梁/棚顶、建筑地面四者卡固连接与粘接剂连接有效结合,比单一粘接剂连接稳固性、抗震性更好。(1) In the installation method of the zipper type wall parts, the installation process of the locking clips is innovatively set up. The zipper type wall parts can be combined with the locking clips through its unique zipper grooves to realize the connection between the wall parts and the building structure column/wall. Body, building beams/roofs, and building ground are effectively combined with the clamp connection and the adhesive connection, which is better in stability and earthquake resistance than a single adhesive connection.

(2)在拉锁式墙体部品的安装方法创新性的设置了插固装饰条工序,更进一步将装饰条的安装与墙体部品之间的注入粘接剂工艺二者有效结合。插固装饰条工序较原有的加装防裂带工序更能有效避免部品与部品和部品与建筑构件连接缝隙之间随着气候环境的变化也会出现细小的裂纹。其装饰性功能也是加装防裂带工序不能比拟的。(2) In the installation method of the zipper type wall parts, the process of inserting and fixing the decorative strips is innovatively set up, which further effectively combines the installation of the decorative strips with the process of injecting adhesive between the wall parts. The process of inserting decorative strips is more effective than the original process of adding anti-crack belts to avoid small cracks between parts and parts and between parts and building components as the climate changes. Its decorative function is also incomparable to the process of installing anti-crack belt.

(3)优选使用与拉锁式墙体部品同材质的紧固楔,有效避免木质楔遇潮湿环境会出现腐烂后在墙体部品与建筑结构之间会出现较多脱离现象。(3) It is preferable to use fastening wedges of the same material as the zipper-type wall parts, which can effectively prevent the wood wedges from rotting in humid environments, and then there will be more separation between the wall parts and the building structure.

(4)创新性的构造柱制作工序设置,将建筑墙体大宽幅优化分割成若干区域,使得墙体部品的安装不受建筑内部举架高空间大的各种限制,安全性大幅提高。(4) The innovative structural column production process setting optimizes the large width of the building wall and divides it into several areas, so that the installation of wall parts is not subject to various restrictions on the large space of the building's interior, and the safety is greatly improved.

(5)安装预制吊挂件工序的采用,可有效解决装配式建筑墙体部品大部分为空心化,空心墙体内外的握钉力和吊挂力不明显不能满足要求的问题。(5) The adoption of the process of installing prefabricated hanging parts can effectively solve the problem that most of the prefabricated building wall parts are hollow, and the nail holding force and hanging force inside and outside the hollow wall are not obvious and cannot meet the requirements.

附图说明Description of drawings

图1为本发明拉锁式墙体部品安装方法整体安装流程图;Fig. 1 is the overall installation flowchart of the zipper type wall part installation method of the present invention;

图2为本发明拉锁式墙体部品安装方法前续准备步骤中配板工序示意图;Fig. 2 is a schematic diagram of the plate matching process in the preparatory steps before the zipper type wall part installation method of the present invention;

图3为本发明拉锁式墙体部品安装方法首块板安装步骤中定位工序、校正工序Ⅰ、板顶端注浆料工序Ⅰ、楔紧固定工序Ⅰ、缝口注浆料工序Ⅰ示意图;Fig. 3 is a schematic diagram of the positioning process, the calibration process I, the grouting process I at the top of the plate, the wedging and fixing process I, and the grouting process I in the first plate installation step of the zipper type wall part installation method of the present invention;

图4为本发明拉锁式墙体部品安装方法后N块板安装步骤中第N块板定位工序、校正工序Ⅱ、板顶端注浆料工序Ⅱ、楔紧固定工序Ⅱ、校平工序、拉锁键注浆料工序、缝口注浆料工序Ⅱ示意图;Fig. 4 shows the positioning process of the Nth board in the installation steps of the N boards after the installation method of the zipper type wall parts of the present invention, the calibration process II, the grouting process II at the top of the board, the wedging and fixing process II, the leveling process, and the zipper key Schematic diagram of grouting process and joint grouting process II;

图5a)为本发明拉锁式墙体部品安装方法插固装饰条工序示意图;Figure 5a) is a schematic diagram of the installation method of the zipper type wall parts of the present invention for inserting and fixing the decorative strips;

图5b)为本发明装饰条单体拉紧结构剖面示意图;Figure 5b) is a schematic cross-sectional view of the single tension structure of the decorative strip of the present invention;

图6为本发明拉锁式墙体部品安装方法加装防裂带工序示意图;Fig. 6 is a schematic diagram of the process of adding an anti-crack belt to the installation method of the zipper type wall parts of the present invention;

图7为本发明拉锁式墙体部品安装方法安装预制吊挂件工序示意图;Fig. 7 is a schematic diagram of the process of installing prefabricated hanging parts in the installation method of zipper type wall parts of the present invention;

图8为本发明拉锁式墙体部品安装方法锁定卡件安装工序示意图;Fig. 8 is a schematic diagram of the installation process of the lock clip in the installation method of the zipper type wall parts of the present invention;

图9为本发明拉锁式墙体部品安装方法锁定卡件安装工序示意图;Fig. 9 is a schematic diagram of the installation process of the locking clip in the installation method of the zipper type wall parts of the present invention;

图10为本发明拉锁式墙体部品安装方法锁定卡件安装工序示意图;Fig. 10 is a schematic diagram of the installation process of the lock clip in the installation method of the zipper type wall parts of the present invention;

图11为现有技术中拉锁式砌块的结构示意图。Fig. 11 is a schematic structural diagram of a zipper block in the prior art.

具体实施方式Detailed ways

根据本发明,提供一种拉锁式墙体部品的安装方法,在安装和施工过程中采用锁定卡件连接工艺、专用装饰条遮缝工艺、专用楔紧固工艺和专用模具浇筑构造柱工艺。According to the present invention, a method for installing zipper-type wall parts is provided. During the installation and construction process, locking clamp connection technology, special decorative strip seam-shielding technology, special wedge fastening technology and special mold pouring structural column technology are used.

在本发明中,拉锁式墙体部品包括但不局限于拉锁式(建筑)墙板、拉锁式(建筑)梁/柱、拉锁式(建筑)砌块(例如拉锁式空心砌块、拉锁式实心砌块和拉锁式复合砌块,如图11所示)、拉锁式(建筑)楼板或拉锁式(建筑)棚板、拉锁式一次性浇筑模具、及其它拉锁式墙体部品、构件等。In the present invention, zippered wall parts include but not limited to zippered (construction) wall panels, zippered (construction) beams/columns, zippered (construction) blocks (such as zippered hollow blocks, zippered solid Blocks and zipper-type composite blocks, as shown in Figure 11), zipper-type (building) floor slabs or zipper-type (building) shed slabs, zipper-type one-time pouring molds, and other zipper-type wall parts and components, etc.

下述先对本发明中的专业术语和现有技术进行介绍:The following first introduces technical terms and prior art in the present invention:

锁扣槽,设置于墙板侧面的垂直于板面的口小内大(垂直侧面看)、外宽内窄(垂直一板面看)的插槽,称为锁扣槽。其中包括整锁扣槽(贯穿墙板侧面)和半锁扣槽(未贯穿墙板侧面)。The lock slot is set on the side of the wall panel perpendicular to the board surface, with a small mouth and a large inside (viewed from a vertical side), and a slot with an outer width and an inner narrow (viewed from a vertical side of the board), called a lock slot. These include full latch slots (through the side of the panel) and half latch slots (not through the side of the panel).

中空腔,沿拉锁式墙体部品长度方向留有若干个贯通孔洞的部位。The hollow cavity has several through holes along the length direction of the zipper type wall parts.

拉锁键,制备拉锁式墙体部品,为做到榫头外大里小、外宽里窄,又便于脱模,沿模具的大边框和挡板的内角或边缘设置的特定形柱体为拉锁键。拉锁键可分为一体拉锁键(一整根柱体,使用时不需要连接)、多体拉锁键(多根柱体,使用时需要连接)、活体拉锁键(利用磁铁的吸引力或螺杆把拉锁键连接在大边框或挡板上,拆模时拉锁键能轻易分离大边框和挡板)和非活体拉锁键(沿大边框和挡板长度方向在其中间部分或非中间部分断开大边框和挡板,将拉锁键用相应材料固定在分断开的大边框和挡板上,拆模时拉锁键不能同大边框和挡板分离)。Zipper keys are used to prepare zipper-type wall parts. In order to make the tenons larger on the outside and smaller on the inside, wider on the outside and narrower in the inside, and easy to demould, the special-shaped cylinders arranged along the large frame of the mold and the inner corners or edges of the baffle are zipper keys. The zipper key can be divided into an integrated zipper key (a whole cylinder, which does not need to be connected during use), a multi-body zipper key (multiple cylinders, which need to be connected during use), and a living body zipper key (using the attraction force of a magnet or a screw to handle The zipper key is connected to the large frame or the baffle, and the zipper key can easily separate the large frame and the baffle when the mold is removed) and the non-living zipper key (the large frame and the baffle are disconnected at the middle part or the non-middle part along the length direction of the large frame and Frame and baffle, fix the zipper key on the separated large frame and baffle with corresponding materials, the zipper key cannot be separated from the large frame and baffle when the mold is removed).

拉锁槽,制备拉锁式墙体部品过程中,拆除模具、拿掉拉锁键后就在墙板榫头上留下了拉锁键外复制体的槽体,命此槽体为拉锁槽。Zipper groove, in the process of preparing zipper type wall parts, after the mold is removed and the zipper key is removed, the groove body of the outer replica of the zipper key is left on the tenon of the wallboard, and this groove body is called the zipper groove.

拉锁式墙板(也称为拉锁式墙体部品),为了有效防止拉锁式墙板粘接处有裂缝产生和有效解决实体连接处产生冷热桥的问题,而在板侧面(即粘接面)的边角处设有两条(根据墙板性能、质量、标准等要求也可设一条)拉锁槽,形成外宽里窄、外大里小的

Figure 636196DEST_PATH_IMAGE001
形榫头,施工安装时将榫头相对(若板与桩、柱、梁或其它墙体连接时将榫头穿插进设置在桩、柱、梁及其它墙体的榫槽内)密合并拼挤严实,用专用浆料将相对的榫头的两条拉锁槽抹平至防裂带槽槽底或板面,待浆料凝固干燥后形成
Figure 653831DEST_PATH_IMAGE002
形的柱体或具有
Figure 430288DEST_PATH_IMAGE002
形柱体所起到其锁合作用的其它形的柱体象拉锁一样牢固的锁合了连接处,故称此建筑墙板为拉锁式建筑墙板(简称拉锁式板)。拉锁式建筑墙板包括:实心板材类、空心板材类、轻质板材类、复合板材类及多层板材、掩边板材、异形板材、围墙板材等。Zipper wall panels (also known as zipper wall parts), in order to effectively prevent cracks in the bonding of zipper wall panels and effectively solve the problem of cold and heat bridges at the physical connection, and on the side of the panel (ie, the bonding surface) ) are provided with two zipper grooves (one can also be provided according to the requirements of wallboard performance, quality, standards, etc.) at the corners, forming a wide outside and narrow inside, large outside and small inside.
Figure 636196DEST_PATH_IMAGE001
Shaped tenon, the tenon is opposite during construction and installation (if the board is connected with a pile, column, beam or other wall, the tenon is inserted into the tenon groove set on the pile, column, beam or other wall) and tightly squeezed , use special slurry to smooth the two zipper grooves of the opposite mortise to the bottom of the anti-crack groove or the surface of the board, and form it after the slurry solidifies and dries.
Figure 653831DEST_PATH_IMAGE002
shaped cylinder or with
Figure 430288DEST_PATH_IMAGE002
The other shaped cylinders that play the locking role of the zipper-shaped cylinder lock the connection firmly like a zipper, so this building wall panel is called a zipper-type building wall panel (zipper-type panel for short). Zip-lock building wall panels include: solid panels, hollow panels, lightweight panels, composite panels and multi-layer panels, edge-masking panels, special-shaped panels, wall panels, etc.

(1) 拉锁式建筑墙板模具要求(1) Zipper type building wall panel mold requirements

①活体拉锁键墙板模具要求①Living zipper key wall panel mold requirements

活体拉锁键墙板模具主要由大边框、挡板和活体拉锁键构成,其中在活体拉锁键确定的侧面上预埋数个等距离的小块磁铁,要求磁力适宜;大边框、挡板如未使用与磁铁相吸的材料时,必须在相应点预埋与磁铁相吸的材料。另种方法是在拉锁键上确定的侧面上固定数个等距离的螺杆,使用时将螺杆穿透大边框、挡板上预制好的连接孔,用螺母加紧固定,脱模时拧下螺母即可轻易拆下大边框和挡板。The living zipper key wall panel mold is mainly composed of a large frame, a baffle and a living zipper key, in which several small magnets at equal distances are pre-embedded on the side determined by the living zipper key, and the magnetic force is required to be suitable; if the large frame and baffle plate are not When using materials that attract magnets, the materials that attract magnets must be pre-embedded at corresponding points. Another method is to fix several equidistant screw rods on the side determined by the zipper key. When in use, the screw rods penetrate the prefabricated connecting holes on the large frame and baffle, and tighten and fix them with nuts. When demolding, unscrew the nuts and the The large bezel and bezel can be easily removed.

②使用非活体拉锁键墙板模具要求② Requirements for using non-living zipper key wall panel molds

非活体拉锁键墙板模具主要由大边框、挡板和拉锁键构成,其中将拉锁键用相应材料固定在已分断开的大边框和挡板(沿长度方向在其中间部位或非中间部位分断开)的内角或边缘处,分断开的大边框和挡板外侧设有数个固定连接件,用来确保分断开的大边框和挡板能随时组装一体,又能随时分断开。The non-living zipper key wall panel mold is mainly composed of a large frame, a baffle and a zipper key, in which the zipper key is fixed on the separated large frame and baffle (in the middle or non-middle part along the length direction) with corresponding materials At the inner corner or edge of the split), there are several fixed connectors on the outside of the split large frame and the baffle, which are used to ensure that the split large frame and the baffle can be assembled at any time and can be separated at any time. .

(2)拉锁式建筑墙板的制作(2) Production of zipper type building wall panels

使用活体拉锁键模具时,根据建筑墙板的外观、规格、性能、质量的要求,选定合适规格的模具,将无缺陷模具组装、校正、固定在适合的工作台上,之后安装活体拉锁键,如墙板设有锁扣槽安装锁扣键,然后按规定程序填铺浆料;(若需要)或投放保温材料或投放其它填充物或安装中空管或安装中空托板等,再按规定程序填铺浆料,浆料可用镁水泥浆料、硫铝水泥浆料、普通水泥浆料或其它建筑材料制成的浆料,凝固定型后,及时拆除大边框、挡板或中空管、中空托板、锁扣键等,最后取下拉锁键,经修整后进行养护。When using the living zipper mold, according to the appearance, specification, performance and quality requirements of the building wall panels, select a mold with a suitable specification, assemble, correct and fix the non-defective mold on a suitable workbench, and then install the living zipper , if the wallboard is equipped with a locking groove, install the locking key, and then fill in the slurry according to the prescribed procedures; (if necessary) or put in insulation materials or other fillers or install hollow pipes or hollow pallets, etc., and then press Fill in the slurry according to the prescribed procedures. The slurry can be made of magnesium cement slurry, sulfur-aluminum cement slurry, ordinary cement slurry or other building materials. After the solidification is fixed, remove the large frame, baffle or hollow pipe , hollow pallet, lock key, etc., and finally remove the lock key and maintain it after trimming.

使用非活体拉锁键模具时,根据建筑墙板的外观、规格、性能、质量的要求,选定合适规格的模具,将无缺陷的分断开的已固定好的拉锁键的大边框及挡板用固定连接件分别组装一体,然后整体组装、校正、固定在适合的工作台上,如墙板设有锁扣槽的安装锁扣键,按规定秩序填铺浆料,(若需要)或投放保温材料或投放其它填充物或安装中空管或安装中空托板等,再按规定程序填铺浆料,凝固定型后随时打开固定连接件,分断开大边框和挡板,拆除分断开后的大边框和挡板及中空管、中空托板、锁扣键等,经修整后进行养护。When using non-living zipper key moulds, select molds with appropriate specifications according to the appearance, specification, performance and quality requirements of the building wall panels, and separate the large frames and baffles of the fixed zipper keys without defects. Assemble them separately with fixed connectors, then assemble, calibrate, and fix them on a suitable workbench. If the wallboard is equipped with a lock slot and a lock key, fill in the slurry according to the specified order, (if necessary) or put it in Insulation materials or other fillers or hollow pipes or hollow pallets are installed, and then the slurry is filled according to the prescribed procedures. After the solidification is fixed, the fixed connectors are opened at any time, the large frame and baffle are separated, and the disconnected parts are removed. The final large frame, baffle, hollow tube, hollow pallet, lock key, etc., are maintained after trimming.

(3)拉锁式建筑墙板的使用(3) Use of zipper type building wall panels

墙板与墙板对接时,将榫头相对密合,用专用浆料把两相对榫头上的相对拉锁槽抹平至防裂带槽槽底,若不设防裂带槽时抹平至板面,待初凝后,拧下螺母、抽出校正螺杆、卸下平整杠,再将专用浆料分批次填充入相对的锁扣槽内至充满填平为止。待浆料凝固干燥后形成

Figure 369425DEST_PATH_IMAGE002
形的柱体或具有
Figure 755276DEST_PATH_IMAGE002
形柱体所起到其锁合作用的其它形柱体,象拉锁一样锁合了两板并非常牢固,在相对的防裂带槽内粘贴防裂带,更确保无裂缝产生。When the wallboard is docked with the wallboard, the tenons are relatively close, and the relative zipper grooves on the two opposite tenons are smoothed to the bottom of the anti-crack groove with special slurry. If there is no anti-crack groove, it is smoothed to the board surface. After the initial setting, unscrew the nut, pull out the correction screw, remove the leveling bar, and then fill the special slurry into the corresponding locking groove in batches until it is filled and leveled. Formed after the slurry solidifies and dries
Figure 369425DEST_PATH_IMAGE002
shaped cylinder or with
Figure 755276DEST_PATH_IMAGE002
The other shaped cylinders that play the locking effect of the shaped cylinder lock the two plates like a zipper and are very firm. The anti-crack tape is pasted in the opposite crack-proof tape groove to ensure that no cracks are produced.

墙板与桩、柱、梁或其它墙体连接时将桩、柱、梁或其它墙体连接处制有榫槽(榫头的外复制体),将榫头穿插进榫槽内,未咬密合处用专用浆料填充严实,待浆料凝固干燥后非常坚固。当板与固定的桩、柱、梁或其它墙体连接又不能从榫槽两头穿插榫头时,可以制成榫槽外口略大于榫头宽处的榫槽,把榫头插入榫槽后用专用浆料充挤满榫槽内剩余的空间,待浆料凝固干燥后非常坚固。When the wall board is connected with piles, columns, beams or other walls, the joints of piles, columns, beams or other walls are made with tenon grooves (external replicas of tenons), and the tenons are inserted into the tenon grooves without bite The joint is filled tightly with special slurry, which is very strong after the slurry is solidified and dried. When the board is connected to a fixed pile, column, beam or other wall and the tenon cannot be inserted from both ends of the tenon groove, the tenon groove can be made with the outer opening of the tenon groove slightly larger than the width of the tenon head. After inserting the tenon head into the tenon groove, use special pulp The slurry fills the remaining space in the tongue and groove, and the slurry is very strong after it is solidified and dried.

(4)一种拉锁式墙体部品,在部品至少一个边角处设有楔形槽,任选地,在楔形槽的边缘还设有缺口,其楔形槽的至少一个侧面设置有一个或多个,优选两个或两个以上凹槽或凸起。(4) A zipper type wall part, with a wedge-shaped groove at at least one corner of the part, optionally, a notch is also provided on the edge of the wedge-shaped groove, and at least one side of the wedge-shaped groove is provided with one or more , preferably two or more grooves or protrusions.

楔形槽为在墙体部品边缘设置的外楔形槽以及在外楔形槽和侧面之间的凹部形成的内楔形槽。The wedge-shaped groove is an outer wedge-shaped groove provided on the edge of the wall part and an inner wedge-shaped groove formed by a recess between the outer wedge-shaped groove and the side surface.

(5)一种制作拉锁式墙体部品时使用的拉锁键,为一个楔形柱体,其中两个面相互垂直,称为垂直面,另外的面称为槽口面,其拉锁键至少一个槽口面上设有一个或多个,优选两个或两个以上的凹槽或凸起。(5) A zipper key used in the production of zipper-type wall parts, which is a wedge-shaped cylinder, two of which are perpendicular to each other, called the vertical surface, and the other surface is called the notch surface, and the zipper key has at least one groove One or more, preferably two or more grooves or protrusions are arranged on the mouth surface.

(6)拉锁式墙体部品的制备方法主要包括模具方法、挤压方法和划切方法。下面对三种方法进行简单描述,可以说明是下面三种方法的描述不应理解为对本发明的限制,本领域技术人员也可以根据其它现有的方法制备拉锁式墙体部品。(6) The preparation methods of zipper wall parts mainly include mold method, extrusion method and cutting method. The three methods are briefly described below, and it can be explained that the description of the following three methods should not be construed as limiting the present invention, and those skilled in the art can also prepare zipper type wall parts according to other existing methods.

(6-1)利用模具方法制作上述拉锁式墙体部品,主要包括以下步骤:(6-1) Using the mold method to make the above-mentioned zipper type wall parts mainly includes the following steps:

组装拉锁式墙体部品的制作模具,主要由边框、挡板和本发明上述的拉锁键构成,即该拉锁键为一个楔形柱体,其中两个面相互垂直,另外的两个槽口面中的至少一个,优选两个槽口面上设有两个或两个以上的凹槽或凸起;The production mold for assembling the zipper type wall parts is mainly composed of a frame, a baffle plate and the above-mentioned zipper key of the present invention, that is, the zipper key is a wedge-shaped cylinder, wherein two surfaces are perpendicular to each other, and the other two notch surfaces At least one, preferably two notches, are provided with two or more grooves or protrusions;

模具内侧固定拉锁键,特别地,将拉锁键垂直边设于边框上,固定方式可选择固定连接,也可以选择活动连接,活动连接方式可以选择磁铁或内楔形槽,相应地,固定连接的拉锁键为非活体拉锁键,活动连接的拉锁键为活体拉锁键;The zipper key is fixed on the inside of the mold. In particular, the vertical side of the zipper key is set on the frame. The fixing method can be fixed connection or movable connection. The movable connection method can be magnet or inner wedge-shaped groove. Correspondingly, the fixed connection zipper The key is a non-living zipper key, and the movable zipper key is a living zipper key;

填铺料浆,任选投放保温材料或投放其它填充物,或者安装中空管或安装中空托板等,然后再填铺料浆,料浆优选为镁水泥料浆、硫铝水泥料浆、普通水泥料浆或其它建筑材料原料制成的料浆;Fill the slurry, optionally put in insulation materials or other fillers, or install hollow pipes or hollow pallets, etc., and then fill the slurry. The slurry is preferably magnesium cement slurry, sulfur-aluminum cement slurry, Ordinary cement slurry or slurry made of other building material raw materials;

凝固定型后,拆除辅助部件,包括边框、挡板或中空管、中空托板、锁扣键等,最后取下拉锁键。After solidification and fixing, remove the auxiliary parts, including the frame, baffle or hollow tube, hollow supporting plate, lock key, etc., and finally remove the lock key.

通过以上方法制作形成本发明的拉锁式墙体部品,在其侧面和外楔形槽之间形成的内楔形槽的至少一侧,优选在内楔形槽的两侧产生两个或两个以上横向凹槽或凸起。Form the zipper type wall part of the present invention by the above method, at least one side of the inner wedge-shaped groove formed between its side and the outer wedge-shaped groove, preferably two or more transverse grooves are produced on both sides of the inner wedge-shaped groove Grooves or bumps.

(6-2)利用划切方法制作拉锁式墙体部品,(6-2) Make zipper wall parts by cutting method,

优选地,该划切方法主要包括以下步骤:Preferably, the slitting method mainly includes the following steps:

脱料槽划切子工序,其将拉锁式墙体部品基材先行划切出脱料槽,在脱料槽划切过程中条状余料由脱料槽中自然向外脱落;Stripping chute cutting sub-process, which cuts the base material of the zipper type wall parts out of the stripping chute first, and the strip-shaped residual material naturally falls off from the stripping chute during the cutting process of the stripping chute;

拉锁槽定型子工序,拉锁槽定型子工序在拉锁式墙体部品基材脱料槽的基础上进一步划切出拉锁槽,在拉锁槽划切过程中条状余料由拉锁槽中向外自然脱落。The zipper groove shaping sub-process, the zipper groove shaping sub-process further cuts out the zipper groove on the basis of the zipper-type wall part base material stripping groove, and the strip-shaped residual material is naturally outward from the zipper groove during the cutting process of the zipper groove fall off.

其中,还可以包括以下步骤:Among them, the following steps may also be included:

任选地拉锁槽轮廓划型子工序,其设置在脱料槽划切子工序与拉锁槽定型子工序之间,用于划出的轮廓槽边角呈圆弧状;或Optionally, the zipper groove profile drawing sub-process is arranged between the stripping chute cutting sub-process and the zipper groove shaping sub-process, and the corners of the contour groove for drawing are arc-shaped; or

任选地,拉锁槽轮廓粗型子工序,其设置在脱料槽划切子工序与拉锁槽定型子工序之间,用于划切出的轮廓粗型槽截面形状小于拉锁槽定型子工序划切出的拉锁槽的截面形状。Optionally, the rough outline of the zipper groove sub-process, which is arranged between the stripping trough scoring and cutting sub-process and the zipper groove shaping sub-process, is used to draw and cut the contour rough-type groove cross-sectional shape smaller than the zipper groove shaping sub-process. The cross-sectional shape of the zipper groove.

优选地,该划切方法主要包括以下步骤:Preferably, the slitting method mainly includes the following steps:

拉锁槽上划切子工序,其将拉锁式墙体部品基材拉锁槽的上槽体先行划切出,在拉锁槽的上槽体划切过程中条状余料由拉锁槽的上槽体中脱落;The sub-process of scribing and cutting on the zipper groove is to cut out the upper groove body of the zipper groove of the base material of the zipper type wall part first, and the strip-shaped residual material is drawn from the upper groove body of the zipper groove during the cutting process of the upper groove body of the zipper groove. fall off;

拉锁槽定型子工序,其在拉锁式墙体部品基材拉锁槽的上槽体基础上进一步划切出拉锁槽,在拉锁槽划切过程中条状余料由拉锁槽中向外脱落。The sub-process of zipper groove shaping is to further cut out the zipper groove on the basis of the upper groove body of the zipper groove of the base material of the zipper type wall part, and the strip-shaped residual material falls out from the zipper groove during the cutting process of the zipper groove.

(6-3)利用挤压方法制作上述拉锁式墙体部品,其中挤压方法主要包括地爬式挤压(挤压机移动)、阿科太式挤压(挤压式固定)和真空挤出。(6-3) Make the above-mentioned zipper wall parts by extrusion method, and the extrusion method mainly includes crawling extrusion (extrusion machine movement), Arcotai extrusion (extrusion fixed) and vacuum extrusion out.

其中,地爬式挤压一般是挤压机在长60-100m固定台座上行走,边移动边挤压并辅助震动成型混凝土空心墙体部品。在台座上养护一定时间,经移动切割机在任意长度上切割后,再吊装、打包、堆放养护。Among them, the crawling extrusion generally means that the extruder walks on a fixed pedestal with a length of 60-100m, extrudes while moving and assists vibration to form concrete hollow wall parts. It is cured on the pedestal for a certain period of time, and after being cut at any length by a mobile cutting machine, it is hoisted, packed, and stacked for maintenance.

其中,阿科太式挤压一般为挤压机固定不支,板材在成型托板上随工艺流水线移动,完成养护、切割、吊装工序。Among them, Arcotai-type extrusion is generally not supported by the extrusion machine, and the sheet moves on the forming pallet with the process line to complete the maintenance, cutting, and hoisting processes.

其中,真空挤出一般为依靠一根大直径螺杆推动混凝土混合料,使其受到挤压和剪切作用,并经过真空吸和模口收缩形成压力,使混合料达到密实和尺寸准确的目的,可以生产具有多种断面形状的系列化板材。Among them, vacuum extrusion generally relies on a large-diameter screw to push the concrete mixture, subjecting it to extrusion and shearing, and forming pressure through vacuum suction and die shrinkage, so that the mixture can be dense and accurate in size. Serialized plates with various cross-sectional shapes can be produced.

下面结合附图对本发明的拉锁式墙体部品安装方法的具体实施方式进一步说明,但不做对本发明的限定。The specific implementation method of the zipper type wall component installation method of the present invention will be further described below in conjunction with the accompanying drawings, but the present invention is not limited thereto.

具体实施例一Specific embodiment one

在图1所示的流程图中,本发明拉锁式墙体部品的安装方法,包括前续准备步骤、首块板安装步骤、后N块板安装步骤、墙体平整步骤,其还包括:In the flow chart shown in Figure 1, the installation method of the zipper type wall parts of the present invention includes the previous preparation steps, the first board installation step, the rear N board installation steps, and the wall leveling step, which also includes:

锁定卡件安装工序,其优选设置在首块板安装步骤和后N块板安装步骤中。The lock clip installation process is preferably set in the first board installation step and the last N board installation steps.

在该具体实施例一中引入锁定卡件安装工序能够很好的解决墙体部品与建筑结构的材质不一致,在其二者的连接中时常出现开裂的技术问题。Introducing the installation process of locking clips in the first embodiment can well solve the technical problem that the material of the wall parts and the building structure are not consistent, and cracks often occur in the connection between the two.

在图1所示的流程图中,前续准备步骤包括清理施工现场工序A1、清理基层工序A2、放线工序A3和配板工序A4。In the flow chart shown in FIG. 1 , the preparatory steps include cleaning the construction site process A1 , cleaning the base layer process A2 , laying out the process A3 and matching the board process A4 .

进一步地,清理施工现场工序A1,即在施工作业前,施工现场应清理干净、场地应平整,并具备安装墙体部品的施工作业条件。Further, clean up the construction site process A1, that is, before the construction operation, the construction site should be cleaned up, the site should be level, and the construction conditions for installing wall parts should be met.

清理基层工序A2,即在施工前,应先清理基层,对需要处理的光滑地面应进行凿毛处理。The process of cleaning the base layer A2, that is, before construction, the base layer should be cleaned first, and the smooth ground that needs to be treated should be chiseled.

放线工序A3,即按安装排板图方线,标出每块拉锁式墙体部品10安装位置、门窗洞口位置,放线应清晰,位置应准确,并应检查无误后在进行下道工序施工。Lay-out process A3, that is, mark the installation position of each zipper-type wall part 10 and the position of the door and window opening according to the square line of the installation board layout. construction.

在此,清理施工现场工序A1、清理基层工序A2、放线工序A3为建筑安装通用工序,这里不具体描述。Here, the process A1 of cleaning the construction site, the process A2 of cleaning the grassroots, and the process A3 of laying out wires are common processes of construction and installation, and will not be described in detail here.

配板工序A4为拉锁式墙体部品10的制作拉锁槽子工序或空心拉锁式墙体部品10板顶端填实制平子工序。The plate matching process A4 is the process of making the zipper groove of the zipper type wall part 10 or the sub-process of filling and flattening the top of the plate of the hollow zipper type wall part 10 .

进一步地,如图2所示,制作拉锁槽子工序用于无拉锁槽的墙体部品10连接面上的拉锁槽101现场制作。在通常情况下拉锁式墙体部品10的两个连接侧面上制有拉锁槽101,在配板工序A4中由于建筑墙体的宽度不一定是拉锁式墙体部品10宽度的倍数,会对最后一块拉锁式墙体部品10尾板进行纵向切割,其一侧的拉锁槽101会被切除,为了保证拉锁式墙体部品10的连接稳固性,需对其无拉锁槽101的一侧进行现场制作拉锁槽101。Further, as shown in FIG. 2 , the process of making the zipper groove is used for on-site fabrication of the zipper groove 101 on the connection surface of the wall part 10 without the zipper groove. Under normal circumstances, the two connecting sides of the zipper type wall parts 10 are shaped on zipper grooves 101. In the matching process A4, the width of the building wall is not necessarily a multiple of the width of the zipper type wall parts 10. A zipper-type wall part 10 tail plate is cut longitudinally, and the zipper groove 101 on one side will be cut off. In order to ensure the connection stability of the zipper-type wall part 10, the side without the zipper groove 101 needs to be fabricated on-site Zipper slot 101 .

值得注意的是,为了保证拉锁式墙体部品10顶端与建筑梁或棚顶13的连接稳固性。图2所示,空心拉锁式墙体部品板顶端填实制平子工序为在配板工序A4中需直接将空心拉锁式墙体部品10的中空腔102的顶端塞入建筑浆料103或功能带后抹平。It is worth noting that in order to ensure the stability of the connection between the top of the zipper type wall part 10 and the building beam or roof 13 . As shown in Figure 2, the sub-process of filling and flattening the top of the hollow zipper wall part board is to directly insert the top of the hollow cavity 102 of the hollow zipper type wall part 10 into the construction slurry 103 or functional belt in the board matching process A4. After smoothing.

在图1所示的流程图中,首块板安装步骤包括首块板定位工序B1、校正工序ⅠB2、板顶端注浆料工序ⅠB3、楔紧固定工序ⅠB4和缝口注浆料工序ⅠB5。In the flow chart shown in Figure 1, the first board installation steps include the first board positioning process B1, calibration process IB2, plate top grouting process IB3, wedging fixation process IB4 and seam grouting process IB5.

进一步地,如图3所示,首块板定位工序B1为将拉锁式墙体部品10放置在建筑构造柱/建筑墙体11的一侧并进行初步定位。Further, as shown in FIG. 3 , the first panel positioning process B1 is to place the zipper type wall part 10 on one side of the building structure column/building wall 11 and perform preliminary positioning.

校正工序ⅠB2为微调拉锁式墙体部品10相对于建筑构造柱/建筑墙体11的位置和角度对拉锁式墙体部品10进行准确定位。The calibration process IB2 is to fine-tune the position and angle of the zipper type wall part 10 relative to the building structure column/building wall 11 to accurately position the zipper type wall part 10 .

板顶端注浆料工序ⅠB3为将制平制实的拉锁式墙体部品10的顶端104注入适量粘接浆料。The top grout injection process IB3 is to inject an appropriate amount of adhesive paste into the top 104 of the flat and solid zipper type wall part 10 .

楔紧固定工序ⅠB4为在拉锁式墙体部品10的底端打入紧固楔12使拉锁式墙体部品10的顶端104与建筑梁或棚顶13紧密接触后将并多余的粘接浆料挤出。其中,本发明对紧固楔的结构不作具体限制,本领域技术人员根据实际拉链式墙体部品的情况而选择。例如,紧固楔的结构可以为采用建筑用胶凝材料一体浇筑成型;紧固楔可制成由楔尖、楔尾构成的短尾楔,或者制成由楔尖、楔体和楔尾构成长尾楔;楔尖由楔底面和楔上斜面形成的锐角构成,楔尾包括有击打面。Wedging and fixing process IB4 is to drive the fastening wedge 12 into the bottom end of the zipper type wall part 10 so that the top 104 of the zipper type wall part 10 is in close contact with the building beam or the roof 13 and remove the excess adhesive paste. extrude. Wherein, the present invention does not specifically limit the structure of the fastening wedge, which is selected by those skilled in the art according to the actual conditions of the zipper type wall parts. For example, the structure of the fastening wedge can be integrally cast with cementitious materials for construction; the fastening wedge can be made into a short tail wedge composed of a wedge tip and a wedge tail, or made of a wedge tip, a wedge body and a wedge tail. Long tail wedge; the tip of the wedge is formed by the acute angle formed by the bottom surface of the wedge and the slope on the wedge, and the tail of the wedge includes the striking surface.

缝口注浆料工序ⅠB5为将拉锁式墙体部品10与建筑构造柱/建筑墙体11之间的连接间隙和拉锁式墙体部品10与地面14之间的间隙注入粘接浆料,其中,板顶端注浆料工序ⅠB3和/或缝口注浆料工序ⅠB5可以替换为安装功能带。The joint grouting process IB5 is to inject the bonding slurry into the connection gap between the zipper type wall part 10 and the building structure column/building wall 11 and the gap between the zipper type wall part 10 and the ground 14, wherein , The plate top grouting process IB3 and/or seam grouting process IB5 can be replaced by the installation function belt.

在图1所示的流程图中,后N块板安装步骤包括第N块板定位工序C1、校正工序ⅡC2、板顶端注浆料工序ⅡC3、楔紧固定工序ⅡC4、校平工序C5、拉锁槽注浆料工序C6和缝口注浆料工序ⅡC7。In the flow chart shown in Figure 1, the installation steps of the last N boards include the positioning process C1 of the Nth board, the calibration process IIC2, the grouting process IIC3 at the top of the board, the wedging and fixing process IIC4, the leveling process C5, and the zipper groove Grouting process C6 and joint grouting process II C7.

进一步地,如图4所示,第N块板定位工序C1将拉锁式墙体部品10放置在首块拉锁式墙体部品10的一侧并进行初步定位。校正工序ⅡC2、板顶端注浆料工序ⅡC3、楔紧固定工序ⅡC4、缝口注浆料工序ⅡC7与首块板定位工序B1的校正工序ⅠB2、板顶端注浆料工序ⅠB3、楔紧固定工序ⅠB4、缝口注浆料工序ⅠB5一致。其中板顶端注浆料工序ⅡC3和/或缝口注浆料工序ⅡC7可以替换为安装功能带。Further, as shown in FIG. 4 , the Nth plate positioning process C1 places the zipper type wall part 10 on one side of the first zipper type wall part 10 and performs preliminary positioning. Correction process ⅡC2, plate top grouting process ⅡC3, wedging and fixing process ⅡC4, seam grouting process ⅡC7 and first plate positioning process B1 correction process ⅠB2, plate top grouting process ⅠB3, wedging and fixing process ⅠB4 , Seam grouting process Ⅰ B5 consistent. Wherein, the plate top grouting process IIC3 and/or seam grouting process IIC7 can be replaced by the installation function belt.

校平工序C5优选采用加装平整杠15对相邻的拉锁式墙体部品10平整度进行校平。平整杠15由对称设置的两块条状体151和贯穿条状体151中部的紧固螺栓152构成。其中可以至少一块拉锁式墙体部品10安装完成后进行校平工序C5,也可以全部拉锁式墙体部品10安装完成后进行校平工序C5。In the leveling process C5, the leveling bar 15 is preferably used to level the flatness of the adjacent zipper type wall parts 10 . The leveling bar 15 is composed of two strips 151 arranged symmetrically and a fastening bolt 152 penetrating through the middle of the strips 151 . The leveling process C5 may be performed after at least one zipper type wall part 10 is installed, or the leveling process C5 may be performed after all the zipper type wall parts 10 are installed.

优选地,为了进一步增强拉锁式部品的牢固性,校平工序C5后还可以进行楔紧固定工序ⅡC4。Preferably, in order to further enhance the firmness of the zipper-type parts, the wedging and fixing process IIC4 may be performed after the leveling process C5.

拉锁槽注浆料工序C6为在相连接的拉锁式墙体部品10的拉锁槽101中灌注粘接浆料。其中拉锁槽注浆料工序C6可以替换为安装功能带。The zipper groove grout injection process C6 is to pour adhesive slurry into the zipper groove 101 of the connected zipper type wall parts 10 . Among them, the zipper groove grouting process C6 can be replaced by the installation function belt.

优选地,拉锁槽注浆料工序C6之后还可以进行楔间空隙注实浆料。其中楔间空隙注实浆料可以替换为安装功能带。Preferably, after the grouting step C6 for the zipper groove, the grouting for the space between wedges may also be injected. Among them, the cementing grout in the gap between wedges can be replaced by the installation function belt.

优选地,当本发明的安装方法还包括在后N块板安装步骤完成之后还需要卸平整杠15。Preferably, when the installation method of the present invention also includes that the leveling bars 15 need to be unloaded after the installation steps of the last N boards are completed.

在图1所示的流程图中,墙体平整步骤包括任选地加装防裂带工序D1、任选地门窗洞口增强工序D2、缝口及墙面处理工序D3和验收工序D4。In the flow chart shown in Figure 1, the wall leveling step includes optional installation of anti-cracking belt process D1, optional door and window opening strengthening process D2, seam and wall surface treatment process D3 and acceptance process D4.

在优选的实施方式中,墙体平整步骤包括缝口及墙面处理工序D3和验收工序D4。In a preferred embodiment, the wall leveling step includes a seam and wall surface treatment process D3 and an acceptance process D4.

如图6所示,加装防裂带工序D1为在相邻的两块拉锁式墙体部品10板面拉锁槽101的连接处粘贴防裂带16或注入防裂带浆料。As shown in FIG. 6 , the process D1 of installing the anti-crack tape is to paste the anti-crack tape 16 or inject the anti-crack tape slurry at the junction of two adjacent zipper type wall parts 10 zipper grooves 101 .

其中,门窗洞口增强工序D2为拉锁式墙体部品10所拼接设置的门窗洞口处进行进一步加固。Wherein, the step D2 of strengthening door and window openings is to further strengthen the door and window openings where the zipper type wall parts 10 are spliced.

缝口及墙面处理工序D3、验收工序D4为建筑装饰通用程序,这一不在赘述。Seam and wall surface treatment process D3 and acceptance process D4 are common procedures for architectural decoration, which will not be repeated here.

在图1所示的流程图中,锁定卡件安装工序包括:In the flow chart shown in Figure 1, the locking clip installation process includes:

柱体卡件安装工序E1,其设置在首块板定位工序B1前端;和/或Cylinder clamp installation process E1, which is arranged at the front end of the first board positioning process B1; and/or

梁卡件安装工序E2和/或地卡件安装工序E3,其设置在楔紧固定工序ⅠB4和缝口注浆料工序ⅠB5之间;和/或Beam clamp installation process E2 and/or ground clamp installation process E3, which is arranged between the wedging and fixing process IB4 and the seam grouting material process IB5; and/or

抗震卡件安装工序E4,其设置在第N块板定位工序C1之后。The anti-seismic clip installation process E4 is set after the Nth board positioning process C1.

在本发明的另一种优选实施方式中,用于拉锁式墙体部品的锁定卡件包括柱体卡件E11、抗震卡件E41、梁卡件E21和地卡件E31中的至少一者。优选地,梁卡件E21和地卡件E31的结构相同,统称为梁地卡件。本发明对柱体卡件E11、抗震卡件E41、梁卡件E21和地卡件E31的结构不作具体地限制,本领域技术人员可以根据实际的拉锁式墙体部品的结构而确定。In another preferred embodiment of the present invention, the locking clip used for the zipper type wall component includes at least one of the column clip E11 , the anti-seismic clip E41 , the beam clip E21 and the ground clip E31 . Preferably, the structure of the beam clip E21 and the ground clip E31 are the same, and they are collectively referred to as beam ground clips. The present invention does not specifically limit the structure of the column clamp E11, the anti-seismic clamp E41, the beam clamp E21 and the ground clamp E31, and those skilled in the art can determine it according to the actual structure of the zipper type wall parts.

其中,柱体卡件用于拉锁式墙体部品与建筑柱体/墙体之间的连接、锁定和紧固。Among them, the column clamp is used for the connection, locking and fastening between the zipper type wall parts and the building column/wall.

在本发明的一个更优选地实施方式中,如图8的放大图为柱体卡件的示意图。柱体卡件E11主要包括固定连板组件E11-1、内连板组件E11-2和顶固螺丝E11-3;In a more preferred embodiment of the present invention, the enlarged view of FIG. 8 is a schematic diagram of the cylinder clamp. The column clamp E11 mainly includes the fixed connecting plate assembly E11-1, the inner connecting plate assembly E11-2 and the jacking screw E11-3;

固定连板组件E11-1由直条板E11-1a和固定设置在直条板左右两端的边卡板ⅠE11-1b和边卡板Ⅱ E11-1c构成;The fixed connecting plate assembly E11-1 is composed of straight slat E11-1a, side clamp ⅠE11-1b and side clamp Ⅱ E11-1c fixedly arranged at the left and right ends of the straight slat;

内连板组件E11-2由固定板E11-2a和连接在固定板左右两端的锁定板Ⅰ E11-2b和锁定板Ⅱ E11-2c构成,内连板组件E11-2固定设置在固定连板组件直条板E11-1a的内侧面上;The inner connecting plate assembly E11-2 is composed of the fixed plate E11-2a, the locking plate I E11-2b and the locking plate II E11-2c connected to the left and right ends of the fixed plate, and the inner connecting plate assembly E11-2 is fixedly arranged on the fixed connecting plate assembly On the inner side of the straight strip E11-1a;

顶固螺丝E11-3旋转连接在边卡板Ⅰ E11-1b、边卡板Ⅱ E11-1c上设置的螺纹孔内,固定连板组件E11-1上的直条板E11-1a的外侧面与建筑柱体/墙体固定连接,锁定板ⅠE11-2b、锁定板Ⅱ E11-2c由顶固螺丝E11-3顶固并锁定在拉锁式墙体部品拉锁凸槽的梯形边上。The top fixing screw E11-3 is rotatably connected in the threaded holes provided on the side clamping plate I E11-1b and the side clamping plate II E11-1c, and fixes the outer surface of the straight strip E11-1a on the connecting plate assembly E11-1 with the Building column/wall fixed connection, locking plate ⅠE11-2b, locking plate Ⅱ E11-2c are fastened and locked on the trapezoidal side of the zipper convex groove of the zipper wall part by the top fixing screw E11-3.

更优选地,柱体卡件E11还包括旋转轴。其中内连板组件的锁定板I、锁定板II通过该旋转轴铰接在固定板的左右两端。More preferably, the cylinder clamp E11 also includes a rotating shaft. Wherein the locking plate I and the locking plate II of the inner connecting plate assembly are hinged to the left and right ends of the fixed plate through the rotating shaft.

进一步,柱体卡件E11还包括连接块。其中锁定板I和锁定板II通过旋转轴和连接块铰接,连接块固定设置在直条板内侧面的两端。Further, the cylinder clamp E11 also includes a connection block. Wherein the locking plate I and the locking plate II are hinged through the rotating shaft and the connecting block, and the connecting block is fixedly arranged at both ends of the inner surface of the straight strip.

在本发明的一个更优选地实施方式中,柱体卡件E11主要包括固定连板组件、顶固螺丝和对称设置在固定连板组件两端的两个内连板组件;In a more preferred embodiment of the present invention, the column clip E11 mainly includes a fixed connecting plate assembly, a jacking screw and two inner connecting plate assemblies symmetrically arranged at both ends of the fixed connecting plate assembly;

固定连板组件由直条板、两块连板和卡板Ⅰ、卡板Ⅱ构成,卡板Ⅰ、卡板Ⅱ通过连板固定连接在直条板的两端;The fixed connecting board assembly is composed of a straight board, two connecting boards and clamping board I and clamping board II, and the clamping board I and clamping board II are fixedly connected to both ends of the straight board through the connecting board;

内连板组件由锁板和固定连接在锁板一端的夹板构成,两个内连板组件通过其夹板夹卡在固定连板组件卡板Ⅰ、卡板Ⅱ上以实现其三者之间的锁定连接。The inner connecting plate assembly is composed of a locking plate and a splint fixedly connected to one end of the locking plate. The two inner connecting plate assemblies are clamped on the clamping plate Ⅰ and clamping plate Ⅱ of the fixed connecting plate assembly through their clamping plates to realize the connection between the three. Lock the connection.

锁板上设置的贯通孔,紧固螺栓穿过内连板组件锁板上设置的贯通孔以实现锁板锁定在拉锁式墙体部品拉锁凸槽的梯形边上,固定连板组件上的直条板的外侧面与建筑柱体/墙体固定连接。The through hole provided on the lock plate, the fastening bolt passes through the through hole provided on the lock plate of the inner connecting plate assembly to realize the locking of the lock plate on the trapezoidal edge of the zipper convex groove of the zipper type wall part, and fix the straight part on the connecting plate assembly The outer side of the batten is fixedly connected to the building column/wall.

抗震卡件E41应用于两块拉锁式墙体部品之间的连接、锁定和紧固。The anti-seismic clip E41 is used for connection, locking and fastening between two zipper wall parts.

在本发明的一个更优选地实施方式中,如图10的放大图为抗震卡件的示意图。抗震卡件E41主要包括夹板组件Ⅰ E41-1、夹板组件Ⅱ E41-2和螺栓组件E41-3,夹板组件ⅠE41-1和夹板组件Ⅱ E41-2通过螺栓组件E41-3相连接;In a more preferred embodiment of the present invention, the enlarged view of FIG. 10 is a schematic diagram of the anti-seismic clip. The anti-seismic clip E41 mainly includes the splint assembly I E41-1, the splint assembly II E41-2 and the bolt assembly E41-3, and the splint assembly IE41-1 and the splint assembly II E41-2 are connected by the bolt assembly E41-3;

夹板组件Ⅰ E41-1和夹板组件Ⅱ E41-2均包括固定连接在一起左翼板E41-1a\E41-2a和右翼板E41-1b\E41-2b;Both the splint assembly I E41-1 and the splint assembly II E41-2 include the left wing plate E41-1a\E41-2a and the right wing plate E41-1b\E41-2b which are fixedly connected together;

左翼板E41-1a\E41-2a和右翼板E41-1b\E41-2b的板体形状与拉锁式墙体部品拉锁凸槽的梯形边的形状相匹配;The shape of the left wing plate E41-1a\E41-2a and the right wing plate E41-1b\E41-2b match the shape of the trapezoidal edge of the zipper convex groove of the zipper type wall part;

左翼板E41-1a\E41-2a和右翼板E41-1b\E41-2b其连接后呈角度为小于180度大于90度的V字形状;The left wing plate E41-1a\E41-2a and the right wing plate E41-1b\E41-2b are connected to form a V shape with an angle of less than 180 degrees and greater than 90 degrees;

夹板组件Ⅰ E41-1、夹板组件Ⅱ E41-2通过其左翼板E41-1a\E41-2a和右翼板E41-1b\E41-2b夹扣在拉锁式墙体部品拉锁凸槽的梯形边上以完成两块拉锁式墙体部品之间的连接。The splint assembly I E41-1 and the splint assembly II E41-2 are clamped on the trapezoidal side of the zipper convex groove of the zipper type wall part through its left wing plate E41-1a\E41-2a and right wing plate E41-1b\E41-2b. Complete the connection between two zippered wall parts.

在本发明的另一种优选实施方式中,用于拉锁式墙体部品的抗震卡件E41主要包括夹板组件Ⅰ、夹板组件Ⅱ和螺栓组件,夹板组件Ⅰ和夹板组件Ⅱ通过螺栓组件相连接;In another preferred embodiment of the present invention, the anti-seismic clip E41 for zipper type wall parts mainly includes a splint assembly I, a splint assembly II and a bolt assembly, and the splint assembly I and splint assembly II are connected through the bolt assembly;

夹板组件Ⅰ和夹板组件Ⅱ均包括有固定连接在一起左翼板和右翼板;Both the splint assembly I and the splint assembly II include a left wing plate and a right wing plate fixedly connected together;

左翼板和右翼板其连接后角度为180度设置的平直形状;The left wing plate and the right wing plate are connected to a straight shape with an angle of 180 degrees;

左翼板和右翼板的板面横向两端面上制有凸状榫条;Convex mortise strips are formed on the lateral ends of the left and right wing plates;

夹板组件Ⅰ、夹板组件Ⅱ通过其左翼板和右翼板两端面上制有凸状榫条夹扣在拉锁式墙体部品拉锁凸槽的梯形边上以完成两块锁式墙体部品之间的连接。在本发明的一个更优选地实施方式中,抗震卡件E41主要包括顶固螺丝、工字板组件和对称固定连接在工字板组件左右两端的两个内连板组件;Plywood assembly Ⅰ and plywood assembly Ⅱ are fastened on the trapezoidal side of the zipper convex groove of the zipper type wall parts through the convex tenon clips on the two ends of the left wing plate and the right wing plate to complete the locking between the two lock type wall parts. connect. In a more preferred embodiment of the present invention, the anti-seismic clip E41 mainly includes top fixing screws, an I-shaped plate assembly, and two inner connecting plate assemblies symmetrically fixedly connected to the left and right ends of the I-shaped plate assembly;

工字板组件由直连板和固定设置在直连板左右两端的边板Ⅰ和边板Ⅱ构成;The I-shaped plate assembly is composed of a direct connection plate and side plates I and II fixedly arranged at the left and right ends of the direct connection plate;

两个内连板组件均由固定板和连接在固定板左右两端的锁定板Ⅰ和锁定板Ⅱ构成,内连板组件固定设置在工字板组件直连板的两侧面上;The two inner connecting plate assemblies are composed of a fixed plate and locking plates I and II connected to the left and right ends of the fixing plate, and the inner connecting plate assemblies are fixedly arranged on both sides of the direct connecting plate of the I-shaped plate assembly;

顶固螺丝旋转连接在边板Ⅰ、边板Ⅱ横向两端设置的螺纹孔内,锁定板Ⅰ、锁定板Ⅱ由顶固螺丝顶固并锁定在两块拉锁式墙体部品拉锁凸槽的梯形边上。The top-fixing screws are rotatably connected in the threaded holes set at the lateral ends of the side plates Ⅰ and Ⅱ. The locking plates Ⅰ and Ⅱ are fastened by the top-fixing screws and locked in the trapezoidal grooves of the zipper convex grooves of the two zipper-type wall parts. side.

更优选地,该抗震卡件E41还包括旋转轴。其中锁定板I、锁定板II通过旋转轴铰接在固定板的左右两端。More preferably, the anti-vibration clamp E41 also includes a rotating shaft. Wherein the locking plate I and the locking plate II are hinged to the left and right ends of the fixed plate through the rotating shaft.

进一步,该抗震卡件E41还包括连接块。其中锁定板I、锁定板II通过旋转轴与连接块铰接,连接块固定设置在工字板组件直连板的两侧面的两端。Further, the anti-seismic clip E41 also includes a connecting block. Wherein the locking plate I and the locking plate II are hinged to the connecting block through the rotating shaft, and the connecting block is fixedly arranged at both ends of the two sides of the direct connecting plate of the I-shaped plate assembly.

在本发明的一个更优选地实施方式中,如图9的放大图为梁卡件E21的示意图。所述梁卡件E21由固定板Ⅱ E21-1、下夹板Ⅱ E21-2和固定设置在下夹板Ⅱ E21-2底端的双头螺杆E21-3构成,下夹板Ⅱ E21-2固定连接在固定板Ⅱ E21-1的下表面中部。In a more preferred embodiment of the present invention, the enlarged view of FIG. 9 is a schematic diagram of the beam clip E21. The beam clip E21 is composed of the fixed plate II E21-1, the lower splint II E21-2 and the double-ended screw E21-3 fixedly arranged at the bottom of the lower splint II E21-2, and the lower splint II E21-2 is fixedly connected to the fixed plate Ⅱ The middle of the lower surface of E21-1.

所述固定板Ⅱ E21-1上制有通孔E21-1a,下夹板Ⅱ E21-2夹卡在抗震卡件E41的夹板组件Ⅰ E41-1和夹板组件Ⅱ E41-2之间,梁卡件E21通过其双头螺杆E21-3的两端分别插入抗震卡件E41的夹板组件Ⅰ E41-1和夹板组件Ⅱ E41-2上制有的螺栓孔E41-3中以实现其三者的紧固连接。在梁卡件E21的具体应用中固定板Ⅱ E21-1通过其通孔 E21-1a由膨胀螺丝固定在建筑梁或棚顶的底面,抗震卡件E41的夹板组件Ⅰ E41-1和夹板组件Ⅱ E41-2在连接、锁定和紧固墙体部品的同时将梁卡件E21的下夹板Ⅱ E21-2卡固在墙体部品连接缝隙内。所述下夹板Ⅱ E21-2底端设置的双头螺杆E21-3穿过抗震卡件E41的夹板组件Ⅰ E41-1和夹板组件Ⅱ E41-2上的螺栓孔中,以实现锁定功能。The fixed plate II E21-1 is formed with a through hole E21-1a, and the lower splint II E21-2 is sandwiched between the splint assembly I E41-1 and the splint assembly II E41-2 of the anti-seismic clamp E41, and the beam clamp E21 inserts the two ends of the double-ended screw E21-3 into the bolt holes E41-3 made on the splint assembly I E41-1 and splint assembly II E41-2 of the anti-seismic clip E41 respectively to realize the fastening of the three connect. In the specific application of the beam clip E21, the fixing plate II E21-1 is fixed on the bottom surface of the building beam or roof by expansion screws through its through hole E21-1a, and the splint assembly I E41-1 and splint assembly II of the anti-seismic clip E41 E41-2 fixes the lower plywood II E21-2 of the beam clip E21 in the connection gap of the wall parts while connecting, locking and fastening the wall parts. The double-ended screw E21-3 provided at the bottom of the lower splint II E21-2 passes through the bolt holes on the splint assembly I E41-1 and splint assembly II E41-2 of the anti-seismic clip E41 to realize the locking function.

在本发明的一个更优选地实施方式中,所述梁卡件E21由一端相互垂直固定连接的固定板Ⅰ和下夹板Ⅰ构成,固定板Ⅰ上制有通孔,下夹板夹卡在抗震卡件E41的夹板组件ⅠE41-1和夹板组件Ⅱ E41-2之间。在梁卡件E21具体应用中,固定板Ⅰ通过其通孔由膨胀螺丝固定在建筑梁或棚顶的底面,抗震卡件E41的夹板组件Ⅰ E41-1和夹板组件Ⅱ E41-2在连接、锁定和紧固墙体部品的同时将梁卡件E21的下夹板Ⅰ卡固在墙体部品连接缝隙内,以实现锁定功能。In a more preferred embodiment of the present invention, the beam clip E21 is composed of a fixed plate I and a lower splint I which are vertically connected to each other at one end. Between the splint assembly IE41-1 and the splint assembly II E41-2 of E41. In the specific application of the beam clip E21, the fixing plate I is fixed on the bottom surface of the building beam or roof by expansion screws through its through hole, and the splint assembly I E41-1 and splint assembly II E41-2 of the anti-seismic clip E41 are connected, While locking and fastening the wall parts, fix the lower splint I of the beam clip E21 in the connection gap of the wall parts to realize the locking function.

具体地,如图8所示,柱体卡件安装工序E1其具体流程为在拉锁式墙体部品10与建筑构造柱或墙体11之间安装柱体卡件E11,柱体卡件E11用于拉锁式墙体部品10与建筑构造柱或墙体11两者之间的连接固定。Specifically, as shown in Figure 8, the specific process of the column clamp installation process E1 is to install the column clamp E11 between the zipper type wall part 10 and the building construction column or wall 11, and the column clamp E11 is used It is fixed in the connection between the zipper type wall part 10 and the building structure column or wall 11 .

具体地,如图9所示,梁卡件安装工序E2其具体流程为在建筑构造梁或棚顶13上安装梁卡件E21,梁卡件E21用于拉锁式墙体部品10与建筑梁或棚顶13两者之间的连接固定。Specifically, as shown in FIG. 9 , the beam clip installation process E2 has a specific process of installing a beam clip E21 on a building construction beam or roof 13, and the beam clip E21 is used for the zipper type wall parts 10 to be connected with the building beam or roof 13. The connection between roof 13 is fixed.

具体地,如图9所示,地卡件安装工序E3其具体流程为在建筑地面14上安装地卡件E31,地卡件E31用于拉锁式墙体部品10与建筑地面14两者之间的连接固定。Specifically, as shown in FIG. 9 , the specific process of the ground clamp installation process E3 is to install the ground clamp E31 on the building ground 14, and the ground clamp E31 is used between the zipper type wall part 10 and the building ground 14. The connection is fixed.

具体地,如图10所示,抗震卡件安装工序E4其具体流程为在两块拉锁式墙体部品10之间上安装抗震卡件E41,抗震卡件E41用于相邻两块拉锁式墙体部品10之间的连接固定。Specifically, as shown in Figure 10, the specific process of the anti-seismic clip installation process E4 is to install the anti-seismic clip E41 between two zipper-type wall parts 10, and the anti-seismic clip E41 is used for two adjacent zipper-type walls. The connection between the body parts 10 is fixed.

由于目前装配式建筑墙体部品大部分为空心化,空心墙体内外的握钉力和吊挂力不明显不能满足要求。为解决上述问题,在图1所示的流程图中,本发明拉锁式墙体部品的安装方法还包括有在拉锁式墙体部品外表面安装预制吊挂件工序,其可设置在前续准备步骤、首块板安装步骤、后N块板安装步骤、墙体平整步骤的任一工序中或后。Since most of the prefabricated building wall parts are hollow, the nail holding force and hanging force inside and outside the hollow wall are not obvious and cannot meet the requirements. In order to solve the above problems, in the flow chart shown in Figure 1, the installation method of the zipper type wall parts of the present invention also includes the process of installing prefabricated hanging parts on the outer surface of the zipper type wall parts, which can be arranged in the preceding preparation step , the installation step of the first board, the installation step of the next N boards, and the step of leveling the wall body or after any process.

其中,本发明对吊挂件的结构不作具体地限制,本领域技术人员可以根据实际情况下进行设置。例如,吊挂件一般为建筑胶凝材料制成的柱状体,其横截面形状为圆形或多边形;所述吊挂件在拉锁式墙体部品上贯穿设置或非贯穿单面设置。Wherein, the present invention does not specifically limit the structure of the hanging member, and those skilled in the art can set it according to the actual situation. For example, the hanging piece is generally a columnar body made of building cementitious material, and its cross-sectional shape is circular or polygonal; the hanging piece is arranged through or non-through on one side of the zipper type wall part.

安装预制吊挂件工序具体为图7所示,在拉锁式墙体部品10上开出与制吊挂件17形状大小相匹配的通孔105,后将预制吊挂件17埋设进拉锁式墙体部品10的通孔105中。预制吊挂件17的密度大于拉锁式墙体部品10的密度,用于安装工件后吊挂各种重物。The process of installing the prefabricated hanging part is specifically shown in Figure 7. A through hole 105 matching the shape and size of the hanging part 17 is opened on the zipper type wall part 10, and then the prefabricated hanging part 17 is embedded in the zipper type wall part 10. in the through hole 105. The density of the prefabricated hanger 17 is greater than that of the zipper type wall part 10, and is used for hanging various heavy objects after the workpiece is installed.

优选地,在图1所示的流程图中,本发明拉锁式墙体部品的安装方法还包括构造柱制作工序G1。Preferably, in the flowchart shown in FIG. 1 , the installation method of the zipper type wall part of the present invention further includes a construction column manufacturing process G1.

构造柱制作工序G1设置在首块板安装步骤之前。其中构造柱上端与建筑梁或棚顶固定连接,其下端与建筑地面相连接。构造柱可将建筑墙体分成若干相邻独立的区域,在这些独立的区域内分段完成拉锁式墙体部品的安装施工,从而减小建筑墙体的宽幅以进一步提高其安全性。The structural column manufacturing process G1 is set before the first board installation step. The upper end of the structural column is fixedly connected with the building beam or roof, and the lower end is connected with the building ground. The structural column can divide the building wall into several adjacent independent areas, and the installation and construction of the zipper wall parts are completed in these independent areas, thereby reducing the width of the building wall and further improving its safety.

在具体装配式建筑墙体部品安装过程中,有时建筑室内举架过高或墙面宽幅过大,构造柱制作工序G1能够保证建筑墙体安装过程中或验收后使用过程中的稳固性,提高墙体的抗冲击力和抗震性。In the installation process of specific prefabricated building wall parts, sometimes the indoor frame of the building is too high or the width of the wall is too large. The structural column manufacturing process G1 can ensure the stability of the building wall during installation or during use after acceptance. Improve the impact resistance and earthquake resistance of the wall.

进一步地,构造柱制作工序G1可以采用传统的施工方法,其包括有构造柱现浇模板安装子工序G11、植筋及绑扎子工序G12和混凝土浇筑子工序G13。Further, the structural column manufacturing process G1 can adopt traditional construction methods, which include the structural column cast-in-place formwork installation sub-process G11, the planting reinforcement and binding sub-process G12, and the concrete pouring sub-process G13.

或者,构造柱制作工序G1采用专用免拆模具进行浇筑,专用模具与拉锁式墙体部品为同一材质,墙体安装完成后拉锁式墙体部品与构造柱浑然一体。构造柱制作工序G1包括有构造柱专用模具安装子工序G14、植筋及绑扎子工序G12和混凝土浇筑子工序G13。Alternatively, the structural column production process G1 uses a special non-dismantling mold for pouring. The special mold and the zipper wall parts are made of the same material. After the wall is installed, the zipper wall parts and the structural column are integrated. The structural column manufacturing process G1 includes the structural column special mold installation sub-process G14, the planting and binding sub-process G12, and the concrete pouring sub-process G13.

优选地,在图1所示的流程图中,本发明拉锁式墙体部品的安装方法还包括有管线同步安装工序H1和/或完善管线工序H2。管线同步安装工序H1设置在首块板安装步骤B和/或后N块板安装步骤C之中,完善管线工序H2设置在缝口及墙面处理工序D3之前。Preferably, in the flowchart shown in FIG. 1 , the installation method of the zipper type wall part of the present invention further includes a pipeline synchronous installation process H1 and/or a pipeline perfecting process H2. The pipeline synchronous installation process H1 is set in the first panel installation step B and/or the last N panels installation step C, and the pipeline improvement process H2 is set before the seam and wall surface treatment process D3.

管线同步安装工序H1为在拉锁式墙体部品的安装过程中通过其内中空腔设置各种强弱电管路。The pipeline synchronous installation process H1 is to install various strong and weak current pipelines through the inner cavity during the installation process of the zipper type wall parts.

完善管线工序H2为在墙体装饰施工之前在拉锁式墙体部品的外表面将各种管线引出并安装接线盒。The pipeline improvement process H2 is to lead out various pipelines and install junction boxes on the outer surface of the zipper type wall parts before the wall decoration construction.

优选地,在图1所示的流程图中,本发明拉锁式墙体部品的安装方法还包括有置入功能带工序I,置入功能带工序I设置在后N块板安装步骤的前端。Preferably, in the flowchart shown in FIG. 1 , the installation method of the zipper type wall parts of the present invention further includes a process I of inserting a functional band, and the process I of inserting a functional band is arranged at the front end of the installation step of the last N boards.

置入功能带工序I为两块拉锁式墙体部品连接处设置功能带,其用于拉锁式墙体隔热或隔音或防火阻燃。Inserting the functional belt process I is to set a functional belt at the junction of two zippered wall parts, which is used for heat insulation or sound insulation or fire and flame retardant of the zippered wall.

置入功能带工序I能够起到增强拉锁式墙体部品连接缝隙间的隔热、隔声或防火阻燃功能。Inserting the functional belt process I can enhance the heat insulation, sound insulation or fire and flame retardant functions between the connecting gaps of the zipper type wall parts.

优选地,本发明拉锁式墙体部品的安装方法的楔紧固定工序ⅠB4和楔紧固定工序ⅡC4中所使用的固定楔其材质与拉锁式墙体部品材质相同。由于木质楔遇潮湿环境会出现腐烂后在墙体部品与建筑结构之间会出现较多脱离现象,从而影响其二者的连接紧固强度,因此在本发明中优选使用材质相同的固定楔其材质拉锁式墙体部品。Preferably, the material of the fixing wedge used in the wedging and fixing process IB4 and the wedging and fixing process IIC4 of the installation method of the zipper type wall part of the present invention is the same as that of the zipper type wall part. Since the wooden wedge will rot in a humid environment, there will be more detachment between the wall parts and the building structure, thereby affecting the connection and fastening strength of the two. Therefore, it is preferred to use the same fixed wedge in the present invention. Material Zipper type wall parts.

在拉锁式墙体部品的安装方法创新性的设置了锁定卡件安装工序,拉锁式墙体部品通过其特有的拉锁槽结合各锁定卡件可实现墙体部品与建筑构造柱/墙体、建筑梁/棚顶、建筑地面四者卡固连接与粘接剂连接有效结合,比单一粘接剂连接稳固性、抗震性更好。In the installation method of zipper wall parts, the installation process of locking clips is innovatively set up. The zipper wall parts can be combined with each locking clip through its unique zipper groove to realize the connection between wall parts and building structural columns/walls, buildings, etc. The clamp connection of the beam/roof and the building ground is effectively combined with the adhesive connection, which is better in stability and earthquake resistance than a single adhesive connection.

具体实施例二Specific embodiment two

本发明拉锁式墙体部品的安装方法,包括前续准备步骤、首块板安装步骤、后N块板安装步骤、墙体平整步骤,还包括:The installation method of the zipper type wall parts of the present invention includes the preceding preparation steps, the first board installation step, the rear N board installation steps, and the wall leveling step, and also includes:

插固装饰条工序,其优选设置在首块板安装步骤、后N块板安装步骤和/或墙体平整步骤中。The process of inserting and fixing the decorative strip is preferably arranged in the first board installation step, the last N board installation steps and/or the wall leveling step.

在该具体实施例二中引入插固装饰条工序,能够更好的解决部品与部品连接缝隙之间随着气候环境的变化也会出现细小裂纹的技术问题。In this specific embodiment 2, the process of inserting and fixing the decorative strips is introduced, which can better solve the technical problem that small cracks will appear between the connecting gaps between parts as the climate and environment change.

具体地,如图1所示,前续准备步骤包括清理施工现场工序A1、清理基层工序A2、放线工序A3、配板工序A4。Specifically, as shown in FIG. 1 , the preparatory steps include cleaning the construction site process A1 , cleaning the base layer process A2 , laying out the process A3 , and matching the board process A4 .

首块板安装步骤包括首块板定位工序B1、校正工序ⅠB2、板顶端注浆料工序ⅠB3、楔紧固定工序ⅠB4、缝口注浆料工序ⅠB5。The installation steps of the first board include the first board positioning process B1, the calibration process IB2, the board top grouting process IB3, the wedge fixing process IB4, and the seam grouting process IB5.

后N块板安装步骤包括第N块板定位工序C1、校正工序ⅡC2、板顶端注浆料工序ⅡC3、楔紧固定工序ⅡC4、校平工序C5、拉锁槽注浆料工序C6、缝口注浆料工序ⅡC7。The installation steps of the last N boards include Nth board positioning process C1, calibration process ⅡC2, board top grouting process ⅡC3, wedge fixing process ⅡC4, leveling process C5, zipper groove grouting process C6, seam grouting Material process ⅡC7.

墙体平整步骤包括任选地门窗洞口增强工序D2、缝口及墙面处理工序D3、验收工序D4。The step of leveling the wall includes optional door and window opening strengthening process D2, seam and wall surface treatment process D3, and acceptance process D4.

上述工序与实施例一的工序相同,这里不在赘述。The above-mentioned process is the same as the process of Embodiment 1, and will not be repeated here.

具体地,如图1和图5a)所示,插固装饰条工序其包括有竖边条插固工序F1、上下边条插固工序F2、中边条插固工序F3。竖边条插固工序F1、上下边条插固工序F2、中边条插固工序F3具体分为两种安装顺序:Specifically, as shown in FIG. 1 and FIG. 5a ), the process of inserting and fixing the decorative strip includes a vertical side strip inserting and fixing process F1 , an upper and lower side strip inserting and fixing process F2 , and a middle side strip inserting and fixing process F3 . The vertical side bar insertion process F1, the upper and lower side bar insertion process F2, and the middle side bar insertion process F3 are specifically divided into two installation sequences:

安装顺序一,插固装饰条工序F的竖边条插固工序F1、上下边条插固工序F2、中边条插固工序F3设置在墙体平整步骤D验收工序D4的前端。Installation sequence 1, the vertical side strip insertion process F1, the upper and lower side strip insertion process F2, and the middle side strip insertion process F3 in the decorative strip insertion process F are set at the front end of the wall leveling step D acceptance process D4.

安装顺序二,插固装饰条工序F的竖边条插固工序F1与缝口注浆料工序ⅠB5同时进行,和/或上下边条插固工序F2与缝口注浆料工序ⅡC7同时进行,和/或中边条插固工序F3与拉锁槽注浆料工序C6同时进行。Installation sequence 2, the vertical side strip inserting process F1 of the decorative strip inserting process F is carried out simultaneously with the seam grouting process IB5, and/or the upper and lower side strip inserting process F2 is carried out simultaneously with the seam grouting process IIC7, And/or the inserting and fixing process F3 of the middle edge strip is performed simultaneously with the grouting material process C6 for the zipper groove.

其中,本发明对装饰条的结构不作具体限制,本领域技术人员可以根据实际的拉链式墙体部品的结构而选择。在本发明的一个优选实施方式中,图5b)为装饰条单体拉紧结构剖面示意图,装饰条主要包括遮盖板F-a和榫条F-b。榫条F-b固定设置在遮盖板F-a上,所述榫条F-b上设置有拉紧结构。所述拉紧结构为单体拉紧结构或复合拉紧结构。Wherein, the present invention does not specifically limit the structure of the decorative strip, which can be selected by those skilled in the art according to the actual structure of the zipper type wall part. In a preferred embodiment of the present invention, Fig. 5b) is a schematic cross-sectional view of a single tensioning structure of a decorative strip, and the decorative strip mainly includes a cover board F-a and a tenon strip F-b. The tenon F-b is fixedly arranged on the cover board F-a, and the tenon F-b is provided with a tensioning structure. The tensioning structure is a single tensioning structure or a composite tensioning structure.

优选地,所述装饰条还包括有角接件,所述角接件上固设有榫条,所述榫条上设置有拉紧结构。本发明所述的装饰条其与墙体的结合脱离原有装饰条所采用的化学胶粘剂粘和的传统模式,所述装饰条采用与建筑墙体材料更为亲和与环保的粘接浆料或勾缝浆料物理性拉接的结合方式。Preferably, the decorative strip further includes corner joints, the corner joints are fixed with a tenon, and the tenon is provided with a tensioning structure. The combination of the decorative strip and the wall of the present invention breaks away from the traditional mode of chemical adhesive bonding used by the original decorative strip, and the decorative strip adopts an adhesive paste that is more friendly and environmentally friendly to building wall materials Or the combination method of physically pulling joints with jointing paste.

具体地,建筑墙体板砌筑过程中在墙体板粘接浆料未固化时将装饰条上设置的榫条插入墙体板之间或墙体板与梁、柱、地面之间的接缝内,或在墙体板粘接浆料固化后通过勾缝浆料将装饰条上制有的榫条和拉紧结构固定粘接在墙体板之间或墙体板与梁柱地面之间的接缝内,以实现所述装饰条遮盖与美化建筑墙体连接缝的功能。Specifically, during the masonry process of building wall panels, when the wall panel bonding slurry is not cured, insert the tenons provided on the decorative strips into the joints between the wall panels or between the wall panels and the beams, columns, and ground. or between the wall panels or between the wall panels and the beam-column ground through the pointing slurry to fix the mortise strips and tension structures made on the decorative strips In order to realize the function of the decorative strip covering and beautifying the joint of the building wall.

为增强所述装饰条与墙体板粘接浆料或勾缝浆料的物理拉接强度,榫条上设置有拉紧结构可设置成单体拉紧结构。In order to enhance the physical tensile strength of the decorative strip and the wall panel bonding slurry or jointing slurry, the tenon is provided with a tensioning structure which can be set as a single tensioning structure.

具体地,所述单体拉紧结构为榫条下端的倒刺、榫条上的若干倒勾、榫条设置成外宽内窄的梯锥形、榫条设置成S形、榫条上设置有若干通孔、榫条b下端面上设置的若干圆亏小于整圆二分之一的凹齿结构。Specifically, the single tensioning structure is the barbs at the lower end of the tenon, several barbs on the tenon, the tenon is set in a trapezoidal shape with a wide outside and a narrow inside, the tenon is set in an S shape, and the tenon is set in an S-shape. There are a plurality of through holes, and a plurality of concave tooth structures whose circle deficit is less than half of the full circle are arranged on the lower end surface of the tenon b.

进一步为增强所述装饰条与墙体板粘接浆料或勾缝浆料的物理拉接强度,榫条上设置有拉紧结构可设置成复合拉紧结构。Further, in order to enhance the physical tension bonding strength between the decorative strip and the wall panel bonding slurry or jointing slurry, a tensioning structure is provided on the tenons, which can be set as a composite tensioning structure.

具体地,所述复合拉紧结构为榫条一端的倒刺与榫条上的通孔同时设置、榫条上的若干倒勾与通孔同时设置、将外宽内窄的梯锥形榫条上设置若干通孔,将S形榫条上设置若干通孔。Specifically, the composite tensioning structure is that the barb at one end of the tenon and the through hole on the tenon are set at the same time, several barbs on the tenon are set at the same time as the through hole, and the trapezoidal tenon with the outer width and inner narrow Several through holes are arranged on the top, and several through holes are arranged on the S-shaped tenon.

在本发明的另一个优选实施方式中,装饰条主要包括有L形阴角装饰条I、平面装饰条、L形阴角装饰条II、L形阳角装饰条。其角接件包括有L形转接件、T形转接件、T形三通转接件、四通转接件、阳角斜接三通转接件、阴角平接三通转接件、阴角斜接三通转接件等等。In another preferred embodiment of the present invention, the decorative strip mainly includes an L-shaped inner corner decorative strip I, a plane decorative strip, an L-shaped inner corner decorative strip II, and an L-shaped outer corner decorative strip. The corner joints include L-shaped adapters, T-shaped adapters, T-shaped tee adapters, four-way adapters, male angle mitered tee adapters, and female angle butt joint tee adapters. , Internal miter tee adapters and so on.

具体地,如图5b)所示,所述L形阴角装饰条I的榫条与遮盖板任一边平行设置,其应用于墙体部品与梁、柱、地面之间缝隙或应用于墙体部品90度转角中平接阴角缝隙的遮盖与美化。Specifically, as shown in Figure 5b), the tenons of the L-shaped internal corner decorative strip I are arranged parallel to any side of the cover board, which is applied to the gap between wall parts and beams, columns, and ground or applied to the wall Covering and beautifying the gaps of butt joints in 90-degree corners of parts.

具体地,如图5b)所示,所述平面装饰条的榫条沿遮盖板的垂直方向设置,其应用于两块墙体部品之间或墙体部品与梁、柱、地面之间水平墙面缝隙的遮盖与美化。Specifically, as shown in Figure 5b), the tenons of the planar decorative strips are arranged along the vertical direction of the covering board, which are applied to the horizontal wall between two wall parts or between wall parts and beams, columns, and ground Covering and beautifying gaps.

具体地,如图5b)所示,所述L形阴角装饰条II的榫条沿遮盖板的外侧面角平分线方向设置,其应用于两块墙体部品90度转角中45度斜接阴角缝隙的遮盖与美化。Specifically, as shown in Figure 5b), the tenons of the L-shaped internal corner decorative strip II are arranged along the direction of the bisector of the outer side angle of the cover board, which is applied to the 45-degree miter joint of the 90-degree corners of the two wall parts Covering and beautifying the gaps in the inner corners.

具体地,如图5b)所示,所述L形阳角装饰条的榫条沿遮盖板的内侧面角平分线方向设置,其应用于两块墙体部品90度转角中45度斜接阳角缝隙的遮盖与美化。Specifically, as shown in Figure 5b), the tenons of the L-shaped male corner decorative strip are arranged along the direction of the bisector of the inner side angle of the cover board, which is applied to the 45-degree mitered male part in the 90-degree corner of two wall parts. Covering and beautifying corner gaps.

所述的L形阴角装饰条I,平面装饰条,L形阴角装饰条II和L形阳角装饰条,四种装饰条端头之间的连接采用45度角斜接或90度插接或三边45度斜接三种连接方式。For the L-shaped inner corner decorative strip I, the flat decorative strip, the L-shaped inner corner decorative strip II and the L-shaped outer corner decorative strip, the connections between the ends of the four decorative strips adopt 45-degree miter joints or 90-degree inserts. There are three connection methods: connection or 45-degree miter connection on three sides.

为增强装饰条的装饰效果,使其与室内外装饰风格保持一致,丰富所述装饰条的表面花纹与图案。所述装饰条还包括有装饰面板,装饰面板覆设在遮盖板的外表面上。In order to enhance the decorative effect of the decorative strip and keep it consistent with the indoor and outdoor decoration styles, the surface patterns and patterns of the decorative strip are enriched. The decorative strip also includes a decorative panel, and the decorative panel is covered on the outer surface of the cover board.

具体地,装饰面板是通过卡头卡箍在遮盖板的两端以实现所述装饰面板与遮盖板的连接。装饰面板是通过卡爪插箍在遮盖板卡槽内,以实现所述装饰面板与遮盖板的连接。Specifically, the decorative panel is connected to the two ends of the cover plate by clips to realize the connection between the decorative panel and the cover plate. The decorative panel is inserted into the slot of the cover plate through the claws, so as to realize the connection between the decorative panel and the cover plate.

优选地,L形阴角装饰条I、平面装饰条、L形阴角装饰条II,L形阳角装饰条,其装饰面板形状与遮盖板形状相一致。Preferably, for the L-shaped interior corner trim strip I, the flat trim strip, the L-shaped interior corner trim strip II, and the L-shaped exterior corner trim strip, the shape of the decorative panel is consistent with the shape of the cover plate.

所述四种装饰条的遮盖板与装饰面板的扣合方式在上述安装方法中采用单独使用或扣合后一体安装或分体安装后扣合的安装方式。The cover boards and decorative panels of the four decorative strips are buckled in the above installation method by using them alone or after being buckled together, or after separate installation and then being buckled together.

具体地,装饰条不包括装饰面板单独使用,由遮盖板独立完成墙体缝隙的遮盖与美化。装饰条在安装过程中先将装饰面板扣合在遮盖板的外表面上,装饰面板和遮盖板一体裁切各角度结构,一体安装。或先将遮盖板裁切出各角度结构单独安装,待粘接浆料或勾缝浆料固化后,再将装饰面板裁切出各角度结构扣合在遮盖板的外表面上。Specifically, the decorative strip does not include the decorative panel and is used alone, and the covering board independently completes the covering and beautification of the wall gap. During the installation process of the decorative strip, the decorative panel is first fastened on the outer surface of the cover board, and the decorative panel and the cover board are cut into various angle structures in one piece and installed in one piece. Or firstly cut out the various angle structures of the covering board and install them separately, after the adhesive paste or pointing paste is cured, then cut out the various angle structures of the decorative panel and fasten them on the outer surface of the covering board.

进一步的图5所示,竖边条插固工序F1其用于拉锁式墙体部品10与建筑构造柱或墙体11之间缝隙的美化。As further shown in FIG. 5 , the vertical strip insertion process F1 is used to beautify the gap between the zipper type wall part 10 and the building structure column or wall 11 .

上下边条插固工序F2其用于拉锁式墙体部品10与建筑构造梁或棚顶13、拉锁式墙体部品10与地面14之间缝隙的美化。The upper and lower side strip inserting and fastening process F2 is used to beautify the gap between the zipper type wall part 10 and the building structure beam or roof 13 , and between the zipper type wall part 10 and the ground 14 .

中边条插固工序F3其用于两块拉锁式墙体部品10之间缝隙的美化。The middle side bar inserting and fixing process F3 is used to beautify the gap between two zipper type wall parts 10 .

本发明拉锁式墙体部品的安装方法还包括安装预制吊挂件工序,其可设置在前续准备步骤、首块板安装步骤、后N块板安装步骤、墙体平整步骤的任一工序中或后。上述工序与实施例一的工序相同,这里不在赘述。The installation method of the zipper type wall parts of the present invention also includes the process of installing prefabricated hanging parts, which can be arranged in any process of the previous preparation step, the first board installation step, the next N board installation steps, and the wall leveling step or back. The above-mentioned process is the same as the process of Embodiment 1, and will not be repeated here.

本发明拉锁式墙体部品的安装方法在还包括构造柱制作工序G1,构造柱上端与建筑梁或棚顶固定连接,其下端与建筑地面相连接。The installation method of the zipper type wall parts of the present invention also includes the manufacturing process G1 of the structural column, the upper end of the structural column is fixedly connected with the building beam or the roof, and the lower end of the structural column is connected with the building ground.

具体地图1所示,构造柱制作工序G1设置在首块板安装步骤之前。上述工序与具体实施例一的工序相同,这里不在赘述。Specifically, as shown in Figure 1, the manufacturing process G1 of the structural column is set before the installation step of the first board. The above process is the same as the process of the specific embodiment 1, and will not be repeated here.

具体地图1所示,拉锁式墙体部品的安装方法还包括有管线同步安装工序H1和完善管线工序H2,管线同步安装工序H1设置在首块板安装步骤和后N块板安装步骤之中,完善管线工序H2设置在缝口及墙面处理工序D3之前。上述工序与具体实施例一的工序相同,这里不在赘述。As shown in the specific map 1, the installation method of the zipper type wall parts also includes the pipeline synchronous installation process H1 and the pipeline improvement process H2. The pipeline synchronous installation process H1 is set in the first board installation step and the last N board installation steps. The pipeline improvement process H2 is set before the seam and wall surface treatment process D3. The above process is the same as the process of the specific embodiment 1, and will not be repeated here.

具体地图1所示,拉锁式墙体部品的安装方法还包括有置入功能带工序I,置入功能带工序I设置在后N块板安装步骤的前端。上述工序与具体实施例一的工序相同,这里不在赘述。As shown in the specific map 1, the installation method of the zipper type wall parts also includes the process I of inserting the function band, and the process I of inserting the function band is arranged at the front end of the installation step of the rear N boards. The above process is the same as the process of the specific embodiment 1, and will not be repeated here.

优选地,本发明拉锁式墙体部品的安装方法的楔紧固定工序ⅠB4和楔紧固定工序ⅡC4中所使用的固定楔其材质与拉锁式墙体部品材质相同。上述工序与具体实施例一的工序相同,这里不在赘述。Preferably, the material of the fixing wedge used in the wedging and fixing process IB4 and the wedging and fixing process IIC4 of the installation method of the zipper type wall part of the present invention is the same as that of the zipper type wall part. The above process is the same as the process of the specific embodiment 1, and will not be repeated here.

在拉锁式墙体部品的安装方法创新性的设置了插固装饰条工序,更进一步将装饰条的安装与墙体部品之间的注入粘接剂工艺二者有效结合。插固装饰条工序较原有的加装防裂带工序更能有效避免部品与部品和部品与建筑构件连接缝隙之间随着气候环境的变化也会出现细小的裂纹、裂缝,其装饰性功能也是加装防裂带工序不能比拟的。In the installation method of the zipper type wall parts, the process of inserting and fixing the decorative strips is innovatively set up, which further effectively combines the installation of the decorative strips with the process of injecting adhesive between the wall parts. The process of inserting decorative strips is more effective than the original process of adding anti-crack belts to avoid small cracks and cracks between parts and parts and between parts and building components as the climate changes. Its decorative function It is also incomparable to the process of installing an anti-crack belt.

以上是本发明实施例所提供的拉锁式墙体部品安装方法的详细介绍,对于本领域的一般技术人员,依据本发明实施例的思想,在具体实施方式及应用范围上均会有改变之处。综上所述本说明书内容不应理解为对本发明的限制,凡依本发明设计思想所做的任何改变都在本发明的保护范围之内。The above is the detailed introduction of the installation method of the zipper type wall parts provided by the embodiment of the present invention. For those of ordinary skill in the art, according to the idea of the embodiment of the present invention, there will be changes in the specific implementation and application range . To sum up, the contents of this specification should not be construed as limiting the present invention, and any changes made according to the design concept of the present invention are within the protection scope of the present invention.

Claims (12)

1. The installation method of the zipper type wall part comprises the steps of preparing, installing the first plate, installing the back N plates and leveling the wall, and is characterized in that,
the first plate mounting step comprises a first plate positioning procedure (B1), a correction procedure I (B2), a plate top end slurry injection procedure I (B3), a wedging fixing procedure I (B4) and a seam slurry injection procedure I (B5);
the mounting step of the back N plates comprises an Nth plate positioning procedure (C1), a correction procedure II (C2), a plate top end slurry injection procedure II (C3), a wedging fixing procedure II (C4), a leveling procedure (C5), a zipper groove slurry injection procedure (C6) and a seam slurry injection procedure II (C7);
the installation method further comprises the following steps:
a locking fastener mounting process, which is arranged in the first plate mounting step and the last N plate mounting steps,
the locking clip installation procedure comprises:
a column fastener mounting step (E1) which is provided at the front end of the first plate positioning step (B1) of the first plate mounting step;
liang Kajian installation procedure (E2) and/or ground clamping piece installation procedure (E3), which is arranged between the wedging fixing procedure I (B4) and the seam grouting material procedure I (B5);
an anti-seismic clamping piece mounting process (E4) which is arranged after the Nth plate positioning process (C1);
liang Kajian installing step (E2) installing Liang Kajian (E21) on a building structure beam or shed roof (13); the anti-seismic clamping piece mounting procedure (E4) is to mount an anti-seismic clamping piece (E41) between the two zipper-type wall parts (10);
liang Kajian (E21) is composed of a fixing plate I and a lower clamping plate I, wherein one end of the fixing plate I and one end of the lower clamping plate I are vertically and fixedly connected, a through hole is formed in the fixing plate I, the fixing plate I is fixed on the bottom surface of a building beam or a shed roof through the through hole by an expansion screw, the lower clamping plate I is clamped between a clamping plate component I (E41-1) and a clamping plate component II (E41-2) of an anti-seismic clamping piece (E41), and the clamping plate component I (E41-1) and the clamping plate component II (E41-2) of the anti-seismic clamping piece (E41) clamp the lower clamping plate I of Liang Kajian (E21) in a wall part connecting gap while connecting, locking and fastening a wall part.
2. The method of installing a zipper-type wall section of claim 1, further comprising: and inserting and fixing the decoration strip, wherein the process is arranged in the first plate mounting step, the last N plates mounting step and/or the wall body leveling step.
3. The method of installing zipper-type wall members as claimed in claim 1, wherein the preliminary preparation step comprises a construction site cleaning step (A1), a base layer cleaning step (A2), a pay-off step (A3) and a plate fitting step (A4).
4. The method for installing zipper-type wall parts according to claim 1, wherein the wall leveling step corresponding to the locking clip installation process comprises an optional crack-preventing tape installation process (D1), an optional door and window opening reinforcement process (D2), a seam and wall surface treatment process (D3), and an acceptance process (D4).
5. The method for installing zipper-type wall parts according to claim 2, wherein the step of leveling the wall corresponding to the step of inserting the trim strip comprises a door and window opening reinforcing step (D2), a seam and wall surface processing step (D3) and an acceptance step (D4) optionally.
6. The method of installing a zipper-type wall part according to claim 5, wherein the step of inserting the trim strip comprises a step of inserting a vertical strip (F1), a step of inserting upper and lower strips (F2), and a step of inserting a middle strip (F3).
7. The method of installing a zipper-type wall part according to claim 6, wherein the vertical bead fastening step (F1), the upper and lower bead fastening steps (F2), and the middle bead fastening step (F3) are provided at the front end of the acceptance step (D4); and/or
The vertical edge strip inserting and fixing process (F1) and the seam grouting process I (B5) are carried out simultaneously; and/or
The upper and lower edge strip inserting and fixing process (F2) and the seam grouting process II (C7) are carried out simultaneously; and/or
The middle edge strip inserting and fixing process (F3) and the zipper groove slurry injecting process (C6) are carried out simultaneously.
8. The method of installing zipper-type wall parts as claimed in claim 2, wherein the leveling step (C5) is performed to level the flatness of the adjacent zipper-type wall parts (10) by using an additional leveling bar (15); wherein
The leveling bar (15) is composed of two symmetrically arranged strip-shaped bodies (151) and fastening bolts (152) penetrating through the middle parts of the strip-shaped bodies (151).
9. The method of installing a zipper-type wall part as claimed in any one of claims 1 to 8, further comprising:
and a step of installing the prefabricated hanging parts, which is arranged in or after any one of the steps of the previous preparation step, the first plate installation step, the back N plates installation step and the wall body leveling step.
10. The method of installing a zipper-type wall section of claim 9, further comprising:
and a structural column manufacturing process (G1) which is arranged before the first plate mounting process.
11. The method of installing a zipper-type wall part as claimed in claim 4 or 5, further comprising:
a pipeline synchronous mounting process (H1) which is arranged in the first board mounting step and/or the last N board mounting steps; and/or
And a pipeline completing step (H2) which is provided before the seam and wall surface treating step (D3).
12. The method of installing a zipper-type wall part as claimed in any one of claims 1 to 8, further comprising:
and (I) a functional band embedding process, wherein the functional band embedding process is arranged at the front end of the mounting step of the last N plates.
CN202110764136.XA 2020-07-16 2021-07-06 Installation method of zipper type wall part Active CN113529955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2021/106175 WO2022012566A1 (en) 2020-07-16 2021-07-14 Method for installing zippered wall part

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010689101 2020-07-16
CN202010689101X 2020-07-16

Publications (2)

Publication Number Publication Date
CN113529955A CN113529955A (en) 2021-10-22
CN113529955B true CN113529955B (en) 2022-10-28

Family

ID=78126959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110764136.XA Active CN113529955B (en) 2020-07-16 2021-07-06 Installation method of zipper type wall part

Country Status (2)

Country Link
CN (1) CN113529955B (en)
WO (1) WO2022012566A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116771003A (en) * 2023-06-26 2023-09-19 中煤地建设工程有限公司 Building wall crack prevention structure and its construction technology
CN117266428B (en) * 2023-11-20 2024-02-06 西南石油大学 Assembled vibration reduction floor slab and assembling method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11293950A (en) * 1998-04-07 1999-10-26 Takenaka Komuten Co Ltd Earthquake-resisting wall structure in existing reinforced concrete-constructed building and steel encased reinforced concrete-constructed building
CN103264436A (en) * 2013-05-08 2013-08-28 姚景祥 Zipper model ruler for manufacturing zipper groove in zipper-type architectural wall plate and method for manufacturing zipper groove by using zipper model ruler
CN105926841A (en) * 2015-03-30 2016-09-07 姚景祥 Zipper-type wall part and zipper key for producing the same
CN111305557A (en) * 2020-03-04 2020-06-19 中铁建工集团有限公司 Super-irrigation-free assembled template system for building wall constructional column

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005058770B3 (en) * 2005-12-09 2007-08-30 Thomas Lorenz Industrietechnik Gmbh & Co. Kg Wall element with lateral connection means
TWM360906U (en) * 2009-03-18 2009-07-11 zhen-hui Xu Plate capable of fully hitching
US20100313493A1 (en) * 2009-06-15 2010-12-16 Henry Kamp System for protection of buildings and method for same
CN101672088B (en) * 2009-10-03 2015-07-29 姚景祥 Zipper-type architectural wall plate
CN102777040A (en) * 2012-07-27 2012-11-14 中山建华墙体材料有限公司 An installation process of an inner partition wall of a double-wall panel with a staggered seam and an inner partition wall of a double-wall panel
CN109487951B (en) * 2017-09-12 2021-12-07 乌兰浩特市环源生物技术开发有限责任公司 Mongolian yurt wall board installation method
CN107700711A (en) * 2017-09-25 2018-02-16 青岛恒科瑞新信息科技有限公司 A kind of Multifunctional splicing partition wall body and its construction method
CN107916795A (en) * 2017-10-25 2018-04-17 界首市菁华科技信息咨询服务有限公司 A kind of assembled reinforcement means of ultra-thin high-strength light shock-proof wall plate
KR102137085B1 (en) * 2018-05-21 2020-07-23 디어건축사사무소 주식회사 Tetris house
CN108818879B (en) * 2018-07-16 2020-05-19 四川时宇建设工程有限公司 Weight hanging structure of prefabricated inner partition plate and construction process of weight hanging structure
CN110485621A (en) * 2019-05-08 2019-11-22 姚井祥 It is a kind of to build dedicated wedge and its application method and installation guard member
CN110439220A (en) * 2019-05-08 2019-11-12 内蒙古拉锁式新型建材科技有限公司 A kind of construction wall hides seam ornamental strip and its uses installation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11293950A (en) * 1998-04-07 1999-10-26 Takenaka Komuten Co Ltd Earthquake-resisting wall structure in existing reinforced concrete-constructed building and steel encased reinforced concrete-constructed building
CN103264436A (en) * 2013-05-08 2013-08-28 姚景祥 Zipper model ruler for manufacturing zipper groove in zipper-type architectural wall plate and method for manufacturing zipper groove by using zipper model ruler
CN105926841A (en) * 2015-03-30 2016-09-07 姚景祥 Zipper-type wall part and zipper key for producing the same
CN111305557A (en) * 2020-03-04 2020-06-19 中铁建工集团有限公司 Super-irrigation-free assembled template system for building wall constructional column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大跨度自平衡式拉锁幕墙吊装技术;尹刚等;《福建建材》;20171120(第11期);全文 *

Also Published As

Publication number Publication date
WO2022012566A1 (en) 2022-01-20
CN113529955A (en) 2021-10-22

Similar Documents

Publication Publication Date Title
US10837166B2 (en) Building structure and construction method for same
CN103711236B (en) Assembled wall panel and its installation method
CN113529955B (en) Installation method of zipper type wall part
CN106522406A (en) Assembly type cast-in-place concrete exterior thermal insulation wall steel skeleton framework system and connecting piece
CN106592859A (en) Interior partition board and construction method
CN110748075B (en) A kind of prefabricated building composite inner partition board and preparation method thereof
CN104594525B (en) Composite thermo-insulating wall board heat-preserving wall system integrated with building structure and construction technology
US20070245654A1 (en) Abutment member
CN112814194B (en) Dry-type connection outer wall structure system and installation method thereof
CN113846795A (en) Prestress assembled building block wallboard and wall and manufacturing process
CN212026728U (en) Assembled partition wall structure
CN211817946U (en) Template structure of cast-in-place bare concrete wall
CN108457414A (en) A kind of combination type heat insulating cavity module
US10415236B2 (en) Outer insulation integrated insulating block system easy to dry-finish and a construction method thereby
CN112663805A (en) Construction method of EPS module heat-insulation system of building outer wall
CN208685904U (en) A combined thermal insulation cavity module
RU134556U1 (en) CONNECTION OF BUILDING WALL UNITS
CN111188409A (en) Anti-seismic section steel structure assembled building plate and assembling method thereof
CN212026684U (en) A new type of extruded hollow composite molding multifunctional architectural decorative wall panel
CN110397181B (en) U-shaped steel support and integrated light wallboard expansion joint structure and manufacturing method thereof
CN206319482U (en) Inner partition plate
CN220908799U (en) Assembled interior partition wall structure
CN106436959A (en) Precast outer wall construction method
CN112440377A (en) Rammed-earth-imitated wallboard made of local materials and manufacturing process thereof
CN119392833B (en) A thermal insulation and decorative integrated composite shear wall with window openings and a manufacturing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant