[go: up one dir, main page]

CN113283040A - Method and system for acquiring cable attribute and laying occupation information on site - Google Patents

Method and system for acquiring cable attribute and laying occupation information on site Download PDF

Info

Publication number
CN113283040A
CN113283040A CN202110481879.6A CN202110481879A CN113283040A CN 113283040 A CN113283040 A CN 113283040A CN 202110481879 A CN202110481879 A CN 202110481879A CN 113283040 A CN113283040 A CN 113283040A
Authority
CN
China
Prior art keywords
cable
data
image data
planning
mobile terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110481879.6A
Other languages
Chinese (zh)
Other versions
CN113283040B (en
Inventor
贾晓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tuwei Technology Co ltd
Original Assignee
Zhejiang Tuwei Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tuwei Technology Co ltd filed Critical Zhejiang Tuwei Technology Co ltd
Priority to CN202110481879.6A priority Critical patent/CN113283040B/en
Publication of CN113283040A publication Critical patent/CN113283040A/en
Application granted granted Critical
Publication of CN113283040B publication Critical patent/CN113283040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/38Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
    • G01S19/39Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/42Determining position
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K19/00Record carriers for use with machines and with at least a part designed to carry digital markings
    • G06K19/06Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
    • G06K19/067Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components
    • G06K19/07Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components with integrated circuit chips
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Geometry (AREA)
  • Strategic Management (AREA)
  • Computer Hardware Design (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Computational Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Navigation (AREA)

Abstract

本申请涉及一种电缆属性及敷设占位信息现场采集的方法和系统,其中,该方法包括:通过移动终端下载并载入规划或设计态数据包,根据移动终端的陀螺仪和地磁传感器获取电缆工作井的地理方位角,通过移动终端对电缆工作井进行影像数据的记录,其中,影像数据包括地理方位角,并对影像数据进行信息标注,得到标注影像数据,将标注影像数据发送到电缆管控主站,通过电缆管控主站对规划或设计态数据进行处理,得到竣工态数据,再对竣工态数据进行质检,处理竣工态数据造成的数据冲突,通过本申请,解决了电缆数据采集的效率低下和数据不准确的问题,实现了对电缆工作井进行电缆调整后的电缆属性及敷设占位信息现场采集的高效化和规范化。

Figure 202110481879

The present application relates to a method and system for on-site collection of cable attributes and laying occupancy information, wherein the method includes: downloading and loading planning or design data packets through a mobile terminal, and acquiring cables according to a gyroscope and a geomagnetic sensor of the mobile terminal The geographic azimuth of the working well, the image data of the cable working well is recorded by the mobile terminal, wherein the image data includes the geographic azimuth, and the image data is marked with information to obtain the marked image data, and the marked image data is sent to the cable management and control The master station processes the planning or design data through the cable control master station to obtain the as-built data, and then performs quality inspection on the as-built data to deal with the data conflict caused by the as-built data. Through this application, the problem of cable data collection is solved. The problems of low efficiency and inaccurate data have realized the high efficiency and standardization of the on-site collection of cable properties and laying occupancy information after cable adjustment for the cable working well.

Figure 202110481879

Description

Method and system for acquiring cable attribute and laying occupation information on site
Technical Field
The application relates to the field of data acquisition, in particular to a method and a system for acquiring cable attribute and laying occupation information on site.
Background
Along with the advance of wisdom city pace, the application of underground cable is more and more, it is more urgent to survey the accuracy nature of underground cable data and scientific management needs, traditional underground cable data acquisition, still adopt the mode of carrying out field collection with paper form, the field is filled in by hand, the acquisition process lacks the management and control instrument of modernization, can't effectively ensure the data of gathering, and when the cable in the cable working well need to update data because the change, traditional cable data acquisition mode is more frequent mistake and efficiency, consequently how to solve cable data acquisition's inefficiency and data inaccurate become the problem that needs to solve at present urgently.
At present, no effective solution is provided aiming at solving the problems of low efficiency and inaccurate data of cable data acquisition in the related technology.
Disclosure of Invention
The embodiment of the application provides a method and a system for acquiring cable attributes and laying occupation information on site, and at least solves the problems of low efficiency and inaccurate data of cable data acquisition in the related technology.
In a first aspect, an embodiment of the present application provides a method for collecting cable attributes and laying occupancy information on site, where the method includes:
downloading and loading a planning or design state data packet through a mobile terminal, and determining a cable working well needing transaction data acquisition according to the planning or design state data packet;
acquiring a geographical azimuth angle of the cable working well according to a gyroscope and a geomagnetic sensor of the mobile terminal, and shooting and recording image data of the cable working well through the mobile terminal, wherein the image data comprises the geographical azimuth angle;
marking the image data with cable attribute, defect information and pointing information through the mobile terminal to obtain marked image data, and sending the marked image data to a cable management and control master station;
processing planning or design state data through the cable management and control master station according to the marked image data to obtain completion state data;
the cable management and control master station performs quality inspection on the completed dynamic data, checks the consistency of the acquisition time and the acquisition position in the image data acquired on site and the recording time and the recording position of the working well associated with the image data, ensures that the image data is actually acquired on the operation site, and processes data conflict caused by the fact that the completed dynamic data does not accord with the planning or design dynamic data.
In some embodiments, before downloading and loading the planning or design state data package through the mobile terminal, the method further comprises:
and processing the planning service information through the cable management and control master station to obtain a planning or design state data packet, wherein the planning or design state data packet comprises planning or design state cable attribute and path information, planning or design state cable and occupied channel association information, and planning or design state cable pipe hole occupation information.
In some embodiments, determining a wireline well requiring transaction data collection based on the planning or design state data package comprises:
and determining the geographical position of the cable working well needing abnormal data acquisition through GPS accurate positioning of the mobile terminal, and reading RFID, a character nameplate and other unique name identifiers bound on the cable working well through the mobile terminal for verification.
In some embodiments, the labeling, by the mobile terminal, the image data with cable attribute, defect information, and pointing information to obtain labeled image data includes:
and carrying out information marking on the cable attribute, the defect and the direction of the abnormal image data through the mobile terminal to obtain marked image data, wherein the information marking comprises the cable name, the path information, a direction icon and the defect description.
In a second aspect, the embodiment of the application provides a system for acquiring cable attributes and laying occupation information on site, and the system comprises a mobile terminal and a cable management and control master station;
the mobile terminal downloads and loads a planning or design state data packet, and determines a cable working well needing transaction data acquisition according to the planning or design state data packet;
the mobile terminal acquires a geographical azimuth angle of the cable working well through a gyroscope and a geomagnetic sensor, and the mobile terminal shoots and records image data of the cable working well, wherein the image data comprises the geographical azimuth angle;
the mobile terminal marks the image data with cable attribute, defect information and pointing information to obtain marked image data, and sends the marked image data to a cable management and control master station;
the cable management and control master station processes planning or design state data according to the marked image data to obtain completion state data;
the cable management and control master station performs quality inspection on the completed dynamic data, checks the consistency of the acquisition time and the acquisition position in the image data acquired on site and the recording time and the recording position of the working well associated with the image data, ensures that the image data is actually acquired on the operation site, and processes data conflict caused by the fact that the completed dynamic data does not accord with the planning or design dynamic data.
In some embodiments, before the mobile terminal downloads and loads the planning or design data package, the system further comprises:
and the cable management and control master station processes according to the planning service information to obtain a planning or design state data packet, wherein the planning or design state data packet comprises planning or design state cable attribute and path information, planning or design state cable and occupied channel association information, and planning or design state cable pipe hole occupation information.
In some embodiments, determining a wireline well requiring transaction data collection based on the planning or design state data package comprises:
the mobile terminal accurately positions through a GPS (global positioning system) to determine the geographic position of the cable working well needing transaction data acquisition, and reads RFID (radio frequency identification), a character nameplate and other unique naming marks bound on the cable working well for verification.
In some embodiments, the mobile terminal performs cable attribute, defect information, and pointing information tagging on the image data, and obtaining tagged image data includes:
and the mobile terminal carries out information marking on the cable attribute, the defect and the direction of the abnormal image data to obtain marked image data, wherein the information marking comprises the cable name, the path information, the direction icon and the defect description.
In a third aspect, an embodiment of the present application provides a computer device, including a memory, a processor, and a computer program stored on the memory and executable on the processor, where the processor, when executing the computer program, implements the method for acquiring cable attributes and laying occupancy information in situ according to the first aspect.
In a fourth aspect, the present application provides a computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements the method for field acquisition of cable attribute and laying occupancy information as described in the first aspect above.
Compared with the prior art, the method and the system for acquiring cable attributes and laying occupation information on site provided by the embodiment of the application download and load a planning or design state data packet through a mobile terminal, determine a cable working well needing transaction data acquisition according to the planning or design state data packet, acquire a geographical azimuth angle of the cable working well according to a gyroscope and a geomagnetic sensor of the mobile terminal, record image data of the cable working well through the mobile terminal, label the image data through information labeling of the image data by the mobile terminal to obtain labeled image data, send the labeled image data to a cable management and control main station, process the planning or design state data through the cable management and control main station according to the labeled image data to obtain completed state data, and perform quality inspection on the completed state data through the cable management and control main station, the data conflict caused by completed engineering state data is processed, the problems of low efficiency of cable data acquisition and inaccurate data are solved, the cable attribute of the cable working well after cable adjustment and the high efficiency and standardization of laying occupation information field acquisition are realized, and the anti-counterfeiting and dislocation recording capabilities are realized.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
fig. 1 is a block diagram of a cable attribute and laying occupancy information field acquisition system according to an embodiment of the present application;
FIG. 2 is a schematic diagram of an interface after a mobile terminal downloads and loads a planning or design data package according to an embodiment of the present application
FIG. 3 is a second schematic interface diagram illustrating a mobile terminal downloading and loading a planning or design-state data package according to an embodiment of the present application;
FIG. 4 is an interface schematic diagram of a mobile terminal determining a geographic location of a wireline work well requiring transaction data collection according to an embodiment of the application;
FIG. 5 is a schematic interface diagram of a mobile terminal performing transaction data collection on a wireline work well according to an embodiment of the application;
fig. 6 is a schematic interface diagram illustrating that a mobile terminal marks image data according to an embodiment of the present application;
FIG. 7 is a flowchart of steps of a method for field collection of cable attributes and laying occupancy information, according to an embodiment of the present application;
FIG. 8 is a flowchart of steps for a method for field collection of cable attributes and lay out placeholder information, in accordance with an embodiment of the present application;
fig. 9 is an internal structural diagram of an electronic device according to an embodiment of the present application.
Description of the drawings: 10. a mobile terminal; 11. cable management and control main website.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application will be described and illustrated below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments provided in the present application without any inventive step are within the scope of protection of the present application.
It is obvious that the drawings in the following description are only examples or embodiments of the present application, and that it is also possible for a person skilled in the art to apply the present application to other similar contexts on the basis of these drawings without inventive effort. Moreover, it should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which may vary from one implementation to another.
Reference in the specification to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the specification. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. Those of ordinary skill in the art will explicitly and implicitly appreciate that the embodiments described herein may be combined with other embodiments without conflict.
Unless defined otherwise, technical or scientific terms referred to herein shall have the ordinary meaning as understood by those of ordinary skill in the art to which this application belongs. Reference to "a," "an," "the," and similar words throughout this application are not to be construed as limiting in number, and may refer to the singular or the plural. The present application is directed to the use of the terms "including," "comprising," "having," and any variations thereof, which are intended to cover non-exclusive inclusions; for example, a process, method, system, article, or apparatus that comprises a list of steps or modules (elements) is not limited to the listed steps or elements, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus. Reference to "connected," "coupled," and the like in this application is not intended to be limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The term "plurality" as referred to herein means two or more. "and/or" describes an association relationship of associated objects, meaning that three relationships may exist, for example, "A and/or B" may mean: a exists alone, A and B exist simultaneously, and B exists alone. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship. Reference herein to the terms "first," "second," "third," and the like, are merely to distinguish similar objects and do not denote a particular ordering for the objects.
The embodiment of the application provides a system for acquiring cable attributes and laying occupancy information on site, and fig. 1 is a structural block diagram of the system for acquiring cable attributes and laying occupancy information on site according to the embodiment of the application, and as shown in fig. 1, the system comprises a mobile terminal 10 and a cable management and control master station 11, wherein the mobile terminal 10 comprises but is not limited to a mobile phone, a tablet personal computer and other intelligent mobile electronic devices with an accurate positioning function, an image acquisition function, a gyroscope and a geomagnetic sensor;
the mobile terminal 10 downloads and loads a planning or design state data packet, and determines a cable working well needing transaction data acquisition according to the planning or design state data packet;
the mobile terminal 10 acquires a geographical azimuth angle of the cable working well through a gyroscope and a geomagnetic sensor, and the mobile terminal 10 performs shooting recording on image data of the cable working well, wherein the image data comprises the geographical azimuth angle;
the mobile terminal 10 labels the cable attribute, the defect information and the pointing information of the image data to obtain labeled image data, and sends the labeled image data to the cable management and control master station 11;
the cable management and control master station 11 processes the planning or design state data according to the marked image data to obtain completion state data;
the cable management and control master station 11 performs quality inspection on completed state data to check consistency of acquisition time and acquisition position in image data acquired in a field and recording time and recording position of a working well associated with the image data, ensures that the image data are actually acquired in an operation field, and processes data conflict caused by inconsistency of the completed state data with planning or design state data.
According to the embodiment of the application, a mobile terminal 10 downloads and loads a planning or design state data packet, a cable working well which needs to be subjected to transaction data acquisition is determined according to the planning or design state data packet, a geographical azimuth angle of the cable working well is obtained according to a gyroscope and a geomagnetic sensor of the mobile terminal 10, the mobile terminal 10 records image data of the cable working well, wherein the image data comprises the geographical azimuth angle, the mobile terminal 10 performs information marking on the image data to obtain marked image data, the marked image data is sent to a cable management and control main station 11, the planning or design state data is processed through the cable management and control main station 11 according to the marked image data to obtain completed state data, the cable management and control main station 11 performs quality inspection on the completed state data to process data conflicts caused by the completed state data, and the problems of low efficiency and inaccurate data acquisition of the cable data are solved, the cable property after the cable is adjusted and the laying occupation information field acquisition are efficient and standardized, and the anti-counterfeiting and dislocation recording capacity is achieved.
In some embodiments, fig. 2 is a schematic interface diagram of the mobile terminal according to the first embodiment of the present application after downloading and loading the planning or design-state data package, and as shown in fig. 2, the mobile terminal 10 after downloading and loading the planning or design-state data package displays a cable work well that needs to perform the transaction data collection.
In some embodiments, fig. 3 is a second interface schematic diagram after a planning or design-state data packet is downloaded and loaded by a mobile terminal according to the embodiment of the present application, as shown in fig. 3, after the cable management and control master station 11 forms planning-state cable occupancy data according to planning service information input and auxiliary computation, a civil engineering facility through which a cable passes is analyzed through data boundary computation to form a planning or design-state data packet, where the planning or design-state data packet includes planning or design-state cable attributes and path information, planning or design-state cable and occupied channel association information, and planning or design-state cable pipe hole occupancy information.
In some embodiments, fig. 4 is an interface schematic diagram of a mobile terminal determining a geographic location of a cable work well requiring transaction data acquisition according to an embodiment of the present application, and as shown in fig. 4, the mobile terminal 10 determines the geographic location of the cable work well requiring transaction data acquisition through GPS precise positioning, and the mobile terminal 10 reads and verifies RFID, a word tag, and other unique naming marks bound on the cable work well, so as to determine the accuracy of the acquisition work well, where the RFID is an abbreviation of Radio Frequency Identification, namely Radio Frequency Identification (RFID).
In some embodiments, fig. 5 is an interface schematic diagram of the mobile terminal performing transaction data acquisition on the cable work well according to the embodiment of the present disclosure, as shown in fig. 5, the mobile terminal 10 obtains a geographic azimuth of the cable work well through a gyroscope and a geomagnetic sensor, and the mobile terminal 10 performs recording of image data on the cable work well, where the image data includes the geographic azimuth.
In some embodiments, fig. 6 is an interface schematic diagram illustrating that the mobile terminal marks image data according to the embodiment of the present application, and as shown in fig. 6, the mobile terminal 10 performs information marking on cable attributes, defects, and directions of the image data, so as to obtain marked image data, where the information marking includes a cable name, path information, a direction icon, and a defect description.
The embodiment of the application provides a method for acquiring cable attributes and laying occupancy information on site, fig. 7 is a flow chart of steps of the method for acquiring cable attributes and laying occupancy information on site according to the embodiment of the application, and as shown in fig. 7, the method includes the following steps:
s702, downloading and loading a planning or design state data packet through the mobile terminal 10, and determining a cable working well needing transaction data acquisition according to the planning or design state data packet;
s704, acquiring a geographical azimuth angle of the cable working well according to a gyroscope and a geomagnetic sensor of the mobile terminal 10, and shooting and recording image data of the cable working well through the mobile terminal 10, wherein the image data comprises the geographical azimuth angle;
s706, marking the cable attribute, the defect information and the pointing information of the image data through the mobile terminal 10 to obtain marked image data, and sending the marked image data to the cable management and control main station 11;
s708, processing the planning or design state data through the cable management and control main station 11 according to the marked image data to obtain completion state data;
and S710, performing quality inspection on the completed state data through the cable management and control main station 11, checking the consistency of the acquisition time and the acquisition position in the image data acquired in the field and the recording time and the recording position of the associated working well, ensuring that the image data is actually acquired in the operation field, and processing data conflict caused by the fact that the completed state data does not accord with the planning or design state data.
Through steps S702 to S710 in the embodiment of the application, the mobile terminal 10 downloads and loads a planning or design state data packet, determines a cable work well requiring transaction data acquisition according to the planning or design state data packet, acquires a geographic azimuth angle of the cable work well according to a gyroscope and a geomagnetic sensor of the mobile terminal 10, records image data of the cable work well through the mobile terminal 10, wherein the image data includes the geographic azimuth angle, performs information annotation on the image data through the mobile terminal 10 to obtain annotated image data, sends the annotated image data to the cable management and control master station 11, processes the planning or design state data through the cable management and control master station 11 according to the annotated image data to obtain completed state data, performs quality inspection on the completed state data through the cable management and control master station 11, processes data conflict caused by the completed state data, and solves the problems of low efficiency and inaccurate data of cable data acquisition, the cable property after the cable is adjusted and the laying occupation information field acquisition are efficient and standardized, and the anti-counterfeiting and dislocation recording capacity is achieved.
In some of these embodiments, prior to downloading and loading the planning or design data package by the mobile terminal 10,
and processing the planning service information through the cable management and control master station 11 to obtain a planning or design state data packet, wherein the planning or design state data packet comprises planning or design state cable attribute and path information, planning or design state cable and occupied channel association information, and planning or design state cable pipe hole occupation information.
In some embodiments, the geographic location of the cable work well where transaction data acquisition is required is determined by GPS accurate positioning of the mobile terminal 10, and the RFID, the nameplate, and other identifiers with unique names bound to the cable work well are read by the mobile terminal 10 for verification.
In some embodiments, the mobile terminal 10 performs information labeling on cable attributes, defects, and directions of the video data, so as to obtain labeled video data, where the information labeling includes a cable name, path information, a direction icon, and a defect description.
The embodiment of the present application provides a method for acquiring cable attributes and laying occupancy information in situ, fig. 8 is a flowchart of steps of the method for acquiring cable attributes and laying occupancy information in situ according to the embodiment of the present application, and it should be noted that the method for acquiring cable attributes and laying occupancy information in situ acquires an image of a facade of a cable work well, that is, a cross-sectional image of a cable channel associated with the cable work well.
As shown in fig. 8, the method comprises the steps of:
s802, downloading and loading a planning or design state data packet through the mobile terminal 10, wherein the planning or design state data packet comprises planning or design state cable attribute and path information, planning or design state cable and occupied channel correlation information, and planning or design state cable pipe hole occupation information;
s804, determining the geographical position of the cable working well needing transaction data acquisition through GPS accurate positioning of the mobile terminal 10, and reading RFID, character nameplates and other unique named identifiers bound on the cable working well through the mobile terminal 10 for verification;
s806, acquiring a geographical azimuth of the cable working well according to a gyroscope and a geomagnetic sensor of the mobile terminal 10, and shooting and recording image data of the vertical face of the cable working well through the mobile terminal 10, wherein the image data comprises the geographical azimuth and can be associated with the vertical face of the cable working well according to the geographical azimuth;
s808, performing information labeling on cable attributes, defects and directions of abnormal image data through the mobile terminal 10 to obtain labeled image data, wherein the information labeling comprises cable names, path information, direction icons and defect descriptions, and sending the labeled image data to the cable management and control main station 11;
s810, processing the planning or design state data through the cable management and control main station 11 according to the marked image data to obtain completion state data;
and S812, performing quality inspection on the completed state data through the cable management and control main station 11, checking consistency of acquisition time and acquisition position in the image data acquired on site and recording time and recording position of the associated working well, ensuring that the image data is actually acquired on the operation site, and processing data conflict caused by inconsistency between the completed state data and the planning or design state data.
Through steps S802 to S812 of the embodiment of the application, the mobile terminal 10 downloads and loads a planning or design state data packet, determines the geographical location of the cable work well requiring transaction data acquisition through GPS precise positioning of the mobile terminal 10, reads RFID bound to the cable work well through the mobile terminal 10 for verification, obtains the geographical azimuth of the cable work well according to a gyroscope and a geomagnetic sensor of the mobile terminal 10, records image data of the cable work well through the mobile terminal 10, wherein the image data includes the geographical azimuth, performs information tagging on the cable in which the image data transaction occurs through the mobile terminal 10 to obtain tagged image data, sends the tagged image data to the cable management and control master station 11, processes the planning or design state data through the cable management and control master station 11 according to the tagged image data to obtain completion state data, the cable management and control main station 11 performs quality inspection on the completion status data, processes data conflict caused by the completion status data, solves the problems of low efficiency and inaccurate data of cable data acquisition, realizes high efficiency and standardization of cable attribute after cable adjustment and laying occupation information field acquisition of the cable working well, and has anti-counterfeiting and dislocation recording capabilities.
In some embodiments, the cable management and control master station 11 performs planning or design state data processing according to the annotated image data to obtain as-built data, performs quality inspection on the as-built data, processes data conflicts caused by the as-built data, ensures data logic integrity, normalization and consistency, forms qualified data, generates an as-built drawing electronic file, performs engineering result evaluation, and forms construction compliance evaluation by comparing the design information with cable transaction data acquired in the construction process.
In addition, by combining the cable attribute and the method for collecting laying occupation information on site in the above embodiments, the embodiments of the present application can provide a storage medium to implement. The storage medium having stored thereon a computer program; when being executed by a processor, the computer program realizes the method for acquiring the cable attribute and the laying occupancy information on site in any embodiment.
In one embodiment, a computer device is provided, which may be a terminal. The computer device includes a processor, a memory, a network interface, a display screen, and an input device connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to implement a method for on-site collection of cable attributes and lay out occupancy information. The display screen of the computer equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment can be a touch layer covered on the display screen, a key, a track ball or a touch pad arranged on the shell of the computer equipment, an external keyboard, a touch pad or a mouse and the like.
In an embodiment, fig. 9 is a schematic internal structure diagram of an electronic device according to an embodiment of the present application, and as shown in fig. 9, there is provided an electronic device, which may be a server, and its internal structure diagram may be as shown in fig. 9. The electronic device comprises a processor, a network interface, an internal memory and a non-volatile memory connected by an internal bus, wherein the non-volatile memory stores an operating system, a computer program and a database. The processor is used for providing calculation and control capacity, the network interface is used for being connected and communicated with an external terminal through a network, the internal memory is used for providing an environment for an operating system and the running of a computer program, the computer program is executed by the processor to realize a method for acquiring cable attributes and laying place occupation information on site, and the database is used for storing data.
Those skilled in the art will appreciate that the configuration shown in fig. 9 is a block diagram of only a portion of the configuration relevant to the present application, and does not constitute a limitation on the electronic device to which the present application is applied, and a particular electronic device may include more or less components than those shown in the drawings, or combine certain components, or have a different arrangement of components.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
It should be understood by those skilled in the art that various features of the above-described embodiments can be combined in any combination, and for the sake of brevity, all possible combinations of features in the above-described embodiments are not described in detail, but rather, all combinations of features which are not inconsistent with each other should be construed as being within the scope of the present disclosure.
The above-mentioned embodiments only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1.一种电缆属性及敷设占位信息现场采集的方法,其特征在于,所述方法包括:1. a method for on-site collection of cable properties and laying occupancy information, characterized in that the method comprises: 通过移动终端下载并载入规划或设计态数据包,根据所述规划或设计态数据包确定需要进行异动数据采集的电缆工作井;Download and load the planning or design state data package through the mobile terminal, and determine the cable work wells that need to collect dynamic data according to the planning or design state data package; 根据所述移动终端的陀螺仪和地磁传感器获取所述电缆工作井的地理方位角,通过所述移动终端对所述电缆工作井进行影像数据的拍摄记录,其中,所述影像数据包括所述地理方位角;The geographic azimuth of the cable working well is obtained according to the gyroscope and geomagnetic sensor of the mobile terminal, and image data is recorded on the cable working well through the mobile terminal, wherein the image data includes the geographic Azimuth; 通过所述移动终端对所述影像数据进行电缆属性、缺陷信息和指向信息标注,得到标注影像数据,并将所述标注影像数据发送到电缆管控主站;Label the image data with cable attributes, defect information and pointing information through the mobile terminal to obtain labeled image data, and send the labeled image data to the cable management master station; 根据所述标注影像数据通过所述电缆管控主站对规划或设计态数据进行处理,得到竣工态数据;According to the marked image data, the planning or design state data is processed through the cable management and control master station to obtain the as-built state data; 通过所述电缆管控主站对所述竣工态数据进行质检,检查现场采集的影像数据中采集时间、采集位置与其所关联工作井的记录时间、记录位置的一致性,确保所述影像数据是作业现场真实采集的,并处理所述竣工态数据与所述规划或设计态数据不符造成的数据冲突。The quality inspection of the as-built data is carried out by the cable management master station, and the consistency of the collection time and collection position in the image data collected on site with the recording time and recording position of the associated working well is checked to ensure that the image data is correct It is actually collected on the job site, and the data conflict caused by the inconsistency between the as-built data and the planning or design data is handled. 2.根据权利要求1所述的方法,其特征在于,在通过移动终端下载并载入规划或设计态数据包之前,所述方法还包括:2. The method according to claim 1, wherein before downloading and loading the planning or design state data package through the mobile terminal, the method further comprises: 根据规划业务信息通过电缆管控主站进行处理,得到规划或设计态数据包,其中,所述规划或设计态数据包包括规划或设计态电缆属性和路径信息、规划或设计态电缆与占用通道关联信息、规划或设计态电缆管孔占用信息。According to the planning service information, it is processed by the cable management and control master station to obtain a planning or design state data packet, wherein the planning or design state data packet includes the planning or design state cable attribute and path information, and the planning or design state cable is associated with the occupied channel. Information, planning or design state cable duct occupancy information. 3.根据权利要求1所述的方法,其特征在于,根据所述规划或设计态数据包确定需要进行异动数据采集的电缆工作井包括:3. The method according to claim 1, characterized in that, according to the planning or design state data package, determining the wireline working well that needs to carry out abnormal data acquisition comprises: 通过所述移动终端的GPS精确定位,确定需要进行异动数据采集的所述电缆工作井的地理位置,并通过所述移动终端读取所述电缆工作井上绑定的RFID、文字铭牌以及其他带有唯一性命名标识进行验证。Through the GPS precise positioning of the mobile terminal, determine the geographic location of the wireline working well that needs to collect data on movement, and read the RFID, text nameplate and other items with the binding on the wireline working well through the mobile terminal. Unique named identifier for verification. 4.根据权利要求1所述的方法,其特征在于,通过所述移动终端对所述影像数据进行电缆属性、缺陷信息和指向信息标注,得到标注影像数据包括:4. The method according to claim 1, wherein the image data is marked with cable attributes, defect information and pointing information by the mobile terminal, and obtaining marked image data comprises: 通过所述移动终端对所述影像数据发生异动的电缆属性、缺陷和指向进行信息标注,得到标注影像数据,其中,所述信息标注包括所述电缆名称、路径信息、指向图标和缺陷描述。The mobile terminal performs information annotation on the cable attributes, defects and orientations of the image data that have changed, to obtain annotated image data, wherein the information annotation includes the cable name, path information, pointing icon and defect description. 5.一种电缆属性及敷设占位信息现场采集的系统,其特征在于,所述系统包括移动终端和电缆管控主站;5. A system for on-site collection of cable attributes and laying occupancy information, wherein the system comprises a mobile terminal and a cable management and control master station; 所述移动终端下载并载入规划或设计态数据包,根据所述规划或设计态数据包确定需要进行异动数据采集的电缆工作井;The mobile terminal downloads and loads the planning or design state data package, and determines the cable work well that needs to perform dynamic data collection according to the planning or design state data package; 所述移动终端通过陀螺仪和地磁传感器获取所述电缆工作井的地理方位角,所述移动终端对所述电缆工作井进行影像数据的拍摄记录,其中,所述影像数据包括所述地理方位角;The mobile terminal acquires the geographic azimuth of the cable working well through a gyroscope and a geomagnetic sensor, and the mobile terminal records image data of the cable working well, wherein the image data includes the geographic azimuth ; 所述移动终端对所述影像数据进行电缆属性、缺陷信息和指向信息标注,得到标注影像数据,并将所述标注影像数据发送到电缆管控主站;The mobile terminal marks the image data with cable attributes, defect information and pointing information, obtains marked image data, and sends the marked image data to the cable management and control master station; 所述电缆管控主站根据所述标注影像数据对规划或设计态数据进行处理,得到竣工态数据;The cable management and control master station processes planning or design data according to the marked image data to obtain as-built data; 所述电缆管控主站对所述竣工态数据进行质检,检查现场采集的影像数据中采集时间、采集位置与其所关联工作井的记录时间、记录位置的一致性,确保所述影像数据是作业现场真实采集的,并处理所述竣工态数据与所述规划或设计态数据不符造成的数据冲突。The cable management master station conducts quality inspection on the as-built data, and checks the consistency of the collection time, collection location and the recording time and recording location of the associated working well in the image data collected on site, to ensure that the image data is an operational The data is collected from the actual site, and the data conflict caused by the inconsistency between the as-built data and the planning or design data is processed. 6.根据权利要求5所述的系统,其特征在于,在所述移动终端下载并载入规划或设计态数据包之前,所述系统还包括:6. The system according to claim 5, wherein before the mobile terminal downloads and loads the planning or design state data package, the system further comprises: 所述电缆管控主站根据规划业务信息进行处理,得到规划或设计态数据包,其中,所述规划或设计态数据包包括规划或设计态电缆属性和路径信息、规划或设计态电缆与占用通道关联信息、规划或设计态电缆管孔占用信息。The cable management and control master station processes according to the planning service information, and obtains a planning or design state data packet, wherein the planning or design state data packet includes the planning or design state cable attribute and path information, the planning or design state cable and the occupied channel. Correlation information, planning or design state cable duct occupancy information. 7.根据权利要求5所述的系统,其特征在于,根据所述规划或设计态数据包确定需要进行异动数据采集的电缆工作井包括:7. The system according to claim 5, characterized in that, determining the wireline working well that needs to carry out data collection for abnormal movement according to the planning or design state data package comprises: 所述移动终端通过GPS精确定位,确定需要进行异动数据采集的所述电缆工作井的地理位置,所述移动终端读取所述电缆工作井上绑定的RFID、文字铭牌以及其他带有唯一性命名标识进行验证。The mobile terminal is accurately positioned through GPS to determine the geographic location of the cable well that needs to collect data from movement, and the mobile terminal reads the RFID, text nameplate and other unique names bound on the cable well. ID for verification. 8.根据权利要求5所述的系统,其特征在于,所述移动终端对所述影像数据进行电缆属性、缺陷信息和指向信息标注,得到标注影像数据包括:8 . The system according to claim 5 , wherein the mobile terminal marks the image data with cable attributes, defect information and pointing information, and obtaining the marked image data comprises: 所述移动终端对所述影像数据发生异动的电缆属性、缺陷和指向进行信息标注,得到标注影像数据,其中,所述信息标注包括所述电缆名称、路径信息、指向图标和缺陷描述。The mobile terminal performs information annotation on the cable attribute, defect and orientation of the image data that has changed, and obtains annotated image data, wherein the information annotation includes the cable name, path information, pointing icon and defect description. 9.一种计算机设备,包括存储器、处理器以及存储在所述存储器上并可在所述处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如权利要求1至4中任一项所述的电缆属性及敷设占位信息现场采集的方法。9. A computer device, comprising a memory, a processor, and a computer program stored on the memory and running on the processor, wherein the processor implements the computer program as claimed in the claims The method for on-site collection of cable attributes and laying occupancy information according to any one of 1 to 4. 10.一种计算机可读存储介质,其上存储有计算机程序,其特征在于,该程序被处理器执行时实现如权利要求1至4中任一项所述的电缆属性及敷设占位信息现场采集的方法。10. A computer-readable storage medium on which a computer program is stored, characterized in that, when the program is executed by a processor, the cable attribute and the laying occupancy information site according to any one of claims 1 to 4 are realized method of collection.
CN202110481879.6A 2021-04-30 2021-04-30 Method and system for acquiring cable attribute and laying occupation information on site Active CN113283040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110481879.6A CN113283040B (en) 2021-04-30 2021-04-30 Method and system for acquiring cable attribute and laying occupation information on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110481879.6A CN113283040B (en) 2021-04-30 2021-04-30 Method and system for acquiring cable attribute and laying occupation information on site

Publications (2)

Publication Number Publication Date
CN113283040A true CN113283040A (en) 2021-08-20
CN113283040B CN113283040B (en) 2022-04-12

Family

ID=77277800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110481879.6A Active CN113283040B (en) 2021-04-30 2021-04-30 Method and system for acquiring cable attribute and laying occupation information on site

Country Status (1)

Country Link
CN (1) CN113283040B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116317172A (en) * 2023-05-25 2023-06-23 中国电建集团山东电力建设第一工程有限公司 A cable laying monitoring system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103809570A (en) * 2013-12-25 2014-05-21 浙江图维电力科技有限公司 Underground shaftway multi-data collecting and controlling system
CN106373034A (en) * 2016-11-01 2017-02-01 天津市普迅电力信息技术有限公司 Management system for data acquisition process of underground power pipeline
CN106708984A (en) * 2016-12-09 2017-05-24 国网北京市电力公司 Method, apparatus and system for acquiring basic data of cable channel
CN109257661A (en) * 2018-08-13 2019-01-22 安徽继远软件有限公司 A kind of buried cable data collection system and acquisition method
CN111149141A (en) * 2017-09-04 2020-05-12 Nng软件开发和商业有限责任公司 Method and apparatus for collecting and using sensor data from vehicles
CN111507951A (en) * 2020-04-08 2020-08-07 中国电力科学研究院有限公司 Cable line tunnel engineering inspection device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103809570A (en) * 2013-12-25 2014-05-21 浙江图维电力科技有限公司 Underground shaftway multi-data collecting and controlling system
CN106373034A (en) * 2016-11-01 2017-02-01 天津市普迅电力信息技术有限公司 Management system for data acquisition process of underground power pipeline
CN106708984A (en) * 2016-12-09 2017-05-24 国网北京市电力公司 Method, apparatus and system for acquiring basic data of cable channel
CN111149141A (en) * 2017-09-04 2020-05-12 Nng软件开发和商业有限责任公司 Method and apparatus for collecting and using sensor data from vehicles
CN109257661A (en) * 2018-08-13 2019-01-22 安徽继远软件有限公司 A kind of buried cable data collection system and acquisition method
CN111507951A (en) * 2020-04-08 2020-08-07 中国电力科学研究院有限公司 Cable line tunnel engineering inspection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116317172A (en) * 2023-05-25 2023-06-23 中国电建集团山东电力建设第一工程有限公司 A cable laying monitoring system and method
CN116317172B (en) * 2023-05-25 2023-10-20 中国电建集团山东电力建设第一工程有限公司 Cable laying monitoring system and method

Also Published As

Publication number Publication date
CN113283040B (en) 2022-04-12

Similar Documents

Publication Publication Date Title
CN108920354B (en) Embedded point management method and device, computer equipment and storage medium
CN111221743B (en) Automatic test method and system
CN108427613B (en) Abnormal interface positioning method and device, computer equipment and storage medium
CN110231937B (en) Script defect scanning method, script defect scanning device, computer equipment and storage medium
CN108829593A (en) Code coverage calculation and analysis methods, device, equipment and storage medium
CN111831574B (en) Regression test planning method, regression test planning device, computer system and medium
WO2007105720A1 (en) Image data recording method, working result recording method using image data, image data recording device, and working result recording system using image data
US20190154463A1 (en) Flow meter reading with image recognition secured with mask and software connected by mobile device
CN115658452B (en) Buried point verification method, buried point verification device, readable storage medium, and electronic device
CN112035114A (en) Page rollback method, device, equipment and medium
CN113283040B (en) Method and system for acquiring cable attribute and laying occupation information on site
CN109491645A (en) Point methods, device, computer equipment and storage medium are buried based on interface element
CN113448849A (en) Page element testing method, device, equipment and storage medium
US8358201B1 (en) Storage and recall of buried asset data over communications networks for damage avoidance and mapping
CN114003250A (en) Software deployment method and device
CN110008758A (en) ID obtaining method and device, electronic equipment and storage medium
CN111444087B (en) Coverage rate data processing method and device, computing equipment and readable storage medium
KR102422297B1 (en) Server, method and computer program for managing concrete materials for construction electronically using rfid (radio frequency identification communication tags
CN108829574A (en) Test data laying method, testing service device and computer readable storage medium
CN110083509A (en) A kind of regular method and device of daily record data
CN109636555A (en) Measuring method, device, computer equipment and the storage medium of capital cost
US20230128643A1 (en) Photographing program
CN109450966B (en) Equipment positioning method and device, computer equipment and storage medium
CN112613340A (en) Archive auditing method and device, computer equipment and storage medium
CN115469266B (en) Method and apparatus for automatically debugging a positioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method and system for on-site collection of cable attributes and installation occupancy information

Granted publication date: 20220412

Pledgee: Kunlun Trust Co.,Ltd.

Pledgor: ZHEJIANG TUWEI TECHNOLOGY Co.,Ltd.

Registration number: Y2026980000437

PE01 Entry into force of the registration of the contract for pledge of patent right