[go: up one dir, main page]

CN113262995B - A construction area monitoring device for on-site construction management based on BIM - Google Patents

A construction area monitoring device for on-site construction management based on BIM Download PDF

Info

Publication number
CN113262995B
CN113262995B CN202110524246.9A CN202110524246A CN113262995B CN 113262995 B CN113262995 B CN 113262995B CN 202110524246 A CN202110524246 A CN 202110524246A CN 113262995 B CN113262995 B CN 113262995B
Authority
CN
China
Prior art keywords
fixedly connected
plate
block
fixing
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110524246.9A
Other languages
Chinese (zh)
Other versions
CN113262995A (en
Inventor
池慧
卢楠
边金
王鹏博
何幸阳
林楠超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ocean University
Original Assignee
Guangdong Ocean University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Ocean University filed Critical Guangdong Ocean University
Priority to CN202110524246.9A priority Critical patent/CN113262995B/en
Publication of CN113262995A publication Critical patent/CN113262995A/en
Application granted granted Critical
Publication of CN113262995B publication Critical patent/CN113262995B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/14Wipes; Absorbent members, e.g. swabs or sponges
    • B08B1/143Wipes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B13/00Accessories or details of general applicability for machines or apparatus for cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B15/00Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
    • B08B15/04Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area from a small area, e.g. a tool
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/50Constructional details
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Cleaning In General (AREA)

Abstract

本发明涉及监控装置技术领域,具体为一种基于BIM的现场施工管理用施工区域监控装置,包括装置主体,所述装置主体下方设置有安装柱,且安装柱前端固定安装有开关,所述安装柱上方设置有角度调节机构,且角度调节机构左方设置有清洁机构,所述清洁机构下方设置有收纳机构,且收纳机构左方设置有限位机构。本发明只需按动开关即可使得海绵块和毛刷向下运动,即可对装置主体镜头进行清洁,无需人们手动清洁,使得清洁的过程更加便捷,还带来了装置在清洁的同时还可自动打开收纳腔,从而使得落入下尘土进入收纳腔内部,进行收集,避免清洁尘土落下。

Figure 202110524246

The invention relates to the technical field of monitoring devices, in particular to a construction area monitoring device for on-site construction management based on BIM, comprising a device main body, an installation column is arranged under the device main body, and a switch is fixedly installed at the front end of the installation column. An angle adjustment mechanism is arranged above the column, and a cleaning mechanism is arranged to the left of the angle adjustment mechanism, a storage mechanism is arranged below the cleaning mechanism, and a limit mechanism is arranged to the left of the storage mechanism. The invention only needs to press the switch to make the sponge block and the brush move downward, and the main lens of the device can be cleaned without manual cleaning, which makes the cleaning process more convenient, and also brings the device to be clean at the same time. The storage cavity can be automatically opened, so that the falling dust can enter the interior of the storage cavity for collection and avoid cleaning dust from falling.

Figure 202110524246

Description

一种基于BIM的现场施工管理用施工区域监控装置A construction area monitoring device for on-site construction management based on BIM

技术领域technical field

本发明涉及监控装置技术领域,具体为一种基于BIM的现场施工管理用施工区域监控装置。The invention relates to the technical field of monitoring devices, in particular to a construction area monitoring device for on-site construction management based on BIM.

背景技术Background technique

BIM技术是一种应用于工程设计建造管理的数据化工具,通过参数模型整合各种项目的相关信息,在项目策划、运行和维护的全生命周期过程中进行共享和传递,使工程技术人员对各种建筑信息作出正确理解和高效应对,为设计团队以及包括建筑运营单位在内的各方建设主体提供协同工作的基础,在提高生产效率、节约成本和缩短工期方面发挥重要作用,从BIM设计过程的资源、行为、交付三个基本维度,给出设计企业的实施标准的具体方法和实践内容。不是简单的将数字信息进行集成,而是一种数字信息的应用,并可以用于设计、建造、管理的数字化方法。这种方法支持建筑工程的集成管理环境,可以使建筑工程在其整个进程中显著提高效率、大量减少风险。BIM technology is a data-based tool applied to engineering design and construction management. It integrates relevant information of various projects through parametric models, and shares and transmits it in the whole life cycle process of project planning, operation and maintenance, so that engineering and technical personnel can Correctly understand and efficiently respond to various building information, provide the basis for collaborative work for the design team and all construction entities including the construction operation unit, and play an important role in improving production efficiency, saving costs and shortening construction periods. From BIM design The three basic dimensions of process resources, behavior, and delivery are given, and the specific methods and practical contents of the design enterprise's implementation standards are given. It is not a simple integration of digital information, but an application of digital information, which can be used for digital methods of design, construction and management. This approach supports an integrated management environment for construction projects, which can enable construction projects to significantly improve efficiency and reduce risks throughout their entire process.

BIM系统中经常会用到监控设备对施工场地进行实时监控,并且为了保证工人的安全等问题,通常会将监控系统和检测系统进行配合,从而实时保证施工工场地的安全,因此可知现在的BIM的现场施工管理用施工区域监控装置基本满足人们需求,但是仍然存在一些问题。Monitoring equipment is often used in the BIM system to monitor the construction site in real time, and in order to ensure the safety of workers and other issues, the monitoring system and the detection system are usually coordinated to ensure the safety of the construction site in real time. Therefore, it is known that the current BIM The construction area monitoring device used for on-site construction management basically meets people's needs, but there are still some problems.

由于监控装置需要对施工位置进行检测,从而使得装置一般安装在施工部位周围,但由于施工部位环境的特殊,会使得施工部位的空气中漂浮大量尘土,可能会导致监控装置的镜头附着大量灰尘,如不及时的进行清洁会影响监控装置的监控效果,但由于监控装置往往安装在较高的位置,当人们进行清洁时还需要借助工具,爬上高处进行清洁,使得清洁时较为麻烦不便,因此亟需一种基于BIM的现场施工管理用施工区域监控装置来解决上述问题。Since the monitoring device needs to detect the construction position, the device is generally installed around the construction site. However, due to the special environment of the construction site, a large amount of dust will float in the air of the construction site, which may cause a large amount of dust to adhere to the lens of the monitoring device. If it is not cleaned in time, the monitoring effect of the monitoring device will be affected. However, since the monitoring device is often installed in a high position, when people clean, they need to use tools to climb up to a high place for cleaning, which makes cleaning more troublesome and inconvenient. Therefore, a construction area monitoring device for on-site construction management based on BIM is urgently needed to solve the above problems.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种基于BIM的现场施工管理用施工区域监控装置,以解决上述背景技术中提出的由于施工部位环境的特殊,会使得施工部位的空气中漂浮大量尘土,可能会导致监控装置的镜头附着大量灰尘,如不及时的进行清洁会影响监控装置的监控效果的问题。The purpose of the present invention is to provide a construction area monitoring device for on-site construction management based on BIM, so as to solve the problem in the above-mentioned background art that due to the special environment of the construction site, a large amount of dust will float in the air of the construction site, which may lead to monitoring A large amount of dust is attached to the lens of the device. If it is not cleaned in time, it will affect the monitoring effect of the monitoring device.

为实现上述目的,本发明提供如下技术方案:一种基于BIM的现场施工管理用施工区域监控装置,包括装置主体,所述装置主体下方设置有安装柱,且安装柱前端固定安装有开关,所述安装柱上方设置有角度调节机构,且角度调节机构左方设置有清洁机构,所述清洁机构下方设置有收纳机构,且收纳机构左方设置有限位机构。In order to achieve the above purpose, the present invention provides the following technical solutions: a construction area monitoring device for on-site construction management based on BIM, including a device main body, a mounting column is arranged under the device main body, and a switch is fixedly installed at the front end of the installation column, so An angle adjustment mechanism is arranged above the installation column, and a cleaning mechanism is arranged to the left of the angle adjustment mechanism, a storage mechanism is arranged below the cleaning mechanism, and a limit mechanism is arranged to the left of the storage mechanism.

优选的,所述角度调节机构包括第一连接板,所述安装柱后端上侧固定连接有第一连接板,且安装柱前端上侧固定连接有第一固定板,所述第一连接板前端中部固定连接有连接杆,且连接杆外部套设有套杆,所述第一固定板上卡合有滑块,且第一固定板上开设有与滑块相互配合的槽口,所述滑块前端中部螺纹连接有螺栓,且螺栓后端贯穿滑块并延伸至连接杆内部,且连接杆内部开设有与螺栓相互配合的螺纹孔,采用这种设计便于使得对装置进行角度调节。Preferably, the angle adjustment mechanism includes a first connecting plate, a first connecting plate is fixedly connected to the upper side of the rear end of the mounting column, and a first fixing plate is fixedly connected to the upper side of the front end of the mounting column, and the first connecting plate The middle part of the front end is fixedly connected with a connecting rod, and the outer part of the connecting rod is sleeved with a sleeve rod. A bolt is threadedly connected to the middle of the front end of the slider, and the rear end of the bolt penetrates the slider and extends to the interior of the connecting rod, and the connecting rod is provided with a threaded hole that cooperates with the bolt. This design facilitates the angle adjustment of the device.

优选的,所述清洁机构包括第一固定块,所述装置主体前后两侧皆固定连接有第一固定块,两组所述第一固定块内部皆卡合有滑动块,且第一固定块内部底端上皆固定连接有第一固定杆,两组所述第一固定杆外部皆套设有滑动块,两组所述第一固定块内部皆开设有与滑动块相互配合的滑槽,两组所述第一固定杆外部上侧皆套设有第一弹簧,且第一弹簧两端分别焊接在滑动块和第一固定块上,两组所述滑动块互相靠近的一侧固定连接有第二连接板,且装置主体顶端中部固定安装有电机,所述第二连接板顶端中部固定连接有第二固定杆,且第二固定杆内部前侧固定连接有第一齿条板,所述电机的输出轴外部固定连接有第一传动齿轮,所述第一传动齿轮与第一齿条板互相啮合,且第二连接板左端前后两侧上皆插设有第一限位杆,两组所述第一限位杆外部皆套设有第二弹簧,两组所述第二弹簧的两端分别焊接在第二连接板和第一限位杆上,且第一限位杆右端固定连接有第二固定板,所述第二固定板右端上侧固定连接有海绵块,且第二固定板右端下侧固定连接有毛刷,采用这种设计便于使得对装置主体镜头进行清洁。Preferably, the cleaning mechanism includes a first fixing block, the front and rear sides of the main body of the device are fixedly connected with a first fixing block, and the two sets of the first fixing blocks are internally engaged with sliding blocks, and the first fixing blocks A first fixing rod is fixedly connected to the inner bottom end, a sliding block is sleeved on the outside of the two sets of the first fixing rod, and a sliding groove which cooperates with the sliding block is provided inside the two sets of the first fixing block. The upper sides of the two sets of the first fixing rods are sleeved with first springs, and the two ends of the first springs are welded to the sliding block and the first fixing block respectively, and the two sets of the sliding blocks are fixedly connected to each other on one side close to each other. There is a second connecting plate, and a motor is fixedly installed in the middle of the top of the main body of the device, a second fixing rod is fixedly connected to the middle of the top of the second connecting plate, and a first rack plate is fixedly connected to the inner front side of the second fixing rod, so The output shaft of the motor is fixedly connected with a first transmission gear, the first transmission gear and the first rack plate are meshed with each other, and a first limit rod is inserted on both the front and rear sides of the left end of the second connection plate. Second springs are sleeved on the outside of the first limit rods of the two groups, the two ends of the second springs of the two groups are respectively welded on the second connecting plate and the first limit rod, and the right end of the first limit rod is fixed A second fixing plate is connected, a sponge block is fixedly connected to the upper side of the right end of the second fixing plate, and a brush is fixedly connected to the lower side of the right end of the second fixing plate. This design is convenient for cleaning the main lens of the device.

优选的,所述收纳机构包括第二齿条板,前侧所述滑动块前端固定连接有第二齿条板,前侧所述第一固定块上开设有与第二齿条板相互配合的滑槽,且装置主体前端左侧固定连接有第三固定板,所述第三固定板上通过轴承活动连接有第二传动杆,且第二传动杆外部左侧固定连接有第二传动齿轮,所述第二传动齿轮与第二齿条板互相啮合,且第二传动杆右端固定连接有第一锥形齿轮,所述装置主体底端固定连接有固定底板,且固定底板内部前侧两侧皆卡合有限位块,所述固定底板内部开设有与限位块相互配合的滑槽,且限位块底端固定连接有收纳腔,前侧所述限位块前端固定连接有第三齿条板,且固定底板上开设有与第三齿条板相互配合的滑槽,所述固定底板前端左侧固定连接有第四固定板,且第四固定板上通过轴承活动连接有第一传动杆,所述第一传动杆外部中侧固定连接有第三传动齿轮,且第三传动齿轮与第三齿条板互相啮合,所述第一传动杆顶端固定连接有第二锥形齿轮,且第二锥形齿轮与第一锥形齿轮互相啮合,两组所述限位块右端皆焊接有第三弹簧,两组所述第三弹簧另一端皆焊接在固定底板上,所述固定底板右端固定连接在套杆左端上,采用这种设计便于使得对清洁产生的灰尘进行收集。Preferably, the storage mechanism includes a second rack plate, the front end of the sliding block on the front side is fixedly connected with a second rack plate, and the first fixed block on the front side is provided with a second rack plate that cooperates with the second rack plate. a chute, and a third fixing plate is fixedly connected to the left side of the front end of the main body of the device, a second transmission rod is movably connected to the third fixing plate through a bearing, and a second transmission gear is fixedly connected to the outer left side of the second transmission rod, The second transmission gear and the second rack plate mesh with each other, and the right end of the second transmission rod is fixedly connected with a first bevel gear, the bottom end of the device main body is fixedly connected with a fixed bottom plate, and both sides of the inner front side of the fixed bottom plate are fixedly connected Both are engaged with the limit block, the fixed bottom plate is provided with a chute that cooperates with the limit block, the bottom end of the limit block is fixedly connected with a storage cavity, and the front end of the limit block on the front side is fixedly connected with a third tooth The fixed bottom plate is provided with a chute that cooperates with the third rack plate, the left side of the front end of the fixed bottom plate is fixedly connected with a fourth fixed plate, and the fourth fixed plate is movably connected with a first transmission through a bearing A third transmission gear is fixedly connected to the outer middle side of the first transmission rod, and the third transmission gear and the third rack plate are meshed with each other, the top of the first transmission rod is fixedly connected with a second bevel gear, and The second bevel gear and the first bevel gear mesh with each other, the right ends of the two sets of limit blocks are welded with third springs, and the other ends of the two sets of third springs are welded to the fixed bottom plate, and the right end of the fixed bottom plate is welded with each other. It is fixedly connected to the left end of the sleeve rod, and the use of this design facilitates the collection of dust generated by cleaning.

优选的,所述固定底板前方左侧设置有连接块,且连接块后端上下两侧分别固定连接在固定底板前端上下两侧上,采用这种设计便于使得对固定底板前端左侧进一步固定。Preferably, the front left side of the fixed bottom plate is provided with a connecting block, and the upper and lower sides of the rear end of the connecting block are fixedly connected to the upper and lower sides of the front end of the fixed bottom plate respectively. This design is convenient to further fix the left side of the front end of the fixed bottom plate.

优选的,所述限位机构包括活动挡板,所述收纳腔内部左侧插设有活动挡板,且收纳腔左端下侧固定连接有第二固定块,所述第二固定块内部插设有限位卡块,且收纳腔左端中部固定连接有第三连接板,所述限位卡块顶端固定连接有第二限位杆,且第二限位杆顶端延伸至第三连接板内部,所述第三连接板内部开设有与第二限位杆相互配合的槽口,且第二限位杆外部套设有第四弹簧,所述第四弹簧两端分别焊接在第三连接板和限位卡块上,采用这种设计便于使得对活动挡板进行锁定和解除锁定。Preferably, the limiting mechanism includes a movable baffle, a movable baffle is inserted in the left side of the storage cavity, and a second fixing block is fixedly connected to the lower side of the left end of the storage cavity, and the second fixing block is inserted inside There is a limit block, and a third connecting plate is fixedly connected to the middle of the left end of the storage cavity, a second limit rod is fixedly connected to the top of the limit block, and the top of the second limit rod extends to the inside of the third connecting plate, so The inside of the third connecting plate is provided with a notch that cooperates with the second limit rod, and a fourth spring is sleeved outside the second limit rod, and both ends of the fourth spring are welded to the third connecting plate and the limit rod respectively. On the position card block, this design is convenient to lock and unlock the movable baffle.

优选的,所述活动挡板顶端右侧固定连接有挡块,且活动挡板右端胶粘有密封垫,采用这种设计便于使得活动挡板与收纳腔更加贴合。Preferably, the top right side of the movable baffle is fixedly connected with a stopper, and the right end of the movable baffle is glued with a sealing gasket. This design facilitates the better fit of the movable baffle and the storage cavity.

一种基于BIM的现场施工管理用施工区域监控装置的使用方法:A method of using a construction area monitoring device for on-site construction management based on BIM:

S1:按动开关,电机工作,毛刷和海绵块向下运动,对装置主体镜面进行清洁;S1: Press the switch, the motor works, the brush and sponge block move down, and the mirror surface of the main body of the device is cleaned;

S2:毛刷和海绵块向下运动,收纳腔打开,对掉落的尘土进行收集;S2: The brush and sponge block move downward, the storage cavity is opened, and the falling dust is collected;

S3:再次按动开关,电机停止工作,第一弹簧和第三弹簧恢复形变,毛刷、海绵块和收纳腔复位;S3: Press the switch again, the motor stops working, the first spring and the third spring return to deformation, and the brush, sponge block and storage cavity are reset;

S4:对安装角度调节,转动套杆,装置主体角度改变,转动螺栓完成固定;S4: Adjust the installation angle, rotate the sleeve rod, change the angle of the main body of the device, and complete the fixing by rotating the bolt;

S5:对收纳腔内部清洁,向上拉动限位卡块,再拉动活动挡板,收纳腔内部尘土落下。S5: Clean the inside of the storage cavity, pull the limit block upward, and then pull the movable baffle, and the dust inside the storage cavity will fall.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

该基于BIM的现场施工管理用施工区域监控装置设置有海绵块、毛刷和收纳腔,采用这种设计避免了施工部位环境的特殊,会使得施工部位的空气中漂浮大量尘土,可能会导致监控装置的镜头附着大量灰尘,如不及时的进行清洁会影响监控装置的监控效果,但由于监控装置往往安装在较高的位置,当人们进行清洁时还需要借助工具,爬上高处进行清洁,使得清洁时较为麻烦不便的问题,带来了当需要对装置主体的镜头部位进行清洁时,只需按动开关即可使得海绵块和毛刷向下运动,即可对装置主体镜头进行清洁,无需人们手动清洁,使得清洁的过程更加便捷,还带来了装置在清洁的同时还可自动打开收纳腔,从而使得落入下尘土进入收纳腔内部,进行收集,避免清洁尘土落下,给下方的工人们带来不便,整个装置结构设计紧密,联动性强,并且当清洁完成后,整个装置可自动复位,便于下侧清洁,大大提升装置的实用性和便捷性。The construction area monitoring device for on-site construction management based on BIM is provided with sponge blocks, brushes and storage chambers. This design avoids the special environment of the construction site, which will cause a lot of dust to float in the air of the construction site, which may lead to monitoring There is a lot of dust attached to the lens of the device. If it is not cleaned in time, it will affect the monitoring effect of the monitoring device. However, because the monitoring device is often installed in a high position, when people clean it, they need to use tools to climb up to a high place for cleaning. This makes cleaning more troublesome and inconvenient, and when it is necessary to clean the lens part of the main body of the device, just press the switch to make the sponge block and the brush move down, and then the main lens of the device can be cleaned. There is no need for people to manually clean, which makes the cleaning process more convenient, and also brings the device to automatically open the storage cavity while cleaning, so that the falling dust can enter the interior of the storage cavity for collection, and prevent the cleaning dust from falling down and giving it to the people below. Workers are inconvenienced. The whole device has a tight structure design and strong linkage, and when the cleaning is completed, the whole device can be automatically reset to facilitate the cleaning of the lower side, which greatly improves the practicability and convenience of the device.

附图说明Description of drawings

图1为本发明的左侧俯视立体结构示意图;Fig. 1 is the left side top view three-dimensional structure schematic diagram of the present invention;

图2为本发明的结构正视剖面示意图;Fig. 2 is the structure front sectional schematic diagram of the present invention;

图3为本发明图1中安装柱、开关和角度调节机构隐藏状态的立体结构示意图;FIG. 3 is a schematic three-dimensional structure diagram of the hidden state of the installation column, the switch and the angle adjustment mechanism in FIG. 1 of the present invention;

图4为本发明图3的右侧俯视立体结构示意图;FIG. 4 is a schematic perspective view of the right side top view of FIG. 3 of the present invention;

图5为本发明图3的结构背视剖面示意图;FIG. 5 is a schematic diagram of a back cross-sectional view of the structure of FIG. 3 of the present invention;

图6为本发明图3的结构左侧视剖面示意图;6 is a schematic cross-sectional view of the left side of the structure of FIG. 3 of the present invention;

图7为本发明图3的结构俯视剖面示意图;7 is a schematic top view cross-sectional view of the structure of FIG. 3 of the present invention;

图8为本发明图3的立体结构剖棉示意图;8 is a schematic diagram of the three-dimensional structure of FIG. 3 of the present invention;

图9为本发明图3中A处的结构放大示意图FIG. 9 is an enlarged schematic view of the structure at A in FIG. 3 of the present invention

图10为本发明图5中B处的结构放大示意图FIG. 10 is an enlarged schematic view of the structure at B in FIG. 5 of the present invention

图11为本发明图3中C处的结构放大示意图Fig. 11 is an enlarged schematic view of the structure at C in Fig. 3 of the present invention

图12为本发明图3中D处的结构放大示意图Fig. 12 is an enlarged schematic view of the structure at D in Fig. 3 of the present invention

图13为本发明图6中E处的结构放大示意图。FIG. 13 is an enlarged schematic view of the structure at E in FIG. 6 of the present invention.

图中:111、装置主体;112、安装柱;113、开关;2、角度调节机构;211、第一连接板;212、第一固定板;213、连接杆;214、滑块;215、螺栓;216、套杆;3、清洁机构;311、第一固定块;312、滑动块;313、第一固定杆;314、第一弹簧;315、第二连接板;316、电机;317、第二固定杆;318、第一齿条板;319、第一传动齿轮;320、第一限位杆;321、第二弹簧;322、第二固定板;323、海绵块;324、毛刷;4、收纳机构;411、第二齿条板;412、第三固定板;413、第二传动齿轮;414、第一锥形齿轮;415、固定底板;416、限位块;417、收纳腔;418、第三齿条板;419、第四固定板;420、第一传动杆;421、第三传动齿轮;422、第二锥形齿轮;423、第三弹簧;424、第二传动杆;425、连接块;5、限位机构;511、活动挡板;512、第二固定块;513、限位卡块;514、第三连接板;515、第二限位杆;516、第四弹簧;517、挡块;518、密封垫。In the figure: 111, device main body; 112, installation column; 113, switch; 2, angle adjustment mechanism; 211, first connecting plate; 212, first fixing plate; 213, connecting rod; 214, slider; 215, bolt ; 216, sleeve rod; 3, cleaning mechanism; 311, the first fixed block; 312, the sliding block; 313, the first fixed rod; 314, the first spring; 315, the second connecting plate; 316, the motor; 317, the first Two fixed rods; 318, the first rack plate; 319, the first transmission gear; 320, the first limit rod; 321, the second spring; 322, the second fixed plate; 323, the sponge block; 324, the brush; 4. Storage mechanism; 411, second rack plate; 412, third fixed plate; 413, second transmission gear; 414, first bevel gear; 415, fixed bottom plate; 416, limit block; 417, storage cavity 418, the third rack plate; 419, the fourth fixed plate; 420, the first transmission rod; 421, the third transmission gear; 422, the second bevel gear; 423, the third spring; 424, the second transmission rod ; 425, connecting block; 5, limit mechanism; 511, movable baffle; 512, second fixed block; 513, limit block; 514, third connecting plate; 515, second limit rod; 516, first Four springs; 517, block; 518, gasket.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

请参阅图1-13,本发明提供的一种实施例:一种基于BIM的现场施工管理用施工区域监控装置,包括装置主体111,装置主体111下方设置有安装柱112,且安装柱112前端固定安装有开关113,安装柱112上方设置有角度调节机构2,且角度调节机构2左方设置有清洁机构3,清洁机构3下方设置有收纳机构4,且收纳机构4左方设置有限位机构5。1-13, an embodiment provided by the present invention: a construction area monitoring device for on-site construction management based on BIM, including a device main body 111, a mounting column 112 is arranged below the device main body 111, and the front end of the mounting column 112 A switch 113 is fixedly installed, an angle adjustment mechanism 2 is arranged above the installation column 112, a cleaning mechanism 3 is arranged to the left of the angle adjustment mechanism 2, a storage mechanism 4 is arranged below the cleaning mechanism 3, and a limit mechanism is arranged to the left of the storage mechanism 4 5.

角度调节机构2包括第一连接板211,安装柱112后端上侧固定连接有第一连接板211,且安装柱112前端上侧固定连接有第一固定板212,第一连接板211前端中部固定连接有连接杆213,且连接杆213外部套设有套杆216,第一固定板212上卡合有滑块214,且第一固定板212上开设有与滑块214相互配合的槽口,滑块214前端中部螺纹连接有螺栓215,且螺栓215后端贯穿滑块214并延伸至连接杆213内部,且连接杆213内部开设有与螺栓215相互配合的螺纹孔,采用这种设计便于使得对装置进行角度调节,使得装置在安装使用时更加灵活便于调节。The angle adjustment mechanism 2 includes a first connecting plate 211 , a first connecting plate 211 is fixedly connected to the upper side of the rear end of the mounting column 112 , and a first fixing plate 212 is fixedly connected to the upper side of the front end of the mounting column 112 , and the middle of the front end of the first connecting plate 211 A connecting rod 213 is fixedly connected, and a sleeve rod 216 is sleeved on the outside of the connecting rod 213 , a sliding block 214 is engaged with the first fixing plate 212 , and a slot that cooperates with the sliding block 214 is formed on the first fixing plate 212 , the middle of the front end of the slider 214 is threadedly connected with a bolt 215, and the rear end of the bolt 215 penetrates the slider 214 and extends to the interior of the connecting rod 213, and the connecting rod 213 is provided with a threaded hole that cooperates with the bolt 215. This design is convenient for The angle adjustment of the device makes the device more flexible and convenient to adjust during installation and use.

清洁机构3包括第一固定块311,装置主体111前后两侧皆固定连接有第一固定块311,两组第一固定块311内部皆卡合有滑动块312,且第一固定块311内部底端上皆固定连接有第一固定杆313,两组第一固定杆313外部皆套设有滑动块312,两组第一固定块311内部皆开设有与滑动块312相互配合的滑槽,两组第一固定杆313外部上侧皆套设有第一弹簧314,且第一弹簧314两端分别焊接在滑动块312和第一固定块311上,两组滑动块312互相靠近的一侧固定连接有第二连接板315,且装置主体111顶端中部固定安装有电机316,第二连接板315顶端中部固定连接有第二固定杆317,且第二固定杆317内部前侧固定连接有第一齿条板318,电机316的输出轴外部固定连接有第一传动齿轮319,第一传动齿轮319与第一齿条板318互相啮合,且第二连接板315左端前后两侧上皆插设有第一限位杆320,两组第一限位杆320外部皆套设有第二弹簧321,两组第二弹簧321的两端分别焊接在第二连接板315和第一限位杆320上,且第一限位杆320右端固定连接有第二固定板322,第二固定板322右端上侧固定连接有海绵块323,且第二固定板322右端下侧固定连接有毛刷324,采用这种设计便于使得对装置主体111镜头进行清洁,无需人们手动清洁,使得清洁的操作更加方便快捷,便于人们后续使用装置主体111。The cleaning mechanism 3 includes a first fixing block 311 , the front and rear sides of the device body 111 are fixedly connected with the first fixing block 311 , the two sets of the first fixing blocks 311 are both engaged with sliding blocks 312 , and the inner bottom of the first fixing block 311 is The ends are fixedly connected with first fixing rods 313 , the two sets of first fixing rods 313 are both sleeved with sliding blocks 312 , and the two sets of first fixing blocks 311 are internally provided with sliding grooves that cooperate with the sliding blocks 312 . A first spring 314 is sleeved on the outer upper side of the first fixing rod 313, and the two ends of the first spring 314 are welded to the sliding block 312 and the first fixing block 311 respectively, and the two sets of sliding blocks 312 are fixed on one side close to each other A second connecting plate 315 is connected, and a motor 316 is fixedly installed in the middle of the top of the device body 111 , a second fixing rod 317 is fixedly connected to the middle of the top of the second connecting plate 315 , and the inner front side of the second fixing rod 317 is fixedly connected with a first The rack plate 318 and the output shaft of the motor 316 are fixedly connected with a first transmission gear 319. The first transmission gear 319 and the first rack plate 318 mesh with each other, and the left end of the second connection plate 315 is inserted on both sides of the front and rear. The first limit rod 320 , the two sets of first limit rods 320 are both sleeved with second springs 321 , and both ends of the two sets of second springs 321 are welded to the second connecting plate 315 and the first limit rod 320 respectively. , and a second fixing plate 322 is fixedly connected to the right end of the first limiting rod 320, a sponge block 323 is fixedly connected to the upper side of the right end of the second fixing plate 322, and a brush 324 is fixedly connected to the lower side of the right end of the second fixing plate 322. This design is convenient for cleaning the lens of the device main body 111 without manual cleaning by people, which makes the cleaning operation more convenient and quicker, and facilitates subsequent use of the device main body 111 by people.

收纳机构4包括第二齿条板411,前侧滑动块312前端固定连接有第二齿条板411,前侧第一固定块311上开设有与第二齿条板411相互配合的滑槽,且装置主体111前端左侧固定连接有第三固定板412,第三固定板412上通过轴承活动连接有第二传动杆424,且第二传动杆424外部左侧固定连接有第二传动齿轮413,第二传动齿轮413与第二齿条板411互相啮合,且第二传动杆424右端固定连接有第一锥形齿轮414,装置主体111底端固定连接有固定底板415,且固定底板415内部前侧两侧皆卡合有限位块416,固定底板415内部开设有与限位块416相互配合的滑槽,且限位块416底端固定连接有收纳腔417,前侧限位块416前端固定连接有第三齿条板418,且固定底板415上开设有与第三齿条板418相互配合的滑槽,固定底板415前端左侧固定连接有第四固定板419,且第四固定板419上通过轴承活动连接有第一传动杆420,第一传动杆420外部中侧固定连接有第三传动齿轮421,且第三传动齿轮421与第三齿条板418互相啮合,第一传动杆420顶端固定连接有第二锥形齿轮422,且第二锥形齿轮422与第一锥形齿轮414互相啮合,两组限位块416右端皆焊接有第三弹簧423,两组第三弹簧423另一端皆焊接在固定底板415上,固定底板415右端固定连接在套杆216左端上,采用这种设计便于使得对清洁产生的灰尘进行收集,避免了清洁过程中尘土落下,从而给下方的人们带来不便。The storage mechanism 4 includes a second rack plate 411 , the front end of the front side sliding block 312 is fixedly connected with the second rack plate 411 , and the first fixing block 311 on the front side is provided with a chute that cooperates with the second rack plate 411 . And a third fixing plate 412 is fixedly connected to the left side of the front end of the main body 111 of the device, a second transmission rod 424 is movably connected to the third fixing plate 412 through a bearing, and a second transmission gear 413 is fixedly connected to the outer left side of the second transmission rod 424 , the second transmission gear 413 and the second rack plate 411 mesh with each other, the right end of the second transmission rod 424 is fixedly connected with the first bevel gear 414, the bottom end of the device main body 111 is fixedly connected with a fixed bottom plate 415, and the interior of the fixed bottom plate 415 Both sides of the front side are engaged with the limit block 416 , the fixed bottom plate 415 is provided with a chute that cooperates with the limit block 416 , and the bottom end of the limit block 416 is fixedly connected with a receiving cavity 417 , and the front end of the front limit block 416 A third rack plate 418 is fixedly connected, and the fixed bottom plate 415 is provided with a chute that cooperates with the third rack plate 418. A fourth fixed plate 419 is fixedly connected to the left side of the front end of the fixed bottom plate 415, and the fourth fixed plate 419 is movably connected with a first transmission rod 420 through a bearing, a third transmission gear 421 is fixedly connected to the outer middle side of the first transmission rod 420, and the third transmission gear 421 and the third rack plate 418 are meshed with each other, and the first transmission rod The top end of 420 is fixedly connected with a second bevel gear 422, and the second bevel gear 422 and the first bevel gear 414 are meshed with each other. The right ends of the two sets of limit blocks 416 are welded with a third spring 423, and two sets of third springs 423 The other end is welded on the fixed bottom plate 415, and the right end of the fixed bottom plate 415 is fixedly connected to the left end of the sleeve rod 216. This design is convenient for collecting the dust generated by cleaning, avoiding the dust falling during the cleaning process, so as to give people below bring inconvenience.

固定底板415前方左侧设置有连接块425,且连接块425后端上下两侧分别固定连接在固定底板415前端上下两侧上,采用这种设计便于使得对固定底板415前端左侧进一步固定,使得固定底板415前端左侧更加稳定,便于装置正常运转。A connecting block 425 is arranged on the front left side of the fixed bottom plate 415, and the upper and lower sides of the rear end of the connecting block 425 are fixedly connected to the upper and lower sides of the front end of the fixed bottom plate 415 respectively. This design is convenient to further fix the left side of the front end of the fixed bottom plate 415. This makes the left side of the front end of the fixed bottom plate 415 more stable, which facilitates the normal operation of the device.

限位机构5包括活动挡板511,收纳腔417内部左侧插设有活动挡板511,且收纳腔417左端下侧固定连接有第二固定块512,第二固定块512内部插设有限位卡块513,且收纳腔417左端中部固定连接有第三连接板514,限位卡块513顶端固定连接有第二限位杆515,且第二限位杆515顶端延伸至第三连接板514内部,第三连接板514内部开设有与第二限位杆515相互配合的槽口,且第二限位杆515外部套设有第四弹簧516,第四弹簧516两端分别焊接在第三连接板514和限位卡块513上,采用这种设计便于使得对活动挡板511进行锁定和解除锁定,从而便于后续对收纳腔417内部尘土的清洁操作。The limiting mechanism 5 includes a movable baffle 511 , a movable baffle 511 is inserted in the left side of the storage cavity 417 , and a second fixing block 512 is fixedly connected to the lower side of the left end of the storage cavity 417 , and a limiter is inserted inside the second fixing block 512 The blocking block 513 is fixedly connected with a third connecting plate 514 in the middle of the left end of the receiving cavity 417 , and a second limiting rod 515 is fixedly connected to the top of the limiting blocking block 513 , and the top of the second limiting rod 515 extends to the third connecting board 514 Inside, the third connecting plate 514 is provided with a notch that cooperates with the second limit rod 515, and the second limit rod 515 is sleeved with a fourth spring 516, and both ends of the fourth spring 516 are welded to the third On the connecting plate 514 and the limiting block 513 , this design facilitates locking and unlocking of the movable baffle 511 , so as to facilitate subsequent cleaning operations on the dust inside the storage cavity 417 .

活动挡板511顶端右侧固定连接有挡块517,采用这种设计便于对活动挡板511进行限位,且活动挡板511右端胶粘有密封垫518,采用这种设计便于使得活动挡板511与收纳腔417更加贴合,避免尘土落下。A stopper 517 is fixedly connected to the top right side of the movable baffle 511. This design is convenient to limit the movable baffle 511, and a gasket 518 is glued to the right end of the movable baffle 511. This design is convenient for making the movable baffle 511. The 511 fits better with the storage cavity 417 to prevent dust from falling.

一种基于BIM的现场施工管理用施工区域监控装置的使用方法:A method of using a construction area monitoring device for on-site construction management based on BIM:

S1:按动开关113,电机316工作,毛刷324和海绵块323向下运动,对装置主体111镜面进行清洁;S1: Press the switch 113, the motor 316 works, the brush 324 and the sponge block 323 move downward, and the mirror surface of the device main body 111 is cleaned;

S2:毛刷324和海绵块323向下运动,收纳腔417打开,对掉落的尘土进行收集;S2: The brush 324 and the sponge block 323 move downward, the receiving cavity 417 is opened, and the falling dust is collected;

S3:再次按动开关113,电机316停止工作,第一弹簧314和第三弹簧423恢复形变,毛刷324、海绵块323和收纳腔417复位;S3: Press the switch 113 again, the motor 316 stops working, the first spring 314 and the third spring 423 restore their deformation, and the brush 324, the sponge block 323 and the storage cavity 417 are reset;

S4:对安装角度调节,转动套杆216,装置主体111角度改变,转动螺栓215完成固定;S4: To adjust the installation angle, rotate the sleeve rod 216, the angle of the device main body 111 is changed, and the bolt 215 is rotated to complete the fixing;

S5:对收纳腔417内部清洁,向上拉动限位卡块513,再拉动活动挡板511,收纳腔417内部尘土落下。S5 : Clean the inside of the storage cavity 417 , pull the limit block 513 upwards, and then pull the movable baffle 511 , and the dust inside the storage cavity 417 falls.

工作原理:当需要对装置主体111镜头进行清洁时,只需按动开关113上侧按钮,使得电机316工作,当电机316工作时会带动第一传动齿轮319转动,当第一传动齿轮319转动时会带动第一齿条板318向下运动,当第一齿条板318向下运动时会带动第二固定杆317向下运动,当第一齿条板318向下运动时会带动第二连接板315向下运动,当第二连接板315向下运动时会带动毛刷324和海绵块323向下运动,当毛刷324和海绵块323运动时会使得海绵块323和海绵块323与装置主体111抵接,使得海绵块323和毛刷324向左运动,从而使得第二弹簧321发生形变,带动海绵块323与毛刷324与装置主体111镜头紧紧抵接,从而进行清洁,当第二连接板315向下运动的同时还会带动两组滑动块312向下运动,当两组滑动块312向下运动时还会使得两组第一弹簧314发生形变,当第一齿条板318到达底端时此时第一传动齿轮319继续转动,当由于第一齿条板318与第一传动齿轮319已不再继续啮合,从而使得第二固定杆317无法继续向下运动,从而完成清洁。Working principle: When it is necessary to clean the lens of the main body 111 of the device, just press the upper button of the switch 113 to make the motor 316 work. When the motor 316 works, it will drive the first transmission gear 319 to rotate. When the first transmission gear 319 rotates When the first rack plate 318 moves downward, it drives the second fixing rod 317 to move downward, and when the first rack plate 318 moves downward, it drives the second fixing rod 317 to move downward. The connecting plate 315 moves downward, and when the second connecting plate 315 moves downward, it will drive the brush 324 and the sponge block 323 to move downward, and when the brush 324 and the sponge block 323 move, the sponge block 323 and the sponge block 323 will The device body 111 abuts, so that the sponge block 323 and the brush 324 move to the left, so that the second spring 321 is deformed, and drives the sponge block 323 and the brush 324 to tightly abut the lens of the device body 111, so as to clean. When the second connecting plate 315 moves downward, it also drives the two sets of sliding blocks 312 to move downward. When the two sets of sliding blocks 312 move downward, the two sets of first springs 314 are deformed. When the 318 reaches the bottom end, the first transmission gear 319 continues to rotate. When the first rack plate 318 and the first transmission gear 319 are no longer meshed, the second fixed rod 317 cannot continue to move downward. clean.

当滑动块312向下运动时还会带动第二齿条板411向下运动,当第二齿条板411向下运动时还会带动第二传动齿轮413逆时针转动,当第二传动齿轮413逆时针转动时还会带动第二传动杆424逆时针转动,当第二传动杆424逆时针转动时会带动第一锥形齿轮414逆时针转动,当第一锥形齿轮414逆时针转动时会带动第二锥形齿轮422逆时针转动,当第二锥形齿轮422逆时针转动时还会带动第一传动杆420逆时针转动,当第一传动杆420逆时针转动时会带动第三传动齿轮421逆时针转动,当第三传动齿轮421逆时针转动时会使得第三齿条板418向左运动,当第三齿条板418向左运动会使得限位块416向左运动,从而使得收纳腔417打开,对上方掉落的尘土进行收集,当限位块416向左运动的同时还会使得两组第三弹簧423发生形变,由于滑动块312向下运动时第二齿条板411即可同时向下运动,从而完成同步打开,当完成清洁时,再按动开关113下侧的按钮使得电机316停止工作,此时两组第一弹簧314和两组第三弹簧423处于形变状态,当电机316停止工作后,两组第一弹簧314和两组第三弹簧423即可恢复形变,使得整个装置恢复初始位置。When the sliding block 312 moves downward, it will also drive the second rack plate 411 to move downward, and when the second rack plate 411 moves downward, it will also drive the second transmission gear 413 to rotate counterclockwise. When the second transmission rod 424 rotates counterclockwise, it will drive the second transmission rod 424 to rotate counterclockwise. When the second transmission rod 424 rotates counterclockwise, it will drive the first bevel gear 414 to rotate counterclockwise. It drives the second bevel gear 422 to rotate counterclockwise. When the second bevel gear 422 rotates counterclockwise, it also drives the first transmission rod 420 to rotate counterclockwise. When the first transmission rod 420 rotates counterclockwise, it drives the third transmission gear. 421 rotates counterclockwise, when the third transmission gear 421 rotates counterclockwise, the third rack plate 418 moves to the left, and when the third rack plate 418 moves to the left, the limit block 416 moves to the left, thereby making the storage cavity 417 is opened to collect the dust falling from above. When the limit block 416 moves to the left, the two sets of third springs 423 will be deformed. Since the sliding block 312 moves downward, the second rack plate 411 can be At the same time, it moves downward to complete the synchronous opening. When cleaning is completed, press the button on the lower side of the switch 113 to stop the motor 316 from working. At this time, the two sets of first springs 314 and the two sets of third springs 423 are in a deformed state. After the motor 316 stops working, the two sets of first springs 314 and the two sets of third springs 423 can restore their deformation, so that the entire device can return to its original position.

当需要对装置主体111的安装角度进行调节时,首先转动套杆216带动装置主体111进行同步转动,当装置主体111到达合适的位置后,只需再逆时针转动螺栓215,使得螺栓215向后,当螺栓215向后运动时会带动滑块214向后运动,当滑块214与套杆216紧紧抵接时即可停止转动,完成套杆216的锁定从而完成角度调节。When the installation angle of the device main body 111 needs to be adjusted, firstly, the sleeve rod 216 is rotated to drive the device main body 111 to rotate synchronously. When the device main body 111 reaches the proper position, the bolt 215 only needs to be rotated counterclockwise to make the bolt 215 backward. , when the bolt 215 moves backwards, it will drive the sliding block 214 to move backwards, when the sliding block 214 is in close contact with the sleeve rod 216, the rotation can be stopped, and the locking of the sleeve rod 216 is completed to complete the angle adjustment.

当需要对收纳腔417收集的尘土进行清洁时,首先向上拉动限位卡块513,当向上拉动限位卡块513时会使得限位卡块513向上运动,从而使得限位卡块513下端解除对活动挡板511的限位,同时还会使得第四弹簧516发生形变,然后在向外侧拉动活动挡板511,即可将收纳腔417打开,从而使得内部的尘土落下,完成清洁,然后在松开限位卡块513此时限位卡块513与活动挡板511抵接,在向内部推动活动挡板511使得活动挡板511恢复初始位置,从而解除限位卡块513底端与活动挡板511的抵接,使得第四弹簧516恢复形变,从而再次完成锁定。When it is necessary to clean the dust collected in the storage cavity 417 , firstly pull the limit block 513 upward, and when the limit block 513 is pulled upward, the limit block 513 will move upward, so that the lower end of the limit block 513 is released The limit of the movable baffle 511 will also deform the fourth spring 516, and then the movable baffle 511 is pulled to the outside to open the storage cavity 417, so that the internal dust falls, and the cleaning is completed. Release the limit block 513 at this time, the limit block 513 is in contact with the movable baffle 511, and the movable baffle 511 is pushed inward to make the movable baffle 511 return to the original position, thereby releasing the bottom end of the limit block 513 and the movable block. The abutment of the plate 511 causes the fourth spring 516 to return to its deformation, thereby completing the locking again.

对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, but that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments are to be regarded in all respects as illustrative and not restrictive, and the scope of the invention is to be defined by the appended claims rather than the foregoing description, which are therefore intended to fall within the scope of the claims. All changes within the meaning and scope of the equivalents of , are included in the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.

Claims (6)

1. The utility model provides a construction area monitoring device for site operation management based on BIM, includes device main part (111), its characterized in that: the device is characterized in that a mounting column (112) is arranged below the device main body (111), a switch (113) is fixedly mounted at the front end of the mounting column (112), an angle adjusting mechanism (2) is arranged above the mounting column (112), a cleaning mechanism (3) is arranged on the left side of the angle adjusting mechanism (2), a containing mechanism (4) is arranged below the cleaning mechanism (3), a limiting mechanism (5) is arranged on the left side of the containing mechanism (4), the cleaning mechanism (3) comprises a first fixing block (311), the front side and the rear side of the device main body (111) are both fixedly connected with the first fixing block (311), sliding blocks (312) are clamped inside the two groups of first fixing blocks (311), first fixing rods (313) are both fixedly connected to the bottom inside the first fixing block (311), and sliding blocks (312) are both sleeved outside the two groups of first fixing rods (313), the inner parts of the two groups of first fixing blocks (311) are provided with sliding grooves matched with the sliding blocks (312), the outer upside of the two groups of first fixing rods (313) is sleeved with a first spring (314), the two ends of the first spring (314) are respectively welded on the sliding blocks (312) and the first fixing blocks (311), one side of the two groups of sliding blocks (312) close to each other is fixedly connected with a second connecting plate (315), the middle part of the top end of the device main body (111) is fixedly provided with a motor (316), the middle part of the top end of the second connecting plate (315) is fixedly connected with a second fixing rod (317), the inner front side of the second fixing rod (317) is fixedly connected with a first rack plate (318), the outer part of an output shaft of the motor (316) is fixedly connected with a first transmission gear (319), the first transmission gear (319) is mutually meshed with the first rack plate (318), and first limiting rods (320) are inserted on the front side and the rear side of the left end of the second connecting plate (315), the two groups of first limiting rods (320) are externally sleeved with second springs (321), two ends of the two groups of second springs (321) are respectively welded on a second connecting plate (315) and the first limiting rods (320), a second fixing plate (322) is fixedly connected to the right end of each first limiting rod (320), a sponge block (323) is fixedly connected to the upper side of the right end of each second fixing plate (322), a brush (324) is fixedly connected to the lower side of the right end of each second fixing plate (322), the accommodating mechanism (4) comprises a second rack plate (411), the front side of the sliding block (312) is fixedly connected with the second rack plate (411), the front side of the first fixing block (311) is provided with a sliding groove matched with the second rack plate (411), a third fixing plate (412) is fixedly connected to the left side of the front end of the device main body (111), and a second transmission rod (424) is movably connected to the third fixing plate (412) through a bearing, a second transmission gear (413) is fixedly connected to the left side of the outside of the second transmission rod (424), the second transmission gear (413) is meshed with the second rack plate (411), a first bevel gear (414) is fixedly connected to the right end of the second transmission rod (424), a fixed base plate (415) is fixedly connected to the bottom end of the device main body (111), limiting blocks (416) are clamped on two sides of the front side of the inside of the fixed base plate (415), sliding grooves matched with the limiting blocks (416) are formed in the fixed base plate (415), a containing cavity (417) is fixedly connected to the bottom end of the limiting blocks (416), a third rack plate (418) is fixedly connected to the front side of the limiting blocks (416), sliding grooves matched with the third rack plate (418) are formed in the fixed base plate (415), a fourth fixing plate (419) is fixedly connected to the left side of the front end of the fixed base plate (415), and have first transfer line (420) through bearing swing joint on fourth fixed plate (419), first transfer line (420) outside inboard fixedly connected with third drive gear (421), and third drive gear (421) and third rack board (418) intermeshing, first transfer line (420) top fixedly connected with second conical gear (422), and second conical gear (422) and first conical gear (414) intermeshing, two sets of stopper (416) right-hand member all welds third spring (423), and is two sets of third spring (423) other end all welds on PMKD (415), PMKD (415) right-hand member fixed connection is on loop bar (216) left end.
2. The BIM-based construction area monitoring device for field construction management according to claim 1, wherein: angle adjustment mechanism (2) are including first connecting plate (211), first connecting plate (211) of side fixedly connected with on erection column (112) rear end, and first fixed plate (212) of side fixedly connected with on erection column (112) front end, first connecting plate (211) front end middle part fixedly connected with connecting rod (213), and the outside cover of connecting rod (213) is equipped with loop bar (216), the block has slider (214) on first fixed plate (212), and sets up the notch of mutually supporting with slider (214) on first fixed plate (212), slider (214) front end middle part threaded connection has bolt (215), and bolt (215) rear end runs through inside slider (214) and extend to connecting rod (213), and connecting rod (213) inside set up the screw hole of mutually supporting with bolt (215).
3. The BIM-based construction area monitoring device for field construction management according to claim 2, wherein: the left side in front of the fixed bottom plate (415) is provided with a connecting block (425), and the upper side and the lower side of the rear end of the connecting block (425) are respectively and fixedly connected to the upper side and the lower side of the front end of the fixed bottom plate (415).
4. The BIM-based construction area monitoring device for field construction management according to claim 3, wherein: stop gear (5) are including adjustable fender (511), it is equipped with adjustable fender (511) to accomodate the inside left side of chamber (417) and insert, and accomodate chamber (417) left end downside fixedly connected with second fixed block (512), inside the inserting of second fixed block (512) is equipped with spacing fixture block (513), and accomodates chamber (417) left end middle part fixedly connected with third connecting plate (514), spacing fixture block (513) top fixedly connected with second gag lever post (515), and second gag lever post (515) top extend to inside third connecting plate (514), the notch of mutually supporting with second gag lever post (515) is seted up to third connecting plate (514) inside, and the outside cover of second gag lever post (515) is equipped with fourth spring (516), fourth spring (516) both ends are welded respectively on third connecting plate (514) and spacing fixture block (513).
5. The BIM-based construction area monitoring device for field construction management according to claim 4, wherein: the right side of the top end of the movable baffle plate (511) is fixedly connected with a stop block (517), and a sealing gasket (518) is glued at the right end of the movable baffle plate (511).
6. The use method of the BIM-based construction area monitoring device for field construction management according to any one of claims 4 to 5, comprising the steps of:
s1: the switch (113) is pressed, the motor (316) works, and the brush (324) and the sponge block (323) move downwards to clean the mirror surface of the device main body (111);
s2: the brush (324) and the sponge block (323) move downwards, the containing cavity (417) is opened, and the fallen dust is collected;
s3: the switch (113) is pressed again, the motor (316) stops working, the first spring (314) and the third spring (423) restore to deform, and the brush (324), the sponge block (323) and the containing cavity (417) reset;
s4: adjusting the installation angle, rotating the loop bar (216), changing the angle of the device main body (111), and rotating the bolt (215) to complete the fixation;
s5: the interior of the containing cavity (417) is cleaned, the limiting clamping block (513) is pulled upwards, then the movable baffle (511) is pulled, and dust in the containing cavity (417) falls down.
CN202110524246.9A 2021-05-13 2021-05-13 A construction area monitoring device for on-site construction management based on BIM Active CN113262995B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110524246.9A CN113262995B (en) 2021-05-13 2021-05-13 A construction area monitoring device for on-site construction management based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110524246.9A CN113262995B (en) 2021-05-13 2021-05-13 A construction area monitoring device for on-site construction management based on BIM

Publications (2)

Publication Number Publication Date
CN113262995A CN113262995A (en) 2021-08-17
CN113262995B true CN113262995B (en) 2022-05-20

Family

ID=77230708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110524246.9A Active CN113262995B (en) 2021-05-13 2021-05-13 A construction area monitoring device for on-site construction management based on BIM

Country Status (1)

Country Link
CN (1) CN113262995B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016187515A (en) * 2015-03-30 2016-11-04 三菱電機株式会社 Filter cleaning device for heat exchanger of show case and show case
CN107091175A (en) * 2017-05-09 2017-08-25 国网山东省电力公司莱芜供电公司 A kind of clean energy resource generating means
CN109526305A (en) * 2018-11-21 2019-03-29 广东海洋大学 A kind of Rice Salt alkalinity germplasm screening experimental bench that work efficiency is high
CN211629591U (en) * 2020-03-31 2020-10-02 扬中市神华电仪设备有限公司 A combined switch cabinet

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NZ579897A (en) * 2008-09-24 2010-07-30 Assa Abloy Australia Pty Ltd Closure system for casement window with cranking assembly and corner gear to connect axles
KR20110075779A (en) * 2009-12-29 2011-07-06 삼성전자주식회사 Filter cleaner
JP6785608B2 (en) * 2016-09-30 2020-11-18 株式会社河合楽器製作所 Keyboard instrument stroke adjustment device
CN207329122U (en) * 2017-08-26 2018-05-08 王波 A kind of medicinal blood stores transporting equipment
CN212617447U (en) * 2018-09-17 2021-02-26 江苏华康消防科技有限公司 Security protection type surveillance camera head
CN109098539A (en) * 2018-11-07 2018-12-28 浙江天宇安防科技有限公司 Fingerprint Lock draws cover panel self closing device
JP6555438B1 (en) * 2019-03-05 2019-08-07 青島欧昇灯具有限公司 LED light for convenient installation
CN110371438B (en) * 2019-07-23 2021-01-12 桂林圆满医学科技有限公司 Stem cell transport case
CN110719387A (en) * 2019-09-08 2020-01-21 宁波鄞州易安智能停车服务有限公司 License plate recognition camera for intelligent parking
CN213018393U (en) * 2019-12-23 2021-04-20 西软软件股份有限公司 Artificial intelligence type monitor
CN111480948B (en) * 2020-05-03 2021-12-17 禧玛诺(连云港)实业有限公司 Smearing device with quantitative glue outlet structure based on shoemaking
CN212278297U (en) * 2020-05-08 2021-01-01 邵鑫鑫 Dead-angle-free monitoring probe for security
CN212537664U (en) * 2020-06-18 2021-02-12 谈红艳 LED illuminating lamp convenient for adjusting illumination angle
CN212342196U (en) * 2020-06-22 2021-01-12 杭州韩工科技有限公司 Connecting device of LED support and LED screen
CN111973355A (en) * 2020-08-17 2020-11-24 于彦芳 Postoperative nursing device and nursing sick bed are intervene to tumour
CN112008674A (en) * 2020-08-18 2020-12-01 贵州电网有限责任公司 Combined tool box for emergency repair
CN212812050U (en) * 2020-10-13 2021-03-26 青岛科技大学 5G on-line monitoring device
CN112283523A (en) * 2020-10-28 2021-01-29 林静 Community nursing is with preliminary examination device
CN112387656A (en) * 2020-10-30 2021-02-23 广东海洋大学 Automatic rotary dust removal device capable of preventing circuit winding for plate processing
CN112547606A (en) * 2020-11-19 2021-03-26 王鹏博 Cleaning device and cleaning method for instrument for orthopedics department

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016187515A (en) * 2015-03-30 2016-11-04 三菱電機株式会社 Filter cleaning device for heat exchanger of show case and show case
CN107091175A (en) * 2017-05-09 2017-08-25 国网山东省电力公司莱芜供电公司 A kind of clean energy resource generating means
CN109526305A (en) * 2018-11-21 2019-03-29 广东海洋大学 A kind of Rice Salt alkalinity germplasm screening experimental bench that work efficiency is high
CN211629591U (en) * 2020-03-31 2020-10-02 扬中市神华电仪设备有限公司 A combined switch cabinet

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
净化器滤芯装置的创新设计及模具开发;陈志超等;《模具制造》;20200408(第04期);全文 *

Also Published As

Publication number Publication date
CN113262995A (en) 2021-08-17

Similar Documents

Publication Publication Date Title
CN113262995B (en) A construction area monitoring device for on-site construction management based on BIM
CN112554086A (en) Warning sign device that river course desilting was used
CN114647019A (en) Geological disaster monitoring is with rainfall monitoring devices who has hierarchical accomodation
CN209861004U (en) Wide-angle monitoring network camera
CN216225685U (en) CT cleaning device convenient to install and used for hospital imaging department
CN214756521U (en) Wisdom building site panorama monitoring device
CN113760051B (en) Visual customization software research and development equipment of assembled building
CN113290491A (en) False tooth processing multi-angle polishing machine capable of synchronously removing dust
CN204740274U (en) Visual distribution meter box
CN114009889A (en) Building engineering manual consumption measurement system
CN210337398U (en) Automatic cleaning device for blackboard
CN112165814A (en) Dustproof automatic dust removal network cabinet and dust removal method thereof
CN213585689U (en) Solar photovoltaic panel with self-cleaning function
CN220732888U (en) Security protection infrared camera based on thing networking
CN212969853U (en) Security protection camera with protective structure for district
CN211146924U (en) Building structure integrating solar energy and building
CN213398418U (en) Decoration equipment formaldehyde check out test set
CN212900551U (en) Cell monitoring camera with cleaning function
CN221812379U (en) Adjustable photovoltaic panel bracket
CN218957191U (en) Face identification acquisition authentication equipment
CN222553090U (en) Screw fastener processingequipment with chip removal structure
CN215499023U (en) Novel network tester
CN213279990U (en) Size-adjustable intelligent distribution frame for construction engineering
CN219389201U (en) Adjustable display device
CN216053111U (en) Quick face identification compares all-in-one

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant